CN111648362A - Large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process - Google Patents
Large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process Download PDFInfo
- Publication number
- CN111648362A CN111648362A CN202010350810.5A CN202010350810A CN111648362A CN 111648362 A CN111648362 A CN 111648362A CN 202010350810 A CN202010350810 A CN 202010350810A CN 111648362 A CN111648362 A CN 111648362A
- Authority
- CN
- China
- Prior art keywords
- pile
- hook
- turning
- main
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 38
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 88
- 239000010959 steel Substances 0.000 claims abstract description 88
- 238000010276 construction Methods 0.000 claims abstract description 24
- 230000005484 gravity Effects 0.000 claims abstract description 8
- 230000007306 turnover Effects 0.000 claims description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 5
- 241000288140 Gruiformes Species 0.000 abstract 1
- 241000124872 Grus grus Species 0.000 abstract 1
- 239000000463 material Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000005266 casting Methods 0.000 description 3
- 230000000087 stabilizing effect Effects 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
- E02D5/285—Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
A single-hook lifting and turning-over process for a large-diameter overweight and overlong single pile is characterized in that the single-hook turning-over process is realized by lifting, erecting and hanging a steel wire rope on the large-diameter overweight and overlong single pile, a crane ship is used for controlling a flat nozzle hook to achieve the control on the stability and the verticality of the single pile, the time for pile sinking construction of a steel pipe pile is greatly saved, the practical significance and the social value are great for the construction of the offshore wind power extra-large diameter and overweight and overlong steel pipe pile sinking, and the problem that pile slipping possibly occurs in common crane ship piling equipment and processes due to the fact that the self gravity of the extra-large diameter and overweight and overlong steel pipe pile is far greater than that of a common steel pipe pile is effectively solved High efficiency and the like.
Description
Technical Field
The invention relates to the technical field of steel pipe pile sinking, in particular to a large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process.
Background
Wind power is a clean renewable energy source, and with the improvement of environmental awareness of people, offshore wind power engineering is built on a large scale in China coastal areas in order to obtain more clean energy sources. As the pile foundation of the main bearing capacity of the fan generator set, the super-large diameter and super-heavy super-long steel pipe pile is generally adopted, and the super-large diameter and super-heavy super-long steel pipe pile is far larger than a common steel pipe pile due to self gravity. The pile sinking construction of the ultra-large diameter steel pipe pile has strict requirements on the lifting and turning-over process of the offshore pile sinking single pile, the pile stabilizing and verticality control difficulty is very high, and the pile sinking construction method is based on the technical specification requirement: the levelness deviation (pile axis gradient) of the foundation top flange is less than or equal to 3 per mill. Therefore, compared with the conventional steel pipe pile sinking turning construction, the turning construction of the extra-large-diameter and extra-heavy and extra-long steel pipe pile sinking in open sea is more difficult to control in stability and verticality. At present, a single pile lifting and turning-over process for a pile sinking commonly comprises the steps of horizontally lifting a steel pipe pile by a crane ship and utilizing the water depth to carry out turning-over and pile erecting operation. And then adjusting the position of the steel pipe pile to enable the steel pipe pile to enter a pile holding device of the pile stabilizing process platform, and adjusting and correcting the verticality of the steel pipe pile. When the traditional lifting and turning-over process is adopted to turn over the steel pipe pile with the ultra-large diameter and the ultra-long steel pipe pile, the turning-over stability of the steel pipe pile is not easy to control, and the perpendicularity of the steel pipe pile needs to be continuously adjusted in the turning-over process, so that the construction time is greatly increased. Therefore, the development of a new steel pipe pile turning process which can save turning construction time, improve turning stability and control verticality more easily has total significance.
Disclosure of Invention
The invention aims to solve the technical problem of the prior art and provides a large-diameter overweight overlong single-pile single-hook lifting and turning-over process which can reduce the turning-over construction time, increase the turning-over stability, improve the verticality of a steel pipe pile and is more convenient to control.
The technical problem to be solved by the present invention is achieved by the following technical means. The invention relates to a large-diameter overweight overlong single-pile single-hook hoisting and turning-over process, which comprises the following steps:
(1) hoisting crane
(1.1) construction preparation: transporting the monopile to a designated sea area through a pile transporting barge; the main crane ship and the auxiliary crane ship are anchored in place, the main crane ship hooks a single-pile main lifting lug through a lifting hook, and the auxiliary crane ship hooks a pile bottom at the turnover end of the single pile through a flat mouth hook;
(1.2) lifting and erecting piles: synchronously lifting the main lifting ship and the auxiliary lifting ship, enabling the single pile to leave the deck of the pile transporting barge, checking the stress condition of the guy cable, continuing lifting if no abnormity exists, and withdrawing the pile transporting barge from a construction area when the single pile is a certain distance away from the deck of the pile transporting barge;
after the pile transporting barge is withdrawn, the main crane ship is matched with the auxiliary crane ship, the single pile is erected, and the flat mouth hook on the auxiliary crane ship automatically falls off in the pile erecting process, so that the hoisting can be completed;
(2) turning over
(2.1) hanging a steel wire rope: respectively hanging a main hoisting steel wire rope, a supporting beam, a steel wire rope and a tail sliding steel wire rope of the steel pipe pile on a main hook of a main hoisting vessel, clamping the bottom of the steel pipe pile by using a flat mouth hook, connecting the flat mouth hook with the tail sliding steel wire rope, connecting an auxiliary hook with the upper part of the tail sliding steel wire rope through a short steel wire rope and a small snap ring, and preparing for unhooking the tail sliding steel wire rope;
(2.2) single-hook pile turning: before turning over and hoisting, a turning-over tool is placed on the deck surface below the pile bottom; the main hook of the main crane ship is lifted, the steel wire rope of the main lifting lug is vertically tensioned and stressed, and the steel wire of the auxiliary hook is loosened and unstressed; the main hook is lifted continuously and shifts towards the gravity center direction of the steel pipe pile, and when the main hook and the gravity center of the steel pipe pile are on the same vertical line, the steel pipe pile leaves the transportation barge;
the main hook continues to rise, when the pile bottom of the steel pipe pile is a certain height away from the surface of the transport barge deck, the transport ship starts to loosen the cable, the position of the cab deviates from that of the main hanging ship, and the anchor boat on site is matched with the transport ship to carry out anchor lifting operation so as to be far away from the main hanging ship;
after the transport ship leaves, the main lifting hook slowly sinks the bottom of the steel pipe pile into water, after the tail sliding steel wire rope does not bear the lifting weight, the tail sliding steel wire rope begins to bend and loosen, at the moment, the auxiliary hook is used for unhooking the tail sliding steel wire rope, and the turning operation can be completed.
The technical problem to be solved by the invention can also be realized by the following technical scheme that in the large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process, in the step (1.2), when the single pile leaves 0.5m away from the deck of the pile-transporting barge, the stress condition of the stay cable is checked.
The technical problem to be solved by the invention can also be realized by the following technical scheme that in the step (1.2), when the distance between the single pile and the deck of the pile-transporting barge is 2-3m, the pile-transporting barge is withdrawn from the construction area.
The technical problem to be solved by the invention can also be realized by the following technical scheme that in the large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process, in the step (2.2), the main hook continues to rise, and when the pile bottom of the steel pipe pile is 5m away from the surface of the transport barge, the transport ship starts to twist and loosen the cable.
The technical problem to be solved by the invention can also be realized by the following technical scheme that in the step (2.1), after the steel wire rope is hung, two wind-holding ropes are hung on the pile top and the pile bottom respectively and are connected to a winch and an anchor machine of a main crane ship.
The technical problem to be solved by the invention can also be realized by the following technical scheme that the turning tool comprises a base, a rotating shaft and a turning sleeve, wherein the turning sleeve is arranged on the base through the rotating shaft.
Compared with the prior art, the invention has the following beneficial effects:
(1) the single-pile single-hook hoisting and turning-over process can realize turning over of the large-diameter overweight and overlong steel pipe pile, and is beneficial to subsequent pile sinking of the large-diameter overweight and overlong steel pipe pile;
(2) compared with the traditional process, the single-pile single-hook hoisting and turning-over process is more convenient and faster, reduces construction steps, shortens construction time, improves construction efficiency, and can realize automatic tripping by using the flat-nose hook;
(3) according to the single-pile single-hook lifting and turning-over process, the flat-nose hook is added, materials are saved, and the tail part of the pile body does not need to be provided with a turning-over lifting lug by using the flat-nose hook;
(4) the single-pile single-hook lifting and turning-over process saves materials, the flat mouth hook can be repeatedly utilized, and the turning-over lifting lug does not need to be cut off;
(5) in the process of turning over and refuting the steel pipe pile, the damage to a deck of the barge is avoided.
Drawings
FIG. 1 is a schematic illustration of a main crane ship, an auxiliary crane ship and a pile barge in position according to the invention;
FIG. 2 is a schematic illustration of the main crane ship and the pile barge in position according to the present invention;
FIG. 3 is a schematic view of the turning over tool of the present invention;
FIG. 4 is a schematic view (one) of the pile-turning of a single ship according to the present invention;
FIG. 5 is a schematic view (two) of the pile-turning of a single ship according to the present invention;
FIG. 6 is a schematic view (III) of pile turning of a single ship according to the present invention;
FIG. 7 is a schematic view of the present invention showing a mud hook;
fig. 8 is a schematic view of the invention for pile turning by mud face.
Detailed Description
The following further describes embodiments of the present invention with reference to the accompanying drawings so as to facilitate further understanding of the present invention by those skilled in the art, and does not constitute a limitation to the right thereof.
Referring to fig. 1-8, the application is a novel ultra-large diameter, overweight and ultra-long steel pipe pile sinking pile turning process for fan jacket sinking pile construction, and the process is as follows:
(1) preparation before hoisting
Considering the influence of on-site rising and falling tide on pile transfer berthing, the direction of the head of the crane ship is consistent with the direction of tide. When the anchor is cast, the anchor casting operation of the main crane ship is firstly carried out, and the anchor casting of the auxiliary crane ship is carried out after the anchor casting of the main crane ship is finished; after two crane ships finish the anchor dropping, the pile barge is slowly leaned to the starboard from the tail direction of the main crane ship under the assistance of the anchor ship, the main lifting lug is aligned with the crane, the pile bottom (bow) faces the auxiliary crane ship, and a port of the anchor dropping at the tail part of the pile barge is ready for departure. When the transport barge enters the point, the anchor at the starboard port of the main crane ship properly releases the cable, so that the transport barge can pass smoothly;
after the pile transfer barge finishes berthing, commanding a main crane of the crane to rotate to a main lifting lug at the top of the single pile, and simultaneously commanding a crane of an auxiliary crane to rotate (or anchor) to a turning lifting lug of the single pile; the main lifting boat firstly hangs a main lifting ring-shaped steel wire rope ring, 1 cable wind rope is tied above the lifting lugs respectively, and then the auxiliary lifting boat is commanded to hang a flat mouth hook at the bottom of the pile;
(2) lifting and erecting pile
After the on-site personnel check and confirm that the pile is correct, the main crane ship and the auxiliary crane ship start to synchronously lift, when the pile is completely separated from the pile-transporting barge deck by about 0.5m, the lifting is suspended, the stress condition of the steel wire rope is checked again, the lifting is continued after no abnormality occurs, and when the pile is separated from the pile-transporting barge deck by 2-3m, the pile-transporting barge exits from the construction area;
after the pile transporting barge is withdrawn, the two crane ships are mutually matched to complete the vertical pile; the auxiliary crane boat flat mouth hook automatically falls off in the pile erecting process;
(3) hanging steel wire rope
The main lifting lug adopts an annular steel wire rope ring, and the pile bottom adopts a flat mouth hook and the annular steel wire rope ring;
(4) single-hook turning pile
Before turning over and hoisting, a turning-over tool is placed on a deck surface below the pile bottom, a main hook of a main hoisting vessel is hoisted, a steel wire rope of a main lifting lug is vertically tensioned and stressed, a tail hoisting steel wire is loosened and unstressed, and the main hook continues hoisting and shifts towards the gravity center direction of the steel pipe pile; when the main hook and the center of gravity are on the same vertical line, the steel pipe pile leaves the transport barge, and the steel pipe pile and the deck of the transport ship keep a certain angle;
the main hook continues to rise, when the pile bottom of the steel pipe pile is a certain height away from the surface of the transport barge deck, the transport ship starts to loosen the cable, the position of the cab deviates from that of the main hoisting operation ship, and the anchor boat on site is matched with the transport ship to carry out anchor lifting operation so as to be far away from the main hoisting ship;
after the transport ship leaves, the bottom of the steel pipe pile is slowly sunk into water by the main lifting hook, the main hook of the foundation pile on the surface of the sea bed is lifted by a certain angle after falling into the water, the steel wire rope of the tail begins to bend and loosen after the steel wire rope of the tail slipping does not bear the lifting weight, and then the steel wire rope of the tail slipping of the main hook begins to unhook by the small hook on the main lifting ship;
and finishing the whole large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process, and then carrying out the next conventional construction.
The beneficial effect that this application brought:
1. the turnover of the large-diameter overweight and overlong steel pipe pile can be realized, and the subsequent pile sinking of the large-diameter overweight and overlong steel pipe pile is facilitated;
2. compared with the traditional process, the method is more convenient and faster, reduces construction steps, shortens construction time, improves construction efficiency, and can realize automatic tripping by using the flat-nose hook;
3. the flat mouth hook is added, so that the material is saved, and the tail part of the pile body does not need to be provided with a turning-over lifting lug by using the flat mouth hook;
4. the material is saved, the flat mouth hook can be repeatedly used, and the turning-over lifting lug does not need to be cut off;
5. in the process of turning over and refuting the steel pipe pile, the damage to a deck of the barge is avoided.
Claims (6)
1. A large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process is characterized in that: the method comprises the following steps:
(1) hoisting crane
(1.1) construction preparation: transporting the monopile to a designated sea area through a pile transporting barge; the main crane ship and the auxiliary crane ship are anchored in place, the main crane ship hooks a single-pile main lifting lug through a lifting hook, and the auxiliary crane ship hooks a pile bottom at the turnover end of the single pile through a flat mouth hook;
(1.2) lifting and erecting piles: synchronously lifting the main lifting ship and the auxiliary lifting ship, enabling the single pile to leave the deck of the pile transporting barge, checking the stress condition of the guy cable, continuing lifting if no abnormity exists, and withdrawing the pile transporting barge from a construction area when the single pile is a certain distance away from the deck of the pile transporting barge;
after the pile transporting barge is withdrawn, the main lifting ship is matched with the auxiliary lifting ship, the single pile is erected, the vertical pile is completed, and the flat mouth hook on the auxiliary lifting ship automatically falls off in the pile erecting process;
(2) turning over
(2.1) hanging a steel wire rope: respectively hanging a main hoisting steel wire rope, a supporting beam, a steel wire rope and a tail sliding steel wire rope of the steel pipe pile on a main hook of a main hoisting vessel, clamping the bottom of the steel pipe pile by using a flat mouth hook, connecting the flat mouth hook with the tail sliding steel wire rope, connecting an auxiliary hook with the upper part of the tail sliding steel wire rope through a short steel wire rope and a small snap ring, and preparing for unhooking the tail sliding steel wire rope;
(2.2) single-hook pile turning: before turning over and hoisting, a turning-over tool is placed on the deck surface below the pile bottom; the main hook of the main crane ship is lifted, the steel wire rope of the main lifting lug is vertically tensioned and stressed, and the steel wire of the auxiliary hook is loosened and unstressed; the main hook is lifted continuously and shifts towards the gravity center direction of the steel pipe pile, and when the main hook and the gravity center of the steel pipe pile are on the same vertical line, the steel pipe pile leaves the transportation barge;
the main hook continues to rise, when the pile bottom of the steel pipe pile is a certain height away from the surface of the transport barge deck, the transport ship starts to loosen the cable, the position of the cab deviates from that of the main hanging ship, and the anchor boat on site is matched with the transport ship to carry out anchor lifting operation so as to be far away from the main hanging ship;
after the transport ship leaves, the main lifting hook slowly sinks the bottom of the steel pipe pile into water, after the tail sliding steel wire rope does not bear the lifting weight, the tail sliding steel wire rope begins to bend and loosen, at the moment, the auxiliary hook is used for unhooking the tail sliding steel wire rope, and the turning operation can be completed.
2. The large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process according to claim 1, characterized in that: and (1.2) when the single pile leaves the deck of the pile-transporting barge by 0.5m, checking the stress condition of the guy cable.
3. The large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process according to claim 1, characterized in that: in the step (1.2), when the single pile is 2-3m away from the deck of the pile transporting barge, the pile transporting barge is withdrawn from the construction area.
4. The large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process according to claim 1, characterized in that: and (2.2) continuously lifting the main hook, and when the pile bottom of the steel pipe pile is 5m away from the surface of the transport barge, the transport ship starts to loosen the cable.
5. The large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process according to claim 1, characterized in that: in the step (2.1), after the steel wire rope is hung, two wind-pulling ropes are hung on the pile top and the pile bottom respectively and connected to a winch and an anchor machine of the main crane ship.
6. The large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process according to claim 1, characterized in that: the turnover tool comprises a base, a rotating shaft and a pile turning sleeve, and the pile turning sleeve is installed on the base through the rotating shaft.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010350810.5A CN111648362A (en) | 2020-04-28 | 2020-04-28 | Large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010350810.5A CN111648362A (en) | 2020-04-28 | 2020-04-28 | Large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111648362A true CN111648362A (en) | 2020-09-11 |
Family
ID=72352233
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010350810.5A Withdrawn CN111648362A (en) | 2020-04-28 | 2020-04-28 | Large-diameter overweight and overlong single-pile single-hook hoisting and turning-over process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111648362A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112726622A (en) * | 2020-12-29 | 2021-04-30 | 保利长大工程有限公司 | Method for overturning large-diameter single pile of fixed-boom crane ship |
| CN112850488A (en) * | 2020-12-31 | 2021-05-28 | 保利长大工程有限公司 | Method for overturning steel pipe pile of fixed-boom crane ship |
| CN112977738A (en) * | 2021-04-23 | 2021-06-18 | 江苏中天科技股份有限公司 | Transport ship for transporting steel pipe piles and hoisting method for steel pipe piles |
| CN114261894A (en) * | 2021-11-17 | 2022-04-01 | 海洋石油工程股份有限公司 | Method for turning over large sheet-shaped structure |
| CN115258056A (en) * | 2022-09-19 | 2022-11-01 | 南通泰胜蓝岛海洋工程有限公司 | Integrated transportation overturning process for offshore steel pipe pile |
| CN115557398A (en) * | 2022-10-27 | 2023-01-03 | 交通运输部广州打捞局 | Hoisting method of heavy parts with full rotation of floating crane combined with fixed stern crane |
| CN116621009A (en) * | 2023-05-12 | 2023-08-22 | 中交第二航务工程勘察设计院有限公司 | Method for hoisting overturned steel pipe piles with a single hook on a full-slewing crane |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105836595A (en) * | 2016-06-20 | 2016-08-10 | 上海江南长兴造船有限责任公司 | Method for turning over subsections and overall section |
| CN206204947U (en) * | 2016-09-26 | 2017-05-31 | 中国海洋石油总公司 | Hydraulic pressure is lifted off formula and plays stake flat nozzle hook |
| CN206940230U (en) * | 2017-06-13 | 2018-01-30 | 中交第三航务工程局有限公司江苏分公司 | A kind of steel-pipe pile turns over tongs |
| CN109775565A (en) * | 2019-02-25 | 2019-05-21 | 中交第三航务工程局有限公司 | A large-diameter single-pile and single-hook underwater pile-turning method |
-
2020
- 2020-04-28 CN CN202010350810.5A patent/CN111648362A/en not_active Withdrawn
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105836595A (en) * | 2016-06-20 | 2016-08-10 | 上海江南长兴造船有限责任公司 | Method for turning over subsections and overall section |
| CN206204947U (en) * | 2016-09-26 | 2017-05-31 | 中国海洋石油总公司 | Hydraulic pressure is lifted off formula and plays stake flat nozzle hook |
| CN206940230U (en) * | 2017-06-13 | 2018-01-30 | 中交第三航务工程局有限公司江苏分公司 | A kind of steel-pipe pile turns over tongs |
| CN109775565A (en) * | 2019-02-25 | 2019-05-21 | 中交第三航务工程局有限公司 | A large-diameter single-pile and single-hook underwater pile-turning method |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112726622A (en) * | 2020-12-29 | 2021-04-30 | 保利长大工程有限公司 | Method for overturning large-diameter single pile of fixed-boom crane ship |
| CN112850488A (en) * | 2020-12-31 | 2021-05-28 | 保利长大工程有限公司 | Method for overturning steel pipe pile of fixed-boom crane ship |
| CN112850488B (en) * | 2020-12-31 | 2024-03-26 | 保利长大工程有限公司 | Method for overturning steel pipe pile by fixed arm frame crane ship |
| CN112977738A (en) * | 2021-04-23 | 2021-06-18 | 江苏中天科技股份有限公司 | Transport ship for transporting steel pipe piles and hoisting method for steel pipe piles |
| CN114261894A (en) * | 2021-11-17 | 2022-04-01 | 海洋石油工程股份有限公司 | Method for turning over large sheet-shaped structure |
| CN114261894B (en) * | 2021-11-17 | 2025-04-29 | 海洋石油工程股份有限公司 | A method for turning over a large sheet structure |
| CN115258056A (en) * | 2022-09-19 | 2022-11-01 | 南通泰胜蓝岛海洋工程有限公司 | Integrated transportation overturning process for offshore steel pipe pile |
| CN115557398A (en) * | 2022-10-27 | 2023-01-03 | 交通运输部广州打捞局 | Hoisting method of heavy parts with full rotation of floating crane combined with fixed stern crane |
| CN116621009A (en) * | 2023-05-12 | 2023-08-22 | 中交第二航务工程勘察设计院有限公司 | Method for hoisting overturned steel pipe piles with a single hook on a full-slewing crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100579860C (en) | Vessel for transporting wind turbines, method for moving wind turbines and wind turbine for offshore wind farm | |
| CN102425167B (en) | Pile sinking method for driving large-diameter steel pipe pile in intertidal zone | |
| US7234409B2 (en) | Vessel for transporting wind turbines, methods of moving a wind turbine, and a wind turbine for an off-shore wind farm | |
| CN109629568A (en) | The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating | |
| CN112897339A (en) | Method for turning large-diameter single pile of full-rotation crane ship | |
| CN114856919B (en) | A method for hoisting a conductor frame using a fully revolving crane vessel | |
| CN102328732A (en) | Offshore pile driving, pile pressing and installing united engineering ship | |
| CN112726622A (en) | Method for overturning large-diameter single pile of fixed-boom crane ship | |
| CN110185057B (en) | A tooling and construction method for lifting and erecting steel pipe piles for offshore wind power single pile foundations | |
| CN109853567A (en) | A kind of pile sinking process of offshore wind farm steel tube pile embeded in rock | |
| CN113605436B (en) | Construction structure and method suitable for building and transporting offshore wind turbine cylindrical foundation on semi-submersible barge | |
| CN115584727A (en) | Offshore Construction Method of Super Large Single Pile | |
| WO2022148789A1 (en) | Offshore wind turbine assembly vessel | |
| CN114542398A (en) | Construction method for hoisting horizontal jacket by fixed-arm frame crane ship | |
| CN112850488B (en) | Method for overturning steel pipe pile by fixed arm frame crane ship | |
| CN204702437U (en) | A kind of build-up type power pontoon combination mast crane device | |
| HK1213532A1 (en) | A specified lifting and piling barge for cellular arc cell construction | |
| CN111017117B (en) | Mooring chain underwater connection method and underwater connection platform | |
| CN114542394A (en) | Method for hoisting vertical jacket by fixed-arm frame crane ship | |
| CN115367075A (en) | Olecranon hook pile turning method for offshore wind power engineering jacket foundation in deep sea area | |
| CN115432599A (en) | Overwater photovoltaic integral installation method | |
| CN105239572A (en) | Offshore construction method for large-diameter single pile fan foundation structure | |
| CN219157747U (en) | Deep sea area marine jacket foundation olecranon hook pile turning device | |
| CN116039877B (en) | Double-ship collaborative hoisting attitude turning method for offshore pile sinking platform | |
| GB2580103A (en) | Underwater pedestal synchronous sinking and posture fixing and solid release control device and method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20200911 |