CN111614007A - An integrated modular substation for temporary application - Google Patents
An integrated modular substation for temporary application Download PDFInfo
- Publication number
- CN111614007A CN111614007A CN202010342383.6A CN202010342383A CN111614007A CN 111614007 A CN111614007 A CN 111614007A CN 202010342383 A CN202010342383 A CN 202010342383A CN 111614007 A CN111614007 A CN 111614007A
- Authority
- CN
- China
- Prior art keywords
- socket
- positioning
- groove
- box body
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B7/00—Enclosed substations, e.g. compact substations
- H02B7/06—Distribution substations, e.g. for urban network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/46—Boxes; Parts thereof or accessories therefor
- H02B1/48—Mounting of devices therein
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/52—Mobile units, e.g. for work sites
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Housings And Mounting Of Transformers (AREA)
Abstract
本发明涉及电力设备技术领域,尤其是涉及一种集成型集装式临时应用的变电站。一种集成型集装式临时应用的变电站,包括变电站本体、预制式箱体和移动式插座箱,所述的变电站本体和移动式插座箱均安装在预制式箱体内部,所述的变电站本体上设置有第一出线插座,所述的移动式插座箱包括插座箱本体,所述的插座箱本体的一侧设置有与第一出线插座相配合的进线插座,所述的插座箱本体的另一侧设置有第二出线插座,所述的插座箱本体的底部设置有多个车轮。本发明接线十分方便,不会影响电力的输送,从而能够保证施工效率。
The invention relates to the technical field of power equipment, in particular to an integrated containerized temporary application substation. An integrated containerized substation for temporary application includes a substation body, a prefabricated box and a mobile socket box, wherein the substation body and the mobile socket box are both installed inside the prefabricated box, and the substation body A first outlet socket is provided on the top, the mobile socket box includes a socket box body, and one side of the socket box body is provided with a wire inlet socket matched with the first outlet socket. The other side is provided with a second outlet socket, and the bottom of the socket box body is provided with a plurality of wheels. The wiring of the invention is very convenient and will not affect the transmission of electric power, so that the construction efficiency can be ensured.
Description
技术领域technical field
本发明涉及电力设备技术领域,尤其是涉及一种集成型集装式临时应用的变电站。The invention relates to the technical field of electric power equipment, in particular to an integrated containerized temporary application substation.
背景技术Background technique
随着国民经济和社会的快速发展,电力能源需求也越来越大,土地和空间资源越来越稀缺,电网规划中变电站的站址和线路通道的落实也愈加困难。电网建设呈现出任务重、要求高、工期紧、征地与政策处理困难等特点,变电站的建设难度加大。由于城市化、工业化快速推进和经济快速发展的需要,电网规划要与城市经济、发展规划相适应,电网建设进度应与国民经济及社会发展相适应,而变电站的建设是电网建设的重要组成部分。With the rapid development of the national economy and society, the demand for power and energy is also increasing, and land and space resources are becoming more and more scarce. Power grid construction presents the characteristics of heavy tasks, high requirements, tight construction period, difficulties in land acquisition and policy processing, etc., and the construction of substations is more difficult. Due to the needs of rapid urbanization, industrialization and rapid economic development, the power grid planning should be adapted to the urban economy and development planning, and the power grid construction progress should be adapted to the national economic and social development, and the construction of substations is an important part of power grid construction. .
预制舱变电站就是将中压配电网末端变电站预先在电气厂内制造并装配,包括变压器,高压开关设备和控制设备、低压开关设备和控制设备、内部接线、计量、补偿、避雷器等辅助设备,配置在一个公用的外壳或一组外壳内,并且设备按照相应标准经过调试与试验的一种成套变电站。The prefabricated cabin substation is to manufacture and assemble the terminal substation of the medium voltage distribution network in the electrical factory in advance, including transformers, high voltage switchgear and control equipment, low voltage switchgear and control equipment, internal wiring, metering, compensation, arresters and other auxiliary equipment. A complete set of substations configured in a common enclosure or a group of enclosures, and the equipment has been debugged and tested in accordance with the corresponding standards.
由于施工现场占地较大,现有的预制舱变电站在使用时容易出现接线不方便的情况,影响了电力的输送,从而导致施工效率降低。Because the construction site occupies a large area, the existing prefabricated cabin substations are prone to inconvenient wiring when in use, which affects the transmission of power and reduces the construction efficiency.
如中国专利公告号为:CN103812042B,于2017年3月8日公告的一种集装箱预制舱式变电站,所述预制舱式变电站包括:变压器,所述变压器为户外使用型;其特征在于,还包括:高压预制舱,所述高压预制舱设置有与所述变压器高压侧连接的电缆,并且所述高压预制舱设置成第一集装箱;低压预制舱,所述低压预制舱设置有于所述变压器低压侧连接的电缆,并且所述低压预制舱设置成第二集装箱;二次保护预制舱,所述二次保护舱设置有于所述变压器连接的电缆,并且所述二次保护舱设置成第三集装箱。虽然该变电站所需的设备可以根据实际需求进行个性化设计,具有尺寸统一、运输方便、易扩展等优点,但是该变电站在使用时容易出现接线不方便的情况,影响了电力的输送,从而导致施工效率降低。For example, China Patent Announcement No.: CN103812042B, a container prefabricated cabin substation announced on March 8, 2017, the prefabricated cabin substation includes: a transformer, and the transformer is of an outdoor use type; it is characterized in that it also includes : high-voltage prefabricated cabin, the high-voltage prefabricated cabin is provided with a cable connected to the high-voltage side of the transformer, and the high-voltage prefabricated cabin is set as a first container; side-connected cables, and the low-voltage prefabricated cabin is set as a second container; a secondary protection prefabricated cabin is provided with cables connected to the transformer, and the secondary protection cabin is set as a third container container. Although the equipment required by the substation can be individually designed according to actual needs, and has the advantages of uniform size, convenient transportation and easy expansion, etc., the substation is prone to inconvenient wiring during use, which affects the transmission of power, resulting in Construction efficiency is reduced.
发明内容SUMMARY OF THE INVENTION
本发明主要是针对由于施工现场占地较大,现有的预制舱变电站在使用时容易出现接线不方便的情况,影响了电力的输送,从而导致施工效率降低的问题,提供一种集成型集装式临时应用的变电站,接线十分方便,不会影响电力的输送,从而能够保证施工效率。The invention mainly aims at the problem that the existing prefabricated cabin substation is prone to inconvenient wiring during use due to the large area occupied by the construction site, which affects the transmission of electric power and thus reduces the construction efficiency. The substation installed for temporary application is very convenient for wiring and will not affect the transmission of power, so as to ensure the construction efficiency.
本发明的目的主要是通过下述方案得以实现的:一种集成型集装式临时应用的变电站,包括变电站本体、预制式箱体和移动式插座箱,所述的变电站本体和移动式插座箱均安装在预制式箱体内部,所述的变电站本体上设置有第一出线插座,所述的移动式插座箱包括插座箱本体,所述的插座箱本体的一侧设置有与第一出线插座相配合的进线插座,所述的插座箱本体的另一侧设置有第二出线插座,所述的插座箱本体的底部设置有多个车轮。变电站本体和移动式插座箱均安装在预制式箱体内部,预制式箱体采用整体焊接,喷砂处理等工艺制作而成,具有集装箱式外观,变电站本体上设置有第一出线插座,移动式插座箱包括插座箱本体,插座箱本体的一侧设置有与第一出线插座相配合的进线插座,插座箱本体的另一侧设置有第二出线插座,插座箱本体的底部设置有多个车轮,具体在使用时,工作人员可以先将插座箱本体上的进线插座通过电缆与变电站本体上的第一出线插座电连接,然后再推动移动式插座箱至靠近施工现场处,从而便于施工现场的电力设备连接至第二出线插座上,实现电力的输送,接线十分方便,从而能够保证施工效率。The purpose of the present invention is mainly achieved through the following scheme: an integrated modular substation for temporary application, including a substation body, a prefabricated box and a mobile socket box, the substation body and the mobile socket box They are all installed inside the prefabricated box body, the substation body is provided with a first outlet socket, the mobile socket box includes a socket box body, and one side of the socket box body is provided with a first outlet socket The other side of the socket box body is provided with a second outlet socket, and the bottom of the socket box body is provided with a plurality of wheels. The substation body and the mobile socket box are installed inside the prefabricated box. The prefabricated box is made by integral welding, sandblasting and other processes, and has a container-like appearance. The substation body is provided with the first outlet socket. The socket box includes a socket box body, one side of the socket box body is provided with a wire inlet socket matched with the first outlet socket, the other side of the socket box body is provided with a second outlet socket, and the bottom of the socket box body is provided with a plurality of When using the wheel, the staff can first connect the inlet socket on the socket box body to the first outlet socket on the substation body through a cable, and then push the mobile socket box to the construction site, so as to facilitate construction The on-site power equipment is connected to the second outlet socket to realize the transmission of power, and the wiring is very convenient, so as to ensure the construction efficiency.
作为优选,所述的插座箱本体通过底座与车轮连接,所述的底座上设置有与插座箱本体相配合的安装槽,所述的车轮设置在底座的下表面上。插座箱本体通过底座与车轮连接,底座上设置有与插座箱本体相配合的安装槽,车轮设置在底座的下表面上,当插座箱本体不需要使用时,可以将插座箱本体与底座分离,从而便于安放;需要使用插座箱本体时,将插座箱本体放入底座上的安装槽内,工作人员即可便捷地移动插座箱本体。Preferably, the socket box body is connected to the wheel through a base, the base is provided with a mounting groove matched with the socket box body, and the wheel is arranged on the lower surface of the base. The socket box body is connected with the wheel through the base, and the base is provided with a mounting groove matched with the socket box body. The wheel is arranged on the lower surface of the base. When the socket box body does not need to be used, the socket box body can be separated from the base. Therefore, the installation is convenient; when the socket box body needs to be used, the socket box body is put into the installation groove on the base, and the staff can move the socket box body conveniently.
作为优选,所述的插座箱本体的底部设置有卡紧装置,所述的卡紧装置包括设置在插座箱本体上的定位壳体,所述的定位壳体的远离插座箱本体的一侧设置有定位槽,所述的安装槽的底面上对应卡紧装置设置有卡紧槽,所述的卡紧槽内设置有与定位槽相配合的卡紧块,所述的定位壳体内位于定位槽的两侧对应设置有滑动槽,所述的滑动槽内滑动连接有定位块,所述的定位块的靠近定位槽的一端与卡紧块相配合。插座箱本体的底部设置有卡紧装置,由于施工现场的地面大都凹凸不平,因此卡紧装置的设计能够提高插座箱本体与底座连接时的稳定性,卡紧装置包括设置在插座箱本体上的定位壳体,定位壳体的远离插座箱本体的一侧设置有定位槽,安装槽的底面上对应卡紧装置设置有卡紧槽,卡紧槽内设置有与定位槽相配合的卡紧块,定位壳体内位于定位槽的两侧对应设置有滑动槽,滑动槽内滑动连接有定位块,定位块的靠近定位槽的一端与卡紧块相配合,将插座箱本体放置到底座的安装槽上时,随着插座箱本体的移动,定位壳体先进入卡紧槽内,然后卡紧块对应卡入定位槽内,卡紧块随后会抵在两个定位块上,定位块受力后会沿着滑动槽往远离定位槽方向移动并抵在卡紧槽的侧壁上,从而极大地增加了插座箱本体与底座连接时的稳定性。Preferably, the bottom of the socket box body is provided with a clamping device, and the clamping device includes a positioning shell disposed on the socket box body, and a side of the positioning shell away from the socket box body is provided There is a positioning groove, the bottom surface of the installation groove is provided with a clamping groove corresponding to the clamping device, the clamping groove is provided with a clamping block matched with the positioning groove, and the positioning casing is located in the positioning groove. There are corresponding sliding grooves on both sides of the sliding groove, a positioning block is slidably connected in the sliding groove, and one end of the positioning block close to the positioning groove is matched with the clamping block. The bottom of the socket box body is provided with a clamping device. Since the ground on the construction site is mostly uneven, the design of the clamping device can improve the stability of the connection between the socket box body and the base. The clamping device includes a set on the socket box body. Positioning housing, the side of the positioning housing away from the socket box body is provided with a positioning groove, the bottom surface of the installation groove is provided with a clamping groove corresponding to the clamping device, and a clamping block matched with the positioning groove is arranged in the clamping groove , There are corresponding sliding grooves on both sides of the positioning groove in the positioning shell, and a positioning block is slidably connected in the sliding groove. When the socket box body moves, the positioning shell first enters the clamping groove, and then the clamping block is correspondingly clamped into the positioning groove, and the clamping block will then abut on the two positioning blocks. It will move away from the positioning slot along the sliding slot and abut against the side wall of the clamping slot, thereby greatly increasing the stability of the connection between the socket box body and the base.
作为优选,所述的卡紧槽的底面上设置有与卡紧块滑动连接的缓冲槽,所述的卡紧块与缓冲槽的底面之间通过缓冲弹簧连接。卡紧槽的底面上设置有与卡紧块滑动连接的缓冲槽,卡紧块与缓冲槽的底面之间通过缓冲弹簧连接,缓冲弹簧的设置能够起到一定的缓冲和防护作用,防止插座箱本体与底座连接时发生碰撞,稳定性和安全性都好。Preferably, the bottom surface of the clamping groove is provided with a buffer groove slidably connected with the clamping block, and the clamping block and the bottom surface of the buffer groove are connected by a buffer spring. The bottom surface of the clamping groove is provided with a buffer groove that is slidably connected to the clamping block. The clamping block and the bottom surface of the buffer groove are connected by a buffer spring. When the body is connected with the base, the collision occurs, and the stability and safety are good.
作为优选,所述的定位块的靠近定位槽的一端对应卡紧块设置有第一导向面,所述的卡紧块上对应第一导向面设置有第二导向面。定位块的靠近定位槽的一端对应卡紧块设置有第一导向面,卡紧块上对应第一导向面设置有第二导向面,在安装时,卡紧块上的第二导向面会抵在定位块的第一导向面上,从而使得定位块受力后能更好的发生移动,防止出现卡死的情况。Preferably, an end of the positioning block close to the positioning groove is provided with a first guide surface corresponding to the clamping block, and a second guide surface is provided on the clamping block corresponding to the first guide surface. One end of the positioning block close to the positioning groove is provided with a first guide surface corresponding to the clamping block, and a second guiding surface is provided on the clamping block corresponding to the first guiding surface. During installation, the second guiding surface on the clamping block will abut against the The first guide surface of the positioning block, so that the positioning block can move better after being stressed, so as to prevent the situation of being stuck.
作为优选,所述的定位块的远离第一导向面的一端对应卡紧槽的侧壁设置有定位直面。定位块的远离第一导向面的一端对应卡紧槽的侧壁设置有定位直面,定位直面的设置使得定位块能够更稳定地贴合在卡紧槽的侧壁上,稳定性好。Preferably, one end of the positioning block away from the first guide surface is provided with a positioning straight surface corresponding to the side wall of the clamping groove. One end of the positioning block away from the first guide surface is provided with a positioning straight surface corresponding to the side wall of the clamping groove.
作为优选,所述的滑动槽的侧壁上设置有辅助腔,所述的定位块上设置有与辅助腔滑动连接的辅助块,所述的辅助块与辅助腔的侧壁之间通过复位弹簧连接。滑动槽的侧壁上设置有辅助腔,定位块上设置有与辅助腔滑动连接的辅助块,辅助块与辅助腔的侧壁之间通过复位弹簧连接,辅助腔、辅助块和复位弹簧的设计能够提高定位块在滑动槽内移动时的稳定性,而且能够使得定位块在不受外力时能够复位,使用十分方便。Preferably, the side wall of the sliding slot is provided with an auxiliary cavity, the positioning block is provided with an auxiliary block slidably connected with the auxiliary cavity, and a return spring is passed between the auxiliary block and the side wall of the auxiliary cavity. connect. The side wall of the sliding groove is provided with an auxiliary cavity, and the positioning block is provided with an auxiliary block slidably connected to the auxiliary cavity. The auxiliary block and the side wall of the auxiliary cavity are connected by a return spring. The design of the auxiliary cavity, the auxiliary block and the return spring The stability of the positioning block when moving in the sliding groove can be improved, and the positioning block can be reset when it is not subjected to external force, which is very convenient to use.
作为优选,所述的插座箱本体的顶端设置有吊环。插座箱本体的顶端设置有吊环,吊环的设计方便工作人员通过起吊工具对插座箱本体进行起吊,操作便捷。Preferably, the top of the socket box body is provided with a lifting ring. The top of the socket box body is provided with a lifting ring, and the design of the lifting ring is convenient for the staff to lift the socket box body by a lifting tool, and the operation is convenient.
作为优选,所述的插座箱本体的侧壁上设置有把手。插座箱本体的侧壁上设置有把手,方便工作人员推动移动式插座箱。Preferably, a handle is provided on the side wall of the socket box body. The side wall of the socket box body is provided with a handle, which is convenient for the staff to push the mobile socket box.
作为优选,所述的吊环的数量为四个,四个吊环均匀分布在插座箱本体的顶端上。吊环的数量为四个,四个吊环均匀分布在插座箱本体的顶端上,从而提高了插座箱本体被起吊时的稳定性和安全性。Preferably, the number of the hoisting rings is four, and the four hoisting rings are evenly distributed on the top of the socket box body. The number of hoisting rings is four, and the four hoisting rings are evenly distributed on the top of the socket box body, thereby improving the stability and safety of the socket box body when it is hoisted.
因此,本发明的一种集成型集装式临时应用的变电站具备下述优点:本发明使用便捷,接线十分方便,不会影响电力的输送,从而能够保证施工效率,移动式插座箱在使用时的稳定性好。Therefore, an integrated container-type temporary application substation of the present invention has the following advantages: the present invention is convenient to use, very convenient for wiring, and does not affect the transmission of electric power, thereby ensuring construction efficiency, and the mobile socket box is in use. good stability.
附图说明Description of drawings
附图1是本发明的结构示意图。1 is a schematic structural diagram of the present invention.
附图2是本发明中变电站本体的主视图。Figure 2 is a front view of the substation body in the present invention.
附图3是本发明中移动式插座箱的主视图。Figure 3 is a front view of the mobile jack box of the present invention.
附图4是本发明中移动式插座箱的侧视图。Figure 4 is a side view of the mobile jack box of the present invention.
附图5是本发明中插座箱本体的主视图。FIG. 5 is a front view of the socket box body of the present invention.
附图6是本发明中底座的剖视图。Figure 6 is a sectional view of the base of the present invention.
附图7是本发明中卡紧装置的剖视图。Figure 7 is a sectional view of the clamping device of the present invention.
图示说明:1-预制式箱体,2-变电站本体,3-第一出线插座,4-插座箱本体,5-吊环,6-第二出线插座,7-底座,8-车轮,9-进线插座,10-把手,11-卡紧装置,12-安装槽,13-辅助块,14-卡紧槽,15-卡紧块,16-第二导向面,17-缓冲槽,18-缓冲弹簧,19-定位壳体,20-定位槽,21-定位块,22-第一导向面,23-辅助腔,24-复位弹簧,25-滑动槽,26-定位直面。Illustration description: 1-Prefabricated box, 2-Substation body, 3-First outlet socket, 4-Socket box body, 5-Hanging ring, 6-Second outlet socket, 7-Base, 8-Wheel, 9- Inlet socket, 10-handle, 11-clamping device, 12-installation groove, 13-auxiliary block, 14-clamping groove, 15-clamping block, 16-second guide surface, 17-buffer groove, 18- Buffer spring, 19-positioning shell, 20-positioning groove, 21-positioning block, 22-first guide surface, 23-auxiliary cavity, 24-return spring, 25-sliding groove, 26-positioning straight surface.
具体实施方式Detailed ways
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。The technical solutions of the present invention will be further described in detail below through embodiments and in conjunction with the accompanying drawings.
实施例1:Example 1:
如图1、2所示,一种集成型集装式临时应用的变电站,包括变电站本体2、预制式箱体1和移动式插座箱,变电站本体2和移动式插座箱均安装在预制式箱体1内部,预制式箱体1采用整体焊接,喷砂处理等工艺制作而成,具有集装箱式外观,变电站本体2上设置有第一出线插座3,移动式插座箱包括插座箱本体4,插座箱本体4的一侧设置有与第一出线插座3相配合的进线插座9,插座箱本体4的另一侧设置有第二出线插座6,插座箱本体4的底部设置有多个车轮8,具体在使用时,工作人员可以先将插座箱本体4上的进线插座9通过电缆与变电站本体2上的第一出线插座3电连接,然后再推动移动式插座箱至靠近施工现场处,从而便于施工现场的电力设备连接至第二出线插座6上,实现电力的输送,接线十分方便,从而能够保证施工效率。As shown in Figures 1 and 2, an integrated modular substation for temporary application includes a
如图3、4、5、6和7所示,插座箱本体4通过底座7与车轮8连接,底座7上设置有与插座箱本体4相配合的安装槽12,车轮8设置在底座7的下表面上,当插座箱本体4不需要使用时,可以将插座箱本体4与底座7分离,从而便于安放;需要使用插座箱本体4时,将插座箱本体4放入底座7上的安装槽12内,工作人员即可便捷地移动插座箱本体4;插座箱本体4的底部设置有卡紧装置11,由于施工现场的地面大都凹凸不平,因此卡紧装置11的设计能够提高插座箱本体4与底座7连接时的稳定性,卡紧装置11包括设置在插座箱本体4上的定位壳体19,定位壳体19的远离插座箱本体4的一侧设置有定位槽20,安装槽12的底面上对应卡紧装置11设置有卡紧槽14,卡紧槽14内设置有与定位槽20相配合的卡紧块15,定位壳体19内位于定位槽20的两侧对应设置有滑动槽25,滑动槽25内滑动连接有定位块21,定位块21的靠近定位槽20的一端与卡紧块15相配合,将插座箱本体4放置到底座7的安装槽12上时,随着插座箱本体4的移动,定位壳体19先进入卡紧槽14内,然后卡紧块15对应卡入定位槽20内,卡紧块15随后会抵在两个定位块21上,定位块21受力后会沿着滑动槽25往远离定位槽20方向移动并抵在卡紧槽14的侧壁上,从而极大地增加了插座箱本体4与底座7连接时的稳定性;卡紧槽14的底面上设置有与卡紧块15滑动连接的缓冲槽17,卡紧块15与缓冲槽17的底面之间通过缓冲弹簧18连接,缓冲弹簧18的设置能够起到一定的缓冲和防护作用,防止插座箱本体4与底座7连接时发生碰撞,稳定性和安全性都好。As shown in FIGS. 3 , 4 , 5 , 6 and 7 , the
定位块21的靠近定位槽20的一端对应卡紧块15设置有第一导向面22,卡紧块15上对应第一导向面22设置有第二导向面16,在安装时,卡紧块15上的第二导向面16会抵在定位块21的第一导向面22上,从而使得定位块21受力后能更好的发生移动,防止出现卡死的情况;定位块21的远离第一导向面22的一端对应卡紧槽14的侧壁设置有定位直面26,定位直面26的设置使得定位块21能够更稳定地贴合在卡紧槽14的侧壁上,稳定性好。One end of the
滑动槽25的侧壁上设置有辅助腔23,定位块21上设置有与辅助腔23滑动连接的辅助块13,辅助块13与辅助腔23的侧壁之间通过复位弹簧24连接,辅助腔23、辅助块13和复位弹簧24的设计能够提高定位块21在滑动槽25内移动时的稳定性,而且能够使得定位块21在不受外力时能够复位,使用十分方便。The side wall of the sliding
插座箱本体4的顶端设置有吊环5,吊环5的设计方便工作人员通过起吊工具对插座箱本体4进行起吊,操作便捷;吊环5的数量为四个,四个吊环5均匀分布在插座箱本体4的顶端上,从而提高了插座箱本体4被起吊时的稳定性和安全性。The top of the
插座箱本体4的侧壁上设置有把手10,方便工作人员推动移动式插座箱。The side wall of the
应理解,该实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。It should be understood that this embodiment is only used to illustrate the present invention and not to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010342383.6A CN111614007B (en) | 2020-04-27 | 2020-04-27 | Integrated packaging type temporarily applied transformer substation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010342383.6A CN111614007B (en) | 2020-04-27 | 2020-04-27 | Integrated packaging type temporarily applied transformer substation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111614007A true CN111614007A (en) | 2020-09-01 |
| CN111614007B CN111614007B (en) | 2021-11-23 |
Family
ID=72204395
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010342383.6A Active CN111614007B (en) | 2020-04-27 | 2020-04-27 | Integrated packaging type temporarily applied transformer substation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111614007B (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2307439A1 (en) * | 1975-04-08 | 1976-11-05 | Bbc Brown Boveri & Cie | Electrical draw-out control panel - has compartmented profile section frame work with interchangeable drawers |
| CN105071335A (en) * | 2015-08-13 | 2015-11-18 | 江苏省电力公司常州供电公司 | Rapid plugging/pulling cable branching box |
| CN206225974U (en) * | 2016-11-22 | 2017-06-06 | 云南电网有限责任公司带电作业分公司 | A kind of ready-package cable connection box |
| CN107681622A (en) * | 2017-11-23 | 2018-02-09 | 国网上海市电力公司 | A kind of removal cable feeder pillar |
| CN108429141A (en) * | 2018-03-08 | 2018-08-21 | 陈富强 | A kind of ring main unit of good fixing effect |
| CN208078421U (en) * | 2018-04-16 | 2018-11-09 | 广州南洋电控设备厂有限公司 | A kind of rotatable outdoor electricity distribution cabinet |
| CN209249999U (en) * | 2019-02-14 | 2019-08-13 | 佛山市湘诺电气设备有限公司 | A kind of electric cabinet electronic box assembling locating calibration device |
| CN209434632U (en) * | 2019-02-12 | 2019-09-24 | 三峡大学 | A kind of support device of switchgear electric automatization equipment |
| CN209563105U (en) * | 2018-12-21 | 2019-10-29 | 厦门启和电器有限公司 | A kind of intellectual one or two fused controlling devices |
| CN209913283U (en) * | 2019-06-14 | 2020-01-07 | 湖北网安科技有限公司 | A modular integrated, quick-plug, mobile power protection system |
-
2020
- 2020-04-27 CN CN202010342383.6A patent/CN111614007B/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2307439A1 (en) * | 1975-04-08 | 1976-11-05 | Bbc Brown Boveri & Cie | Electrical draw-out control panel - has compartmented profile section frame work with interchangeable drawers |
| CN105071335A (en) * | 2015-08-13 | 2015-11-18 | 江苏省电力公司常州供电公司 | Rapid plugging/pulling cable branching box |
| CN206225974U (en) * | 2016-11-22 | 2017-06-06 | 云南电网有限责任公司带电作业分公司 | A kind of ready-package cable connection box |
| CN107681622A (en) * | 2017-11-23 | 2018-02-09 | 国网上海市电力公司 | A kind of removal cable feeder pillar |
| CN108429141A (en) * | 2018-03-08 | 2018-08-21 | 陈富强 | A kind of ring main unit of good fixing effect |
| CN208078421U (en) * | 2018-04-16 | 2018-11-09 | 广州南洋电控设备厂有限公司 | A kind of rotatable outdoor electricity distribution cabinet |
| CN209563105U (en) * | 2018-12-21 | 2019-10-29 | 厦门启和电器有限公司 | A kind of intellectual one or two fused controlling devices |
| CN209434632U (en) * | 2019-02-12 | 2019-09-24 | 三峡大学 | A kind of support device of switchgear electric automatization equipment |
| CN209249999U (en) * | 2019-02-14 | 2019-08-13 | 佛山市湘诺电气设备有限公司 | A kind of electric cabinet electronic box assembling locating calibration device |
| CN209913283U (en) * | 2019-06-14 | 2020-01-07 | 湖北网安科技有限公司 | A modular integrated, quick-plug, mobile power protection system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111614007B (en) | 2021-11-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206339574U (en) | A kind of open side type DC voltage generator | |
| CN201562893U (en) | Movable box-type high-voltage and low-voltage substation | |
| CN111933423A (en) | Body structure of single-phase direct-buried dry-type transformer | |
| CN202454943U (en) | Box type substation | |
| CN215119735U (en) | Energy storage converter all-in-one that steps up | |
| CN102882132A (en) | Integrated fully-sealed component of medium voltage electric cable connector and medium voltage fuser | |
| CN111614007A (en) | An integrated modular substation for temporary application | |
| CN211629710U (en) | Operation and maintenance device for substation equipment | |
| CN212137034U (en) | Mobile socket box of transformer substation for box type temporary application | |
| CN211239455U (en) | A communication base station sharing 10kV power tower energy acquisition and metering device | |
| CN202171843U (en) | High-voltage electric energy prepayment metering control device | |
| CN203551621U (en) | High-voltage dry-type metering box with three-phase four-wire system | |
| CN207819194U (en) | A kind of movable transformer pack construction power supply system | |
| CN106711824A (en) | Vehicle-mounted complete equipment with transformer and GIS direct connection | |
| CN217788137U (en) | Modular combined outdoor three-dimensional wound core dry-type transformer | |
| CN211905457U (en) | Multifunctional connecting device for insulating safety tool | |
| CN205355657U (en) | Movable HGIS combined electrical apparatus | |
| CN210430587U (en) | Metal-enclosed three-phase three-wire medium-high voltage combined metering box | |
| CN203055652U (en) | Combined type mutual inductor | |
| CN204390890U (en) | The combined power transformer of a kind of building | |
| CN202917804U (en) | Integrated fully-sealed component of medium voltage electric cable connector and medium voltage fuse | |
| CN2369250Y (en) | Dry all sealed high voltage electric power meter | |
| CN211508722U (en) | Safe isolated form three proofings wireless alternating-current charging stake | |
| CN201765930U (en) | Combined power transformer | |
| CN201215872Y (en) | Prefabricated substation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |