CN111877764B - Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete - Google Patents

Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete Download PDF

Info

Publication number
CN111877764B
CN111877764B CN202010770747.0A CN202010770747A CN111877764B CN 111877764 B CN111877764 B CN 111877764B CN 202010770747 A CN202010770747 A CN 202010770747A CN 111877764 B CN111877764 B CN 111877764B
Authority
CN
China
Prior art keywords
pipe
machine
pipe clamp
made sand
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010770747.0A
Other languages
Chinese (zh)
Other versions
CN111877764A (en
Inventor
崔健
钱申春
彭申凯
刘晓晗
沈维成
徐磊
危明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Highway And Bridge Construction Group Co ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202010770747.0A priority Critical patent/CN111877764B/en
Publication of CN111877764A publication Critical patent/CN111877764A/en
Application granted granted Critical
Publication of CN111877764B publication Critical patent/CN111877764B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了管卡支撑结构,包括支撑台,支撑台设第一液压杆和第二液压杆,第一液压杆固接伺服电机、驱动轴、主动齿轮及齿圈;输入管道通过输入管卡连接椭圆形料管I,输入管卡包括角铁及环形条块,环形条块设环形卡槽与法兰孔;输出管道通过输出管卡与椭圆形料管II连接,椭圆形料管I与椭圆形料管II之间设椭圆形料管III;位于中部的椭圆形料管III外壁套接圆形支撑环,圆形支撑环固接弹簧杆,弹簧杆铆接水平固定杆和倾斜摆动杆,水平固定杆与倾斜摆动杆之间铆接第三液压杆;本发明还提出了用于长距离泵送机制砂混凝土的施工方法。本发明综合机制砂混凝土配方与泵送结构的两方面调整,彻底解决混凝土的长距离泵送问题,适用于300米以上的泵送。

The present invention discloses a pipe clamp support structure, including a support platform, a first hydraulic rod and a second hydraulic rod are arranged on the support platform, the first hydraulic rod is fixedly connected to a servo motor, a driving shaft, a driving gear and a gear ring; an input pipeline is connected to an elliptical material pipe I through an input pipe clamp, the input pipe clamp includes an angle iron and an annular bar, and the annular bar is provided with an annular clamping groove and a flange hole; an output pipeline is connected to an elliptical material pipe II through an output pipe clamp, and an elliptical material pipe III is arranged between the elliptical material pipe I and the elliptical material pipe II; the outer wall of the elliptical material pipe III located in the middle is sleeved with a circular support ring, the circular support ring is fixedly connected to a spring rod, the spring rod is riveted to a horizontal fixed rod and an inclined swing rod, and a third hydraulic rod is riveted between the horizontal fixed rod and the inclined swing rod; the present invention also proposes a construction method for long-distance pumping of machine-made sand concrete. The present invention comprehensively adjusts the two aspects of the machine-made sand concrete formula and the pumping structure, thoroughly solves the problem of long-distance pumping of concrete, and is suitable for pumping over 300 meters.

Description

Pipe clamp supporting structure and construction method for long-distance pumping machine-made sand concrete
Technical Field
The invention relates to the technical field of concrete pumping, in particular to a pipe clamp supporting structure and a construction method for long-distance pumping machine-made sand concrete.
Background
In recent years, with the rapid increase of engineering construction and the lack of natural sand resources, the application of machine-made sand to replace natural sand is imperative, and the investigation and research of Anhui provinces have mineral resources such as limestone and granite with rich reserves, and the exploitation is convenient, so that the limestone machine-made sand is often used as fine aggregate in highway and water transportation engineering, the scientific and reasonable use of the machine-made sand not only can improve the working performance and mechanical property of concrete, but also can greatly reduce the engineering cost, and therefore, anhui province construction units gradually adopt the machine-made sand to replace natural sand to carry out highway and water transportation engineering construction.
However, compared with natural sand, the machine-made sand has coarser particles and also contains a certain amount of stone powder, so that the viscosity of the machine-made sand concrete is relatively high, and the actual performance of the machine-made sand concrete can be influenced in the long-distance pumping process. Therefore, research and analysis are carried out on the application of the machine-made sand concrete in the long-distance pumping technology, so that the method has extremely important practical significance in improving the problems of the machine-made sand concrete in the long-distance pumping technology application.
In order to solve the problem, project organization experts and technicians based on projects such as S11 turnip to yellow mountain highway WHLJ-01 contract section and S11 turnip to yellow mountain highway WHLJ-07 contract section are under construction, and the technical problem of easy blockage at the long-distance pumping pipeline nodes is effectively solved by analyzing and testing the working performance and mechanical properties of the machine-made sand concrete, and simultaneously, the problem of easy blockage is solved by combining a novel pipe clamp supporting structure.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a pipe clamp supporting structure and a construction method for long-distance pumping machine-made sand concrete.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
The pipe clamp supporting structure comprises a supporting table arranged below a pumping pipeline node, a first hydraulic rod and a second hydraulic rod are vertically arranged on the upper surface of the supporting table, a servo motor is fixedly connected to the top end of the first hydraulic rod, an arc chute is fixedly connected to the top of a shell of the servo motor, a groove part on the upper surface of the arc chute is in sliding fit with the lower part of the pipe wall of an input pipeline, a driving shaft is arranged on the servo motor, a bearing seat which is in sleeve joint fit with the driving shaft is arranged at the top end of the second hydraulic rod, a driving gear is fixedly connected to the middle part of the driving shaft, a gear ring is meshed with the driving gear, and the gear ring is fixedly arranged on the outer ring of the input pipe clamp;
The input pipeline is connected with an oval material pipe I through an input pipe clamp, one end of the input pipeline, which is close to the oval material pipe I, is provided with a hole-free flange ring, one end of the oval material pipe I, which is close to the input pipeline, is provided with a pin hole flange ring, the input pipe clamp consists of angle irons at two ends and annular strips at the middle, the two angle irons of the input pipe clamp are connected in a fitting way through fastening bolts, the inner cambered surface of the annular strips of the input pipe clamp is provided with two groups of annular clamping grooves, one group of annular clamping grooves is in sleeve joint with the hole-free flange ring, the other group of annular clamping grooves is in sleeve joint with the pin hole flange ring, the annular strips of the input pipe clamp are not provided with holes at one end face position, which is close to the oval material pipe I, of the pin hole flange ring at one end of the oval material pipe I is fixed in the flange hole through fastening bolts, and the gear ring is fixed on the outer ring of the annular strips of the input pipe clamp;
The output pipeline is connected with an oval material pipe II at the tail part through an output pipe clamp, one end of the output pipeline, which is close to the oval material pipe II, is also provided with a non-hole flange ring, the output pipe clamp also comprises angle irons at two ends and annular strip blocks at the middle part, the two angle irons of the output pipe clamp are connected in a fit manner through fastening bolts, the inner cambered surface of the annular strip block of the output pipe clamp is provided with two groups of annular clamping grooves, one group of annular clamping grooves is in sleeve joint fit with the non-hole flange ring, the other group of annular clamping grooves is in sleeve joint fit with the pin hole flange ring, the position, close to one end face of the output pipeline, of the annular strip block of the output pipe clamp is provided with a flange hole, and the pin hole flange ring at one end of the oval material pipe II is fixed in the flange hole through the fastening bolts;
2-13 groups of oval pipes III are arranged between the oval pipes I and the oval pipes II, the vertical sections of the 2-13 groups of oval pipes III are oval, the inclined sections at the two ends are all right circles, the inclined sections at the two ends are symmetrically arranged, the two ends of the oval pipes III are all provided with non-porous flange rings, the non-porous flange rings are fixedly arranged at the inclined sections, transition pipe clamps are arranged between the adjacent non-porous flange rings and are also composed of angle irons at the two ends and annular strips at the middle part, the two angle irons of the transition pipe clamps are connected in a fitting mode through fastening bolts, and the inner cambered surfaces of the annular strips of the transition pipe clamps are provided with two groups of annular clamping grooves which are sleeved and matched with the pin hole flange rings;
The outer wall of the elliptical material pipe III positioned in the middle is sleeved with a circular supporting ring, the bottom of the outer ring of the circular supporting ring is fixedly connected with a spring rod, one end of the spring rod, which is far away from the circular supporting ring, is riveted with a horizontal fixed rod and an inclined swinging rod, one end of the horizontal fixed rod, which is far away from the spring rod, is vertically fixedly connected with a movable rod section of the second hydraulic rod, and one end of the inclined swinging rod, which is far away from the spring rod, is vertically fixedly connected with the outer ring of the annular strip block of the output pipe clamp;
A third hydraulic rod is riveted between the horizontal fixing rod and the inclined swinging rod, and the horizontal fixing rod, the inclined swinging rod and the third hydraulic rod form a deformable triangle.
Preferably, the inner side walls of the annular clamping grooves of the input pipe clamp, the transition pipe clamp and the output pipe clamp are subjected to smooth treatment, and the non-porous flange ring and the pin hole flange ring are subjected to smooth treatment, so that water tightness is ensured, and a large amount of muddy water is prevented from penetrating into the gaps of the pipe clamps.
Preferably, sealing rubber rings are arranged between adjacent non-porous flange rings in a cushioning manner, so that friction force and buffering performance are improved, and torque force transmission efficiency between transition pipe clamps is facilitated.
Preferably, a smooth sealing sheet is arranged between the non-porous flange ring and the pinhole flange ring in a cushioning manner, so that the sealing performance and the friction damage resistance of the input pipe clamp and the output pipe clamp are improved.
Preferably, the servo motor is a positive and negative low-speed motor, the oval material pipe I, the oval material pipe II and the oval material pipe III form a twistable node bent pipe, when the device is used, the servo motor is rotated forward for half a circle and then rotated backward for half a circle, and the forward rotation and the backward rotation are alternately carried out, so that torque transmission among the oval material pipe I, the oval material pipe II and the oval material pipe III is realized, a vector twisting type stirring process is realized, cement mortar can be fully stirred in the node bent pipe, and the risk of pipeline blockage caused by layering, precipitation and even drying of the cement mortar at the node is avoided.
Based on the pipe clamp supporting structure, the invention also provides a construction method for long-distance pumping machine-made sand concrete, which comprises the following steps:
a. screening machine-made sand concrete raw materials, namely screening a proper amount of cement, water, fly ash, machine-made sand, broken stone and additives according to strength requirements, wherein the machine-made sand is specifically fine aggregate crushed by limestone or granite through a machine, the cement adopts silicate cement, the stone powder content in the machine-made sand is 0-20%, and the water reducing rate of the broken stone and the fly ash without alkali active additives is not suitable to be less than 16%;
b. According to the strength requirement, the optimal stone powder content in the machine-made sand used by the C30 machine-made sand concrete is 10% -15%, the optimal stone powder content in the machine-made sand used by the C40 machine-made sand concrete is 5% -12%, the optimal stone powder content in the machine-made sand used by the C50 machine-made sand concrete is 5% -7%, the optimal stone powder content in the machine-made sand used by the C60 machine-made sand concrete is not more than 5%, and the sand rate is improved by 2% -4% compared with natural sand;
c. B, transporting the machine-made sand concrete, namely placing all raw materials of the machine-made sand concrete in the step b into a stirrer in a transport vehicle by adopting a high-pressure pump, continuously stirring at a speed of 1-3 revolutions per minute in the transport process, and discharging after stirring by a stirring cylinder for 1-2 minutes before transporting to a site for discharging;
d. pumping machine-made sand concrete, namely paving a conveying pipe, namely paving straight, short and flat conveying pump inlet horizontal pipes by at least 15m, fixing the conveying pipe every 3m, covering the conveying pipe by using a gunny bag in summer construction, and watering and cooling;
The pipe clamp supporting structure is arranged at the joint of the conveying pipe, the machine-made sand concrete is guided into the conveying pipe by adopting the output pump pipe, when the flow at the outlet is reduced sharply, layering dryness or blockage is generated, and the like, the servo motor is started to drive the input pipe clamp to rotate to generate torque, the torque is transmitted to the oval pipe I through the pinhole flange ring, the torque is transmitted to the oval pipe II and the oval pipe III through the non-hole flange ring, the torsion is transmitted to the joint elbow structure in a torsion deformation mode, the whole torque is caused, the vector torsion type stirring process is realized, cement mortar can be fully stirred in the joint elbow, the risk of pipeline blockage caused by layering, precipitation and even dryness of the cement mortar at the joint is avoided, and the power input through the pipe clamp supporting structure is realized, so that the dredging process at the joint of the conveying pipe is realized;
e. The machine-made sand concrete is vibrated, namely mechanical vibration is adopted when the machine-made sand concrete is conveyed to the site, the vibration time of each vibration point is controlled to be 20-30 s according to different conditions such as the consistency of a mixture, the vibration position and the like, the machine-made sand concrete is easy to liquefy and isolate compared with natural sand concrete with the same slump by taking the concrete as the degree of non-sinking, non-bubbling, flat surface and floating slurry, and excessive vibration or leakage vibration is avoided;
f. Curing the machine-made sand concrete, namely after field vibration, the machine-made sand concrete should strengthen early-stage moisture curing, the exposed surface should adopt water-retaining curing, spraying and even sprinkling curing can be adopted after the mold is removed, the curing time should be not less than 7d, and the machine-made sand concrete should not be directly watered when the environmental temperature is lower than 5 ℃.
Compared with the prior art, the invention has the beneficial effects that:
1. The invention provides a pipe clamp supporting structure, which is used for solving the problem that the joint of the existing long-distance pumping pipeline is easy to block, and comprises a twisted and deformed joint bent pipe structure formed by an input pipe clamp, a transition pipe clamp and an output pipe clamp, wherein the input pipe clamp and the external force gear drive can rotate the input pipe clamp and the elliptical pipe I to cause whole torque transmission when in use, cement mortar can be fully stirred in the joint bent pipe, the risk of pipeline blocking caused by layering, precipitation and even drying of the cement mortar at the joint is avoided, and the power input through the pipe clamp supporting structure is achieved, so that the dredging process of the joint of the conveying pipe is realized.
2. Aiming at the problem that the existing long-distance pumping pipeline node is easy to block, the invention also provides a screening and mixing process of a machine-made sand concrete formula, and provides different transportation, pumping, vibrating and maintenance schemes aiming at the special formula, so as to form a unique construction method, and the construction method researches the influence of machine-made sand powder on a concrete mixture through experimental analysis, so as to prepare the concrete which meets the design specified strength and durability and meets the pumpability requirement of the machine-made sand.
3. The construction method of the invention ensures that the concrete mixture fills the pipe and is easy to flow by a series of measures of prolonging the stirring time of the machine-made sand concrete, reasonably controlling the sand rate and controlling the stone powder content, has enough cohesiveness, and does not segregate or bleed in the pumping process.
4. According to the construction method, a pipeline cleaning waste recycling technology is adopted, when pumping is about to end, 2-3 m mortar is pumped, concrete is ejected, mortar is ejected by pumping water, the mortar is pumped into a waste mortar box, water and part of sand and stone participated in a pipe flow back to a pump truck along with the water, and the filtered sand and stone are transported back to a concrete supply station, so that natural resources are saved, a site cleaning effect is maintained, and the environment-friendly construction requirement is met.
5. The invention combines the two aspects of regulation of the formulation and the pumping structure of the machine-made sand concrete to improve a plurality of problems of the long-distance pumping pipeline technology, thoroughly solves the long-distance pumping problem of the concrete, is particularly suitable for the construction process of the machine-made sand concrete with the pumping distance of more than 300 meters, and is worth popularizing.
Drawings
FIG. 1 is a schematic view of a pipe clamp support structure according to the present invention;
FIG. 2 is a schematic diagram illustrating the gear connection of an input pipe strap in the pipe strap support structure according to the present invention;
FIG. 3 is a schematic view illustrating connection of a circular support ring in a pipe clamp support structure according to the present invention;
fig. 4 is a schematic diagram of an assembly structure of a fitting of the node elbow structure of the present invention.
In the figure, a supporting table 1, a first hydraulic rod 2, a second hydraulic rod 3, a servo motor 4, an arc chute 5, an input pipeline 6, a driving shaft 7, a driving gear 8, a gear ring 9, an input pipe clamp 10, angle irons 101, annular bar blocks 102, annular clamping grooves 103, flange holes 104, an oval material pipe I11, a non-porous flange ring 12, a pinhole flange ring 13, an output pipeline 14, an output pipe clamp 15, a transition pipe clamp 16, a circular supporting ring 17, a spring rod 18, a horizontal fixing rod 19, an inclined swinging rod 20, a third hydraulic rod 21, an oval material pipe II 22 and an oval material pipe III33.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-4, a pipe clamp supporting structure comprises a supporting table 1 arranged below a pumping pipeline node, a first hydraulic rod 2 and a second hydraulic rod 3 are vertically arranged on the upper surface of the supporting table 1, a servo motor 4 is fixedly connected to the top end of the first hydraulic rod 2, an arc chute 5 is fixedly connected to the top of a shell of the servo motor 4, a groove part on the upper surface of the arc chute 5 is in sliding fit with the lower part of the pipe wall of an input pipeline 6, a driving shaft 7 is arranged on the servo motor 4, a bearing seat which is in sleeve joint fit with the driving shaft 7 is arranged on the top end of the second hydraulic rod 3, a driving gear 8 is fixedly connected to the middle part of the driving shaft 7, a gear ring 9 is meshed with the driving gear 8, and the gear ring 9 is fixedly arranged on the outer ring of the input pipe clamp 10; the input pipeline 6 is connected with an elliptical material pipe I11 through an input pipe clamp 10, one end of the input pipeline 6, which is close to the elliptical material pipe I11, is provided with a non-hole flange ring 12, one end of the elliptical material pipe I11, which is close to the input pipeline 6, is provided with a pin hole flange ring 13, the input pipe clamp 10 consists of angle irons 101 at two ends and a middle annular bar 102, the two angle irons 101 of the input pipe clamp 10 are connected in a fitting way through fastening bolts, the inner cambered surface of the annular bar 102 of the input pipe clamp 10 is provided with two groups of annular clamping grooves 103, one group of annular clamping grooves 103 is in sleeved fit with the non-hole flange ring 12, the other group of annular clamping grooves 103 is in sleeved fit with the pin hole flange ring 13, the annular bar 102 of the input pipe clamp 10, which is close to the input pipeline 6, is provided with a flange hole 104, the pin hole flange ring 13 at one end of the elliptical material pipe I11 is fixed in the flange hole 104 through fastening bolts, the ring gear 9 is fixed on the outer ring of the annular bar 102 of the input pipe clamp 10, the output pipeline 14 is connected with an elliptical material pipe II22 at the tail through an output pipe clamp 15, the output pipeline 14 is also provided with a hole-free flange ring 12 near one end of the oval pipe II22, the output pipe clamp 15 is also composed of angle irons 101 at two ends and an annular strip block 102 in the middle, the two angle irons 101 of the output pipe clamp 15 are connected in a fit manner through fastening bolts, the inner cambered surface of the annular strip block 102 of the output pipe clamp 15 is provided with two groups of annular clamping grooves 103, one group of annular clamping grooves 103 is sleeved and matched with the hole-free flange ring 12, the other group of annular clamping grooves 103 is sleeved and matched with the pin hole flange ring 13, the annular strip block 102 of the output pipe clamp 15 is not provided with a hole near one end face of the output pipeline 14, the annular strip block 102 of the output pipe clamp 15 is provided with a flange hole 104 near one end face of the oval pipe II22, the pin hole flange ring 13 at one end of the oval pipe II22 is fixed in the flange hole 104 through fastening bolts, 2-13 groups of the oval pipe II are arranged between the oval pipe I11 and the oval pipe II22, 2-13 groups of oval pipe III33 are arranged between the oval pipe I11 and the oval pipe II22, and the vertical sections of 2-13 groups of oval pipe III33 are oval pipe III, The two end inclined cross sections are right circular, the inclined cross sections at the two ends are symmetrically arranged, the two ends of the oval material pipe III33 are respectively provided with a hole-free flange ring 12, the hole-free flange rings 12 are fixedly arranged at the inclined cross sections, a transition pipe clamp 16 is arranged between the adjacent hole-free flange rings 12, the transition pipe clamp 16 is also composed of angle irons 101 at the two ends and a middle annular bar 102, the two angle irons 101 of the transition pipe clamp 16 are connected by fastening bolts in a fit manner, the inner cambered surface of the annular bar 102 of the transition pipe clamp 16 is provided with two groups of annular clamping grooves 103 which are sleeved and matched with the pin hole flange ring 13, the outer wall of the oval material pipe III33 at the middle is sleeved with a circular supporting ring 17, the bottom of the outer ring of the circular supporting ring 17 is fixedly connected with a spring rod 18, one end, far away from the circular supporting ring 17, of the spring rod 18 is riveted with a horizontal fixing rod 19 and an inclined swinging rod 20, one end, far away from the spring rod 18, of the horizontal fixing rod 19 is vertically fixedly connected with a movable rod section of the second hydraulic rod 3, one end, far away from the spring rod 18, of the horizontal swinging rod 20 is vertically fixedly connected with the outer ring of the annular bar 102 of the output pipe clamp 15, the horizontal fixing rod 19, a third hydraulic rod 21 is riveted between the horizontal fixing rod 19 and the inclined swinging rod 20, and the third hydraulic rod 21 the tilt lever 20 and the third hydraulic lever 21 form a deformable triangle.
Referring to fig. 4, the inner side walls of the annular clamping grooves 103 of the input pipe clamp 10, the transition pipe clamp 16 and the output pipe clamp 15 are all subjected to smooth treatment, and the non-porous flange ring 12 and the pin hole flange ring 13 are all subjected to smooth treatment, so that water tightness is ensured, and a large amount of muddy water is prevented from penetrating into the gaps of each pipe clamp.
Referring to fig. 4, sealing rubber rings are arranged between adjacent non-porous flange rings 12 in a cushioning manner, so that friction force and cushioning property are improved, and torque force transmission efficiency between the transition pipe clamps 16 is facilitated.
Referring to fig. 4, a smooth sealing piece is interposed between the imperforate flange ring 12 and the pinhole flange ring 13 to improve the sealability and abrasion damage resistance of the input pipe clamp 10 and the output pipe clamp 15.
Referring to fig. 1, the servo motor 4 is specifically a forward and reverse low-speed motor, the oval material pipe I11, the oval material pipe II22 and the oval material pipe III33 form a node elbow capable of twisting, when in use, the servo motor 4 is rotated forward for half a circle and then rotated backward for half a circle, and the forward rotation and the backward rotation are alternately performed, so that torque transmission among the oval material pipe I11, the oval material pipe II22 and the oval material pipe III33 is realized, a vector twisting type stirring process is realized, cement mortar can be fully stirred in the node elbow, and the risk of pipeline blockage caused by layering, precipitation and even drying of the cement mortar at the node is avoided.
Based on the pipe clamp supporting structure, the invention also provides a construction method for long-distance pumping machine-made sand concrete, which comprises the following steps:
a. screening machine-made sand concrete raw materials, namely screening a proper amount of cement, water, fly ash, machine-made sand, broken stone and additives according to strength requirements, wherein the machine-made sand is specifically fine aggregate crushed by limestone or granite through a machine, the cement adopts silicate cement, the stone powder content in the machine-made sand is 0-20%, and the water reducing rate of the broken stone and the fly ash without alkali active additives is not suitable to be less than 16%;
b. According to the strength requirement, the optimal stone powder content in the machine-made sand used by the C30 machine-made sand concrete is 10% -15%, the optimal stone powder content in the machine-made sand used by the C40 machine-made sand concrete is 5% -12%, the optimal stone powder content in the machine-made sand used by the C50 machine-made sand concrete is 5% -7%, the optimal stone powder content in the machine-made sand used by the C60 machine-made sand concrete is not more than 5%, and the sand rate is improved by 2% -4% compared with natural sand;
c. B, transporting the machine-made sand concrete, namely placing all raw materials of the machine-made sand concrete in the step b into a stirrer in a transport vehicle by adopting a high-pressure pump, continuously stirring at a speed of 1-3 revolutions per minute in the transport process, and discharging after stirring by a stirring cylinder for 1-2 minutes before transporting to a site for discharging;
d. pumping machine-made sand concrete, namely paving a conveying pipe, namely paving straight, short and flat conveying pump inlet horizontal pipes by at least 15m, fixing the conveying pipe every 3m, covering the conveying pipe by using a gunny bag in summer construction, and watering and cooling;
the pipe clamp supporting structure is arranged at the joint of the conveying pipe, the machine-made sand concrete is guided into the conveying pipe by adopting an output pump pipe, when the flow rate at the outlet is reduced sharply, layering dryness or blockage is generated, and the like, the servo motor 4 is started to drive the input pipe clamp 10 to rotate to generate torque, the torque is transmitted to the oval pipe I11 through the pinhole flange ring 13, the torque is transmitted to the oval pipe II22 and the oval pipe III33 through the non-hole flange ring 12, the pipe is of a torsion deformed joint bent pipe structure, the whole torque is caused, the vector torsion type stirring process is realized, cement mortar can be fully stirred in the joint bent pipe, the risk of pipeline blockage caused by layering, sedimentation and even drying of the cement mortar at the joint is avoided, and the power input through the pipe clamp supporting structure is realized, so that the dredging process at the joint of the conveying pipe is realized;
e. The machine-made sand concrete is vibrated, namely mechanical vibration is adopted when the machine-made sand concrete is conveyed to the site, the vibration time of each vibration point is controlled to be 20-30 s according to different conditions such as the consistency of a mixture, the vibration position and the like, the machine-made sand concrete is easy to liquefy and isolate compared with natural sand concrete with the same slump by taking the concrete as the degree of non-sinking, non-bubbling, flat surface and floating slurry, and excessive vibration or leakage vibration is avoided;
f. Curing the machine-made sand concrete, namely after field vibration, the machine-made sand concrete should strengthen early-stage moisture curing, the exposed surface should adopt water-retaining curing, spraying and even sprinkling curing can be adopted after the mold is removed, the curing time should be not less than 7d, and the machine-made sand concrete should not be directly watered when the environmental temperature is lower than 5 ℃.
Technological principle of machine-made sand concrete:
1. Referring to table 1, as the stone dust content in the machine-made sand increases, the bleeding segregation problem of the corresponding pumped concrete no longer occurs, the workability is remarkably improved, and the slump is also greatly improved. However, the optimal control amount of the stone powder content in the machine-made sand is about 10 percent, once the content of the stone powder is more than 15 percent, the water quantity of the pumped concrete is increased, the slump of the pumped concrete is obviously reduced, the strength of the pumped concrete is improved to a certain extent by increasing the stone powder content, and the strength value of the pumped concrete is reduced if the content is too high, mainly because the early stage of hydration of the cement plays a role in nucleation of C-S-H and calcium hydroxide, the early stage strength of the cement is changed, and the stacking density of machine-made sand particles is improved, so that the strength of the pumped concrete formed by the machine-made sand can be improved. If the stone powder content in the machine-made sand is relatively large, the most dense stacking structure in the concrete is damaged, the cement-bone ratio of the concrete is affected, and the strength value of the concrete is reduced, and along with the continuous increase of the stone powder content in the machine-made sand, the corresponding dryness of the pumped concrete is presented as a change trend of decreasing before increasing, because the stone powder in the machine-made sand contains a plurality of fine particles with filling effect, the tortuosity degree of capillary holes of the concrete is increased, and the pore structure of the concrete is thinned, so that the dryness of the pumped concrete formed by the stone powder can be inhibited to a certain extent by using the stone powder in a proper amount. Therefore, the stone powder content in the corresponding machine-made sand is properly controlled to be about 10 percent in the machine-made sand concrete mixing process, the workability of the machine-made sand can be effectively improved, the compressive strength of the concrete mixed by the machine-made sand is improved, and the drying shrinkage performance of the concrete is reduced, so that the machine-made sand concrete meeting the concrete pumping requirement can be mixed.
TABLE 1 influence of stone dust content on the performance of concrete mixes of different strength classes
2. Referring to table 2, since the machine-made sand is affected by the production equipment and the parent rock material, the grain is coarse, generally medium coarse sand, if the sand rate is too small, the configured concrete is coarse, bleeding, segregation, stirring, vibrating and pumping are easy to occur, the poured concrete is easy to generate honeycomb pitting surface, the surface is more air bubbles and is not smooth, if the sand rate is too large, the concrete strength is too low and uneven, the shrinkage is large, cracks are easy to occur on the surface, and the effect of improving the sand rate by 2-4% is optimal when the machine-made sand concrete with the same water-cement ratio as the natural sand concrete is configured through multiple experiments.
TABLE 2 selection of machine-made sand concrete sand fractions at different water-cement ratios
The quality control standard of the machine-made sand concrete in the invention is that the construction method mainly conforms to the current regulations, regulations and standards of execution, and mainly comprises the following steps:
1 < premixed concrete > GB/T14202,
2 "Construction Sand" GB/T14684,
3 Specification for concrete Structure design GB 50010,
4 Standard for Performance test of common concrete mixture GB/T50080,
5 GB/T50081 of ordinary concrete mechanical property test method Standard,
6 Standard for testing the Long-term Performance and durability of common concrete GB/T50082,
7 Concrete quality control Standard GB 50164,
8 'Concrete structure engineering construction quality acceptance Specification' GB 50204,
9 GB/T50476 of concrete Structure durability design Specification,
10 Concrete construction Specification GB 50666,
11 Concrete pumping construction technical regulations JGJT 10,
12J 52, standard for quality and inspection method of sand and stone for ordinary concrete,
13 General concrete mix design rules JGJ 55,
14 Manual sand concrete application technical Specification JGJ/T241,
15 GB/T50107 of concrete strength test and evaluation Standard,
16 JTG E42, highway engineering aggregate test procedure,
17 JTG/T B07-01, technical regulations for anti-corrosion of highway engineering concrete structure,
18 JTG/T F50 0 of technical Specification for road bridge and culvert construction,
19J-JTG/T F & lt 60 & gt,
20 JTG F80-1, highway engineering quality inspection and assessment Standard.
The quality assurance measures of the machine-made sand concrete comprise:
1. the metering precision is strictly controlled;
2, increasing the grain composition, fineness modulus and detection frequency of stone powder content (containing methylene blue test) of the machine-made sand;
3, when the machine-made sand and coarse aggregate are piled and taken, measures are taken to prevent segregation;
4, strictly measuring the water content of the machine-made sand and the coarse aggregate, and timely adjusting the weighing of the machine-made sand, the coarse aggregate and the mixing water according to the water content change so as to ensure the consistency of the laboratory mixing proportion and the construction mixing proportion of the concrete;
When 5 machine-made sand concrete is stirred, when the machine-made sand powder content, MB value change are large, sand rate and water reducer dosage should be adjusted timely, and concrete mixing fluidity and workability are ensured to be good.
And 6, adopting machine-made sand concrete transported by a stirring transport vehicle, and after the machine-made sand concrete reaches the site, rotating at a high speed for 20 seconds to stir uniformly, when the slump loss is large and the construction requirement cannot be met, adding a proper amount of water reducer with the same component as the original blending ratio into a transport vehicle tank, rapidly rotating and stirring uniformly, pumping or pouring after the required working performance is achieved, wherein the adding amount of the water reducer is determined by a test in advance and recorded.
The grain composition of the machine-made sand is large in fluctuation, segregation and layering of a machine-made sand concrete mixture are easy to be aggravated by jolting and the like in the transportation process, and the stirring tank is required to continuously stir at a slow speed of 2-4 r/min in the concrete transportation process. Before the concrete is discharged, the stirring tank can discharge the concrete by adopting a rapid gear high-speed rotation for more than 30 seconds, so that the concrete is ensured not to be layered and isolated. The time from the machine-made sand concrete discharging to the pouring and molding is not longer than the initial setting time of the machine-made sand concrete.
8, Due to poor workability of the machine-made sand concrete, the machine-made sand concrete of the vertical component is evenly distributed in a layering manner when being poured, and the layering thickness is reduced to 300-400 mm from 500mm specified by the natural sand concrete.
And 9, adopting machine-made sand concrete for pumping construction, wherein the transportation of the machine-made sand concrete can ensure the continuous pumping of the concrete and meet the specification of JGJ/T10 of the current industry standard concrete pumping construction technical regulations.
10. The machine-made sand concrete should adopt mechanical vibration, the vibration time of each vibration point is controlled to be 20 s-30 s according to different conditions such as the consistency of the mixture and the vibration position, so that the surface of the concrete mixture is smooth and the degree of no bubble overflow is basically achieved, and vibration and lack of vibration are strictly forbidden.
The 11 machine-made sand concrete should strengthen early moisture maintenance, the exposed surface should adopt water retention maintenance, spray and even sprinkling maintenance after removing the mould, the maintenance time should be not less than 7d, the winter construction machine-made sand concrete should not be directly watered when the environmental temperature is lower than 5 ℃.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (6)

1.管卡支撑结构,包括设置在泵送管道节点处下方位置的支撑台(1),其特征在于,所述支撑台(1)上表面竖直设置有第一液压杆(2)和第二液压杆(3),所述第一液压杆(2)顶端固接有伺服电机(4),所述伺服电机(4)外壳顶部固接有弧形滑槽(5),所述弧形滑槽(5)上表面的凹槽部与输入管道(6)管壁下部滑动配合,所述伺服电机(4)设有驱动轴(7),所述第二液压杆(3)顶端设有与驱动轴(7)套接配合的轴承座,所述驱动轴(7)中部固接有主动齿轮(8),所述主动齿轮(8)啮合有齿圈(9),所述齿圈(9)固设在输入管卡(10)的外圈上;1. A pipe clamp support structure, comprising a support platform (1) arranged at a position below a node of a pumping pipeline, characterized in that a first hydraulic rod (2) and a second hydraulic rod (3) are vertically arranged on the upper surface of the support platform (1), a servo motor (4) is fixedly connected to the top of the first hydraulic rod (2), an arc-shaped slide groove (5) is fixedly connected to the top of the housing of the servo motor (4), a groove portion on the upper surface of the arc-shaped slide groove (5) is slidably matched with the lower part of the pipe wall of an input pipe (6), the servo motor (4) is provided with a driving shaft (7), a bearing seat sleeved with the driving shaft (7) is provided at the top of the second hydraulic rod (3), a driving gear (8) is fixedly connected to the middle of the driving shaft (7), the driving gear (8) is meshed with a gear ring (9), and the gear ring (9) is fixedly arranged on the outer ring of the input pipe clamp (10); 所述输入管道(6)通过输入管卡(10)连接有椭圆形料管I(11),所述输入管道(6)靠近椭圆形料管I(11)的一端设有无孔法兰环(12),所述椭圆形料管I(11)靠近输入管道(6)一端设有销孔法兰环(13),所述输入管卡(10)由两端的角铁(101)和中部的环形条块(102)组成,输入管卡(10)的两个所述角铁(101)之间通过紧固螺栓贴合连接,所述输入管卡(10)的环形条块(102)的内弧面设有两组环形卡槽(103),其中一组所述环形卡槽(103)与无孔法兰环(12)套接配合,另一组所述环形卡槽(103)与销孔法兰环(13)套接配合,所述输入管卡(10)的环形条块(102)靠近输入管道(6)一端面位置不设孔,所述输入管卡(10)的环形条块(102)靠近椭圆形料管I(11)的一端面位置设有法兰孔(104),所述椭圆形料管I(11)一端的销孔法兰环(13)通过紧固螺栓固定在法兰孔(104)内,所述齿圈(9)固设在输入管卡(10)环形条块(102)的外圈上;The input pipe (6) is connected to an elliptical material pipe I (11) through an input pipe clamp (10); a non-hole flange ring (12) is provided at one end of the input pipe (6) close to the elliptical material pipe I (11); a pin hole flange ring (13) is provided at one end of the elliptical material pipe I (11) close to the input pipe (6); the input pipe clamp (10) is composed of angle irons (101) at both ends and an annular bar (102) in the middle; the two angle irons (101) of the input pipe clamp (10) are closely connected by fastening bolts; the inner arc surface of the annular bar (102) of the input pipe clamp (10) is provided with two groups of annular grooves (103), one group of which is The annular groove (103) is sleeved with a non-hole flange ring (12), and another group of the annular grooves (103) is sleeved with a pin hole flange ring (13). The annular strip (102) of the input pipe clamp (10) is not provided with a hole at an end surface position close to the input pipe (6). The annular strip (102) of the input pipe clamp (10) is provided with a flange hole (104) at an end surface position close to the elliptical material pipe I (11). The pin hole flange ring (13) at one end of the elliptical material pipe I (11) is fixed in the flange hole (104) by fastening bolts. The gear ring (9) is fixed on the outer ring of the annular strip (102) of the input pipe clamp (10); 输出管道(14)通过输出管卡(15)与尾部的椭圆形料管II(22)连接,所述输出管道(14)靠近椭圆形料管II(22)一端也设有无孔法兰环(12),所述输出管卡(15)也由两端的角铁(101)和中部的环形条块(102)组成,输出管卡(15)的两个所述角铁(101)之间通过紧固螺栓贴合连接,所述输出管卡(15)的环形条块(102)的内弧面设有两组环形卡槽(103),其中一组所述环形卡槽(103)与无孔法兰环(12)套接配合,另一组所述环形卡槽(103)与销孔法兰环(13)套接配合,所述输出管卡(15)的环形条块(102)靠近输出管道(14)一端面位置不设孔,所述输出管卡(15)的环形条块(102)靠近椭椭圆形料管II(22)的一端面位置设有法兰孔(104),所述椭圆形料管II(22)一端的销孔法兰环(13)通过紧固螺栓固定在法兰孔(104)内;The output pipe (14) is connected to the tail elliptical material pipe II (22) through an output pipe clamp (15). The output pipe (14) is also provided with a non-hole flange ring (12) at one end close to the elliptical material pipe II (22). The output pipe clamp (15) is also composed of angle irons (101) at both ends and an annular bar (102) in the middle. The two angle irons (101) of the output pipe clamp (15) are closely connected by fastening bolts. The inner arc surface of the annular bar (102) of the output pipe clamp (15) is provided with two groups of annular grooves (103), one of which is provided with a plurality of annular grooves (103). The annular groove (103) is sleeved with a flange ring without a hole (12), and another group of the annular grooves (103) is sleeved with a flange ring with a pin hole (13). The annular strip (102) of the output pipe clamp (15) is not provided with a hole at an end surface position close to the output pipe (14), and the annular strip (102) of the output pipe clamp (15) is provided with a flange hole (104) at an end surface position close to the elliptical material pipe II (22). The pin hole flange ring (13) at one end of the elliptical material pipe II (22) is fixed in the flange hole (104) by fastening bolts. 所述椭圆形料管I(11)与椭圆形料管II(22)之间设有2-13组椭圆形料管III(33),所述椭圆形料管I(11)与椭圆形料管II(22)之间设有2-13组椭圆形料管III(33)的竖截面均为椭圆形、两端斜截面均为正圆形且两端的斜截面对称设置,所述椭圆形料管III(33)的两端均设有无孔法兰环(12),且无孔法兰环(12)固设在所述斜截面处,相邻的所述无孔法兰环(12)之间设有设有过渡管卡(16),所述过渡管卡(16)也由两端的角铁(101)和中部的环形条块(102)组成,所述过渡管卡(16)的两个角铁(101)之间通过紧固螺栓贴合连接,所述过渡管卡(16)的环形条块(102)的内弧面设有两组与销孔法兰环(13)套接配合的环形卡槽(103);2-13 groups of oval material pipes III (33) are arranged between the oval material pipe I (11) and the oval material pipe II (22), and 2-13 groups of oval material pipes III (33) are arranged between the oval material pipe I (11) and the oval material pipe II (22), and the vertical sections of the oval material pipes III (33) are all oval, and the oblique sections at both ends are all perfect circles, and the oblique sections at both ends are symmetrically arranged, and both ends of the oval material pipe III (33) are provided with non-hole flange rings (12), and the non-hole flange rings (12) A transition pipe clamp (16) is fixedly arranged at the oblique cross section and arranged between adjacent non-hole flange rings (12). The transition pipe clamp (16) is also composed of angle irons (101) at both ends and an annular bar (102) in the middle. The two angle irons (101) of the transition pipe clamp (16) are closely connected by fastening bolts. The inner arc surface of the annular bar (102) of the transition pipe clamp (16) is provided with two groups of annular grooves (103) which are sleeved and matched with the pin hole flange ring (13). 位于中部的所述椭圆形料管III(33)外壁套接有圆形支撑环(17),所述圆形支撑环(17)外圈底部固接有弹簧杆(18),所述弹簧杆(18)远离圆形支撑环(17)一端铆接有水平固定杆(19)和倾斜摆动杆(20),所述水平固定杆(19)远离弹簧杆(18)的一端垂直固接在第二液压杆(3)的活动杆段,所述倾斜摆动杆(20)远离弹簧杆(18)的一端垂直固接在输出管卡(15)环形条块(102)的外圈上;The outer wall of the oval material pipe III (33) located in the middle is sleeved with a circular support ring (17), the bottom of the outer ring of the circular support ring (17) is fixedly connected with a spring rod (18), and the end of the spring rod (18) away from the circular support ring (17) is riveted with a horizontal fixing rod (19) and an inclined swing rod (20), the end of the horizontal fixing rod (19) away from the spring rod (18) is vertically fixed to the movable rod section of the second hydraulic rod (3), and the end of the inclined swing rod (20) away from the spring rod (18) is vertically fixed to the outer ring of the annular bar (102) of the output pipe clamp (15); 所述水平固定杆(19)与所述倾斜摆动杆(20)之间铆接有第三液压杆(21),所述水平固定杆(19)、倾斜摆动杆(20)及第三液压杆(21)形成一个可变形的三角形。A third hydraulic rod (21) is riveted between the horizontal fixed rod (19) and the tilted swing rod (20); the horizontal fixed rod (19), the tilted swing rod (20) and the third hydraulic rod (21) form a deformable triangle. 2.根据权利要求1所述的管卡支撑结构,其特征在于,所述输入管卡(10)、过渡管卡(16)及输出管卡(15)的环形卡槽(103)内侧壁均经过光滑处理,所述无孔法兰环(12)和销孔法兰环(13)均经过光滑处理,保证水密性,避免大量泥水渗入各管卡缝隙内。2. The pipe clamp support structure according to claim 1 is characterized in that the inner walls of the annular grooves (103) of the input pipe clamp (10), the transition pipe clamp (16) and the output pipe clamp (15) are all smoothed, and the non-hole flange ring (12) and the pin hole flange ring (13) are all smoothed to ensure water tightness and prevent a large amount of muddy water from seeping into the gaps of each pipe clamp. 3.根据权利要求1所述的管卡支撑结构,其特征在于,相邻所述无孔法兰环(12)之间垫设有密封橡胶圈,提高摩擦力和缓冲性,便于过渡管卡(16)之间的扭矩力传递效率。3. The pipe clamp support structure according to claim 1 is characterized in that a sealing rubber ring is provided between adjacent non-porous flange rings (12) to increase friction and cushioning properties and facilitate torque transmission efficiency between transition pipe clamps (16). 4.根据权利要求1所述的管卡支撑结构,其特征在于,所述无孔法兰环(12)与销孔法兰环(13)之间垫设光滑密封片,提高输入管卡(10)及输出管卡(15)的密封性和耐摩擦损伤性能。4. The pipe clamp support structure according to claim 1 is characterized in that a smooth sealing sheet is provided between the non-hole flange ring (12) and the pin hole flange ring (13) to improve the sealing and friction damage resistance of the input pipe clamp (10) and the output pipe clamp (15). 5.根据权利要求1所述的管卡支撑结构,其特征在于,所述伺服电机(4)具体是正反低速电机,椭圆形料管I(11)、椭圆形料管II(22)及椭圆形料管III(33)形成一个可扭动的节点弯管,使用时将伺服电机(4)正转半圈再反转半圈,正转反转交替进行,以实现椭圆形料管I(11)、椭圆形料管II(22)及椭圆形料管III(33)之间的扭矩传递,实现一种矢量扭动式搅拌过程,可使水泥砂浆在该节点弯管内得到充分搅拌,避免水泥砂浆在节点处分层、沉淀乃至干涸造成管道堵塞的风险。5. The pipe clamp support structure according to claim 1 is characterized in that the servo motor (4) is specifically a forward and reverse low-speed motor, and the elliptical material pipe I (11), the elliptical material pipe II (22) and the elliptical material pipe III (33) form a twistable node elbow. When in use, the servo motor (4) is rotated forward half a circle and then reversed half a circle, and the forward and reverse rotations are performed alternately to achieve torque transmission between the elliptical material pipe I (11), the elliptical material pipe II (22) and the elliptical material pipe III (33), thereby realizing a vector twisting stirring process, so that the cement mortar can be fully stirred in the node elbow, avoiding the risk of cement mortar stratification, precipitation or even drying up at the node causing pipeline blockage. 6.用于长距离泵送机制砂混凝土的施工方法,采用权利要求1-5任一所述的管卡支撑结构,其特征在于,包括以下步骤:6. A construction method for long-distance pumping of machine-made sand concrete, using the pipe clamp support structure according to any one of claims 1 to 5, characterized in that it comprises the following steps: a.机制砂混凝土原材料的筛选:依照强度要求,筛选适量的水泥、水、粉煤灰、机制砂、碎石及外加剂,机制砂具体是由石灰岩或花岗岩通过机制粉碎后的细集料,其中水泥采用硅酸盐水泥,机制砂中的石粉含量为0-20%,碎石和粉煤灰不具有碱活性,外加剂的减水率不小于16%;a. Selection of raw materials for machine-made sand concrete: according to the strength requirements, select appropriate amounts of cement, water, fly ash, machine-made sand, crushed stone and admixtures. Machine-made sand is fine aggregate crushed by limestone or granite, of which cement is silicate cement, the stone powder content in machine-made sand is 0-20%, crushed stone and fly ash are not alkali-active, and the water-reducing rate of admixture is not less than 16%; b.机制砂混凝土的配置:根据强度要求,C30机制砂混凝土所用机制砂中的石粉含量为10%~15%,C40机制砂混凝土所用机制砂中的石粉含量为5%~12%,C50机制砂混凝土所用机制砂中的石粉含量为5%~7%,C60机制砂混凝土所用机制砂中的石粉含量不超过5%,砂率比天然砂提高2~4%;b. Configuration of machine-made sand concrete: According to the strength requirements, the stone powder content of the machine-made sand used in C30 machine-made sand concrete is 10% to 15%, the stone powder content of the machine-made sand used in C40 machine-made sand concrete is 5% to 12%, the stone powder content of the machine-made sand used in C50 machine-made sand concrete is 5% to 7%, and the stone powder content of the machine-made sand used in C60 machine-made sand concrete does not exceed 5%. The sand rate is 2 to 4% higher than that of natural sand; c.机制砂混凝土的运输:采用高压泵将步骤b中的机制砂混凝土各原料至于运输车中的搅拌机中,运输过程中以1~3转/min速度不停地进行搅动,运到现场卸料前使拌筒搅拌1~2min后再卸料;c. Transportation of machine-made sand concrete: Use a high-pressure pump to put the raw materials of the machine-made sand concrete in step b into the mixer in the transport vehicle. During transportation, stir them continuously at a speed of 1 to 3 rpm. Before unloading at the site, stir the mixing drum for 1 to 2 minutes before unloading; d.机制砂混凝土的泵送:铺设输送管铺设要直、短、平,输送泵入口水平管至少15m,输送管每隔3m固定;夏季施工时,输送管采用麻袋覆盖并浇水降温;d. Pumping of machine-made sand concrete: The delivery pipe should be laid straight, short and flat, the horizontal pipe at the inlet of the delivery pump should be at least 15m, and the delivery pipe should be fixed every 3m; during summer construction, the delivery pipe should be covered with sacks and watered to cool it down; 在输送管的节点处设置权利要求1所述的管卡支撑结构,采用输出泵管将机制砂混凝土导入输送管中,当出口处流量锐减、产生分层干涸或堵塞情况时,开启伺服电机(4)带动输入管卡(10)的旋转产生扭矩,通过销孔法兰环(13)将扭矩传递给椭圆形料管I(11),再通过无孔法兰环(12)将扭矩传递椭圆形料管II(22)及椭圆形料管III(33),形成一种可扭动变形的节点弯管结构,并造成整个扭矩传递,实现一种矢量扭动式搅拌过程,可使水泥砂浆在该节点弯管内得到充分搅拌,避免水泥砂浆在节点处分层、沉淀乃至干涸造成管道堵塞的风险,起到通过管卡支撑结构的动力输入,实现输送管节点处的疏通过程;The pipe clamp support structure as claimed in claim 1 is arranged at the node of the conveying pipe, and the machine-made sand concrete is introduced into the conveying pipe by using an output pump pipe. When the flow at the outlet decreases sharply, stratification, drying or blockage occurs, the servo motor (4) is turned on to drive the rotation of the input pipe clamp (10) to generate torque, and the torque is transmitted to the elliptical material pipe I (11) through the pin hole flange ring (13), and then the torque is transmitted to the elliptical material pipe II (22) and the elliptical material pipe III (33) through the non-hole flange ring (12), so as to form a twistable and deformable node elbow structure, and cause the entire torque to be transmitted, so as to realize a vector twisting mixing process, so that the cement mortar can be fully stirred in the node elbow, and the risk of stratification, precipitation or even drying of the cement mortar at the node causing pipeline blockage is avoided, and the power input of the pipe clamp support structure is used to realize the dredging process at the conveying pipe node; e.机制砂混凝土的振捣:输送到现场时,机制砂混凝土采用机械振捣,每一个振点的振捣时间根据拌合物稠度和振捣部位,控制在20~30s,以混凝土不在沉落、不冒气泡、表面平坦、浮浆为度,机制砂混凝土比同坍落度的天然砂混凝土易于液化离析,应避免过振或漏振;e. Vibration of machine-made sand concrete: When transported to the site, machine-made sand concrete is mechanically vibrated. The vibration time of each vibration point is controlled within 20 to 30 seconds according to the consistency of the mixture and the vibration location. The vibration time is controlled to be within 20 to 30 seconds, and the concrete is not sinking, does not bubble, has a flat surface, and is slurry. Machine-made sand concrete is more likely to liquefy and segregate than natural sand concrete with the same slump. Over-vibration or missed vibration should be avoided. f.机制砂混凝土的养护:现场振捣后,外露面采用保水养护,拆模后采用喷淋、均匀洒水养护,养护时间不少于7d,冬季施工机制砂混凝土,环境温度低于5℃时不得直接浇水。f. Maintenance of machine-made sand concrete: After on-site vibration, the exposed surface shall be maintained with water retention. After demolding, spraying and uniform watering shall be used for maintenance. The maintenance time shall not be less than 7 days. When constructing machine-made sand concrete in winter, direct watering is not allowed when the ambient temperature is below 5°C.
CN202010770747.0A 2020-08-04 2020-08-04 Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete Active CN111877764B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010770747.0A CN111877764B (en) 2020-08-04 2020-08-04 Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010770747.0A CN111877764B (en) 2020-08-04 2020-08-04 Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete

Publications (2)

Publication Number Publication Date
CN111877764A CN111877764A (en) 2020-11-03
CN111877764B true CN111877764B (en) 2024-12-03

Family

ID=73210474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010770747.0A Active CN111877764B (en) 2020-08-04 2020-08-04 Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete

Country Status (1)

Country Link
CN (1) CN111877764B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112915310A (en) * 2021-01-26 2021-06-08 浙江清华柔性电子技术研究院 In-vivo implantable peristaltic pump, peristaltic pump controller and body fluid transfer system
CN114086766B (en) * 2021-12-03 2023-04-07 上海建工集团股份有限公司 Autoregression bilateral open-close type arm support pump pipe
CN114371106B (en) * 2022-01-07 2024-10-15 苏州混凝土水泥制品研究院有限公司 Machine-made sand morphology parameter test analysis method
CN115316145A (en) * 2022-08-30 2022-11-11 徐州市果园 Automatic trimming means of plant
CN116791614A (en) * 2023-06-28 2023-09-22 广东工业大学 Flexible filler grabbing device in karst pile construction process
CN120052146B (en) * 2025-04-28 2025-10-14 岳阳市农业科学研究院 Cereal grass combine with hang and unload formula pocket

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212743407U (en) * 2020-08-04 2021-03-19 安徽省公路桥梁工程有限公司 Pipe clamp support structure for long-distance pumping pipeline nodes of machine-made sand concrete

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3464272B2 (en) * 1994-05-11 2003-11-05 日本国土開発株式会社 Construction method of mass concrete
KR20030068958A (en) * 2002-02-19 2003-08-25 고세현 Concrete Pumping Apparatus and Puming Method
CN101928127A (en) * 2010-08-30 2010-12-29 武汉海剑工贸有限责任公司 Super-light aggregate concrete for long-distance homogeneous pumping construction and preparation method thereof
CN103643740B (en) * 2013-11-12 2016-08-17 浙江江南春建设集团有限公司 A kind of steel pipe column concrete lifting construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212743407U (en) * 2020-08-04 2021-03-19 安徽省公路桥梁工程有限公司 Pipe clamp support structure for long-distance pumping pipeline nodes of machine-made sand concrete

Also Published As

Publication number Publication date
CN111877764A (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN111877764A (en) Pipe clamp supporting structure and construction method for long-distance pumping machine-made sand concrete
CN102276224B (en) Marine engineering self-compacting high-performance concrete and preparation method thereof
CN110966022B (en) Railway tunnel lining construction method based on medium-high fluidity concrete
CN101857401A (en) Self-flowing semi-flexible composite pavement and its construction method
CN113929402B (en) Goaf filling method
CN107500685A (en) A kind of application of cemented filling material containing rice-straw fibre in mining with stowing
CN107500686B (en) Filling material containing straw fibers and application thereof in filling mining
CN114477928A (en) Low-resilience injection dry material and preparation method thereof
CN215619007U (en) High full-automatic intelligent casting machine of stability
CN112174588B (en) High-strength brick slag light aggregate self-compacting pump concrete and preparation method and pumping method thereof
CN102351477A (en) Mixture for preparing C55 high-intensity ultra-high-pumping concrete
CN112031458A (en) Concrete structure repairing construction method
CN212743407U (en) Pipe clamp support structure for long-distance pumping pipeline nodes of machine-made sand concrete
CN111689726A (en) Ultrahigh-pressure long-distance pumping concrete and preparation method thereof
CN110845204A (en) Polymer repair mortar used under low-temperature condition, and preparation method and construction method thereof
CN1579722A (en) Steel-containing fiber pouring material construction method and equipment
CN117105546B (en) Metal-rich cement additive and application thereof in improving concrete performance by using reinforcing steel bars
CN111517713A (en) Low-cost high-strength C45 fine-stone concrete and preparation method thereof
CN110467403A (en) A kind of large expansion self-compacting fair-faced concrete material and preparation method thereof
CN118438519A (en) A concrete 3D printing system and method
CN116924753A (en) Underwater non-dispersive self-compacting concrete based on multi-element composite rubber material and construction method
KR101511222B1 (en) Method for repairing concrete structure using light weight polymer repairing modified mortar composition having light ash
CN211194470U (en) A kind of concrete pouring blanking anti-separation device
CN210999420U (en) A kind of feeding and mixing device for concrete production
CN109053090A (en) A kind of superfine sand concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230031 no.445 Huangshan Road, Shushan District, Hefei City, Anhui Province

Patentee after: Anhui Construction Engineering Highway and Bridge Construction Group Co.,Ltd.

Country or region after: China

Address before: 230031 no.445 Huangshan Road, Shushan District, Hefei City, Anhui Province

Patentee before: ANHUI ROAD & BRIDGE ENGINEERING Co.,Ltd.

Country or region before: China