CN111705741A - Drainage and water refilling system, drainage method and refilling method of water cushion pond - Google Patents

Drainage and water refilling system, drainage method and refilling method of water cushion pond Download PDF

Info

Publication number
CN111705741A
CN111705741A CN202010702419.7A CN202010702419A CN111705741A CN 111705741 A CN111705741 A CN 111705741A CN 202010702419 A CN202010702419 A CN 202010702419A CN 111705741 A CN111705741 A CN 111705741A
Authority
CN
China
Prior art keywords
maintenance
water
drainage
pipe
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010702419.7A
Other languages
Chinese (zh)
Other versions
CN111705741B (en
Inventor
方杰
曹春建
李胜兵
许志翔
吴胜华
方晓红
袁静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202010702419.7A priority Critical patent/CN111705741B/en
Publication of CN111705741A publication Critical patent/CN111705741A/en
Application granted granted Critical
Publication of CN111705741B publication Critical patent/CN111705741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Hydraulic Turbines (AREA)

Abstract

本发明涉及一种水垫塘检修排水及回充水系统、排水方法和回充水方法。本发明的目的是提供一种安全可靠、切实可行的水垫塘检修排水及回充水系统、排水方法和回充水方法。本发明的技术方案是:该系统设置于二道坝内,具有:自流充排水管,连通二道坝上游水垫塘和下游河道;流量计,安装于所述自流充排水管上;集水池,设置于水垫塘底部与二道坝相连区域;检修排水管路,包括检修取水管、检修排水总管Ⅰ、检修排水支管和检修排水总管Ⅱ;反冲洗管路,包括检修取水管、检修排水总管Ⅰ和检修排水总管Ⅱ;压力变送器,安装于检修排水总管Ⅰ,用于监视水垫塘内集水池的水位;控制监测系统,与流量计和压力变送器电路连接。本发明适用于水利水电工程领域。

Figure 202010702419

The invention relates to a water cushion pond maintenance drainage and water backfilling system, a drainage method and a water backfilling method. The purpose of the present invention is to provide a safe, reliable and practicable water-cushion pond maintenance, drainage and refilling system, drainage method and refilling method. The technical scheme of the present invention is as follows: the system is arranged in the Erdao Dam, and has: an artesian filling and draining pipe, which connects the upstream water cushion pond and the downstream river channel of the Erdaoba; a flow meter is installed on the artesian filling and draining pipe; a water collecting tank , set in the area where the bottom of the water cushion pond is connected to the Erdao dam; maintenance of the drainage pipeline, including maintenance of the water intake pipe, maintenance of the drainage main pipe I, maintenance of the drainage branch pipe and maintenance of the drainage main pipe II; backwash pipeline, including maintenance of the water intake pipe, maintenance and drainage Main pipe I and maintenance drainage main pipe II; pressure transmitter, installed in the maintenance and drainage main pipe I, used to monitor the water level of the sump in the water cushion pond; control and monitoring system, connected with the flow meter and pressure transmitter circuit. The invention is suitable for the field of water conservancy and hydropower engineering.

Figure 202010702419

Description

水垫塘检修排水及回充水系统、排水方法和回充水方法Drainage and water refilling system, drainage method and refilling method of water cushion pond

技术领域technical field

本发明涉及一种水垫塘检修排水及回充水系统、排水方法和回充水方法。适用于水利水电工程领域。The invention relates to a water cushion pond maintenance drainage and water backfilling system, a drainage method and a water backfilling method. Applicable to the field of water conservancy and hydropower engineering.

背景技术Background technique

水垫塘是拱坝坝后的消能防冲保护工程,防止拱坝泄水后坝基产生冲蚀破坏,保护坝的安全稳定。通常在拱坝泄洪运行,或暴雨时岸坡塌方可能会对水垫塘产生冲蚀破坏。为了保障大坝的安全,一般都需要定期对水垫塘进行抽水检修维护。The water cushion pond is an energy dissipation and anti-scour protection project behind the arch dam, which prevents the dam foundation from being eroded and damaged after the arch dam discharges water, and protects the safety and stability of the dam. Usually, the flood discharge operation of the arch dam, or the collapse of the bank slope during heavy rain may cause erosion damage to the water cushion pond. In order to ensure the safety of the dam, it is generally necessary to carry out pumping maintenance for the water cushion pond on a regular basis.

(1)目前我国已建的二滩、拉西瓦、小湾等大型水电站的水垫塘多采用临时抽排水系统对水垫塘抽水排空进行检修。(1) At present, the water cushion ponds of Ertan, Laxiwa, Xiaowan and other large hydropower stations built in my country mostly use temporary pumping and drainage systems to pump and empty the water cushion ponds for maintenance.

临时抽排方式主要有以下不足之处:1、系统搭建工作量大,排水系统和组装程序繁琐;2、系统全程基本都需要人工干预,无法实现自动控制和监测,运行、维护不方便;3、抽水系统设备均布置在户外,排水系统故障率高,工作效率低,排水时间长;4、临时电源和机电设备裸露在外,可能会给工作人员带来安全隐患。Temporary pumping and drainage methods mainly have the following shortcomings: 1. The system construction workload is heavy, and the drainage system and assembly procedures are cumbersome; 2. The whole process of the system basically requires manual intervention, which cannot realize automatic control and monitoring, and is inconvenient to operate and maintain; 3. . The pumping system equipment is arranged outdoors, the drainage system has a high failure rate, low work efficiency, and long drainage time; 4. The temporary power supply and electromechanical equipment are exposed, which may bring safety hazards to the staff.

(2)专利号为201020554462.5的中国专利“水垫塘的给排水系统”提供了一种在二道坝内设置固定式抽排水泵房供水垫塘检修使用的方案,其优点为:与之前方案相比,可以实现水垫塘检修时充排水的自动控制操作。(2) The Chinese patent "Water Supply and Drainage System for Water Pad Pool" with the patent number of 201020554462.5 provides a solution for setting up a fixed pumping and drainage pump room in the second dam for the maintenance and use of the water supply pad pool. Its advantages are: the same as the previous solution. In contrast, the automatic control operation of filling and draining during the maintenance of the water cushion pond can be realized.

但这种方案也有不少缺点,主要为:1、设置在水泵前后的抽水管低于水垫塘底部,设置的排水管则低于或者接近河床底部,由于该系统仅在水垫塘检修时需要,平常并不运行,长时间的静止状态,抽排水管路自然存在淤积,导致系统出现堵塞,且管道内的清淤困难,因此取排水口及管路的设置要选择合理的位置,并且还要考虑有一定的反冲洗功能;2、水泵系统仅设置了控制阀门,功能并不明确,实际上在水垫塘前后水压平衡后,水泵需要造压运行以满足水泵正常运行需要,需要增加泵控阀和造压阀来满足系统运行需要;3、水垫塘检修排水系统是由多台泵组组成运行,根据水垫塘塘内水位综合考虑运行,同时未考虑水垫塘底部少量积水时的汇集及排水;4、大型水垫塘两岸边坡较高,水垫塘后的二道坝要考虑河谷谷幅变形的影响,谷幅变形会对泵房结构及抽排水管路造成极大的影响,本专利也未考虑此影响;5、在取排水管口处既有上游泄洪所产生的滚石、也有上游未清理干净的编制袋等杂物,给水泵、阀门及排水管路安全运行造成极大的安全隐患,这些因素的应对方案在本专利也未得到体现,需要设置过滤设备,6、未考虑充排水管路系统实际应用的水位范围,同时也未考虑在高速水流下所产生的噪音;7、下游河道的取排水口封堵检修在水体中也要考虑相应的措施;因此按照本发明方案作为工程应用,尚需要解决一系列问题,因而其实用价值并不是很高。However, this solution also has many shortcomings, mainly as follows: 1. The suction pipes set before and after the water pump are lower than the bottom of the water cushion pond, and the drainage pipes are set below or close to the bottom of the river bed, because the system is only used when the water cushion pond is overhauled. It is necessary, usually not running, and in a static state for a long time, the pumping and draining pipelines naturally have siltation, which leads to blockage of the system, and it is difficult to clear the silt in the pipeline. It is also necessary to consider a certain backwashing function; 2. The pump system is only equipped with a control valve, and the function is not clear. In fact, after the water pressure before and after the water cushion pond is balanced, the pump needs to build pressure to meet the needs of the normal operation of the pump. Increase the pump control valve and pressure building valve to meet the needs of system operation; 3. The maintenance and drainage system of the water cushion pond is composed of multiple pump groups. The operation is comprehensively considered according to the water level in the water cushion pond, and the small amount of the bottom of the water cushion pond is not considered. 4. The slopes on both sides of the large water cushion pond are relatively high, and the second dam behind the water cushion pond should consider the influence of the valley width deformation. The valley width deformation will cause damage to the structure of the pump room and the drainage pipeline. 5. At the mouth of the intake and drainage pipes, there are both rolling stones generated by the upstream flood discharge, and debris such as woven bags that have not been cleaned upstream, as well as water supply pumps, valves and drainage pipelines. Safe operation causes great potential safety hazards. The solutions to these factors are not reflected in this patent. Filtering equipment needs to be set up. 6. The water level range of the actual application of the filling and draining pipeline system is not considered, and the high-speed water flow is not considered. 7. Corresponding measures should also be considered in the water body for plugging and maintenance of the intake and drainage outlets of the downstream river; therefore, according to the solution of the present invention, as an engineering application, a series of problems still need to be solved, so its practical value is not very high. .

(3)专利公开号为CN103556611B的中国专利“可发电的水垫塘充排水系统”提供了一种在二道坝排水廊道内设置抽水蓄能发电厂房,通过设置可逆式水轮发电机组利用水垫塘自动充水和排水的水能落差以及收集两岸山体的渗漏水量用于发电,在满足水垫塘检修排水的需要,降低了电站辅助系统的能耗;检修设备能够长期用于发电,也提高了设备的利用率,降低了设备的故障率;本系统大量减少了充排水时所耗的电能以及电站辅助系统运行时的运行维护费用,技术方案更可靠、更节能环保。(3) The Chinese patent "Water Cushion Pond Filling and Draining System That Can Generate Electricity" with the Patent Publication No. CN103556611B provides a pumped-storage power plant house in the drainage corridor of the Erdao dam, and the reversible hydro-turbine generator set is arranged to utilize water The water energy drop of the automatic filling and drainage of the pad pond and the seepage water of the mountains on both sides are collected for power generation, which meets the needs of the maintenance and drainage of the pad pond and reduces the energy consumption of the auxiliary system of the power station; the maintenance equipment can be used for long-term power generation, It also improves the utilization rate of the equipment and reduces the failure rate of the equipment; the system greatly reduces the power consumption during charging and drainage and the operation and maintenance costs during the operation of the auxiliary system of the power station, and the technical solution is more reliable, more energy-saving and environmentally friendly.

但是在上述专利号为201020554462.5的中国专利“水垫塘的给排水系统”存在的缺点方面,没有相应考虑,因而也限制该可发电的水垫塘充排水系统在水垫塘检修排水设施中的真正运用。However, in terms of the shortcomings of the above-mentioned Chinese patent "Water Supply and Drainage System for Water Pad Pond" with the patent number of 201020554462.5, there is no corresponding consideration, so it also limits the use of the water pad pond filling and drainage system that can generate electricity in the water pad pond maintenance and drainage facilities. really use.

发明内容SUMMARY OF THE INVENTION

本发明要解决的技术问题是:针对上述存在的问题,提供一种安全可靠、切实可行的水垫塘检修排水及回充水系统、排水方法和回充水方法。The technical problem to be solved by the present invention is to provide a safe, reliable and feasible water cushion pond maintenance, drainage and water refilling system, drainage method and water refilling method in view of the above existing problems.

本发明所采用的技术方案是:一种水垫塘检修排水及回充水系统,设置于二道坝内,其特征在于,具有:The technical scheme adopted in the present invention is: a water cushion pond maintenance drainage and water backfilling system, which is arranged in the second dam, and is characterized in that it has:

自流充排水管,连通二道坝上游水垫塘和下游河道,其上配有充排水阀组;The self-flowing filling and draining pipe connects the upstream water cushion pond and the downstream river channel of the Erdaoba, and is equipped with a filling and draining valve group;

流量计,安装于所述自流充排水管上,用于获取自流充排水管管内得流量变化;a flow meter, installed on the artesian filling and draining pipe, used to obtain the flow change in the artesian filling and draining pipe;

集水池,设置于水垫塘底部与二道坝相连区域,该集水池的进水口处设有双层拦污栅;The sump is set at the bottom of the water cushion pond in the area where the second dam is connected, and a double-layer trash rack is arranged at the water inlet of the sump;

检修排水管路,包括检修取水管、检修排水总管Ⅰ、检修排水支管和检修排水总管Ⅱ,检修取水管一端连通所述集水池,检修取水管另一端连通检修排水总管Ⅰ,检修排水总管Ⅰ与检修排水总管Ⅱ之间经若干检修排水支管相连通,检修排水总管Ⅱ的出水口连通下游河道;其中所述检修取水管上装有检修取水隔离阀,所述检修排水支管上装有检修排水泵;The maintenance and drainage pipelines include the maintenance water intake pipe, the maintenance drainage main pipe I, the maintenance drainage branch pipe and the maintenance drainage main pipe II. The maintenance and drainage main pipes II are connected through several maintenance and drainage branch pipes, and the water outlet of the maintenance and drainage main pipes II is connected to the downstream river; wherein the maintenance water intake pipe is provided with a maintenance water intake isolation valve, and the maintenance drainage branch pipe is provided with a maintenance drainage pump;

反冲洗管路,包括所述检修取水管、检修排水总管Ⅰ和检修排水总管Ⅱ,在检修排水总管Ⅰ与检修排水总管Ⅱ经反冲洗管相连,反冲洗管上配有反冲洗阀组;The backwash pipeline includes the maintenance water intake pipe, the maintenance drainage main pipe I and the maintenance drainage main pipe II. The maintenance drainage main pipe I and the maintenance drainage main pipe II are connected by the backwash pipe, and the backwash pipe is equipped with a backwash valve group;

压力变送器,安装于所述检修排水总管Ⅰ,用于监视水垫塘内集水池的水位;The pressure transmitter is installed in the maintenance and drainage main pipe I, and is used to monitor the water level of the sump in the water cushion pond;

控制监测系统,与所述流量计和压力变送器电路连接;control and monitor system, connected with the flow meter and pressure transmitter circuit;

所述检修取水管分为检修取水管Ⅰ和检修取水管Ⅱ,其中检修取水管Ⅰ、Ⅱ的取水口分别位于集水池内高、低不同高程。The maintenance water intake pipes are divided into maintenance water intake pipes I and maintenance water intake pipes II, wherein the water intakes of the maintenance water intake pipes I and II are respectively located at different elevations in the sump.

所述检修排水总管Ⅱ的出水口经三通连通所述自流充排水管,所述充排水阀组包括位于三通上游的上游充排水阀组和位于三通下游的下游充排水阀组。The water outlet of the maintenance and drainage main pipe II is connected to the self-flowing filling and draining pipe through a tee, and the filling and draining valve group includes an upstream filling and draining valve group located upstream of the tee and a downstream filling and draining valve group located downstream of the tee.

所述自流充排水管上与检修排水总管Ⅱ相连部位高程高于其两端端口高程。The elevation of the part connected to the maintenance drainage main pipe II on the self-flowing filling and draining pipe is higher than the elevation of the ports at both ends thereof.

所述检修取水管的取水口处设有拦污栅。A trash rack is provided at the water intake of the maintenance water intake pipe.

部分所述检修排水支管上的检修排水泵采用检修排水小泵,其余检修排水支管上的检修排水泵采用检修排水大泵。The maintenance and drainage pumps on some of the maintenance and drainage branches are small maintenance and drainage pumps, and the maintenance and drainage pumps on the other maintenance and drainage branches are large maintenance and drainage pumps.

所述检修排水总管Ⅱ分为检修排水总管Ⅱ-Ⅰ和检修排水总管Ⅱ-Ⅱ,所述检修排水小泵和部分检修排水大泵连通所述检修排水总管Ⅱ-Ⅰ,其余所述检修排水大泵连通所述检修排水总管Ⅱ-Ⅱ。The maintenance drainage main pipe II is divided into the maintenance drainage main pipe II-I and the maintenance drainage main pipe II-II. The maintenance drainage small pump and part of the maintenance drainage large pump are connected to the maintenance drainage main pipe II-I, and the rest of the maintenance drainage large pipes are connected. The pump communicates with the maintenance and drainage mains II-II.

所述自流充排水管分为于所述检修排水总管Ⅱ-Ⅰ相连的自流充排水管Ⅰ和与检修排水总管Ⅱ-Ⅱ相连的自流充排水管Ⅱ。The artesian filling and draining pipe is divided into an artesian filling and draining pipe I connected with the maintenance and drainage main pipe II-I and an artesian filling and draining pipe II connected with the maintenance and drainage main pipe II-II.

所述自流充排水管的与下游河道相连端制有能安装盲板的法兰。The end connected with the downstream river channel of the self-flowing filling and draining pipe is provided with a flange capable of installing a blind plate.

一种所述水垫塘检修排水及回充水系统的排水方法,其特征在于:A drainage method for the maintenance drainage and backfilling water system of the water cushion pond, characterized in that:

打开自流充排水管上的充排水阀组,将水垫塘内高于下游河道水位的全部水体排至下游河道当中;Open the filling and draining valve group on the self-flowing filling and draining pipe, and discharge all the water in the water cushion pond higher than the water level of the downstream river into the downstream river;

根据自流充排水管上流量计的流量信号变化,判断水垫塘内水位和下游河道内的水位情况;According to the flow signal change of the flow meter on the artesian filling and draining pipe, judge the water level in the water cushion pond and the water level in the downstream channel;

当水垫塘水位与下游河道水位基本持平时,关断充排水阀组,打开检修取水管Ⅰ上的检修取水隔离阀,将水垫塘内的水体经检修取水管Ⅰ、检修排水总管Ⅰ、检修排水支管引入至检修排水泵;When the water level of the water cushion pond is basically the same as the water level of the downstream river, turn off the filling and draining valve group, open the maintenance water intake isolation valve on the maintenance water intake pipe I, and pass the water body in the water cushion pond through the maintenance water intake pipe I, the maintenance drainage main pipe I, and the maintenance The drain branch pipe is introduced to the maintenance drain pump;

启动数台检修排水泵,将水垫塘内水内抽至水位到检修取水管Ⅰ取水口附近,停止检修排水泵抽水,关闭检修取水管Ⅰ上的检修取水隔离阀;Start several maintenance and drainage pumps, pump the water in the water cushion pond to the water level near the water intake of the maintenance water intake pipe I, stop the maintenance drainage pump pumping water, and close the maintenance water intake isolation valve on the maintenance water intake pipe I;

打开反冲洗管上的反冲洗阀组,打开检修取水管Ⅱ上的检修取水隔离阀,利用下游尾水高于上游水垫塘内水位的水压,对拦污栅及检修取水管II进行冲洗;Open the backwash valve group on the backwash pipe, open the maintenance water intake isolation valve on the maintenance water intake pipe II, and use the water pressure of the downstream tail water higher than the water level in the upstream pad pool to flush the trash rack and the maintenance water intake pipe II;

冲洗完毕后,关闭反冲洗阀组,利用数台检修排水泵将水垫塘内剩余的积水排干;After flushing, close the backwash valve group, and use several maintenance and drainage pumps to drain the remaining water in the pad pool;

利用检修排水总管Ⅰ上设置的压力变送器信号监视水垫塘内集水池内的水位,并控制数台检修排水泵排出水垫塘内集水池内的积水。Use the pressure transmitter signal set on the maintenance drainage main I to monitor the water level in the sump in the water cushion pond, and control several maintenance drainage pumps to discharge the accumulated water in the sump in the water cushion pond.

一种所述水垫塘检修排水及回充水系统的回充水方法,其特征在于:A water backfilling method for the maintenance drainage and backfilling water system of the water cushion pond, characterized in that:

打开自流充排水管上的充排水阀组,利用下游河道水位高于水垫塘内底板高程,将二道坝下游水经自流充排水管向水垫塘自流回充;Open the filling and draining valve group on the self-flowing filling and draining pipe, and use the water level of the downstream river to be higher than the elevation of the inner floor of the water-cushion pond, and recharge the water downstream of the second dam to the water-cushioning pond through the self-flowing filling and draining pipe;

通过设置在自流充排水管路上流量计传输的数据监测自流充排水管路内通过的水流量,进而判断充水是否完成;The flow of water passing through the artesian filling and draining pipeline is monitored by the data transmitted by the flowmeter set on the artesian filling and draining pipeline, and then it is judged whether the water filling is completed;

当充水完成以后,关闭自流充排水管路上的充排水阀组。When the water filling is completed, close the filling and draining valve group on the self-flowing filling and draining pipeline.

本发明的有益效果是:本发明通过设置不同高程的取水口解决水垫塘检修排水系统中的塘内滚石对取水口的影响,也能够解决漂浮物以及泥沙沉积对水垫塘检修排水系统的泥沙淤积和设备安全运行影响。The beneficial effects of the present invention are as follows: the present invention solves the influence of the rolling stones in the pond in the maintenance and drainage system of the water cushion pond on the water intake by setting water intakes with different elevations, and can also solve the problem of floating objects and sediment deposition on the maintenance and drainage system of the water cushion pond. Sedimentation and equipment safe operation.

本发明通过设置大小不同类型的泵组解决初期大量抽水以及后期塘内检修的渗漏积水自动抽排系统;设置合理的反冲洗管路为解决取排水的淤堵问题准备备用措施。The invention solves the large amount of water pumping at the initial stage and the automatic pumping and draining system of seepage and accumulated water for maintenance in the pond at the later stage by setting up pump groups of different sizes; setting a reasonable backwash pipeline prepares backup measures for solving the blockage problem of water intake and drainage.

本发明中通过检修取水管、检修排水总管Ⅰ、检修排水支管、检修排水总管Ⅱ与自流充排水管结合设置水垫塘检修时的充排水管路,并考虑设置在合理的水位高程,既能满足自流充排水需要,还不至于产生淤堵,并且还能借助于水泵泵组强大的排水能力为自流充排水管路防淤堵和杂物进入管道提供安全上的保障,同时将自流充排水管路及设备设置在合理高程上二道坝坝体内及专用阀室内,既解决了下游河道排水口的封堵,亦减小了以往的取水口较难封堵以及封堵时所产生的风险。In the present invention, the filling and draining pipelines during the maintenance of the water cushion pond are set by combining the maintenance of the water intake pipe, the maintenance drainage main pipe I, the maintenance drainage branch pipe, the maintenance drainage main pipe II and the self-flow filling and drainage pipe, and considering the setting at a reasonable water level elevation, it can not only be It can meet the needs of artesian filling and drainage without causing blockage, and can also use the powerful drainage capacity of the pump set to provide safety protection for the self-flowing filling and drainage pipelines to prevent clogging and debris from entering the pipeline, and at the same time, the self-flowing filling and drainage can be The pipelines and equipment are installed in the dam body of the second dam and the special valve room at a reasonable elevation, which not only solves the blocking of the downstream river drainage outlet, but also reduces the difficulty of blocking the water intake in the past and the risk of blocking. .

附图说明Description of drawings

图1为实施例的结构示意图。FIG. 1 is a schematic structural diagram of an embodiment.

图2为图1的A-A剖视图。FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1 .

图3为图1的B-B剖视图。FIG. 3 is a cross-sectional view taken along line B-B of FIG. 1 .

图4为图1的C-C剖视图。FIG. 4 is a C-C cross-sectional view of FIG. 1 .

图5为实施例中管路及设备的轴测图。Figure 5 is an axonometric view of piping and equipment in the embodiment.

图中:1、集水池;2、拦污栅;3、检修取水管Ⅰ;4、检修排水总管Ⅰ;5、检修排水支管;6、检修取水管Ⅱ;7、自流充排水管;701、自流充排水管Ⅰ;702、自流充排水管Ⅱ;8、检修排水总管Ⅱ;801、检修排水总管Ⅱ-Ⅰ;802、检修排水总管Ⅱ-Ⅱ;9、检修取水隔离阀;10、检修排水大泵;11、取水口;12、反冲洗管;13、压力变送器;14、波纹膨胀节;15、检修排水小泵;16、大泵后检修隔离球阀;17、大泵后造压闸阀;18、大泵后水力控制阀;20、大泵前检修隔离球阀;21、小泵前检修隔离球阀;22、小泵后水力控制阀;23、小泵后造压闸阀;24、小泵后检修隔离球阀;25、反冲洗隔离球阀;26、反冲洗操作球阀;27、流量计;28、自流充排水检修阀;29、流充排水操作阀;30、盲板;31、法兰。In the figure: 1. Water collection tank; 2. Trash rack; 3. Maintenance of water intake pipe I; 4. Maintenance of drainage main pipe I; 5. Maintenance of drainage branch pipe; 6. Maintenance of water intake pipe II; Artesian filling and draining pipe I; 702, self-flowing filling and draining pipe II; 8. Inspection and drainage main pipe II; 801, inspection and drainage mains II-I; 802, inspection and drainage mains II-II; 9. Inspection and maintenance of water intake isolation valve; 10. Inspection and drainage Large pump; 11. Water intake; 12. Backwash pipe; 13. Pressure transmitter; 14. Corrugated expansion joint; 15. Maintenance of small drainage pump; 16. Maintenance of isolation ball valve after large pump; Gate valve; 18. Hydraulic control valve after large pump; 20. Maintenance isolation ball valve before large pump; 21. Maintenance isolation ball valve before small pump; 22. Hydraulic control valve after small pump; 23. Pressure-making gate valve after small pump; 24. Small pump Inspection isolation ball valve after pump; 25, backwash isolation ball valve; 26, backwash operation ball valve; 27, flow meter; 28, self-flow filling and drainage maintenance valve; 29, flow filling and drainage operation valve; 30, blind plate; 31, flange .

具体实施方式Detailed ways

本实施例为一种水垫塘检修排水及回充水系统,设置于二道坝内,具有:自流充排水管、集水池、检修排水管路、反冲洗管路和控制监测系统。This embodiment is an overhaul, drainage and backfilling water system for a water cushion pond, which is installed in the second dam and has: a self-flowing filling and draining pipe, a sump, an overhauling and draining pipeline, a backwashing pipeline, and a control and monitoring system.

本实施例中自流充排水管具有自流充排水管Ⅰ和自流充排水管Ⅱ,自流充排水管Ⅰ和自流充排水管Ⅱ均连通二道坝上游的水垫塘和下游的河道,自流充排水管Ⅰ和自流充排水管Ⅱ的与下游河道相连端制有能安装盲板的法兰。In this embodiment, the self-flowing filling and draining pipe has the self-flowing filling and draining pipe I and the self-flowing filling and draining pipe II. Both the self-flowing filling and draining pipe I and the self-flowing filling and draining pipe II are connected to the water cushion pond upstream of the second dam and the downstream river, and the artesian filling and draining The connecting ends of the pipe I and the self-flowing filling and draining pipe II with the downstream channel are provided with flanges capable of installing blind plates.

在反拱水垫塘底部中心线与二道坝相连接的区域设置集水池,在集水池前设置有拦污栅,以防止水垫塘泄洪时有较大和较多的滚石落入集水池,保持集水池不被积石填满。In the area where the center line of the bottom of the reverse arch water cushion pond is connected with the second dam, a collection tank is set up, and a trash rack is set in front of the collection tank to prevent larger and more rolling stones from falling into the collection tank when the water cushion pond is flooded. Keep the sump from filling up with rocks.

本实施例中检修排水管路包括检修取水管、检修排水总管Ⅰ、检修排水支管和检修排水总管Ⅱ,其中检修取水管具有两根检修取水管Ⅰ和一根检修取水管Ⅱ,检修取水管Ⅰ、Ⅱ上均设置有检修取水隔离阀。检修取水管Ⅰ、Ⅱ的取水口连通集水池并设置有拦污栅,检修取水管Ⅰ的取水口布置高程高于水垫塘底部高程,检修取水管Ⅱ取水口布置低于水垫塘底部高程,可尽可能避免受塘内水体内的杂物堵塞影响,保证水垫塘内大量的积水通过此通道抽排至下游河道,位于集水坑底部,满足在集水池清淤后能够自动汇集水垫塘塘内少量的渗漏积水。In this embodiment, the maintenance drainage pipeline includes maintenance water intake pipe, maintenance drainage main pipe I, maintenance drainage branch pipe and maintenance drainage main pipe II, wherein the maintenance water intake pipe has two maintenance water intake pipes I and one maintenance water intake pipe II, and the maintenance water intake pipe I , II are equipped with maintenance water isolation valve. The water intakes of the maintenance water intake pipes I and II are connected to the water collecting tank and are equipped with a trash rack. The water intake of the maintenance water intake pipe I is arranged at a higher elevation than the bottom elevation of the water cushion pond, and the water intake of the maintenance water intake pipe II is arranged below the bottom elevation of the water cushion pond. It can avoid being blocked by debris in the water body in the pond as much as possible, and ensure that a large amount of accumulated water in the water cushion pond is pumped to the downstream river through this channel, which is located at the bottom of the sump, so that the water cushion can be automatically collected after the sump is dredged. A small amount of seepage and accumulated water in the pond.

本例中两根检修取水管Ⅰ和一根检修取水管Ⅱ的出水口共同连接检修排水总管Ⅰ,检修排水总管Ⅰ上设有波纹膨胀节。In this example, the water outlets of two maintenance water intake pipes I and one maintenance water intake pipe II are jointly connected to the maintenance drainage main pipe I, and a corrugated expansion joint is arranged on the maintenance drainage main pipe I.

本实施例中检修排水总管Ⅱ分为检修排水总管Ⅱ-Ⅰ和检修排水总管Ⅱ-Ⅱ,检修排水总管Ⅱ-Ⅰ经三通连通自流充排水管Ⅰ,检修排水总管Ⅱ-Ⅱ经三通连通自流充排水管Ⅱ,并且采用水平连接,避免泥沙进入到检修排水总管Ⅱ内,造成检修排水总管Ⅱ的淤积。在自流充排水管Ⅰ和自流充排水管Ⅱ上、三通上游装有上游充排水阀组和三通下游装有下游充排水阀组。上游充排水阀组包括自流充排水检修阀和自流充排水操作阀,下游充排水阀组包括自流充排水操作阀和自流充排水检修阀。In this embodiment, the maintenance and drainage main pipe II is divided into maintenance and drainage main pipe II-I and maintenance and drainage main pipe II-II. The self-flowing filling and draining pipe II shall be connected horizontally to prevent sediment from entering the maintenance and drainage main pipe II, resulting in siltation of the maintenance and drainage main pipe II. On the self-flowing filling and draining pipe I and the self-flowing filling and draining pipe II, an upstream filling and draining valve group is installed on the upstream of the tee, and a downstream filling and draining valve group is installed in the downstream of the tee. The upstream filling and draining valve group includes an artesian filling and draining inspection valve and an artesian filling and draining operation valve, and the downstream filling and draining valve group includes an artesian filling and draining operation valve and an artesian filling and drainage inspection valve.

本例中自流充排水管Ⅰ、Ⅱ上与检修排水总管Ⅱ-Ⅰ、Ⅱ-Ⅱ相连部位高程高于其两端端口高程,避免上下游泥沙淤积对水垫塘检修排水系统的影响,保证系统管路和设备的畅通。检修排水总管Ⅱ-Ⅰ、Ⅱ-Ⅱ于相应的自流充排水管Ⅰ、Ⅱ水平连接,避免有泥沙进入检修排水总管Ⅱ-Ⅰ、Ⅱ-Ⅱ。In this example, the elevation of the parts connected to the maintenance and drainage mains II-I and II-II on the self-flowing filling and drainage pipes I and II is higher than the elevation of the ports at both ends, so as to avoid the influence of the upstream and downstream sediment deposition on the maintenance and drainage system of the water cushion pond and ensure that the The smooth flow of system pipelines and equipment. The maintenance and drainage mains II-I and II-II are horizontally connected to the corresponding artesian filling and drainage pipes I and II to prevent sediment from entering the maintenance and drainage mains II-I and II-II.

本实施例中在检修排水总管Ⅰ和检修排水总管Ⅱ-Ⅰ之间经若干检修排水支管连通,部分检修排水支管上装有检修排水小泵,其余检修排水支管上装有检修排水大泵;在检修排水总管Ⅰ和检修排水总管Ⅱ-Ⅰ之间经若干检修排水支管连通,检修排水支管上装有检修排水大泵。In this embodiment, the maintenance drainage main pipe I and the maintenance drainage main pipe II-I are connected through a number of maintenance drainage branch pipes, some maintenance drainage branch pipes are equipped with maintenance drainage small pumps, and the other maintenance drainage branch pipes are equipped with maintenance drainage large pumps; The main pipe I and the maintenance drainage main pipe II-I are connected through a number of maintenance and drainage branch pipes, and a large maintenance and drainage pump is installed on the maintenance and drainage branch pipes.

本例中在检修排水大泵泵前的检修排水支管上装有大泵前检修隔离球阀,泵后的检修排水支管上装有大泵后水力控制阀、大泵后造压闸阀和大泵后检修隔离球阀。在检修排水小泵泵前的检修排水支管上装有小泵前检修隔离球阀,泵后的检修排水支管上装有小泵后水力控制阀、小泵后造压闸阀和小泵后检修隔离球阀。In this example, the maintenance drainage branch pipe before the large pump is equipped with a large pump maintenance isolation ball valve, and the maintenance drainage branch after the pump is equipped with a large pump rear hydraulic control valve, a rear pressure gate valve and a large pump rear maintenance isolation ball. ball valve. The maintenance drainage branch pipe in front of the small pump is equipped with a small pump front maintenance isolation ball valve, and the maintenance drainage branch after the pump is equipped with a small pump rear hydraulic control valve, a small pump rear pressure gate valve and a small pump rear maintenance isolation ball valve.

本实施例中反冲洗管路包括反冲洗管,以及检修排水管路中的检修取水管Ⅱ、检修排水总管Ⅰ、检修排水总管Ⅱ-Ⅰ和自流充排水管Ⅰ,检修排水总管Ⅰ和检修排水总管Ⅱ-Ⅰ之间经反冲洗管连通,反冲洗管上装有反冲洗阀组,反冲洗阀组包括反冲洗操作球阀和反冲洗隔离球阀。In this embodiment, the backwashing pipeline includes a backwashing pipe, as well as the maintenance water intake pipe II, the maintenance drainage main pipe I, the maintenance drainage main pipe II-I and the self-flow charging and drainage pipe I in the maintenance drainage pipeline, the maintenance drainage main pipe I and the maintenance drainage pipe The main pipes II-I are connected through a backwashing pipe. The backwashing pipe is equipped with a backwashing valve group. The backwashing valve group includes a backwashing operation ball valve and a backwashing isolation ball valve.

本实施例中控制监测系统电路中连接有流量计和压力变送器,其中流量计安装于所述自流充排水管上,用于获取自流充排水管管内的流量变化;压力变送器在检修排水总管Ⅰ上,并设置有两只,用于监视水垫塘内集水池的水位。In this embodiment, a flowmeter and a pressure transmitter are connected to the circuit of the control and monitoring system, wherein the flowmeter is installed on the artesian filling and draining pipe, and is used to obtain the flow change in the artesian filling and draining pipe; the pressure transmitter is being repaired. There are two on the main drainage pipe I, which are used to monitor the water level of the sump in the water cushion pond.

本实施例中水垫塘检修排水方法包括以下步骤:In the present embodiment, the maintenance and drainage method of the water cushion pond includes the following steps:

水垫塘的检修排水一般都安排在下游水位较低的情况下将水垫塘内的积水排至下游,尽可能利用水垫塘检修排水及回充水系统中的自流充排水管等将水垫塘内的积水排至下游,降低系统运行的能耗。The maintenance and drainage of the water-cushion pond is generally arranged to discharge the accumulated water in the water-cushion pond to the downstream when the downstream water level is low. The accumulated water in the pad pond is discharged to the downstream, reducing the energy consumption of the system operation.

打开自流充排水管上的自流充排水检修阀、自流充排水操作阀等,将二道坝上游水垫塘和下游河道经自流充排水管连接起来,将水垫塘内高于下游河道水位的全部水体排至下游河道当中。Open the self-flowing filling and draining maintenance valve, the self-flowing filling and draining operation valve, etc. on the self-flowing filling and draining pipe, connect the upstream water cushion pond of the Erdaoba and the downstream river through the artesian filling and draining pipe, and connect all the water in the water cushion pond higher than the water level of the downstream river. The water body is discharged into the downstream river channel.

根据自流充排水管上的流量计的流量信号变化,判断水垫塘内水位和下游河道内的水位情况。According to the flow signal change of the flow meter on the artesian filling and draining pipe, the water level in the water cushion pond and the water level in the downstream river channel are judged.

当水垫塘水位与下游河道水位基本持平时,将自流充排水管上三通上游的自流充排水操作阀等分别进行关闭,打开取水口设置高程较高的检修取水管Ⅰ上的检修取水隔离阀,将水垫塘内相应水质较好的水体引入至大、小泵组成的抽排系统水泵设备泵前。When the water level of the water cushion pond is basically the same as the water level of the downstream river, close the artesian filling and draining operation valves, etc., upstream of the tee on the artesian filling and draining pipe respectively, open the water intake and set the maintenance water intake isolation on the maintenance water intake pipe I with a higher elevation. The valve is used to introduce the corresponding water body with better water quality in the water cushion pond to the front of the pump equipment of the pumping and drainage system composed of large and small pumps.

利用现地控制设备、变配电设备、电源电缆、数据光纤和控制监测系统等相关设备,启动数台检修排水大泵,将水垫塘内水内抽至水位到两个设置在较高高程的检修取水管Ⅰ取水口附近,停止检修排水大泵抽水。Using on-site control equipment, power transformation and distribution equipment, power cables, data optical fibers, control and monitoring systems and other related equipment, start several large maintenance and drainage pumps, and pump the water in the pad pond to the water level to two sets at a higher elevation. Check the vicinity of the water intake of the water intake pipe I, and stop the maintenance of the large drainage pump to pump water.

关闭检修取水管Ⅰ上的检修取水隔离阀,关闭大泵前检修隔离球阀和小泵前检修隔离球阀,打开反冲洗管操作球阀和反冲洗管隔离球阀,打开检修取水管Ⅱ上的检修取水隔离阀,利用下游尾水高于上游水垫塘内水位的水压,对集水池内和集水池前的拦污栅、检修取水管II进行冲洗。Close the maintenance water isolation valve on the maintenance water intake pipe I, close the maintenance isolation ball valve before closing the large pump and the maintenance isolation ball valve before the small pump, open the backwash pipe operation ball valve and the backwash pipe isolation ball valve, and open the maintenance water intake isolation valve on the maintenance water intake pipe II. The valve can use the water pressure of the downstream tail water higher than the water level in the upstream water cushion pond to flush the trash rack and maintenance water intake pipe II in and in front of the sump.

冲洗完毕后,关闭反冲洗管上的反冲洗管操作球阀和反冲洗管隔离球阀,打开大泵前检修隔离球阀和小泵前检修隔离球阀,利用数台检修排水大泵和检修排水小泵将水垫塘内剩余的积水排干。After flushing, close the backwashing pipe operation ball valve on the backwashing pipe and the isolation ball valve of the backwashing pipe, open the large pump and overhaul the isolation ball valve before the small pump, and use several large maintenance drainage pumps and small maintenance drainage pumps to Drain the remaining stagnant water in the pond.

检修排水大泵停机,将检修排水小泵切换至自动运行模式,利用检修排水管Ⅰ设置的两只压力变送器信号监视水垫塘内集水池内的水位,并控制检修排水小泵排出水垫塘内集水池内的积水。Stop the large maintenance drainage pump, switch the small maintenance drainage pump to automatic operation mode, use the signals of the two pressure transmitters set in the maintenance drainage pipe I to monitor the water level in the sump in the water cushion pond, and control the small maintenance drainage pump to discharge the water cushion Accumulation of water in a sump in a pond.

本实施例中在水垫塘检修完成后回充水的方法包括以下步骤:In the present embodiment, the method for refilling water after the maintenance of the water cushion pond is completed includes the following steps:

打开自流充排水管上的自流充排水检修阀、自流充排水操作阀等,将二道坝上游水垫塘和下游河道经自流充排水管连接。Open the self-flowing filling and draining maintenance valve, the self-flowing filling and draining operation valve, etc. on the self-flowing filling and draining pipe, and connect the upstream water cushion pond and the downstream river channel of the second dam through the self-flowing filling and draining pipe.

利用下游河道水位高于水垫塘内底板高程,实现二道坝下游水经自流充排水管向水垫塘内自流回充。The water level in the downstream channel is higher than the elevation of the inner floor of the water cushion pond, so that the water downstream of the Erdaoba can be recharged to the water cushion pond through the artesian filling and drainage pipes.

通过设置在自流充排水管上的流量计传输的数据监测可以监测自流充排水管路内通过的水流量,进而判断充水是否完成。The data monitoring transmitted by the flow meter set on the artesian filling and draining pipe can monitor the flow of water passing through the artesian filling and draining pipe, and then judge whether the water filling is completed.

当充水完成以后,关闭自流充排水管路上的自流充排水操作阀等。When the water filling is completed, close the self-flowing filling and draining operation valve, etc. on the self-flowing filling and draining pipeline.

当水垫塘泄洪时,可局部开启大坝深孔事故闸门首先将水垫塘充水至二道坝坝顶高程,后全开大坝深孔事故闸门,达到泄洪要求。When the water cushion pond releases floods, the dam deep hole accident gate can be partially opened to first fill the water cushion pond to the crest elevation of the Erdao dam, and then fully open the dam deep hole accident gate to meet the flood discharge requirements.

本实施例中水垫塘排水系统的设备检修分为两个层次进行。第一层实施操作步骤为:首先关闭自流充排水管上的充排水阀组,达到切断上游水垫塘内水和下游河道水的目的,实现二道坝体内排水泵房和自流充排水阀室内剩余所有设备的检修。第二层实施操作步骤,首先将水垫塘内水体排干,然后将盲板与自流充排水管上的法兰进行紧固连接,隔断下游水,可实现二道坝体内排水泵房和自流充排水阀室内所有设备的检修。In this embodiment, the equipment maintenance of the drainage system of the pond is divided into two levels. The operation steps of the first layer are as follows: First, close the filling and draining valve group on the self-flowing filling and draining pipe to cut off the water in the upstream water cushion pond and the water in the downstream river, and realize the residual water in the drainage pump room in the second dam and the self-flowing filling and draining valve in the room. Overhaul of all equipment. The second layer implements the operation steps. First, drain the water body in the water cushion pond, and then fasten the blind plate to the flange on the self-flow filling and drainage pipe to cut off the downstream water. Overhaul of all equipment in the drain valve room.

对于设置有大型水垫塘的水利水电工程,采用本发明安全、可靠的水垫塘充排水系统后,可将主要抽排水设备、变配电设备以及起吊设备布置在二道坝内合适的位置,用于水垫塘内检修抽排水需要;设置不同高程取水口的检修取水管,将自流充排水阀室设置较高位置,自流充排水管与抽排水总管结合,并布置在下游河床之上高程,并成顺坡布置,可最大程度的避免二道坝上、下游泥沙淤积对水垫塘检修排水系统的影响,保证系统管路和设备的畅通;将自流充排水阀室布置在水垫塘一侧的廊道内,利用水垫塘与底板的斜坡可避免水垫塘充水时的高速水流对底板的冲击,起到较好的消能作用,从而使得水垫塘检修排水系统抗堵塞、抗潮湿以及抗河谷挤压变形能力得到了极大的提高。同时本系统还可设置现地操作和远程控制监测系统,可以实现自动充排水控制,运行人员操作方便,避免了临时充排水系统搭建的繁琐以及系统运行的安全隐患,更能保证水垫塘的稳定运行。同时该系统无需增加额外投资,节省了检修时的充排水时间,极大地提高水垫塘充排水效率;此外,本系统大量减少了充排水时所耗的电能,技术方案更节能环保。For water conservancy and hydropower projects with large water cushion ponds, after the safe and reliable water cushion pond filling and drainage system of the present invention is adopted, the main pumping and drainage equipment, power transformation and distribution equipment and lifting equipment can be arranged at suitable positions in the second dam , used for maintenance, pumping and drainage needs in the water cushion pond; set up maintenance water intake pipes for water intakes at different elevations, set the artesian filling and draining valve chamber at a higher position, and combine the artesian filling and drainage pipes with the pumping and drainage mains, and arrange them at the elevation above the downstream riverbed. , and arranged along the slope, which can avoid the influence of sediment deposition upstream and downstream of the second dam on the maintenance and drainage system of the water cushion pond to the greatest extent, and ensure the smooth flow of the system pipeline and equipment; In the corridor on one side of the pond, the use of the slope of the water cushion pond and the bottom plate can avoid the impact of the high-speed water flow on the bottom plate when the water cushion pond is filled with water, and play a better role in energy dissipation, so that the maintenance and drainage system of the water cushion pond can resist clogging. , moisture resistance and resistance to valley extrusion deformation have been greatly improved. At the same time, the system can also be equipped with a local operation and remote control monitoring system, which can realize automatic filling and drainage control, which is convenient for operators to operate, avoids the cumbersome construction of the temporary filling and drainage system and the hidden safety hazards of system operation, and can better ensure the safety of the water cushion pond. Stable operation. At the same time, the system does not need to increase additional investment, saves the filling and drainage time during maintenance, and greatly improves the filling and drainage efficiency of the water cushion pond. In addition, the system greatly reduces the power consumption during filling and drainage, and the technical solution is more energy-saving and environmentally friendly.

Claims (10)

1.一种水垫塘检修排水及回充水系统,设置于二道坝内,其特征在于,具有:1. a water cushion pond maintenance drainage and backfill water system, is arranged in the Erdao dam, is characterized in that, has: 自流充排水管(7),连通二道坝上游水垫塘和下游河道,其上配有充排水阀组;The self-flowing filling and draining pipe (7) connects the upstream water cushion pond and the downstream river channel of the Erdaoba, and is equipped with a filling and draining valve group; 流量计,安装于所述自流充排水管(7)上,用于获取自流充排水管(7)管内得流量变化;a flowmeter, installed on the artesian filling and draining pipe (7), for obtaining the flow change in the self-flowing filling and draining pipe (7); 集水池(1),设置于水垫塘底部与二道坝相连区域,该集水池的进水口处设有拦污栅(2);A water collecting pond (1) is arranged at the bottom of the water cushion pond in the area where the second dam is connected, and a trash rack (2) is arranged at the water inlet of the collecting pond; 检修排水管路,包括检修取水管、检修排水总管Ⅰ(4)、检修排水支管(5)和检修排水总管Ⅱ(8),检修取水管一端连通所述集水池(1),检修取水管另一端连通检修排水总管Ⅰ(4),检修排水总管Ⅰ(4)与检修排水总管Ⅱ(8)之间经若干检修排水支管(5)相连通,检修排水总管Ⅱ(8)的出水口连通下游河道;其中所述检修取水管上装有检修取水隔离阀(9),所述检修排水支管(5)上装有检修排水泵;Maintenance of the drainage pipeline, including maintenance of the water intake pipe, maintenance of the drainage main pipe I (4), maintenance of the drainage branch pipe (5) and maintenance of the drainage main pipe II (8). One end is connected to the maintenance and drainage main pipe I (4), the maintenance and drainage main pipe I (4) and the maintenance and drainage main pipe II (8) are connected through a number of maintenance and drainage branch pipes (5), and the water outlet of the maintenance and drainage main pipe II (8) is connected to the downstream. River; wherein said maintenance water intake pipe is equipped with maintenance water intake isolation valve (9), and said maintenance drainage branch pipe (5) is provided with maintenance drainage pump; 反冲洗管(12)路,包括所述检修取水管、检修排水总管Ⅰ(4)和检修排水总管Ⅱ(8),在检修排水总管Ⅰ(4)与检修排水总管Ⅱ(8)经反冲洗管(12)相连,反冲洗管(12)上配有反冲洗阀组;The backwashing pipe (12), including the maintenance water intake pipe, the maintenance drainage main pipe I (4) and the maintenance drainage main pipe II (8), are backwashed in the maintenance drainage main pipe I (4) and the maintenance drainage main pipe II (8). The pipes (12) are connected, and the backwashing pipe (12) is provided with a backwashing valve group; 压力变送器(13),安装于所述检修排水总管Ⅰ(4),用于监视水垫塘内集水池(1)的水位;A pressure transmitter (13), installed in the maintenance and drainage main pipe I (4), is used to monitor the water level of the sump (1) in the water cushion pond; 控制监测系统,与所述流量计和压力变送器(13)电路连接;a control and monitoring system, connected with the flowmeter and the pressure transmitter (13) in an electrical circuit; 所述检修取水管分为检修取水管Ⅰ(3)和检修取水管Ⅱ(6),其中检修取水管Ⅰ、Ⅱ的取水口(11)分别位于集水池(1)内高、低不同高程。The maintenance water intake pipes are divided into maintenance water intake pipes I (3) and maintenance water intake pipes II (6), wherein the water intakes (11) of the maintenance water intake pipes I and II are respectively located at different elevations in the water collecting tank (1). 2.根据权利要求1所述的水垫塘检修排水及回充水系统,其特征在于:所述检修排水总管Ⅱ(8)的出水口经三通连通所述自流充排水管(7),所述充排水阀组包括位于三通上游的上游充排水阀组和位于三通下游的下游充排水阀组。2. The water cushion pond maintenance drainage and backfill water system according to claim 1, characterized in that: the water outlet of the maintenance drainage main pipe II (8) is connected to the self-flow filling and drainage pipe (7) through a tee, The filling and draining valve group includes an upstream filling and draining valve group located upstream of the tee and a downstream filling and draining valve group located downstream of the tee. 3.根据权利要求2所述的水垫塘检修排水及回充水系统,其特征在于:所述自流充排水管(7)上与检修排水总管Ⅱ(8)相连部位高程高于其两端端口高程。3. The water cushion pond maintenance drainage and backfilling water system according to claim 2, characterized in that: the elevation of the part connected to the maintenance drainage main pipe II (8) on the self-flow filling and drainage pipe (7) is higher than its two ends Port elevation. 4.根据权利要求1所述的水垫塘检修排水及回充水系统,其特征在于:所述检修取水管的取水口(11)处设有拦污栅(2)。4. The water-cushion pond maintenance drainage and backfill water system according to claim 1, characterized in that: a trash rack (2) is provided at the water intake (11) of the maintenance water intake pipe. 5.根据权利要求1~3任意一项所述的水垫塘检修排水及回充水系统,其特征在于:部分所述检修排水支管(5)上的检修排水泵采用检修排水小泵(15),其余检修排水支管(5)上的检修排水泵采用检修排水大泵(10)。5. The water cushion pond maintenance drainage and backfilling system according to any one of claims 1 to 3, wherein the maintenance drainage pump on part of the maintenance drainage branch pipe (5) adopts the maintenance drainage small pump (15). ), the maintenance drainage pump on the remaining maintenance drainage branch pipes (5) adopts the maintenance drainage large pump (10). 6.根据权利要求5所述的水垫塘检修排水及回充水系统,其特征在于:所述检修排水总管Ⅱ(8)分为检修排水总管Ⅱ-Ⅰ(801)和检修排水总管Ⅱ-Ⅱ(802),所述检修排水小泵(15)和部分检修排水大泵(10)连通所述检修排水总管Ⅱ-Ⅰ(801),其余所述检修排水大泵(10)连通所述检修排水总管Ⅱ-Ⅱ(802)。6. The water cushion pond maintenance drainage and backfill water system according to claim 5, characterized in that: said maintenance drainage main pipe II (8) is divided into maintenance drainage main pipe II-I (801) and maintenance drainage main pipe II- II (802), the small maintenance drainage pump (15) and part of the maintenance drainage large pump (10) are connected to the maintenance drainage main pipe II-I (801), and the remaining large maintenance drainage pumps (10) are connected to the maintenance drainage Drain Main II-II (802). 7.根据权利要求6所述的水垫塘检修排水及回充水系统,其特征在于:所述自流充排水管(7)分为于所述检修排水总管Ⅱ-Ⅰ(801)相连的自流充排水管Ⅰ(701)和与检修排水总管Ⅱ-Ⅱ(802)相连的自流充排水管Ⅱ(702)。7. The water-cushion pond maintenance drainage and backfill water system according to claim 6, characterized in that: the self-flow filling and drainage pipes (7) are divided into self-flowing pipes connected to the maintenance and drainage main pipes II-I (801). The filling and draining pipe I (701) and the self-flowing filling and draining pipe II (702) connected with the maintenance and drainage main pipe II-II (802). 8.根据权利要求1所述的水垫塘检修排水及回充水系统,其特征在于:所述自流充排水管(7)的与下游河道相连端制有能安装盲板(30)的法兰(31)。8. The water cushion pond maintenance, drainage and backfilling system according to claim 1, characterized in that: the end of the self-flowing filling and draining pipe (7) connected to the downstream river channel is provided with a method for installing a blind plate (30). orchid (31). 9.一种权利要求1~8任意一项所述水垫塘检修排水及回充水系统的排水方法,其特征在于:9. A drainage method of the water cushion pond maintenance drainage and backfill water system according to any one of claims 1 to 8, characterized in that: 打开自流充排水管(7)上的充排水阀组,将水垫塘内高于下游河道水位的全部水体排至下游河道当中;Open the filling and draining valve group on the self-flowing filling and draining pipe (7), and discharge all the water in the water cushion pond higher than the water level of the downstream river into the downstream river; 根据自流充排水管(7)上流量计的流量信号变化,判断水垫塘内水位和下游河道内的水位情况;According to the flow signal change of the flow meter on the self-flow filling and draining pipe (7), judge the water level in the water cushion pond and the water level in the downstream channel; 当水垫塘水位与下游河道水位基本持平时,关断充排水阀组,打开检修取水管Ⅰ(3)上的检修取水隔离阀(9),将水垫塘内的水体经检修取水管Ⅰ(3)、检修排水总管Ⅰ(4)、检修排水支管(5)引入至检修排水泵;When the water level of the water cushion pond is basically the same as the water level of the downstream river, turn off the filling and draining valve group, open the maintenance water intake isolation valve (9) on the maintenance water intake pipe I (3), and pass the water body in the water cushion pond through the maintenance water intake pipe I (9). 3) The main maintenance drainage pipe I (4) and the maintenance drainage branch pipe (5) are introduced to the maintenance drainage pump; 启动数台检修排水泵,将水垫塘内水内抽至水位到检修取水管Ⅰ(3)取水口(11)附近,停止检修排水泵抽水,关闭检修取水管Ⅰ(3)上的检修取水隔离阀(9);Start several maintenance and drainage pumps, pump the water in the water cushion pool to the water level near the water intake (11) of the maintenance water intake pipe I (3), stop the maintenance drainage pump pumping water, and close the maintenance water intake isolation on the maintenance water intake pipe I (3). valve (9); 打开反冲洗管(12)上的反冲洗阀组,打开检修取水管Ⅱ(6)上的检修取水隔离阀(9),利用下游尾水高于上游水垫塘内水位的水压,对拦污栅(2)及检修取水管II(6)进行冲洗;Open the backwash valve group on the backwash pipe (12), open the maintenance water intake isolation valve (9) on the maintenance water intake pipe II (6), and use the water pressure of the downstream tail water higher than the water level in the upstream pad pool to block the sewage. The grid (2) and the maintenance water intake pipe II (6) are flushed; 冲洗完毕后,关闭反冲洗阀组,利用数台检修排水泵将水垫塘内剩余的积水排干;After flushing, close the backwash valve group, and use several maintenance and drainage pumps to drain the remaining water in the pad pool; 利用检修排水总管Ⅰ(4)上设置的压力变送器(13)信号监视水垫塘内集水池(1)内的水位,并控制数台检修排水泵排出水垫塘内集水池(1)内的积水。Use the signal of the pressure transmitter (13) set on the main maintenance drainage pipe I (4) to monitor the water level in the sump (1) in the water cushion pond, and control several maintenance drainage pumps to discharge the water in the sump (1) in the water cushion pond. standing water. 10.一种权利要求1~8任意一项所述水垫塘检修排水及回充水系统的回充水方法,其特征在于:10. A water backfilling method for the maintenance, drainage and backfilling water system of a water cushion pond according to any one of claims 1 to 8, characterized in that: 打开自流充排水管(7)上的充排水阀组,利用下游河道水位高于水垫塘内底板高程,将二道坝下游水经自流充排水管(7)向水垫塘自流回充;Open the filling and draining valve group on the self-flowing filling and draining pipe (7), and make use of the water level of the downstream channel to be higher than the elevation of the inner floor of the water-cushion pond, and recharge the water from the downstream of the second dam to the water-cushioning pond through the self-flowing filling and draining pipe (7); 通过设置在自流充排水管(7)路上流量计传输的数据监测自流充排水管(7)路内通过的水流量,进而判断充水是否完成;The flow of water passing through the artesian filling and draining pipe (7) is monitored by the data transmitted by the flow meter arranged on the road of the artesian filling and draining pipe (7), and then it is judged whether the water filling is completed; 当充水完成以后,关闭自流充排水管(7)路上的充排水阀组。When the water filling is completed, close the filling and draining valve group on the self-flowing filling and draining pipe (7).
CN202010702419.7A 2020-07-21 2020-07-21 Water cushion pond maintenance drainage and refilling system, drainage method and refilling method Active CN111705741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010702419.7A CN111705741B (en) 2020-07-21 2020-07-21 Water cushion pond maintenance drainage and refilling system, drainage method and refilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010702419.7A CN111705741B (en) 2020-07-21 2020-07-21 Water cushion pond maintenance drainage and refilling system, drainage method and refilling method

Publications (2)

Publication Number Publication Date
CN111705741A true CN111705741A (en) 2020-09-25
CN111705741B CN111705741B (en) 2025-04-18

Family

ID=72546816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010702419.7A Active CN111705741B (en) 2020-07-21 2020-07-21 Water cushion pond maintenance drainage and refilling system, drainage method and refilling method

Country Status (1)

Country Link
CN (1) CN111705741B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006077441A (en) * 2004-09-08 2006-03-23 Minoru Morita Drain pipe washing system and drain pipe washing method
CN101949145A (en) * 2010-10-09 2011-01-19 中国水电顾问集团成都勘测设计研究院 Water supply and drainage system of plunge pool
CN201857601U (en) * 2010-11-08 2011-06-08 广州市水务规划勘测设计研究院 Water filling and draining system for rubber dam
CN103556611A (en) * 2013-11-05 2014-02-05 中国水电顾问集团华东勘测设计研究院有限公司 Plunge pool water filling and discharging system capable of generating electricity
CN206800331U (en) * 2017-06-14 2017-12-26 李斯杨 A kind of diversion system for Hydraulic and Hydro-Power Engineering
CN212896116U (en) * 2020-07-21 2021-04-06 中国电建集团华东勘测设计研究院有限公司 Water cushion pond overhauling, draining and refilling system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006077441A (en) * 2004-09-08 2006-03-23 Minoru Morita Drain pipe washing system and drain pipe washing method
CN101949145A (en) * 2010-10-09 2011-01-19 中国水电顾问集团成都勘测设计研究院 Water supply and drainage system of plunge pool
CN201857601U (en) * 2010-11-08 2011-06-08 广州市水务规划勘测设计研究院 Water filling and draining system for rubber dam
CN103556611A (en) * 2013-11-05 2014-02-05 中国水电顾问集团华东勘测设计研究院有限公司 Plunge pool water filling and discharging system capable of generating electricity
CN206800331U (en) * 2017-06-14 2017-12-26 李斯杨 A kind of diversion system for Hydraulic and Hydro-Power Engineering
CN212896116U (en) * 2020-07-21 2021-04-06 中国电建集团华东勘测设计研究院有限公司 Water cushion pond overhauling, draining and refilling system

Also Published As

Publication number Publication date
CN111705741B (en) 2025-04-18

Similar Documents

Publication Publication Date Title
CN109930548B (en) A facility and method for siphoning water in a reservoir using rainwater resources
CN103556611B (en) The cushion pool filling and drainage system that can generate electricity
CN206928252U (en) A kind of small water conservancy gate of energy-conserving and environment-protective
CN204343257U (en) The rubber dam of the wear-resistant steel plate of a kind of autocontrol band
CN204959682U (en) Water lowering and waterlogging facility for prevention and control are gushed to regional inland river
CN106702968A (en) Arc type overflow dam capable of automatically washing away sand and reducing siltation and running method of arc type overflow dam
CN207582618U (en) A kind of pump discharges into water system
CN212896116U (en) Water cushion pond overhauling, draining and refilling system
CN101949145A (en) Water supply and drainage system of plunge pool
CN211172272U (en) System for flushing and shunting municipal sewage pipe
CN219410782U (en) Self-flow drainage system of horizontal hole maintenance channel is drawn to pumped storage power station
CN108677894B (en) Power generation system utilizing pipeline type karst groundwater and design method
CN111705741A (en) Drainage and water refilling system, drainage method and refilling method of water cushion pond
CN108149644B (en) A hydraulic automatic silt reduction system and construction method in front of a rolling dam
CN217128379U (en) Lake and reservoir surface layer water drainage facility
CN206752427U (en) A kind of power station ground power house tailrace outlet structure and its power station
CN216108848U (en) A energy-conserving integration sewage pump station for crossing a river
CN111321714B (en) A overhaul drainage system for V style of calligraphy tailwater tunnel crowd
CN204356878U (en) A kind of drainage system utilizing green water pump
CN201809752U (en) Water supply and drainage system for plunge pool
CN114182698A (en) Continuous sand flushing type desilting basin structure and overhauling operation method thereof
CN114808864A (en) Method for solving rear drainage failure of water gate wing wall
CN108194120B (en) Tunnel structure with power generation function
CN206721845U (en) A kind of diversion tunnel
CN111910590A (en) Anti-freezing and dredging gate and anti-freezing dredging method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant