CN111749351A - A self-reset energy-dissipating connection device for prefabricated shear walls - Google Patents
A self-reset energy-dissipating connection device for prefabricated shear walls Download PDFInfo
- Publication number
- CN111749351A CN111749351A CN202010760771.6A CN202010760771A CN111749351A CN 111749351 A CN111749351 A CN 111749351A CN 202010760771 A CN202010760771 A CN 202010760771A CN 111749351 A CN111749351 A CN 111749351A
- Authority
- CN
- China
- Prior art keywords
- bolt
- plate
- replaceable
- holes
- energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005265 energy consumption Methods 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 90
- 239000010959 steel Substances 0.000 claims description 90
- 238000004873 anchoring Methods 0.000 claims description 15
- 210000002435 tendon Anatomy 0.000 claims description 15
- 230000021715 photosynthesis, light harvesting Effects 0.000 claims description 13
- 230000002787 reinforcement Effects 0.000 claims description 5
- 238000010521 absorption reaction Methods 0.000 abstract description 6
- 230000035939 shock Effects 0.000 abstract description 6
- 230000005484 gravity Effects 0.000 abstract description 2
- 230000009471 action Effects 0.000 description 14
- 239000002184 metal Substances 0.000 description 13
- 239000004567 concrete Substances 0.000 description 9
- 238000000034 method Methods 0.000 description 8
- 238000010276 construction Methods 0.000 description 5
- 238000001125 extrusion Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000008439 repair process Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009827 uniform distribution Methods 0.000 description 2
- 230000003313 weakening effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/98—Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/18—Spacers of metal or substantially of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
技术领域technical field
本发明属于可恢复功能结构技术领域,特别涉及一种用于装配式剪力墙的自复位耗能连接装置。The invention belongs to the technical field of recoverable functional structures, and in particular relates to a self-resetting energy-dissipating connecting device for an assembled shear wall.
背景技术Background technique
目前,主要是采用“三水准,两阶段”的抗震设防目标;但由于地震的复杂性和不完全确定性,建筑结构往往遭受到超越其本身抗震设防烈度的地震作用;虽然按照现有的抗震设防目标,大多数建筑结构不至于发生倒塌而造成重大的人员伤亡,但地震作用造成的建筑结构的局部破坏却难以修复,将严重影响震后人们的正常生活;同时,修复造成的大量花费和建筑物使用功能长期不能恢复都给社会经济造成了巨大的损失;因此,当前的抗震设防目标逐渐由保障生命安全向既要保障居民的生命安全、也要使建筑物能够快速恢复其使用功能和居民正常生活的抗震设防目标转变。At present, the "three-level, two-stage" seismic fortification target is mainly adopted; however, due to the complexity and incompleteness of earthquakes, building structures are often subjected to seismic actions that exceed their own seismic fortification intensity; although according to the existing seismic fortifications The fortification target, most building structures will not collapse and cause heavy casualties, but the local damage of building structures caused by the earthquake is difficult to repair, which will seriously affect the normal life of people after the earthquake. The long-term failure to restore the function of buildings has caused huge losses to the society and economy; therefore, the current goal of seismic fortification has gradually changed from ensuring life safety to protecting the life safety of residents and enabling buildings to quickly restore their use and function. The goal of earthquake-resistant fortification for the normal life of residents has changed.
目前的建筑结构在具备自复位能力以及应用耗能减震和可更换部件方面的结构体系却较为单一,不能更好地有效提高和发挥结构的抗震性能和可恢复功能。因此,如何使结构同时具备自复位和耗能减震能力以及可更换功能是当前急需解决的技术问题。The current building structure is relatively simple in terms of self-resetting ability, application of energy-consuming shock absorption and replaceable components, and cannot effectively improve and exert the seismic performance and recoverable function of the structure. Therefore, how to make the structure have the ability of self-reset, energy consumption and shock absorption and replaceable function at the same time is a technical problem that needs to be solved urgently at present.
发明内容SUMMARY OF THE INVENTION
针对现有技术中存在的技术问题,本发明提供了一种用于装配式剪力墙的自复位耗能连接装置;以解决现有的建筑结构无法同时具备自复位及耗能减震的技术问题。Aiming at the technical problems existing in the prior art, the present invention provides a self-reset energy-dissipating connection device for prefabricated shear walls; in order to solve the problem that the existing building structures cannot have the technologies of self-reset and energy dissipation and shock absorption at the same time question.
为达到上述目的,本发明采用的技术方案为:To achieve the above object, the technical scheme adopted in the present invention is:
本发明提供了一种用于装配式剪力墙的自复位耗能连接装置,包括耗能连接件及预应力系统;耗能连接件对称设置在预制墙板的两端底角处,耗能连接件的下端与上部墙板的底端平齐;预应力系统贯穿设置在预制墙板的中轴线上,通过预应力系统将上部墙板与下部墙板连接成整体;The invention provides a self-resetting energy-dissipating connecting device for an assembled shear wall, comprising an energy-dissipating connecting piece and a prestressing system; The lower end of the connecting piece is flush with the bottom end of the upper wall panel; the prestressing system is arranged through the central axis of the prefabricated wall panel, and the upper wall panel and the lower wall panel are connected as a whole through the prestressing system;
耗能连接件包括两个可更换板及若干螺栓杆,两个可更换板竖向对称设置上部墙板的内外表面;可更换板的两端竖向分别设置有若干螺栓孔,上部墙板中对应设置有螺杆通孔;螺栓杆依次贯穿螺栓孔及螺杆通孔,将两个可更换板及上部墙板连接在一起,且螺栓杆能够在螺栓孔及螺栓通孔中滑动。The energy-consuming connector includes two replaceable plates and several bolt rods, and the two replaceable plates are vertically symmetrically arranged on the inner and outer surfaces of the upper wall plate; the two ends of the replaceable plate are respectively provided with a number of bolt holes vertically, and the upper wall plate is provided with a plurality of bolt holes respectively. Correspondingly, a screw through hole is provided; the bolt rod penetrates the bolt hole and the screw through hole in sequence, connecting the two replaceable plates and the upper wall plate together, and the bolt rod can slide in the bolt hole and the bolt through hole.
进一步的,可更换板的一端设置有若干矩形螺栓孔及第一条形螺栓孔,矩形螺栓孔与第一条形螺栓孔的中心位于同一竖直面上;若干矩形螺栓孔依次设置在第一条形螺栓孔的上方,矩形螺栓孔及第一条形螺栓孔均靠近上部墙板的端部设置;Further, one end of the replaceable plate is provided with a plurality of rectangular bolt holes and a first strip bolt hole, and the centers of the rectangular bolt holes and the first strip bolt holes are located on the same vertical plane; Above the strip bolt holes, the rectangular bolt holes and the first strip bolt holes are arranged close to the end of the upper wall panel;
可更换板件的另一端设置有若干第二条形螺栓孔及圆形螺栓孔,第二条形螺栓孔与圆形螺栓孔的中心位于同一竖直面上;若干第二条形螺栓孔依次设置在圆形螺栓孔的上方,第二条形螺栓孔及圆形螺栓孔均远离上部墙板的端部;The other end of the replaceable plate is provided with a plurality of second bar-shaped bolt holes and circular bolt holes, and the centers of the second bar-shaped bolt holes and the circular bolt holes are located on the same vertical plane; the plurality of second bar-shaped bolt holes are arranged in sequence It is arranged above the circular bolt hole, and the second strip bolt hole and the circular bolt hole are far away from the end of the upper wall panel;
上部墙体中的螺栓通孔与可更换板上的矩形螺栓孔、第一条形螺栓孔、第二条形螺栓孔及圆形螺栓孔对应设置,螺栓杆水平穿设在螺栓通孔中;两个可更换板上的矩形螺栓孔、第一条形螺栓孔、第二条形螺栓孔及圆形螺栓孔分别通过螺栓杆连接,并在螺栓杆的两端设置螺帽。The bolt through holes in the upper wall are arranged corresponding to the rectangular bolt holes, the first strip bolt holes, the second strip bolt holes and the circular bolt holes on the replaceable plate, and the bolt rods are horizontally penetrated in the bolt through holes; The rectangular bolt holes, the first strip-shaped bolt holes, the second strip-shaped bolt holes and the circular bolt holes on the two replaceable plates are respectively connected by bolt rods, and nuts are provided at both ends of the bolt rods.
进一步的,第一条形螺栓孔及第二条形螺栓孔均采用矩形圆角螺孔,矩形圆角螺孔的长轴为竖直方向。Further, both the first bar-shaped bolt hole and the second bar-shaped bolt hole are rectangular rounded screw holes, and the long axis of the rectangular rounded screw holes is the vertical direction.
进一步的,可更换板的中间开设若干通孔,若干通孔水平平行设置,通孔的长轴与水平方向一致,若干通孔将可更换板的中间划分为若干水平耗能段。Further, a plurality of through holes are opened in the middle of the replaceable plate, the through holes are arranged in parallel horizontally, the long axes of the through holes are consistent with the horizontal direction, and the through holes divide the middle of the replaceable plate into a plurality of horizontal energy consumption sections.
进一步的,可更换板上的矩形螺栓孔个数与可更换板中的水平耗能段个数相同。Further, the number of rectangular bolt holes on the replaceable plate is the same as the number of horizontal energy dissipation sections in the replaceable plate.
进一步的,可更换板采用低屈服点钢板。Further, the replaceable plate adopts low yield point steel plate.
进一步的,还包括两个墙角钢套,两个墙角钢套对称设置在预制墙板的两端底角处;墙角钢套包括钢套底板及两个钢套侧板,钢套底板水平设置在上部墙板的底端,两个钢套侧板竖向对称设置在上部墙板的内外表面,钢套侧板的底端与钢套底板固定连接;钢套侧板设置在可更换板与预制墙板之间,钢套侧板上开设有螺栓贯穿孔,钢套侧板上的螺栓贯穿孔与可更换板上的螺栓孔对应设置,钢套侧板通过螺栓杆与可更换板连接在一起。Further, it also includes two corner steel sleeves, and the two corner steel sleeves are symmetrically arranged at the bottom corners of both ends of the prefabricated wall panel; the corner steel sleeve includes a steel sleeve bottom plate and two steel sleeve side plates, and the steel sleeve bottom plate is horizontally arranged at the bottom corners. At the bottom end of the upper wall panel, two steel sleeve side panels are vertically symmetrically arranged on the inner and outer surfaces of the upper wall panel, and the bottom end of the steel sleeve side panel is fixedly connected with the steel sleeve bottom plate; Between the wall panels, there are bolt through holes on the side plates of the steel sleeve, the bolt through holes on the side plates of the steel sleeve are correspondingly arranged with the bolt holes on the replaceable plate, and the side plates of the steel sleeve are connected with the replaceable plate by bolt rods. .
进一步的,钢套侧板的上端出露可更换板的上端设置,钢套侧板远离预制墙板的一侧与出露可更换板设置,钢套侧板出露可更换板的长度为50-100mm。Further, the upper end of the steel sleeve side plate is exposed to the upper end of the replaceable plate, and the side of the steel sleeve side plate away from the prefabricated wall panel is arranged with the exposed replaceable plate, and the length of the exposed replaceable plate of the steel sleeve side plate is 50 mm. -100mm.
进一步的,预应力系统包括预应力筋及锚固装置,两个锚固装置分别设置在预应力钢筋的上下两端,上部墙板及下部墙板的中轴线处设置有预应力筋孔道,预应力钢筋贯穿设置在预应力筋孔道中;锚固装置与上部墙板或下部墙板之间设置有钢垫板。Further, the prestressing system includes prestressing tendons and anchoring devices. The two anchoring devices are respectively arranged at the upper and lower ends of the prestressing steel bars. The central axis of the upper wall panel and the lower wall panel is provided with a prestressing tendon channel, and the prestressing bar. The penetration is arranged in the prestressed rib channel; a steel backing plate is arranged between the anchoring device and the upper wall panel or the lower wall panel.
与现有技术相比,本发明的有益效果为:Compared with the prior art, the beneficial effects of the present invention are:
本发明提供了一种用于装配式剪力墙的自复位耗能连接装置,通过在上下层预制墙板中轴线设置预应力系统,利用预加应力及墙体自重控制墙体发生摇摆;通过在预制墙板的两端底角处设置耗能连接件,耗能连接件采用可更换板与螺栓杆组合,在地震作用下,预制墙板受到地震作用会围绕一侧墙角发生摇摆,另一侧墙角抬升;当墙角发生摇摆时,螺栓杆在可更换板的螺栓孔及预制墙板的螺栓通孔中滑动,利用螺栓杆滑动时产生的摩擦力及预应力系统,实现对地震能量的有效消耗,避免了地震作用对墙体结构损伤;地震能量主要集中于可更换板处,通过可更换板的耗能和损伤,能够有效保证结构非更换部位保持完好;当地震作用减少时,在预应力系统的作用下,通过预加应力及墙体自身重力回到初始位置,实现自复位功能,进而实现了建筑结构的自复位和耗能减震。The invention provides a self-reset energy-dissipating connection device for an assembled shear wall. By arranging a prestressing system on the central axis of the upper and lower prefabricated wall panels, the prestressing force and the self-weight of the wall body are used to control the wall body to sway; Energy-dissipating connectors are arranged at the bottom corners of both ends of the prefabricated wall panels. The energy-dissipating connectors are combined with replaceable plates and bolt rods. Under the action of earthquakes, the prefabricated wall panels will sway around one corner of the wall and the other The side wall corner is lifted; when the wall corner is swayed, the bolt rod slides in the bolt hole of the replaceable plate and the bolt through hole of the prefabricated wall panel, and the friction force and prestress system generated when the bolt rod slides are used to realize the effective seismic energy It avoids the damage to the wall structure caused by the seismic action; the seismic energy is mainly concentrated at the replaceable plate, and the energy consumption and damage of the replaceable plate can effectively ensure that the non-replaceable parts of the structure remain intact; Under the action of the stress system, the self-reset function is realized by prestressing and the wall's own gravity returning to the initial position, thereby realizing the self-reset and energy consumption and shock absorption of the building structure.
进一步的,通过在可更换板的一端设置若干矩形螺栓孔,矩形螺栓孔为螺栓杆安装预留较大的安装空间,便于螺栓杆安装在矩形螺栓孔中;同时,在墙体摇摆前期,螺栓杆能够在矩形螺栓孔中滑动,通过螺栓杆在矩形螺栓孔中滑动实现摩擦耗能,确保了墙体摇摆前期墙体结构的稳定性;通过设置条形螺栓孔,条形螺栓孔为螺栓杆提供较大的滑动空间,实现了条形螺栓孔中的螺栓杆在地震作用下的有效滑动,满足满足墙体在地震作用下摩擦耗能和钢板受剪变形耗能的要求;通过设置圆形螺栓,螺栓杆穿设在圆形螺栓孔中,实现了对可更换板与预制墙板之间的固定,确保了耗能连接件的稳定性。Further, by setting a number of rectangular bolt holes at one end of the replaceable plate, the rectangular bolt holes reserve a large installation space for the bolt rod installation, which is convenient for the bolt rod to be installed in the rectangular bolt holes; The rod can slide in the rectangular bolt hole, and the friction energy dissipation is realized by sliding the bolt rod in the rectangular bolt hole, which ensures the stability of the wall structure in the early stage of the wall swing; by setting the strip bolt hole, the strip bolt hole is the bolt rod Provides a large sliding space, realizes the effective sliding of the bolt rod in the strip bolt hole under the action of earthquake, and meets the requirements of friction energy dissipation of the wall and shear deformation energy dissipation of the steel plate under the action of earthquake; The bolts and the bolt rods are arranged in the circular bolt holes, which realizes the fixation between the replaceable plate and the prefabricated wall plate and ensures the stability of the energy-consuming connecting piece.
进一步的,条形螺栓孔采用矩形圆角螺孔,避免了螺栓杆滑动至条形螺栓孔端部处产生应力集中,增大了螺栓杆与条形螺栓孔的接触面,避免了螺栓杆断裂,确保了耗能连接件的可靠性及稳定性。Further, the strip bolt hole adopts a rectangular rounded screw hole, which avoids the stress concentration caused by the bolt rod sliding to the end of the strip bolt hole, increases the contact surface between the bolt rod and the strip bolt hole, and avoids the bolt rod from breaking. , to ensure the reliability and stability of energy-consuming connectors.
进一步的,通过在可更换板的中间开设通孔,在可更换板的中间部位形成薄弱区,确保了可更换板的塑形变形产生在可更换板的中间部位,实现了可更换板塑形变形分布的均匀性。Further, by opening a through hole in the middle of the replaceable plate, a weak area is formed in the middle part of the replaceable plate, which ensures that the plastic deformation of the replaceable plate occurs in the middle part of the replaceable plate, and realizes the shaping of the replaceable plate. Uniformity of deformation distribution.
进一步的,将可更换板上的矩形螺栓孔的个数与其中的水平耗能段个数相同设置,确保了矩形螺栓孔中的螺栓杆对可更换板中的水平耗能段有足够的约束作用;同时,避免了矩形螺栓孔的开孔面积对可更换板连接区域的削弱。Further, the number of rectangular bolt holes on the replaceable plate is set to be the same as the number of horizontal energy-dissipating sections in it, ensuring that the bolt rods in the rectangular bolt holes have sufficient constraints on the horizontal energy-dissipating sections in the replaceable plate. At the same time, the weakening of the connecting area of the replaceable plate by the opening area of the rectangular bolt hole is avoided.
进一步的,可更换板采用低屈服点钢板,低屈服点钢板便于加工,具有良好的深冲性能和深拉延性能,易加工制作出形状复杂的钢制品;同时,具有良好的塑性变形、低周疲劳和滞回耗能等性能,能有效提高结构的抗震性能。Further, the replaceable plate is made of low yield point steel plate, which is easy to process, has good deep drawing performance and deep drawing performance, and is easy to process to produce steel products with complex shapes; at the same time, it has good plastic deformation, low The performance of cycle fatigue and hysteretic energy dissipation can effectively improve the seismic performance of the structure.
进一步的,通过在预制墙板与可更换板之间设置墙角钢套,墙角钢套采用三块板件进行固定拼接形成的槽型结构,通过将墙角钢套与预制墙板连接一个整体,用于加强连接区域的刚度和强度,同时保护耗能连接件与预制墙体连接处的混凝土不由于耗能连接件对墙体造成的挤压而发生压碎破坏。Further, by arranging an angle steel sleeve between the prefabricated wall panel and the replaceable panel, the angle steel sleeve adopts a trough structure formed by fixing and splicing three plates, and by connecting the angle steel sleeve and the prefabricated wall panel into a whole, the It is used to strengthen the rigidity and strength of the connection area, and at the same time protect the concrete at the connection between the energy-consuming connector and the prefabricated wall from crushing damage due to the extrusion of the energy-consuming connector to the wall.
进一步的,将钢套侧板露出可更换板设置,为墙板底角提高较大的保护面积,避免耗能连接件对墙板底角混凝土产生挤压破坏;优选的,将墙角钢套的矩形角设置为圆弧倒角,避免了墙角钢套出现盈利集中。Further, the steel sleeve side plate is exposed to the replaceable plate setting, which increases a larger protection area for the bottom corner of the wall panel, and prevents the energy-consuming connectors from causing extrusion damage to the concrete at the bottom corner of the wall panel; The rectangular corners are set as arc chamfers, which avoids the profit concentration of the corner steel sleeves.
进一步的,通过在锚固装置与预制墙板之间设置钢垫块,避免了预应力筋端部出现应力集中,从而压坏墙体避免的混凝土。Further, by arranging steel spacers between the anchoring device and the prefabricated wall panels, stress concentration at the ends of the prestressed tendons is avoided, thereby crushing the concrete avoided by the wall.
附图说明Description of drawings
图1为本发明所述的自复位耗能连接装置的整体装配结构示意图;1 is a schematic diagram of the overall assembly structure of the self-resetting energy-consuming connecting device according to the present invention;
图2为本发明所述的自复位耗能连接装置在受到地震作用状态的示意图;Fig. 2 is the schematic diagram of the self-resetting energy-dissipating connecting device of the present invention under the action of earthquake;
图3为本发明所述的自复位耗能连接装置中的可更换板件结构示意图。3 is a schematic structural diagram of a replaceable plate in the self-resetting energy-consuming connection device according to the present invention.
其中1,耗能连接件,2预应力系统,3墙角钢套,4上部墙板,5下部墙板,6螺栓杆;11可更换板;111矩形螺栓孔,112第一条形螺栓孔,113第二条形螺栓孔,114圆形螺栓孔;31钢套底板,32钢套侧板。Among them, 1, energy dissipation connector, 2 prestressing system, 3 corner steel sleeve, 4 upper wall panel, 5 lower wall panel, 6 bolt rod; 11 replaceable plate; 111 rectangular bolt hole, 112 first strip bolt hole, 113 second strip bolt hole, 114 round bolt hole; 31 steel sleeve bottom plate, 32 steel sleeve side plate.
具体实施方式Detailed ways
为了使本发明所解决的技术问题,技术方案及有益效果更加清楚明白,以下具体实施例,对本发明进行进一步的详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the technical problems, technical solutions and beneficial effects solved by the present invention clearer, the following specific embodiments will further describe the present invention in detail. It should be understood that the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.
如附图1-3所示,本发明提供了一种用于装配式剪力墙的自复位耗能连接装置,包括耗能连接件1、预应力系统2及墙角钢套3;耗能连接件1对称设置在预制墙板的两端底角处,耗能连接件1的下端与上部墙板4的底端平齐;预应力系统2贯穿设置在预制墙板的中轴线上,通过预应力系统2将上部墙板4与下部墙板5连接成整体;墙角钢套3对称设置在预制墙板的两端底角处,且位于耗能连接件1与预制墙板之间,提高了预制墙板连接件区域的强度和刚度,形成对预制墙板底角的有效保护,避免了耗能连接件1对墙体造成的压碎破坏。As shown in Figures 1-3, the present invention provides a self-resetting energy-dissipating connection device for an assembled shear wall, including an energy-dissipating connector 1, a
耗能连接件1包括两个可更换板11及若干螺栓杆,两个可更换板11竖向对称设置上部墙板4的内外表面;可更换板11的两端竖向分别设置有若干螺栓孔,上部墙板4中对应设置有螺杆通孔;螺栓杆6依次贯穿螺栓孔及螺杆通孔,螺栓杆6的两端设置有螺帽;通过螺栓杆6及螺帽配合,将两个可更换板11及上部墙板4连接在一起,且螺栓杆6能够在螺栓孔及螺栓通孔中上下滑动。The energy-consuming connector 1 includes two
其中,可更换板11的一端设置有若干矩形螺栓孔111及第一条形螺栓孔112,矩形螺栓孔111与第一条形螺栓孔112的中心位于同一竖直面上;若干矩形螺栓孔111竖向依次设置在第一条形螺栓孔112的上方,矩形螺栓孔111及第一条形螺栓孔112均靠近上部墙板4的端部设置。One end of the
可更换板件11的另一端设置有若干第二条形螺栓孔113及圆形螺栓孔114,第二条形螺栓孔113与圆形螺栓孔114的中心位于同一竖直面上;若干第二条形螺栓孔113竖向依次设置在圆形螺栓孔114的上方,第二条形螺栓孔113及圆形螺栓孔114均远离上部墙板4的端部。The other end of the
上部墙体4中的螺栓通孔与可更换板11上的矩形螺栓孔111、第一条形螺栓孔112、第二条形螺栓孔113及圆形螺栓孔114对应设置;其中,与矩形螺栓孔111对应的螺栓通孔的位置和尺寸大小与该矩形螺栓孔的位置及尺寸大小保持一致,该矩形螺栓孔与其对应的螺栓通孔中贯穿设置有螺栓杆;与第一条形螺栓孔112对应的螺栓通孔的位置和尺寸大小与该第一条形螺栓孔的位置和尺寸大小保持一致,该第一条形螺栓孔与其对应的螺栓通孔中贯穿设置有螺栓杆;与第二条形螺栓孔113对应的螺栓通孔的位置和尺寸大小与该第二条形螺栓孔的位置和尺寸大小保持一致,该第二条形螺栓孔与其对应的螺栓通孔中贯穿设置有螺栓杆;与圆形螺栓孔114对应的螺栓通孔的位置和尺寸大小与该圆形螺栓孔的位置和尺寸大小保持一致,该圆形螺栓孔与其对应的螺栓通孔中贯穿设置有螺栓杆;上述任一螺栓杆水平依次贯穿其中一个可更换板、预制墙板及另一可更换板,并在螺栓杆的两端设置螺帽,通过螺栓杆将两个可更换板及预制墙板连接在一起;其中,矩形螺栓孔及条形螺栓孔中的螺栓杆能够在受力作用下发生滑动;利用螺栓杆滑动时产生的摩擦力及预应力系统,实现对地震能量的有效消耗,避免了地震作用对墙体结构的损伤;可更换板11通过螺栓杆及螺帽与预制墙板连接,实现了对可更换板11的更换维修。The bolt through holes in the
优选的,第一条形螺栓孔112及第二条形螺栓孔113均采用矩形圆角螺孔,矩形圆角螺孔的长轴为竖直方向;条形螺栓孔采用矩形圆角螺孔,避免了螺栓杆滑动至条形螺栓孔端部处产生应力集中,增大了螺栓杆与条形螺栓孔的接触面壁,避免了螺栓杆断裂,确保了耗能连接件的可靠性及稳定性。Preferably, the first bar-
可更换板11的中间开设若干通孔,若干通孔上下平行设置,通孔的长轴与水平方向一致,若干通孔将可更换板的中间划分为若干水平耗能段;通过在可更换板的中间开设通孔,在可更换板的中间部位形成薄弱区,确保了可更换板的塑形变形产生在可更换板的中间部位,实现了可更换板塑形变形分布的均匀性。A number of through holes are opened in the middle of the
优选的,可更换板11上的矩形螺栓孔个数与可更换板中的水平耗能段个数相同,确保了矩形螺栓孔中的螺栓杆对可更换板中的水平耗能段有足够的约束作用;同时,避免了矩形螺栓孔的开孔面积对可更换板连接区域的削弱。Preferably, the number of rectangular bolt holes on the
可更换板11采用低屈服点钢板,低屈服点钢板便于加工,具有良好的深冲性能和深拉延性能,易加工制作出形状复杂的钢制品;同时,具有良好的塑性变形、低周疲劳和滞回耗能等性能,能有效提高结构的抗震性能。The
墙角钢套3包括钢套底板31及两个钢套侧板32,钢套底板31水平设置在上部墙板4的底端,两个钢套侧板32竖向对称设置在上部墙板4的内外表面,钢套侧板32的底端与钢套底板31固定连接;钢套侧板32设置在可更换板11与预制墙板之间,钢套侧板32上开设有螺栓固定孔,钢套侧板32上的螺栓固定孔与可更换板11上的螺栓孔对应设置,钢套侧板32通过螺栓杆与可更换板11紧密连接。The
钢套侧板32的上端出露可更换板11的上端设置,钢套侧板32远离预制墙板的一侧与出露可更换板11设置,钢套侧板32出露可更换板11的长度为50-100mm;将钢套侧板露出可更换板设置,为墙板底角提高较大的保护面积,避免耗能连接件对墙板底角混凝土产生挤压破坏;优选的,将墙角钢套的矩形角设置为圆弧倒角,避免了墙角钢套出现盈利集中。The upper end of the steel
预应力系统2包括预应力筋及锚固装置,两个锚固装置分别设置在预应力钢筋的上下两端,上部墙板4及下部墙板5的中轴线处设置有预应力筋孔道,预应力钢筋贯穿设置在预应力筋孔道中;锚固装置与上部墙板4或下部墙板5之间设置有钢垫板。The
工作原理working principle
本发明所述的一种用于装配式剪力墙的自复位耗能连接装置,利用预应力系统提供的预加应力及预制墙板自重,墙体开始发生摇摆;在墙体摇摆前期,螺栓杆能够在矩形螺栓孔中滑动,通过螺栓杆在矩形螺栓孔中滑动实现摩擦耗能,确保了墙体摇摆前期墙体结构的稳定性;在地震作用初期,螺栓杆在条形螺栓孔中滑动,可更换板的一侧开始随着墙体的抬升,利用螺栓杆在螺孔中滑动产生的摩擦力消耗地震能力;随着地震作用的加强,螺栓杆慢慢滑动至条形螺栓孔的边缘;此时,可更换板的另一侧固定不变,可更换板开始发生塑形变形屈服耗能;同时,设置在墙体中间部位的预应力系统也开始协同消耗地震能量;当地震作用减少时,在预应力系统的作用下,通过预加应力及墙体自身重力回到初始位置,实现自复位功能,进而实现了建筑结构的自复位和耗能减震。The self-resetting energy-dissipating connection device for an assembled shear wall of the present invention utilizes the prestressing provided by the prestressing system and the self-weight of the prefabricated wall panels, and the wall begins to swing; in the early stage of the wall swing, the bolts The rod can slide in the rectangular bolt hole, and friction energy dissipation is realized by sliding the bolt rod in the rectangular bolt hole, which ensures the stability of the wall structure in the early stage of the wall swing; in the early stage of earthquake action, the bolt rod slides in the strip bolt hole , the side of the replaceable plate begins to rise with the wall, using the friction force generated by the bolt rod sliding in the screw hole to consume the seismic capacity; with the strengthening of the seismic action, the bolt rod slowly slides to the edge of the strip bolt hole ; At this time, the other side of the replaceable plate is fixed, and the replaceable plate begins to undergo plastic deformation and yield energy consumption; at the same time, the prestressing system installed in the middle of the wall also begins to consume seismic energy cooperatively; when the seismic action decreases At the time, under the action of the prestressing system, the self-resetting function is realized through the prestressing and the weight of the wall itself returning to the initial position, thereby realizing the self-resetting and energy consumption and shock absorption of the building structure.
制作及装配方法Manufacturing and assembly methods
步骤1、预制墙板制作Step 1. Prefabricated wall panel production
预制墙体采用提前按规格预制好的钢筋混凝土剪力墙,在浇筑混凝土前在需要安置预应力筋处的墙体部位预留一个贯穿孔道,在可更换区域内相应位置处也预留了若干对应形状规格均相同的螺栓通孔;同时,提前将可更换区域内的墙角钢套以及预应力筋端部的钢垫板预埋在相应位置,通过混凝土浇筑与墙体形成一个整体;其中,墙角钢套采用工厂预制加工,墙角钢套通过三块板件通过焊接形成的一个槽型结构,并在槽型的两个侧板上开有与可更换板相对应且规格形状相同的螺栓固定孔。The prefabricated wall adopts the reinforced concrete shear wall that has been prefabricated in advance according to the specifications. Before pouring the concrete, a through hole is reserved in the part of the wall where the prestressed tendons need to be placed, and a number of holes are also reserved in the corresponding position in the replaceable area. Corresponding bolt through-holes with the same shape and specification; at the same time, pre-buried the corner steel sleeve in the replaceable area and the steel backing plate at the end of the prestressed tendon in the corresponding position, and formed a whole with the wall through concrete pouring; among them, The corner steel sleeve is prefabricated in the factory. The corner steel sleeve is a groove structure formed by welding three plates, and the two side plates of the groove are fixed with bolts corresponding to the replaceable plates and with the same specification and shape. hole.
步骤2、可更换板及墙角钢套制作。
可更换板均采用在工厂中预制加工形成,可更换板开有若干形状不同的螺栓孔;其中,包括矩形螺栓孔、矩形圆角螺栓孔及圆形螺孔;为了使可更换板的塑性变形分布均匀,在可更换板的中间部位开设通孔;The replaceable plates are all prefabricated in the factory, and the replaceable plates have several bolt holes of different shapes; among them, there are rectangular bolt holes, rectangular rounded bolt holes and round screw holes; in order to make the plastic deformation of the replaceable plate Evenly distributed, through holes are opened in the middle of the replaceable plate;
步骤3、墙板吊装施工
上下墙板吊装到位后,首先设置临时支撑,再进行上部墙板及下部墙板的连接;之后,将已经预制好的可更换板对应放置在预制墙板的内外表面,对称设置预制墙板的两端底角处;安装圆形螺孔的螺栓杆及螺母以固定可更换金属板,再依次将剩余螺栓孔中的螺栓杆与螺帽进行初拧安装,确保每颗螺母可按位置精准安装后,再对螺栓进行旋紧。After the upper and lower wall panels are hoisted in place, first set up temporary supports, and then connect the upper and lower wall panels; after that, place the prefabricated replaceable panels on the inner and outer surfaces of the prefabricated wall panels, and set the prefabricated wall panels symmetrically. At the bottom corners of both ends; install the bolt rods and nuts of the circular screw holes to fix the replaceable metal plate, and then perform the initial screwing and installation of the bolt rods and nuts in the remaining bolt holes in turn to ensure that each nut can be accurately installed according to the position Then, tighten the bolts.
步骤4、将已经通过贯穿孔道且伸出上下墙板的预应力筋进行张拉。利用张拉设备对预应力筋进行张拉,再利用锚固装置将张拉后的预应力筋进行锚固。
实施例Example
本实施例提供了一种用于装配式剪力墙的自复位耗能连接装置,以提高建筑结构的抗震性能,实现建筑结构在受震后实现快速更换,修复难度较小。The present embodiment provides a self-reset energy-consuming connection device for a prefabricated shear wall, so as to improve the seismic performance of the building structure, realize the rapid replacement of the building structure after the earthquake, and reduce the difficulty of repair.
本实施例所述的一种用于装配式剪力墙的自复位耗能连接装置,包括耗能连接件、预应力系统及墙体钢套;其中,耗能连接件对称设置在预制墙板的两端底角处,耗能连接件的下端与上部墙板的底端平齐;预应力系统贯穿设置在预制墙板的中轴线上,通过预应力系统将上部墙板与下部墙板连接成整体。A self-reset energy-dissipating connection device for an assembled shear wall described in this embodiment includes energy-dissipating connectors, a prestressing system and a wall steel sleeve; wherein, the energy-dissipating connectors are symmetrically arranged on the prefabricated wall panels At the bottom corners of both ends, the lower end of the energy-consuming connector is flush with the bottom end of the upper wall panel; the prestressing system is arranged through the central axis of the prefabricated wall panel, and the upper wall panel and the lower wall panel are connected by the prestressing system. into a whole.
预应力系统包括预应力筋及锚固装置,两个锚固装置分别设置在预应力钢筋的上下两端,上部墙板及下部墙板的中轴线处设置有预应力筋孔道,预应力钢筋贯穿设置在预应力筋孔道中;锚固装置与上部墙板或下部墙板之间设置有钢垫板;在预制墙体时,在墙体相应的部位预留有一个贯穿的孔道,在墙体吊装就位后,预应力筋穿过孔道伸出墙体,并采用后张拉的方法对预应力筋进行张拉;同时,在预应力筋端部设置了一块薄钢垫板,薄钢垫板设置在锚固装置与上部或下部墙板之间,防止预应力筋端部出现应力集中,避免了压坏墙体混凝土。The prestressing system includes prestressing tendons and anchoring devices. The two anchoring devices are respectively arranged at the upper and lower ends of the prestressing steel bars. The central axis of the upper wall panel and the lower wall panel are provided with prestressing tendon channels. In the prestressed rib channel; a steel backing plate is arranged between the anchoring device and the upper wall panel or the lower wall panel; when the wall is prefabricated, a through-hole channel is reserved in the corresponding part of the wall, and the wall is hoisted in place Afterwards, the prestressed rib protrudes out of the wall through the tunnel, and the prestressed rib is tensioned by the method of post-tensioning; at the same time, a thin steel backing plate is set at the end of the prestressing rib, and the thin steel backing plate is set in the Between the anchoring device and the upper or lower wall panel, the stress concentration at the end of the prestressed tendon is prevented, and the wall concrete is prevented from being crushed.
耗能连接件包括两个可更换金属板及若干螺栓杆,为了有利于可更换金属板的塑性变形分布均匀,本实施例中在可更换金属板的中间部位开设三个形状相同的孔洞,三个孔洞上下水平设置,孔洞的长轴为水平方向;其中,相邻孔洞之间的连接钢板的尺寸规格相同,有利于塑性损伤分布更均匀,从而有效提高可更换金属板的耗能能力。The energy-consuming connector includes two replaceable metal plates and several bolt rods. In order to facilitate the uniform distribution of plastic deformation of the replaceable metal plates, in this embodiment, three holes of the same shape are opened in the middle of the replaceable metal Each hole is arranged horizontally up and down, and the long axis of the hole is in the horizontal direction; among them, the size of the connecting steel plates between adjacent holes is the same, which is conducive to more uniform distribution of plastic damage, thereby effectively improving the energy dissipation capacity of the replaceable metal plate.
本实施例中,两个耗能连接件中的四块可更换金属板均采用Q235低屈服点钢板;其中,每个可更换金属板上开有七个螺孔,其中,三个螺孔为矩形螺孔,一个第一矩形圆角螺孔,两个第二矩形圆角螺孔及一个圆形螺孔,且矩形螺孔与第一矩形圆角螺孔的中心位于同一竖直面上;矩形螺孔设置在矩形圆角螺孔的上方,矩形螺孔及矩形圆角螺孔均靠近上部墙板的端部设置;第二矩形圆角螺孔与圆形螺孔的中心位于同一竖直面上;第二矩形圆角螺孔设置在圆形螺孔的上方,第二矩形圆角螺孔及圆形螺孔均远离上部墙板的端部;矩形圆角螺孔是为了满足墙体在地震作用下摩擦耗能和钢板受剪变形耗能的要求,圆形螺孔是为了固定可更换金属板。所有螺孔通过螺栓进行连接,并在墙体的两侧通过螺帽进行拧紧;通过将四块可更换金属板分别对应布置在预制墙板底部墙角的两侧,同时,为了满足预制墙板在水平两个方向的受力要求,预制墙板同侧的两块可更换金属板采用的是对称布置。In this embodiment, the four replaceable metal plates in the two energy-consuming connectors are all made of Q235 low-yield point steel plates; seven screw holes are opened on each replaceable metal plate, wherein the three screw holes are A rectangular screw hole, a first rectangular rounded screw hole, two second rectangular rounded screw holes and a circular screw hole, and the centers of the rectangular screw hole and the first rectangular rounded screw hole are located on the same vertical plane; The rectangular screw hole is arranged above the rectangular rounded screw hole, and the rectangular screw hole and the rectangular rounded screw hole are arranged close to the end of the upper wall plate; the center of the second rectangular rounded screw hole and the circular screw hole are located in the same vertical The second rectangular rounded screw hole is arranged above the circular screw hole, and both the second rectangular rounded screw hole and the circular screw hole are far away from the end of the upper wall panel; the rectangular rounded screw hole is to meet the requirements of the wall In order to meet the requirements of friction energy consumption and steel plate shear deformation energy consumption under earthquake action, the circular screw hole is used to fix the replaceable metal plate. All screw holes are connected by bolts and tightened by nuts on both sides of the wall; by arranging four replaceable metal plates on both sides of the bottom corners of the prefabricated wall panels, at the same time, in order to meet the needs of the prefabricated wall panels in the For the force requirements in two horizontal directions, the two replaceable metal plates on the same side of the prefabricated wallboard are arranged symmetrically.
墙角钢套设置在耗能连接件与上部墙板连接处的可更换区域,墙角钢套是由提前在工厂预制而成,通过三块钢板进行焊接形成的槽型结构,同时对槽型结构的钢套侧板竖向平行设置在预制墙板的内外表面,并在钢套侧板预留了相对应的螺栓孔。通过提前预埋在墙体中,使其与墙体结构形成一个整体;墙角钢套用于加强连接区域的刚度和强度,同时保护可更换金属板与预制墙板连接处的混凝土,不由于可更换金属板对墙体造成的挤压而发生压碎破坏;本实施例中,将钢套侧板的上端上部及内侧均伸出可更换金属板,伸出长度为50-100mm。The corner steel sleeve is arranged in the replaceable area where the energy-consuming connector and the upper wall panel are connected. The corner steel sleeve is prefabricated in the factory in advance, and is a groove-shaped structure formed by welding three steel plates. The steel sleeve side plates are vertically and parallelly arranged on the inner and outer surfaces of the prefabricated wall panels, and corresponding bolt holes are reserved in the steel sleeve side plates. By pre-embedding in the wall in advance, it forms an integral body with the wall structure; the corner steel sleeve is used to strengthen the rigidity and strength of the connection area, and at the same time protect the concrete at the connection between the replaceable metal plate and the prefabricated wall panel. The metal plate is crushed and damaged by the extrusion of the wall body; in this embodiment, the upper part and the inner side of the upper end of the side plate of the steel sleeve are extended to replace the metal plate, and the extension length is 50-100mm.
本发明所述的一种用于装配式剪力墙的自复位耗能连接装置,通过螺栓杆、可更换板及预应力系统和非更换构件等部位协同受力,形成多道抗震防线,从而可有效提高结构的抗震性能;在地震作用时,主要利用螺栓杆滑动时产生的摩擦力、可更换板屈服以及预应力筋消耗地震能量;并且,地震能量主要集中于可更换部件处,通过可更换板的耗能和损伤,能够有效保证结构非更换部位保持完好;在地震作用后,结构能够通过其本身的自复位能力恢复到震前的结构状态;同时,可更换部件和墙体之间采用螺栓连接,震后便于更换,从而能够快速恢复结构的抗震功能,有效地降低了结构在震后修复和加固的建设费用。The self-resetting energy-dissipating connection device for an assembled shear wall described in the present invention forms multiple anti-seismic defense lines through the coordinated force of the bolt rod, the replaceable plate, the prestressed system and the non-replaceable components, etc. It can effectively improve the seismic performance of the structure; in the event of an earthquake, the friction force generated by the sliding of the bolt rod, the yield of the replaceable plate and the prestressed tendons are mainly used to consume the seismic energy; and the seismic energy is mainly concentrated in the replaceable parts. The energy consumption and damage of the replacement plate can effectively ensure that the non-replaceable parts of the structure remain intact; after the earthquake, the structure can be restored to the structural state before the earthquake through its own self-resetting ability; at the same time, the space between the replaceable parts and the wall Bolted connection is adopted, which is easy to replace after earthquake, so that the seismic function of the structure can be quickly restored, and the construction cost of repair and reinforcement of the structure after the earthquake can be effectively reduced.
本发明中的预制墙板、耗能连接件、预应力系统及墙角钢套等构件均在工厂预制而成,并可直接在施工现场装配整体而成,较传统湿式连接方式具有精确度高、施工方便快捷、后期可更换等优势,符合建筑工业化的发展趋势;本发明整体结构构造简单,便于施工,通过螺栓连接,且以钢材、混凝土等普通建筑材料制作而成,便于应用和推广。The prefabricated wall panels, energy-consuming connectors, prestressed systems and corner steel sleeves in the present invention are all prefabricated in the factory, and can be assembled directly on the construction site as a whole. Compared with the traditional wet connection method, it has high precision, The advantages of convenient and quick construction and later replacement are in line with the development trend of building industrialization; the overall structure of the invention is simple, convenient for construction, connected by bolts, and made of common building materials such as steel and concrete, which is convenient for application and promotion.
上述实施例仅仅是能够实现本发明技术方案的实施方式之一,本发明所要求保护的范围并不仅仅受本实施例的限制,还包括在本发明所公开的技术范围内,任何熟悉本技术领域的技术人员所容易想到的变化、替换及其他实施方式。The above-mentioned embodiment is only one of the embodiments that can realize the technical solution of the present invention. The scope of protection claimed in the present invention is not only limited by this embodiment, but also included in the technical scope disclosed in the present invention. Anyone familiar with the present technology Variations, substitutions, and other implementations will readily occur to those skilled in the art.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010760771.6A CN111749351B (en) | 2020-07-31 | 2020-07-31 | Self-resetting energy consumption connecting device for assembled shear wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010760771.6A CN111749351B (en) | 2020-07-31 | 2020-07-31 | Self-resetting energy consumption connecting device for assembled shear wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111749351A true CN111749351A (en) | 2020-10-09 |
| CN111749351B CN111749351B (en) | 2024-11-29 |
Family
ID=72712814
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010760771.6A Active CN111749351B (en) | 2020-07-31 | 2020-07-31 | Self-resetting energy consumption connecting device for assembled shear wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111749351B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112982708A (en) * | 2021-02-23 | 2021-06-18 | 中国地震局工程力学研究所 | Alleviate two-way metal consumer of assembled self-reset dumbbell shape of film effect |
| CN113216453A (en) * | 2021-06-17 | 2021-08-06 | 西安建筑科技大学 | Shear wall with built-in replaceable energy consumption connection and vertical joint and installation method |
| CN113216438A (en) * | 2021-06-17 | 2021-08-06 | 西安建筑科技大学 | Novel shearing energy consumption type self-resetting damper and method |
| CN113235771A (en) * | 2021-05-26 | 2021-08-10 | 华能秦煤瑞金发电有限责任公司 | Easily repaired assembled shear wall |
| CN115045418A (en) * | 2022-07-19 | 2022-09-13 | 西安建筑科技大学 | A kind of embedded self-reset energy dissipation RC frame structure rocking wall and its assembly method |
| CN117027310A (en) * | 2023-09-11 | 2023-11-10 | 天津大学 | A self-resetting metal sandwich wall panel system and its installation method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012041774A (en) * | 2010-08-20 | 2012-03-01 | Norimine Okura | Fastener |
| KR20130027786A (en) * | 2011-09-08 | 2013-03-18 | 디알비동일 주식회사 | Shear wall type vibration control apparatus |
| CN203701330U (en) * | 2014-01-05 | 2014-07-09 | 海南大学 | rocking shear wall |
| CN207392515U (en) * | 2017-10-23 | 2018-05-22 | 沈阳建筑大学 | Combined type constraint energy consumption wall |
| JP2018197474A (en) * | 2017-05-24 | 2018-12-13 | 積水ハウス株式会社 | Wall member and foundation joint structure |
| CN212772939U (en) * | 2020-07-31 | 2021-03-23 | 西安建筑科技大学 | Self-resetting energy-consumption connecting device for assembly type shear wall |
-
2020
- 2020-07-31 CN CN202010760771.6A patent/CN111749351B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012041774A (en) * | 2010-08-20 | 2012-03-01 | Norimine Okura | Fastener |
| KR20130027786A (en) * | 2011-09-08 | 2013-03-18 | 디알비동일 주식회사 | Shear wall type vibration control apparatus |
| CN203701330U (en) * | 2014-01-05 | 2014-07-09 | 海南大学 | rocking shear wall |
| JP2018197474A (en) * | 2017-05-24 | 2018-12-13 | 積水ハウス株式会社 | Wall member and foundation joint structure |
| CN207392515U (en) * | 2017-10-23 | 2018-05-22 | 沈阳建筑大学 | Combined type constraint energy consumption wall |
| CN212772939U (en) * | 2020-07-31 | 2021-03-23 | 西安建筑科技大学 | Self-resetting energy-consumption connecting device for assembly type shear wall |
Non-Patent Citations (1)
| Title |
|---|
| 吕西林;陈云;毛苑君;: "结构抗震设计的新概念――可恢复功能结构", 同济大学学报(自然科学版), no. 07, 15 July 2011 (2011-07-15), pages 941 - 948 * |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112982708A (en) * | 2021-02-23 | 2021-06-18 | 中国地震局工程力学研究所 | Alleviate two-way metal consumer of assembled self-reset dumbbell shape of film effect |
| CN113235771A (en) * | 2021-05-26 | 2021-08-10 | 华能秦煤瑞金发电有限责任公司 | Easily repaired assembled shear wall |
| CN113216453A (en) * | 2021-06-17 | 2021-08-06 | 西安建筑科技大学 | Shear wall with built-in replaceable energy consumption connection and vertical joint and installation method |
| CN113216438A (en) * | 2021-06-17 | 2021-08-06 | 西安建筑科技大学 | Novel shearing energy consumption type self-resetting damper and method |
| CN113216453B (en) * | 2021-06-17 | 2024-12-03 | 西安建筑科技大学 | A shear wall with vertical seams and a method for installing the wall with replaceable energy-dissipating connections |
| CN113216438B (en) * | 2021-06-17 | 2025-07-25 | 西安建筑科技大学 | Novel shearing energy consumption type self-resetting damper and method |
| CN115045418A (en) * | 2022-07-19 | 2022-09-13 | 西安建筑科技大学 | A kind of embedded self-reset energy dissipation RC frame structure rocking wall and its assembly method |
| CN115045418B (en) * | 2022-07-19 | 2024-08-09 | 西安建筑科技大学 | An embedded self-resetting energy-absorbing RC frame structure swing wall and its assembly method |
| CN117027310A (en) * | 2023-09-11 | 2023-11-10 | 天津大学 | A self-resetting metal sandwich wall panel system and its installation method |
| CN117027310B (en) * | 2023-09-11 | 2026-02-03 | 天津大学 | Self-resetting metal sandwich wallboard system and installation method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111749351B (en) | 2024-11-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111749351A (en) | A self-reset energy-dissipating connection device for prefabricated shear walls | |
| CN108612188B (en) | Assembled self-resetting prestressed concrete frame | |
| CN108468397A (en) | Assembled self-recovery energy-consumption type double-steel-plate slotted shear wall structure | |
| CN113756447B (en) | An energy dissipation node for connecting a prefabricated shear wall and a coupling beam and its assembly method | |
| CN107386435A (en) | The assembled of prestressed node connection can recover function steel frame support system | |
| CN102535682A (en) | Replaceable connecting joint for wallboard components of precast concrete shear wall structures | |
| CN111749352A (en) | An energy dissipation connection device for prefabricated shear walls | |
| CN204676723U (en) | The adaptive intelligent reinforced concrete frame structure of energy consume mechanism | |
| CN116876694A (en) | Assembled self-resetting manual controllable plastic hinge node structure and assembling method | |
| CN215630814U (en) | Self-resetting composite wall structure based on friction and replaceable metal yield energy consumption | |
| CN113529946B (en) | Beam column energy consumption connecting piece based on U-shaped plate and construction method thereof | |
| CN113529944B (en) | A beam-column energy-absorbing connector and construction method thereof | |
| CN115012553A (en) | An earthquake-resistant reinforcement steel plate shear wall for existing buildings | |
| CN107355027B (en) | Section steel concrete shear wall assembly type space modularized structural system and construction method | |
| CN206800712U (en) | A kind of power consumption assembled combined steel plate shearing force wall of strip connecting plate | |
| CN212772939U (en) | Self-resetting energy-consumption connecting device for assembly type shear wall | |
| CN210685071U (en) | Assembled power consumption shear force wall of removable built-in shaped steel bracing | |
| CN110284589B (en) | Hub-type precast concrete beam-column assembled self-reset system and construction method | |
| CN109296069B (en) | A repairable seismic energy-absorbing connection node for prefabricated steel structures | |
| CN111749353A (en) | A replaceable energy-consuming connection device for self-resetting shear walls | |
| CN216892932U (en) | Assembled composite wall perps power consumption connection structure | |
| CN118704611A (en) | A steel frame beam-column node and connection method | |
| CN215715983U (en) | A beam-column energy-dissipating connector | |
| CN206091502U (en) | Use concrete frame antidetonation reinforced structure of steel sheet net | |
| CN212613144U (en) | An energy dissipation connection device for prefabricated shear walls |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |