- CN112003069B CN112003069B CN202010669421.9A CN202010669421A CN112003069B CN 112003069 B CN112003069 B CN 112003069B CN 202010669421 A CN202010669421 A CN 202010669421A CN 112003069 B CN112003069 B CN 112003069B
- Authority
- CN
- China
- Prior art keywords
- heavy
- connection end
- protection
- measurement
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005259 measurement Methods 0.000 title claims abstract description 118
- 238000001514 detection method Methods 0.000 claims description 38
- 230000005611 electricity Effects 0.000 claims 4
- 238000009434 installation Methods 0.000 abstract description 12
- 230000000694 effects Effects 0.000 abstract description 3
- 238000011900 installation process Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 7
- 238000012544 monitoring process Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000003780 insertion Methods 0.000 description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000000956 alloy Substances 0.000 description 2
- 229910045601 alloy Inorganic materials 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 229910052802 copper Inorganic materials 0.000 description 2
- 239000010949 copper Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000007769 metal material Substances 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R13/00—Details of coupling devices of the kinds covered by groups H01R12/70 or H01R24/00 - H01R33/00
- H01R13/46—Bases; Cases
- H01R13/53—Bases or cases for heavy duty; Bases or cases for high voltage with means for preventing corona or arcing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R31/00—Coupling parts supported only by co-operation with counterpart
- H01R31/06—Intermediate parts for linking two coupling parts, e.g. adapter
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H1/00—Details of emergency protective circuit arrangements
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
本申请涉及一种保护测控系统,通过设置有所述重载连接器,将所述第一连接端与所述保护测控装置电连接,将所述第二连接端与所述环网柜电连接,实现了二次回路的预先电连接。通过将所述保护测控装置与所述第一连接端,以及所述环网柜和所述第二连接端之间进行预先连接。所述第一连接端与所述第二连接端相匹配,在使用时,只需要将所述第一连接端与所述第二连接端进行插接即可,无需进行二次回路的重新布线。本申请实施例提供的所述保护测控系统解决了现有技术中存在的目前的保护测控装置安装复杂的技术问题,达到了简化所述保护测控装置安装工序,提高安装效率的技术效果。
The present application relates to a protection measurement and control system. By providing the heavy-duty connector, the first connection end is electrically connected to the protection measurement and control device, and the second connection end is electrically connected to the ring main unit. , to achieve the pre-electrical connection of the secondary circuit. By pre-connecting the protection measurement and control device with the first connection end, and between the ring network cabinet and the second connection end. The first connection end matches the second connection end, and when in use, only the first connection end and the second connection end need to be plugged in, and there is no need to rewire the secondary circuit . The protection measurement and control system provided by the embodiments of the present application solves the technical problem of complex installation of the current protection measurement and control device existing in the prior art, and achieves the technical effect of simplifying the installation process of the protection measurement and control device and improving the installation efficiency.
Description
技术领域technical field
本申请涉及电气设备技术领域,特别是涉及一种保护测控装置和系统。The present application relates to the technical field of electrical equipment, and in particular, to a protection measurement and control device and system.
背景技术Background technique
保护测控装置是指在配电网中集保护、测量、控制、监测、通讯、事件记录、故障录波、操作防误等多种功能于一体的电气设备。保护测控装置既可以和综合操作系统配合完成电站控制、保护、防误闭锁和当地功能,还可以独立成套完成110kV及以下中小规模无人值守变电站或者作为220kV及以上变电站中、低压侧的成套保护和测量监控功能,是变电站中至关重要的电气设备。保护测控装置内部具有多种监测和控制设备,在实际安装使用中,需要在现场设置二次回路,通过二次回路与一次设备配套使用。而二次回路较为复杂,需要专业的工作人员来进行长时间操作,目前的保护测控装置安装复杂。Protection measurement and control device refers to electrical equipment that integrates various functions such as protection, measurement, control, monitoring, communication, event recording, fault recording, and operation error prevention in the distribution network. The protection measurement and control device can cooperate with the comprehensive operating system to complete the power station control, protection, anti-fault blocking and local functions, and can also independently complete the small and medium-scale unattended substations of 110kV and below or be used as a complete set of protection for the medium and low voltage sides of 220kV and above substations And measurement monitoring function, is a vital electrical equipment in the substation. There are a variety of monitoring and control equipment inside the protection measurement and control device. In actual installation and use, it is necessary to set up a secondary circuit on site, and use the secondary circuit to match the primary equipment. The secondary circuit is relatively complex, requiring professional staff to operate for a long time, and the current protection measurement and control device is complicated to install.
发明内容SUMMARY OF THE INVENTION
基于此,有必要针对目前的保护测控装置安装复杂的问题,提供一种保护测控装置和系统。Based on this, it is necessary to provide a protection measurement and control device and a system for the complex installation of the current protection measurement and control device.
一种保护测控系统,应用于配电网的工作线路,所述保护测控系统包括:A protection measurement and control system is applied to the working line of a power distribution network. The protection measurement and control system includes:
保护测控装置,所述保护测控装置的输入端与所述工作线路电连接,所述保护测控装置用于检测及控制所述工作线路的工作状态;a protection measurement and control device, the input end of the protection measurement and control device is electrically connected to the working circuit, and the protection measurement and control device is used to detect and control the working state of the working circuit;
环网柜,与所述工作线路电连接;a ring network cabinet, electrically connected to the working line;
重载连接器,包括:Overloaded connectors, including:
第一连接端,设置于所述保护测控装置的外表面,且与所述保护测控装置的输出端电连接;a first connection end, arranged on the outer surface of the protection measurement and control device, and electrically connected with the output end of the protection measurement and control device;
第二连接端,设置于所述环网柜表面,且与所述环网柜电连接,所述第二连接端与所述第一连接端相匹配。The second connection end is arranged on the surface of the ring main unit and is electrically connected with the ring main unit, and the second connection end matches the first connection end.
在其中一个实施例中,所述保护测控装置包括:In one embodiment, the protection measurement and control device includes:
保护测控设备,所述保护测控设备的输入端与所述工作线路电连接,所述保护测控设备的输出端与所述第一连接端电连接,所述保护测控设备用于检测及控制所述工作线路的工作状态;Protection measurement and control equipment, the input end of the protection measurement and control equipment is electrically connected with the working line, the output end of the protection measurement and control equipment is electrically connected with the first connection terminal, and the protection measurement and control equipment is used to detect and control the The working status of the working line;
第一壳体,具有第一容纳空腔,所述第一连接端设置于所述第一壳体的外表面,且与所述保护测控设备电连接,所述保护测控设备设置于所述第一容纳空腔。The first housing has a first accommodating cavity, the first connecting end is arranged on the outer surface of the first housing, and is electrically connected with the protection measurement and control device, and the protection measurement and control device is arranged in the first housing. an accommodating cavity.
在其中一个实施例中,所述环网柜包括:In one embodiment, the ring main unit comprises:
第二壳体,具有第二容纳空腔,所述第二连接端设置于所述第二壳体的外表面;the second shell has a second accommodating cavity, the second connection end is disposed on the outer surface of the second shell;
多个断路器,设置于所述第二容纳空腔,所述多个断路器的输入端分别与所述第二连接端电连接,所述多个断路器的输出端分别与所述工作线路电连接。A plurality of circuit breakers are arranged in the second accommodating cavity, the input ends of the circuit breakers are respectively electrically connected with the second connection ends, and the output ends of the circuit breakers are respectively connected with the working circuit electrical connection.
在其中一个实施例中,还包括:In one embodiment, it also includes:
多个可拆卸组件,分别设置于所述第一壳体与所述第二壳体,所述第一连接端通过所述可拆卸组件固定于所述第一壳体的外表面,所述第二连接端通过所述可拆卸组件固定于所述第二壳体的外表面。A plurality of detachable components are respectively arranged on the first casing and the second casing, the first connecting end is fixed on the outer surface of the first casing through the detachable components, and the first connecting end is fixed on the outer surface of the first casing through the detachable components. The two connecting ends are fixed on the outer surface of the second housing through the detachable assembly.
在其中一个实施例中,所述保护测控设备包括:In one embodiment, the protection measurement and control equipment includes:
交流量检测组件,设置于所述第一容纳空腔,所述交流量检测组件的输入端与所述工作线路电连接,所述交流量检测组件用于检测所述工作线路的电流和/或电压信号;An AC volume detection component, disposed in the first accommodating cavity, an input end of the AC volume detection component is electrically connected to the working line, and the AC volume detection component is used to detect the current and/or the current of the working line voltage signal;
所述第一连接端包括:The first connection end includes:
第一交流量重载连接端,设置于所述第一壳体的外表面,所述第一交流量重载连接端的一端与所述交流量检测组件的输出端电连接;a first heavy-duty connection end for alternating current, disposed on the outer surface of the first housing, and one end of the first heavy-duty connection end for alternating current is electrically connected to the output end of the alternating current detection component;
所述第二连接端包括:The second connection end includes:
第二交流量重载连接端,设置于所述第二壳体的外表面,所述第二交流量重载连接端与多个所述断路器电连接,所述第二交流量重载连接端与所述第一交流量重载连接端相匹配。The second heavy-duty connection end of alternating current is arranged on the outer surface of the second housing, the second heavy-duty connection end of alternating current is electrically connected with a plurality of the circuit breakers, and the second heavy-duty connection of alternating current is connected The terminal is matched with the first AC heavy-duty connection terminal.
在其中一个实施例中,所述保护测控设备还包括:In one embodiment, the protection measurement and control equipment further includes:
开入量检测组件,设置于所述第一容纳空腔,所述开入量检测组件的输入端与所述工作线路电连接,所述开入量检测组件用于检测所述工作线路的开关状态;The binary input detection component is arranged in the first accommodating cavity, the input end of the binary input detection component is electrically connected with the working circuit, and the binary input detection component is used to detect the switch of the working circuit state;
所述第一连接端还包括:The first connection end also includes:
第一开入量重载连接端,设置于所述第一壳体的外表面,所述第一开入量重载连接端的一端与所述开入量检测组件电连接;The first binary input heavy-duty connection end is disposed on the outer surface of the first housing, and one end of the first binary input heavy-duty connection end is electrically connected to the binary input detection component;
所述第二连接端还包括:The second connection end also includes:
第二开入量重载连接端,设置于所述第二壳体的外表面,所述第二开入量重载连接端与多个所述断路器电连接,所述第二开入量重载连接端与所述第一开入量重载连接端相匹配。The second binary input heavy-duty connection end is disposed on the outer surface of the second housing, the second binary input heavy-duty connection end is electrically connected with a plurality of the circuit breakers, and the second binary input heavy-duty connection end is electrically connected to the circuit breakers. The heavy-duty connection end matches the first binary input heavy-duty connection end.
在其中一个实施例中,所述保护测控设备还包括:In one embodiment, the protection measurement and control equipment further includes:
操作回路,设置于所述第一容纳空腔,所述操作回路的输入端与所述工作线路电连接,所述操作回路用于对所述工作线路进行保护操作;an operation circuit, arranged in the first accommodating cavity, an input end of the operation circuit is electrically connected to the working circuit, and the operation circuit is used to perform a protection operation on the working circuit;
所述第一连接端还包括:The first connection end also includes:
第一操作回路重载连接端,设置于所述第一壳体的外表面,所述第一操作回路重载连接端的一端与所述操作回路的输出端电连接;a heavy-duty connection end of the first operation loop is disposed on the outer surface of the first casing, and one end of the heavy-duty connection end of the first operation loop is electrically connected to the output end of the operation loop;
所述第二连接端还包括:The second connection end also includes:
第二操作回路重载连接端,设置于所述第二壳体的外表面,所述第二操作回路重载连接端与多个所述断路器电连接,所述第二操作回路重载连接端与所述第一操作回路重载连接端相匹配。The second operation circuit heavy-duty connection end is disposed on the outer surface of the second housing, the second operation circuit heavy-duty connection end is electrically connected with a plurality of the circuit breakers, and the second operation circuit heavy-duty connection The terminal is matched with the heavy-duty connection terminal of the first operation loop.
在其中一个实施例中,所述第一交流量重载连接端与所述第二交流量重载连接端中相邻插针之间具有第一特征距离,所述第一开入量重载连接端与第二开入量重载连接端中相邻插针之间具有第二特征距离,所述第一操作回路重载连接端与第二操作回路重载连接端中相邻插针之间具有第三特征距离,所述第一特征距离、所述第二特征距离和所述第三特征距离均不相等。In one of the embodiments, there is a first characteristic distance between adjacent pins in the first AC heavy-duty connection end and the second AC heavy-duty connection end, and the first binary input heavy-duty There is a second characteristic distance between the connection end and the adjacent pins in the second binary heavy-duty connection end, and the distance between the first operation loop heavy-duty connection end and the adjacent pins in the second operation loop heavy-duty connection end is There is a third characteristic distance between them, and the first characteristic distance, the second characteristic distance and the third characteristic distance are all unequal.
在其中一个实施例中,所述第一交流量重载连接端与所述第二交流量重载连接端中的插针具有第一特征高度,所述第一开入量重载连接端与第二开入量重载连接端中的插针具有第二特征高度,所述第一操作回路重载连接端与第二操作回路重载连接端中的插针具有第三特征高度,所述第一特征高度、所述第二特征高度和所述第三特征高度均不相等。In one of the embodiments, the pins in the first AC heavy-duty connection end and the second AC heavy-duty connection end have a first characteristic height, and the first open-input heavy-duty connection end is connected to the The pins in the second binary heavy-duty connection end have a second characteristic height, the pins in the first operation circuit heavy-duty connection end and the second operation circuit heavy-duty connection end have a third characteristic height, and the The first feature height, the second feature height, and the third feature height are not equal.
在其中一个实施例中,所述第一交流量重载连接端与所述第二交流量重载连接端、所述第一开入量重载连接端与第二开入量重载连接端,以及所述第一操作回路重载连接端与第二操作回路重载连接端中插针的数量均不相等。In one embodiment, the first AC heavy-duty connection end and the second AC heavy-duty connection end, the first binary input heavy-duty connection end and the second binary input heavy-duty connection end , and the number of pins in the heavy-duty connection end of the first operation loop and the heavy-duty connection end of the second operation loop are not equal.
本申请实施例提供的所述保护测控系统包括:保护测控装置、环网柜和重载连接器,所述重载连接器包括第一连接端和第二连接端。本申请实施例通过设置有所述重载连接器,将所述第一连接端与所述保护测控装置电连接,将所述第二连接端与所述环网柜电连接,实现了二次回路的预先电连接。通过将所述保护测控装置与所述第一连接端,以及所述环网柜和所述第二连接端之间进行预先连接。所述第一连接端与所述第二连接端相匹配,在使用时,只需要将所述第一连接端与所述第二连接端进行插接即可,无需进行二次回路的重新布线。本申请实施例提供的所述保护测控系统解决了现有技术中存在的目前的保护测控装置安装复杂的技术问题,达到了简化所述保护测控装置安装工序,提高安装效率的技术效果。The protection measurement and control system provided in the embodiment of the present application includes: a protection measurement and control device, a ring network cabinet, and a heavy-duty connector, where the heavy-duty connector includes a first connection end and a second connection end. In the embodiment of the present application, the heavy-duty connector is provided, the first connection end is electrically connected with the protection measurement and control device, and the second connection end is electrically connected with the ring main unit, thereby realizing the secondary Pre-electrical connection of the loop. By pre-connecting the protection measurement and control device with the first connection end, and between the ring network cabinet and the second connection end. The first connection end matches the second connection end, and when in use, only the first connection end and the second connection end need to be plugged in, and there is no need to rewire the secondary circuit . The protection measurement and control system provided by the embodiments of the present application solves the technical problem of complex installation of the current protection measurement and control device existing in the prior art, and achieves the technical effect of simplifying the installation process of the protection measurement and control device and improving the installation efficiency.
附图说明Description of drawings
为了更清楚地说明本申请实施例或传统技术中的技术方案,下面将对实施例或传统技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present application or in the traditional technology, the following briefly introduces the accompanying drawings that are used in the description of the embodiments or the traditional technology. Obviously, the drawings in the following description are only the For some embodiments of the application, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without any creative effort.
图1为本申请一个实施例提供的保护测控系统结构示意图;1 is a schematic structural diagram of a protection measurement and control system provided by an embodiment of the present application;
图2为本申请一个实施例提供的保护测控系统重载连接器结构示意图;2 is a schematic structural diagram of a heavy-duty connector of a protection measurement and control system provided by an embodiment of the present application;
图3为本申请一个实施例提供的保护测控装置结构示意图;3 is a schematic structural diagram of a protection measurement and control device provided by an embodiment of the present application;
图4为本申请一个实施例提供的环网柜结构示意图;4 is a schematic structural diagram of a ring network cabinet provided by an embodiment of the present application;
图5为本申请一个实施例提供的保护测控系统结构示意图;5 is a schematic structural diagram of a protection measurement and control system provided by an embodiment of the present application;
图6为本申请一个实施例提供的保护测控系统结构示意图;6 is a schematic structural diagram of a protection measurement and control system provided by an embodiment of the present application;
图7为本申请一个实施例提供的保护测控系统结构示意图。FIG. 7 is a schematic structural diagram of a protection measurement and control system according to an embodiment of the present application.
附图标记说明:Description of reference numbers:
10、保护测控系统;10. Protection measurement and control system;
100、保护测控装置;100. Protection measurement and control device;
110、保护测控设备;110. Protection of measurement and control equipment;
111、交流量检测组件;111. AC volume detection component;
112、开入量检测组件;112. Binary input detection component;
113、操作回路;113. Operation loop;
120、第一壳体;120. The first shell;
200、环网柜;200. Ring network cabinet;
210、第二壳体;210. The second shell;
220、断路器;220, circuit breaker;
300、重载连接器;300. Overload connector;
310、第一连接端;310. A first connection end;
311、第一交流量重载连接端;311. The first AC heavy-duty connection terminal;
312、第一开入量重载连接端;312. The first binary input heavy-duty connection end;
313、第一操作回路重载连接端;313. The first operation loop overload connection terminal;
320、第二连接端;320. The second connection end;
321、第二交流量重载连接端;321. The second AC heavy-duty connection terminal;
322、第二开入量重载连接端;322. The second binary input heavy-duty connection terminal;
323、第二操作回路重载连接端。323. The second operation loop overload connection terminal.
具体实施方式Detailed ways
为了使本申请的目的、技术方案及优点更加清楚明白,以下通过实施例,并结合附图,对本申请的一种保护测控装置和系统进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本申请,并不用于限定本申请。In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the following embodiments will further describe a protection measurement and control device and system of the present application in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application.
本文中为部件所编序号本身,例如“第一”、“第二”等,仅用于区分所描述的对象,不具有任何顺序或技术含义。而本申请所说“连接”、“联接”,如无特别说明,均包括直接和间接连接(联接)。在本申请的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。The serial numbers themselves, such as "first", "second", etc., for the components herein are only used to distinguish the described objects, and do not have any order or technical meaning. The "connection" and "connection" mentioned in this application, unless otherwise specified, include both direct and indirect connections (connections). In the description of this application, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", The orientation or positional relationship indicated by "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description , rather than indicating or implying that the referred device or element must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as a limitation on the present application.
在本申请中,除非另有明确的规定和限定,第一特征在第二特征“上”或“下”可以是第一和第二特征直接接触,或第一和第二特征通过中间媒介间接接触。而且,第一特征在第二特征“之上”、“上方”和“上面”可是第一特征在第二特征正上方或斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”可以是第一特征在第二特征正下方或斜下方,或仅仅表示第一特征水平高度小于第二特征。In this application, unless otherwise expressly stated and defined, a first feature "on" or "under" a second feature may be in direct contact with the first and second features, or the first and second features indirectly through an intermediary touch. Also, the first feature being "above", "over" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is level higher than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature has a lower level than the second feature.
本申请实施例提供了一种保护测控系统10,可以应用于配电网中的工作线路,所述配电网可以为高压配电网,也可以为低压配电网,所述工作线路可以为任意电气设备的工作线路,例如一次设备的工作线路或二次设备的工作线路等,用于检测和控制所述工作线路的工作状态。The embodiment of the present application provides a protection measurement and
请参见图1本申请一个实施例提供了一种保护测控系统10,包括:保护测控装置100、环网柜200和重载连接器300。Please refer to FIG. 1 . An embodiment of the present application provides a protection measurement and
所述保护测控装置100的输入端可以与所述工作线路电连接,所述保护测控装置100用于检测及控制所述工作线路的工作状态。所述保护测控装置100是指集保护、测量、控制、监测、通讯、事件记录、故障录波、操作防误等多种功能于一体的电气设备。所述保护测控装置100的输出端还可以连接有joyo系列综合操作系统等共同配合完成所述工作线路的控制、保护、防误闭锁等其他功能。所述保护测控装置100还可以独立完成110kv及以下中小规模无人值守变电站或者作为220kv及以上变电站中、低压侧的成套保护和测量监控功能。所述保护测控装置100既可以就地分散安装,也可以集中组屏安装,是构成变电站、发电厂厂用电等电站综合自动化系统的理想的智能设备装置。本实施例对于所述保护测控装置100的种类、型号等均不作任何限定,只需要满足可以实现检测及控制所述工作线路的工作状态的功能即可。The input end of the protection measurement and
所述环网柜200是指每个配电支路中的开关柜,例如出线开关柜等。所述开关柜的母线为环形干线的一部分,也就是说,所述环形干线是由多台出线开关柜的母线连接起来共同组成的环形干线。所述环网柜200的额定电流一般不会过大,因此,所述环网柜200内的开关设备一般也是较为简单的设备,例如带高压熔断器的高压负荷开关,在正常工作中,利用所述负荷开关操作正常电流,利用所述熔断器切除短路电流,所述负荷开关和所述熔断器结合起来便可以在一定容量内取代断路器220而执行断路器220的功能。所述环网柜200还可以安装于非环网结构的配电系统中,作为以负荷开关为主的高压开关柜使用。本实施例对于所述环网柜200的类型、型号等均不作任何限定,可根据实际情况具体选择。The
所述重载连接器300又名HDC重载接插件、航空插。所述重载连接器300包括公插和母插两部分,所述重载连接器300可以实现预先安装,尤其是在繁杂或复杂电路的预先安装,可以极大地提高设备的安装效率,减少接线的错误率。同时,当采用多个重载连接器时,可以方便高效地实现设备各功能模块的模块化结构,使得设备能方便的运输、安装、维护和维修。所述重载连接器300的防护等级较高,例如IP65、IP67等,在严苛环境下设备连接系统中具有很大的优势。同时,所述重载连接器300可以在恶劣环境下提供有效保护,为设备提供高集成度的连接,通过不同的组合方式提高设备控制的有效利用率。请参见图2,所述重载连接器300包括:第一连接端310和第二连接端320。The heavy-
所述第一连接端310设置于所述保护测控装置100的外表面,且与所述保护测控装置100的输出端电连接,将所述保护测控装置100需要与所述环网柜200预先连接的线路接入所述第一连接端310,形成预先连接的第一二次回路。所述第二连接端320设置于所述环网柜200表面,且与所述环网柜200电连接,所述第二连接端320与所述第一连接端310相匹配,将所述环网柜200需要和所述保护测控装置100连接的线路预先接入所述第二连接端320,形成预先连接的第二二次回路。所述第二连接端320与所述第一连接端310相匹配,在使用时将所述第一连接端310和所述第二连接端320相连即可实现所述保护测控装置100与所述环网柜200之间的电连接,也就实现了所述第一二次回路与所述第二二次回路之间的电连接,而无需在现场进行布线,进行所述二次回路的布线。The
本申请实施例提供的所述保护测控系统10的工作原理如下:The working principle of the protection measurement and
本申请实施例提供的所述保护测控系统10包括:保护测控装置100、环网柜200和重载连接器300,所述重载连接器300包括第一连接端310和第二连接端320,所述第一连接端310与所述保护测控装置100电连接,所述第二连接端320与所述环网柜200电连接。所述第一连接端310与所述第二连接端320相匹配,在使用时,将所述第一连接端310与所述第二连接端320进行插接,所述保护测控装置100的电信号依次通过所述第一连接端310和所述第二连接端320进入所述环网柜200,所述环网柜200根据接收到的所述电信号进行动作,以达到控制所述工作线路工作状态的目的。The protection measurement and
本申请实施例提供的所述保护测控系统10包括:保护测控装置100、环网柜200和重载连接器300,所述重载连接器300包括第一连接端310和第二连接端320。本申请实施例通过设置有所述重载连接器300,将所述第一连接端310与所述保护测控装置100电连接,将所述第二连接端320与所述环网柜200电连接,实现了二次回路的预先电连接。通过将所述保护测控装置100与所述第一连接端310,以及所述环网柜200和所述第二连接端320之间进行预先连接。所述第一连接端310与所述第二连接端320相匹配,在使用时,只需要将所述第一连接端310与所述第二连接端320进行插接即可,无需进行二次回路的重新布线。本申请实施例提供的所述保护测控系统10解决了现有技术中存在的目前的保护测控装置100安装复杂的技术问题,达到了简化所述保护测控装置100安装工序,提高安装效率的技术效果。The protection measurement and
请参见图3,在一个实施例中,所述保护测控装置100包括:保护测控设备110和第一壳体120。Referring to FIG. 3 , in one embodiment, the protection measurement and
所述保护测控设备110的输入端与所述工作线路电连接,所述保护测控设备110的输出端与所述第一连接端310电连接,所述保护测控设备110用于检测及控制所述工作线路的工作状态。所述保护测控设备110可以包括:交流量检测组件111、开入量检测组件112、电源检测组件与操作回路113等,所述交流量检测组件111、所述开入量检测组件112、所述操作回路113与所述电源检测组件等分别接入所述工作线路,以采集所述工作线路的不同状态参数。本实施例对于所述保护测控设备110不作任何限定,可根据实际情况具体设定,只需要满足可以实现采集所述工作线路的不同状态参数的功能即可。The input end of the protection measurement and
所述第一壳体120具有第一容纳空腔,所述第一连接端310设置于所述第一壳体120的外表面,所述第一连接端310可以嵌于所述第一壳体120的外表面,也可以固定于所述第一壳体120的外表面。所述保护测控设备110设置于所述第一容纳空腔,所述第一连接端310与所述保护测控设备110电连接。所述第一壳体120可以为任意金属材料制成,例如:铁、铜、钢、合金等。所述第一壳体120可以为方形、矩形、圆柱状、或者其他任意形状,本实施例对于所述第一壳体120不作任何限定,可根据实际情况具体设定,只需要满足可以实现具有第一容纳空腔,可以为所述保护测控设备110提供安装空间的功能即可。The
请参见图4,在一个实施例中,所述环网柜200包括:第二壳体210和断路器220。Referring to FIG. 4 , in one embodiment, the ring
所述第二壳体210具有第二容纳空腔,所述第二连接端320设置于所述第二壳体210的外表面,所述第二连接端320可以嵌于所述第二壳体210的外表面,也可以固定于所述第二壳体210的外表面。所述第二壳体210可以为任意金属材料制成,例如:铁、铜、钢、合金等。所述第二壳体210可以为方形、矩形、圆柱状、或者其他任意形状,本实施例对于所述第二壳体210不作任何限定,可根据实际情况具体设定,只需要满足可以实现具有第二容纳空腔,可以为所述多个断路器220提供安装空间的功能即可。所述断路器220设置于所述第二容纳空腔,所述第二连接端320与所述断路器220电连接。所述断路器220的数量可以为一个,也可以为多个。当所述断路器220为多个时,所述多个断路器220均设置于所述第二容纳空腔,所述多个断路器220的输入端分别与所述第二连接端320电连接,所述多个断路器220的输出端分别与所述工作线路电连接。所述多个断路器220可以相同,也可以不同,所述多个断路器220分别接入所述工作线路的不同节点以控制所述工作线路不同位置的连通和断开,或者可以接入多条不同的所述工作线路,以控制不同的所述工作线路的连通与断开。所述多个断路器220可以为高压断路器220,也可以为低压断路器220,本实施例不作任何限定,可根据实际情况具体选择。The
在一个实施例中,所述保护测控系统10还包括:可拆卸组件。In one embodiment, the protection measurement and
所述可拆卸组件的数量可以为多个,多个所述可拆卸组件分别设置于所述第一壳体120与所述第二壳体210,所述第一连接端310通过所述可拆卸组件固定于所述第一壳体120的外表面,所述第二连接端320通过所述可拆卸组件固定于所述第二壳体210的外表面。所述可拆卸组件可以为螺丝与螺栓,或者隔离销、螺钉与螺孔等,以方便所述第一连接端310与所述第二连接端320的安装与拆除。The number of the detachable components may be multiple, and a plurality of the detachable components are respectively disposed on the
请参见图5,在一个实施例中,所述保护测控设备110包括交流量检测组件111,所述第一连接端310包括第一交流量重载连接端311,所述第二连接端320包括第二交流量重载连接端321。Referring to FIG. 5 , in one embodiment, the protection measurement and
所述交流量检测组件111设置于所述第一容纳空腔,所述交流量检测组件111的输入端与所述工作线路电连接,所述交流量检测组件111用于检测所述工作线路的电流和/或电压信号。所述交流量检测组件111可以包括电流互感器和电压互感器,所述电流互感器和所述电压互感器均设置于所述第一容纳空腔,在使用时,分别与所述工作线路电连接,以采集所述工作线路的电流信号和电压信号。The AC
所述第一交流量重载连接端311设置于所述第一壳体120的外表面,所述第一交流量重载连接端311的一端与所述交流量检测组件111的输出端电连接。所述第二交流量重载连接端321设置于所述第二壳体210的外表面,所述第二交流量重载连接端321与多个所述断路器220电连接。所述第二交流量重载连接端321与所述第一交流量重载连接端311相匹配,所述第一交流量重载连接端311与所述第二交流量重载连接端321相互匹配共同构成了所述交流量重载连接器,所述交流量重载连接器的插针可以排列为双列并列,当所述第一交流量重载连接端311与所述第二交流重载连接端之间分离时,可以自动封接电流互感器二次侧回路。所述交流量重载连接器可以为矩形连接器,以避免电流互感二次回路引起过电压。The first AC heavy-
请参见图6,在一个实施例中,所述保护测控设备110包括开入量检测组件112,所述第一连接端310包括第一开入量重载连接端312,所述第二连接端320包括第二开入量重载连接端322。Referring to FIG. 6 , in one embodiment, the protection measurement and
所述开入量检测组件112设置于所述第一容纳空腔,所述开入量检测组件112的输入端与所述工作线路电连接,所述开入量检测组件112用于检测所述工作线路的开关状态。所述开入量可以为:手合断路器同期的开入、弹簧储能器的开入以及闭锁重合闸的开入等。本实施例对于所述开入量检测组件112不作任何限定,可根据实际情况具体选择或者设定,只需要满足可以实现对于所述开入量的检测的功能即可。The binary
所述第一开入量重载连接端312设置于所述第一壳体120的外表面,所述第一开入量重载连接端312的一端与所述开入量检测组件112电连接。所述第二开入量重载连接端322设置于所述第二壳体210的外表面,所述第二开入量重载连接端322分别与多个所述断路器220电连接。所述第二开入量重载连接端322与所述第一开入量重载连接端312相匹配,所述第二开入量重载连接端322与所述第一开入量重载连接端312共同构成所述开入量重载连接器,所述开入量重载连接器的插针可以采用双列并排的32芯,以接入更多的开入量检测点,扩大所述开入量的检测范围。The first binary input heavy-
请参见图7,在一个实施例中,所述保护测控设备110包括操作回路113,所述第一连接端310包括第一操作回路重载连接端313,所述第二连接端320包括第二操作回路重载连接端323。Referring to FIG. 7 , in one embodiment, the protection measurement and
所述操作回路113设置于所述第一容纳空腔,所述操作回路113的输入端与所述工作线路电连接,所述操作回路113用于对所述工作线路进行保护操作。所述操作回路113是指所述工作线路中的手合、手跳、遥跳等回路,通过所述手合、所述手跳、所述遥跳等对所述工作线路行控制,以在所述工作线路发生过电压等时启动跳闸等保护动作。本实施例对于所述操作回路113不作任何限定,只需要可以满足可以实现对所述工作线路进行保护操作的功能即可。The
所述第一操作回路重载连接端313设置于所述第一壳体120的外表面,所述第一操作回路重载连接端313的一端与所述操作回路113的输出端电连接。所述第二操作回路重载连接端323设置于所述第二壳体210的外表面,所述第二操作回路重载连接端323与多个所述断路器220电连接。所述第二操作回路重载连接端323与所述第一操作回路重载连接端313相匹配,所述第一操作回路重载连接端313与所述第二操作回路重载连接端323共同构成了所述操作回路重载连接器,所述操作回路重载连接器可以采用矩形重载连接器,所述矩形重载连接器的插针可以采用四列并排的64芯,以方便接入不同的操作回路。The first operation circuit heavy-
在一个实施例中,所述第一交流量重载连接端311与所述第二交流量重载连接端321中相邻插针之间具有第一特征距离,例如可以为13.5mm。所述第一开入量重载连接端312与第二开入量重载连接端322中相邻插针之间具有第二特征距离,例如可以为5.08mm,所述第一操作回路重载连接端313与第二操作回路重载连接端323中相邻插针之间具有第三特征距离,例如可以为5.10mm。所述第一特征距离、所述第二特征距离和所述第三特征距离均不相等,以防止所述交流量重载连接器、所述开入量重载连接器和所述操作回路重载连接器之间的误插而造成电路的错接,引起不安全事故的发生。In one embodiment, there is a first characteristic distance between adjacent pins in the first AC heavy-
在一个实施例中,所述第一交流量重载连接端311与所述第二交流量重载连接端321中的插针具有第一特征高度,例如可以为9mm。所述第一开入量重载连接端312与第二开入量重载连接端322中的插针具有第二特征高度,例如可以为7.62mm,所述第一操作回路重载连接端313与第二操作回路重载连接端323中的插针具有第三特征高度,例如可以为8.62mm。所述第一特征高度、所述第二特征高度和所述第三特征高度均不相等,以防止所述交流量重载连接器、所述开入量重载连接器和所述操作回路重载连接器之间的误插而造成电路的错接,引起不安全事故的发生。In one embodiment, the pins in the first AC heavy-
在一个实施例中,所述第一交流量重载连接端311与所述第二交流量重载连接端321的插针数量均为第一数值、所述第一开入量重载连接端312与第二开入量重载连接端322的插针数量均为第二数值,所述第一操作回路重载连接端313与第二操作回路重载连接端323的插针数量均为第三数值,所述第一数值、所述第二数值与所述第三数值均不相等。例如所述交流量重载连接器可以为26芯,所述开入量重载连接器可以为32芯,所述操作回路重载连接器可以为64芯,可以有效防止所述交流量重载连接器、所述开入量重载连接器和所述操作回路重载连接器之间的误插而造成电路的错接,引起不安全事故的发生。In one embodiment, the number of pins of the first AC heavy-
以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-described embodiments can be combined arbitrarily. For the sake of brevity, all possible combinations of the technical features in the above-described embodiments are not described. However, as long as there is no contradiction between the combinations of these technical features, All should be regarded as the scope described in this specification.
以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only represent several embodiments of the present application, and the descriptions thereof are relatively specific and detailed, but should not be construed as a limitation on the scope of the patent application. It should be pointed out that for those skilled in the art, without departing from the concept of the present application, several modifications and improvements can be made, which all belong to the protection scope of the present application. Therefore, the scope of protection of the patent of the present application shall be subject to the appended claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010669421.9A CN112003069B (en) | 2020-07-13 | 2020-07-13 | Protection measurement and control device and system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010669421.9A CN112003069B (en) | 2020-07-13 | 2020-07-13 | Protection measurement and control device and system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112003069A CN112003069A (en) | 2020-11-27 |
| CN112003069B true CN112003069B (en) | 2022-04-26 |
Family
ID=73467975
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010669421.9A Active CN112003069B (en) | 2020-07-13 | 2020-07-13 | Protection measurement and control device and system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112003069B (en) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101030711A (en) * | 2007-03-15 | 2007-09-05 | 中国船舶重工集团公司第七一二研究所 | Microcomputer protecting controller |
| CN203774613U (en) * | 2013-12-03 | 2014-08-13 | 国家电网公司 | Universal type temporary switch cabinet |
| US8849614B2 (en) * | 2002-11-06 | 2014-09-30 | Gridquant, Inc. | System and method for monitoring and managing three-phase power flows in electrical transmission and distribution networks |
| CN204216476U (en) * | 2014-11-28 | 2015-03-18 | 湖南长高高压开关集团股份公司 | A kind of modularization intelligent box fixes gas-filled type high-voltage alternating metal enclosed switchgear |
| CN204947563U (en) * | 2015-09-14 | 2016-01-06 | 河北宇德电气设备科技有限公司 | A kind of integrated protection and monitoring device |
| CN105576542A (en) * | 2016-02-06 | 2016-05-11 | 铁道第三勘察设计院集团有限公司 | Vehicular pre-installed solid insulation switching station |
| CN106088701A (en) * | 2016-07-18 | 2016-11-09 | 中国电力科学研究院 | A kind of 35kV assembled intelligent substation building method |
| CN110535243A (en) * | 2019-09-26 | 2019-12-03 | 浙江涵普电力科技有限公司 | A kind of intelligent comprehensive protection supervisory equipment |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20070291442A1 (en) * | 2002-12-23 | 2007-12-20 | Cooper Technologies Company | Method of Making and Repairing a Modular Push-On Busbar System |
| CN104617540B (en) * | 2015-01-09 | 2017-09-19 | 长园深瑞继保自动化有限公司 | The small-sized protective relaying device used suitable for outdoor installation |
| CN105305365A (en) * | 2015-10-30 | 2016-02-03 | 国网福建省电力有限公司 | Power grid relay protection emergency management system |
-
2020
- 2020-07-13 CN CN202010669421.9A patent/CN112003069B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8849614B2 (en) * | 2002-11-06 | 2014-09-30 | Gridquant, Inc. | System and method for monitoring and managing three-phase power flows in electrical transmission and distribution networks |
| CN101030711A (en) * | 2007-03-15 | 2007-09-05 | 中国船舶重工集团公司第七一二研究所 | Microcomputer protecting controller |
| CN203774613U (en) * | 2013-12-03 | 2014-08-13 | 国家电网公司 | Universal type temporary switch cabinet |
| CN204216476U (en) * | 2014-11-28 | 2015-03-18 | 湖南长高高压开关集团股份公司 | A kind of modularization intelligent box fixes gas-filled type high-voltage alternating metal enclosed switchgear |
| CN204947563U (en) * | 2015-09-14 | 2016-01-06 | 河北宇德电气设备科技有限公司 | A kind of integrated protection and monitoring device |
| CN105576542A (en) * | 2016-02-06 | 2016-05-11 | 铁道第三勘察设计院集团有限公司 | Vehicular pre-installed solid insulation switching station |
| CN106088701A (en) * | 2016-07-18 | 2016-11-09 | 中国电力科学研究院 | A kind of 35kV assembled intelligent substation building method |
| CN110535243A (en) * | 2019-09-26 | 2019-12-03 | 浙江涵普电力科技有限公司 | A kind of intelligent comprehensive protection supervisory equipment |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112003069A (en) | 2020-11-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105098645B (en) | Distribution automation cabinet and application thereof | |
| CN105098643B (en) | Distribution automation cabinet and its application | |
| CN110299041A (en) | A kind of Intelligent power distribution terminal and communication O&M integration practical training system and method | |
| CN106856332A (en) | A kind of distributed photovoltaic power generation grid-connected system | |
| US20230288451A1 (en) | Electric meter collar adaptor to divert power to distributed power generation resources | |
| CN203932778U (en) | Outdoor switching station | |
| CN206712478U (en) | A kind of distributed photovoltaic power generation grid-connected system | |
| CN108598922A (en) | Segmented threephase load phasing switch cabinet | |
| CN112003069A (en) | Protection measurement and control devices and systems | |
| CN216720910U (en) | Direct-current power supply circuit | |
| CN211377569U (en) | Outdoor installation full voltage level integration transformer protection device | |
| CN214900263U (en) | Integrated mobile power supply device | |
| CN212435042U (en) | A circuit breaker and non-contact switch combined programmable power distribution device | |
| CN105098644B (en) | Outdoor switching station | |
| CN209544874U (en) | Intelligent power supply and distribution system | |
| CN208062495U (en) | A kind of intelligent AC first cabinet of each row output branch copper bar and current transformer installing structure | |
| CN222169398U (en) | An AC uninterruptible power supply system with 10kV input for communication | |
| CN217590132U (en) | Quick plug-in type 0.4KV distribution box | |
| CN219695334U (en) | High-capacity direct test control console | |
| CN222868371U (en) | A distribution box capable of quickly restoring power supply using an emergency power supply system | |
| CN222015897U (en) | A multi-way connection for transformation and expansion of 10kV feeder cabinet | |
| CN214380110U (en) | PCS cabinet power supply system | |
| CN224249368U (en) | Distribution box and distributed power generation system | |
| CN204905742U (en) | Middling pressure looped netowrk vacuum circuit breaker cabinet | |
| CN116599032B (en) | Two-inlet-wire two-bus-connection electric control system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |