CN111740408B - 一种基于鲁棒随机模型的光热电站最优报价决策方法 - Google Patents
一种基于鲁棒随机模型的光热电站最优报价决策方法 Download PDFInfo
- Publication number
- CN111740408B CN111740408B CN202010563779.3A CN202010563779A CN111740408B CN 111740408 B CN111740408 B CN 111740408B CN 202010563779 A CN202010563779 A CN 202010563779A CN 111740408 B CN111740408 B CN 111740408B
- Authority
- CN
- China
- Prior art keywords
- photo
- power station
- thermal power
- formula
- thermal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/10—Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
时段/t | 光热功率/MW | 时段/t | 光热功率/MW |
1-6 | 0 | 14 | 150 |
7 | 30 | 15 | 150 |
8 | 90 | 16 | 140 |
9 | 150 | 17 | 150 |
10 | 150 | 18 | 150 |
11 | 150 | 19 | 100 |
12 | 100 | 20 | 60 |
13 | 130 | 21-24 | 0 |
时段/t | 1-10 | 11-14 | 15-18 | 19-24 |
出力/MW | 20 | 50 | 45 | 25 |
时段/t | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
电价/元·MWh<sup>-1</sup> | 355 | 353 | 358 | 355 | 353 | 348 | 345 | 341 | 348 | 360 | 363 | 370 |
时段/t | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
电价/元·MWh<sup>-1</sup> | 364 | 358 | 351 | 348 | 352 | 365 | 376 | 380 | 385 | 378 | 376 | 364 |
时段/t | 预测偏差/MW | 时段/t | 预测偏差/MW |
1-6 | 0 | 14 | 30 |
7 | 20 | 15 | 30 |
8 | 50 | 16 | 30 |
9 | 50 | 17 | 30 |
10 | 40 | 18 | 40 |
11 | 30 | 19 | 50 |
12 | 30 | 20 | 50 |
13 | 30 | 21-24 | 0 |
时段/t | 1-10 | 11-12 | 13-14 | 15-18 | 19-24 |
出力/MW | 20 | 28 | 42 | 45 | 50 |
报价/元 | 380.1 | 372.3 | 347.2 | 345.7 | 345.5 |
场景 | 鲁棒系数 | 置信水平 | 预期收益/万元 |
1 | 1.0 | 0.50 | 29.18 |
2 | 0.8 | 0.42 | 28.64 |
3 | 0.6 | 0.35 | 27.81 |
4 | 0.4 | 0.27 | 26.58 |
5 | 0.2 | 0.21 | 25.36 |
6 | 0 | 0.16 | 25.24 |
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010563779.3A CN111740408B (zh) | 2020-06-19 | 2020-06-19 | 一种基于鲁棒随机模型的光热电站最优报价决策方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010563779.3A CN111740408B (zh) | 2020-06-19 | 2020-06-19 | 一种基于鲁棒随机模型的光热电站最优报价决策方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111740408A CN111740408A (zh) | 2020-10-02 |
CN111740408B true CN111740408B (zh) | 2023-03-14 |
Family
ID=72650216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010563779.3A Active CN111740408B (zh) | 2020-06-19 | 2020-06-19 | 一种基于鲁棒随机模型的光热电站最优报价决策方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111740408B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113159835B (zh) * | 2021-04-07 | 2023-02-28 | 远光软件股份有限公司 | 基于人工智能的发电侧电价报价方法、装置、存储介质及电子设备 |
CN113437744B (zh) * | 2021-06-09 | 2022-02-01 | 河海大学 | 考虑不确定性的光热-生物质混合电站鲁棒优化调度模型 |
CN115600761B (zh) * | 2022-11-09 | 2023-05-02 | 山东大学 | 考虑不确定性因素的综合能源生产单元自调度方法和系统 |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108023367A (zh) * | 2017-07-12 | 2018-05-11 | 甘肃省电力公司风电技术中心 | 一种含光热发电的混合电力系统负荷频率控制方法 |
JP6369965B1 (ja) * | 2018-02-01 | 2018-08-08 | 山田和幸株式会社 | 電力供給方法、情報処理プログラム及び電力供給装置 |
CN108258695B (zh) * | 2018-02-28 | 2019-08-27 | 东南大学 | 一种交直流混联微网的随机鲁棒耦合型优化调度方法 |
CN108428013A (zh) * | 2018-03-19 | 2018-08-21 | 广东电网有限责任公司电力科学研究院 | 一种含热储能的光热电站多市场鲁棒投标方法 |
CN109347124B (zh) * | 2018-11-29 | 2022-06-10 | 国网江苏省电力有限公司南京供电分公司 | 利用蓄热热泵群的电热微网联络线功率平抑方法与装置 |
US11196263B2 (en) * | 2018-11-30 | 2021-12-07 | Midcontinent Independent System Operator, Inc. | Systems and methods for managing energy storing resources of an electrical power grid |
CN109727158B (zh) * | 2019-01-25 | 2020-12-18 | 燕山大学 | 一种基于改进弱鲁棒优化的电热综合能源系统调度方法 |
CN109934470B (zh) * | 2019-02-27 | 2023-01-20 | 上海交通大学 | 聚合大规模空调负荷的信息物理建模与控制方法 |
CN110322056B (zh) * | 2019-06-19 | 2022-08-16 | 河海大学 | 一种计及中央空调系统的虚拟电厂随机自适应鲁棒优化调度方法 |
CN110443467A (zh) * | 2019-07-18 | 2019-11-12 | 天津大学 | 一种区域综合能源系统太阳能消纳能力评估方法 |
CN110910047A (zh) * | 2019-12-07 | 2020-03-24 | 国家电网有限公司 | 一种电热耦合微能源站随机调度优化方法 |
-
2020
- 2020-06-19 CN CN202010563779.3A patent/CN111740408B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN111740408A (zh) | 2020-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110571867B (zh) | 一种计及风电不确定性的虚拟电厂日前优化调度系统方法 | |
CN111740408B (zh) | 一种基于鲁棒随机模型的光热电站最优报价决策方法 | |
CN108063451B (zh) | 一种提高风电接纳能力的电网多元优化调度方法 | |
CN107332286B (zh) | 一种含储热的热电联产与风电协调调度方法 | |
CN104463378B (zh) | 用于水电资源丰富地区省级电网风力发电消纳能力的算法 | |
CN108009693A (zh) | 基于两级需求响应的并网微电网双层优化方法 | |
CN111445107A (zh) | 冷热电联供型微电网多目标优化配置方法 | |
CN114330827B (zh) | 多能流虚拟电厂分布式鲁棒自调度优化方法及其应用 | |
CN115173453A (zh) | 一种储能辅助电网调峰的优化配置方法 | |
Xiao et al. | A multi‐energy complementary coordinated dispatch method for integrated system of wind‐photovoltaic‐hydro‐thermal‐energy storage | |
CN116706869A (zh) | 一种用于区域电网供需平衡场景的预测方法及装置 | |
CN116979578A (zh) | 一种风光水火储的电气热三联产优化调度方法和系统 | |
CN116050637A (zh) | 基于分时电价的综合能源虚拟电厂优化调度方法及系统 | |
CN115640902A (zh) | 计及碳价不确定性的园区综合能源系统低碳优化调度方法 | |
CN113962419B (zh) | 基于改进多目标布谷鸟搜索算法的热电联产机组负荷优化分配方法 | |
CN117526440A (zh) | 一种计及灵活性的煤-水-风-光协同发电系统优化运行方法 | |
CN110336308B (zh) | 一种基于机会约束的主动配电网经济调度方法 | |
CN110472364B (zh) | 一种考虑可再生能源的离网式热电气联产系统的优化方法 | |
CN110119850B (zh) | 基于光热发电调节的储热量双阶段优化调度方法 | |
CN116418013A (zh) | 风-光-抽水蓄能联合系统多目标优化方法及系统 | |
Hu et al. | Dual-time scale optimal dispatch of the CSP-PV hybrid power plant considering dynamic operation | |
CN106355286A (zh) | 水冷却光伏‑光热发电系统的发电量计算方法及系统 | |
CN115765034A (zh) | 一种光热-光伏-火电联合协同控制方法及系统 | |
CN115276088A (zh) | 一种联合发电系统中光热电站储热容量优化配置方法 | |
CN113673156A (zh) | 适应全可再生能源基地多场景的光热发电容量优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Luo Inventor after: Li Xing Inventor after: Yue Chao Inventor after: Lei Xiaoling Inventor after: Zhu Ziqi Inventor after: Li Meiling Inventor after: Zhang Wensong Inventor after: Qi Qiumin Inventor after: Ma Wenguang Inventor after: Zhang Lijuan Inventor after: Wang Zhenghui Inventor after: Li Xin Inventor before: Zhu Ziqi Inventor before: Li Xing Inventor before: Yue Chao Inventor before: Lei Xiaoling Inventor before: Li Meiling Inventor before: Zhang Wensong Inventor before: Qi Qiumin Inventor before: Ma Wenguang Inventor before: Zhang Lijuan Inventor before: Wang Zhenghui Inventor before: Li Xin Inventor before: Li Luo |
|
GR01 | Patent grant | ||
GR01 | Patent grant |