- CN111980890A CN111980890A CN202010959307.XA CN202010959307A CN111980890A CN 111980890 A CN111980890 A CN 111980890A CN 202010959307 A CN202010959307 A CN 202010959307A CN 111980890 A CN111980890 A CN 111980890A
- Authority
- CN
- China
- Prior art keywords
- pressure
- valve
- main
- ups
- diaphragm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B43/00—Machines, pumps, or pumping installations having flexible working members
- F04B43/02—Machines, pumps, or pumping installations having flexible working members having plate-like flexible members, e.g. diaphragms
- F04B43/06—Pumps having fluid drive
- F04B43/073—Pumps having fluid drive the actuating fluid being controlled by at least one valve
- F04B43/0733—Pumps having fluid drive the actuating fluid being controlled by at least one valve with fluid-actuated pump inlet or outlet valves; with two or more pumping chambers in series
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B11/00—Equalisation of pulses, e.g. by use of air vessels; Counteracting cavitation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B43/00—Machines, pumps, or pumping installations having flexible working members
- F04B43/0009—Special features
- F04B43/0081—Special features systems, control, safety measures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B43/00—Machines, pumps, or pumping installations having flexible working members
- F04B43/02—Machines, pumps, or pumping installations having flexible working members having plate-like flexible members, e.g. diaphragms
- F04B43/06—Pumps having fluid drive
- F04B43/067—Pumps having fluid drive the fluid being actuated directly by a piston
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B43/00—Machines, pumps, or pumping installations having flexible working members
- F04B43/02—Machines, pumps, or pumping installations having flexible working members having plate-like flexible members, e.g. diaphragms
- F04B43/06—Pumps having fluid drive
- F04B43/073—Pumps having fluid drive the actuating fluid being controlled by at least one valve
- F04B43/0736—Pumps having fluid drive the actuating fluid being controlled by at least one valve with two or more pumping chambers in parallel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B49/00—Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
- F04B49/06—Control using electricity
- F04B49/065—Control using electricity and making use of computers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B49/00—Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
- F04B49/08—Regulating by delivery pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B49/00—Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
- F04B49/22—Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00 by means of valves
- F04B49/225—Control, e.g. of pump delivery, or pump pressure of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00 by means of valves with throttling valves or valves varying the pump inlet opening or the outlet opening
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B53/00—Component parts, details or accessories not provided for in, or of interest apart from, groups F04B1/00 - F04B23/00 or F04B39/00 - F04B47/00
- F04B53/10—Valves; Arrangement of valves
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Reciprocating Pumps (AREA)
Abstract
本发明公开了一种正排量隔膜泵事故后的防水锤损伤装置及控制方法,涉及矿浆管道输送领域。所述装置包括多个主泵隔膜室,每个隔膜室与主泵上的活塞杆单独连接,隔膜室推进液侧主排泄通道上设置检修总阀,主排泄通道向下通向油箱;主排泄通道上设置压力传感器,压力传感器连接主排泄通道上的高压电磁阀,高压电磁阀另一端连接带UPS控制系统的UPS连接端口。本装置的优点在于可有效的实现主泵曲轴的失去动力时及时释放出口压力,确保主泵隔膜室压力低于出口单向阀开启压力,保障出口单向阀及时关闭,进一步防止压力传导到主泵轴承,实现主泵的保护。
The invention discloses a device and a control method for preventing hammer damage after a positive displacement diaphragm pump accident, and relates to the field of ore slurry pipeline transportation. The device includes a plurality of main pump diaphragm chambers, each diaphragm chamber is independently connected with the piston rod on the main pump, the main drain channel on the propulsion liquid side of the diaphragm chamber is provided with an overhaul main valve, and the main drain channel leads downward to the oil tank; A pressure sensor is arranged on the channel, the pressure sensor is connected to the high-pressure solenoid valve on the main drain channel, and the other end of the high-pressure solenoid valve is connected to the UPS connection port with the UPS control system. The advantage of this device is that it can effectively release the outlet pressure in time when the crankshaft of the main pump loses power, ensure that the pressure in the diaphragm chamber of the main pump is lower than the opening pressure of the outlet check valve, ensure that the outlet check valve is closed in time, and further prevent the pressure from being transmitted to the main pump. Pump bearing to realize the protection of the main pump.
Description
技术领域technical field
本发明公开了一种正排量隔膜泵事故后的防水锤损伤装置及控制方法,涉及矿浆管道输送技术领域。The invention discloses a device and a control method for waterproof hammer damage after an accident of a positive displacement diaphragm pump, and relates to the technical field of ore slurry pipeline transportation.
背景技术Background technique
正排量隔膜泵由于其输送扬程高,输送介质和泵体主动力部件不直接接触,效率高等优势在固液两相流(矿浆)管道输送领域广泛应用,在实际生产运行过程中,难免出现许多突发性事故停机状况(如泵站失电、机械和控制故障等)。众所周知,流体管道输送过程中,突然停机都会产生不同程度的停泵水锤(和输送介质、管线特性、装置性能等有关),停泵水锤对整个系统危害巨大,在低粘度流体中最为明显(如水),所以输水管道系统都会设计有很多防水锤装置(如止回、调压、泄放、缓冲等);而在矿浆管道输送系统中,由于浆体本身粘度较大(为水的10倍左右);输送流速较低(一般小于2m/s);管道运行压力较高,矿浆磨蚀性强等,所以一般要求输送管道为全通性(即管道上的阀门等设施在全开状态下不影响浆体在管道中的流动),显然输水系统中的水锤预防手段不适用于矿浆管道系统,许多工程实践也证明了这点。The positive displacement diaphragm pump is widely used in the field of solid-liquid two-phase flow (slurry) pipeline transportation due to its high conveying head, no direct contact between the conveying medium and the main power components of the pump body, and high efficiency. Many unexpected shutdown conditions (such as pumping station power loss, mechanical and control failures, etc.). As we all know, in the process of fluid pipeline transportation, sudden shutdown will produce different degrees of pump stop water hammer (related to the conveying medium, pipeline characteristics, device performance, etc.). (such as water), so the water pipeline system will be designed with many waterproof hammer devices (such as check, pressure regulation, release, buffer, etc.); in the slurry pipeline transportation system, due to the high viscosity of the slurry itself (for water about 10 times); the conveying flow rate is low (generally less than 2m/s); the operating pressure of the pipeline is high, and the slurry is highly abrasive, etc., so the conveying pipeline is generally required to be fully connected (that is, the valves and other facilities on the pipeline are in a fully open state. It does not affect the flow of the slurry in the pipeline), obviously the water hammer prevention method in the water delivery system is not suitable for the slurry pipeline system, and many engineering practices have also proved this.
矿浆管道系统在事故停泵时产生的水锤效应(压力振荡趋势),对正排量隔膜泵运动和传动部件(特别是动力端曲轴及轴承、减速机齿轮等)破坏极大,久而久之造成轴承、齿轮及连接等部件中的机械故障时有发生,加大了主泵的维修成本,影响生产组织。根据生产实践对该现象进行认真分析,提出本发明。The water hammer effect (pressure oscillation trend) produced by the slurry pipeline system when the pump is stopped in an accident, greatly damages the movement and transmission components of the positive displacement diaphragm pump (especially the power end crankshaft and bearings, reducer gears, etc.) Mechanical failures in components such as gears, gears and connections occur from time to time, which increases the maintenance cost of the main pump and affects the production organization. According to the production practice, the phenomenon is carefully analyzed, and the present invention is proposed.
发明内容SUMMARY OF THE INVENTION
为了解决上述问题,本发明公开了一种正排量隔膜泵事故后的防水锤损伤装置及控制方法,其有效避免主泵曲轴在生产运行过程中因外部因素或自身故障导致的突然性停机带来的破坏,特别是针对主泵活塞杆失去动力时及时释放压力最高的活塞腔,使对应的出口单向阀及时关闭,确保管道水锤产生的反击带来的压力不平衡,进而传导到主泵曲轴上,造成更大的伤害。In order to solve the above problems, the present invention discloses a device and a control method for preventing hammer damage after an accident of a positive displacement diaphragm pump, which can effectively avoid the sudden shutdown of the crankshaft of the main pump due to external factors or its own failure during production and operation. In particular, when the piston rod of the main pump loses power, the piston chamber with the highest pressure is released in time, so that the corresponding outlet check valve is closed in time to ensure that the pressure imbalance caused by the counterattack caused by the water hammer in the pipeline is transmitted to the main pump. pump crankshaft, causing more damage.
本发明采用的技术方案如下:The technical scheme adopted in the present invention is as follows:
本发明公开了一种正排量隔膜泵事故后的防水锤损伤装置,包括多个隔膜室,每个隔膜室与主泵上的活塞杆单独连接,隔膜室推进液侧主排泄通道上设置检修总阀,检修总阀长期打开,检修时关闭总阀进行检修,主排泄通道管路向下通向油箱;The invention discloses a device for preventing hammer damage after a positive displacement diaphragm pump accident. The main valve, the main maintenance valve is open for a long time, and the main valve is closed for maintenance during maintenance, and the main drain channel pipeline leads down to the fuel tank;
进一步地,所述主排泄通道上设置压力传感器,连接分支排泄通道上的高压电磁阀,另一条分支通道上设置手动排泄阀,下端连接隔膜室进油管道,当隔膜泵更换过液压油、长时间停机再启动或运行过程中空气进入油路系统后,都需要手动间歇性通过该阀门短时间反复开关来排出液压油中的空气,保证隔膜泵推进液系统的正常运行;Further, a pressure sensor is set on the main discharge channel, which is connected to the high-pressure solenoid valve on the branch discharge channel, and a manual discharge valve is set on the other branch channel, and the lower end is connected to the oil inlet pipeline of the diaphragm chamber. After the time is stopped and restarted or the air enters the oil circuit system during operation, it is necessary to manually and intermittently switch the valve repeatedly for a short time to discharge the air in the hydraulic oil to ensure the normal operation of the diaphragm pump propulsion fluid system;
进一步地,所述高压电磁阀为常闭型,下端连接隔膜室出油管道;高压电磁阀另一端连接带UPS控制系统的UPS连接端口,通过UPS对高压电磁阀的供电,在故障情况下也可使高压电磁阀正常使用;Further, the high-pressure solenoid valve is of a normally closed type, and the lower end is connected to the oil outlet pipe of the diaphragm chamber; the other end of the high-pressure solenoid valve is connected to a UPS connection port with a UPS control system, and the power supply to the high-pressure solenoid valve through the UPS can also be used in the event of a fault. The high-pressure solenoid valve can be used normally;
进一步地,带UPS控制系统通过各条排泄通道上的压力传感器监测隔膜室压力值;Further, the control system with UPS monitors the pressure value of the diaphragm chamber through the pressure sensors on each discharge channel;
进一步地,带UPS控制系统接收主电源丢失信号,判断故障类型并对系统做出反馈(1)系统判断为供电系统故障,主电源丢失信号由隔膜泵变频器系统引入带UPS控制系统,(2)系统判断为泵机械故障或控制系统故障,隔膜泵紧急停机信号由现场PLC系统进行预先判断,若判断发生压力失衡,现场PLC系统将信号传入带UPS控制系统,若非压力失衡信号,现场PLC系统将信号传入总电脑;Further, the control system with UPS receives the main power loss signal, judges the type of failure and gives feedback to the system (1) The system judges that the power supply system is faulty, and the main power loss signal is introduced into the control system with UPS from the diaphragm pump inverter system, (2) ) The system judges the pump mechanical failure or control system failure, and the emergency stop signal of the diaphragm pump is pre-judged by the on-site PLC system. If it is judged that pressure imbalance occurs, the on-site PLC system will transmit the signal to the control system with UPS. The system transmits the signal to the main computer;
进一步地,带UPS控制系统在接收到以上2种事故信号中的任意1种或2种后,立即对监测压力传感器实际数值进行一次比较,输出结果为最大值对应的高压电磁阀打开,并监测该最大值与第二值的相差在时,输出关闭对应的高压电磁阀,完成本次监测和逻辑输出。Further, after receiving any one or two of the above two kinds of accident signals, the control system with UPS immediately compares the actual value of the monitoring pressure sensor, and the output result is that the high-pressure solenoid valve corresponding to the maximum value is opened and monitored. The difference between the maximum value and the second value is When the output closes the corresponding high-voltage solenoid valve, the monitoring and logic output are completed.
本发明的技术效果如下:The technical effect of the present invention is as follows:
本装置可应用于输水系统中的水锤预防,同时可以应用于矿浆管道输送系统,有效避免主泵曲轴在生产运行过程中因外部因素或自身故障导致的突然性停机带来的破坏;采用本装置可有效地实现主泵曲轴失去动力时及时释放出口压力,确保主泵隔膜室压力低于出口单向阀开启压力,保障出口单向阀及时关闭,进一步防止压力传导到主泵轴承,实现主泵的保护。The device can be applied to the prevention of water hammer in the water delivery system, and can also be applied to the slurry pipeline transportation system to effectively avoid the damage caused by the sudden shutdown of the main pump crankshaft due to external factors or its own failure during the production and operation process; The device can effectively release the outlet pressure in time when the crankshaft of the main pump loses power, ensure that the pressure in the diaphragm chamber of the main pump is lower than the opening pressure of the outlet check valve, ensure that the outlet check valve is closed in time, and further prevent the pressure from being transmitted to the main pump bearing. Protection of the main pump.
附图说明Description of drawings
图1是隔膜室整体示意图;Fig. 1 is the overall schematic diagram of diaphragm chamber;
A1-A3—隔膜室总排泄阀,B1-B3—手动排泄阀,C1-C3—高压电磁阀,P1-P3—压力传感器,D—带UPS控制系统。A1-A3—diaphragm chamber total drain valve, B1-B3—manual drain valve, C1-C3—high pressure solenoid valve, P1-P3—pressure sensor, D—with UPS control system.
图2是隔膜室装置连接图;Fig. 2 is the connection diagram of diaphragm chamber device;
1-入口单向阀,2-出口单向阀,3-隔膜室,4-手动排泄阀,5-高压电磁阀,6-手动排泄阀,7-带UPS控制系统,8-隔膜室进油管道,9-隔膜室出油管道,10-压力传感器。1- Inlet check valve, 2- Outlet check valve, 3- Diaphragm chamber, 4- Manual drain valve, 5- High pressure solenoid valve, 6- Manual drain valve, 7- With UPS control system, 8- Diaphragm chamber oil inlet Pipe, 9-diaphragm chamber oil outlet pipe, 10-pressure sensor.
图3是控制系统流程图Figure 3 is a flow chart of the control system
具体实施方式Detailed ways
下面结合附图,对本发明作详细的说明。The present invention will be described in detail below with reference to the accompanying drawings.
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments.
本实施例中,所采用的数据为优选方案,但并不用于限制本发明;In this embodiment, the data used are preferred solutions, but are not used to limit the present invention;
实施例1Example 1
如图1-2所示,本实施例主泵选用3个隔膜室,针对主泵3个活塞杆失去动力时及时释放压力最高的活塞腔,使对应的出口单向阀及时关闭,确保管道水锤产生的反击带来的压力不平衡;As shown in Figure 1-2, the main pump of this embodiment uses three diaphragm chambers. When the three piston rods of the main pump lose power, the piston chamber with the highest pressure is released in time, so that the corresponding outlet check valve is closed in time to ensure that the water in the pipeline is closed. The pressure caused by the counterattack generated by the hammer is unbalanced;
本实施例中,隔膜室推进液侧设置手动排泄阀,手动排泄阀安装三通,形成隔膜室总排泄通道和两条分支排泄通道,其特征在于,所述一条分支排泄通道上设置手动排泄阀,另一条分支排泄通道上设置高压电磁阀;In this embodiment, a manual drain valve is installed on the propellant side of the diaphragm chamber, and the manual drain valve is installed with a three-way to form a general drain channel and two branch drain channels of the diaphragm chamber. It is characterized in that a manual drain valve is arranged on the one branch drain channel. , and a high-pressure solenoid valve is set on the other branch drainage channel;
本实施例中,所述隔膜室总排泄通道上安装隔膜室手动总排泄阀和压力传感器,总排泄阀通过压力传感器一端与分支排泄通道上的手动排泄阀连接,另一端与分支排泄通道上的高压电磁阀连接;In this embodiment, a manual total discharge valve and a pressure sensor are installed on the general discharge passage of the diaphragm chamber. One end of the total discharge valve is connected to the manual discharge valve on the branch discharge passage through the pressure sensor, and the other end is connected to the manual discharge valve on the branch discharge passage. High pressure solenoid valve connection;
本实施例中,所述分支排泄通道上的手动排泄阀一端连接带UPS控制系统,另一端连接隔膜室进油管道;所述另一条分支排泄通道上的高压电磁阀一端连接带UPS控制系统,另一端连接隔膜室出油管道;In this embodiment, one end of the manual drain valve on the branch drain channel is connected to the control system with UPS, and the other end is connected to the oil inlet pipeline of the diaphragm chamber; one end of the high-pressure solenoid valve on the other branch drain channel is connected to the control system with UPS, The other end is connected to the oil outlet pipe of the diaphragm chamber;
本实施例中,所述压力传感器设置两个端口,一个端口连接带UPS控制系统的压力感测接口,另一端口通向高压电磁阀连接带UPS控制系统的UPS连接端口;In this embodiment, the pressure sensor is provided with two ports, one port is connected to the pressure sensing interface with the UPS control system, and the other port leads to the high-pressure solenoid valve and is connected to the UPS connection port with the UPS control system;
本实施例中,所述隔膜室一端连接入口单向阀,另一端连接出口单向阀至油箱。In this embodiment, one end of the diaphragm chamber is connected to the inlet check valve, and the other end is connected to the outlet check valve to the fuel tank.
实施例2Example 2
如图1-2所示,本实施例隔膜泵在正常运行时,A1、A2、A3为常开状态;B1、B2、B3 为关闭状态;C1、C2、C3为断电关闭状态;P1、P2、P3实时检测三个隔膜室压力;D为带 UPS控制系统,端口与压力传感器连接对装置进行实时控制;As shown in Figure 1-2, when the diaphragm pump of this embodiment is in normal operation, A1, A2, and A3 are normally open; B1, B2, and B3 are closed; C1, C2, and C3 are power-off and closed; P1, P2 and P3 detect the pressure of the three diaphragm chambers in real time; D is a control system with UPS, and the port is connected with a pressure sensor to control the device in real time;
本实施例中,A1、A2、A3为三个隔膜室总排泄阀,选用手动针型阀,该阀门作为检修总阀,始终处于常开状态;当后端阀门(B或C系列阀门)或管路出现故障需检修更换时,关闭该阀门,可暂时切断油路;检修完成后,手动开启该阀门,工作人员观察油路通畅情况以及系统监测到的压力值,手动控制该阀门的开闭程度,测试检修效果同时保证操作人员的人身安全;In this embodiment, A1, A2, and A3 are the total discharge valves of the three diaphragm chambers, and a manual needle valve is selected. This valve is used as the main maintenance valve and is always in a normally open state; when the back-end valve (B or C series valve) or When the pipeline fails and needs to be repaired and replaced, close the valve to temporarily cut off the oil circuit; after the repair is completed, manually open the valve, the staff observes the smoothness of the oil circuit and the pressure value monitored by the system, and manually controls the opening and closing of the valve degree, test the maintenance effect and ensure the personal safety of the operator;
本实施例中,B1、B2、B3分别为三个隔膜室分支排泄通道上的手动排泄阀,采用手动针型阀,始终处于常闭状态;当隔膜泵更换过液压油,长时间停机再启动或运行过程中空气进入油路系统后,都需要手动间歇性通过该阀门短时间反复开关来排出液压油中的空气,保证隔膜泵推进液系统的正常运行;In this embodiment, B1, B2, and B3 are the manual drain valves on the branch drain channels of the three diaphragm chambers, respectively, and the manual needle valve is used, which is always in a normally closed state; when the diaphragm pump has been replaced with hydraulic oil, it will be restarted after a long shutdown. Or after the air enters the oil circuit system during operation, it is necessary to manually and intermittently switch the valve repeatedly for a short time to discharge the air in the hydraulic oil to ensure the normal operation of the diaphragm pump propulsion fluid system;
本实施例中,C1、C2、C3为隔膜室另一条支路上的高压电磁阀,该阀与B系列阀在通路上为并联结构,有全开和全关两种工作状态。In this embodiment, C1, C2, and C3 are high-pressure solenoid valves on another branch of the diaphragm chamber. The valve and the B series valve are in a parallel structure in the passageway, and have two working states: fully open and fully closed.
实施例3Example 3
如图1-3所示,本实施例中C系列高压电磁阀由带UPS控制系统通过压力传感器实时监测,正常情况下均为关闭状态;As shown in Figure 1-3, in this embodiment, the C series high-pressure solenoid valve is monitored in real time by the pressure sensor with the UPS control system, and is normally closed;
本实施例中,事故发生后带UPS控制系统接收信号对故障进行判断,(1)系统判断为供电系统故障,主电源丢失信号由隔膜泵变频器系统引入带UPS控制系统;高压电磁阀一端连接带UPS控制系统的UPS连接端口,即使停电也可通过UPS电源单独供电,不会因为停电导致高压电磁阀正常打开;In this embodiment, after the accident occurs, the UPS control system receives the signal to judge the fault, (1) the system judges that the power supply system is faulty, and the main power loss signal is introduced into the UPS control system from the diaphragm pump inverter system; one end of the high-voltage solenoid valve is connected to UPS connection port with UPS control system, even if there is a power failure, it can be powered by the UPS power supply alone, and the high-voltage solenoid valve will not be opened normally due to the power failure;
(2)系统判断为泵机械故障或控制系统故障,隔膜泵紧急停机信号由现场PLC系统进行预先判断,若判断发生隔膜室之间压力失衡,现场PLC系统将信号传入带UPS控制系统,若非压力失衡信号,可能发生其他器械故障,现场PLC系统对此信号进行判断,将判断结果传入总控制系统进行处理;(2) The system judges the pump mechanical failure or control system failure, and the emergency stop signal of the diaphragm pump is pre-judged by the on-site PLC system. If it is judged that the pressure between the diaphragm chambers is unbalanced, the on-site PLC system will transmit the signal to the UPS control system. Pressure imbalance signal, other equipment failure may occur, the on-site PLC system judges this signal, and transmits the judgment result to the general control system for processing;
本实施例中,各个隔膜室排泄通道上的压力传感器分别与带UPS控制系统连接,事故发生操作人员可在控制系统上实时观测每个隔膜室的压力值;In this embodiment, the pressure sensors on the discharge channels of each diaphragm chamber are respectively connected to the control system with UPS, and the operator can observe the pressure value of each diaphragm chamber in real time on the control system when an accident occurs;
本实施例中,事故信号处理完成后,带UPS控制系统对压力失衡信号做二次判断;In this embodiment, after the accident signal processing is completed, the UPS control system makes a secondary judgment on the pressure imbalance signal;
带UPS控制系统判断隔膜室压力正常,将判断结果上传总控制系统做其他事故分析处理,The UPS control system judges that the pressure of the diaphragm chamber is normal, and uploads the judgment results to the general control system for other accident analysis and processing.
带UPS控制系统判断隔膜室压力异常,立即对检测到的P1、P2、P3实际数值进行一次比较,输出结果为最大值对应分支排泄通道上的高压电磁阀打开;The UPS control system judges that the pressure of the diaphragm chamber is abnormal, and immediately compares the detected actual values of P1, P2 and P3, and the output result is the maximum value corresponding to the opening of the high-pressure solenoid valve on the branch discharge channel;
本实施例中,带UPS控制系统通过压力传感器实时监测对应的压力最大值与第二大值相差在时,输出关闭对应的高压电磁阀,完成本次监测和逻辑输出;In this embodiment, the control system with UPS monitors the corresponding maximum pressure value in real time through the pressure sensor and the difference between the second maximum value and the When the output closes the corresponding high-voltage solenoid valve, the monitoring and logic output are completed;
本实施例中,压力最大值与第二大值相差在时,均可确保主泵3个隔膜室压力低于出口单向阀开启压力,保障出口单向阀及时关闭,进一步防止压力传导到主泵轴承,实现主泵保护的效果;In this embodiment, the difference between the maximum pressure value and the second maximum value is It can ensure that the pressure of the three diaphragm chambers of the main pump is lower than the opening pressure of the outlet check valve, so as to ensure that the outlet check valve is closed in time, further preventing the pressure from being transmitted to the main pump bearing, and achieving the effect of main pump protection;
当压力最大值与第二大值相差在控制系统完全关闭对应的高压电磁阀;When the difference between the maximum pressure value and the second maximum value is The control system completely closes the corresponding high-pressure solenoid valve;
当压力最大值与第二大值相差在控制系统控制高压电磁阀关闭一半,等待压力无波动将电磁阀完全关闭;When the difference between the maximum pressure value and the second maximum value is The control system controls the high-pressure solenoid valve to close half, and waits for no pressure fluctuation to completely close the solenoid valve;
当压力最大值与第二大值相差在高压电磁阀继续全部打开,等待压力无波动或减小将电磁阀完全关闭。When the difference between the maximum pressure value and the second maximum value is The high pressure solenoid valve continues to be fully open, waiting for no fluctuation or decrease in pressure to fully close the solenoid valve.
本实施例中,以如下对比结果为例(P1>P2>P3)选择最大值P1对应的C1并为其通电,C1打开泄压;当时,C1断电关闭。In this embodiment, taking the following comparison results as an example (P1>P2>P3), select C1 corresponding to the maximum value P1 and energize it, and C1 is turned on to release pressure; when When the power is turned off, C1 is turned off.
以上所述仅是本发明的优选实施方式,并不用以限制本发明,凡在本发明的精神和原则之内所做的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above are only the preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the present invention. within.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010959307.XA CN111980890A (en) | 2020-09-14 | 2020-09-14 | A kind of anti-hammer damage device and control method after positive displacement diaphragm pump accident |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010959307.XA CN111980890A (en) | 2020-09-14 | 2020-09-14 | A kind of anti-hammer damage device and control method after positive displacement diaphragm pump accident |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111980890A true CN111980890A (en) | 2020-11-24 |
Family
ID=73449711
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010959307.XA Pending CN111980890A (en) | 2020-09-14 | 2020-09-14 | A kind of anti-hammer damage device and control method after positive displacement diaphragm pump accident |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111980890A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118167594A (en) * | 2024-03-29 | 2024-06-11 | 江苏恒久机械股份有限公司 | Connecting assembly for multi-cylinder diaphragm compressor and multi-cylinder diaphragm compressor |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5779278A (en) * | 1980-10-31 | 1982-05-18 | Nippon Fuiidaa Kogyo Kk | Reciprocating pump |
| US6554578B1 (en) * | 1998-06-16 | 2003-04-29 | Bran & Luebbe Gmbh | Diaphragm pump and device for controlling same |
| CN1724868A (en) * | 2005-07-14 | 2006-01-25 | 杭州大潮石化设备有限公司 | Internal circulation pressure balance ultra-high pressure hydraulic diaphragm metering pump |
| CN101705934A (en) * | 2009-11-23 | 2010-05-12 | 杭州大潮石化设备有限公司 | Simplified hydraulic reciprocating diaphragm pump |
| CN104214078A (en) * | 2014-08-08 | 2014-12-17 | 云南大红山管道有限公司 | Diaphragm pump with automatic protection function and automatic protection method of diaphragm pump |
| CN212744286U (en) * | 2020-09-14 | 2021-03-19 | 云南大红山管道有限公司 | Device for preventing damage of water hammer after accident of positive displacement diaphragm pump |
-
2020
- 2020-09-14 CN CN202010959307.XA patent/CN111980890A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5779278A (en) * | 1980-10-31 | 1982-05-18 | Nippon Fuiidaa Kogyo Kk | Reciprocating pump |
| US6554578B1 (en) * | 1998-06-16 | 2003-04-29 | Bran & Luebbe Gmbh | Diaphragm pump and device for controlling same |
| CN1724868A (en) * | 2005-07-14 | 2006-01-25 | 杭州大潮石化设备有限公司 | Internal circulation pressure balance ultra-high pressure hydraulic diaphragm metering pump |
| CN101705934A (en) * | 2009-11-23 | 2010-05-12 | 杭州大潮石化设备有限公司 | Simplified hydraulic reciprocating diaphragm pump |
| CN104214078A (en) * | 2014-08-08 | 2014-12-17 | 云南大红山管道有限公司 | Diaphragm pump with automatic protection function and automatic protection method of diaphragm pump |
| CN212744286U (en) * | 2020-09-14 | 2021-03-19 | 云南大红山管道有限公司 | Device for preventing damage of water hammer after accident of positive displacement diaphragm pump |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118167594A (en) * | 2024-03-29 | 2024-06-11 | 江苏恒久机械股份有限公司 | Connecting assembly for multi-cylinder diaphragm compressor and multi-cylinder diaphragm compressor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111336397B (en) | Intelligent lubrication system and control method for shaft-type main engine | |
| EA015299B1 (en) | Wellhead flowline protection and testing system with esp speed controller and emergency isolation valve | |
| CN205329782U (en) | Intelligent no negative pressure booster pump station water supply equipment | |
| WO2020007309A1 (en) | Monitoring, prevention and management method for preventing drill pump from pump suffocation and misoperation, and pump pressure protection system therefor | |
| CN102966578B (en) | Nuclear power station pump group compress control method and device | |
| CN2901281Y (en) | Multifunction high pressure device safety property detector | |
| CN204879451U (en) | Modularization gas pressure regulating box | |
| CN105507961B (en) | Method for using supercritical-unit water-feeding-pump steam turbine protection system | |
| CN212900956U (en) | an emergency inflatable device | |
| CN213065568U (en) | A high-pressure water pressure-stabilizing valve block structure | |
| CN112429811B (en) | An online diagnostic device for ultrafiltration membrane integrity in a power plant and a control method thereof | |
| CN120367902A (en) | Hydraulic system structure capable of detecting internal leakage of isolation valve and internal leakage detection method | |
| CN212744286U (en) | Device for preventing damage of water hammer after accident of positive displacement diaphragm pump | |
| CN116733663B (en) | Air supplementing system and air supplementing method for solving vibration of top cover of energy storage power station | |
| CN220186541U (en) | Vacuum oil purifying device for sealing oil of steam turbine | |
| CN204327528U (en) | A kind of control valve for water pump | |
| CN220726229U (en) | Pump pressure protection gate group of drilling pump and pump pressure protection system thereof | |
| CN220599877U (en) | Dry gas sealed turbine expander skid-mounted power generation device | |
| CN115929586B (en) | One-button starting system and starting method of multi-stage reciprocating compressor | |
| CN219389408U (en) | Water-cooling operation and maintenance device for offshore wind driven generator | |
| CN215987674U (en) | Fluid conveying and energy isolating practical training device | |
| CN115622070A (en) | Control device and control method for runner idling in phase modulation working condition of pumped storage unit | |
| CN221442838U (en) | Liquid ring pump working liquid serial monitoring system | |
| CN113719444B (en) | Automatic jigger control system and method under pressure release state of compressor unit | |
| CN220893755U (en) | Blowout preventer pressure testing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |