CN112051467A - Automatic testing method for energy storage high-voltage box product - Google Patents
Automatic testing method for energy storage high-voltage box product Download PDFInfo
- Publication number
- CN112051467A CN112051467A CN202010935732.5A CN202010935732A CN112051467A CN 112051467 A CN112051467 A CN 112051467A CN 202010935732 A CN202010935732 A CN 202010935732A CN 112051467 A CN112051467 A CN 112051467A
- Authority
- CN
- China
- Prior art keywords
- test
- voltage
- testing
- unit
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/025—Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/12—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/52—Testing for short-circuits, leakage current or ground faults
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
Description
技术领域technical field
本发明涉及储能高压箱产品测试技术领域,具体为一种用于储能高压箱产品的自动化测试方法。The invention relates to the technical field of energy storage high-voltage box product testing, in particular to an automated testing method for energy-storage high-voltage box products.
背景技术Background technique
整个储能系统主要是由PCS系统、电池系统、管理控制系统以及后台监控系统四部分组成。储能高压箱产品作为储能管理控制系统的核心组成部分,负责整个储能系统之间的数据分析、管理、控制和通信交互。储能高压箱产品功能和质量的可靠,关乎着整个储能系统的安全性和稳定性。The entire energy storage system is mainly composed of four parts: PCS system, battery system, management control system and background monitoring system. As the core component of the energy storage management and control system, the energy storage high-voltage box product is responsible for data analysis, management, control and communication interaction between the entire energy storage system. The reliability of the function and quality of the energy storage high-voltage box products is related to the safety and stability of the entire energy storage system.
储能高压箱产品的主要组成部分包括CMU、采集传感器(电压/电流/漏电流/温度)、开关及操作机构(断路器、接触器、电操)、熔断器、电源部分、热管理部分(风扇和空调)、通信部分外加连接线束和连接铜排一起组成的一个数据采集、分析、通信和管理的管理控制系统。基本工作原理是高压箱系统通过外部通信交互和内部传感器采集的方式获取储能系统采集单元提供的电池电压、充放电电流、温度、绝缘电阻等参数,经过内部的CMU进行汇总分析后,控制内部开关及操作机构和热管理部分动作或保持,从而对储能系统的运行进行监测和保护;同时高压箱系统通过外部通信交互将这些数据上传至储能系统的后台监控系统,便于后台系统对于储能系统运行状态的进行实时监控和管理。The main components of energy storage high-voltage box products include CMU, acquisition sensor (voltage/current/leakage current/temperature), switch and operating mechanism (circuit breaker, contactor, electric operation), fuse, power supply part, thermal management part ( A management and control system for data acquisition, analysis, communication and management composed of a communication part plus a connecting wire harness and a connecting copper bar. The basic working principle is that the high-voltage box system obtains the battery voltage, charge and discharge current, temperature, insulation resistance and other parameters provided by the energy storage system acquisition unit through external communication interaction and internal sensor acquisition. The switch, operating mechanism and thermal management part act or maintain, so as to monitor and protect the operation of the energy storage system; at the same time, the high-voltage box system uploads these data to the background monitoring system of the energy storage system through external communication interaction, which is convenient for the background system to monitor the storage system. Real-time monitoring and management of system operating status.
储能高压箱产品作为储能管理控制系统的核心组成部分,负责整个储能系统之间的数据分析、管理、控制和通信交互。储能高压箱产品功能和质量的可靠,关乎着整个储能系统的安全性和稳定性。经过调研,现有的储能行业中,大部分厂家的储能高压箱产品出货测试主要有以下两种方法:As the core component of the energy storage management and control system, the energy storage high-voltage box product is responsible for data analysis, management, control and communication interaction between the entire energy storage system. The reliability of the function and quality of the energy storage high-voltage box products is related to the safety and stability of the entire energy storage system. After investigation, in the existing energy storage industry, most manufacturers have the following two methods for the delivery test of energy storage high-voltage box products:
(1)依靠外购各种成套设备和测试工具手动模拟测试或者人工搭建测试平台,通过仿真现场储能系统运行的方式测试储能高压箱产品的主要功能。(1) Rely on outsourcing various complete sets of equipment and test tools to manually simulate the test or build a test platform manually, and test the main functions of the energy storage high-voltage box products by simulating the operation of the on-site energy storage system.
(2)将已组装好的储能高压箱产品初步检测后置于储能系统内部,依靠联调现场出货的储能系统来测试储能高压箱的功能和质量。(2) Preliminarily test the assembled energy storage high-voltage box products and place them inside the energy storage system, and rely on the energy storage system shipped on site to test the function and quality of the energy storage high-voltage box.
虽然以上两种方法均能实现储能高压箱产品的功能测试,但是存在以下问题和缺点:Although the above two methods can realize the functional test of energy storage high-voltage box products, there are the following problems and disadvantages:
(1)手动模拟测试或者人工搭建平台测试效率低、人工成本高,不利于储能高压箱产品的批量生产出货。且储能高压箱部分功能测试通过人工平台和手动模拟及其困难甚至无法实现,故此种方法还存在测试功能不全面,测试结果不真实的风险。(1) Manual simulation test or manual platform building test has low efficiency and high labor cost, which is not conducive to mass production and shipment of energy storage high-voltage box products. In addition, some functional tests of the energy storage high-voltage box are difficult or even impossible to achieve through manual platform and manual simulation. Therefore, this method still has the risk of incomplete test functions and unreal test results.
(2)依靠联调现场出货的储能系统来测试储能高压箱产品的功能和质量,此种方法虽然真实有效,也可全面测试。但是每次测试时需提前准备好供联调测试的储能系统,测试过程中需要根据整体的储能测试数据进行筛选和分析,还得排除因其他产品问题带来的干扰和故障,故此方法测试效率低下、测试前准备时间和测试结束后拆卸时间较长、对厂家调试人员技术要求高、投入时间和经济成本高,故此种方法并不适用于储能高压箱产品测试经济、高效、全面、通用的基本理念。(2) Test the function and quality of the energy storage high-voltage box products by relying on the energy storage system shipped from the joint commissioning site. Although this method is real and effective, it can also be fully tested. However, for each test, the energy storage system for the joint test needs to be prepared in advance. During the test, it is necessary to screen and analyze the overall energy storage test data, and to eliminate the interference and faults caused by other product problems. Therefore, this method The test efficiency is low, the preparation time before the test and the disassembly time after the test are long, the technical requirements for the manufacturer's debugging personnel are high, the investment time and economic cost are high, so this method is not suitable for energy storage high-voltage box product testing. Economical, efficient and comprehensive , General basic concept.
发明内容SUMMARY OF THE INVENTION
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本发明提供了一种用于储能高压箱产品的自动化测试方法,解决了现有的储能高压箱产品测试人力与经济成本居高不下,测试效率低下、测试难度高、测试周期时间长的问题。In view of the deficiencies of the prior art, the present invention provides an automatic testing method for energy storage high-voltage box products, which solves the problem that the existing energy-storage high-voltage box products have high labor and economic costs, low test efficiency and difficulty in testing. High, long test cycle time.
(二)技术方案(2) Technical solutions
为实现以上目的,本发明通过以下技术方案予以实现:一种用于储能高压箱产品的自动化测试方法,包括硬件平台与软件测试部分,所述硬件平台包括恒流源单元、恒压源单元、内阻测量单元、交直流耐压测试单元、高压控制自动切换单元、供电单元、温度检测单元、AI/AO/DI/DO仿真模拟信号输出和检测单元、低压控制自动切换单元与网络通信及服务器单元;所述软件测试部分包括测试上位机与测试CASE脚本,所述测试上位机由信息采集、数据解析、通信交互、功能控制和分析判断、测试结果输出部分组成,所述测试CASE脚本由值、对象、数组、字符串、数字部分组成。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: an automated testing method for energy storage high-voltage box products, comprising a hardware platform and a software testing part, the hardware platform comprising a constant current source unit, a constant voltage source unit , internal resistance measurement unit, AC and DC withstand voltage test unit, high voltage control automatic switching unit, power supply unit, temperature detection unit, AI/AO/DI/DO simulation analog signal output and detection unit, low voltage control automatic switching unit and network communication and Server unit; The software testing part includes a test host computer and a test CASE script, the test host computer is composed of information collection, data analysis, communication interaction, function control and analysis judgment, and test result output parts, and the test CASE script is composed of Value, object, array, string, number part.
优选的,所述的测试上位机由信息采集、数据解析、通信交互、功能控制和分析判断、测试结果输出部分组成,所述测试CASE由值、对象、数组、字符串、数字部分组成,其特征在于:在每个测试过程中,测试上位机按照流程依次调用测试CASE-1至测试CASE-n(n≥1),每次调用后进行测试结果判定并输出测试结果,然后进行下一步测试。Preferably, the test host computer is composed of information collection, data analysis, communication interaction, function control and analysis and judgment, and test result output, and the test case is composed of value, object, array, character string, and number. It is characterized in that: in each test process, the test host computer sequentially calls the test CASE-1 to the test CASE-n (n≥1) according to the process, and after each call, the test result is judged and the test result is output, and then the next test is performed. .
优选的,所述测试上位机提供测试CASE供用户选择,每一个所述测试CASE对应一项储能高压箱产品功能,所述测试CASE依照储能高压箱产品的功能和逻辑要求按照特定的格式来开发和编写,所述测试CASE能覆盖储能高压箱产品的全部出货功能。Preferably, the test host computer provides a test case for the user to choose, each test case corresponds to a function of an energy storage high-voltage box product, and the test case is in a specific format according to the function and logic requirements of the energy-storage high-voltage box product To develop and write, the test CASE can cover all the shipping functions of the energy storage high-voltage tank products.
优选的,所述恒流源单元采用可远程通信的程控恒定电流源组成;所述恒压源单元采用可远程通信的程控恒定电压源组成;所述内阻测量单元采用可远程通信的程控高精度电阻测试仪组成;所述交直流耐压测试单元采用可远程通信的程控高精度交直流绝缘耐压仪组成;所述高压控制自动切换单元采用多路高压接触器、低压继电器矩阵和多路DO控制模块组成;所述供电单元采用可远程通信的程控AC-DC电源组成;所述温度检测单元采用可远程通信的温度变送器和高精度热电偶组成;所述AI/AO/DI/DO仿真模拟信号输出和检测单元由AI、AO、DI与DO四种功能模块组成;所述低压控制自动切换单元采用低压继电器矩阵和多路DO控制模块组成;所述网络通信及服务器单元由网络通信服务器、工业交换机、网关、CAN盒、串口服务器等通信模块和网络设备组成;所述软件测试部分包括测试上位机与测试CASE;所述测试上位机由信息采集、数据解析、通信交互、功能控制和分析判断、测试结果输出部分组成,所述测试CASE由值、对象、数组、字符串、数字部分组成。Preferably, the constant current source unit is composed of a program-controlled constant current source capable of remote communication; the constant voltage source unit is composed of a program-controlled constant voltage source capable of remote communication; the internal resistance measurement unit is composed of a program-controlled high voltage source capable of remote communication It is composed of a precision resistance tester; the AC and DC withstand voltage test unit is composed of a program-controlled high-precision AC and DC insulation withstand voltage instrument capable of remote communication; the high-voltage control automatic switching unit adopts a multi-channel high-voltage contactor, a low-voltage relay matrix and a multi-channel The DO control module is composed; the power supply unit is composed of a program-controlled AC-DC power supply that can communicate remotely; the temperature detection unit is composed of a temperature transmitter that can communicate remotely and a high-precision thermocouple; the AI/AO/DI/ The DO simulation analog signal output and detection unit is composed of four functional modules: AI, AO, DI and DO; the low-voltage control automatic switching unit is composed of a low-voltage relay matrix and a multi-channel DO control module; the network communication and server unit is composed of a network Communication server, industrial switch, gateway, CAN box, serial port server and other communication modules and network equipment; the software test part includes a test host computer and a test case; the test host computer is composed of information collection, data analysis, communication interaction, function It is composed of control and analysis judgment and test result output parts, and the test case is composed of value, object, array, character string, and number part.
优选的,所述硬件平台与软件测试部分通过以下步骤对于储能高压箱产品进行自动测试:Preferably, the hardware platform and the software testing part perform automatic testing on the energy storage high-voltage box product through the following steps:
第一步、利用硬件平台测试储能高压箱产品时,测试上位机调用初始化平台CASE并根据初始化平台CASE中逻辑完成高压箱和高压箱测试系统初始化,确保高压箱已正常上电运行,确保自动化测试平台内部的各功能模块和设备均已进入就绪状态;The first step, when using the hardware platform to test the energy storage high-voltage box product, the test host computer calls the initialization platform CASE and completes the initialization of the high-voltage box and the high-voltage box test system according to the logic in the initialization platform CASE to ensure that the high-voltage box has been powered on normally. All functional modules and equipment inside the test platform have entered the ready state;
第二步、利用硬件平台测试高压箱产品高压部分功能时,测试上位机调用测试CASE后根据测试CASE中设定逻辑控制高压控制自动切换单元切换为对应的高压测试回路,同时控制硬件平台中的高压测试单元输出或测量。The second step is to use the hardware platform to test the function of the high-voltage part of the high-voltage box product. After calling the test CASE, the test host computer controls the high-voltage control automatic switching unit to switch to the corresponding high-voltage test loop according to the logic set in the test CASE, and controls the hardware platform. High voltage test unit output or measurement.
第三步、硬件平台高压测试单元中的测量设备可直接读取或采集对应的高压箱数值,然后通过网络通信设备上传至测试上位机,综合测试CASE中设定的参数进行分析比对,得出对应的测试报告和结论,硬件平台高压测试单元中的输出设备可根据测试CASE设定输出对应的电压、电流值给高压箱采集,高压箱内部的功能模块接收并采集到输入的电压、电流值后将高压箱内部的状态变化和采样值通过网络通信设备上传至测试上位机,测试上位机结合测试设定值、高压箱采样值、高压箱状态变化进行分析判断,得出得出对应的测试报告和结论。The third step, the measurement equipment in the high-voltage test unit of the hardware platform can directly read or collect the corresponding high-voltage box value, and then upload it to the test host computer through the network communication device, and analyze and compare the parameters set in the comprehensive test CASE. The corresponding test report and conclusion are obtained. The output device in the high-voltage test unit of the hardware platform can output the corresponding voltage and current values according to the test CASE settings to the high-voltage box for collection, and the functional modules inside the high-voltage box receive and collect the input voltage and current. After the value is determined, the state change and sampling value inside the high-voltage box are uploaded to the test host computer through the network communication device. Test reports and conclusions.
第四步、利用硬件平台测试高压箱产品低压部分功能时,测试上位机调用测试CASE后根据测试CASE中设定逻辑控制低压控制自动切换单元切换为对应的低压测试回路,并控制硬件平台中低压测试单元的AO和DO仿真测试单元模拟输出测试所需的AO和DO信号给储能高压箱低压部分采集或检测,同时,储能高压箱低压部分也可根据测试CASE中设定的输出需求输出对应的AO和DO信号给自动化测试系统中的AI和DI功能模块进行检测。The fourth step is to use the hardware platform to test the function of the low-voltage part of the high-voltage box product. After calling the test CASE, the test host computer controls the low-voltage control automatic switching unit to switch to the corresponding low-voltage test loop according to the logic set in the test CASE, and controls the medium and low voltage of the hardware platform. The AO and DO simulation test unit of the test unit simulates the AO and DO signals required for the output test to collect or detect the low-voltage part of the energy storage high-voltage box. At the same time, the low-voltage part of the energy-storage high-voltage box can also output according to the output demand set in the test case. The corresponding AO and DO signals are detected by the AI and DI function modules in the automated test system.
第五步、高压箱采集到硬件平台输出的AO/DO信号后将自身的状态变化和转换后的数据上传给测试上位机;同时,自动化测试系统中的AI和DI功能模块检测到高压箱低压部分输出的AO/DO信号后将检测到的数据也上传给测试上位机,测试上位机综合高压箱的输入、输出值以及高压箱的自身状态变化并结合测试CASE中的逻辑设定要求进行分析判断,得出测试结果并输出对应的测试报告。Step 5. After the high-voltage box collects the AO/DO signal output by the hardware platform, it uploads its own state changes and converted data to the test host computer; at the same time, the AI and DI function modules in the automated test system detect the low-voltage of the high-voltage box. After part of the output AO/DO signal, the detected data will also be uploaded to the test host computer to test the input and output values of the host computer's integrated high-voltage box and the state change of the high-voltage box, and analyze it in combination with the logic setting requirements in the test case. Judgment, get the test result and output the corresponding test report.
第六步、硬件平台低压测试单元中的服务器模拟单元主要功能是提供BMU仿真模拟数据给高压箱内部的CMU采集,以判断高压箱内部的CMU及CAN通信回路是否合格;测试上位机根据测试CASE控制服务器模拟单元输出供测试用的BMU仿真数据给高压箱内部的CMU采集,同时将CMU采集到BMU数据后的状态变化上传给测试上位机进行分析和判断,得出测试结果并输出对应的测试报告。The sixth step, the main function of the server simulation unit in the low-voltage test unit of the hardware platform is to provide BMU simulation data to the CMU inside the high-voltage box to collect, so as to judge whether the CMU and CAN communication circuit inside the high-voltage box are qualified; test the host computer according to the test CASE The control server simulation unit outputs the BMU simulation data for testing to the CMU inside the high-voltage box for collection, and at the same time uploads the state changes after the CMU collects the BMU data to the test host computer for analysis and judgment, and obtains the test results and outputs the corresponding test. Report.
第七步、硬件平台低压测试单元中的温度检测单元主要功能是为高压箱内部的环境温度采集和极柱温度采集是否精准提供一个参考和比对值;测试时,需将温度变送器连接的热电偶置于高压箱内部,温度变送器直接读取热电偶采集的温度数值并将采集数据上传给测试上位机;同时测试上位机读取高压箱上传的内部环境温度和极柱温度,通过对温度变送器上传值与高压箱上传值比对并结合测试CASE中的设定要求进行分析判断,得出测试结果并输出对应的测试报告。Step 7. The main function of the temperature detection unit in the low-voltage test unit of the hardware platform is to provide a reference and comparison value for the accuracy of the ambient temperature acquisition and the pole temperature acquisition inside the high-pressure box; during the test, the temperature transmitter needs to be connected The thermocouple is placed inside the high pressure box, the temperature transmitter directly reads the temperature value collected by the thermocouple and uploads the collected data to the test host computer; at the same time, the test host computer reads the internal ambient temperature and pole temperature uploaded by the high pressure box, By comparing the upload value of the temperature transmitter with the upload value of the high pressure box and analyzing and judging in combination with the setting requirements in the test case, the test result is obtained and the corresponding test report is output.
第八步、用户根据储能高压箱产品实际出货需求设置和选择对应测试CASE进行加载测试,全部参数设置好后,测试上位机遵循一键式操作;同时,开发人员编写测试CASE时可根据现场出货时间紧急程度适当调整延时和测试时间。The eighth step, the user sets and selects the corresponding test case for the loading test according to the actual shipping requirements of the energy storage high-voltage box product. After all parameters are set, the test host computer follows the one-button operation; at the same time, the developer can write the test case according to the The delay and test time are appropriately adjusted according to the urgency of the on-site delivery time.
第九步、利用硬件平台完成高压箱全部功能测试后,测试上位机自动根据测试数据记录整理和汇总出一份最终版的测试报告,并通过网络通信及服务器单元将测试报告上传至云端服务器供后台人员查看和下载。The ninth step, after using the hardware platform to complete the full functional test of the high-voltage box, the test host computer automatically organizes and summarizes a final version of the test report according to the test data records, and uploads the test report to the cloud server through network communication and the server unit for supply. Background staff to view and download.
优选的,所述硬件平台测试时按照测试回路走向和电压等级又可分为:高压箱高压部分测试、高压箱低压部分测试,所述高压箱高压部分测试包括高压箱的簇电压测试、簇电流测试、漏电流测试、绝缘电阻测试、交流耐压测试、直流耐压测试、黑启动测试、内阻测试、分合闸测试、电操功能测试。Preferably, the hardware platform test can be further divided into: high-voltage box high-voltage part test and high-voltage box low-voltage part test according to the test loop direction and voltage level, and the high-voltage box high-voltage part test includes the cluster voltage test of the high-voltage box, cluster current test Test, leakage current test, insulation resistance test, AC withstand voltage test, DC withstand voltage test, black start test, internal resistance test, opening and closing test, electrical operation function test.
优选的,所述高压箱的簇电压测试采用硬件平台中提到的恒压源单元、高压控制自动切换单元组合完成;所述高压箱的簇电流测试采用硬件平台中提到的恒流源单元、高压控制自动切换单元组合完成;所述漏电流测试采用硬件平台中提到的AO仿真模拟信号输出单元、高压控制自动切换单元组合完成;所述绝缘电阻测试采用硬件平台中提到的交直流耐压测试单元、高压控制自动切换单元组合完成;所述交流耐压测试采用硬件平台中提到的交直流耐压测试单元、高压控制自动切换单元组合完成;所述直流耐压测试采用硬件平台中提到的交直流耐压测试单元、高压控制自动切换单元组合完成;所述黑启动测试采用硬件平台中提到的恒压源单元、高压控制自动切换单元组合完成;所述内阻测试采用硬件平台中提到的内阻测量单元、高压控制自动切换单元组合完成;所述分合闸测试采用硬件平台中提到的内阻测量单元、高压控制自动切换单元组合完成;所述电操测试采用硬件平台中提到的内阻测量单元、高压控制自动切换单元组合完成。Preferably, the cluster voltage test of the high-voltage box adopts the combination of the constant voltage source unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the cluster current test of the high-voltage box adopts the constant current source unit mentioned in the hardware platform. The combination of the high-voltage control automatic switching unit is completed; the leakage current test is completed by the combination of the AO simulation analog signal output unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the insulation resistance test uses the AC and DC mentioned in the hardware platform. The withstand voltage test unit and the high voltage control automatic switching unit are combined to complete; the AC withstand voltage test is completed by the combination of the AC and DC withstand voltage test unit and the high voltage control automatic switching unit mentioned in the hardware platform; the DC withstand voltage test is completed by using the hardware platform The combination of the AC and DC withstand voltage test unit and the high-voltage control automatic switching unit mentioned in is completed; the black-start test is completed by the combination of the constant voltage source unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the internal resistance test adopts The combination of the internal resistance measurement unit and the high-voltage control automatic switching unit mentioned in the hardware platform is completed; the opening and closing test is completed by the combination of the internal resistance measurement unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the electrical operation test is completed; It is completed by the combination of the internal resistance measurement unit and the high-voltage control automatic switching unit mentioned in the hardware platform.
优选的,所述高压箱低压部分测试包括:高压箱的DI输入测试、高压箱的DO输出测试、高压箱的AI输入测试、高压箱的AO输出测试、温度一致性测试和CAN通信测试;所述高压箱的DI输入测试采用硬件平台中提到的DO仿真模拟信号输出单元、低压控制自动切换单元组合完成;所述高压箱的DO输出测试采用硬件平台中提到的DI信号检测单元、低压控制自动切换单元组合完成;所述高压箱的AI输入测试采用硬件平台中提到的AO仿真模拟信号输出单元、低压控制自动切换单元组合完成;所述高压箱的AO输出测试采用硬件平台中提到的AI信号检测单元、低压控制自动切换单元组合完成;所述高压箱的温度一致性测试采用硬件平台中提到的温度检测单元完成;所述高压箱的CAN通信测试采用硬件平台中提到的网络通信及服务器单元完成。Preferably, the test of the low-voltage part of the high-voltage box includes: the DI input test of the high-voltage box, the DO output test of the high-voltage box, the AI input test of the high-voltage box, the AO output test of the high-voltage box, the temperature consistency test and the CAN communication test; The DI input test of the high-voltage box is completed by the combination of the DO simulation analog signal output unit and the low-voltage control automatic switching unit mentioned in the hardware platform; the DO output test of the high-voltage box adopts the DI signal detection unit, low-voltage control unit mentioned in the hardware platform. The combination of the control automatic switching unit is completed; the AI input test of the high-voltage box is completed by the combination of the AO simulation analog signal output unit and the low-voltage control automatic switching unit mentioned in the hardware platform; the AO output test of the high-voltage box is completed by the hardware platform. The received AI signal detection unit and low-voltage control automatic switching unit are combined and completed; the temperature consistency test of the high-voltage box is completed by using the temperature detection unit mentioned in the hardware platform; the CAN communication test of the high-voltage box is completed by using the hardware platform mentioned in the test. The network communication and server unit are completed.
有益效果beneficial effect
本发明提供了一种用于储能高压箱产品的自动化测试方法。具备以下有益效果:The invention provides an automatic testing method for energy storage high-voltage box products. Has the following beneficial effects:
(1)、该用于储能高压箱产品的自动化测试方法,通过全过程实时读取和记录真实的测试数据,自动筛选出不通过测试项,自动根据测试数据记录整理和汇总输出具有说服力的测试报告,减少人工参与及修改,能确保测试报告的真实性和可靠性,提升品控管理,保证出货质量。本发明方法操作简单且要求测试上位机可根据测试需求设置一键测试、循环测试、暂停/接续测试等功能键。故而对操作人员技术要求低,测试工作量小而简单,普通的生产工人即可按照测试流程和作业指导进行操作。(1) This automatic test method for energy storage high-voltage box products can read and record real test data in real time through the whole process, automatically filter out the test items that fail, and automatically record and summarize the output according to the test data. It is convincing It can ensure the authenticity and reliability of the test report, improve the quality control management, and ensure the quality of the shipment. The method of the invention is simple to operate and requires that the test host computer can set function keys such as one-key test, loop test, pause/continue test and the like according to test requirements. Therefore, the technical requirements for operators are low, the test workload is small and simple, and ordinary production workers can operate according to the test process and operation instructions.
(2)、该用于储能高压箱产品的自动化测试方法,自动化程度高且能够实现循环测试,测试启动后不需要人工参与,能够自动记录并导出测试数据和结果,自动输出测试报告,从而解放人力资源,节约人力成本,提升测试效率。本发明方法能够根据不同的测试项目和需求编辑对应的测试CASE脚本,测试CASE脚本可全面覆盖储能高压箱产品的各项功能和保护控制逻辑,实现测试功能多样化。本发明方法测试完成后测试上位机通过网络通信及服务器单元自动将测试报告和测试数据上传至云端服务器,实现测试全过程可监测、可管理,便于测试人员分析测试数据,改进测试方法和产品质量。(2) The automatic test method for energy storage high-voltage box products has a high degree of automation and can realize cyclic testing. No manual participation is required after the test is started, and the test data and results can be automatically recorded and exported, and the test report can be automatically output, thereby Liberate human resources, save labor costs, and improve test efficiency. The method of the invention can edit corresponding test CASE scripts according to different test items and requirements, and the test CASE scripts can comprehensively cover various functions and protection control logics of energy storage high-voltage box products, thereby realizing the diversification of test functions. After the test of the method of the present invention is completed, the test host computer automatically uploads the test report and test data to the cloud server through network communication and the server unit, so that the whole test process can be monitored and managed, which is convenient for testers to analyze the test data and improve the test method and product quality. .
附图说明Description of drawings
图1为本发明储能高压箱产品系统原理图;Fig. 1 is the principle diagram of the energy storage high-voltage box product system of the present invention;
图2为本发明硬件平台原理图;2 is a schematic diagram of a hardware platform of the present invention;
图3为本发明硬件平台网络图;Fig. 3 is the hardware platform network diagram of the present invention;
图4为利用本发明提供的硬件平台测试储能高压箱产品初始化功能的测试逻辑图;Fig. 4 is the test logic diagram of utilizing the hardware platform provided by the present invention to test the initialization function of the energy storage high-voltage box product;
图5、6、7、8、9为利用本发明提供的硬件平台测试储能高压箱产品高压部分的测试逻辑图;5, 6, 7, 8, and 9 are test logic diagrams for testing the high-voltage part of the energy storage high-voltage box product using the hardware platform provided by the present invention;
图10、11、12、13为利用本发明提供的硬件平台测试储能高压箱产品低压部分的测试逻辑图;10, 11, 12, and 13 are test logic diagrams for testing the low-voltage part of the energy storage high-voltage box product using the hardware platform provided by the present invention;
图14为本发明自动化测试处理流程框图;Fig. 14 is a flow chart of the automated testing process of the present invention;
图15为本发明实际应用测试流程图。FIG. 15 is a flow chart of the practical application test of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-15,本发明提供一种技术方案:一种用于储能高压箱产品的自动化测试方法,包括硬件平台与软件测试部分,硬件平台包括恒流源单元、恒压源单元、内阻测量单元、交直流耐压测试单元、高压控制自动切换单元、供电单元、温度检测单元、AI/AO/DI/DO仿真模拟信号输出和检测单元、低压控制自动切换单元与网络通信及服务器单元;软件测试部分包括测试上位机与测试CASE脚本,测试上位机由信息采集、数据解析、通信交互、功能控制和分析判断、测试结果输出部分组成,测试CASE脚本由值、对象、数组、字符串、数字部分组成。1-15, the present invention provides a technical solution: an automatic testing method for energy storage high-voltage box products, including a hardware platform and a software testing part, the hardware platform includes a constant current source unit, a constant voltage source unit, Internal resistance measurement unit, AC and DC withstand voltage test unit, high voltage control automatic switching unit, power supply unit, temperature detection unit, AI/AO/DI/DO simulation analog signal output and detection unit, low voltage control automatic switching unit and network communication and server Unit; the software test part includes the test host computer and the test case script. The test host computer is composed of information collection, data analysis, communication interaction, function control and analysis and judgment, and test result output. The test case script is composed of values, objects, arrays, characters String and numeric parts.
本实施例中,的测试上位机由信息采集、数据解析、通信交互、功能控制和分析判断、测试结果输出部分组成,测试CASE由值、对象、数组、字符串、数字部分组成,其特征在于:在每个测试过程中,测试上位机按照流程依次调用测试CASE-1至测试CASE-n(n≥1),每次调用后进行测试结果判定并输出测试结果,然后进行下一步测试。In this embodiment, the test host computer is composed of information collection, data analysis, communication interaction, function control and analysis and judgment, and test result output parts, and the test case is composed of value, object, array, character string, and number. : In each test process, the test host computer sequentially calls the test CASE-1 to the test CASE-n (n≥1) according to the process. After each call, the test result is judged and the test result is output, and then the next test is performed.
本实施例中,测试上位机提供测试CASE供用户选择,每一个测试CASE对应一项储能高压箱产品功能,测试CASE依照储能高压箱产品的功能和逻辑要求按照特定的格式来开发和编写,测试CASE能覆盖储能高压箱产品的全部出货功能。In this embodiment, the test host computer provides test cases for the user to choose, each test case corresponds to a function of the energy storage high-voltage box product, and the test case is developed and written in a specific format according to the function and logic requirements of the energy-storage high-voltage box product , the test CASE can cover all the shipping functions of the energy storage high-voltage box products.
本实施例中,恒流源单元采用可远程通信的程控恒定电流源组成;恒压源单元采用可远程通信的程控恒定电压源组成;内阻测量单元采用可远程通信的程控高精度电阻测试仪组成;交直流耐压测试单元采用可远程通信的程控高精度交直流绝缘耐压仪组成;高压控制自动切换单元采用多路高压接触器、低压继电器矩阵和多路DO控制模块组成;供电单元采用可远程通信的程控AC-DC电源组成;温度检测单元采用可远程通信的温度变送器和高精度热电偶组成;AI/AO/DI/DO仿真模拟信号输出和检测单元由AI、AO、DI与DO四种功能模块组成;低压控制自动切换单元采用低压继电器矩阵和多路DO控制模块组成;网络通信及服务器单元由网络通信服务器、工业交换机、网关、CAN盒、串口服务器等通信模块和网络设备组成;软件测试部分包括测试上位机与测试CASE;测试上位机由信息采集、数据解析、通信交互、功能控制和分析判断、测试结果输出部分组成,测试CASE由值、对象、数组、字符串、数字部分组成。In this embodiment, the constant current source unit is composed of a program-controlled constant current source capable of remote communication; the constant voltage source unit is composed of a program-controlled constant voltage source capable of remote communication; the internal resistance measurement unit is composed of a program-controlled high-precision resistance tester capable of remote communication Composition; AC and DC withstand voltage test unit is composed of program-controlled high-precision AC and DC insulation withstand voltage instrument with remote communication; high-voltage control automatic switching unit is composed of multi-channel high-voltage contactor, low-voltage relay matrix and multi-channel DO control module; power supply unit adopts It is composed of a program-controlled AC-DC power supply that can communicate remotely; the temperature detection unit is composed of a temperature transmitter that can communicate remotely and a high-precision thermocouple; the AI/AO/DI/DO simulation analog signal output and detection unit is composed of AI, AO, DI It is composed of four functional modules with DO; the low-voltage control automatic switching unit is composed of low-voltage relay matrix and multi-channel DO control modules; the network communication and server unit is composed of network communication server, industrial switch, gateway, CAN box, serial port server and other communication modules and network Equipment composition; software test part includes test host computer and test case; test host computer is composed of information collection, data analysis, communication interaction, function control and analysis judgment, test result output part, test case is composed of value, object, array, string , the digital part.
本实施例中,硬件平台与软件测试部分通过以下步骤对于储能高压箱产品进行自动测试:In this embodiment, the hardware platform and the software testing part perform automatic testing on the energy storage high-voltage box product through the following steps:
第一步、利用硬件平台测试储能高压箱产品时,测试上位机调用初始化平台CASE并根据初始化平台CASE中逻辑完成高压箱和高压箱测试系统初始化,确保高压箱已正常上电运行,确保自动化测试平台内部的各功能模块和设备均已进入就绪状态;The first step, when using the hardware platform to test the energy storage high-voltage box product, the test host computer calls the initialization platform CASE and completes the initialization of the high-voltage box and the high-voltage box test system according to the logic in the initialization platform CASE to ensure that the high-voltage box has been powered on normally. All functional modules and equipment inside the test platform have entered the ready state;
第二步、利用硬件平台测试高压箱产品高压部分功能时,测试上位机调用测试CASE后根据测试CASE中设定逻辑控制高压控制自动切换单元切换为对应的高压测试回路,同时控制硬件平台中的高压测试单元输出或测量。The second step is to use the hardware platform to test the function of the high-voltage part of the high-voltage box product. After calling the test CASE, the test host computer controls the high-voltage control automatic switching unit to switch to the corresponding high-voltage test loop according to the logic set in the test CASE, and controls the hardware platform. High voltage test unit output or measurement.
第三步、硬件平台高压测试单元中的测量设备可直接读取或采集对应的高压箱数值,然后通过网络通信设备上传至测试上位机,综合测试CASE中设定的参数进行分析比对,得出对应的测试报告和结论,硬件平台高压测试单元中的输出设备可根据测试CASE设定输出对应的电压、电流值给高压箱采集,高压箱内部的功能模块接收并采集到输入的电压、电流值后将高压箱内部的状态变化和采样值通过网络通信设备上传至测试上位机,测试上位机结合测试设定值、高压箱采样值、高压箱状态变化进行分析判断,得出得出对应的测试报告和结论。The third step, the measurement equipment in the high-voltage test unit of the hardware platform can directly read or collect the corresponding high-voltage box value, and then upload it to the test host computer through the network communication device, and analyze and compare the parameters set in the comprehensive test CASE. The corresponding test report and conclusion are obtained. The output device in the high-voltage test unit of the hardware platform can output the corresponding voltage and current values according to the test CASE settings to the high-voltage box for collection, and the functional modules inside the high-voltage box receive and collect the input voltage and current. After the value is determined, the state change and sampling value inside the high-voltage box are uploaded to the test host computer through the network communication device. Test reports and conclusions.
第四步、利用硬件平台测试高压箱产品低压部分功能时,测试上位机调用测试CASE后根据测试CASE中设定逻辑控制低压控制自动切换单元切换为对应的低压测试回路,并控制硬件平台中低压测试单元的AO和DO仿真测试单元模拟输出测试所需的AO和DO信号给储能高压箱低压部分采集或检测,同时,储能高压箱低压部分也可根据测试CASE中设定的输出需求输出对应的AO和DO信号给自动化测试系统中的AI和DI功能模块进行检测。The fourth step is to use the hardware platform to test the function of the low-voltage part of the high-voltage box product. After calling the test CASE, the test host computer controls the low-voltage control automatic switching unit to switch to the corresponding low-voltage test loop according to the logic set in the test CASE, and controls the medium and low voltage of the hardware platform. The AO and DO simulation test unit of the test unit simulates the AO and DO signals required for the output test to collect or detect the low-voltage part of the energy storage high-voltage box. At the same time, the low-voltage part of the energy-storage high-voltage box can also output according to the output demand set in the test case. The corresponding AO and DO signals are detected by the AI and DI function modules in the automated test system.
第五步、高压箱采集到硬件平台输出的AO/DO信号后将自身的状态变化和转换后的数据上传给测试上位机;同时,自动化测试系统中的AI和DI功能模块检测到高压箱低压部分输出的AO/DO信号后将检测到的数据也上传给测试上位机,测试上位机综合高压箱的输入、输出值以及高压箱的自身状态变化并结合测试CASE中的逻辑设定要求进行分析判断,得出测试结果并输出对应的测试报告。Step 5. After the high-voltage box collects the AO/DO signal output by the hardware platform, it uploads its own state changes and converted data to the test host computer; at the same time, the AI and DI function modules in the automated test system detect the low-voltage of the high-voltage box. After part of the output AO/DO signal, the detected data will also be uploaded to the test host computer to test the input and output values of the host computer's integrated high-voltage box and the state change of the high-voltage box, and analyze it in combination with the logic setting requirements in the test case. Judgment, get the test result and output the corresponding test report.
第六步、硬件平台低压测试单元中的服务器模拟单元主要功能是提供BMU仿真模拟数据给高压箱内部的CMU采集,以判断高压箱内部的CMU及CAN通信回路是否合格;测试上位机根据测试CASE控制服务器模拟单元输出供测试用的BMU仿真数据给高压箱内部的CMU采集,同时将CMU采集到BMU数据后的状态变化上传给测试上位机进行分析和判断,得出测试结果并输出对应的测试报告。The sixth step, the main function of the server simulation unit in the low-voltage test unit of the hardware platform is to provide BMU simulation data to the CMU inside the high-voltage box to collect, so as to judge whether the CMU and CAN communication circuit inside the high-voltage box are qualified; test the host computer according to the test CASE The control server simulation unit outputs the BMU simulation data for testing to the CMU inside the high-voltage box for collection, and at the same time uploads the state changes after the CMU collects the BMU data to the test host computer for analysis and judgment, and obtains the test results and outputs the corresponding test. Report.
第七步、硬件平台低压测试单元中的温度检测单元主要功能是为高压箱内部的环境温度采集和极柱温度采集是否精准提供一个参考和比对值;测试时,需将温度变送器连接的热电偶置于高压箱内部,温度变送器直接读取热电偶采集的温度数值并将采集数据上传给测试上位机;同时测试上位机读取高压箱上传的内部环境温度和极柱温度,通过对温度变送器上传值与高压箱上传值比对并结合测试CASE中的设定要求进行分析判断,得出测试结果并输出对应的测试报告。Step 7. The main function of the temperature detection unit in the low-voltage test unit of the hardware platform is to provide a reference and comparison value for the accuracy of the ambient temperature acquisition and the pole temperature acquisition inside the high-pressure box; during the test, the temperature transmitter needs to be connected The thermocouple is placed inside the high pressure box, the temperature transmitter directly reads the temperature value collected by the thermocouple and uploads the collected data to the test host computer; at the same time, the test host computer reads the internal ambient temperature and pole temperature uploaded by the high pressure box, By comparing the upload value of the temperature transmitter with the upload value of the high pressure box and analyzing and judging in combination with the setting requirements in the test case, the test result is obtained and the corresponding test report is output.
第八步、用户根据储能高压箱产品实际出货需求设置和选择对应测试CASE进行加载测试,全部参数设置好后,测试上位机遵循一键式操作;同时,开发人员编写测试CASE时可根据现场出货时间紧急程度适当调整延时和测试时间。The eighth step, the user sets and selects the corresponding test case for the loading test according to the actual shipping requirements of the energy storage high-voltage box product. After all parameters are set, the test host computer follows the one-button operation; at the same time, the developer can write the test case according to the The delay and test time are appropriately adjusted according to the urgency of the on-site delivery time.
第九步、利用硬件平台完成高压箱全部功能测试后,测试上位机自动根据测试数据记录整理和汇总出一份最终版的测试报告,并通过网络通信及服务器单元将测试报告上传至云端服务器供后台人员查看和下载。The ninth step, after using the hardware platform to complete the full functional test of the high-voltage box, the test host computer automatically organizes and summarizes a final version of the test report according to the test data records, and uploads the test report to the cloud server through network communication and the server unit for supply. Background staff to view and download.
本实施例中,硬件平台测试时按照测试回路走向和电压等级又可分为:高压箱高压部分测试、高压箱低压部分测试,高压箱高压部分测试包括高压箱的簇电压测试、簇电流测试、漏电流测试、绝缘电阻测试、交流耐压测试、直流耐压测试、黑启动测试、内阻测试、分合闸测试、电操功能测试。In this embodiment, the hardware platform test can be further divided into: high-voltage box high-voltage part test, high-voltage box low-voltage part test, and high-voltage box high-voltage part test according to the direction of the test loop and the voltage level. Leakage current test, insulation resistance test, AC withstand voltage test, DC withstand voltage test, black start test, internal resistance test, opening and closing test, electrical operation function test.
本实施例中,高压箱的簇电压测试采用硬件平台中提到的恒压源单元、高压控制自动切换单元组合完成;高压箱的簇电流测试采用硬件平台中提到的恒流源单元、高压控制自动切换单元组合完成;漏电流测试采用硬件平台中提到的AO仿真模拟信号输出单元、高压控制自动切换单元组合完成;绝缘电阻测试采用硬件平台中提到的交直流耐压测试单元、高压控制自动切换单元组合完成;交流耐压测试采用硬件平台中提到的交直流耐压测试单元、高压控制自动切换单元组合完成;直流耐压测试采用硬件平台中提到的交直流耐压测试单元、高压控制自动切换单元组合完成;黑启动测试采用硬件平台中提到的恒压源单元、高压控制自动切换单元组合完成;内阻测试采用硬件平台中提到的内阻测量单元、高压控制自动切换单元组合完成;分合闸测试采用硬件平台中提到的内阻测量单元、高压控制自动切换单元组合完成;电操测试采用硬件平台中提到的内阻测量单元、高压控制自动切换单元组合完成。In this embodiment, the cluster voltage test of the high-voltage box is completed by the combination of the constant voltage source unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the cluster current test of the high-voltage box adopts the constant current source unit, high voltage The combination of the control automatic switching unit is completed; the leakage current test is completed by the combination of the AO simulation analog signal output unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the insulation resistance test is completed by using the AC and DC withstand voltage test unit, high voltage The combination of the control automatic switching unit is completed; the AC withstand voltage test is completed by the combination of the AC and DC withstand voltage test unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the DC withstand voltage test is completed by using the AC and DC withstand voltage test unit mentioned in the hardware platform. The combination of the high-voltage control automatic switching unit is completed; the black-start test is completed by the combination of the constant voltage source unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the internal resistance test uses the internal resistance measurement unit mentioned in the hardware platform, and the high-voltage control automatic The combination of the switching unit is completed; the opening and closing test is completed by the combination of the internal resistance measurement unit and the high-voltage control automatic switching unit mentioned in the hardware platform; the electrical operation test is completed by using the combination of the internal resistance measurement unit and the high-voltage control automatic switching unit mentioned in the hardware platform Finish.
本实施例中,高压箱低压部分测试包括:高压箱的DI输入测试、高压箱的DO输出测试、高压箱的AI输入测试、高压箱的AO输出测试、温度一致性测试和CAN通信测试;高压箱的DI输入测试采用硬件平台中提到的DO仿真模拟信号输出单元、低压控制自动切换单元组合完成;高压箱的DO输出测试采用硬件平台中提到的DI信号检测单元、低压控制自动切换单元组合完成;高压箱的AI输入测试采用硬件平台中提到的AO仿真模拟信号输出单元、低压控制自动切换单元组合完成;高压箱的AO输出测试采用硬件平台中提到的AI信号检测单元、低压控制自动切换单元组合完成;高压箱的温度一致性测试采用硬件平台中提到的温度检测单元完成;高压箱的CAN通信测试采用硬件平台中提到的网络通信及服务器单元完成。In this embodiment, the low-voltage part test of the high-voltage box includes: the DI input test of the high-voltage box, the DO output test of the high-voltage box, the AI input test of the high-voltage box, the AO output test of the high-voltage box, the temperature consistency test and the CAN communication test; The DI input test of the box is completed by the combination of the DO simulation analog signal output unit and the low-voltage control automatic switching unit mentioned in the hardware platform; the DO output test of the high-voltage box adopts the DI signal detection unit and the low-voltage control automatic switching unit mentioned in the hardware platform. The combination is completed; the AI input test of the high-voltage box adopts the combination of the AO simulation analog signal output unit and the low-voltage control automatic switching unit mentioned in the hardware platform; the AO output test of the high-voltage box adopts the AI signal detection unit mentioned in the hardware platform, the low-voltage control unit The combination of control and automatic switching units is completed; the temperature consistency test of the high-voltage box is completed by the temperature detection unit mentioned in the hardware platform; the CAN communication test of the high-voltage box is completed by the network communication and server unit mentioned in the hardware platform.
工作时,本发明方法提供的自动化测试平台分为高压部分自动化测试和低压部分自动化测试。During operation, the automatic testing platform provided by the method of the present invention is divided into automatic testing of high-voltage parts and automatic testing of low-voltage parts.
高压部分自动化测试启动后,测试上位机根据测试CASE中的设定逻辑控制自动化测试平台进行高低压自动切换测试,成功切换为高压部分测试后;测试上位机根据测试CASE中的设定逻辑和设定参数控制自动化测试平台的高压测试单元仿真输出高压测试信号值给储能高压箱采集或检测,同时读取或测量储能高压箱内部的状态变化和功能采样值,综合测试单元设定的输出值、储能高压箱采样值、储能高压箱内部状态变化、储能高压箱逻辑和参数设定要求来进行分析判断,得出对应的测试报告和结论。After the automatic test of the high-voltage part is started, the test host computer controls the automatic test platform to perform the automatic switching test of high and low voltage according to the setting logic in the test CASE, and after successfully switching to the high-voltage part test; The high-voltage test unit of the fixed-parameter control automatic test platform simulates and outputs the high-voltage test signal value for the energy storage high-voltage box to collect or detect, and reads or measures the state change and function sampling value inside the energy-storage high-voltage box, and integrates the output set by the test unit. Value, sample value of energy storage high-voltage tank, internal state change of energy storage high-voltage tank, energy storage high-voltage tank logic and parameter setting requirements to analyze and judge, and draw corresponding test reports and conclusions.
低压部分自动化测试启动后,测试上位机根据测试CASE中的设定逻辑控制自动化测试平台进行高低压自动切换测试,成功切换为低压部分测试后;测试上位机根据测试CASE中的设定逻辑和设定参数控制自动化测试平台的低压仿真测试单元模拟输出测试所需的AO和DO信号给储能高压箱低压部分采集或检测。同时采集储能高压箱内部的状态变化和转换后的数据显示,综合储能高压箱的输入值、输出值以及储能高压箱逻辑和参数设定要求来进行分析判断,得出对应的测试报告和结论。After the automatic test of the low-voltage part is started, the test host computer controls the automatic test platform to perform the automatic switching test of high and low voltage according to the setting logic in the test CASE, and after successfully switching to the low-voltage part test; The low-voltage simulation test unit of the fixed-parameter control automatic test platform simulates the output of the AO and DO signals required for the test to collect or detect the low-voltage part of the energy storage high-voltage box. At the same time, the state changes inside the energy storage high-voltage box and the converted data display are collected, and the input and output values of the energy storage high-voltage box, as well as the logic and parameter setting requirements of the energy storage high-voltage box are analyzed and judged, and the corresponding test report is obtained. and conclusions.
最后,测试上位机综合高压部分和低压部分的所有测试CASE结果,自动筛选出不通过测试项,自动根据测试数据记录整理和汇总输出具有说服力的测试报告。测试完成后,测试上位机将本次测试报告和测试数据记录通过平台自带的网络通信及服务器单元上传至指定的云端服务器供后台人员查看和下载。Finally, the test upper computer integrates all the test CASE results of the high-voltage part and the low-voltage part, automatically filters out the test items that fail, and automatically records and summarizes the test report according to the test data and outputs a convincing test report. After the test is completed, the test host computer uploads the test report and test data record to the designated cloud server through the network communication and server unit that comes with the platform for the background personnel to view and download.
以储能高压箱平台初始化测试为例,如附图中图4所示。测试储能高压箱平台初始化逻辑时,测试上位机根据已编辑好的测试CASE控制储能高压箱进入初始化,测试储能高压箱内部的断路器、接触器能够根据逻辑指令由断开位置切换至闭合,测试储能高压箱内部的CMU能够常电启动、在BMU数据模拟正常情况下处于无告警、无保护状态;同时,测试上位机根据已编辑好的测试CASE控制储能高压箱产品自动化测试系统平台设备进入初始化,测试自动化测试系统平台中仿真测试设备能够根据逻辑指令由其他状态切换为初始化状态,测试自动化测试系统平台中高低压控制切换部分能够根据逻辑指令实现高低压控制切换,测试自动化测试系统平台中服务端设备部分能够根据逻辑指令实现服务端数据模拟输入初始化。若上述设备均能按照测试CASE中设定的逻辑要求自动进入初始化状态,则储能高压箱平台初始化测试合格。若上述设备中出现一项以上未能按照测试CASE中设定的逻辑要求进入初始化状态,则此项测试不合格。全过程测试完成后,测试上位机自动输出对应的测试报告和测试数据供测试人员分析该项功能是否失效。同理,测试储能高压箱产品其他项功能时,测试上位机也是根据已编辑好的测试CASE控制对应模块/单元输出或检测仿真模拟数据来自动完成全过程测试,如附图中图5-9和图10-13所示。Take the energy storage high-voltage tank platform initialization test as an example, as shown in Figure 4 in the accompanying drawings. When testing the initialization logic of the energy storage high-voltage box platform, the test host computer controls the energy storage high-voltage box to enter the initialization according to the edited test CASE, and the circuit breaker and contactor inside the test energy storage high-voltage box can be switched from the off position to the open position according to the logic command. Closed, the CMU inside the test energy storage high-voltage box can be started with constant power, and it is in a state of no alarm and no protection under normal BMU data simulation; at the same time, the test host computer controls the energy storage high-voltage box product according to the edited test case. Automatic test The system platform equipment enters the initialization, the simulation test equipment in the test automation test system platform can switch from other states to the initialization state according to the logic command, and the high and low voltage control switching part in the test automation test system platform can realize the high and low voltage control switching according to the logic command, and the test automation test The server-side equipment part in the system platform can realize the initialization of the server-side data simulation input according to the logic instruction. If the above equipment can automatically enter the initialization state according to the logic requirements set in the test CASE, the energy storage high-voltage box platform initialization test is qualified. If more than one item of the above equipment fails to enter the initialization state according to the logic requirements set in the test CASE, this test is not qualified. After the whole process test is completed, the test host computer automatically outputs the corresponding test report and test data for the tester to analyze whether the function is invalid. In the same way, when testing other functions of the energy storage high-voltage box product, the test host computer also automatically completes the whole process test according to the edited test CASE control corresponding module/unit output or detection simulation data, as shown in Figure 5- 9 and Figures 10-13.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下。由语句“包括一个......限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素”。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus. without more restrictions. An element defined by the phrase "comprising an... does not preclude the presence of additional identical elements in a process, method, article or apparatus comprising said element".
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010935732.5A CN112051467A (en) | 2020-09-08 | 2020-09-08 | Automatic testing method for energy storage high-voltage box product |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010935732.5A CN112051467A (en) | 2020-09-08 | 2020-09-08 | Automatic testing method for energy storage high-voltage box product |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN112051467A true CN112051467A (en) | 2020-12-08 |
Family
ID=73610879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010935732.5A Pending CN112051467A (en) | 2020-09-08 | 2020-09-08 | Automatic testing method for energy storage high-voltage box product |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112051467A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113253115A (en) * | 2021-04-27 | 2021-08-13 | 沃太能源股份有限公司 | Large-scale energy storage test platform supporting combined debugging of software and hardware |
| CN114266153A (en) * | 2021-12-21 | 2022-04-01 | 章鱼博士智能技术(上海)有限公司 | A CMU testing method, device and system |
| CN114527732A (en) * | 2022-02-22 | 2022-05-24 | 南方电网电力科技股份有限公司 | Four-quadrant power control automatic test system and method for energy storage system |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202471932U (en) * | 2012-03-31 | 2012-10-03 | 惠州市亿能电子有限公司 | Simulation testing platform for comprehensive battery management system |
| CN204290977U (en) * | 2014-08-20 | 2015-04-22 | 成都华太航空科技有限公司 | CMU testboard |
| CN105589001A (en) * | 2016-02-01 | 2016-05-18 | 惠州市蓝微新源技术有限公司 | BMS testing method and testing system based on TestStand |
| CN105954630A (en) * | 2016-06-27 | 2016-09-21 | 南通阿斯通电器制造有限公司 | Novel high-voltage combined debugging test bench |
| CN106019002A (en) * | 2016-05-13 | 2016-10-12 | 合肥国轩高科动力能源有限公司 | A verification test platform and test method for battery management system |
| CN107064703A (en) * | 2016-12-23 | 2017-08-18 | 惠州市亿能电子有限公司 | A kind of high-voltaghe compartment automatic testing method and its system |
| CN109613348A (en) * | 2018-10-23 | 2019-04-12 | 武汉力神动力电池系统科技有限公司 | A kind of high-voltaghe compartment tooling automatic detection device |
| CN110297135A (en) * | 2019-05-09 | 2019-10-01 | 武汉格罗夫氢能汽车有限公司 | A kind of new-energy automobile high voltage power distribution boxes detecting device |
| CN210037993U (en) * | 2019-02-02 | 2020-02-07 | 上海度普新能源科技有限公司 | Battery management system function test equipment |
-
2020
- 2020-09-08 CN CN202010935732.5A patent/CN112051467A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202471932U (en) * | 2012-03-31 | 2012-10-03 | 惠州市亿能电子有限公司 | Simulation testing platform for comprehensive battery management system |
| CN204290977U (en) * | 2014-08-20 | 2015-04-22 | 成都华太航空科技有限公司 | CMU testboard |
| CN105589001A (en) * | 2016-02-01 | 2016-05-18 | 惠州市蓝微新源技术有限公司 | BMS testing method and testing system based on TestStand |
| CN106019002A (en) * | 2016-05-13 | 2016-10-12 | 合肥国轩高科动力能源有限公司 | A verification test platform and test method for battery management system |
| CN105954630A (en) * | 2016-06-27 | 2016-09-21 | 南通阿斯通电器制造有限公司 | Novel high-voltage combined debugging test bench |
| CN107064703A (en) * | 2016-12-23 | 2017-08-18 | 惠州市亿能电子有限公司 | A kind of high-voltaghe compartment automatic testing method and its system |
| CN109613348A (en) * | 2018-10-23 | 2019-04-12 | 武汉力神动力电池系统科技有限公司 | A kind of high-voltaghe compartment tooling automatic detection device |
| CN210037993U (en) * | 2019-02-02 | 2020-02-07 | 上海度普新能源科技有限公司 | Battery management system function test equipment |
| CN110297135A (en) * | 2019-05-09 | 2019-10-01 | 武汉格罗夫氢能汽车有限公司 | A kind of new-energy automobile high voltage power distribution boxes detecting device |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113253115A (en) * | 2021-04-27 | 2021-08-13 | 沃太能源股份有限公司 | Large-scale energy storage test platform supporting combined debugging of software and hardware |
| CN114266153A (en) * | 2021-12-21 | 2022-04-01 | 章鱼博士智能技术(上海)有限公司 | A CMU testing method, device and system |
| CN114527732A (en) * | 2022-02-22 | 2022-05-24 | 南方电网电力科技股份有限公司 | Four-quadrant power control automatic test system and method for energy storage system |
| CN114527732B (en) * | 2022-02-22 | 2023-09-08 | 南方电网电力科技股份有限公司 | Automatic testing system and testing method for four-quadrant power control of energy storage system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107271896B (en) | Safety relay testing device and testing method thereof | |
| CN103869260B (en) | A kind of power detecting system and method | |
| CN103235277B (en) | The integrated debugging apparatus of Intelligent transformer station capacitive apparatus on-line monitoring system | |
| CN106771701A (en) | A kind of electric vehicle charge interface uniformity automated detection system and method | |
| CN112051467A (en) | Automatic testing method for energy storage high-voltage box product | |
| CN101207280A (en) | Power system relay protection intelligent calibration method and device | |
| CN111983993B (en) | Automatic testing method for energy storage CMU | |
| CN105929278B (en) | A kind of unsteady flow module high voltage test macro and method | |
| CN111123000A (en) | Electronic integrated single machine automatic test system, method and medium | |
| CN105158718B (en) | A kind of fault detector integrated test facility and test system | |
| CN203191537U (en) | Intelligentized integration debug apparatus for on-line monitoring system of transformer station capacitive equipment | |
| CN104391501B (en) | A kind of condition monitoring system and method for Supervisory Computer Control System For Hydroelectic Power Plant | |
| CN106872886A (en) | A kind of Intellectualized Switchgear detection debugging apparatus, system and joint debugging method | |
| CN105842560A (en) | Relay protection type component testing system | |
| CN202421448U (en) | Relay detecting device for nuclear power stations | |
| CN114184864A (en) | Intelligent oscillograph test method and system | |
| CN111781444A (en) | Automatic testing system and method for grid-connected single machine | |
| CN104515956A (en) | Method and device for detecting intelligent ammeter power module | |
| CN208937976U (en) | A kind of drilling machine electric control product test macro | |
| CN202075350U (en) | Ageing monitoring system for industrial products of safety barrier and isolator | |
| CN112379252B (en) | Primary and secondary fusion pole switch test system | |
| CN109860737A (en) | A kind of lithium battery dynamical system Function Test Automation system | |
| CN109342971A (en) | Charging pile parts quality inspection system and AC and DC charging pile parts inspection system | |
| CN212391599U (en) | Monitoring device for secondary short circuit test of power transformer | |
| CN212083646U (en) | Online checking system for electric energy meter checking assembly line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201208 |
|
| RJ01 | Rejection of invention patent application after publication |