CN112095871B - Environment-friendly building curtain - Google Patents

Environment-friendly building curtain Download PDF

Info

Publication number
CN112095871B
CN112095871B CN202011027844.7A CN202011027844A CN112095871B CN 112095871 B CN112095871 B CN 112095871B CN 202011027844 A CN202011027844 A CN 202011027844A CN 112095871 B CN112095871 B CN 112095871B
Authority
CN
China
Prior art keywords
groove
plate
spring
rotating
vertical beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011027844.7A
Other languages
Chinese (zh)
Other versions
CN112095871A (en
Inventor
綦美丽
邓兆荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ruiwei Engineering Co.,Ltd.
Original Assignee
Shenzhen Ruiwei Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ruiwei Engineering Co ltd filed Critical Shenzhen Ruiwei Engineering Co ltd
Priority to CN202011027844.7A priority Critical patent/CN112095871B/en
Publication of CN112095871A publication Critical patent/CN112095871A/en
Application granted granted Critical
Publication of CN112095871B publication Critical patent/CN112095871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/002Arrangements for cleaning building facades

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)

Abstract

The invention discloses an environment-friendly building curtain wall, which comprises a vertical beam and a cross beam, wherein an assembly groove is formed in the vertical beam, a rotating column is installed at one end of the middle part of the assembly groove through a threaded hole, a first threaded groove is formed at one end of the outer side of the rotating column, a movable plate is movably installed at one end of the rotating column, an L-shaped plate is installed at one end of the movable plate through a screw, a fixed rod is hinged at one end of the L-shaped plate, a fixed spring is uniformly welded at one end of the fixed rod, one end of the fixed spring is welded at one end of the L-shaped plate, and a sliding groove is formed in the position, corresponding to the L-shaped plate, of the vertical beam, the installation and the disassembly are simpler, more convenient and safer, and the safety factor of workers is improved.

Description

Environment-friendly building curtain
Technical Field
The invention relates to the technical field of building curtain walls, in particular to an environment-friendly building curtain wall.
Background
The building curtain wall is composed of a supporting structure system and a panel, has certain displacement capacity relative to a main structure, does not bear the external protective structure or the decorative structure of the building acted on the main structure, is the external wall protection of the building, does not bear the weight, is hung like a curtain, is also called a hanging wall, and is a light wall with decorative effect commonly used by modern large-scale and high-rise buildings. The building envelope structure consists of a structural frame and an embedded plate, and does not bear the load and the action of a main structure.
But when installing the curtain now, the staff need install the wallboard through a large amount of screws, has leaded to the installation intensity big, and the installation effectiveness is low, and when dismantling the maintenance, needs the staff to dismantle the wallboard again after high altitude screw dismantles, needs the staff high altitude construction once more, and high altitude construction time is long, leads to staff factor of safety to be low.
Disclosure of Invention
The invention provides an environment-friendly building curtain wall, which can effectively solve the problems that when the curtain wall is installed, workers need to install a wallboard through a large number of screws, so that the installation strength is high, the installation efficiency is low, and when the curtain wall is disassembled and maintained, the workers need to disassemble the wallboard after the screws are disassembled at high altitude, the workers need to work at high altitude again, the time of the work at high altitude is long, and the safety coefficient of the workers is low.
In order to achieve the purpose, the invention provides the following technical scheme: an environment-friendly building curtain wall comprises vertical beams and cross beams, wherein the cross beams are fixedly connected between the top ends and the bottom ends of the two vertical beams;
the efficient assembly components are arranged in the vertical beams, so that the wallboard is simple and convenient to mount, and can be preliminarily fixed before mounting, the time of high-altitude operation of workers is reduced, the safety coefficient is improved, and the wallboard is convenient to mount and dismount by the workers;
the cleaning assembly is arranged in the beam, so that when more dust is on the wallboard, the wallboard can be cleaned, and the wallboard automatically restores to the original position after being cleaned, so that the next cleaning is facilitated, the secondary cleaning is performed in the cleaning process, and the cleaning effect is improved;
a secondary fixing and sealing assembly is mounted at one end of the outer side of the vertical beam to secondarily fix the wallboard, so that the phenomenon of deviation of the fixed wallboard is effectively avoided, the sealing performance of the wallboard is further improved, and the aesthetic feeling of the curtain wall is improved;
a quick connection stabilizing assembly is arranged between two adjacent vertical beams, so that the two vertical beams can be conveniently positioned, the installation of the vertical beams is convenient, the sealing performance is better in the installation process, and the stability between the two vertical beams is improved;
two install between the perpendicular roof beam back and shelter from the subassembly, make things convenient for the staff to shelter from the sunshine of penetrating, avoid sunshine to penetrate directly and carry out indoorly, cause the problem of influence to the personnel, can install fast simultaneously and dismantle, make things convenient for the staff to clear up.
Preferably, the efficient assembly component comprises an assembly groove, a rotating column, a first threaded groove, a moving plate, an L-shaped plate, a fixed spring, a fixed rod, a second threaded groove, a driving plate, a moving frame, a connecting plate, a corresponding hole, a matching groove, a sliding groove and a sealing rod;
an assembly groove is formed in the vertical beam, a rotary column is mounted at one end of the middle of the assembly groove through a threaded hole, a first threaded groove is formed in one end of the outer side of the rotary column, a movable plate is movably mounted at one end of the rotary column, an L-shaped plate is mounted at one end of the movable plate through a screw, a fixed rod is hinged to one end of the L-shaped plate, a fixed spring is uniformly welded at one end of the fixed rod, one end of the fixed spring is welded to one end of the L-shaped plate, and a sliding groove is formed in the position, corresponding to the L-shaped plate, of the vertical beam;
the utility model discloses a revolving column, including revolving column, first thread groove, driving plate, perpendicular roof beam and crossbeam, the second thread groove has been seted up in the revolving column middle part outside, the revolving column outside is located second thread groove position department and is connected with the driving plate through the screw hole, driving plate one end has the removal frame through the screwed connection, erect roof beam and crossbeam and correspond the removal frame position department and seted up the matching groove, erect the roof beam and correspond the driving plate and remove the board position department and all seted up corresponding hole, it has the sealing rod all to bond with dead lever one end to remove frame and dead lever one end, driving plate and removal board top surface all have the connecting plate through the mounting screw with the bottom surface, two connecting plate one end is connected with another driving plate and movable plate respectively through the screw.
Compared with the prior art, the invention has the beneficial effects that: the invention has scientific and reasonable structure and safe and convenient use:
1. the efficient assembling component is arranged, through the fixing rod, the L-shaped plate and the fixing spring, a primary fixing effect is achieved firstly, workers can fix the wallboard conveniently, the phenomenon that the wallboard shakes before fixing is effectively avoided, the efficient assembling component is matched with the rotary column, the first thread groove, the second thread groove and the moving frame for use, the wallboard is convenient to fix, the installation is convenient and fast, the problem that a large number of screws are needed for fixing in the prior art is effectively solved, the installation cost is reduced, a secondary fixing structure can be formed through the elasticity of the fixing spring, the fixing stability and the connecting strength are enhanced, meanwhile, the wallboard can be disassembled indoors, the purposes that high-altitude operation time is short and high-altitude operation is not needed during disassembly are achieved, the installation and disassembly are simpler and safer, and the safety coefficient of the workers is improved;
and through the use of sealing rod and connecting plate, effectual reinforcing wallboard and erect the leakproofness between roof beam and the crossbeam among the fixed process, effectually avoid outside long-term and air and rainwater contact back, lead to the life-span reduction of fixed spring and dead lever, influence the problem fixed to the wallboard.
2. Be provided with the clearance subassembly, through the wind wheel, the drive rope, the clearance brush, the use of admission cylinder and clearance brush, can effectually clear up the dust on wall surface, improve the aesthetic feeling of wall, the while need not staff's high altitude construction clearance, improve staff's factor of safety, use through axis of rotation and elasticity rope, after the clearance is ended, make the clearance brush automatic accomodate, be convenient for next time to the wall clearance, the effectual clearance brush of having avoided leads to the fact the influence at the outer pleasing to the eye of wallboard, the use of cooperation air outlet cylinder and venthole, at the in-process of clearance, can again to the secondary clearance of wall and to the clearance brush clearance, the effect and the efficiency of the dust of clearance are improved, the problem that need not the secondary clearance appears.
3. The secondary fixing and sealing assembly is arranged, the wallboard can be fixed again through the use of the connecting rod, the protective plate and the clamping groove, the offset phenomenon of the fixed wallboard is effectively avoided, the sealing performance of the wallboard can be further improved, the effective sealing rod is aged, the fixed spring is rusted, the service life of the curtain wall is prolonged, the fixed ends of the vertical beam and the transverse beam are shielded, the smoothness of the surface of the curtain wall is guaranteed, and the attractiveness of the curtain wall is effectively improved;
through the use of dwang, sealing spring, closing spring, baffle and rotor plate, at the clearance in-process, fixed and spacing to the driving rope, the problem of having avoided the clearance brush clearance in-process to rock appears, and can have a guide effect to the wind that blows off from relative hole, further improves the effect of clearance, and the effectual unclean problem of clearance wall that has avoided appears.
4. The quick connection stabilizing assembly is arranged, pre-fixing and positioning are carried out before welding through the limiting spring, the limiting plate, the connecting column and the circular groove, so that two vertical beams can be conveniently welded by workers, secondary protection is formed after secondary fixing of the vertical beams is achieved, the stability between the vertical beams is effectively enhanced, and the structural strength between the vertical beams is enhanced;
and the cooperation is pressed board, briquetting, pressing spring, shift ring, is pressed the use of groove and rubber ring, reaches the effect that improves the leakproofness in the installation, need not staff and installs sealing device once more, saves staff's installation physical power, avoids between the air admission two perpendicular roof beams, to erecting roof beam interface position department and causing the influence, and the indirectness improves the fastness between the structure, improves the life who erects the roof beam.
5. Be provided with and shelter from the subassembly, through the gear, the ring gear, the rotation post and the use that shelters from cloth, make things convenient for the staff to adjust the position that shelters from cloth, effectually block to sunshine, it is indoor to avoid sunshine direct-jet to get into, cause the influence to indoor staff, and the use of cooperation increase pole and slider, guarantee to shelter from the subsides of cloth and apply the nature, better feasible shelter from cloth subsides and apply on the wallboard surface, reach better effect that shelters from sunshine, through the use of installation spring and solid fixed cylinder, conveniently install and dismantle sheltering from cloth, thereby be convenient for shelter from the clearance of cloth, make simultaneously to shelter from cloth in-process in the installation, make to shelter from that cloth is fixed more stable, be difficult for rocking, indirectness has improved the effect of sheltering from sunshine.
To sum up, through the use of high-efficient equipment subassembly and high-speed joint stabilizing assembly, time and intensity that can effectual reduction staff's installation to and reduce high altitude construction's time, reduce staff's intensity of labour and improvement staff factor of safety, make the whole joint strength and the stability of curtain high simultaneously, prolonged curtain life, the effectual emergence of avoiding the accident improves the security of curtain.
Through the use of high-efficient equipment subassembly, clearance subassembly and the fixed seal subassembly of secondary, can guarantee the fixed stable of wallboard when, can be convenient for again clear up the wall, and can guarantee the stability of clearance again among the clearance process, guaranteed the effect of clearance, it is good to have reached the leakproofness simultaneously, has prolonged the life of wallboard to improve the feature of environmental protection of curtain.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention.
In the drawings:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a mounting groove mounting structure of the present invention;
FIG. 3 is a schematic view of the mating groove mounting structure of the present invention;
FIG. 4 is a schematic view of the efficient assembly of the present invention;
FIG. 5 is a schematic view of a spin column mounting arrangement of the present invention;
FIG. 6 is a schematic view of the cleaning assembly of the present invention;
FIG. 7 is a schematic view of a cleaning brush mounting arrangement of the present invention;
fig. 8 is a schematic view of a protective panel mounting structure of the present invention;
FIG. 9 is a schematic view of the secondary stationary seal assembly of the present invention;
FIG. 10 is a schematic view of the quick connect stabilization assembly of the present invention;
FIG. 11 is a schematic view of a spacing spring mounting arrangement of the present invention;
FIG. 12 is a schematic view of the structure of the present invention for forming the connecting slot;
FIG. 13 is a schematic view of the shielding assembly of the present invention;
FIG. 14 is a schematic view of the mounting structure of the shielding cloth of the present invention;
reference numbers in the figures: 1. erecting a beam; 2. a cross beam;
3. assembling the components efficiently; 301. assembling a groove; 302. a spin column; 303. a first thread groove; 304. moving the plate; 305. an L-shaped plate; 306. fixing the spring; 307. fixing the rod; 308. a second thread groove; 309. driving the plate; 310. moving the frame; 311. a connecting plate; 312. a corresponding hole; 313. a mating groove; 314. a sliding groove; 315. a sealing rod;
4. cleaning the assembly; 401. mounting grooves; 402. a rotating shaft; 403. driving the rope; 404. cleaning a brush; 405. a wind wheel; 406. a blowing cavity; 407. an elastic cord; 408. an air inlet cylinder; 409. an air outlet cylinder; 410. an air outlet;
5. secondarily fixing the sealing assembly; 501. a connecting rod; 502. a protection plate; 503. a card slot; 504. cleaning the holes; 505. rotating the rod; 506. a seal spring; 507. a rotating plate; 508. a closing spring; 509. an opposing aperture; 510. a closing plate; 511. a baffle plate; 512. a protective frame;
6. a quick connect stabilization assembly; 601. connecting grooves; 602. a spring slot; 603. a limiting spring; 604. a limiting plate; 605. connecting columns; 606. a circular groove; 607. pressing a groove; 608. briquetting; 609. pressing the groove; 610. a pressing plate; 611. a pressing spring; 612. a moving ring; 613. a rubber ring; 614. a rubber groove;
7. a shielding component; 701. a chute; 702. a fixed cylinder; 703. installing a spring; 704. a movable post; 705. rotating the column; 706. a gear; 707. a toothed ring; 708. a shielding cloth; 709. a slider; 710. and a weight increasing rod.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Example (b): as shown in fig. 1-14, the invention provides a technical scheme that an environment-friendly building curtain wall comprises vertical beams 1 and cross beams 2, wherein the cross beams 2 are fixedly connected between the top ends and the bottom ends of the two vertical beams 1;
the efficient assembly component 3 is arranged in the vertical beam 1, so that the wallboard is simple and convenient to mount, and can be preliminarily fixed before mounting, the time of high-altitude operation of workers is reduced, the safety coefficient is improved, and the wallboard is convenient to mount and dismount by the workers;
the cleaning assembly 4 is arranged in the beam 2, when more dust is on the wallboard, the wallboard can be cleaned, and the wallboard can be automatically restored to the original position after being cleaned, so that the next cleaning is facilitated, the secondary cleaning is carried out in the cleaning process, and the cleaning effect is improved;
a secondary fixing and sealing assembly 5 is mounted at one end of the outer side of the vertical beam 1, and is used for secondarily fixing the wallboard, so that the phenomenon that the fixed wallboard deviates is effectively avoided, the sealing performance of the wallboard is further improved, and the aesthetic feeling of the curtain wall is improved;
the quick connection stabilizing assembly 6 is arranged between two adjacent vertical beams 1, so that the two vertical beams 1 can be conveniently positioned, the installation of the vertical beams 1 is convenient, the sealing performance is better in the installation process, and the stability between the two vertical beams 1 is improved;
install between two 1 backs of perpendicular roof beam and shelter from subassembly 7, make things convenient for the staff to shelter from the sunshine of penetrating, avoid sunshine to penetrate directly and carry out indoorly, cause the problem of influence to the staff, can install fast simultaneously and dismantle, make things convenient for the staff to clear up.
The high-efficiency assembly component 3 comprises an assembly groove 301, a rotating column 302, a first thread groove 303, a moving plate 304, an L-shaped plate 305, a fixed spring 306, a fixed rod 307, a second thread groove 308, a driving plate 309, a moving frame 310, a connecting plate 311, a corresponding hole 312, a matching groove 313, a sliding groove 314 and a sealing rod 315;
an assembly groove 301 is formed in the vertical beam 1, a rotating column 302 is mounted at one end of the middle of the assembly groove 301 through a threaded hole, a first threaded groove 303 is formed in one end of the outer side of the rotating column 302, a moving plate 304 is movably mounted at one end of the rotating column 302, an L-shaped plate 305 is mounted at one end of the moving plate 304 through a screw, a fixed rod 307 is hinged to one end of the L-shaped plate 305, a fixed spring 306 is uniformly welded at one end of the fixed rod 307, one end of the fixed spring 306 is welded at one end of the L-shaped plate 305, and a sliding groove 314 is formed in the position, corresponding to the L-shaped plate 305, of the vertical beam 1;
a second thread groove 308 is arranged on the outer side of the middle part of the rotary column 302, a driving plate 309 is connected with the position of the second thread groove 308 on the outer side of the rotary column 302 through a threaded hole, a moving frame 310 is connected with one end of the driving plate 309 through a screw, matching grooves 313 are arranged on the positions of the vertical beam 1 and the cross beam 2 corresponding to the moving frame 310, corresponding holes 312 are arranged on the positions of the vertical beam 1 corresponding to the driving plate 309 and the moving plate 304, sealing rods 315 are respectively bonded with one ends of the moving frame 310 and the fixed rod 307, connecting plates 311 are respectively mounted on the top surface and the bottom surface of the driving plate 309 and the moving plate 304 through screws, one ends of the two connecting plates 311 are respectively connected with the other driving plate 309 and the moving plate 304 through screws, the spiral directions of the first thread groove 303 and the second thread groove 308 are opposite, the length and width of the corresponding hole 312 are equal to those of the movable frame 310 and the fixed rod 307, respectively, so that the wallboard can be clamped conveniently.
The cleaning component 4 comprises a mounting groove 401, a rotating shaft 402, a driving rope 403, a cleaning brush 404, a wind wheel 405, a blowing cavity 406, an elastic rope 407, an air inlet cylinder 408, an air outlet cylinder 409 and an air outlet hole 410;
one end of the beam 2 is provided with a mounting groove 401, a rotating shaft 402 is movably mounted in the mounting groove 401, two ends of the outer side of the rotating shaft 402 are respectively wound with a driving rope 403, the bottom ends of the two driving ropes 403 are respectively connected with two ends of the top surface of a cleaning brush 404, a wind wheel 405 is fixedly sleeved on the outer side of one end of the rotating shaft 402, a blowing cavity 406 is formed at the position of the vertical beam 1 corresponding to the wind wheel 405, one end of the bottom surface of the blowing cavity 406 is penetrated and mounted with an air inlet tube 408, the winding direction of the driving rope 403 at the two ends of the rotating shaft 402, a telescopic slot is formed at the position of the vertical beam 1 corresponding to the elastic rope 407, the width of the telescopic slot is equal to that of the elastic rope 407, the longitudinal section of one end of the wind wheel 405 is arc-shaped, the cleaning brush 404 is convenient to move and the wind wheel 405 is convenient to drive the wind wheel 405 to move, thereby better driving the rotating shaft 402 to rotate, an air outlet tube 409 is formed at the end of the bottom surface of the blowing cavity 406 close to the air inlet tube 408, and air outlet 410 is uniformly formed at the position of one end of the vertical beam 1 penetrating and is formed at the inner end of the air outlet tube 409, an elastic rope 407 is fixedly connected to the outer side of one end of the rotating shaft 402, and one end of the elastic rope 407 is fixedly installed inside the top end of the vertical beam 1.
The secondary fixing sealing assembly 5 comprises a connecting rod 501, a protective plate 502, a clamping groove 503, a cleaning hole 504, a rotating rod 505, a sealing spring 506, a rotating plate 507, a sealing spring 508, an opposite hole 509, a sealing plate 510, a baffle 511 and a protective frame 512;
one end of the rotating column 302 is movably connected with a connecting rod 501, one end of the connecting rod 501 is positioned outside the vertical beam 1 and is fixedly connected with a protective plate 502, a clamping groove 503 is formed in the protective plate 502, a cleaning hole 504 is formed in the position, corresponding to the mounting groove 401, of the top end of the clamping groove 503, a rotating rod 505 is hinged to one end of the bottom of the cleaning hole 504, sealing springs 506 are uniformly welded to the top surface of the rotating rod 505, and one end of each sealing spring 506 is welded to the inner wall of the cleaning hole 504;
the position of the outer part of the protection plate 502 corresponding to the air outlet 410 is provided with a relative hole 509, the outer side of the protection plate 502 is hinged with a rotating plate 507 at one side of the relative hole 509, one end of the rotating plate 507 is uniformly welded with a closed spring 508, one end of the closed spring 508 is welded at one end of the protection plate 502, one end of the rotating rod 505 and one end of the rotating plate 507 are both provided with round corners, the diameter of the closed plate 510 is equal to that of the relative hole 509, the width of the cleaning hole 504 is larger than that of the cleaning brush 404, the rotating rod 505 and the rotating plate 507 are convenient to rotate, the relative hole 509 is better sealed, therefore, the internal sealing performance of the vertical beam 1 and the transverse beam 2 is ensured, a closed plate 510 is bonded at the position of one end of the rotating plate 507 corresponding to the position of the opposite hole 509, a baffle 511 is mounted at the position of one end of the rotating plate 507 outside the protective plate 502 through screws, a protective frame 512 is hinged outside the closed spring 508 outside the protective plate 502, and one end of the protective frame 512 is mounted at one end of the rotating plate 507 through screws.
The quick connection stabilizing assembly 6 comprises a connecting groove 601, a spring groove 602, a limiting spring 603, a limiting plate 604, a connecting column 605, a circular groove 606, a pressing groove 607, a pressing block 608, a pressing groove 609, a pressing plate 610, a pressing spring 611, a moving ring 612, a rubber ring 613 and a rubber groove 614;
the connecting groove 601 is uniformly formed in the top surface of one vertical beam 1, the spring grooves 602 are formed in two ends of the middle inside the connecting groove 601, the limiting spring 603 is welded at one end inside the spring groove 602, the limiting plate 604 is welded at one end of the limiting plate 603, the arc angle is formed at one end of the limiting plate 604, the diameter of the arc angle is equal to that of the circular groove 606, the width of the circular groove 606 is equal to that of the limiting plate 604, a chamfer is machined at the bottom end of the connecting column 605, the diameter of the connecting column 605 is equal to that of the connecting groove 601, the limiting plate 604 is fixed more stably, connection between the two vertical beams 1 is more stable, the connecting column 605 is conveniently inserted into the connecting groove 601, the connecting column 605 is welded at the position inside the connecting groove 601 on the bottom surface of the other vertical beam 1, and the circular groove 606 is formed in the position, corresponding to the limiting plate 604, outside the connecting column 605;
the connecting groove 601 is internally and uniformly provided with a pressing groove 607, the connecting column 605 is welded with a pressing block 608 at the position corresponding to the pressing groove 607, one end of the top end of one vertical beam 1 is positioned at the position corresponding to the pressing groove 607 and is provided with a pressing groove 609, the middle part inside the pressing groove 609 is provided with a pressing plate 610 through a rotating shaft, one end of the bottom surface of the pressing plate 610 is welded with a pressing spring 611, one end of the pressing spring 611 is welded at the bottom surface of the pressing groove 609, the top end of the pressing plate 610 is positioned at the position corresponding to the inside of the pressing groove 609 and is provided with a moving ring 612, the top surface of the moving ring 612 is bonded with a rubber ring 613, and the bottom surface of the other vertical beam 1 is provided with a rubber groove 614 at the position corresponding to the rubber ring 613.
The shielding component 7 comprises a sliding chute 701, a fixed cylinder 702, a mounting spring 703, a movable column 704, a rotating column 705, a gear 706, a toothed ring 707, shielding cloth 708, a sliding block 709 and a weight rod 710;
the spout 701 has been seted up to 1 one end of perpendicular roof beam, the inside top movable mounting of spout 701 has a fixed cylinder 702, the inside one end welding of fixed cylinder 702 has installation spring 703, movable post 704 has been placed between two adjacent fixed cylinders 702, a fixed cylinder 702 one end runs through the 1 top welding of perpendicular roof beam and has a rotation post 705, the fixed gear 706 that has cup jointed in rotation post 705 one end outside, the meshing of gear 706 outside has ring gear 707, movable post 704 outside fixed mounting has shelters from cloth 708, shelter from cloth 708 bottom surface seam and has knitted weight bar 710, weight bar 710 both ends are in the inside movable mounting of spout 701 has slider 709, the drive groove has all been seted up at the inside both ends of a fixed cylinder 702, the outside both ends of fixed cylinder 702 correspond and drive the welding of trench position department and have the drive pole.
The working principle and the using process of the invention are as follows: when a worker installs the two vertical beams 1, firstly welding one vertical beam 1 on a wall surface, placing the other vertical beam 1 on the top end of the other vertical beam 1, along with the placement of the other vertical beam 1, inserting the connecting column 605 into the connecting groove 601, and along with the movement of the connecting column 605, driving the limiting plate 604 to move in the spring groove 602, so that the limiting spring 603 is compressed, when the circular groove 606 moves to the spring groove 602, the limiting spring 603 is stretched, so that the limiting plate 604 is clamped into the circular groove 606, the vertical beam 1 is conveniently positioned and can be preliminarily fixed when the vertical beam 1 is installed, and the worker can conveniently weld the vertical beam 1;
during the movement of the connecting column 605 in the moving process of the connecting groove 601, the pressing block 608 moves in the pressing groove 607, along with the movement of the pressing block 608, the pressing block 608 gradually contacts with the pressing plate 610, so that one end of the pressing plate 610 is pressed downwards, the pressing spring 611 is stretched, so that the other end of the pressing plate 610 is lifted, the moving ring 612 is pushed to move in the pressing groove 609, so that the rubber ring 613 is clamped in the rubber groove 614, and along with the movement of the pressing block 608, the pressing plate 610 is pressed more tightly, so that the rubber ring 613 is pressed more tightly in the rubber groove 614, and the sealing performance between the two vertical beams 1 is effectively enhanced.
After the two vertical beams 1 are installed, an operator installs the wall board, and when the operator installs the wall board, the wall board is placed between the vertical beams 1 and the cross beam 2, in the process, the fixing spring 306 is compressed to drive the fixing rod 307 to rotate, when the wall board is not in contact with the fixing rod 307, the fixing spring 306 is stretched to make the fixing rod 307 pop out, and the wall board is preliminarily fixed, so that the operator can fix the wall board more easily, and then the operator drives the first thread groove 303 and the second thread groove 308 to rotate in the threaded hole by rotating the rotating column 302, and drives the moving plate 304 and the driving plate 309 to move in the corresponding hole 312 by the rotation of the first thread groove 303 and the second thread groove 308, and drives the fixing rod 307 and the moving frame 310 to move when the moving plate 304 and the driving plate 309 move, respectively, so that the fixing rod 307 and the moving frame 310 move towards the wall board gradually, wallboard both ends are all fixed, move the in-process at dead lever 307 simultaneously, dead lever 307 rotates to the horizontality gradually, make fixed spring 306 compress, play the fixed action to the wallboard once more, thereby it is fixed with the wallboard, when fixed, sealing rod 315 and wallboard contact, strengthen the leakproofness between wallboard and the perpendicular roof beam 1, thereby prolong the life-span of curtain, when needs maintain the curtain, the staff can follow indoor through rotating column 302, with the wallboard not hard up back, take off the wallboard, need not the staff and carry out high altitude construction, improve staff's factor of safety, and reduce the efficiency of dismantlement, improve wallboard installation and dismantlement and efficiency.
At fixed wallboard in-process, remove the in-process at the column spinner 302, drive connecting rod 501 and remove, thereby drive connecting rod 501 and remove, drive protection shield 502 and remove, make protection shield 502 card on erecting roof beam 1 and crossbeam 2, fix and seal the wallboard again, the stability and the leakproofness of wallboard have been guaranteed again, after protection shield 502 card was on erecting roof beam 1 and crossbeam 2, hole 509 aligns with venthole 410 relatively this moment, and clearance hole 504 corresponds with venthole 410, be convenient for later to the clearance of wallboard.
When there is more dust on the wallboard surface, this moment the staff lets in gas to air inlet tube 408, along with gaseous letting in, it rotates to drive wind wheel 405, rotation through wind wheel 405, it rotates to drive axis of rotation 402, rotation through axis of rotation 402, it is loose gradually to drive rope 403 this moment, and elasticity rope 407 twines gradually above axis of rotation 402, thereby it removes to drive cleaning brush 404, clear up the wallboard surface, in the clearance process, gas can get into air outlet tube 409 again, spout by venthole 410, clear up the wallboard surface once more, the effect and the efficiency of clearance are improved.
In the moving process of the cleaning brush 404, the cleaning brush 404 is firstly contacted with the rotating rod 505, the rotating rod 505 is made to rotate, the sealing spring 506 is stretched, when the cleaning brush 404 is not contacted with the rotating rod 505, the sealing spring 506 is compressed at the moment, the rotating rod 505 is driven to rotate, the driving rope 403 can be clamped through the rotation of the rotating rod 505, the cleaning brush 404 is further kept stable, the cleaning effect is further improved, meanwhile, after the gas is blown out through the gas outlet hole 410, the rotating plate 507 is blown to rotate, the sealing spring 508 is stretched, the sealing plate 510 is moved out of the opposite hole 509, the rotating plate 507 is made to rotate by 90 degrees, the rotating plate 507 is blocked through the baffle 511, the protection frame 512 is also driven to rotate in the rotating process of the baffle 511, the sealing spring 508 is protected, and the service life of the sealing spring 508 is prolonged.
The worker can drive the gear 706 to rotate through the rotating toothed ring 707, and the rotating column 705 is driven to rotate through the rotation of the gear 706, so as to drive the movable column 704 to rotate, thereby driving the shielding cloth 708 to rotate, so as to shield the wallboard, shield the sunlight, and prevent the sunlight from directly injecting into the room, and the problem of influence on the worker occurs, and in the process of rotating the shielding cloth 708, the weight increasing rod 710 is driven to move, the sliding block 709 is driven to move in the sliding groove 701, the weight of the bottom end of the shielding cloth 708 is increased, and a sealing effect is achieved, so that the effect is better, when the worker needs to clean the shielding cloth 708, the worker can compress the mounting spring by moving the movable column 704, after taking one end of the movable column 704 out of the fixed cylinder 703, take out the other end of the movable column 704, thereby detaching the shielding cloth 708, and the worker can detach the shielding cloth 708 conveniently, the efficiency of dismantlement and installation is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a building curtain wall, includes vertical beam (1) and crossbeam (2), its characterized in that: a cross beam (2) is fixedly connected between the top ends and the bottom ends of the two vertical beams (1);
an assembly component (3) is installed inside the vertical beam (1), and the assembly component (3) comprises an assembly groove (301), a rotating column (302), a first threaded groove (303), a moving plate (304), an L-shaped plate (305), a fixed spring (306), a fixed rod (307), a second threaded groove (308), a driving plate (309), a moving frame (310), a connecting plate (311), a corresponding hole (312), a matching groove (313), a sliding groove (314) and a sealing rod (315);
an assembly groove (301) is formed in the vertical beam (1), a rotating column (302) is installed at one end of the middle of the assembly groove (301) through a threaded hole, a first threaded groove (303) is formed in one end of the outer side of the rotating column (302), a moving plate (304) is movably installed at one end of the rotating column (302), an L-shaped plate (305) is installed at one end of the moving plate (304) through a screw, a fixed rod (307) is hinged to one end of the L-shaped plate (305), a fixed spring (306) is uniformly welded to one end of the fixed rod (307), one end of the fixed spring (306) is welded to one end of the L-shaped plate (305), and a sliding groove (314) is formed in the position, corresponding to the L-shaped plate (305), of the vertical beam (1);
a second thread groove (308) is formed in the outer side of the middle of the rotary column (302), a driving plate (309) is connected to the position, located in the second thread groove (308), of the outer side of the rotary column (302) through a threaded hole, one end of the driving plate (309) is connected with a movable frame (310) through a screw, matching grooves (313) are formed in the positions, corresponding to the movable frame (310), of the vertical beam (1) and the transverse beam (2), corresponding holes (312) are respectively arranged at the positions of the vertical beam (1) corresponding to the driving plate (309) and the moving plate (304), one end of the movable frame (310) and one end of the fixed rod (307) are both bonded with a sealing rod (315), the top surfaces and the bottom surfaces of the driving plate (309) and the moving plate (304) are respectively provided with a connecting plate (311) through screws, and one end of each of the two connecting plates (311) is respectively connected with the other driving plate (309) and the other moving plate (304) through screws;
a cleaning assembly (4) is arranged in the beam (2), and the cleaning assembly (4) comprises a mounting groove (401), a rotating shaft (402), a driving rope (403), a cleaning brush (404), a wind wheel (405), a blowing cavity (406), an elastic rope (407), an air inlet cylinder (408), an air outlet cylinder (409) and an air outlet hole (410);
the cleaning brush is characterized in that one end of the cross beam (2) is provided with a mounting groove (401), a rotating shaft (402) is movably mounted in the mounting groove (401), two ends of the outer side of the rotating shaft (402) are respectively wound with a driving rope (403), the bottom ends of the two driving ropes (403) are respectively connected with two ends of the top surface of the cleaning brush (404), a wind wheel (405) is fixedly sleeved on the outer side of one end of the rotating shaft (402), a blowing cavity (406) is formed in the position of the vertical beam (1) corresponding to the wind wheel (405), one end of the bottom surface of the blowing cavity (406) is provided with an air inlet cylinder (408) in a penetrating manner, one end of the bottom surface of the blowing cavity (406) close to the air inlet cylinder (408) is provided with an air outlet cylinder (409), one end of the inner part of the air outlet cylinder (409) penetrates through the vertical beam (1) is uniformly provided with air outlet holes (410), and the outer side of one end of the rotating shaft (402) is fixedly connected with an elastic rope (407), one end of the elastic rope (407) is fixedly arranged inside the top end of the vertical beam (1);
a secondary fixed sealing assembly (5) is mounted at one end of the outer side of the vertical beam (1), and the secondary fixed sealing assembly (5) comprises a connecting rod (501), a protective plate (502), a clamping groove (503), a cleaning hole (504), a rotating rod (505), a sealing spring (506), a rotating plate (507), a sealing spring (508), an opposite hole (509), a sealing plate (510), a baffle plate (511) and a protective frame (512);
one end of the rotating column (302) is movably connected with a connecting rod (501), one end of the connecting rod (501) is positioned outside the vertical beam (1) and is fixedly connected with a protective plate (502), a clamping groove (503) is formed in the protective plate (502), a cleaning hole (504) is formed in the position, corresponding to the mounting groove (401), of the top end of the clamping groove (503), one end of the bottom of the cleaning hole (504) is hinged with a rotating rod (505), sealing springs (506) are uniformly welded on the top surface of the rotating rod (505), and one end of each sealing spring (506) is welded on the inner wall of the cleaning hole (504);
the protection plate is characterized in that a relative hole (509) is formed in the position, corresponding to the air outlet hole (410), of the outer side of the protection plate (502), a rotating plate (507) is hinged to the position, located on one side of the relative hole (509), of the outer side of the protection plate (502), a sealing spring (508) is uniformly welded to one end of the rotating plate (507), one end of the sealing spring (508) is welded to one end of the protection plate (502), a sealing plate (510) is bonded to the position, corresponding to the relative hole (509), of one end of the rotating plate (507), a baffle (511) is mounted at the position, located at one end of the rotating plate (507), of the outer side of the protection plate (502) through a screw, a protection frame (512) is hinged to the outer side of the sealing spring (508), and one end of the protection frame (512) is mounted at one end of the rotating plate (507) through a screw;
a connection stabilizing assembly (6) is arranged between two adjacent vertical beams (1), and the connection stabilizing assembly (6) comprises a connecting groove (601), a spring groove (602), a limiting spring (603), a limiting plate (604), a connecting column (605), a circular groove (606), a pressing groove (607), a pressing block (608), a pressing groove (609), a pressing plate (610), a pressing spring (611), a moving ring (612), a rubber ring (613) and a rubber groove (614);
connecting grooves (601) are uniformly formed in the top surface of one vertical beam (1), spring grooves (602) are formed in the two ends of the middle of the inside of each connecting groove (601), a limiting spring (603) is welded at one end of the inside of each spring groove (602), a limiting plate (604) is welded at one end of each limiting spring (603) which is positioned inside each spring groove (602), a connecting column (605) is welded inside each connecting groove (601) in the bottom surface of the other vertical beam (1), and a circular groove (606) is formed in the position, corresponding to the limiting plate (604), of the outer side of each connecting column (605);
pressing grooves (607) are uniformly formed in the connecting groove (601), pressing blocks (608) are welded at positions, corresponding to the pressing grooves (607), of the connecting columns (605), a pressing groove (609) is formed in the position, located at one end of the pressing groove (607), of the top end of one vertical beam (1), a pressing plate (610) is installed in the middle of the inside of the pressing groove (609) through a rotating shaft, a pressing spring (611) is welded at one end of the bottom surface of the pressing plate (610), one end of the pressing spring (611) is welded to the bottom surface of the pressing groove (609), a moving ring (612) is placed at the position, located in the pressing groove (609), of the top end of the pressing plate (610), a rubber ring (613) is bonded to the top surface of the moving ring (612), and a rubber groove (614) is formed in the position, corresponding to the rubber ring (613), of the bottom surface of the other vertical beam (1);
a shielding component (7) is arranged between the back surfaces of the two vertical beams (1), and the shielding component (7) comprises a sliding groove (701), a fixed cylinder (702), an installation spring (703), a movable column (704), a rotating column (705), a gear (706), a toothed ring (707), shielding cloth (708), a sliding block (709) and a weight increasing rod (710);
one end of the vertical beam (1) is provided with a sliding chute (701), the top end inside the sliding chute (701) is movably provided with a fixed cylinder (702), one end of the inside of each fixed cylinder (702) is welded with a mounting spring (703), a movable column (704) is arranged between two adjacent fixed cylinders (702), one end of each fixed cylinder (702) penetrates through the top end of the vertical beam (1) and is welded with a rotating column (705), a gear (706) is fixedly sleeved on the outer side of one end of the rotating column (705), a toothed ring (707) is meshed on the outer side of the gear (706), a shielding cloth (708) is fixedly arranged at the outer side of the movable column (704), a weighting rod (710) is sewn at the bottom surface of the shielding cloth (708), the two ends of the weight-increasing rod (710) are positioned in the sliding groove (701) and are movably provided with a sliding block (709), the two ends of the inner part of one fixed cylinder (702) are both provided with driving grooves, the two ends of the outer side of the fixed cylinder (702) are welded with driving rods corresponding to the positions of the driving grooves.
2. The building curtain wall as claimed in claim 1, wherein the first thread groove (303) and the second thread groove (308) have opposite spiral directions, and the length and width of the corresponding hole (312) are equal to those of the movable frame (310) and the fixed rod (307), respectively.
3. The building curtain wall according to claim 2, wherein the driving rope (403) at two ends of the rotating shaft (402) is wound in a winding direction, the vertical beam (1) is provided with a telescopic groove at a position corresponding to the elastic rope (407), the width of the telescopic groove is equal to that of the elastic rope (407), and the longitudinal section of one end of the wind wheel (405) is arc-shaped.
4. The building curtain wall as claimed in claim 3, wherein the rotating rod (505) and the rotating plate (507) are rounded at one end, the diameter of the closing plate (510) is equal to that of the opposite hole (509), and the width of the cleaning hole (504) is greater than that of the cleaning brush (404).
5. The building curtain wall according to claim 4, wherein an arc angle is formed at one end of the limiting plate (604), the diameter of the arc angle is equal to that of the circular groove (606), the width of the circular groove (606) is equal to that of the limiting plate (604), a chamfer is formed at the bottom end of the connecting column (605), and the diameter of the connecting column (605) is equal to that of the connecting groove (601).
CN202011027844.7A 2020-09-26 2020-09-26 Environment-friendly building curtain Active CN112095871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011027844.7A CN112095871B (en) 2020-09-26 2020-09-26 Environment-friendly building curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011027844.7A CN112095871B (en) 2020-09-26 2020-09-26 Environment-friendly building curtain

Publications (2)

Publication Number Publication Date
CN112095871A CN112095871A (en) 2020-12-18
CN112095871B true CN112095871B (en) 2021-10-12

Family

ID=73756242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011027844.7A Active CN112095871B (en) 2020-09-26 2020-09-26 Environment-friendly building curtain

Country Status (1)

Country Link
CN (1) CN112095871B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746685A (en) * 2020-12-28 2021-05-04 王爱林 Energy-saving wall body suitable for heating-free indoor bathroom
CN113529963B (en) * 2021-08-20 2022-05-24 山东鼎驰木业集团有限公司 Quickly-built wooden house

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4000770A1 (en) * 1990-01-12 1991-07-18 Reynolds Aluminium Deutschland CONNECTION OF THE JOINT BETWEEN BAR AND POST ON A CARRIER FOR ONE OR ON A FAÇADE WALL
JP2837808B2 (en) * 1994-07-25 1998-12-16 ナショナル住宅産業株式会社 Exterior wall panel installation structure
DE19834519A1 (en) * 1998-07-31 2000-02-03 Seele Gmbh & Co Kg Cleaning and shading system for double walled glass roof or wall can be operated from inside either as required or automatically
CN108643416B (en) * 2018-07-18 2019-12-10 深圳市腾基建设工程有限公司 But mansion glass curtain wall of automatically cleaning
CN109826344A (en) * 2019-04-03 2019-05-31 江苏中装建设有限公司 A kind of element type building curtain wall
CN209941990U (en) * 2019-04-30 2020-01-14 东莞市景润装饰有限公司 Self-cleaning curtain wall
CN110792384B (en) * 2019-09-09 2021-04-20 宁波先锋新材料股份有限公司 Curtain device with freely adjustable shielding position
CN211499361U (en) * 2019-11-23 2020-09-15 北京仁久建设工程有限公司 Curtain wall mounting structure
CN111535709A (en) * 2020-05-21 2020-08-14 重庆宏亚远桥金属制品有限责任公司 Energy-saving window structure and construction method thereof

Also Published As

Publication number Publication date
CN112095871A (en) 2020-12-18

Similar Documents

Publication Publication Date Title
CN112095871B (en) Environment-friendly building curtain
CN215483576U (en) Steel construction is combination cross-section structure for post roof beam
CN112827303B (en) Interior decoration is with dustproof curtain that hangs down
CN218324291U (en) Safety device is used in construction in room
CN221494796U (en) Welding fixture
CN217949835U (en) Elevator shaft opening edge protection device
CN211114276U (en) High-rise building photovoltaic curtain wall
CN216215643U (en) Steel cable bridge with rain-proof fire prevention function
CN110854740A (en) High altitude suspension insulator dismouting mechanism and automatic change device
CN214784797U (en) Assembled steel construction building steel beam column combination wall
CN216867731U (en) Hoop replaceable anti-seismic support for air pipe
CN217106338U (en) Building site is with protection canopy
CN214098485U (en) Building construction monitoring platform based on BIM
CN216240250U (en) Environment-friendly energy-saving device for steel structure building wall
CN219365632U (en) Protection fence structure for building construction
CN220100438U (en) Novel canopy
CN216921192U (en) Pipeline structure in high building elevator shaft
CN219754192U (en) Telegraph pole convenient for wire erection
CN220732922U (en) Intelligent building security device
CN214462317U (en) Building construction platform with protective structure
CN109339352A (en) A kind of curtain wall lighting roof installation fixed structure of glass plate
CN214090501U (en) Curtain wall connecting structure based on high-rise building
CN221031701U (en) Novel well drilling rain-proof sand prevention canopy
CN218264462U (en) Aluminum profile curtain wall for building
CN114922287B (en) High-efficient installation formula house steel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Qi Meili

Inventor after: Deng Zhaorong

Inventor before: Deng Zhaorong

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210923

Address after: 518000 unit AB, 5th floor, gang'an building, No.19, Shihua Road, Futian Free Trade Zone, Fubao community, Fubao street, Futian District, Shenzhen, Guangdong Province

Applicant after: Shenzhen Ruiwei Engineering Co.,Ltd.

Address before: 510000 No. 157, Gongye Avenue, Haizhu District, Guangzhou, Guangdong

Applicant before: Deng Zhaorong

GR01 Patent grant