CN112103830A - Medium/high voltage centralized control prefabricated cabin for energy storage power station - Google Patents

Medium/high voltage centralized control prefabricated cabin for energy storage power station Download PDF

Info

Publication number
CN112103830A
CN112103830A CN202011078929.8A CN202011078929A CN112103830A CN 112103830 A CN112103830 A CN 112103830A CN 202011078929 A CN202011078929 A CN 202011078929A CN 112103830 A CN112103830 A CN 112103830A
Authority
CN
China
Prior art keywords
cabinet
energy storage
storage power
power station
centralized control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011078929.8A
Other languages
Chinese (zh)
Inventor
林伟
姚映青
王业林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Guoxuan New Energy Technology Co Ltd
Original Assignee
Nantong Guoxuan New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Guoxuan New Energy Technology Co Ltd filed Critical Nantong Guoxuan New Energy Technology Co Ltd
Priority to CN202011078929.8A priority Critical patent/CN112103830A/en
Publication of CN112103830A publication Critical patent/CN112103830A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B7/00Enclosed substations, e.g. compact substations
    • H02B7/06Distribution substations, e.g. for urban network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/12Monitoring network conditions, e.g. electrical magnitudes or operational status
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/13Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network
    • H02J13/1321Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network using a wired telecommunication network or a data transmission bus
    • H02J13/1323Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network using a wired telecommunication network or a data transmission bus using optical fibres
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in networks by storage of energy
    • H02J3/32Arrangements for balancing of the load in networks by storage of energy using batteries or super capacitors with converting means

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种储能电站用中/高压集控预制舱,它包括集装箱箱体,由开关室和集控室拼接而成,开关室和集控室中间设置有应急通道门,开关室内设有一次设备组,用于在储能电站充放电过程中接收和输送电能;集控室内设有二次设备组、储能电站能量管理系统以及火灾报警系统,二次设备组对一次设备进行测控、保护,集控室内的储能电站能量管理与储能电站的最高级电池管理系统、双向逆变器连接,储能电站能量管理系统负责管理储能电站充放电、升压逆变过程,火灾报警系统对全站消防、通讯、监控进行管理。本产品适用于大容量储能电站、变电站与储能电站距离较远等情况,操作人员可于舱内对储能电站就地进行调控,便于电站的运行、维护和管理。

Figure 202011078929

The invention discloses a medium/high voltage centralized control prefabricated cabin for an energy storage power station, which comprises a container box and is formed by splicing a switch room and a centralized control room. An emergency access door is arranged between the switch room and the centralized control room, and the switch room is provided with an emergency access door. The primary equipment group is used to receive and transmit electric energy during the charging and discharging process of the energy storage power station; the centralized control room is equipped with a secondary equipment group, an energy management system of the energy storage power station and a fire alarm system, and the secondary equipment group monitors and controls the primary equipment. Protection, the energy management of the energy storage power station in the centralized control room is connected to the highest level battery management system and bidirectional inverter of the energy storage power station. The energy management system of the energy storage power station is responsible for managing the charging and discharging process of the energy storage power station, boosting and inversion process, and fire alarm. The system manages the fire protection, communication and monitoring of the whole station. This product is suitable for large-capacity energy storage power stations, substations and energy storage power stations that are far away. The operator can control the energy storage power station on the spot in the cabin, which is convenient for the operation, maintenance and management of the power station.

Figure 202011078929

Description

一种储能电站用中/高压集控预制舱A medium/high voltage centralized control prefabricated cabin for energy storage power station

技术领域technical field

本发明涉及储能技术领域,尤其涉及一种储能电站用中/高压集控预制舱。The invention relates to the technical field of energy storage, in particular to a medium/high voltage centralized control prefabricated cabin for an energy storage power station.

背景技术Background technique

随着全球石油、煤炭等传统能源短缺问题的日益突出,全球各国对太阳能、风能等新能源的大力开发和利用具有重要意义,其中,储能电站作为一种有效存储和利用能源的设备,在此背景下应运而生。With the increasing shortage of traditional energy sources such as oil and coal in the world, it is of great significance for countries around the world to vigorously develop and utilize new energy sources such as solar energy and wind energy. It came into being against this background.

储能电站可利用峰谷价差为用户节约电费,可为电网运行提供调峰、调频、需求响应支持等服务,还可用作应急备用电源,目前,储能电站主要由仓储式和集装箱式。其中,集装箱式储能系统,电池舱箱体一般按20尺、40尺等标准箱设计,而中/高压控制舱因受电站的规模、场地及用户或电力系统接入要求等的影响,一般为非标准集装箱,当系统接入电压等级提高或电站规模增大时,中/高压控制舱的设计则需要进行较大的改动,缺乏通用性。Energy storage power stations can use the peak-valley price difference to save electricity costs for users, provide services such as peak regulation, frequency regulation, and demand response support for grid operation, and can also be used as emergency backup power sources. Among them, the containerized energy storage system, the battery compartment box is generally designed according to 20 feet, 40 feet and other standard boxes, and the medium/high voltage control room is generally affected by the scale of the power station, site and user or power system access requirements, etc. For non-standard containers, when the system access voltage level is increased or the scale of the power station is increased, the design of the medium/high voltage control cabin needs to be greatly modified, and it lacks versatility.

发明内容SUMMARY OF THE INVENTION

为了解决上述技术所存在的不足之处,本发明提供了一种储能电站用中/高压集控预制舱。In order to solve the shortcomings of the above technologies, the present invention provides a medium/high voltage centralized control prefabricated cabin for an energy storage power station.

为了解决以上技术问题,本发明采用的技术方案是:一种储能电站用中/高压集控预制舱,它包括集装箱箱体,集装箱箱体由开关室和集控室在宽度方向上拼接而成,开关室和集控室中间设置有应急通道门,开关室内设有一次设备组,一次设备组包括出线柜、计量柜、PT柜、进线柜、站用变,出线柜、计量柜、PT柜、进线柜、站用变通过母线依次连接,出线柜接入附近变电站低压侧母线,进线柜通过电缆与供电侧相连接,一次设备组用于在储能电站充放电过程中接收和输送电能;集控室内设有二次设备组、储能电站能量管理系统以及火灾报警系统,集控室内的二次设备组包括交流电源柜、交流馈线柜、安全自动化柜、远动通讯柜、安防屏柜、直流电源柜、蓄电池柜、备用柜一、备用柜二、操作台、模拟屏,二次设备组对一次设备进行测控、保护,集控室内的储能电站能量管理系统包括能量管理系统柜,能量管理系统柜与储能电站的最高级电池管理系统、双向逆变器连接,储能电站能量管理系统负责管理储能电站充放电、升压逆变过程,火灾报警系统对全站消防、通讯、监控进行管理。In order to solve the above technical problems, the technical solution adopted in the present invention is: a medium/high voltage centralized control prefabricated cabin for an energy storage power station, which includes a container box, and the container box is formed by splicing a switch room and a centralized control room in the width direction , There is an emergency access door between the switch room and the centralized control room, and there is a primary equipment group in the switch room. The primary equipment group includes outgoing cabinets, measuring cabinets, PT cabinets, incoming cabinets, station transformers, outgoing cabinets, measuring cabinets, PT cabinets The incoming cabinet and the station transformer are connected in sequence through the busbar, the outgoing cabinet is connected to the low-voltage side busbar of the nearby substation, the incoming cabinet is connected to the power supply side through the cable, and the primary equipment group is used for receiving and transmitting during the charging and discharging process of the energy storage station Electric energy; the centralized control room is equipped with secondary equipment group, energy management system of energy storage power station and fire alarm system. The secondary equipment group in the centralized control room includes AC power supply cabinet, AC feeder cabinet, safety automation cabinet, telecontrol communication cabinet, security protection Screen cabinet, DC power cabinet, battery cabinet, backup cabinet 1, backup cabinet 2, operation console, simulation screen, secondary equipment group to measure, control and protect primary equipment. The energy management system of the energy storage power station in the centralized control room includes the energy management system Cabinet, energy management system cabinet is connected with the highest level battery management system and bidirectional inverter of the energy storage power station. The energy management system of the energy storage power station is responsible for managing the charging and discharging, boosting and inversion process of the energy storage power station, and the fire alarm system is responsible for the fire protection of the whole station. , communication, monitoring management.

进一步地,交流电源柜和交流馈线柜相邻摆放,交流电源柜内具有ATS双电源自动切换装置。Further, the AC power supply cabinet and the AC feeder cabinet are placed adjacent to each other, and the AC power supply cabinet is provided with an ATS dual power automatic switching device.

进一步地,安全自动化柜中具有公用测控装置、频率电压紧急控制装置、电能质量在线监测装置以及储能电站互动终端;电能质量在线监测装置与开关室内的出线柜连接,测量交流电流和电压回路;频率电压紧急控制装置与开关室内的出线柜连接,保护交流电流和电压回路。Further, the safety automation cabinet is provided with a public monitoring and control device, a frequency and voltage emergency control device, a power quality online monitoring device, and an interactive terminal of an energy storage power station; the power quality online monitoring device is connected to the outlet cabinet in the switch room to measure the AC current and voltage loop; The frequency and voltage emergency control device is connected to the outlet cabinet in the switch room to protect the AC current and voltage circuit.

进一步地,远动通讯柜通过线缆、网线与公用测控装置连接,远动通讯柜通过光纤与远方调度中心连接。Further, the telecontrol communication cabinet is connected to the public monitoring and control device through cables and network cables, and the telecontrol communication cabinet is connected to the remote dispatch center through optical fibers.

进一步地,安防屏柜内设置有数字网络硬盘录像机、硬盘、显示器、核心交换机。Further, the security screen cabinet is provided with a digital network hard disk video recorder, a hard disk, a display, and a core switch.

进一步地,直流电源柜和蓄电池柜相邻摆放,直流电源柜上具有电源切换装置。Further, the DC power supply cabinet and the storage battery cabinet are placed adjacent to each other, and the DC power supply cabinet is provided with a power switching device.

进一步地,开关室和集控室均设置有整体式集装箱空调,开关室和集控室舱顶均设置有烟感器、温感器、网络半球摄像机。Further, both the switch room and the centralized control room are provided with integral container air conditioners, and the cabin roofs of the switch room and the centralized control room are provided with smoke detectors, temperature sensors, and network dome cameras.

进一步地,集装箱箱体的表面设有防腐涂层,集装箱箱体的四周侧壁和顶壁均敷设有夹芯板岩棉保温层。Further, the surface of the container body is provided with an anti-corrosion coating, and the surrounding side walls and the top wall of the container body are provided with a sandwich panel rock wool insulation layer.

进一步地,火灾报警系统内设置有消防主机、输入/输出模块、短路隔离器,输入/输出模块与消防主机相连接,短路隔离器安装在火灾报警系统的主线和支线的交叉处。Further, the fire alarm system is provided with a fire fighting host, an input/output module and a short-circuit isolator, the input/output module is connected with the fire fighting host, and the short-circuit isolator is installed at the intersection of the main line and the branch line of the fire alarm system.

本发明公开了一种储能电站用中/高压集控预制舱,本集控预制舱可用于10kV、35kV电压等级接入的储能电站,同时也适用于大容量储能电站、变电站与储能电站距离较远等情况。操作人员可于舱内对储能电站就地进行调控,便于电站的运行、维护和管理。The invention discloses a medium/high voltage centralized control prefabricated cabin for an energy storage power station. The centralized control prefabricated cabin can be used for energy storage power stations connected to voltage levels of 10kV and 35kV, and is also suitable for large-capacity energy storage power stations, substations and storage power stations. The power station is far away, etc. The operator can control the energy storage power station on the spot in the cabin, which is convenient for the operation, maintenance and management of the power station.

附图说明Description of drawings

图1为本发明的结构组成示意图。Figure 1 is a schematic diagram of the structure of the present invention.

图2为图1的左视图。FIG. 2 is a left side view of FIG. 1 .

图中:1、装箱箱体;2、开关室;3、集控室;4、应急通道门;5、计量柜;6、PT柜;7、进线柜;8、站用变;9、交流电源柜;10、交流馈线柜;11、安全自动化柜;12、远动通讯柜;13、安防屏柜;14、直流电源柜;15、蓄电池柜;16、备用柜一;17、备用柜二;18、操作台;19、模拟屏;20、火灾报警系统;21、能量管理系统柜;22、出线柜;23、逃生门;24、百叶窗。In the figure: 1. Packing box; 2. Switch room; 3. Central control room; 4. Emergency access door; 5. Measuring cabinet; 6. PT cabinet; 7. Line entry cabinet; 8. Station transformer; 9. AC power cabinet; 10. AC feeder cabinet; 11. Safety automation cabinet; 12. Telecontrol communication cabinet; 13. Security screen cabinet; 14. DC power cabinet; 15. Battery cabinet; 16. Backup cabinet 1; 17. Backup cabinet 2; 18, console; 19, simulation screen; 20, fire alarm system; 21, energy management system cabinet; 22, outlet cabinet; 23, escape door; 24, shutters.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本发明作进一步详细的说明。The present invention will be described in further detail below with reference to the accompanying drawings and specific embodiments.

如图1和图2所示的储能电站用中/高压集控预制舱,它包括集装箱箱体1,集装箱箱体1由开关室2和集控室3在宽度方向上拼接而成,开关室2和集控室3相对独立且二者中间设置有应急通道门4,开关室2内设有一次设备组,一次设备组包括出线柜22、计量柜5、PT柜6、进线柜7、站用变8,计量柜5采用熔断器手车式,配有经校验的电能表,出线柜22、计量柜5、PT柜6、进线柜7、站用变8通过母线依次连接,出线柜22接入附近变电站低压侧母线,进线柜7通过电缆与供电侧相连接,一次设备组用于在储能电站充放电过程中接收和输送电能;集控室3内设有二次设备组、储能电站能量管理系统以及火灾报警系统20,集控室3内的二次设备组包括交流电源柜9、交流馈线柜10、安全自动化柜11、远动通讯柜12、安防屏柜13、直流电源柜14、蓄电池柜15、备用柜一16、备用柜二17、操作台18、模拟屏19,二次设备组对一次设备进行测控、保护,集控室3内的储能电站能量管理系统包括能量管理系统柜21,能量管理系统柜21与储能电站的最高级电池管理系统、双向逆变器连接,储能电站能量管理系统负责管理储能电站充放电、升压逆变过程,火灾报警系统20对全站消防、通讯、监控进行管理。As shown in Figures 1 and 2, the medium/high voltage centralized control prefabricated cabin for the energy storage power station includes a container box 1. The container box 1 is formed by splicing a switch room 2 and a centralized control room 3 in the width direction. The switch room 2 and the centralized control room 3 are relatively independent and there is an emergency access door 4 between them. The switch room 2 is provided with a primary equipment group. The primary equipment group includes the outlet cabinet 22, the metering cabinet 5, the PT cabinet 6, the inlet cabinet 7, and the station. Transformer 8, metering cabinet 5 adopts fuse handcart type, equipped with a calibrated electric energy meter, outlet cabinet 22, metering cabinet 5, PT cabinet 6, incoming cabinet 7, and station transformer 8 are connected in sequence through the bus bar, and the outgoing wires are connected in turn. The cabinet 22 is connected to the low-voltage side busbar of the nearby substation, and the incoming cabinet 7 is connected to the power supply side through cables. The primary equipment group is used to receive and transmit electric energy during the charging and discharging process of the energy storage station; the central control room 3 is equipped with a secondary equipment group. , energy management system of energy storage power station and fire alarm system 20, secondary equipment group in centralized control room 3 includes AC power supply cabinet 9, AC feeder cabinet 10, safety automation cabinet 11, telecontrol communication cabinet 12, security screen cabinet 13, DC Power supply cabinet 14, battery cabinet 15, backup cabinet 1 16, backup cabinet 2 17, operation console 18, simulation screen 19, the secondary equipment group monitors, controls and protects the primary equipment. The energy management system of the energy storage power station in the centralized control room 3 includes: Energy management system cabinet 21. Energy management system cabinet 21 is connected to the highest-level battery management system and bidirectional inverter of the energy storage power station. The energy management system of the energy storage power station is responsible for managing the charging and discharging of the energy storage power station, boosting and inversion processes, and fire alarms. The system 20 manages the fire protection, communication and monitoring of the whole station.

交流电源柜9和交流馈线柜10相邻摆放,交流电源柜9内具有ATS双电源自动切换装置,同时具备消防分励脱扣功能。The AC power supply cabinet 9 and the AC feeder cabinet 10 are placed adjacent to each other. The AC power supply cabinet 9 is provided with an ATS dual power automatic switching device, and also has the function of fire shunt tripping.

安全自动化柜11中具有公用测控装置、频率电压紧急控制装置、电能质量在线监测装置以及储能电站互动终端;电能质量在线监测装置与开关室2内的出线柜22连接,测量交流电流和电压回路;频率电压紧急控制装置与开关室2内的出线柜22连接,保护交流电流和电压回路;公用测控装置与模拟屏19相连接,公用测控装置同时与计量柜5、PT柜6、出线柜22、站用变8的手车试验位置和工作位置的端子连接,起到采集模拟量、开关量的输入和控制作用。The safety automation cabinet 11 is provided with a public monitoring and control device, a frequency and voltage emergency control device, a power quality online monitoring device, and an interactive terminal of an energy storage power station; the power quality online monitoring device is connected to the outlet cabinet 22 in the switch room 2 to measure the alternating current and voltage loops The frequency and voltage emergency control device is connected to the outlet cabinet 22 in the switch room 2 to protect the AC current and voltage circuit; the public measurement and control device is connected to the analog screen 19, and the public measurement and control device is simultaneously connected with the metering cabinet 5, PT cabinet 6, outlet cabinet 22 , The terminal connection of the handcart test position and the working position of the station transformer 8 plays the role of input and control of the acquisition of analog quantity and switch quantity.

远动通讯柜12通过线缆、网线与公用测控装置连接,远动通讯柜12通过光纤与远方调度中心连接。远动通讯柜12中设置有时钟同步装置、通讯管理装置、交换机、协议转换器,可以定点对时,经规约转换与智能设备进行数据交换,实现与后台系统、调度中心之间遥测、遥信信号的发送和接受。The telecontrol communication cabinet 12 is connected to the public monitoring and control device through cables and network cables, and the telecontrol communication cabinet 12 is connected to the remote dispatch center through optical fibers. The telecontrol communication cabinet 12 is provided with a clock synchronization device, a communication management device, a switch, and a protocol converter, which can be time-synchronized at a fixed point, and exchange data with the intelligent equipment through protocol conversion, so as to realize telemetry and remote communication with the background system and dispatch center. Sending and receiving of signals.

安防屏柜13采用机架式安装,安防屏柜13内设置有数字网络硬盘录像机、硬盘、显示器、核心交换机。全站舱外及各舱内各摄像机采集到的视频数据经交换机通过网线传送汇集至安防屏中的核心交换机,核心交换机与数字网络硬盘录像机通过超六类网线连接,数字网络硬盘录像机采集数据后进行编码,产生图像,图像存储于硬盘中,最终通过安防屏柜13的显示器查看图像,对全站起到视频监控的作用。The security screen cabinet 13 is rack-mounted, and the security screen cabinet 13 is provided with a digital network hard disk video recorder, a hard disk, a display, and a core switch. The video data collected by the cameras outside the cabin and in each cabin of the whole station is transmitted through the switch through the network cable and collected to the core switch in the security screen. Encoding is performed to generate an image, the image is stored in the hard disk, and the image is finally viewed through the display of the security screen cabinet 13, which plays a role in video surveillance for the entire station.

直流电源柜14和蓄电池柜15相邻摆放,直流电源柜14上具有电源切换装置。两路电源均引自交流电源柜9,直流电源柜14有多个出线,主要为开关柜分合闸储能、监控后台、火灾报警系统20、视频安防、安全自动柜提供电源。The DC power supply cabinet 14 and the storage battery cabinet 15 are placed adjacent to each other, and the DC power supply cabinet 14 is provided with a power switching device. The two power sources are drawn from the AC power supply cabinet 9, and the DC power supply cabinet 14 has multiple outlets, which mainly provide power for the switch cabinet opening and closing energy storage, monitoring background, fire alarm system 20, video security, and safety automatic cabinet.

开关室2和集控室3均设置有整体式集装箱空调,开关室2和集控室3舱顶均设置有烟感器、温感器、网络半球摄像机。The switch room 2 and the centralized control room 3 are both equipped with integral container air conditioners, and the cabin roofs of the switch room 2 and the centralized control room 3 are equipped with smoke detectors, temperature sensors and network dome cameras.

集装箱箱体1的表面设有防腐涂层,集装箱箱体1的四周侧壁和顶壁均敷设有夹芯板岩棉保温层。储能电站用中/高压集控预制舱的集装箱箱体1的表面作防腐处理,分别涂有富锌底漆、环氧漆、丙烯酸面漆,防腐层厚度不低于120um,底架结构采用沥青漆,集装箱箱体1除底部外均敷设夹芯板岩棉保温层,地板采用镀锌板;集装箱箱体1底部采用多段横梁结构,横梁选用槽钢以加强箱体的承重能力;逃生门加装推杆锁,大门为锁杆结构,逃生门23上部加装铝合金百叶窗24、内部加防尘棉。The surface of the container body 1 is provided with an anti-corrosion coating, and the surrounding side walls and the top wall of the container body 1 are provided with a sandwich panel rock wool insulation layer. The surface of the container body 1 of the medium/high voltage centralized control prefabricated cabin for the energy storage power station is treated with anti-corrosion treatment, and is coated with zinc-rich primer, epoxy paint, and acrylic top paint respectively. The thickness of the anti-corrosion layer is not less than 120um. Asphalt paint, sandwich panel rock wool insulation layer except for the bottom of container box 1, and galvanized sheet for the floor; multi-section beam structure at the bottom of container box 1, and channel steel for the beam to enhance the load-bearing capacity of the box; escape door A push rod lock is installed, the door is a lock rod structure, an aluminum alloy shutter 24 is installed on the upper part of the escape door 23, and dust-proof cotton is added inside.

火灾报警系统20内设置有消防主机、输入/输出模块、短路隔离器,输入/输出模块与消防主机相连接,短路隔离器安装在火灾报警系统20的主线和支线的交叉处,主要用于保护消防控制主机。The fire alarm system 20 is provided with a fire fighting host, an input/output module, and a short-circuit isolator. The input/output module is connected to the fire fighting host. The short-circuit isolator is installed at the intersection of the main line and the branch line of the fire alarm system 20, and is mainly used for protection. Fire control host.

本集控预制舱可用于10kV、35kV电压等级接入的储能电站,同时也适用于大容量储能电站、变电站与储能电站距离较远等情况。操作人员可于舱内对储能电站就地进行调控,便于电站的运行、维护和管理。This centralized control prefabricated cabin can be used for energy storage power stations connected to 10kV and 35kV voltage levels, and also suitable for large-capacity energy storage power stations, substations and energy storage power stations that are far away from each other. The operator can control the energy storage power station on the spot in the cabin, which is convenient for the operation, maintenance and management of the power station.

上述实施方式并非是对本发明的限制,本发明也并不仅限于上述举例,本技术领域的技术人员在本发明的技术方案范围内所做出的变化、改型、添加或替换,也均属于本发明的保护范围。The above-mentioned embodiments are not intended to limit the present invention, and the present invention is not limited to the above-mentioned examples. Changes, modifications, additions or replacements made by those skilled in the art within the scope of the technical solutions of the present invention also belong to the present invention. The scope of protection of the invention.

Claims (9)

1.一种储能电站用中/高压集控预制舱,其特征在于:它包括集装箱箱体(1),集装箱箱体(1)由开关室(2)和集控室(3)在宽度方向上拼接而成,开关室(2)和集控室(3)中间设置有应急通道门(4),开关室(2)内设有一次设备组,一次设备组包括出线柜(22)、计量柜(5)、PT柜(6)、进线柜(7)、站用变(8),出线柜(22)、计量柜(5)、PT柜(6)、进线柜(7)、站用变(8)通过母线依次连接,出线柜(22)接入附近变电站低压侧母线,进线柜(7)通过电缆与供电侧相连接,一次设备组用于在储能电站充放电过程中接收和输送电能;集控室(3)内设有二次设备组、储能电站能量管理系统以及火灾报警系统(20),集控室(3)内的二次设备组包括交流电源柜(9)、交流馈线柜(10)、安全自动化柜(11)、远动通讯柜(12)、安防屏柜(13)、直流电源柜(14)、蓄电池柜(15)、备用柜一(16)、备用柜二(17)、操作台(18)、模拟屏(19),二次设备组对一次设备进行测控、保护,集控室(3)内的储能电站能量管理系统包括能量管理系统柜(21),能量管理系统柜(21)与储能电站的最高级电池管理系统、双向逆变器连接,储能电站能量管理系统负责管理储能电站充放电、升压逆变过程,火灾报警系统(20)对全站消防、通讯、监控进行管理。1. A medium/high voltage centralized control prefabricated cabin for an energy storage power station, characterized in that: it comprises a container box (1), and the container box (1) consists of a switch room (2) and a centralized control room (3) in the width direction The switch room (2) and the central control room (3) are provided with an emergency access door (4), the switch room (2) is provided with a primary equipment group, and the primary equipment group includes an outlet cabinet (22), a metering cabinet (5), PT cabinet (6), incoming cabinet (7), station transformer (8), outgoing cabinet (22), metering cabinet (5), PT cabinet (6), incoming cabinet (7), station The substations (8) are connected in sequence through the busbar, the outlet cabinet (22) is connected to the busbar on the low-voltage side of the nearby substation, and the inlet cabinet (7) is connected to the power supply side through cables. The primary equipment group is used in the charging and discharging process of the energy storage station. Receiving and transmitting electric energy; the centralized control room (3) is provided with a secondary equipment group, an energy management system of an energy storage power station and a fire alarm system (20), and the secondary equipment group in the centralized control room (3) includes an AC power supply cabinet (9) , AC feeder cabinet (10), safety automation cabinet (11), telecontrol communication cabinet (12), security screen cabinet (13), DC power cabinet (14), battery cabinet (15), backup cabinet one (16), Standby cabinet two (17), operation console (18), simulation screen (19), the secondary equipment group monitors, controls and protects the primary equipment, and the energy management system of the energy storage power station in the centralized control room (3) includes the energy management system cabinet ( 21), the energy management system cabinet (21) is connected to the highest-level battery management system and bidirectional inverter of the energy storage power station. The energy management system of the energy storage power station is responsible for managing the charging and discharging, boosting and inversion processes of the energy storage power station, and the fire alarm system. (20) Manage the fire protection, communication and monitoring of the whole station. 2.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述交流电源柜(9)和交流馈线柜(10)相邻摆放,交流电源柜(9)内具有ATS双电源自动切换装置。2. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, wherein the AC power supply cabinet (9) and the AC feeder cabinet (10) are placed adjacent to each other, and the AC power supply cabinet (9) ) with ATS dual power automatic switching device. 3.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述安全自动化柜(11)中具有公用测控装置、频率电压紧急控制装置、电能质量在线监测装置以及储能电站互动终端;电能质量在线监测装置与开关室(2)内的出线柜(22)连接,测量交流电流和电压回路;频率电压紧急控制装置与开关室(2)内的出线柜(22)连接,保护交流电流和电压回路。3. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, characterized in that: the safety automation cabinet (11) is provided with a public measurement and control device, a frequency and voltage emergency control device, and a power quality online monitoring device and the interactive terminal of the energy storage power station; the power quality online monitoring device is connected to the outlet cabinet (22) in the switch room (2) to measure the AC current and voltage loop; the frequency and voltage emergency control device is connected to the outlet cabinet (22) in the switch room (2). 22) Connection, protection of alternating current and voltage loops. 4.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述远动通讯柜(12)通过线缆、网线与公用测控装置连接,远动通讯柜(12)通过光纤与远方调度中心连接。4. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, characterized in that: the telecontrol communication cabinet (12) is connected with a public monitoring and control device through cables and network cables, and the telecontrol communication cabinet (12) 12) Connect with the remote dispatch center through optical fiber. 5.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述安防屏柜(13)内设置有数字网络硬盘录像机、硬盘、显示器、核心交换机。5. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, wherein the security screen cabinet (13) is provided with a digital network hard disk video recorder, a hard disk, a display, and a core switch. 6.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述直流电源柜(14)和蓄电池柜(15)相邻摆放,直流电源柜(14)上具有电源切换装置。6. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, characterized in that: the DC power supply cabinet (14) and the storage battery cabinet (15) are placed adjacent to each other, and the DC power supply cabinet (14) There is a power switch device on it. 7.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述开关室(2)和集控室(3)均设置有整体式集装箱空调,开关室(2)和集控室(3)舱顶均设置有烟感器、温感器、网络半球摄像机。7. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, wherein the switch room (2) and the centralized control room (3) are both provided with an integral container air conditioner, and the switch room (2) ) and the roof of the central control room (3) are provided with smoke detectors, temperature sensors and network dome cameras. 8.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述集装箱箱体(1)的表面设有防腐涂层,集装箱箱体(1)的四周侧壁和顶壁均敷设有夹芯板岩棉保温层。8. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, characterized in that: the surface of the container box (1) is provided with an anti-corrosion coating, and the surrounding sides of the container box (1) are provided with an anti-corrosion coating. Both the wall and the top wall are provided with a sandwich slate rock wool insulation layer. 9.根据权利要求1所述的储能电站用中/高压集控预制舱,其特征在于:所述火灾报警系统(20)内设置有消防主机、输入/输出模块、短路隔离器,输入/输出模块与消防主机相连接,短路隔离器安装在火灾报警系统(20)的主线和支线的交叉处。9. The medium/high voltage centralized control prefabricated cabin for an energy storage power station according to claim 1, wherein the fire alarm system (20) is provided with a fire fighting host, an input/output module, a short-circuit isolator, an input/output The output module is connected with the fire fighting host, and the short-circuit isolator is installed at the intersection of the main line and the branch line of the fire alarm system (20).
CN202011078929.8A 2020-10-10 2020-10-10 Medium/high voltage centralized control prefabricated cabin for energy storage power station Pending CN112103830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011078929.8A CN112103830A (en) 2020-10-10 2020-10-10 Medium/high voltage centralized control prefabricated cabin for energy storage power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011078929.8A CN112103830A (en) 2020-10-10 2020-10-10 Medium/high voltage centralized control prefabricated cabin for energy storage power station

Publications (1)

Publication Number Publication Date
CN112103830A true CN112103830A (en) 2020-12-18

Family

ID=73782673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011078929.8A Pending CN112103830A (en) 2020-10-10 2020-10-10 Medium/high voltage centralized control prefabricated cabin for energy storage power station

Country Status (1)

Country Link
CN (1) CN112103830A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11888294B2 (en) 2021-03-10 2024-01-30 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Power distribution device, power distribution trailer, electric drive system and operation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203086030U (en) * 2012-12-18 2013-07-24 中广核风电有限公司 Full intelligent distributed 35kV opening/closing station
CN103996986A (en) * 2014-06-09 2014-08-20 安徽赛瑞储能设备有限公司 Box type energy storage transformer substation structure
CN205622124U (en) * 2016-04-29 2016-10-05 南自晋能自动化有限公司 Prefabricated cabin formula transformer substation of 110kV
CN207819229U (en) * 2017-12-15 2018-09-04 中国能源建设集团江苏省电力设计院有限公司 One kind being used for distributed energy storage power station container
CN212485956U (en) * 2020-10-10 2021-02-05 南通国轩新能源科技有限公司 Medium/high voltage centralized control prefabricated cabin for energy storage power station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203086030U (en) * 2012-12-18 2013-07-24 中广核风电有限公司 Full intelligent distributed 35kV opening/closing station
CN103996986A (en) * 2014-06-09 2014-08-20 安徽赛瑞储能设备有限公司 Box type energy storage transformer substation structure
CN205622124U (en) * 2016-04-29 2016-10-05 南自晋能自动化有限公司 Prefabricated cabin formula transformer substation of 110kV
CN207819229U (en) * 2017-12-15 2018-09-04 中国能源建设集团江苏省电力设计院有限公司 One kind being used for distributed energy storage power station container
CN212485956U (en) * 2020-10-10 2021-02-05 南通国轩新能源科技有限公司 Medium/high voltage centralized control prefabricated cabin for energy storage power station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11888294B2 (en) 2021-03-10 2024-01-30 Yantai Jereh Petroleum Equipment & Technologies Co., Ltd. Power distribution device, power distribution trailer, electric drive system and operation method thereof

Similar Documents

Publication Publication Date Title
CN102819258B (en) Intelligent cell total management system
CN105811584A (en) Intelligent transformation method of conventional substation
CN103107595B (en) Substation automation system in prefabricated transformer substation
CN102497034B (en) Smart power grid junction station
CN209627050U (en) Marine wind electric field integrated monitoring system
CN210337621U (en) Integrated novel charging integrated high-power direct-current charging stack
CN209731140U (en) Photovoltaic generating system
CN109361207A (en) A kind of charging system and method
CN110687864A (en) A DC centralized control system
CN210927503U (en) Photovoltaic power generation and energy storage integrated power supply system
CN212485956U (en) Medium/high voltage centralized control prefabricated cabin for energy storage power station
CN111049468A (en) Photovoltaic power generation and energy storage integrated power supply system and method
CN112103830A (en) Medium/high voltage centralized control prefabricated cabin for energy storage power station
CN204761157U (en) A synthesize measurement and control device for distributed generator
CN104333232B (en) Mining explosion suppression type intelligent integrated power supply apparatus
CN106100029A (en) Station is filled in a kind of energy storage soon
CN205583475U (en) Integrated transformer substation of 110kV prepackage type
CN221080926U (en) Distributed energy storage system supporting integration of multiple parallel reserves
CN115864496A (en) Electric power energy supply system with near-zero carbon emission and supply method thereof
CN203466477U (en) Intelligent box-type transformer substation
CN217281685U (en) 50MW 110kV new forms of energy booster station system
CN115805829B (en) Automobile charging pile system based on box-type transformer substation
CN218449504U (en) Comprehensive energy power supply system based on light storage is straight gentle
CN216648904U (en) 50MW 35kV new forms of energy switch station system
CN217642873U (en) Electrochemical energy storage all-in-one machine applied to micro-grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201218