CN111691656A - Construction frame and manufacturing method thereof - Google Patents

Construction frame and manufacturing method thereof Download PDF

Info

Publication number
CN111691656A
CN111691656A CN202010676408.6A CN202010676408A CN111691656A CN 111691656 A CN111691656 A CN 111691656A CN 202010676408 A CN202010676408 A CN 202010676408A CN 111691656 A CN111691656 A CN 111691656A
Authority
CN
China
Prior art keywords
fixing
frame
sleeve
rotating connecting
integrally formed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010676408.6A
Other languages
Chinese (zh)
Inventor
孙伟俊
林韵致
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi University of Technology
Original Assignee
Shaanxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi University of Technology filed Critical Shaanxi University of Technology
Priority to CN202010676408.6A priority Critical patent/CN111691656A/en
Publication of CN111691656A publication Critical patent/CN111691656A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62BDEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
    • A62B35/00Safety belts or body harnesses; Similar equipment for limiting displacement of the human body, especially in case of sudden changes of motion
    • A62B35/0043Lifelines, lanyards, and anchors therefore
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/248Inclined struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Emergency Lowering Means (AREA)

Abstract

本发明属于施工架技术领域,尤其为建筑施工架,包括主体架,以及固定连接在主体架上表面的安装架,所述主体架的外表面一体成型有若干个转动连接轴,所述主体架通过若干个所述转动连接轴转动连接有若干个固定架,所述固定架的另一端一体成型有螺纹固定套,所述螺纹固定套的内部旋合有螺纹杆,所述螺纹杆的下表面一体成型有摩擦支撑块,在主体架的外表面通过转动连接轴转动连接有若干个固定架,使得固定架外表面的螺纹固定套便于旋合有螺纹杆,从而使得螺纹杆下表面的摩擦支撑块便于通过螺纹杆从螺纹固定套的内部进行向下旋合,进而使得摩擦支撑块便于对主体架进行安全固定,使得主体架整体能够进行稳固固定使用。

Figure 202010676408

The invention belongs to the technical field of construction frames, in particular to a construction frame, comprising a main frame and a mounting frame fixedly connected to the upper surface of the main frame. The outer surface of the main frame is integrally formed with several rotating connecting shafts. Several fixing frames are rotatably connected through a plurality of the rotating connecting shafts, the other end of the fixing frame is integrally formed with a threaded fixing sleeve, a threaded rod is screwed inside the threaded fixing sleeve, and the lower surface of the threaded rod is A friction support block is integrally formed, and several fixing frames are connected on the outer surface of the main frame by rotating the connecting shaft, so that the threaded fixing sleeve on the outer surface of the fixing frame is convenient for screwing the threaded rod, so that the friction support on the lower surface of the threaded rod is The block is convenient to be screwed down from the inside of the threaded fixing sleeve through the threaded rod, so that the friction support block is convenient for the safe fixing of the main frame, so that the main frame can be stably fixed and used as a whole.

Figure 202010676408

Description

建筑施工架及其制造方法Building construction frame and method of making the same

技术领域technical field

本发明属于施工架技术领域,具体涉及一种建筑施工架及其制造方法。The invention belongs to the technical field of construction frames, and in particular relates to a construction frame and a manufacturing method thereof.

背景技术Background technique

建筑施工架又称为脚手架,脚手架是为了保证各施工过程顺利进行而搭设的工作平台。按搭设的位置分为外脚手架、里脚手架;按材料不同可分为木脚手架、竹脚手架、钢管脚手架;按构造形式分为立杆式脚手架、桥式脚手架、门式脚手架、悬吊式脚手架、挂式脚手架、挑式脚手架、爬式脚手架,施工架在现代的室内装修作业中有着重要的作用,但其在使用时仍存在一定的不便性,在脚手架进行移动使用时,难以对其进行稳固的固定,从而使得施工架在使用时仍存在一定的安全隐患,且在施工架的使用过程中,对工作人员的保护存在一定的缺陷。The construction frame is also called scaffolding. The scaffolding is a working platform set up to ensure the smooth progress of each construction process. According to the erection position, it can be divided into outer scaffolding and inner scaffolding; according to different materials, it can be divided into wooden scaffolding, bamboo scaffolding, steel pipe scaffolding; Hanging scaffolding, pick-up scaffolding, climbing scaffolding, and construction scaffolding play an important role in modern interior decoration operations, but they still have certain inconveniences in use. When the scaffolding is moved, it is difficult to stabilize it. Therefore, the construction frame still has certain hidden dangers in use, and there are certain defects in the protection of the staff during the use of the construction frame.

发明内容SUMMARY OF THE INVENTION

为解决现有技术中存在的上述问题,本发明提供了建筑施工架及其制造方法,具有便于固定和安全保护的特点。In order to solve the above problems existing in the prior art, the present invention provides a building construction frame and a manufacturing method thereof, which have the characteristics of convenient fixing and safety protection.

为实现上述目的,本发明提供如下技术方案:建筑施工架,包括主体架,以及固定连接在主体架上表面的安装架,所述主体架的外表面一体成型有若干个转动连接轴,所述主体架通过若干个所述转动连接轴转动连接有若干个固定架,所述固定架的另一端一体成型有螺纹固定套,所述螺纹固定套的内部旋合有螺纹杆,所述螺纹杆的下表面一体成型有摩擦支撑块,且所述螺纹固定套和摩擦支撑块均为金属构件。In order to achieve the above purpose, the present invention provides the following technical solutions: a construction frame, including a main frame, and a mounting frame fixedly connected to the upper surface of the main frame, the outer surface of the main frame is integrally formed with several rotating connecting shafts, the The main frame is rotatably connected to a plurality of fixing frames through a plurality of the rotating connecting shafts, the other end of the fixing frame is integrally formed with a threaded fixing sleeve, and a threaded rod is screwed inside the threaded fixing sleeve, and the threaded rod is A friction support block is integrally formed on the lower surface, and the threaded fixing sleeve and the friction support block are both metal components.

作为本发明的建筑施工架优选技术方案,所述安装架的外表面通过螺栓固定连接有若干个连接固定套,所述安装架通过若干个所述连接固定套固定连接有安全轴,所述安全轴的外表面滑动连接有滑动套,所述滑动套的外表面捆绑有安全绳。As the preferred technical solution of the construction frame of the present invention, the outer surface of the mounting frame is fixedly connected with a plurality of connection fixing sleeves by bolts, and the installation frame is fixedly connected with a safety shaft through a plurality of the connection fixing sleeves. The outer surface of the shaft is slidably connected with a sliding sleeve, and the outer surface of the sliding sleeve is bound with a safety rope.

作为本发明的建筑施工架优选技术方案,所述固定架的外表面一体成型有若干个转动连接套,所述固定架通过若干个所述转动连接套转动连接在转动连接轴的外表面。As a preferred technical solution of the construction frame of the present invention, the outer surface of the fixing frame is integrally formed with a plurality of rotating connecting sleeves, and the fixing frame is rotatably connected to the outer surface of the rotating connecting shaft through a plurality of the rotating connecting sleeves.

作为本发明的建筑施工架优选技术方案,所述滑动套的内壁中滚动连接有若干个滚珠,所述安全轴的外表面开设有若干个凹槽,所述安全轴和滑动套之间通过若干个所述滚珠和凹槽进行滑动连接。As the preferred technical solution of the construction frame of the present invention, the inner wall of the sliding sleeve is rollingly connected with a number of balls, the outer surface of the safety shaft is provided with a number of grooves, and the safety shaft and the sliding sleeve pass through a number of grooves. Each of the balls and grooves is slidably connected.

作为本发明的建筑施工架优选技术方案,所述转动连接套的外表面旋合有固定栓,所述转动连接套通过所述固定栓固定连接在转动连接轴的外表面。As a preferred technical solution of the construction frame of the present invention, a fixing bolt is screwed on the outer surface of the rotating connecting sleeve, and the rotating connecting sleeve is fixedly connected to the outer surface of the rotating connecting shaft through the fixing bolt.

作为本发明的建筑施工架优选技术方案,所述固定架和螺纹固定套均共设置有若干个,且若干个所述固定架和螺纹固定套均以所述主体架对称分布。As a preferred technical solution of the construction frame of the present invention, a plurality of the fixing frames and the threaded fixing sleeves are provided in total, and the plurality of the fixing frames and the threaded fixing sleeves are distributed symmetrically with the main frame.

作为本发明的建筑施工架优选技术方案,所述安全轴和连接固定套均为金属构件。As the preferred technical solution of the building construction frame of the present invention, the safety shaft and the connection and fixing sleeve are both metal components.

本发明还提供了上述一种建筑施工架的制造方法,包括如下步骤:The present invention also provides a method for manufacturing the above-mentioned building construction frame, comprising the following steps:

S1、完成主架体、安装架、安全轴、固定架、螺纹杆、连接固定套、滑动套的预制;其中,所述主体架的外表面一体成型有若干个转动连接轴,所述固定架的一端一体成型有螺纹固定套,且固定架的外表面一体成型有若干个转动连接套,所述螺纹杆的下表面一体成型有摩擦支撑块;S1. Complete the prefabrication of the main frame body, the mounting frame, the safety shaft, the fixing frame, the threaded rod, the connecting and fixing sleeve, and the sliding sleeve; wherein, the outer surface of the main frame is integrally formed with several rotating connecting shafts, and the fixing frame One end of the threaded rod is integrally formed with a threaded fixing sleeve, and the outer surface of the fixing frame is integrally formed with several rotating connection sleeves, and the lower surface of the threaded rod is integrally formed with a friction support block;

S2、在安装架的外表面通过螺栓固定连接若干个连接固定套,并在水平对称的两个连接固定套之间安装一安全轴,所述安全轴的外表面滑动连接有滑动套,所述滑动套的外表面捆绑有安全绳;所述滑动套的内壁中滚动连接有若干个滚珠,所述安全轴的外表面开设有若干个凹槽,所述安全轴和滑动套之间通过若干个所述滚珠和凹槽进行滑动连接;S2. Several connection fixing sleeves are fixedly connected by bolts on the outer surface of the mounting frame, and a safety shaft is installed between the two horizontally symmetrical connection fixing sleeves. The outer surface of the safety shaft is slidably connected with a sliding sleeve. The outer surface of the sliding sleeve is bound with a safety rope; the inner wall of the sliding sleeve is rolled and connected with a number of balls, the outer surface of the safety shaft is provided with a number of grooves, and a number of grooves pass between the safety shaft and the sliding sleeve. The ball and the groove are slidably connected;

S3、在所述转动连接套的外表面旋合固定栓,将转动连接套通过所述固定栓固定连接在转动连接轴的外表面。S3, screw a fixing bolt on the outer surface of the rotating connecting sleeve, and fix the rotating connecting sleeve on the outer surface of the rotating connecting shaft through the fixing bolt.

与现有技术相比,本发明的有益效果是:通过设置有主体架,使得在主体架的上表面可以安装多个安装架组成施工架进行使用,并在主体架的外表面通过转动连接轴转动连接有若干个固定架,使得固定架外表面的螺纹固定套便于旋合有螺纹杆,从而使得螺纹杆下表面的摩擦支撑块便于通过螺纹杆从螺纹固定套的内部进行向下旋合,进而使得摩擦支撑块便于对主体架进行安全固定,使得主体架整体能够进行稳固固定使用,且在安装架的外表面通过连接固定套固定连接有安全轴,使得滑动套便于在安全轴的外表面进行滑动,同时在滑动套的外表面设置有安全绳,使得安全绳能够系在工作人员身上进行保护,并使得安全绳能够跟随滑动套在安全轴的外表面进行滑动,而不影响施工作业。Compared with the prior art, the beneficial effect of the present invention is: by being provided with a main frame, a plurality of installation frames can be installed on the upper surface of the main frame to form a construction frame for use, and the outer surface of the main frame can be connected by rotating a shaft. Several fixing frames are connected in rotation, so that the threaded fixing sleeve on the outer surface of the fixing frame can be easily screwed with a threaded rod, so that the friction support block on the lower surface of the threaded rod can be easily screwed down from the inside of the threaded fixing sleeve through the threaded rod. Further, the friction support block is convenient for the safe fixing of the main frame, so that the main frame can be stably fixed and used as a whole, and the safety shaft is fixedly connected to the outer surface of the installation frame through the connection fixing sleeve, so that the sliding sleeve is convenient for the outer surface of the safety shaft. At the same time, a safety rope is arranged on the outer surface of the sliding sleeve, so that the safety rope can be tied to the staff for protection, and the safety rope can follow the sliding sleeve to slide on the outer surface of the safety shaft without affecting the construction operation.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention. In the attached image:

图1为本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2为本发明中的主体架俯视结构示意图;Fig. 2 is the top view structure schematic diagram of the main frame in the present invention;

图3为本发明中的主体架固定结构示意图;3 is a schematic diagram of the fixing structure of the main frame in the present invention;

图4为本发明中的滑动套结构示意图;FIG. 4 is a schematic view of the structure of the sliding sleeve in the present invention;

图5为本发明中的转动连接套结构示意图;5 is a schematic structural diagram of a rotating connecting sleeve in the present invention;

图中:1、安全轴;2、安装架;3、主体架;4、固定架;5、螺纹固定套;6、螺纹杆;7、摩擦支撑块;8、连接固定套;9、转动连接轴;10、固定栓;11、转动连接套;12、滑动套;13、滚珠;14、凹槽;15、安全绳。In the figure: 1. Safety shaft; 2. Mounting frame; 3. Main frame; 4. Fixing frame; 5. Threaded fixing sleeve; 6. Threaded rod; 7. Friction support block; 8. Connection fixing sleeve; 9. Rotating connection Shaft; 10. Fixed bolt; 11. Rotating connecting sleeve; 12. Sliding sleeve; 13. Ball; 14. Groove; 15. Safety rope.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

实施例Example

请参阅图1-5,本发明提供以下技术方案:建筑施工架,包括主体架3,以及固定连接在主体架3上表面的安装架2,主体架3的外表面一体成型有若干个转动连接轴9,主体架3通过若干个转动连接轴9转动连接有若干个固定架4,固定架4的另一端一体成型有螺纹固定套5,螺纹固定套5的内部旋合有螺纹杆6,螺纹杆6的下表面一体成型有摩擦支撑块7,且螺纹固定套5和摩擦支撑块7均为金属构件,本实施例中通过设置有主体架3,使得在主体架3的上表面可以安装多个安装架2组成施工架进行使用,并在主体架3的外表面通过转动连接轴9转动连接有若干个固定架4,使得固定架4外表面的螺纹固定套5便于旋合有螺纹杆6,从而使得螺纹杆6下表面的摩擦支撑块7便于通过螺纹杆6从螺纹固定套5的内部进行向下旋合,进而使得摩擦支撑块7便于对主体架3进行安全固定,使得主体架3整体能够进行稳固固定使用。1-5, the present invention provides the following technical solutions: a construction frame, including a main frame 3, and a mounting frame 2 fixedly connected to the upper surface of the main frame 3, and the outer surface of the main frame 3 is integrally formed with a number of rotating connections Axle 9, the main frame 3 is rotatably connected with a number of fixing frames 4 through several rotating connecting shafts 9, the other end of the fixing frame 4 is integrally formed with a threaded fixing sleeve 5, and the inside of the threaded fixing sleeve 5 is screwed with a threaded rod 6. The lower surface of the rod 6 is integrally formed with a friction support block 7, and the threaded fixing sleeve 5 and the friction support block 7 are both metal components. In this embodiment, the main body frame 3 is provided, so that more The mounting brackets 2 form a construction rack for use, and a number of fixing brackets 4 are rotatably connected to the outer surface of the main frame 3 by rotating the connecting shaft 9, so that the threaded fixing sleeve 5 on the outer surface of the fixing bracket 4 can be easily screwed with a threaded rod 6 , so that the friction support block 7 on the lower surface of the threaded rod 6 is easy to screw down from the inside of the threaded fixing sleeve 5 through the threaded rod 6, so that the friction support block 7 is convenient for the main body frame 3 to be safely fixed, so that the main body frame 3 The whole can be used for stable fixation.

具体的,安装架2的外表面通过螺栓固定连接有若干个连接固定套8,安装架2通过若干个连接固定套8固定连接有安全轴1,安全轴1的外表面滑动连接有滑动套12,滑动套12的外表面捆绑有安全绳15,本实施例中且在安装架2的外表面通过连接固定套8固定连接有安全轴1,使得滑动套12便于在安全轴1的外表面进行滑动,同时在滑动套12的外表面设置有安全绳15,使得安全绳15能够系在工作人员身上进行保护,并使得安全绳15能够跟随滑动套12在安全轴1的外表面进行滑动,而不影响施工作业。Specifically, the outer surface of the mounting frame 2 is fixedly connected with several connecting and fixing sleeves 8 through bolts, the mounting frame 2 is fixedly connected with the safety shaft 1 through several connecting and fixing sleeves 8, and the outer surface of the safety shaft 1 is slidably connected with a sliding sleeve 12 , the outer surface of the sliding sleeve 12 is bound with a safety rope 15. In this embodiment, the safety shaft 1 is fixedly connected to the outer surface of the mounting frame 2 through the connecting and fixing sleeve 8, so that the sliding sleeve 12 is convenient for the outer surface of the safety shaft 1. At the same time, a safety rope 15 is arranged on the outer surface of the sliding sleeve 12, so that the safety rope 15 can be tied to the worker for protection, and the safety rope 15 can follow the sliding sleeve 12 to slide on the outer surface of the safety shaft 1, and Does not affect construction work.

具体的,固定架4的外表面一体成型有若干个转动连接套11,固定架4通过若干个转动连接套11转动连接在转动连接轴9的外表面,本实施例中通过在固定架4的外表面上设置有若干个转动连接套11,使得固定架4便于通过若干个转动连接套11转动连接在转动连接轴9的外表面,同时在转动连接套11的外表面设置有固定栓10,使得在摩擦支撑块7需要使用时,可以转动固定架4将其内部的摩擦支撑块7需地面进行支撑,然后通过固定栓10对转动连接套11进行固定,在不需要进行固定支撑时,可以将固定架4和螺纹固定套5转动与主体架3进行贴合放置。Specifically, a plurality of rotating connecting sleeves 11 are integrally formed on the outer surface of the fixing frame 4 , and the fixing frame 4 is rotatably connected to the outer surface of the rotating connecting shaft 9 through a plurality of rotating connecting sleeves 11 . A number of rotating connecting sleeves 11 are arranged on the outer surface, so that the fixing frame 4 is easily connected to the outer surface of the rotating connecting shaft 9 through several rotating connecting sleeves 11, and a fixing bolt 10 is arranged on the outer surface of the rotating connecting sleeve 11 at the same time, When the friction support block 7 needs to be used, the fixed frame 4 can be rotated to support the friction support block 7 inside it on the ground, and then the rotating connection sleeve 11 can be fixed by the fixed bolt 10. When no fixed support is required, it can be Rotate the fixing frame 4 and the threaded fixing sleeve 5 to fit with the main frame 3 .

具体的,滑动套12的内壁中滚动连接有若干个滚珠13,安全轴1的外表面开设有若干个凹槽14,安全轴1和滑动套12之间通过若干个滚珠13和凹槽14进行滑动连接,本实施例中通过设置有滚珠13和凹槽14,使得滑动套12便于便捷在安全轴1的外表面进行滑动使用。Specifically, a plurality of balls 13 are rollingly connected to the inner wall of the sliding sleeve 12 , and a plurality of grooves 14 are formed on the outer surface of the safety shaft 1 . For the sliding connection, in this embodiment, the balls 13 and the grooves 14 are provided, so that the sliding sleeve 12 is convenient and convenient to slide on the outer surface of the safety shaft 1 .

具体的,转动连接套11的外表面旋合有固定栓10,转动连接套11通过固定栓10固定连接在转动连接轴9的外表面。Specifically, the outer surface of the rotating connecting sleeve 11 is screwed with a fixing bolt 10 , and the rotating connecting sleeve 11 is fixedly connected to the outer surface of the rotating connecting shaft 9 through the fixing bolt 10 .

具体的,固定架4和螺纹固定套5均共设置有若干个,且若干个固定架4和螺纹固定套5均以主体架3对称分布。Specifically, a plurality of fixing frames 4 and threaded fixing sleeves 5 are provided in total, and the plurality of fixing frames 4 and threaded fixing sleeves 5 are symmetrically distributed with the main frame 3 .

具体的,安全轴1和连接固定套8均为金属构件。Specifically, the safety shaft 1 and the connecting and fixing sleeve 8 are both metal components.

本具体实施制作时,包括如下步骤:When this specific implementation is made, the following steps are included:

S1、完成主架体3、安装架2、安全轴1、固定架4、螺纹杆6、连接固定套8、滑动套12的预制;其中,所述主体架3的外表面一体成型有若干个转动连接轴9,所述固定架4的一端一体成型有螺纹固定套5,且固定架4的外表面一体成型有若干个转动连接套11,所述螺纹杆6的下表面一体成型有摩擦支撑块7;S1. Complete the prefabrication of the main frame body 3, the mounting frame 2, the safety shaft 1, the fixing frame 4, the threaded rod 6, the connection fixing sleeve 8, and the sliding sleeve 12; wherein, the outer surface of the main frame 3 is integrally formed with several Rotating the connecting shaft 9, one end of the fixing frame 4 is integrally formed with a threaded fixing sleeve 5, and the outer surface of the fixing frame 4 is integrally formed with several rotating connecting sleeves 11, and the lower surface of the threaded rod 6 is integrally formed with friction support block 7;

S2、在安装架2的外表面通过螺栓固定连接若干个连接固定套8,并在水平对称的两个连接固定套8之间安装一安全轴1,所述安全轴1的外表面滑动连接有滑动套12,所述滑动套12的外表面捆绑有安全绳15;所述滑动套12的内壁中滚动连接有若干个滚珠13,所述安全轴1的外表面开设有若干个凹槽14,所述安全轴1和滑动套12之间通过若干个所述滚珠13和凹槽14进行滑动连接;S2. Several connection fixing sleeves 8 are fixedly connected by bolts on the outer surface of the mounting frame 2, and a safety shaft 1 is installed between the two horizontally symmetrical connection fixing sleeves 8. The outer surface of the safety shaft 1 is slidably connected with The sliding sleeve 12, the outer surface of the sliding sleeve 12 is bound with a safety rope 15; the inner wall of the sliding sleeve 12 is rollingly connected with a number of balls 13, and the outer surface of the safety shaft 1 is provided with a number of grooves 14, The safety shaft 1 and the sliding sleeve 12 are slidably connected through a plurality of the balls 13 and the grooves 14;

S3、在所述转动连接套11的外表面旋合固定栓10,将转动连接套11通过所述固定栓10固定连接在转动连接轴9的外表面。S3 , screw the fixing bolt 10 on the outer surface of the rotating connecting sleeve 11 , and fix the rotating connecting sleeve 11 to the outer surface of the rotating connecting shaft 9 through the fixing bolt 10 .

本发明的工作原理及使用流程:本发明在使用过程中,通过设置有主体架3,使得在主体架3的上表面可以安装多个安装架2组成施工架进行使用,并在主体架3的外表面通过转动连接轴9转动连接有若干个固定架4,使得固定架4外表面的螺纹固定套5便于旋合有螺纹杆6,从而使得螺纹杆6下表面的摩擦支撑块7便于通过螺纹杆6从螺纹固定套5的内部进行向下旋合,进而使得摩擦支撑块7便于对主体架3进行安全固定,使得主体架3整体能够进行稳固固定使用,且在安装架2的外表面通过连接固定套8固定连接有安全轴1,使得滑动套12便于在安全轴1的外表面进行滑动,同时在滑动套12的外表面设置有安全绳15,使得安全绳15能够系在工作人员身上进行保护,并使得安全绳15能够跟随滑动套12在安全轴1的外表面进行滑动,而不影响施工作业,通过在固定架4的外表面上设置有若干个转动连接套11,使得固定架4便于通过若干个转动连接套11转动连接在转动连接轴9的外表面,同时在转动连接套11的外表面设置有固定栓10,使得在摩擦支撑块7需要使用时,可以转动固定架4将其内部的摩擦支撑块7需地面进行支撑,然后通过固定栓10对转动连接套11进行固定,在不需要进行固定支撑时,可以将固定架4和螺纹固定套5转动与主体架3进行贴合放置,通过设置有滚珠13和凹槽14,使得滑动套12便于便捷在安全轴1的外表面进行滑动使用。The working principle and use process of the present invention: during the use of the present invention, the main frame 3 is provided, so that a plurality of mounting frames 2 can be installed on the upper surface of the main frame 3 to form a construction frame for use, and the main frame 3 can be installed on the upper surface of the main frame 3. The outer surface is rotatably connected with a number of fixing frames 4 by rotating the connecting shaft 9, so that the threaded fixing sleeve 5 on the outer surface of the fixing frame 4 is convenient for screwing the threaded rod 6, so that the friction support block 7 on the lower surface of the threaded rod 6 is easy to pass through the thread. The rod 6 is screwed down from the inside of the threaded fixing sleeve 5, so that the friction support block 7 is convenient for the safe fixing of the main body frame 3, so that the main body frame 3 can be stably fixed and used, and the outer surface of the mounting frame 2 passes through. The connection fixing sleeve 8 is fixedly connected with the safety shaft 1, so that the sliding sleeve 12 is easy to slide on the outer surface of the safety shaft 1, and at the same time, a safety rope 15 is arranged on the outer surface of the sliding sleeve 12, so that the safety rope 15 can be tied to the staff. For protection, the safety rope 15 can follow the sliding sleeve 12 to slide on the outer surface of the safety shaft 1 without affecting the construction operation. 4. It is convenient to be connected to the outer surface of the rotating connecting shaft 9 through several rotating connecting sleeves 11. At the same time, the outer surface of the rotating connecting sleeve 11 is provided with a fixing bolt 10, so that when the friction support block 7 needs to be used, the fixing frame 4 can be rotated. The internal friction support block 7 needs to be supported on the ground, and then the rotating connecting sleeve 11 is fixed by the fixing bolt 10. When the fixed support is not required, the fixing frame 4 and the threaded fixing sleeve 5 can be rotated and the main frame 3. The sliding sleeve 12 is convenient and convenient to slide on the outer surface of the safety shaft 1 by being provided with the balls 13 and the grooves 14 when placed in close contact.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, the The technical solutions described in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (8)

1.建筑施工架,包括主体架(3),以及固定连接在主体架(3)上表面的安装架(2),其特征在于:所述主体架(3)的外表面一体成型有若干个转动连接轴(9),所述主体架(3)通过若干个所述转动连接轴(9)转动连接有若干个固定架(4),所述固定架(4)的另一端一体成型有螺纹固定套(5),所述螺纹固定套(5)的内部旋合有螺纹杆(6),所述螺纹杆(6)的下表面一体成型有摩擦支撑块(7),且所述螺纹固定套(5)和摩擦支撑块(7)均为金属构件。1. A construction frame, comprising a main frame (3), and a mounting frame (2) fixedly connected to the upper surface of the main frame (3), characterized in that: the outer surface of the main frame (3) is integrally formed with several A rotating connecting shaft (9), the main frame (3) is rotatably connected with a plurality of fixing frames (4) through a plurality of the rotating connecting shafts (9), and the other end of the fixing frame (4) is integrally formed with threads A fixing sleeve (5), a threaded rod (6) is screwed inside the threaded fixing sleeve (5), a friction support block (7) is integrally formed on the lower surface of the threaded rod (6), and the thread is fixed Both the sleeve (5) and the friction support block (7) are metal components. 2.如权利要求1所述的建筑施工架,其特征在于:所述安装架(2)的外表面通过螺栓固定连接有若干个连接固定套(8),所述安装架(2)通过若干个所述连接固定套(8)固定连接有安全轴(1),所述安全轴(1)的外表面滑动连接有滑动套(12),所述滑动套(12)的外表面捆绑有安全绳(15)。2. The building construction frame according to claim 1, characterized in that: the outer surface of the mounting frame (2) is fixedly connected with a plurality of connecting and fixing sleeves (8) by bolts, and the mounting frame (2) is connected by a plurality of Each of the connecting and fixing sleeves (8) is fixedly connected with a safety shaft (1), the outer surface of the safety shaft (1) is slidably connected with a sliding sleeve (12), and the outer surface of the sliding sleeve (12) is bound with a safety shaft (12). rope (15). 3.如权利要求1所述的建筑施工架,其特征在于:所述固定架(4)的外表面一体成型有若干个转动连接套(11),所述固定架(4)通过若干个所述转动连接套(11)转动连接在转动连接轴(9)的外表面。3. The construction frame according to claim 1, characterized in that: the outer surface of the fixing frame (4) is integrally formed with a plurality of rotating connecting sleeves (11), and the fixing frame (4) passes through a plurality of The rotating connecting sleeve (11) is rotatably connected to the outer surface of the rotating connecting shaft (9). 4.如权利要求2所述的建筑施工架,其特征在于:所述滑动套(12)的内壁中滚动连接有若干个滚珠(13),所述安全轴(1)的外表面开设有若干个凹槽(14),所述安全轴(1)和滑动套(12)之间通过若干个所述滚珠(13)和凹槽(14)进行滑动连接。4. The construction frame according to claim 2, characterized in that: a plurality of balls (13) are rollingly connected in the inner wall of the sliding sleeve (12), and a plurality of balls (13) are provided on the outer surface of the safety shaft (1). There are grooves (14), and the safety shaft (1) and the sliding sleeve (12) are slidably connected through a plurality of the balls (13) and the grooves (14). 5.如权利要求3所述的建筑施工架,其特征在于:所述转动连接套(11)的外表面旋合有固定栓(10),所述转动连接套(11)通过所述固定栓(10)固定连接在转动连接轴(9)的外表面。5 . The construction frame according to claim 3 , wherein a fixing bolt ( 10 ) is screwed on the outer surface of the rotating connecting sleeve ( 11 ), and the rotating connecting sleeve ( 11 ) passes through the fixing bolt. 6 . (10) is fixedly connected to the outer surface of the rotating connecting shaft (9). 6.如权利要求1所述的建筑施工架,其特征在于:所述固定架(4)和螺纹固定套(5)均共设置有若干个,且若干个所述固定架(4)和螺纹固定套(5)均以所述主体架(3)对称分布。6. The construction frame according to claim 1, characterized in that: a plurality of the fixing frame (4) and the threaded fixing sleeve (5) are provided in total, and a plurality of the fixing frame (4) and the threaded The fixing sleeves (5) are distributed symmetrically with the main frame (3). 7.如权利要求2所述的建筑施工架,其特征在于:所述安全轴(1)和连接固定套(8)均为金属构件。7 . The construction frame according to claim 2 , wherein the safety shaft ( 1 ) and the connecting and fixing sleeve ( 8 ) are both metal components. 8 . 8.如权利要求1-7任一项所述的建筑施工架的制造方法,其特征在于:包括如下步骤:8. the manufacture method of building construction frame as described in any one of claim 1-7, is characterized in that: comprise the steps: S1、完成主架体(3)、安装架(2)、安全轴(1)、固定架(4)、螺纹杆(6)、连接固定套(8)、滑动套(12)的预制;其中,所述主体架(3)的外表面一体成型有若干个转动连接轴(9),所述固定架(4)的一端一体成型有螺纹固定套(5),且固定架(4)的外表面一体成型有若干个转动连接套(11),所述螺纹杆(6)的下表面一体成型有摩擦支撑块(7);S1. Complete the prefabrication of the main frame body (3), the mounting frame (2), the safety shaft (1), the fixing frame (4), the threaded rod (6), the connection fixing sleeve (8), and the sliding sleeve (12); wherein , the outer surface of the main frame (3) is integrally formed with a plurality of rotating connecting shafts (9), one end of the fixing frame (4) is integrally formed with a threaded fixing sleeve (5), and the outer surface of the fixing frame (4) is integrally formed with a threaded fixing sleeve (5). Several rotating connection sleeves (11) are integrally formed on the surface, and friction support blocks (7) are integrally formed on the lower surface of the threaded rod (6); S2、在安装架(2)的外表面通过螺栓固定连接若干个连接固定套(8),并在水平对称的两个连接固定套(8)之间安装一安全轴(1),所述安全轴(1)的外表面滑动连接有滑动套(12),所述滑动套(12)的外表面捆绑有安全绳(15);所述滑动套(12)的内壁中滚动连接有若干个滚珠(13),所述安全轴(1)的外表面开设有若干个凹槽(14),所述安全轴(1)和滑动套(12)之间通过若干个所述滚珠(13)和凹槽(14)进行滑动连接;S2. Several connection fixing sleeves (8) are fixedly connected by bolts on the outer surface of the mounting frame (2), and a safety shaft (1) is installed between the two horizontally symmetrical connection fixing sleeves (8). A sliding sleeve (12) is slidably connected to the outer surface of the shaft (1), and a safety rope (15) is bound on the outer surface of the sliding sleeve (12); and a plurality of balls are rolled and connected in the inner wall of the sliding sleeve (12). (13), a plurality of grooves (14) are formed on the outer surface of the safety shaft (1), and a plurality of the balls (13) and the grooves pass between the safety shaft (1) and the sliding sleeve (12). Slot (14) for sliding connection; S3、在所述转动连接套(11)的外表面旋合固定栓(10),将转动连接套(11)通过所述固定栓(10)固定连接在转动连接轴(9)的外表面。S3. Screw the fixing bolt (10) on the outer surface of the rotating connecting sleeve (11), and fix the rotating connecting sleeve (11) to the outer surface of the rotating connecting shaft (9) through the fixing bolt (10).
CN202010676408.6A 2020-07-14 2020-07-14 Construction frame and manufacturing method thereof Pending CN111691656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010676408.6A CN111691656A (en) 2020-07-14 2020-07-14 Construction frame and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010676408.6A CN111691656A (en) 2020-07-14 2020-07-14 Construction frame and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN111691656A true CN111691656A (en) 2020-09-22

Family

ID=72485930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010676408.6A Pending CN111691656A (en) 2020-07-14 2020-07-14 Construction frame and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN111691656A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2852892C2 (en) * 1978-12-07 1982-08-26 Hymer Leichtmetallbau Ingenieur Erwin Hymer, 7988 Wangen Mobile working platform with extension arms
EP0861952A1 (en) * 1997-02-27 1998-09-02 HYMER LEICHTMETALLBAU GmbH & Co. KG Scaffold with vertically movable outtrigger
WO2006111603A1 (en) * 2005-04-18 2006-10-26 Usko Kettunen Movable scaffolding
EP2696008A2 (en) * 2012-08-11 2014-02-12 Hymer-Leichtmetallbau GmbH & Co. KG Telescopic scaffold and method for operating a telescopic scaffold
CN206822483U (en) * 2017-01-20 2018-01-02 佛山市科译家居用品有限公司 A kind of new draw runner curtain rod device
CN109252680A (en) * 2018-10-09 2019-01-22 张华涛 A kind of installation method of the fixed frame of construction
CN109252651A (en) * 2018-10-09 2019-01-22 张华涛 Fixed rack structure for construction
CN209442536U (en) * 2019-01-10 2019-09-27 上海金虞机械有限公司 A kind of crane of high stability
CN110306779A (en) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 A kind of scaffold integral movable type platform
CN209780180U (en) * 2019-04-17 2019-12-13 吉林省送变电工程有限公司 Insulating scaffold for power transmission line construction
CN110761543A (en) * 2019-11-12 2020-02-07 中铁第四勘察设计院集团有限公司 A municipal vehicle mobile roof-climbing operation platform suitable for municipal vehicle maintenance

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2852892C2 (en) * 1978-12-07 1982-08-26 Hymer Leichtmetallbau Ingenieur Erwin Hymer, 7988 Wangen Mobile working platform with extension arms
EP0861952A1 (en) * 1997-02-27 1998-09-02 HYMER LEICHTMETALLBAU GmbH & Co. KG Scaffold with vertically movable outtrigger
WO2006111603A1 (en) * 2005-04-18 2006-10-26 Usko Kettunen Movable scaffolding
EP2696008A2 (en) * 2012-08-11 2014-02-12 Hymer-Leichtmetallbau GmbH & Co. KG Telescopic scaffold and method for operating a telescopic scaffold
CN206822483U (en) * 2017-01-20 2018-01-02 佛山市科译家居用品有限公司 A kind of new draw runner curtain rod device
CN109252680A (en) * 2018-10-09 2019-01-22 张华涛 A kind of installation method of the fixed frame of construction
CN109252651A (en) * 2018-10-09 2019-01-22 张华涛 Fixed rack structure for construction
CN209442536U (en) * 2019-01-10 2019-09-27 上海金虞机械有限公司 A kind of crane of high stability
CN209780180U (en) * 2019-04-17 2019-12-13 吉林省送变电工程有限公司 Insulating scaffold for power transmission line construction
CN110306779A (en) * 2019-06-19 2019-10-08 河南省工建集团有限责任公司 A kind of scaffold integral movable type platform
CN110761543A (en) * 2019-11-12 2020-02-07 中铁第四勘察设计院集团有限公司 A municipal vehicle mobile roof-climbing operation platform suitable for municipal vehicle maintenance

Similar Documents

Publication Publication Date Title
CN114030973B (en) Hoisting equipment and method for large-size glass curtain wall with balance mechanism for building
CN207296390U (en) Form bracing system jacking
CN207296341U (en) A kind of scaffold for building
CN111691656A (en) Construction frame and manufacturing method thereof
CN207582935U (en) A kind of civil construction tool-type scaffold wall connecting piece
CN209509443U (en) A kind of easy-to-dismount scaffold of civil engineering
CN205653628U (en) Windowsill shines by support
CN207228591U (en) A kind of architectural engineering scaffold
CN108316630B (en) High-altitude hanging scaffold
CN211447692U (en) Scaffold frame for construction convenient to shift
CN208037891U (en) A kind of crane balance supporting seat
CN108261744B (en) Adjustable backboard and basketball stand
CN207727944U (en) A kind of elevating scaffold of the decoration convenient for assembling
CN211229427U (en) Scaffold for building construction
CN218117178U (en) A kind of scaffolding balance support
CN208779069U (en) A kind of total station bracket fixing device
CN216042504U (en) Scaffold for building engineering
CN208603613U (en) Mast type hoisting device for electromechanical equipment of super high-rise building
CN112563934A (en) Power transmission and transformation framework column
CN221761799U (en) A construction ladder
CN211775592U (en) Scaffold base for construction
CN222414200U (en) A concrete truss floor deck installation and fixing structure
CN217028019U (en) Outer wall scaffold consolidates base for construction
CN221655683U (en) A safety rope fixing device for exterior wall construction
CN221646317U (en) Scaffolding with a structure for preventing tools from falling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200922