CN111792508A - A kind of blast furnace cooling wall split arc hoisting batch positioning device and construction method - Google Patents
A kind of blast furnace cooling wall split arc hoisting batch positioning device and construction method Download PDFInfo
- Publication number
- CN111792508A CN111792508A CN202010598624.3A CN202010598624A CN111792508A CN 111792508 A CN111792508 A CN 111792508A CN 202010598624 A CN202010598624 A CN 202010598624A CN 111792508 A CN111792508 A CN 111792508A
- Authority
- CN
- China
- Prior art keywords
- blast furnace
- hoisting
- main hanger
- main
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
Description
技术领域technical field
本发明属于高炉冷却壁安装设备技术领域,具体涉及一种高炉冷却壁分弧吊装批量就位装置及施工方法。The invention belongs to the technical field of blast furnace cooling stave installation equipment, and in particular relates to a batch positioning device and a construction method for blast furnace cooling stave split arc hoisting.
背景技术Background technique
高炉冷却壁,作为高炉炼铁系统中的冷却设备,起着极其重要的作用。高炉冷却壁的安装速度和精度,直接影响着后续工艺的生产乃至产品质量。Blast furnace stave, as the cooling equipment in blast furnace ironmaking system, plays an extremely important role. The installation speed and accuracy of blast furnace cooling stave directly affect the production and product quality of the subsequent process.
经过检索发现,在授权公告号为CN204324689U的中国专利中公开了高炉冷却壁更换专用吊装工具,通过在横梁两端配套安装两套手拉猫头小车,并和手拉猫头小车配套安装手拉葫芦,在拆装冷却壁时,手拉葫芦实现轴向定位,手拉猫头小车实现径向定位,卷扬机一次吊装到位后,使用手拉葫芦和手拉猫头小车进行微调,提高效率,而且一次吊装两块冷却壁,同时进行两块冷却壁的拆装,缩短高炉检修用时,省时省力的技术效果。After searching, it was found that the special lifting tool for blast furnace cooling stave replacement was disclosed in the Chinese patent with the authorization announcement number CN204324689U. Two sets of hand-pulled cat head trolleys were installed at both ends of the beam, and the hand-pulled cat head trolley was matched with the hand-pulled cat head trolley. When disassembling and assembling the cooling wall, the chain hoist realizes the axial positioning, and the hand pull cat head trolley realizes the radial positioning. After the hoist is hoisted in place at one time, use the chain block hoist and the hand pull cat head trolley to make fine adjustments to improve the efficiency. Two cooling staves are hoisted at one time, and the two cooling staves are disassembled and assembled at the same time, which shortens the time for blast furnace maintenance and saves time and effort.
但是上述技术方案由于采用横梁以及两端设有的手拉猫头小车实现同时安装两个冷却壁,横梁长度一般近似炉内直径长度才能将冷却壁安装在对应位置,安装或更换过程中需要同时操作两端地手拉猫头小车,操作难度较大,并且在吊装过程中由于吊具特定的结构易发生触壁问题,存在较大地安全隐患。However, in the above technical solution, two cooling staves can be installed at the same time due to the use of beams and hand-pulled cat head trolleys at both ends. It is difficult to operate the hand-pulled cat head trolley at both ends, and during the hoisting process, due to the specific structure of the spreader, the problem of touching the wall is prone to occur, and there is a great potential safety hazard.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种高炉冷却壁分弧吊装批量就位装置及施工方法,旨在有效解决背景技术中的技术问题。The purpose of the present invention is to provide a batch in-position device and a construction method for split arc hoisting of a blast furnace cooling stave, so as to effectively solve the technical problems in the background art.
为实现上述目的,本发明提供如下技术方案:一种高炉冷却壁分弧吊装批量就位装置,包括起吊设备,还包括:连接在起吊设备和冷却壁之间的主吊架,所述主吊架的横截面为1/4圆周长的弧形结构且与高炉内壁适配。将主吊架的结构改进为与高炉内壁适配的弧形结构,且利用1/4圆周长结构可以无障碍地通过炉口,同时还能保证在有效地保证吊装过程中地安全性,利用弧形结构还可以有效地将冷却壁和炉壁更加近距离安装,进而有效减少冷却壁与炉壁位置重合后的操作步骤,节约施工成本。In order to achieve the above purpose, the present invention provides the following technical solutions: a blast furnace cooling stave split arc hoisting batch positioning device, including hoisting equipment, and also comprising: a main hanger connected between the hoisting equipment and the cooling stave, the main hoisting device The cross section of the rack is an arc structure of 1/4 circumference and is adapted to the inner wall of the blast furnace. The structure of the main hanger is improved to an arc-shaped structure suitable for the inner wall of the blast furnace, and the 1/4 circumference structure can pass through the furnace mouth without obstacles, and at the same time, it can also ensure the safety during the hoisting process. The arc structure can also effectively install the cooling stave and the furnace wall at a closer distance, thereby effectively reducing the operation steps after the positions of the cooling stave and the furnace wall are overlapped, and saving construction costs.
作为本发明一种优选的,所述主吊架包括两个主架梁,两个所述主架梁的纵截面为C型结构,两个所述主架梁背对设置,两个所述主架梁之间固定连接有承力板,所述承力板的底部部分延伸至主吊架的下方,位于主架梁下方的所述承力板上开设有吊孔。为了使得主吊架能够完全承载单块或多块冷却壁,故将两个主架梁的截面设计为C型结构,提高主吊架的抗扭性能和抗拉性能,同时承力板与主架梁之间接触面较大可以有效保证抗拉强度。As a preferred embodiment of the present invention, the main hanger includes two main frame beams, the longitudinal sections of the two main frame beams are C-shaped structures, the two main frame beams are arranged back to face, and the two main frame beams A bearing plate is fixedly connected between the main frame beams, the bottom part of the bearing plate extends to the lower part of the main hanger, and the bearing plate located under the main frame beam is provided with a hoisting hole. In order to enable the main hanger to fully carry a single or multiple cooling walls, the cross-sections of the two main frame beams are designed as C-shaped structures to improve the torsion resistance and tensile performance of the main hanger. The larger contact surface between the frame beams can effectively ensure the tensile strength.
作为本发明一种优选的,还包括支承架,所述支承架固定连接在主吊架的底部,所述支承架设置有两组且分别位于主吊架沿长度方向的1/4长度处、 3/4长度处。为了更好地保证主吊架的抗拉能力和抗扭能力,故设计该支承架,同时在吊具不使用时,利用支承架还能稳定地安放避免出现磕碰损坏。As a preferred option of the present invention, it also includes a support frame, the support frame is fixedly connected to the bottom of the main hanger, the support frame is provided with two groups and is located at 1/4 of the length of the main hanger along the length direction, 3/4 of the length. In order to better ensure the tensile strength and torsion resistance of the main hanger, the support frame is designed, and at the same time, when the spreader is not in use, the support frame can be stably placed to avoid bump damage.
作为本发明一种优选的,所述主吊架的顶部设有平衡结构,所述平衡结构用于维持在非承载工况下的主吊架呈水平状态。通过平衡结构可以有效保证在主吊架在非承载工况下的水平状态,防止出现受力不均衡导致的侧偏影响吊装质量。As a preferred embodiment of the present invention, a balance structure is provided on the top of the main hanger, and the balance structure is used to maintain the main hanger in a horizontal state under a non-load-bearing condition. The balance structure can effectively ensure the horizontal state of the main hanger under non-load-bearing conditions, and prevent the side deflection caused by the unbalanced force from affecting the hoisting quality.
作为本发明一种优选的,所述平衡结构包括两个吊耳,两个所述吊耳连线的中心与主吊架的重心位于同一水平面内,为了实现主吊架在承载和非承载工况下的平衡状态,承载工况下能故作此设计。As a preferred embodiment of the present invention, the balance structure includes two lifting lugs, and the center of the line connecting the two lifting lugs is located in the same horizontal plane as the center of gravity of the main hanger. This design can be assumed under the load-bearing condition.
作为本发明一种优选的,所述平衡结构包括三个吊耳,三个所述吊耳呈等腰三角形分布,一个所述吊耳位于主吊架的中部、其余两个所述吊耳分别位于主吊架的两端。为了实现主吊架在承载和非承载工况下的平衡状态,故作此设计。As a preferred option of the present invention, the balance structure includes three lifting ears, the three lifting ears are distributed in an isosceles triangle, one of the lifting ears is located in the middle of the main hanger, and the other two lifting ears are respectively located at both ends of the main hanger. In order to realize the balance state of the main hanger under the load-bearing and non-load-bearing conditions, this design is made.
还公开了一种高炉冷却壁分弧吊装批量就位装置的施工方法,包括以下步骤:Also disclosed is a construction method for split-arc hoisting batch-in-place devices for blast furnace cooling stave, comprising the following steps:
A.首先将起吊设备与对应的吊耳连接,随后将待吊装的冷却壁与承力板上的吊孔连接;A. First connect the hoisting equipment with the corresponding lifting lugs, and then connect the cooling wall to be hoisted with the lifting holes on the bearing plate;
B.启动起吊设备将冷却壁和主吊架整体吊装至高炉内部,并移动起吊设备的吊点位置将主吊架和冷却壁一同缓慢地移动至高炉内壁处,通过冷却壁上的连接件与高炉内壁对应的位置处固定连接,后使冷却壁与承力板的吊孔分离;B. Start the hoisting equipment to hoist the cooling stave and the main hanger into the blast furnace as a whole, and move the lifting point of the hoisting equipment to slowly move the main hanger and the cooling stave to the inner wall of the blast furnace together. The position corresponding to the inner wall of the blast furnace is fixedly connected, and then the cooling wall and the lifting hole of the bearing plate are separated;
C.重复步骤A和B,直至所有的冷却壁吊装完成后,通过起吊设备将主吊架移动至地面上,主吊架通过支承架平整安放在地面上。C. Repeat steps A and B until all the cooling walls are hoisted, move the main hanger to the ground through the lifting equipment, and place the main hanger on the ground through the support frame.
与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:
1.本发明中利用主吊架地1/4圆周长的弧形结构设计并与高炉内壁适配,可以更加近距离地在炉内壁上定位安装冷却壁的工作,降低触碰风险提高安全性。1. In the present invention, the arc structure of 1/4 of the circumference of the main hanger is designed and adapted to the inner wall of the blast furnace, so that the work of positioning and installing the cooling stave on the inner wall of the furnace can be located more closely, reducing the risk of touching and improving the safety. .
2.本发明中主吊架包括两个背对设置的主架梁和位于主架梁之间的承力板,利用主架梁的C型结构可以有效地提高抗拉能力和抗扭能力,同时还可以保证承力板地承载力。2. In the present invention, the main hanger includes two main frame beams arranged opposite to each other and a bearing plate located between the main frame beams, and the C-shaped structure of the main frame beam can effectively improve the tensile capacity and torsion resistance, At the same time, it can also ensure the bearing capacity of the bearing board.
3.本发明中在主吊架的顶部设有平衡结构,利用平衡结构可以有效地保证主吊架在非承载工况下的水平状态,防止自身出现侧偏进而带动吊装冷却壁出现侧偏的问题。3. In the present invention, a balance structure is provided on the top of the main hanger, and the use of the balance structure can effectively ensure the horizontal state of the main hanger under non-load-bearing conditions, preventing itself from side deflection and driving the hoisting cooling stave to appear side deflection. question.
4.本发明中在主吊架底部固定支承架,利用支承架特定的设计位置,可以进一步有效地提高主吊架的抗拉能力和抗扭能力,在非使用工况下安全放置。4. In the present invention, the support frame is fixed at the bottom of the main hanger, and the specific design position of the support frame can further effectively improve the tensile and torsional resistance of the main hanger, and can be placed safely under non-use conditions.
附图说明Description of drawings
附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention. In the attached image:
图1为本发明的整体结构仰视图;Fig. 1 is the bottom view of the overall structure of the present invention;
图2为本发明中实施例3的整体结构仰视图;2 is a bottom view of the overall structure of
图3为图2中A-A处的剖面图;Fig. 3 is the sectional view at A-A place in Fig. 2;
图4为本发明中实施例4的整体结构仰视图;4 is a bottom view of the overall structure of Embodiment 4 of the present invention;
图5为图4中B-B处的剖面图。FIG. 5 is a cross-sectional view at B-B in FIG. 4 .
图中:1、主吊架;11、主架梁;12、承力板;2、支承架;3、吊耳。In the figure: 1. Main hanger; 11. Main frame beam; 12. Bearing plate; 2. Support frame; 3. Lifting lug.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
实施例1Example 1
请参阅图1至图3所示,本发明提供以下技术方案:一种高炉冷却壁分弧吊装批量就位装置,包括起吊设备,还包括:连接在起吊设备和冷却壁之间的主吊架1,主吊架1的横截面为1/4圆周长的弧形结构且与高炉内壁适配。通过起吊设备带动主吊架1和主吊架1连接的冷却壁整体移动,并将冷却壁可以近距离地定位吊装至高炉内壁上,大大简化操作步骤,同时还能降低触碰风险、降低操作难度并提高吊装安全性。Please refer to FIGS. 1 to 3 , the present invention provides the following technical solutions: a blast furnace cooling stave sub-arc hoisting batch positioning device, including a hoisting device, and also comprising: a main hanger connected between the hoisting device and the
具体的,主吊架1包括两个主架梁11,弧两个主架梁11均由长约9m的槽钢20a弯制成,两个主架梁11的纵截面为C型结构,两个主架梁11背对设置,两个主架梁11之间固定连接有承力板12,承力板12由长*宽*厚 300mm*80mm*10mm的钢板制成。承力板12的底部部分延伸至主吊架1的下方,位于主架梁11下方的承力板12上开设有直径为20cm的吊孔与对应的冷却壁连接。利用两个主架梁11背对设置以及截面为C型结构设计,可以大大提高主吊架1整体结构的抗拉能力和抗压能力,同时还能有效地保证承力板12地承载能力。Specifically, the
实施例2:Example 2:
如图1所示,在实施例1的基础上进一步优选地方案,还包括支承架2,支承架2固定连接在两个主架梁11的底部,支承架2设置有两组且分别位于主架梁11沿长度方向的1/4长度处、3/4长度处。利用支承架2可以将两个主架梁11 的底部进行加固,进一步更好地保证主吊架1的抗拉能力和抗扭能力,同时在吊具不使用时,利用支承架2还能稳定地安放避免出现磕碰损坏。As shown in FIG. 1 , on the basis of
实施例3:Example 3:
如图2至图3所示,在实施例2地基础上进一步优选地方案,主吊架1 的顶部设有平衡结构,平衡结构用于维持在非承载工况下的主吊架1呈水平状态。通过平衡结构可以有效保证在主吊架1在非承载工况下的水平状态,只有保证了自身地水平才能去保证冷却壁的侧壁为竖直状态、顶面为水平状态,进而才能有效地保证冷却壁地精准安装,保证吊装质量。As shown in FIG. 2 to FIG. 3 , on the basis of
具体的,平衡结构包括两个吊耳3,两个吊耳3连线的中心与主吊架1的重心处于同一竖直平面内,利用主吊架1上的承力板12和吊孔吊装一次性安装层1/4的冷却壁,或者吊装的冷却壁重心与两个吊耳3连线中心位于同一水平面内的时候也能实现稳定吊装。Specifically, the balance structure includes two lifting
实施例4:Example 4:
如图4和图5所示,与实施例3不同的是,平衡结构包括三个吊耳3,三个吊耳3呈等腰三角形分布,一个吊耳3位于主吊架1的中部、其余两个吊耳3分别位于主吊架1的两端,可以使得主吊架1始终处于水平状态下,既可以实用实施例2的工况下还可以适用于冷却壁中心和吊装中心非重合工况下,进行冷却壁的安装工作,适用的范围会更广,操作难度会进一步降低。As shown in FIG. 4 and FIG. 5 , the difference from
本发明的工作原理及使用流程:首先将起吊设备与对应的吊耳3连接,通过承力板12底部的吊孔与对应的冷却壁连接,启动起吊设备将冷却壁和主吊架1整体吊装至高炉内部,通过调节起吊设备的吊点位置将主吊架1和冷却壁近距离靠近锅炉内壁,随后将冷却壁安装在高炉内壁上地设计位置处,整个过程操作简单、结构简单,利于推广。当不需要时,直需要正放主吊架1 即可,底部的支承架2使得主吊架1平稳地放置在地面上。The working principle and use process of the present invention: first, connect the hoisting equipment to the corresponding lifting lugs 3, connect the corresponding cooling wall through the lifting holes at the bottom of the bearing
实施例5:Example 5:
一种高炉冷却壁分弧吊装批量就位装置的施工方法,包括以下步骤:A construction method for a blast furnace cooling wall split arc hoisting batch in-position device, comprising the following steps:
A.首先将起吊设备与对应的吊耳3连接,随后将待吊装的冷却壁与承力板12上的吊孔连接;A. First, connect the hoisting equipment with the corresponding lifting lugs 3, and then connect the cooling wall to be hoisted with the lifting holes on the bearing
B.启动起吊设备将冷却壁和主吊架1整体吊装至高炉内部,并移动起吊设备的吊点位置将主吊架1和冷却壁一同缓慢地移动至高炉内壁处,通过冷却壁上的连接件与高炉内壁对应的位置处固定连接,后使冷却壁与承力板12 的吊孔分离;B. Start the hoisting equipment to hoist the cooling stave and the
C.重复步骤A和B,直至所有的冷却壁吊装完成后,通过起吊设备将主吊架1移动至地面上,主吊架1通过支承架2平整安放在地面上。C. Repeat steps A and B until all cooling staves are hoisted, move the
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it is still The technical solutions described in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010598624.3A CN111792508A (en) | 2020-06-28 | 2020-06-28 | A kind of blast furnace cooling wall split arc hoisting batch positioning device and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010598624.3A CN111792508A (en) | 2020-06-28 | 2020-06-28 | A kind of blast furnace cooling wall split arc hoisting batch positioning device and construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111792508A true CN111792508A (en) | 2020-10-20 |
Family
ID=72804725
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010598624.3A Pending CN111792508A (en) | 2020-06-28 | 2020-06-28 | A kind of blast furnace cooling wall split arc hoisting batch positioning device and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111792508A (en) |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09255276A (en) * | 1996-03-19 | 1997-09-30 | Ishikawajima Constr Materials Co Ltd | Segment lifting equipment |
| JP2004250132A (en) * | 2003-02-18 | 2004-09-09 | Mitsubishi Fuso Truck & Bus Corp | Work suspension tool |
| CN102275809A (en) * | 2011-07-07 | 2011-12-14 | 中国十七冶集团有限公司 | Special-purposed bidirectional regulation combined lifting appliance for lifting tower drum of wind driven generator |
| CN103964299A (en) * | 2014-04-29 | 2014-08-06 | 中国葛洲坝集团三峡建设工程有限公司 | Hoisting buckling device for filling pile concrete feeding pipe, and construction method |
| CN106542417A (en) * | 2016-11-25 | 2017-03-29 | 国网福建省电力有限公司 | Power Station Turbine main shaft overhauls special lifting tool and using method |
| CN207566714U (en) * | 2017-10-26 | 2018-07-03 | 上海市安装工程集团有限公司 | Large scale arc panel special hoisting bar |
| CN208293566U (en) * | 2018-05-22 | 2018-12-28 | 宁夏路桥工程股份有限公司 | A kind of steel reinforcement cage positioning hangar system |
| CN109607367A (en) * | 2018-12-29 | 2019-04-12 | 南通中远船务工程有限公司 | A kind of console mode multipurpose variable cross-section hanging beam |
| WO2020017152A1 (en) * | 2018-07-19 | 2020-01-23 | 日鉄エンジニアリング株式会社 | Stave and stave installation method |
| CN210064905U (en) * | 2019-03-18 | 2020-02-14 | 广州城建职业学院 | A multi-purpose hanging beam for prefabricated building components |
| CN210763947U (en) * | 2019-10-25 | 2020-06-16 | 郑州市汇通水泥预制品有限公司 | Three-ring shoulder pole type lifting appliance |
| CN212292478U (en) * | 2020-06-28 | 2021-01-05 | 中国十七冶集团有限公司 | Arc-dividing hoisting batch in-place device for cooling wall of blast furnace |
-
2020
- 2020-06-28 CN CN202010598624.3A patent/CN111792508A/en active Pending
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09255276A (en) * | 1996-03-19 | 1997-09-30 | Ishikawajima Constr Materials Co Ltd | Segment lifting equipment |
| JP2004250132A (en) * | 2003-02-18 | 2004-09-09 | Mitsubishi Fuso Truck & Bus Corp | Work suspension tool |
| CN102275809A (en) * | 2011-07-07 | 2011-12-14 | 中国十七冶集团有限公司 | Special-purposed bidirectional regulation combined lifting appliance for lifting tower drum of wind driven generator |
| CN103964299A (en) * | 2014-04-29 | 2014-08-06 | 中国葛洲坝集团三峡建设工程有限公司 | Hoisting buckling device for filling pile concrete feeding pipe, and construction method |
| CN106542417A (en) * | 2016-11-25 | 2017-03-29 | 国网福建省电力有限公司 | Power Station Turbine main shaft overhauls special lifting tool and using method |
| CN207566714U (en) * | 2017-10-26 | 2018-07-03 | 上海市安装工程集团有限公司 | Large scale arc panel special hoisting bar |
| CN208293566U (en) * | 2018-05-22 | 2018-12-28 | 宁夏路桥工程股份有限公司 | A kind of steel reinforcement cage positioning hangar system |
| WO2020017152A1 (en) * | 2018-07-19 | 2020-01-23 | 日鉄エンジニアリング株式会社 | Stave and stave installation method |
| CN109607367A (en) * | 2018-12-29 | 2019-04-12 | 南通中远船务工程有限公司 | A kind of console mode multipurpose variable cross-section hanging beam |
| CN210064905U (en) * | 2019-03-18 | 2020-02-14 | 广州城建职业学院 | A multi-purpose hanging beam for prefabricated building components |
| CN210763947U (en) * | 2019-10-25 | 2020-06-16 | 郑州市汇通水泥预制品有限公司 | Three-ring shoulder pole type lifting appliance |
| CN212292478U (en) * | 2020-06-28 | 2021-01-05 | 中国十七冶集团有限公司 | Arc-dividing hoisting batch in-place device for cooling wall of blast furnace |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4415397B2 (en) | Stacker crane | |
| WO2012000218A1 (en) | Ladle lifting device lifted by hydraulic cylinders | |
| WO2024050986A1 (en) | Pre-assembly tool | |
| CN212292478U (en) | Arc-dividing hoisting batch in-place device for cooling wall of blast furnace | |
| CN120715584B (en) | Assembly tooling and assembly method for vacuum chamber cold shields in nuclear fusion devices | |
| CN212599995U (en) | Welding installation equipment for hot-melt welded pipe | |
| CN218988577U (en) | A spreader for wheel hub production | |
| CN219567326U (en) | Auxiliary fixture is dismantled to bank bridge crane cart running gear | |
| CN219768146U (en) | Equipment pin shaft penetrating and detaching device | |
| CN114572804B (en) | A sling system and method of using the same | |
| CN106121252A (en) | A kind of hydraulic stepping turns material device and method from climbing | |
| CN114368664B (en) | An inclined construction elevator cage | |
| CN106284960A (en) | Simple attachment type raise scaffold | |
| CN113387279B (en) | Assembly method of ring rail crane and ring rail crane | |
| CN209758862U (en) | Self-balancing device and single-beam or double-beam bridge crane using same | |
| CN205998874U (en) | A kind of Slag treatment baffle-box quick-replaceable special purpose device | |
| CN116352414A (en) | Device for wearing and dismantling equipment pins and its operating method | |
| CN109160435B (en) | A detachable installation device suitable for subway DC equipment | |
| CN116161526A (en) | Lifting device for side wall of freight logistics vehicle and operation method thereof | |
| CN217361141U (en) | Hoisting structure and reactor pressure vessel side support hoisting system | |
| CN223034498U (en) | A hanging basket device suitable for complex exterior wall construction | |
| CN209538048U (en) | Mobile security operation platform applied to separate type bridge | |
| CN224242567U (en) | Hanging bracket | |
| CN217756690U (en) | Movable mounting bracket | |
| CN112139695A (en) | Method for replacing middle section of blast furnace shell |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201020 |