CN111842613A - Continuous processing die and forming method of chair leg pipe - Google Patents

Continuous processing die and forming method of chair leg pipe Download PDF

Info

Publication number
CN111842613A
CN111842613A CN202010617808.XA CN202010617808A CN111842613A CN 111842613 A CN111842613 A CN 111842613A CN 202010617808 A CN202010617808 A CN 202010617808A CN 111842613 A CN111842613 A CN 111842613A
Authority
CN
China
Prior art keywords
die
pipe fitting
station
pipe
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010617808.XA
Other languages
Chinese (zh)
Other versions
CN111842613B (en
Inventor
张翼飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anglide Furniture Co ltd
Original Assignee
Anglide Furniture Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anglide Furniture Co ltd filed Critical Anglide Furniture Co ltd
Priority to CN202010617808.XA priority Critical patent/CN111842613B/en
Publication of CN111842613A publication Critical patent/CN111842613A/en
Application granted granted Critical
Publication of CN111842613B publication Critical patent/CN111842613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D35/00Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
    • B21D35/002Processes combined with methods covered by groups B21D1/00 - B21D31/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • B21D28/02Punching blanks or articles with or without obtaining scrap; Notching
    • B21D28/14Dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/08Dies with different parts for several steps in a process

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Punching Or Piercing (AREA)

Abstract

本发明属于模具技术领域,尤其涉及一种椅脚管件连续式加工模。它解决了现有技术设计不合理等等现象。本椅脚管件连续式加工模包括按照加工顺序依次设置的管件置放工位,用于放置未加工的管件;管件成型工位,用于将管件两端成型;管件定长工位,用于将管件的两端端部多余长度切除;管件精整工位,用于将管件定长工位后的管件进行精整,制得椅脚管件成品;管件移料机构,用于将上述管件按照工位顺序从前一个工位移动至后一个工位。本申请的优点在于:设计更合理且提高了生产加工效率。

Figure 202010617808

This invention belongs to the field of mold technology, and particularly relates to a continuous processing mold for chair leg tubes. It solves the problems of unreasonable design in existing technologies. This continuous processing mold for chair leg tubes includes: a tube placement station arranged sequentially according to the processing order, used to place unprocessed tubes; a tube forming station, used to form both ends of the tube; a tube length fixing station, used to cut off excess length from both ends of the tube; a tube finishing station, used to finish the tube after the length fixing station to obtain the finished chair leg tube; and a tube transfer mechanism, used to move the tubes from one station to the next according to the station sequence. The advantages of this application are: a more reasonable design and improved production efficiency.

Figure 202010617808

Description

椅脚管件连续式加工模及成型方法Continuous processing die and forming method of chair leg pipe

技术领域technical field

本发明属于模具技术领域,尤其涉及一种椅脚管件连续式加工模及成型方法。The invention belongs to the technical field of molds, and in particular relates to a continuous processing mold and a molding method of a chair leg pipe fitting.

背景技术Background technique

椅脚其有五星椅脚,其中一种五星椅脚其中间管和五单脚采用焊接连接。The chair legs have five-star chair feet, and one of the five-star chair feet has a welding connection between the middle tube and the five single legs.

单脚其为了能够便于滚轮的安装,以及提高单脚的结构强度,一般在单脚的外端进行弧形段的成型加工,成型加工后其可以便于连接螺母等等部件的焊接固定,另一端成型椭圆便于与中心座连接。In order to facilitate the installation of the roller and improve the structural strength of the single foot, the arc-shaped section is generally formed at the outer end of the single foot. Shaped oval for easy connection to the center seat.

目前的这种单件其成型加工需要经过多道工序,成型-定长和整形等等,这多道的工序一般采用独立的工位在不同的设备上加工,这种方式其为最传统的方式,效率较低,产品的一致性也较差。At present, the forming of this single piece needs to go through multiple processes, such as forming-fixing and shaping, etc. These multiple processes are generally processed on different equipment by independent stations. This method is the most traditional method. method, the efficiency is lower, and the consistency of the product is also poor.

发明内容SUMMARY OF THE INVENTION

本发明的目的是针对上述问题,提供一种可以解决上述技术问题的椅脚管件连续式加工模及成型方法。The purpose of the present invention is to address the above problems, and to provide a continuous processing die and a forming method for a chair leg pipe fitting that can solve the above technical problems.

为达到上述目的,本发明采用了下列技术方案:To achieve the above object, the present invention has adopted the following technical solutions:

本椅脚管件连续式加工模包括按照加工顺序依次设置的The continuous processing die of the chair leg fittings includes a series of

管件置放工位,用于放置未加工的管件;Pipe fitting placement station for placing unprocessed pipe fittings;

管件成型工位,用于将管件两端成型;The pipe forming station is used to form both ends of the pipe;

管件定长工位,用于将管件的两端端部多余长度切除;The pipe fitting fixed-length station is used to cut off the excess length of the two ends of the pipe fitting;

管件精整工位,用于将管件定长工位后的管件进行精整,制得椅脚管件成品;The pipe fitting finishing station is used to finish the pipe fittings after the pipe fitting lengthening station to obtain the finished chair foot pipe fittings;

管件移料机构,用于将上述管件按照工位顺序从前一个工位移动至后一个工位。The pipe fitting moving mechanism is used to move the above-mentioned pipe fittings from the previous station to the next station according to the station sequence.

在上述的椅脚管件连续式加工模中,所述的管件定长工位包括前定长工位和后定长工位,前定长工位用于将管件被成型后的圆弧段多余长度切除,后定长工位用于将管件被成型后的椭圆段的端部多余长度切除。In the above-mentioned continuous processing die for the pipe fittings of the chair legs, the pipe fitting fixing station includes a front fixing length station and a rear fixing length station. The fixed-length station is used to cut off the excess length of the end of the formed oval section of the pipe.

在上述的椅脚管件连续式加工模中,所述的管件置放工位、管件成型工位、管件成型工位、管件定长工位和管件精整工位设置在固定板上。In the above-mentioned continuous processing mold for the pipe fittings of the chair legs, the pipe fitting placement station, the pipe fitting forming station, the pipe fitting forming station, the pipe fitting lengthening station and the pipe fitting finishing station are arranged on the fixing plate.

在上述的椅脚管件连续式加工模中,所述的固定板下表面通过支撑机构连接有底板。In the above-mentioned continuous processing mold for the leg fittings of the chair, the lower surface of the fixing plate is connected with a bottom plate through a supporting mechanism.

在上述的椅脚管件连续式加工模中,所述的管件移料机构包括固定在底板上表面的移动座,并且移动座的移动方向为上述工位的顺序排列方向,在固定板的中心区域设有矩形通孔,在移动座上设有贯穿矩形通孔的升降驱动器,以及连接在升降驱动器上的移料架,移料架位于固定板上表面上方,移料架升降可以取得管件和释放管件,移动座移动带动移料架移动从而将管件从上一个工位移送至下一个工位。In the above-mentioned continuous processing mold for chair leg pipe fittings, the pipe fitting moving mechanism includes a moving seat fixed on the upper surface of the bottom plate, and the moving direction of the moving seat is the sequential arrangement direction of the above-mentioned stations, in the central area of the fixed plate There is a rectangular through hole, a lift drive through the rectangular through hole is arranged on the movable seat, and a moving frame is connected to the lift driver. The moving frame is located above the surface of the fixed plate. For the pipe fittings, the movement of the moving base drives the moving frame to move the pipe fittings from the previous work station to the next work station.

在上述的椅脚管件连续式加工模中,所述的管件置放工位包括放置下静模和位于放置下静模上方的升降动模,升降动模下降与放置下静模配合从而将放置下静模上的管件夹持。In the above-mentioned continuous processing mold for chair leg pipe fittings, the pipe fitting placement station includes a lower static mold for placing and a lifting movable mold above the lower static mold for placement. Tube clamping on static die.

在上述的椅脚管件连续式加工模中,所述的管件成型工位包括下成型凸模和位于下成型凸模上方的升降成型凹模,升降成型凹模下降与下成型凸模配合从而将管件一端成型。In the above-mentioned continuous processing mold for chair leg pipe fittings, the pipe fitting forming station includes a lower forming punch and a lift forming concave die located above the lower forming punch, and the lift forming concave die is lowered to cooperate with the lower forming punch to form the lower moulding punch. One end of the pipe is formed.

在上述的椅脚管件连续式加工模中,所述的前定长工位包括支撑在管件中部的下支撑模,位于下支撑模上方的上升降模,上升降模下降与下支撑模配合将管件约束固定,还包括位于管件远离其被成型一端的第一竖直块,穿设在第一竖直块上并且可以相对第一竖直块的第一水平伸阶梯轴,第一水平伸阶梯轴和第一驱动器连接并且第一驱动器驱动第一水平伸阶梯轴插入至管件远离其被成型一端内部,还包括位于管件被成型一端内侧的内侧凹面固定模,以及位于管件被成型一端外侧的外冲切平移模,外冲切平移模靠近管件的一侧设有与管件被成型端外侧匹配的弧形凹面并且外冲切平移模和第一平移驱动器连接,管件被成型的一端其内侧凹面与内侧凹面固定模匹配并且第一平移驱动器驱动外冲切平移模向管件被成型一端移动并将多余长度切除。In the above-mentioned continuous processing mold for chair leg pipe fittings, the front fixed-length station includes a lower support die supported in the middle of the pipe fitting, an upper lift die located above the lower support die, and the upper lift die is lowered to cooperate with the lower support die to move the pipe fittings. Constraining and fixing, it also includes a first vertical block located at the end of the pipe piece away from the formed end, passing through the first vertical block and extending relative to the first horizontally extending stepped shaft of the first vertical block, and the first horizontally extending stepped shaft The first driver is connected with the first driver and the first driver drives the first horizontally extending stepped shaft to be inserted into the inside of the pipe fitting away from the formed end, and also includes an inner concave fixed die located inside the formed end of the pipe, and an outer punch located outside the formed end of the pipe Cutting translation die, the side of the outer punching translation die close to the pipe fitting is provided with an arc-shaped concave surface that matches the outer side of the formed end of the pipe fitting, and the outer punching translation die is connected with the first translation driver. The concave stationary die is mated and the first translation drive drives the outer die cutting translation die to move toward the formed end of the tube and cut off excess length.

在上述的椅脚管件连续式加工模中,所述的后定长工位包括位于管件被前定长工位加工一端的水平端部定位板,管件被前定长工位加工后的一端端面抵靠在水平端部定位板上表面,以及将管件被前定长工位加工后的一端抱紧的凹凸抱紧装置,以及位于管件另一端的第二固定凹模,位于第二固定凹模上方的升降压紧模,位于升降压紧模上方并且与升降压紧模竖直滑动连接的驱动上模,在升降压紧模上穿设有与升降压紧模竖直滑动连接的竖直冲压刀,竖直冲压刀的刀刃朝下,竖直冲压刀的上端和驱动上模连接,还包括位于管件圆弧段一端内侧的内侧凹面基准模,以及位于内侧凹面基准模外侧的外凸面抱紧模,外凸面抱紧模和第二驱动器连接。In the above-mentioned continuous processing die for the pipe fittings of chair legs, the rear fixing station includes a horizontal end positioning plate located at one end of the pipe fitting processed by the front fixing station, and the end face of one end of the pipe fitting processed by the front fixing station abuts against the The upper surface of the horizontal end positioning plate, and the concave-convex holding device that holds the end of the pipe after being processed by the front fixed-length station, and the second fixed die at the other end of the pipe, and the lifting pressure above the second fixed die The clamping die is a driving upper die that is located above the lifting and pressing die and is vertically slidably connected to the lifting and pressing die. A vertical punching knife that is vertically slidably connected to the lifting and pressing die is pierced on the lifting and pressing die. The cutting edge of the punching knife faces down, and the upper end of the vertical punching knife is connected with the driving upper die, and also includes an inner concave surface reference die located inside one end of the circular arc segment of the pipe fitting, and an outer convex surface holding die located outside the inner concave reference die. Hold the die and connect the second driver.

在上述的椅脚管件连续式加工模中,所述的管件精整工位包括第二竖直块和穿设在第二竖直块上并且可以相对第二竖直块水平移动的精整轴,精整轴的一端通过第二平移驱动器伸入至管件远离其被成型加工的一端内部,还包括位于管件圆弧段一端内侧的内侧凹面精整模,以及位于内侧凹面精整模外侧的外凸面精整模,外凸面精整模和第三驱动器连接。In the above-mentioned continuous processing die for the pipe of the chair leg, the pipe finishing station comprises a second vertical block and a finishing shaft which is penetrated on the second vertical block and can move horizontally relative to the second vertical block One end of the finishing shaft extends into the inside of the end of the pipe that is far away from the forming process through the second translation drive, and also includes an inner concave finishing die located inside one end of the circular arc segment of the pipe, and an outer finishing die located outside the inner concave finishing die. The convex finishing die, the outer convex finishing die and the third driver are connected.

椅脚管件连续式成型方法,本方法采用所述的椅脚管件连续式成型模,包括如下步骤:A continuous molding method for a chair leg tube, the method adopts the continuous molding die for a chair leg tube, and includes the following steps:

S1、将未加工的管件放置在管件置放工位上;S1. Place the unprocessed pipe fittings on the pipe fitting placement station;

S2、移动管件置放工位上的未加工管件并移送至管件成型工位上,管件成型工位对未加工的管件两端进行成型加工,将管件一端加工成型呈圆弧状,另一端加工成型呈椭圆状;S2. Move the unprocessed pipe fitting on the pipe fitting placement station and transfer it to the pipe fitting forming station. The pipe fitting forming station shapes both ends of the unprocessed pipe fitting, and processes one end of the pipe fitting into an arc shape, and the other end is processed and formed. elliptical;

S3、将S2步骤加工后的管件移送至管件定长工位,首先对管件的圆弧段其端部进行多余长度切除,然后再将管件椭圆段的多余长度切除;S3, transfer the pipe fitting processed in step S2 to the pipe fitting fixed-length station, first cut off the excess length of the end of the circular arc segment of the pipe fitting, and then cut off the excess length of the elliptical segment of the pipe fitting;

S4、将S3步骤的管件移送至管件精整工位,管件精整工位对管件的圆弧段和椭圆段同步整形,即,完成管件成型加工。S4, transfer the pipe fitting in step S3 to the pipe fitting finishing station, and the pipe fitting finishing station reshapes the circular arc segment and the elliptical segment of the pipe fitting synchronously, that is, completes the pipe fitting forming process.

与现有的技术相比,椅脚管件连续式加工模的优点在于:Compared with the existing technology, the advantages of the continuous processing die for the leg fittings are:

利用集成于一体的方式,其可以省略了设备与设备之间的调度过程,以及可以提高生产效率,大幅降低操作工的人数,降低了企业生产人力成本,同时,间隔并且连续的加工,其可以提高产品加工的一致性,产品加工质量稳定并且复合企业的生产要求,另外,还能够适用于大批量的生产加工,设计更加合理。Using the integrated method, it can omit the scheduling process between equipment and equipment, and can improve production efficiency, greatly reduce the number of operators, and reduce the production labor cost of the enterprise. At the same time, interval and continuous processing, it can Improve the consistency of product processing, stable product processing quality and meet the production requirements of enterprises. In addition, it can also be applied to large-scale production and processing, and the design is more reasonable.

附图说明Description of drawings

图1是本发明提供的加工模俯视结构示意图。FIG. 1 is a schematic top-view structural diagram of a processing die provided by the present invention.

图2是本发明提供的加工模立体结构示意图。FIG. 2 is a schematic diagram of the three-dimensional structure of the processing die provided by the present invention.

图3是本发明提供的加工模结构示意图。3 is a schematic structural diagram of a processing die provided by the present invention.

图4是本发明提供的加工模每个工位中有管件的状态示意图。FIG. 4 is a schematic diagram of the state in which there are pipe fittings in each station of the processing die provided by the present invention.

图中,管件置放工位1、放置下静模10、升降动模11、管件成型工位2、下成型凸模20、升降成型凹模21、下椭圆模22、上椭圆模23、芯轴24、管件定长工位3、前定长工位30、下支撑模301、上升降模302、第一竖直块303、第一水平伸阶梯轴304、第一驱动器305、外冲切平移模306、内侧凹面固定模307、第一平移驱动器308、后定长工位31、水平端部定位板310、凹凸抱紧装置311、第二固定凹模312、升降压紧模313、驱动上模314、竖直冲压刀315、内侧凹面基准模316、外凸面抱紧模317、第二驱动器318、管件精整工位4、第二竖直块40、精整轴41、第二平移驱动器42、内侧凹面精整模43、外凸面精整模44、第三驱动器45、管件移料机构5、移动座50、升降驱动器51、移料架52、导轨53、固定板6、矩形通孔60、底板7。In the figure, the pipe fitting placement station 1, the lower static die 10, the lifting movable die 11, the pipe fitting forming station 2, the lower forming punch 20, the lifting forming concave die 21, the lower elliptical die 22, the upper elliptical die 23, the mandrel 24. Pipe fixing station 3, front fixing station 30, lower supporting die 301, upper lifting die 302, first vertical block 303, first horizontally extending stepped shaft 304, first driver 305, outer punching translation die 306 , the inner concave fixed die 307, the first translation driver 308, the rear fixing station 31, the horizontal end positioning plate 310, the concave and convex clamping device 311, the second fixed die 312, the lifting and pressing die 313, the driving upper die 314, Vertical punching knife 315, inner concave reference die 316, outer convex clamping die 317, second driver 318, pipe finishing station 4, second vertical block 40, finishing shaft 41, second translation driver 42, inner side Concave finishing die 43, convex finishing die 44, third driver 45, pipe material moving mechanism 5, moving seat 50, lifting driver 51, material moving frame 52, guide rail 53, fixed plate 6, rectangular through hole 60, bottom plate 7.

具体实施方式Detailed ways

以下是发明的具体实施例并结合附图,对本发明的技术方案作进一步的描述,但本发明并不限于这些实施例。The following are specific embodiments of the invention and combined with the accompanying drawings to further describe the technical solutions of the present invention, but the present invention is not limited to these embodiments.

如图1和图4所示,本椅脚管件连续式加工模包括按照加工顺序依次设置的管件置放工位1,用于放置未加工的管件;As shown in Fig. 1 and Fig. 4, the continuous processing die for the leg fittings of the chair includes a fitting placement station 1 arranged in sequence according to the processing sequence, for placing the unprocessed fittings;

管件成型工位2,用于将管件两端成型;Pipe fitting forming station 2, used to form both ends of the pipe fitting;

管件定长工位3,用于将管件的两端端部多余长度切除;Pipe fitting fixing station 3, used to cut off the excess length of both ends of the pipe fitting;

管件精整工位4,用于将管件定长工位3后的管件进行精整,制得椅脚管件成品;The pipe fitting finishing station 4 is used for finishing the pipe fittings after the pipe fitting lengthening station 3 to obtain the finished chair foot pipe fittings;

管件移料机构5,用于将上述管件按照工位顺序从前一个工位移动至后一个工位。The pipe fitting moving mechanism 5 is used to move the above-mentioned pipe fittings from the previous station to the next station according to the station sequence.

所述的管件置放工位1、管件成型工位2、管件成型工位2、管件定长工位3和管件精整工位4设置在固定板6上。The pipe fitting placement station 1 , the pipe fitting forming station 2 , the pipe fitting forming station 2 , the pipe fitting lengthening station 3 and the pipe fitting finishing station 4 are arranged on the fixing plate 6 .

如图2和图3所示,As shown in Figure 2 and Figure 3,

所述的固定板6下表面通过支撑机构连接有底板7。The bottom surface of the fixing plate 6 is connected with a bottom plate 7 through a supporting mechanism.

支撑机构包括设置在底板7上表面上的两排支撑板,管件移料机构5置于两排支撑板之间。The supporting mechanism includes two rows of supporting plates arranged on the upper surface of the bottom plate 7, and the pipe-piece moving mechanism 5 is placed between the two rows of supporting plates.

利用集成于一体的方式,其可以省略了设备与设备之间的调度过程,以及可以提高生产效率,大幅降低操作工的人数,降低了企业生产人力成本,同时,间隔并且连续的加工,其可以提高产品加工的一致性,产品加工质量稳定并且复合企业的生产要求,另外,还能够适用于大批量的生产加工,设计更加合理。Using the integrated method, it can omit the scheduling process between equipment and equipment, and can improve production efficiency, greatly reduce the number of operators, and reduce the production labor cost of the enterprise. At the same time, interval and continuous processing, it can Improve the consistency of product processing, stable product processing quality and meet the production requirements of enterprises. In addition, it can also be applied to large-scale production and processing, and the design is more reasonable.

进一步地,管件置放工位1包括放置下静模10和位于放置下静模10上方的升降动模11,升降动模11下降与放置下静模10配合从而将放置下静模10上的管件夹持。Further, the pipe fitting placement station 1 includes a lower static mold 10 for placing and a lifting and moving mold 11 located above the lower static mold 10. The lifting and moving mold 11 descends to cooperate with the placing lower static mold 10 to place the pipe fittings on the lower static mold 10. Clamp.

进一步地,管件成型工位2包括下成型凸模20和位于下成型凸模20上方的升降成型凹模21,升降成型凹模21与冲床升降头连接,升降成型凹模21下降与下成型凸模20配合从而将管件一端成型成圆弧状。升降成型凹模21与下成型凸模20之间设有竖直导向结构,这里的竖直导向结构包括设置在下成型凸模20上的两根竖直导杆,在升降成型凹模21上设有供所述竖直导杆上端一一插入的导向孔,以提高升降成型凹模21升降的稳定性。Further, the pipe fitting forming station 2 includes a lower forming punch 20 and a lift forming concave die 21 located above the lower forming punch 20. The lift forming concave die 21 is connected to the lifting head of the punch press, and the lift forming concave die 21 descends and the lower forming convex mould 21 is lowered. The die 20 cooperates to form one end of the pipe into a circular arc shape. A vertical guide structure is provided between the lifting forming die 21 and the lower forming punch 20 . The vertical guide structure here includes two vertical guide rods arranged on the lower forming punch 20 . There are guide holes into which the upper ends of the vertical guide rods are inserted one by one, so as to improve the stability of the lifting and lowering forming die 21 .

其次,在下成型凸模20靠近管件圆弧段一端端部设有竖直导向板25,以及升降成型凹模21上设有与竖直导向板25滑动连接的导向槽26,以进一步提高升降成型凹模21升降稳定性。Next, a vertical guide plate 25 is provided at one end of the lower forming punch 20 near the circular arc section of the pipe, and a guide groove 26 slidably connected to the vertical guide plate 25 is provided on the lift forming die 21 to further improve the lift forming process. The lifting and lowering stability of the die 21.

其次,管件成型工位2还包括用于将管件远离被成型呈圆弧段一端加工呈椭圆状的椭圆成型机构,该椭圆成型机构包括下椭圆模22,位于下椭圆模22上方的上椭圆模23,上椭圆模23与冲床升降头连接,以及一端从下椭圆模22外端伸入至下椭圆模22中的芯轴24,芯轴24和芯轴驱动气缸或者油缸连接,未加工管件一端置入下椭圆模22,上椭圆模23下降与下椭圆模22匹配,此时的芯轴24插入至未加工管件中,以提供管件成型过程中的受力支撑。Secondly, the pipe fitting forming station 2 also includes an elliptical forming mechanism for processing the pipe fitting away from the end of the circular arc segment to be formed into an elliptical shape. 23. The upper elliptical die 23 is connected with the lifting head of the punch press, and one end extends from the outer end of the lower elliptical die 22 to the mandrel 24 in the lower elliptical die 22. The mandrel 24 is connected with the mandrel driving cylinder or oil cylinder, and one end of the unprocessed pipe fitting is The lower elliptical die 22 is placed, the upper elliptical die 23 is lowered to match the lower elliptical die 22, and the mandrel 24 is inserted into the unprocessed pipe fitting to provide force support during the forming process of the pipe fitting.

加工时,先加工椭圆段,然后抽出芯轴并且适当松开上椭圆模23,然后下成型凸模20和升降成型凹模21开始加工圆弧段加工,圆弧段加工过程中,由于管件弯曲使得椭圆段脱离下椭圆模22,以便于圆弧段加工。During processing, the elliptical segment is processed first, then the mandrel is pulled out and the upper elliptical die 23 is properly loosened, and then the lower forming punch 20 and the lifting forming die 21 begin to process the arc segment. During the arc segment processing, due to the bending of the pipe. The ellipse segment is released from the lower ellipse die 22 to facilitate the machining of the arc segment.

进一步地,管件定长工位3包括前定长工位30和后定长工位31,前定长工位30用于将管件被成型后的圆弧段多余长度切除,后定长工位31用于将管件被成型后的椭圆段的端部多余长度切除。Further, the pipe fixing station 3 includes a front fixing station 30 and a rear fixing station 31. The front fixing station 30 is used to cut off the excess length of the circular arc segment after the pipe fitting is formed, and the rear fixing station 31 is used for pipe fittings. The excess length at the end of the formed oval segment is cut off.

具体地,前定长工位30包括支撑在管件中部的下支撑模301,位于下支撑模301上方的上升降模302,上升降模302下降与下支撑模301配合将管件约束固定,上升降模302的下表面连接有两根相互平行的限制柱309,下支撑模301的顶部设有悬臂支撑部3010,两根限制柱309之间形成的间距略大于悬臂支撑部3010的宽度并且上升降模302下降后所述悬臂支撑部3010位于两根限制柱309之间,从而形成约束。Specifically, the front fixing station 30 includes a lower support die 301 supported in the middle of the pipe fitting, an upper lift die 302 located above the lower support die 301, the upper lift die 302 descends and cooperates with the lower support die 301 to constrain and fix the pipe fitting, and the upper lift die 302 is lowered. The lower surface of 302 is connected with two mutually parallel confinement columns 309, the top of the lower support die 301 is provided with a cantilever support portion 3010, the distance formed between the two confinement columns 309 is slightly larger than the width of the cantilever support portion 3010, and the upper die is lifted and lowered. After 302 is lowered, the cantilever support portion 3010 is located between the two restriction columns 309, thereby forming a restriction.

还包括位于管件远离其被成型一端的第一竖直块303,穿设在第一竖直块303上并且可以相对第一竖直块303的第一水平伸阶梯轴304,第一水平伸阶梯轴304和第一驱动器305连接并且第一驱动器305驱动第一水平伸阶梯轴304插入至管件远离其被成型一端内部,第一驱动器305为气缸或者油缸,还包括位于管件被成型一端内侧的内侧凹面固定模307,内侧凹面固定模307的下侧设有倒角,以提供一个切边刀具避让,以及位于管件被成型一端外侧的外冲切平移模306,外冲切平移模306靠近管件的一侧设有与管件被成型端外侧匹配的弧形凹面并且外冲切平移模306和第一平移驱动器308连接,第一平移驱动器308为气缸或者油缸,管件被成型的一端其内侧凹面与内侧凹面固定模307匹配并且第一平移驱动器308驱动外冲切平移模306向管件被成型一端移动并将多余长度切除。It also includes a first vertical block 303 located at the end of the pipe that is far away from the formed end, which is penetrated on the first vertical block 303 and can extend relative to the first vertical block 303. The shaft 304 is connected with the first driver 305, and the first driver 305 drives the first horizontally extending stepped shaft 304 to be inserted into the inside of the pipe fitting away from the formed end. The first driver 305 is an air cylinder or an oil cylinder, and also includes an inner side located inside the formed end of the pipe fitting. The concave fixed die 307, the underside of the inner concave fixed die 307 is provided with a chamfer to provide an edge-cutting tool avoidance, and an outer die-cutting translation die 306 located on the outside of one end of the pipe to be formed, the outer die-cutting translation die 306 is close to the pipe One side is provided with an arc-shaped concave surface that matches the outer side of the formed end of the pipe fitting, and the outer die-cutting translation die 306 is connected with the first translation driver 308. The first translation driver 308 is an air cylinder or an oil cylinder. The concave fixed die 307 mates and the first translation drive 308 drives the outer die cutting translation die 306 to move toward the end of the tube being formed and cut off the excess length.

外冲切平移模306和固定板之间设有第一水平导向结构。第一水平导向结构包括两根穿设在固定板的固定座上的第一导向杆,在外冲切平移模306上设有供所述第一导向杆一一插入的第一导向孔,以提高外冲切平移模306移动的平顺性和稳定性。A first horizontal guide structure is provided between the outer punching translation die 306 and the fixing plate. The first horizontal guide structure includes two first guide rods passing through the fixed seat of the fixed plate, and the outer punching translation die 306 is provided with first guide holes for the first guide rods to be inserted one by one, so as to improve the The smoothness and stability of the movement of the outer die-cutting translation die 306 .

其次,在内侧凹面固定模307靠近下支撑模301的一面设有倾斜坡面一,在每根限制柱309靠近内侧凹面固定模307的一侧下端设有倾斜坡面二3090,所述的倾斜坡面一和倾斜坡面二吻合从而说明上升降模302下降到位。Secondly, the first inclined slope surface is provided on the side of the inner concave fixed mold 307 close to the lower support mold 301, and the lower end of each restricting column 309 close to the inner concave fixed mold 307 is provided with an inclined slope surface 2 3090. The slope 1 and the inclined slope 2 are matched to indicate that the upper lifting die 302 is lowered in place.

第一水平伸阶梯轴304插入至椭圆段中从而使得管件一端定位,避免在余料切除时轴向冲击管件而使得管件发生轴向位移。第一水平伸阶梯轴304最大外径大于管件椭圆段的内径,同时,该第一水平伸阶梯轴304可以起到一定的整形作用。The first horizontally extending stepped shaft 304 is inserted into the elliptical section so as to locate one end of the pipe fitting, so as to avoid axial displacement of the pipe fitting due to axial impact on the pipe fitting when the residual material is removed. The maximum outer diameter of the first horizontally extending stepped shaft 304 is larger than the inner diameter of the elliptical section of the pipe fitting, and at the same time, the first horizontally extending stepped shaft 304 can play a certain role in shaping.

其次,后定长工位31包括位于管件被前定长工位30加工一端的水平端部定位板310,管件被前定长工位30加工后的一端端面抵靠在水平端部定位板310上表面,以及将管件被前定长工位30加工后的一端抱紧的凹凸抱紧装置311,凹凸抱紧装置311包括贴合管件被成型一端内凹面的内弧形凸面,以及位于内弧形凸面外侧的外平移块,在外平移块上设有与管件被成型一端外凸面贴合的外弧形凹面,外平移块和气缸或者油缸连接,以便于将管件被成型一端抱紧,以及位于管件另一端的第二固定凹模312,位于第二固定凹模312上方的升降压紧模313,位于升降压紧模313上方并且与升降压紧模313竖直滑动连接的驱动上模314,驱动上模314上设有两根竖直导向杆,在升降压紧模313上设有供所述的竖直导向杆一一插入的导向孔,以确保升降压紧模313压紧后连接在驱动上模314上的竖直冲压刀315竖直升降的垂直性,驱动上模314与冲床升降头连接,在升降压紧模313上穿设有与升降压紧模313竖直滑动连接的竖直冲压刀315,在固定板上设有供竖直冲压刀315下端进入的避让孔,避让孔可以进行避让以及废料的落料,竖直冲压刀315的刀刃朝下,竖直冲压刀315的上端和驱动上模314连接,还包括位于管件圆弧段一端内侧的内侧凹面基准模316,以及位于内侧凹面基准模316外侧的外凸面抱紧模317,外凸面抱紧模317和第二驱动器318连接。第二驱动器318为气缸或者油缸。Secondly, the rear fixing station 31 includes a horizontal end positioning plate 310 located at one end of the pipe fitting processed by the front fixing station 30, and the end face of the pipe fitting after being processed by the front fixing station 30 abuts on the upper surface of the horizontal end positioning plate 310, And the concave-convex holding device 311 for holding the end of the pipe fitting after being processed by the front fixed-length station 30, the concave-convex holding device 311 includes an inner arc convex surface that fits the inner concave surface of the formed end of the pipe fitting, and is located outside the inner arc convex surface. The outer translation block is provided with an outer arc-shaped concave surface that fits with the outer convex surface of the formed end of the pipe fitting, and the outer translation block is connected with a cylinder or an oil cylinder, so as to hold the formed end of the pipe fitting tightly, and the other end of the pipe fitting is located at the other end of the pipe fitting. The second fixed female die 312, the lifting and pressing die 313 located above the second fixed female die 312, the driving upper die 314 located above the lifting and pressing die 313 and vertically slidingly connected with the lifting and pressing die 313, the driving upper die 314 There are two vertical guide rods on it, and the lifting and pressing die 313 is provided with guide holes for the vertical guide rods to be inserted one by one, so as to ensure that the lifting and pressing die 313 is connected to the driving upper die 314 after being pressed. The vertical punching knife 315 on the upper part is vertically lifted, and the upper die 314 is driven to connect with the lifting head of the punch press, and the vertical punching knife 315 which is vertically slidably connected to the lifting and pressing die 313 is pierced on the lifting and pressing die 313. , the fixing plate is provided with an avoidance hole for the lower end of the vertical punching knife 315 to enter, the avoidance hole can be used for avoidance and blanking of waste materials, the blade of the vertical punching knife 315 is facing down, and the upper end of the vertical punching knife 315 is driven upward. The mold 314 is connected, and also includes an inner concave reference mold 316 located on the inner side of one end of the circular arc segment of the pipe fitting, and an outer convex surface holding mold 317 located outside the inner concave reference mold 316. The outer convex surface holding mold 317 is connected with the second driver 318. The second driver 318 is an air cylinder or an oil cylinder.

其次,外凸面抱紧模317和固定板之间设有第二导向结构,第二导向结构包括固定在固定板上的两块第二导向块,第二导向块横向截面呈L形,两块第二导向块之间形成凹字形导向空间,外凸面抱紧模317置于凹字形导向空间中并且两者间隙配合。Secondly, a second guide structure is provided between the outer convex surface holding die 317 and the fixing plate. The second guide structure includes two second guide blocks fixed on the fixing plate. A concave-shaped guide space is formed between the second guide blocks, and the outer convex surface holding mold 317 is placed in the concave-shaped guide space and the two are in clearance fit.

进一步地,管件精整工位4包括第二竖直块40和穿设在第二竖直块40上并且可以相对第二竖直块40水平移动的精整轴41,精整轴41的一端通过第二平移驱动器42伸入至管件椭圆段内部,还包括位于管件圆弧段一端内侧的内侧凹面精整模43,以及位于内侧凹面精整模43外侧的外凸面精整模44,外凸面精整模44和第三驱动器45连。第二平移驱动器42和第三驱动器45均为气缸或者油缸。Further, the pipe finishing station 4 includes a second vertical block 40 and a finishing shaft 41 which is penetrated on the second vertical block 40 and can move horizontally relative to the second vertical block 40. One end of the finishing shaft 41 The second translation driver 42 extends into the inside of the elliptical segment of the pipe, and further includes an inner concave finishing die 43 located inside one end of the circular arc segment of the pipe, and an outer convex finishing die 44 located outside the inner concave finishing die 43. The sizing die 44 is connected to the third driver 45 . Both the second translation driver 42 and the third driver 45 are air cylinders or oil cylinders.

其次,在固定板上设有位于精整轴41下方的下椭圆承接模46,以及位于下椭圆承接模46上方的下压椭圆模47,下压椭圆模47与冲床升降头连接,实现对椭圆段的压紧。Secondly, a lower elliptical receiving die 46 located below the finishing shaft 41 and a lower pressing elliptical die 47 located above the lower elliptical receiving die 46 are arranged on the fixed plate. segment compression.

精整轴41最后插入至管件的椭圆段中,确保整形质量。The finishing shaft 41 is finally inserted into the elliptical section of the pipe, ensuring the quality of the finishing.

另外,外凸面精整模44和固定板之间设有第三导向结构,第三导向结构的结构与第二导向结构的结构相同。In addition, a third guide structure is provided between the outer convex surface finishing die 44 and the fixing plate, and the structure of the third guide structure is the same as that of the second guide structure.

进一步地,管件移料机构5包括固定在底板7上表面的移动座50,并且移动座50的移动方向为上述工位的顺序排列方向,在固定板6的中心区域设有矩形通孔60,在移动座50上设有贯穿矩形通孔60的升降驱动器51,以及连接在升降驱动器51上的移料架52,移料架52位于固定板6上表面上方,移料架52升降可以取得管件和释放管件,移动座50移动带动移料架52移动从而将管件从上一个工位移送至下一个工位。Further, the pipe fitting moving mechanism 5 includes a moving seat 50 fixed on the upper surface of the bottom plate 7, and the moving direction of the moving seat 50 is the sequential arrangement direction of the above-mentioned stations, and a rectangular through hole 60 is provided in the central area of the fixed plate 6, The moving base 50 is provided with a lifting driver 51 penetrating the rectangular through hole 60, and a moving frame 52 connected to the lifting driver 51. The moving frame 52 is located above the upper surface of the fixed plate 6, and the moving frame 52 can be lifted and lowered to obtain pipe fittings. and release the pipe, the moving base 50 moves the moving frame 52 to move the pipe to move the pipe from the previous work station to the next work station.

在成型加工时,此时的移料架52位于管件中部下方,当需要进行移料时,此时的移料架52则被驱动上升。During the forming process, the material moving frame 52 at this time is located below the middle of the pipe, and when the material needs to be moved, the material moving frame 52 at this time is driven to rise.

移料架52包括一条状梁,在条状梁上表面设有五个承接槽口,承接槽口处于管件的中部位置,以确保将管件稳定取得上升、平移和下降释放。The moving frame 52 includes a strip beam, and five receiving slots are arranged on the upper surface of the strip beam, and the receiving slots are located in the middle of the pipe fitting to ensure that the pipe fitting can be stably lifted, translated and lowered.

升降驱动器51为多伸缩杆的气缸或者油缸。以避免单伸缩杆还需要设计导向的非稳定性现象。The lift driver 51 is an air cylinder or an oil cylinder with multiple telescopic rods. In order to avoid the instability phenomenon of the single telescopic rod also needs to be designed.

其次,移动座50滑动设置在底板7上表面的导轨53上,在底板7上表面设有与移动座50连接的气缸或者油缸,上水的移料其可以实现升降和平移两个方位的位移。Secondly, the movable seat 50 is slidably arranged on the guide rail 53 on the upper surface of the bottom plate 7, and the upper surface of the bottom plate 7 is provided with an air cylinder or an oil cylinder connected with the movable seat 50, and the moving material of the water can realize the displacement of lifting and translation in two directions. .

本实施例的升降均通过冲床上的升降头实现,当然,可以在升降头上安装一水平连接块,以便于与本实施例中需要升降的部件连接,形成统一升降控制。The lifting and lowering of this embodiment are all realized by the lifting head on the punching machine. Of course, a horizontal connecting block can be installed on the lifting head to facilitate connection with the components that need to be lifted and lowered in this embodiment to form unified lifting control.

椅脚管件连续式成型方法,本方法采用所述的椅脚管件连续式成型模,包括如下步骤:A continuous molding method for a chair leg tube, the method adopts the continuous molding die for a chair leg tube, and includes the following steps:

S1、将未加工的管件放置在管件置放工位上;S1. Place the unprocessed pipe fittings on the pipe fitting placement station;

S2、移动管件置放工位上的未加工管件并移送至管件成型工位上,管件成型工位对未加工的管件两端进行成型加工,将管件一端加工成型呈圆弧状,另一端加工成型呈椭圆状;S2. Move the unprocessed pipe fitting on the pipe fitting placement station and transfer it to the pipe fitting forming station. The pipe fitting forming station shapes both ends of the unprocessed pipe fitting, and processes one end of the pipe fitting into an arc shape, and the other end is processed and formed. elliptical;

S3、将S2步骤加工后的管件移送至管件定长工位,首先对管件的圆弧段其端部进行多余长度切除,然后再将管件椭圆段的多余长度切除;S3, transfer the pipe fitting processed in step S2 to the pipe fitting fixed-length station, first cut off the excess length of the end of the circular arc segment of the pipe fitting, and then cut off the excess length of the elliptical segment of the pipe fitting;

S4、将S3步骤的管件移送至管件精整工位,管件精整工位对管件的圆弧段和椭圆段同步整形,即,完成管件成型加工。S4, transfer the pipe fitting in step S3 to the pipe fitting finishing station, and the pipe fitting finishing station reshapes the circular arc segment and the elliptical segment of the pipe fitting synchronously, that is, completes the pipe fitting forming process.

本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。The specific embodiments described herein are merely illustrative of the spirit of the invention. Those skilled in the art to which the present invention pertains can make various modifications or additions to the described specific embodiments or substitute in similar manners, but will not deviate from the spirit of the present invention or go beyond the definition of the appended claims range.

Claims (10)

1. The continuous processing die for chair leg pipe fittings is characterized by comprising a plurality of processing dies which are sequentially arranged according to the processing sequence
A pipe placing station (1) for placing unprocessed pipes;
the pipe fitting forming station (2) is used for forming two ends of the pipe fitting, one end of the pipe fitting is formed into an arc shape, and the other end of the pipe fitting is formed into an oval shape;
the pipe fitting length fixing station (3) is used for cutting off the redundant length of the end parts of the two ends of the pipe fitting;
the pipe finishing station (4) is used for finishing the pipe after the pipe length fixing station (3) to obtain a chair leg pipe finished product;
and the pipe moving mechanism (5) is used for moving the pipe from the previous station to the next station according to the station sequence.
2. The continuous forming die for the chair leg pipe fittings according to the claim 1, wherein the pipe fitting length fixing station (3) comprises a front length fixing station (30) and a rear length fixing station (31), the front length fixing station (30) is used for cutting off the excess length of the circular arc section after the pipe fitting is formed, and the rear length fixing station (31) is used for cutting off the excess length of the end part of the oval section after the pipe fitting is formed.
3. The continuous forming die for the chair leg pipe fittings according to the claim 1, wherein the pipe fitting placing station (1), the pipe fitting forming station (2), the pipe fitting length fixing station (3) and the pipe fitting finishing station (4) are arranged on the fixing plate (6); the lower surface of the fixing plate (6) is connected with a bottom plate (7) through a supporting mechanism.
4. The continuous forming die for chair leg pipe fittings according to claim 3, wherein the pipe fitting moving mechanism (5) comprises a moving seat (50) fixed on the upper surface of the bottom plate (7), and the moving direction of the moving seat (50) is the sequential arrangement direction of the stations, a rectangular through hole (60) is arranged in the central region of the fixed plate (6), a lifting driver (51) penetrating through the rectangular through hole (60) is arranged on the moving seat (50), and a moving frame (52) connected to the lifting driver (51), the moving frame (52) is located above the upper surface of the fixed plate (6), the moving frame (52) can be lifted to take the pipe fitting and release the pipe fitting, and the moving seat (50) moves to drive the moving frame (52) to move the pipe fitting from the previous station to the next station.
5. The continuous forming die for the chair leg pipe fittings according to claim 1, wherein the pipe fitting placing station (1) comprises a lower static die (10) and a movable lifting die (11) positioned above the lower static die (10), and the movable lifting die (11) descends to cooperate with the lower static die (10) so as to clamp the pipe fitting placed on the lower static die (10).
6. The continuous forming die for the chair leg pipe fittings according to the claim 1, wherein the pipe fitting forming station (2) comprises a lower forming male die (20) and a lifting forming female die (21) positioned above the lower forming male die (20), and the lifting forming female die (21) descends to be matched with the lower forming male die (20) so as to form one end of the pipe fitting into a circular arc shape; the pipe fitting forming machine also comprises an ellipse forming mechanism which is used for processing one end of the pipe fitting, which is far away from the formed arc section, into an ellipse; the elliptical forming mechanism comprises a lower elliptical die, an upper elliptical die and a mandrel, wherein the upper elliptical die is positioned above the lower elliptical die, one end of the mandrel extends into the lower elliptical die from the outer end of the lower elliptical die, the mandrel is connected with a mandrel driving cylinder or an oil cylinder, one end of a raw pipe fitting is placed into the lower elliptical die, and the upper elliptical die descends to be matched with the lower elliptical die.
7. The continuous forming die for chair leg pipe fittings according to claim 2, wherein the front length fixing station (30) comprises a lower supporting die (301) supported in the middle of the pipe fitting, an upper lifting die (302) positioned above the lower supporting die (301), the upper lifting die (302) descends to cooperate with the lower supporting die (301) to restrain and fix the pipe fitting, a first vertical block (303) positioned at one end of the pipe fitting far away from the formed end of the pipe fitting, a first horizontal extending stepped shaft (304) which is arranged on the first vertical block (303) in a penetrating way and can be opposite to the first vertical block (303), the first horizontal extending stepped shaft (304) is connected with a first driver (305) and the first driver (305) drives the first horizontal extending stepped shaft (304) to be inserted into the end of the pipe fitting far away from the formed end of the pipe fitting, an inner side fixed die (307) positioned at the inner side of the formed end of the pipe fitting, and an outer punching translation die (306) positioned at the outer side of the formed end of the pipe fitting, an arc concave surface matched with the outer side of the formed end of the pipe fitting is arranged on one side, close to the pipe fitting, of the outer punching translation die (306), the outer punching translation die (306) is connected with a first translation driver (308), the inner concave surface of the formed end of the pipe fitting is matched with the inner concave surface fixed die (307), and the first translation driver (308) drives the outer punching translation die (306) to move towards the formed end of the pipe fitting and cut off the excess length.
8. The continuous forming die for the chair leg pipe fittings according to claim 7, wherein the rear length fixing station (31) comprises a horizontal end positioning plate (310) positioned at one end of the pipe fitting processed by the front length fixing station (30), one end surface of the pipe fitting processed by the front length fixing station (30) is abutted against the upper surface of the horizontal end positioning plate (310), a concave-convex clasping device (311) clasping one end of the pipe fitting processed by the front length fixing station (30), a second fixed female die (312) positioned at the other end of the pipe fitting, a lifting compression die (313) positioned above the second fixed female die (312), a driving upper die (314) positioned above the lifting compression die (313) and vertically and slidably connected with the lifting compression die (313), and a vertical stamping knife (315) vertically and slidably connected with the lifting compression die (313) is arranged on the lifting compression die (313) in a penetrating manner, the cutting edge of the vertical stamping knife (315) faces downwards, the upper end of the vertical stamping knife (315) is connected with the driving upper die (314), the vertical stamping device further comprises an inner side concave surface reference die (316) located on the inner side of one end of the circular arc section of the pipe fitting, an outer convex surface clasping die (317) located on the outer side of the inner side concave surface reference die (316), and the outer convex surface clasping die (317) is connected with the second driver (318).
9. The continuous forming die for the chair leg pipe fittings according to claim 1, wherein the pipe fitting finishing station (4) comprises a second vertical block (40) and a finishing shaft (41) which is arranged on the second vertical block (40) in a penetrating way and can horizontally move relative to the second vertical block (40), one end of the finishing shaft (41) extends into the pipe fitting oval section through a second translation driver (42), the continuous forming die further comprises an inner concave finishing die (43) which is positioned at the inner side of one end of the pipe fitting circular arc section, and an outer convex finishing die (44) which is positioned at the outer side of the inner concave finishing die (43), and the outer convex finishing die (44) is connected with a third driver (45).
10. The chair leg pipe fitting continuous forming method is characterized in that the chair leg pipe fitting continuous forming method adopts the chair leg pipe fitting continuous forming die of any one of claims 1 to 9, and comprises the following steps:
s1, placing the unprocessed pipe fitting on a pipe fitting placing station;
s2, moving the unprocessed pipe on the pipe placing station and transferring the unprocessed pipe to a pipe forming station, wherein the pipe forming station forms and processes two ends of the unprocessed pipe, and one end of the pipe is formed into an arc shape, and the other end of the pipe is formed into an oval shape;
s3, transferring the pipe processed in the step S2 to a pipe fixed-length station, cutting off the redundant length of the end part of the arc section of the pipe, and cutting off the redundant length of the oval section of the pipe;
and S4, transferring the pipe fitting obtained in the step S3 to a pipe fitting finishing station, and synchronously finishing the arc section and the oval section of the pipe fitting by the pipe fitting finishing station, namely finishing the forming processing of the pipe fitting.
CN202010617808.XA 2020-06-30 2020-06-30 Continuous processing die and forming method of chair leg pipe Active CN111842613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010617808.XA CN111842613B (en) 2020-06-30 2020-06-30 Continuous processing die and forming method of chair leg pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010617808.XA CN111842613B (en) 2020-06-30 2020-06-30 Continuous processing die and forming method of chair leg pipe

Publications (2)

Publication Number Publication Date
CN111842613A true CN111842613A (en) 2020-10-30
CN111842613B CN111842613B (en) 2022-02-15

Family

ID=72989275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010617808.XA Active CN111842613B (en) 2020-06-30 2020-06-30 Continuous processing die and forming method of chair leg pipe

Country Status (1)

Country Link
CN (1) CN111842613B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09239733A (en) * 1996-03-08 1997-09-16 Yazaki Corp Composite integrated mold for continuous molding, and continuous manufacturing equipment for molded products
CN204620838U (en) * 2015-03-24 2015-09-09 浙江龙生汽车部件股份有限公司 The progressive die of installation foot before making automotive seat
CN204620835U (en) * 2015-03-24 2015-09-09 浙江龙生汽车部件股份有限公司 Make the progressive die of slide rail on automotive seat
CN204620830U (en) * 2015-03-24 2015-09-09 浙江龙生汽车部件股份有限公司 The progressive die of installation foot after making automotive seat
CN206474903U (en) * 2017-02-16 2017-09-08 东莞市先行者智能设备科技有限公司 A kind of seat pin central tube full automatic processing device
CN208450367U (en) * 2018-05-30 2019-02-01 苏州吉昕泰金属制品有限公司 The automobile tube beam supporting element continuous stamping die for having material strip accurate limiting mechanism
CN209255624U (en) * 2018-12-01 2019-08-16 无锡烁然机械科技有限公司 The progressive die for installation foot behind shaping armchair outside
CN210450556U (en) * 2019-06-28 2020-05-05 常州东仕豪机械制造有限公司 Continuous mould of stay tube

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09239733A (en) * 1996-03-08 1997-09-16 Yazaki Corp Composite integrated mold for continuous molding, and continuous manufacturing equipment for molded products
CN204620838U (en) * 2015-03-24 2015-09-09 浙江龙生汽车部件股份有限公司 The progressive die of installation foot before making automotive seat
CN204620835U (en) * 2015-03-24 2015-09-09 浙江龙生汽车部件股份有限公司 Make the progressive die of slide rail on automotive seat
CN204620830U (en) * 2015-03-24 2015-09-09 浙江龙生汽车部件股份有限公司 The progressive die of installation foot after making automotive seat
CN206474903U (en) * 2017-02-16 2017-09-08 东莞市先行者智能设备科技有限公司 A kind of seat pin central tube full automatic processing device
CN208450367U (en) * 2018-05-30 2019-02-01 苏州吉昕泰金属制品有限公司 The automobile tube beam supporting element continuous stamping die for having material strip accurate limiting mechanism
CN209255624U (en) * 2018-12-01 2019-08-16 无锡烁然机械科技有限公司 The progressive die for installation foot behind shaping armchair outside
CN210450556U (en) * 2019-06-28 2020-05-05 常州东仕豪机械制造有限公司 Continuous mould of stay tube

Also Published As

Publication number Publication date
CN111842613B (en) 2022-02-15

Similar Documents

Publication Publication Date Title
CN114951364B (en) Rectangular pipe integrated forming die, hydraulic forming machine and forming method thereof
CN206343527U (en) Sheet metal work fast ram mould
CN220862532U (en) Alleviate thin wall work piece hot stamping die of deformation fold
CN105290219A (en) Stretch-forming and punching composite die
CN110102639B (en) Punch forming composite die for automobile seat framework and machining process of punch forming composite die
CN211464429U (en) Rectangular pipe manufacturing die
CN205798168U (en) For processing the bending die of Z-shaped support
CN111842613A (en) Continuous processing die and forming method of chair leg pipe
CN213104143U (en) Continuous flaring device for water pipe
CN220497434U (en) Special-shaped steel template manufacturing device
CN210497897U (en) Tubular section bar piercing press
CN200991730Y (en) Two edge folding mould of bending machine
CN212703998U (en) Chair Leg Pipe Parts Continuous Machining Die
CN215657414U (en) Flanging die for hook-shaped nut plate bracket
CN214349063U (en) A double-material heat shield drawing die for automobile exhaust system
CN221158174U (en) Special-shaped pipe body forming die
CN109604460B (en) A kind of plate riveting equipment and its process
CN215918825U (en) Deep drawing die for special-shaped end cover piece of automobile mixing cavity
CN215657273U (en) Large-caliber ultrathin-wall elbow processing equipment
CN224042230U (en) Automatic thermoforming of piston
CN223875918U (en) Transformer clamp manufacturing plate and profile bending device
CN223718137U (en) A type of airfoil skin drawing die
CN223185209U (en) Special-shaped steel pipe drawing device
CN213052365U (en) Multi-station automatic stamping forming die for metal pipes
CN224181874U (en) Stamping bed device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant