CN111778842A - A connection structure of steel plate beams - Google Patents

A connection structure of steel plate beams Download PDF

Info

Publication number
CN111778842A
CN111778842A CN202010809856.9A CN202010809856A CN111778842A CN 111778842 A CN111778842 A CN 111778842A CN 202010809856 A CN202010809856 A CN 202010809856A CN 111778842 A CN111778842 A CN 111778842A
Authority
CN
China
Prior art keywords
plate
steel plate
steel
pier
plate beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010809856.9A
Other languages
Chinese (zh)
Other versions
CN111778842B (en
Inventor
苏庆田
苏航
张龙伟
倪迪
周可哥
邹迪升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN202010809856.9A priority Critical patent/CN111778842B/en
Publication of CN111778842A publication Critical patent/CN111778842A/en
Application granted granted Critical
Publication of CN111778842B publication Critical patent/CN111778842B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a connecting structure of steel plate beams, which comprises two mutually inosculated connecting parts, wherein the two connecting parts are positioned on two different steel plate beams, each connecting part comprises a step arranged at the end part of each steel plate beam and connecting plates fixedly arranged at two sides of the step, the connecting plates in the two connecting parts are in one-to-one correspondence, and the two corresponding connecting plates are fixedly connected through bolts. The connecting structure of the steel plate beam has the advantages of simple structure and convenient connection, can greatly simplify the construction process of the steel plate beam, and reduces the construction cost.

Description

一种钢板梁的连接结构A connection structure of steel plate beams

技术领域technical field

本发明涉及桥梁技术领域,特别是涉及一种钢板梁的连接结构。The invention relates to the technical field of bridges, in particular to a connection structure of a steel plate beam.

背景技术Background technique

钢板组合桥梁中的钢板梁是由上翼缘钢板、钢腹板和下翼缘钢板焊接而成的钢结构构件。对于多跨连续钢板组合梁桥其施工方法一般是先架设钢梁,然后施工混凝土桥面板。其中钢梁的施工方法有多种,如支架法施工、顶推法施工等。采用支架法施工钢板梁是最为常见的施工方法,其具体施工方法为:钢板梁通常在工厂加工为多个节段,运输到工地现场进行拼接形成大节段的梁体,再采用汽车吊把大节段梁体吊装到桥墩上,最后把节段之间在桥位处进行连接,从而形成连续的钢板梁。Steel plate beams in steel plate composite bridges are steel structural members welded by upper flange steel plates, steel webs and lower flange steel plates. For multi-span continuous steel plate composite girder bridges, the construction method is generally to erect steel beams first, and then construct concrete bridge decks. Among them, there are many construction methods for steel beams, such as support method construction, jacking method construction and so on. Using the bracket method to construct the steel plate beam is the most common construction method. The specific construction method is as follows: the steel plate beam is usually processed into multiple sections in the factory, transported to the construction site for splicing to form a large-section beam body, and then a car hanging handle is used. The large segment beam is hoisted to the bridge pier, and finally the segments are connected at the bridge position to form a continuous steel plate beam.

传统的钢板梁施工方法有两种。一种是搭设临时墩法:以4跨连续梁为例进行说明,首先吊装第一跨的梁体节段,支承在1号墩、2号墩和第二跨的临时墩上;然后吊装第二跨的梁体节段,支承在第二跨的临时墩和3号墩上,在第二跨临时墩上拼接第一跨梁段和第二跨梁段;然后吊装第三跨的梁体节段,支承在第三跨的临时墩和4号墩上,在第三跨临时墩上拼接第二跨梁段和第三跨梁段;最后吊装第四跨的梁体节段,支承在第四跨的临时墩和4号墩上,在第四跨临时墩上拼接第三跨梁段和第四跨梁段。这种施工方法需要在每一个梁段的端部需要设置临时墩,等钢梁形成整体之后再拆除临时墩。临时墩的设置和拆除需要投入一定量的材料和人力成本。There are two traditional steel plate beam construction methods. One is the method of erecting temporary piers: take a 4-span continuous beam as an example to illustrate, first hoist the beam segment of the first span, and support it on the No. 1 pier, No. 2 pier and the temporary pier of the second span; then hoist the second span The beam body segment of the second span is supported on the temporary pier and No. 3 pier of the second span, and the first span beam segment and the second span beam segment are spliced on the temporary pier of the second span; then the beam body segment of the third span is hoisted and supported on the third span On the three-span temporary pier and No. 4 pier, splicing the second-span beam segment and the third-span beam segment on the third-span temporary pier; finally hoist the fourth-span beam segment, which is supported on the fourth-span temporary pier and the 4th-span beam segment. On the No. pier, splicing the third-span beam section and the fourth-span beam section on the fourth-span temporary pier. This construction method requires temporary piers to be installed at the ends of each beam section, and the temporary piers are removed after the steel beams are formed as a whole. The installation and removal of temporary piers require a certain amount of material and labor costs.

另一种是在中间墩设置双支座:以两跨连续梁为例进行说明,首先在桥位处把2个大节段钢梁制作完成,每一跨的梁体节段长度等于桥梁的跨度。施工时把每一个梁体节段吊装放置到相邻的两个桥墩上,然后再把相邻的梁体进行连接,形成连续连结构。这种施工方法需要在中间桥墩的上部纵桥向设置两排支座,为了放置纵桥向的两排支座,需要中间桥墩的顶部沿纵桥向尺寸比只设置一排支座的尺寸大,细节构造复杂。这种施工方法使得支座用量和桥墩材料比其他方法的多,成本高。The other is to set double supports in the middle pier: take the two-span continuous beam as an example to illustrate, first, two large-segment steel beams are fabricated at the bridge position, and the length of the beam body segment of each span is equal to the span of the bridge. During construction, each beam body segment is hoisted and placed on two adjacent piers, and then the adjacent beam bodies are connected to form a continuous connection structure. This construction method requires two rows of supports to be arranged on the upper part of the middle pier in the longitudinal bridge direction. In order to place the two rows of supports in the longitudinal bridge direction, the size of the top of the middle pier along the longitudinal bridge direction is required to be larger than that of only one row of supports. , the details are complex. This construction method requires more bearing and pier material than other methods, and the cost is high.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种钢板梁的连接结构,以解决上述现有技术存在的问题,简化钢板梁的施工工序,并降低施工成本。The purpose of the present invention is to provide a connection structure of a steel plate beam, so as to solve the above problems existing in the prior art, simplify the construction process of the steel plate beam, and reduce the construction cost.

为实现上述目的,本发明提供了如下方案:For achieving the above object, the present invention provides the following scheme:

本发明提供了一种钢板梁的连接结构,包括两个相互吻合的连接部,两个所述连接部位于不同的两个钢板梁上,所述连接部包括设置在所述钢板梁的端部的台阶和固设在所述台阶两侧的连接板,两个所述连接部中的所述连接板一一对应,对应的两个所述连接板通过螺栓固连。The present invention provides a connection structure of a steel plate beam, comprising two connecting parts that are matched with each other, the two connecting parts are located on two different steel plate beams, and the connecting parts include end parts arranged on the steel plate beams The step and the connecting plates fixed on both sides of the step, the connecting plates in the two connecting parts are in one-to-one correspondence, and the corresponding two connecting plates are fixedly connected by bolts.

优选的,所述连接板包括依次连接的上竖板、水平板和下竖板。Preferably, the connecting plate comprises an upper vertical plate, a horizontal plate and a lower vertical plate connected in sequence.

优选的,所述上竖板与所述水平板之间、所述水平板与所述下竖板之间分别设置有圆弧过渡板。Preferably, arc transition plates are respectively provided between the upper vertical plate and the horizontal plate, and between the horizontal plate and the lower vertical plate.

优选的,所述上竖板、所述水平板、所述下竖板和所述圆弧过渡板均为包边钢板。Preferably, the upper vertical plate, the horizontal plate, the lower vertical plate and the arc transition plate are all edging steel plates.

优选的,所述上竖板、所述水平板和所述下竖板分别与所述钢板梁焊接。Preferably, the upper vertical plate, the horizontal plate and the lower vertical plate are respectively welded with the steel plate beam.

优选的,所述上竖板、所述水平板和所述下竖板上分别设置有螺栓孔。Preferably, bolt holes are respectively provided on the upper vertical plate, the horizontal plate and the lower vertical plate.

优选的,在所述钢板梁的腹板上设置有分别与所述连接板连接的竖向加劲板和纵向加劲板。Preferably, a vertical stiffening plate and a longitudinal stiffening plate respectively connected to the connecting plate are provided on the web plate of the steel plate beam.

优选的,所述连接板与所述台阶的表面平齐。Preferably, the connecting plate is flush with the surface of the step.

本发明相对于现有技术取得了以下技术效果:The present invention has achieved the following technical effects with respect to the prior art:

本发明的钢板梁的连接结构的结构简单,连接方便,能够极大地简化钢板梁的施工工序,并降低施工成本。The connection structure of the steel plate beam of the present invention has simple structure and convenient connection, can greatly simplify the construction process of the steel plate beam, and reduce the construction cost.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some of the present invention. In the embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without any creative effort.

图1为采用本发明钢板梁的连接结构的两跨连续梁的结构示意图;Fig. 1 is the structural representation of the two-span continuous beam adopting the connection structure of the steel plate beam of the present invention;

图2为本发明钢板梁的连接结构的结构示意图一;Fig. 2 is the structural representation one of the connection structure of the steel plate beam of the present invention;

图3为本发明钢板梁的连接结构的结构示意图二;Fig. 3 is the structural schematic diagram two of the connection structure of the steel plate beam of the present invention;

图4为采用本发明钢板梁的连接结构的四跨连续梁的一种方案的结构示意图;4 is a schematic structural diagram of a scheme of a four-span continuous beam using the connection structure of the steel plate beam of the present invention;

图5为采用本发明钢板梁的连接结构的四跨连续梁的另一种方案的结构示意图;5 is a schematic structural diagram of another scheme of a four-span continuous beam using the connection structure of the steel plate beam of the present invention;

其中:1、一号墩;2、二号墩;3、三号墩;4、第一钢板梁;5、第二钢板梁;6、第三钢板梁;7、四号墩;8、五号墩;9、第四钢板梁;10、竖向加劲板;11、纵向加劲板;12、圆弧过渡板;13、螺栓孔;14、上竖板;15、水平板;16、下竖板;17、螺栓。Among them: 1, No. 1 pier; 2, No. 2 pier; 3, No. 3 pier; 4, No. 1 steel plate beam; 5, No. 2 steel plate beam; 6, No. 3 steel plate beam; No. pier; 9. Fourth steel plate beam; 10. Vertical stiffening plate; 11. Longitudinal stiffening plate; 12. Arc transition plate; 13. Bolt hole; 14. Upper vertical plate; 15. Horizontal plate; 16. Lower vertical plate plate; 17. Bolts.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有付出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

本发明的目的是提供一种钢板梁的连接结构,以解决上述现有技术存在的问题,简化钢板梁的施工工序,并降低施工成本。The purpose of the present invention is to provide a connection structure of a steel plate beam, so as to solve the above problems existing in the prior art, simplify the construction process of the steel plate beam, and reduce the construction cost.

为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be described in further detail below with reference to the accompanying drawings and specific embodiments.

如图1至图5所示:本实施例提供了一种钢板梁的连接结构,包括两个相互吻合的连接部,一个连接部位于第一钢板梁4的端部,另一个连接部位于第二钢板梁5的端部。As shown in FIGS. 1 to 5 : this embodiment provides a connection structure of a steel plate beam, including two connecting parts that match each other, one connecting part is located at the end of the first steel plate beam 4 , and the other connecting part is located at the first steel plate beam 4 . The ends of two steel plate beams 5 .

以第一钢板梁4上的连接部为例,连接部包括设置在第一钢板梁4的端部的台阶和固设在台阶两侧的连接板,两个连接部中的连接板一一对应,对应的两个连接板通过螺栓17固连。Taking the connection part on the first steel plate beam 4 as an example, the connection part includes a step arranged at the end of the first steel plate beam 4 and a connection plate fixed on both sides of the step, and the connection plates in the two connection parts correspond one-to-one. , the corresponding two connecting plates are fixedly connected by bolts 17 .

具体的,连接板包括依次连接的上竖板14、圆弧过渡板12、水平板15、圆弧过渡板12和下竖板16,圆弧过渡板12的设置能够避免上竖板14、下竖板16与水平板15相交处截面变化较为突然,导致该部位容易出现应力过大情况。在本实施例中,上竖板14、水平板15、下竖板16和圆弧过渡板12均采用包边钢板。上竖板14、水平板15和下竖板16分别与钢板梁焊接,且上竖板14、水平板15和下竖板16上分别设置有螺栓17孔13。Specifically, the connecting plate includes an upper vertical plate 14 , an arc transition plate 12 , a horizontal plate 15 , an arc transition plate 12 and a lower vertical plate 16 connected in sequence. The cross-section change at the intersection of the vertical plate 16 and the horizontal plate 15 is relatively sudden, which leads to excessive stress at this position. In this embodiment, the upper vertical plate 14 , the horizontal plate 15 , the lower vertical plate 16 and the arc transition plate 12 are all made of edge-wrapped steel plates. The upper vertical plate 14 , the horizontal plate 15 and the lower vertical plate 16 are respectively welded with the steel plate beam, and the upper vertical plate 14 , the horizontal plate 15 and the lower vertical plate 16 are respectively provided with bolts 17 holes 13 .

在本实施例中第一钢板梁4的端部的连接部起到支撑作用,而第二钢板梁5端部的连接部起到搭接作用,为了便于螺栓17的安装和现场的快速拼接,可以设置第一钢板梁4端部的连接板上的螺栓17孔13直径比第二钢板梁5端部上的连接板上的螺栓17孔13直径大2mm。In this embodiment, the connecting part of the end of the first steel plate beam 4 plays a supporting role, and the connecting part of the end of the second steel plate beam 5 plays a lap joint function. In order to facilitate the installation of the bolts 17 and the quick splicing on site, The diameter of the bolt 17 hole 13 on the connecting plate at the end of the first steel plate beam 4 can be set to be 2 mm larger than the diameter of the bolt 17 hole 13 on the connecting plate at the end of the second steel plate beam 5 .

在钢板梁的腹板上设置有分别与连接板连接的竖向加劲板10和纵向加劲板11。竖向加劲板10和纵向加劲板11的设置能够防止连接部附近的腹板受力过大发生局部失稳,竖向加劲板10和纵向加劲板11在交汇处焊接在一起。Vertical stiffening plates 10 and longitudinal stiffening plates 11 are arranged on the webs of the steel plate beams, which are respectively connected with the connecting plates. The arrangement of the vertical stiffening plate 10 and the longitudinal stiffening plate 11 can prevent the web near the connection portion from being overstressed and localized instability occurs. The vertical stiffening plate 10 and the longitudinal stiffening plate 11 are welded together at the intersection.

图1所示为采用本实施例钢板梁的连接结构的两跨连续梁的结构示意图,包括一号墩1、二号墩2、三号墩3、第一钢板梁4和第二钢板梁5,第一钢板梁4架设在一号墩1和二号墩2上,第一钢板梁4的右端和第二钢板梁5的左端分别设置有连接部,即第一钢板梁4的右端与第二钢板梁5的左端通过本实施例中钢板梁的连接结构连接在一起,第二钢板梁5的右端架在三号墩3上。1 is a schematic structural diagram of a two-span continuous beam using the connection structure of steel plate beams in this embodiment, including No. 1 pier 1, No. 2 pier 2, No. 3 pier 3, a first steel plate beam 4 and a second steel plate beam 5 , the first steel plate beam 4 is erected on the first pier 1 and the second pier 2, the right end of the first steel plate beam 4 and the left end of the second steel plate beam 5 are respectively provided with connecting parts, that is, the right end of the first steel plate beam 4 and the The left ends of the two steel plate beams 5 are connected together by the connection structure of the steel plate beams in this embodiment, and the right end of the second steel plate beam 5 is supported on the third pier 3 .

图4为采用本实施例钢板梁的连接结构的四跨连续梁的一种方案的结构示意图,包括一号墩1、二号墩2、三号墩3、四号墩7、五号墩8、第一钢板梁4、第二钢板梁5和第三钢板梁6,第一钢板梁4架设在一号墩1和二号墩2上,第一钢板梁4的右端、第二钢板梁5的左端、第二钢板梁5的右端和第三钢板梁6的左端分别设置有连接部,即第一钢板梁4的右端与第二钢板梁5的左端、第二钢板梁5的右端和第三钢板梁6的左端分别通过本实施例中钢板梁的连接结构连接在一起,第二钢板梁5的右端架在三号墩3上,第三钢板梁6架设在四号墩7和五号墩8上。4 is a schematic structural diagram of a scheme of a four-span continuous beam using the connection structure of the steel plate beam of the present embodiment, including the first pier 1, the second pier 2, the third pier 3, the fourth pier 7, and the fifth pier 8 , the first steel plate beam 4, the second steel plate beam 5 and the third steel plate beam 6, the first steel plate beam 4 is erected on the first pier 1 and the second pier 2, the right end of the first steel plate beam 4, the second steel plate beam 5 The left end of the second steel plate beam 5 and the left end of the third steel plate beam 6 are respectively provided with connecting parts, that is, the right end of the first steel plate beam 4 and the left end of the second steel plate beam 5, the right end of the second steel plate beam 5 and the third steel plate beam 5. The left ends of the three steel plate beams 6 are respectively connected together by the connection structure of the steel plate beams in this embodiment, the right end of the second steel plate beam 5 is supported on the third pier 3, and the third steel plate beam 6 is erected on the fourth pier 7 and the fifth Trick 8 on.

图5为采用本实施例钢板梁的连接结构的四跨连续梁的另一种方案的结构示意图,包括一号墩1、二号墩2、三号墩3、四号墩7、五号墩8、第一钢板梁4、第二钢板梁5、第三钢板梁6和第四钢板梁9,第一钢板梁4架设在一号墩1和二号墩2上,第一钢板梁4的右端、第二钢板梁5的左端、第二钢板梁5的右端、第三钢板梁6的左端、第三钢板梁6的右端和第四钢板梁9的左端分别设置有连接部,即第一钢板梁4的右端与第二钢板梁5的左端、第二钢板梁5的右端和第三钢板梁6的左端、第三钢板梁6的右端和第三钢板梁6的左端分别通过本实施例中钢板梁的连接结构连接在一起,第二钢板梁5的右端架在三号墩3上,第三钢板梁6架设在四号墩7上,第四钢板梁9架设在五号墩8上。FIG. 5 is a schematic structural diagram of another scheme of the four-span continuous beam using the connection structure of the steel plate beam of the present embodiment, including the first pier 1, the second pier 2, the third pier 3, the fourth pier 7, and the fifth pier 8. The first steel plate beam 4, the second steel plate beam 5, the third steel plate beam 6 and the fourth steel plate beam 9, the first steel plate beam 4 is erected on the first pier 1 and the second pier 2, the first steel plate beam 4 The right end, the left end of the second steel plate beam 5, the right end of the second steel plate beam 5, the left end of the third steel plate beam 6, the right end of the third steel plate beam 6 and the left end of the fourth steel plate beam 9 are respectively provided with connecting parts, that is, the first The right end of the steel plate beam 4 and the left end of the second steel plate beam 5, the right end of the second steel plate beam 5 and the left end of the third steel plate beam 6, the right end of the third steel plate beam 6 and the left end of the third steel plate beam 6 pass through this embodiment respectively. The connection structure of the middle steel plate beams is connected together, the right end of the second steel plate beam 5 is erected on the third pier 3, the third steel plate beam 6 is erected on the fourth pier 7, and the fourth steel plate beam 9 is erected on the fifth pier 8 .

需要注意的是,在本实施例中连接板与钢板梁端部的台阶的表面平齐,但在实际运用中,为了兼顾两个连接的钢板梁的横向限位连接,在保证两个连接部能够吻合的基础上,设置连接板凸出或内凹于台阶的表面也是可行的。It should be noted that in this embodiment, the surfaces of the connecting plate and the step at the end of the steel plate beam are flush, but in practical application, in order to take into account the lateral limit connection of the two connected steel plate beams, it is necessary to ensure that the two connecting parts are On the basis of being able to fit, it is also feasible to set the connecting plate protruding or concave on the surface of the step.

在本发明的描述中,需要说明的是,术语“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“笫二”等仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on those shown in the accompanying drawings The orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention . Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and should not be construed to indicate or imply relative importance.

本说明书中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本发明的限制。In this specification, specific examples are used to illustrate the principles and implementations of the present invention, and the descriptions of the above embodiments are only used to help understand the method and the core idea of the present invention; The idea of the invention will have changes in the specific implementation manner and application range. In conclusion, the contents of this specification should not be construed as limiting the present invention.

Claims (8)

1. The utility model provides a connection structure of steel sheet roof beam which characterized in that: the connecting plate comprises two mutually matched connecting parts, wherein the two connecting parts are positioned on two different steel plate beams, the connecting parts comprise steps arranged at the end parts of the steel plate beams and connecting plates fixedly arranged on two sides of the steps, the two connecting plates in the connecting parts correspond to one another one by one, and the two corresponding connecting plates are fixedly connected through bolts.
2. The connecting structure of steel plate girders according to claim 1, characterized in that: the connecting plate comprises an upper vertical plate, a horizontal plate and a lower vertical plate which are connected in sequence.
3. The connecting structure of steel plate girders according to claim 2, characterized in that: arc transition plates are respectively arranged between the upper vertical plate and the horizontal plate and between the horizontal plate and the lower vertical plate.
4. The connecting structure of steel plate girders according to claim 3, characterized in that: the upper vertical plate, the horizontal plate, the lower vertical plate and the arc transition plate are all edge-wrapped steel plates.
5. The connecting structure of steel plate girders according to claim 2, characterized in that: the upper vertical plate, the horizontal plate and the lower vertical plate are respectively welded with the steel plate girder.
6. The connecting structure of steel plate girders according to claim 2, characterized in that: the upper vertical plate, the horizontal plate and the lower vertical plate are respectively provided with bolt holes.
7. The connecting structure of steel plate girders according to claim 1, characterized in that: and a web plate of the steel plate beam is provided with a vertical stiffening plate and a longitudinal stiffening plate which are respectively connected with the connecting plate.
8. The connecting structure of steel plate girders according to claim 1, characterized in that: the connecting plate is flush with the surface of the step.
CN202010809856.9A 2020-08-13 2020-08-13 A connection structure of steel plate beams Active CN111778842B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010809856.9A CN111778842B (en) 2020-08-13 2020-08-13 A connection structure of steel plate beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010809856.9A CN111778842B (en) 2020-08-13 2020-08-13 A connection structure of steel plate beams

Publications (2)

Publication Number Publication Date
CN111778842A true CN111778842A (en) 2020-10-16
CN111778842B CN111778842B (en) 2024-11-05

Family

ID=72762568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010809856.9A Active CN111778842B (en) 2020-08-13 2020-08-13 A connection structure of steel plate beams

Country Status (1)

Country Link
CN (1) CN111778842B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113430917A (en) * 2021-07-02 2021-09-24 湖南省交通规划勘察设计院有限公司 Anti-seismic beam falling structure suitable for multi-span plate girder bridge and plate girder system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1637215A (en) * 2003-12-23 2005-07-13 东洋综合建业株式会社 Structure and method of connecting I-type prestressed concrete beams using steel brackets
CN103669193A (en) * 2014-01-13 2014-03-26 河南省交通规划勘察设计院有限责任公司 Laterally spliced combination T beam with wavy steel webs and construction method thereof
CN104314007A (en) * 2014-10-09 2015-01-28 中铁十局集团有限公司 Large-span overload slideway beam for pulling
CN109267470A (en) * 2018-10-22 2019-01-25 上海市政工程设计研究总院(集团)有限公司 A kind of assembled type steel-concrete preflex composite continuous bridge and its construction method
CN209397486U (en) * 2018-11-08 2019-09-17 湖南省欣宏建设工程有限公司 A kind of bridge expanssion joint convenient for construction
CN212611918U (en) * 2020-08-13 2021-02-26 同济大学 Connecting structure of steel plate beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1637215A (en) * 2003-12-23 2005-07-13 东洋综合建业株式会社 Structure and method of connecting I-type prestressed concrete beams using steel brackets
CN103669193A (en) * 2014-01-13 2014-03-26 河南省交通规划勘察设计院有限责任公司 Laterally spliced combination T beam with wavy steel webs and construction method thereof
CN104314007A (en) * 2014-10-09 2015-01-28 中铁十局集团有限公司 Large-span overload slideway beam for pulling
CN109267470A (en) * 2018-10-22 2019-01-25 上海市政工程设计研究总院(集团)有限公司 A kind of assembled type steel-concrete preflex composite continuous bridge and its construction method
CN209397486U (en) * 2018-11-08 2019-09-17 湖南省欣宏建设工程有限公司 A kind of bridge expanssion joint convenient for construction
CN212611918U (en) * 2020-08-13 2021-02-26 同济大学 Connecting structure of steel plate beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113430917A (en) * 2021-07-02 2021-09-24 湖南省交通规划勘察设计院有限公司 Anti-seismic beam falling structure suitable for multi-span plate girder bridge and plate girder system

Also Published As

Publication number Publication date
CN111778842B (en) 2024-11-05

Similar Documents

Publication Publication Date Title
US11578465B2 (en) Temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and method of constructing same
CN106758856B (en) The construction method of the pretensioned prestressing corrugated steel web plate composite box girder of precast block
CN102154988B (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
CN110886237A (en) Arch bridge construction method
CN108240069A (en) A kind of large span multi-section combined truss roof structure system and its construction method
CN116892172B (en) Method for erecting sections of public rail co-construction multi-span continuous steel truss bridge
CN106149572A (en) A kind of beam bridge ruggedized construction and reinforcement means
CN107326794A (en) A kind of assembled integral prestress steel Combined concrete beam type bridge
CN106192717A (en) Bridge steel-concrete joint section and its installation method
CN105064200A (en) Prestressed ferroconcrete combined simply-supported beam bridge with preprocessed assembled fish-bellied truss frame and construction method of prestressed ferroconcrete combined simply-supported beam bridge
CN104583496A (en) Truss element method without chord members and combined node bridge
CN110318344A (en) A kind of No. 0 block bracket of novel steel box-girder and No. 0 block erection construction method
CN109629454B (en) Bridging equipment and bridging method for lifting segmental beam on single side
CN108678181A (en) Silo roof steel truss and concrete combined structure high-altitude construction method
CN109736179B (en) Assembled construction method of tied arch bridge
CN114717944B (en) Erection method of inverted trapezoid-section steel truss bridge
CN115821786A (en) Method for erecting double-deck support-free steel truss girder
CN111778842A (en) A connection structure of steel plate beams
CN212611918U (en) Connecting structure of steel plate beam
CN109972512A (en) A kind of cast-in-situ construction method of profiled sheet-concrete combined bridge deck
CN110904854B (en) Arch bridge construction method adapting to removal progress
JP2963879B2 (en) Bridge girder
CN112411396A (en) Variable cross-section steel truss girder bridge construction system and construction method
CN118517071A (en) A reverse construction method for a steel structure suspension structure with frame first and tube later
CN110777632A (en) Railway assembly type steel diagonal brace combined PC beam and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant