CN111636903A - 一种预埋件保护及孔洞预留的施工方法 - Google Patents

一种预埋件保护及孔洞预留的施工方法 Download PDF

Info

Publication number
CN111636903A
CN111636903A CN202010490953.6A CN202010490953A CN111636903A CN 111636903 A CN111636903 A CN 111636903A CN 202010490953 A CN202010490953 A CN 202010490953A CN 111636903 A CN111636903 A CN 111636903A
Authority
CN
China
Prior art keywords
foam board
plywood
embedded part
steel bar
placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010490953.6A
Other languages
English (en)
Inventor
高天龙
白国峰
张隽
叶东昊
帅建兵
李智慧
江梦策
王健
孙丙超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN202010490953.6A priority Critical patent/CN111636903A/zh
Publication of CN111636903A publication Critical patent/CN111636903A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及暗挖隧道施工技术领域,更具体而言,涉及一种预埋件保护及孔洞预留的施工方法。包括以下步骤:S1、制备泡沫板;S2、使用水平激光仪确定混凝土面标高;S3、将泡沫板放置在预埋件上方,泡沫板上方放置胶合板;S4、胶合板上放置钢筋,用铁丝将钢筋固定、绑扎,铁丝采用镀锌铁丝;S5、浇筑混凝土;S6、后期使用时,将泡沫板整体取出。有行车需求位置,可将铁丝截断,取下钢筋,只保留胶合板和泡沫板、后期需使用时,取下胶合板,将泡沫板敲碎取出;无行车要求处,可保留钢筋,后期需使用时,整体取出。本发明操作简单有效,有效降低了施工成本,提高了施工效率。本发明主要应用在隧道预埋件保护和孔洞预留方面。

Description

一种预埋件保护及孔洞预留的施工方法
技术领域
本发明涉及暗挖隧道施工技术领域,更具体而言,涉及一种预埋件保护及孔洞预留的施工方法。
背景技术
对于暗挖隧道中的二次衬砌,因施工步序或结构需求,需留设预埋件以及预留孔洞。尤其是在地铁车站中所需较多,大量的预埋件需要有保护措施以及孔洞需支架立模。仰拱施工时的体现最为明显,仰拱存有许多站台板柱、中板柱,在施工中为了满足站内行车条件,柱钢筋不能高于混凝土面,需在接头位置预留孔洞方便后期连接并加以保护,因此需要大量小型孔洞的支架立模,在混凝土浇筑完成达到强度后,再进行模板拆除,但为了保证行车安全及对于预埋钢筋的保护,还需覆盖钢板,由于该数量较多,该工序费工耗时,降低了整体施工速度。
发明内容
为克服上述现有技术中存在的不足,本发明提供一种预埋件保护及孔洞预留的施工方法,该方法操作简单,施工成本低,能有效对预埋件进行保护,预留的孔洞平整,对施工影响小。
为解决上述技术问题,本发明采取的技术方案为:
一种预埋件保护及孔洞预留的施工方法,包括以下步骤:
S1、制备泡沫板;
S2、使用水平激光仪确定混凝土面标高;
S3、将泡沫板放置在预埋件上方,泡沫板上方放置胶合板;
S4、胶合板上放置钢筋,用铁丝将钢筋固定、绑扎;
S5、浇筑混凝土;
S6、后期使用时,将泡沫板整体取出。
所述步骤S1中,泡沫板裁成与孔洞大小相同的尺寸。
所述步骤S3中,将泡沫板下压,使预埋件置于泡沫板内。
所述步骤S3中,胶合板的尺寸与孔洞大小相同。
所述步骤S6中,操作前有行车需求时,泡沫板暂不取出,将钢筋撤除即可。
与现有技术相比,本发明所具有的有益效果为:
材料制作简单,施工操作简单,能有效提高施工效率;可以根据施工需要调整泡沫板及其他施工材料的形状和尺寸,调整灵活性强,重复利用率高;施工成本低,同时提高了施工现场钢筋废料的利用率;不影响施工通车,可调整性强。
附图说明
图1为本发明的施工流程示意图;
图2为本发明的施工结构示意图;
图中:1为泡沫板、2为预埋件、3为胶合板、4为钢筋、5为铁丝。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1、图2所示,一种预埋件保护及孔洞预留的施工方法,包括以下步骤:
S1、制备泡沫板1;
S2、使用水平激光仪确定混凝土面标高;
S3、将泡沫板1放置在预埋件2上方,泡沫板1上方放置胶合板3;
S4、胶合板3上放置钢筋4,钢筋4放置在胶合板3的中心线上,用铁丝5将钢筋4固定、绑扎,铁丝5采用镀锌铁丝;
S5、浇筑混凝土;
S6、后期使用时,将泡沫板1整体取出。
优选的,步骤S1中,根据施工要求,泡沫板1裁成与孔洞大小相同的尺寸,泡沫板1采用聚苯乙烯泡沫板。
优选的,步骤S3中,将泡沫板1下压,使预埋件2置于泡沫板1内。
优选的,步骤S3中,胶合板3的尺寸与孔洞大小相同。
优选的,步骤S6中,操作前有行车需求时,泡沫板1暂不取出,将钢筋4撤除,只留下泡沫板1和胶合板3即可,后期需操作时,取下胶合板3,将泡沫板1敲碎取出;无行车要求处,可保留钢筋4,后期使用时,整体取出。
根据孔洞要求制备泡沫板1和胶合板3,将泡沫板1设置在预留件上,下压使预留件置于泡沫板1内,泡沫板1上放置胶合板3,胶合板3上端面与混凝土标高在同一水平高度,利用铁丝5将钢筋4绑扎在胶合板3上,有行车需求位置,可将铁丝5截断,取下钢筋4,只保留胶合板3和泡沫板1、后期需使用时,取下胶合板3,将泡沫板1敲碎取出;无行车要求处,可保留钢筋4,后期需使用时,整体取出。
上面仅对本发明的较佳实施例作了详细说明,但是本发明并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化,各种变化均应包含在本发明的保护范围之内。

Claims (5)

1.一种预埋件保护及孔洞预留的施工方法,其特征在于,包括以下步骤:
S1、制备泡沫板;
S2、使用水平激光仪确定混凝土面标高;
S3、将泡沫板放置在预埋件上方,泡沫板上方放置胶合板;
S4、胶合板上放置钢筋,用铁丝将钢筋固定、绑扎;
S5、浇筑混凝土;
S6、后期使用时,将泡沫板整体取出。
2.根据权利要求1所述的一种预埋件保护及孔洞预留的施工方法,其特征在于:所述步骤S1中,泡沫板裁成与孔洞大小相同的尺寸。
3.根据权利要求1所述的一种预埋件保护及孔洞预留的施工方法,其特征在于:所述步骤S3中,将泡沫板下压,使预埋件置于泡沫板内。
4.根据权利要求1所述的一种预埋件保护及孔洞预留的施工方法,其特征在于:所述步骤S3中,胶合板的尺寸与孔洞大小相同。
5.根据权利要求1所述的一种预埋件保护及孔洞预留的施工方法,其特征在于:所述步骤S6中,操作前有行车需求时,泡沫板暂不取出,将钢筋撤除即可。
CN202010490953.6A 2020-06-02 2020-06-02 一种预埋件保护及孔洞预留的施工方法 Pending CN111636903A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010490953.6A CN111636903A (zh) 2020-06-02 2020-06-02 一种预埋件保护及孔洞预留的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010490953.6A CN111636903A (zh) 2020-06-02 2020-06-02 一种预埋件保护及孔洞预留的施工方法

Publications (1)

Publication Number Publication Date
CN111636903A true CN111636903A (zh) 2020-09-08

Family

ID=72327820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010490953.6A Pending CN111636903A (zh) 2020-06-02 2020-06-02 一种预埋件保护及孔洞预留的施工方法

Country Status (1)

Country Link
CN (1) CN111636903A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356890A (zh) * 2021-07-19 2021-09-07 中铁一局集团有限公司 一种隧道衬砌预留孔洞施工方法

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6443645A (en) * 1987-08-07 1989-02-15 Sugita Ind Joint construction method of reinforcing bar in concrete groove
JPH10159112A (ja) * 1996-12-03 1998-06-16 Takenaka Doboku Co Ltd 小規模地下室等の施工法
DE10061361A1 (de) * 2000-12-09 2002-06-13 Knauf Daemmstoffe Gmbh Verfahren und Vorrichtung für die Herstellung von Dämmplatten aus Schaumstoff
CN201334672Y (zh) * 2008-12-11 2009-10-28 贵阳铝镁设计研究院 地下结构底板的保护装置
CN101775902A (zh) * 2010-01-15 2010-07-14 上海市浦东新区建设市场管理署 清水混凝土柱形构件预埋件的设置及混凝土浇筑方法
CN103061504A (zh) * 2013-01-30 2013-04-24 陕西建工集团第五建筑工程有限公司 混凝土板管道安装预留洞施工模具及施工方法
CN202945806U (zh) * 2012-08-18 2013-05-22 中国化学工程第十六建设有限公司 混疑土预留孔塞
CN103306303A (zh) * 2013-06-14 2013-09-18 鞍钢集团工程技术有限公司 一种设备地脚螺栓预留孔的成型方法
CN203347229U (zh) * 2013-06-27 2013-12-18 国家电网公司 螺栓预留孔模具
CN203440830U (zh) * 2013-07-25 2014-02-19 中冶天工集团有限公司 用于预留螺栓孔的装置
CN103774684A (zh) * 2014-01-21 2014-05-07 浙江省建工集团有限责任公司 一种基础螺栓孔的预留设施工方法
CN104530577A (zh) * 2014-12-30 2015-04-22 中铁七局集团第五工程有限公司 高铁预制箱梁封端用橡胶套及其使用方法
CN104652467A (zh) * 2014-12-28 2015-05-27 中国二冶集团有限公司 设备基础螺栓预留孔的施工方法
CN104712140A (zh) * 2015-03-19 2015-06-17 中国化学工程第三建设有限公司 一种可溶解式混凝土预留洞模具及其施工方法
CN204899016U (zh) * 2015-08-13 2015-12-23 文登蓝岛建筑工程有限公司 一种带互连式预埋件的防水预制墙板
CN205421555U (zh) * 2016-03-01 2016-08-03 中建五局第三建设有限公司 超高层楼承板钢筋预留预埋结构
CN107366299A (zh) * 2016-05-11 2017-11-21 五冶集团上海有限公司 一种混凝土预留孔洞模板安装方法
CN107489238A (zh) * 2016-06-13 2017-12-19 中铁十二局集团有限公司 一种有效应对变形条件的屋面和顶板的变形缝的防水做法
CN207144013U (zh) * 2017-09-11 2018-03-27 上海宝冶集团有限公司 一种预埋钢筋的保护装置
CN207903764U (zh) * 2018-01-31 2018-09-25 中铁十局集团建筑工程有限公司 一种铁路货场龙门吊走行轨锚固螺栓预留孔定位装置
CN208950162U (zh) * 2018-08-14 2019-06-07 中冶建筑研究总院(深圳)有限公司 便于安装支撑梁的混凝土立柱以及其与支撑梁的连接结构
CN209874069U (zh) * 2018-10-19 2019-12-31 中国水利水电第十四工程局有限公司 一种混凝土施工用预埋件
CN210032149U (zh) * 2019-05-16 2020-02-07 衡水通达桥闸工程橡胶有限公司 一种tdkf可拆卸止水缝
CN210104792U (zh) * 2019-03-19 2020-02-21 中国市政工程东北设计研究总院有限公司 一种预留接头管廊段

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6443645A (en) * 1987-08-07 1989-02-15 Sugita Ind Joint construction method of reinforcing bar in concrete groove
JPH10159112A (ja) * 1996-12-03 1998-06-16 Takenaka Doboku Co Ltd 小規模地下室等の施工法
DE10061361A1 (de) * 2000-12-09 2002-06-13 Knauf Daemmstoffe Gmbh Verfahren und Vorrichtung für die Herstellung von Dämmplatten aus Schaumstoff
CN201334672Y (zh) * 2008-12-11 2009-10-28 贵阳铝镁设计研究院 地下结构底板的保护装置
CN101775902A (zh) * 2010-01-15 2010-07-14 上海市浦东新区建设市场管理署 清水混凝土柱形构件预埋件的设置及混凝土浇筑方法
CN202945806U (zh) * 2012-08-18 2013-05-22 中国化学工程第十六建设有限公司 混疑土预留孔塞
CN103061504A (zh) * 2013-01-30 2013-04-24 陕西建工集团第五建筑工程有限公司 混凝土板管道安装预留洞施工模具及施工方法
CN103306303A (zh) * 2013-06-14 2013-09-18 鞍钢集团工程技术有限公司 一种设备地脚螺栓预留孔的成型方法
CN203347229U (zh) * 2013-06-27 2013-12-18 国家电网公司 螺栓预留孔模具
CN203440830U (zh) * 2013-07-25 2014-02-19 中冶天工集团有限公司 用于预留螺栓孔的装置
CN103774684A (zh) * 2014-01-21 2014-05-07 浙江省建工集团有限责任公司 一种基础螺栓孔的预留设施工方法
CN104652467A (zh) * 2014-12-28 2015-05-27 中国二冶集团有限公司 设备基础螺栓预留孔的施工方法
CN104530577A (zh) * 2014-12-30 2015-04-22 中铁七局集团第五工程有限公司 高铁预制箱梁封端用橡胶套及其使用方法
CN104712140A (zh) * 2015-03-19 2015-06-17 中国化学工程第三建设有限公司 一种可溶解式混凝土预留洞模具及其施工方法
CN204899016U (zh) * 2015-08-13 2015-12-23 文登蓝岛建筑工程有限公司 一种带互连式预埋件的防水预制墙板
CN205421555U (zh) * 2016-03-01 2016-08-03 中建五局第三建设有限公司 超高层楼承板钢筋预留预埋结构
CN107366299A (zh) * 2016-05-11 2017-11-21 五冶集团上海有限公司 一种混凝土预留孔洞模板安装方法
CN107489238A (zh) * 2016-06-13 2017-12-19 中铁十二局集团有限公司 一种有效应对变形条件的屋面和顶板的变形缝的防水做法
CN207144013U (zh) * 2017-09-11 2018-03-27 上海宝冶集团有限公司 一种预埋钢筋的保护装置
CN207903764U (zh) * 2018-01-31 2018-09-25 中铁十局集团建筑工程有限公司 一种铁路货场龙门吊走行轨锚固螺栓预留孔定位装置
CN208950162U (zh) * 2018-08-14 2019-06-07 中冶建筑研究总院(深圳)有限公司 便于安装支撑梁的混凝土立柱以及其与支撑梁的连接结构
CN209874069U (zh) * 2018-10-19 2019-12-31 中国水利水电第十四工程局有限公司 一种混凝土施工用预埋件
CN210104792U (zh) * 2019-03-19 2020-02-21 中国市政工程东北设计研究总院有限公司 一种预留接头管廊段
CN210032149U (zh) * 2019-05-16 2020-02-07 衡水通达桥闸工程橡胶有限公司 一种tdkf可拆卸止水缝

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
中国水利水电第十一工程局有限公司: "《城市轨道交通施工技术》", 31 July 2019, 中国铁道出版社有限公司 *
娄在明: "地铁车站土建预埋件及预留孔洞施工管理与控制", 《水利水电施工》 *
张宝华等: "《建筑工程技术与组织》", 31 May 2018 *
张隽: "雁门关隧道破碎围岩施工技术", 《铁道建筑技术》 *
王岑元等: "聚苯乙烯泡沫板在电气预埋工程中的应用", 《建筑电气》 *
蒲磊: "设备混凝土基础重要部位施工方法探讨", 《黄河水利职业技术学院学报》 *
陈星: "地铁车站轨顶风道施工技术", 《水利水电施工》 *
魏燕敏: "混凝土预留孔施工", 《建筑工人》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356890A (zh) * 2021-07-19 2021-09-07 中铁一局集团有限公司 一种隧道衬砌预留孔洞施工方法

Similar Documents

Publication Publication Date Title
CN2529936Y (zh) 钢筋保护层塑料垫块
CN209636857U (zh) 侧壁混凝土分仓浇筑结构
CN109469349A (zh) 一种增设钢筋混凝土次梁的楼板加固改造方法
CN111636903A (zh) 一种预埋件保护及孔洞预留的施工方法
CN116357069A (zh) 双曲面屋面结构施工方法
CN105756377B (zh) 一种泳池及其施工方法
CN105155843A (zh) 构造柱的施工方法及装置
CN110080299A (zh) 一种浅埋山岭隧道明挖施工工法
CN115126249A (zh) 一种狭窄环境下高大墙板混凝土振捣方法
CN102936953B (zh) “大”字型劲钢结构模板施工方法
CN213979041U (zh) 地下室顶板回顶支撑架结构
CN203285056U (zh) 楼梯模板支撑底座
CN104631675B (zh) 一种双面预制叠合板
CN107587637A (zh) 加气混凝土砌块箱式内模空心楼盖及其施工方法
CN108222505B (zh) 楼梯踏步施工缝的留置方法
CN113006382B (zh) 一种屋面防水结构及铺装工艺
CN101899815A (zh) 架桥机安装桥梁过渡跨t型边梁防架桥机侧翻装置
CN109113357A (zh) 一种管廊预埋槽固定装置及其固定方法
CN109853948A (zh) 二次结构现浇悬挑窗台板的一体模板体系及支模方法
CN210622367U (zh) 一种预应力混凝土空心板加固装置
CN104234432B (zh) 车库顶板结构施工方法
CN109386167A (zh) 公路挡土墙上方波形护栏的施工方法
CN208168340U (zh) 一种应用于叠合楼板施工的铝合金模板
CN114016664A (zh) 一种基于预应力张拉槽的可早拆模的悬挑梁施工结构
CN220790704U (zh) 一种预制板锥形梁加固结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200908