CN111598422A - Construction quality inspection method, system, medium and device - Google Patents

Construction quality inspection method, system, medium and device Download PDF

Info

Publication number
CN111598422A
CN111598422A CN202010372863.7A CN202010372863A CN111598422A CN 111598422 A CN111598422 A CN 111598422A CN 202010372863 A CN202010372863 A CN 202010372863A CN 111598422 A CN111598422 A CN 111598422A
Authority
CN
China
Prior art keywords
record
rectification
acceptance
construction quality
quality inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010372863.7A
Other languages
Chinese (zh)
Inventor
陈添鹤
阮美琴
李发林
张奇
陈立力
刘建松
谢帆
孙健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jaso Group Co ltd
Original Assignee
Shanghai Jaso Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jaso Group Co ltd filed Critical Shanghai Jaso Group Co ltd
Priority to CN202010372863.7A priority Critical patent/CN111598422A/en
Publication of CN111598422A publication Critical patent/CN111598422A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention provides a construction quality inspection method, a system, a medium and a device, wherein the method comprises the following steps: generating a construction quality inspection plan of the building, and sending the construction quality inspection plan to a corresponding quality worker end; receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record; when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan; when the acceptance record is the rectification list, sending the rectification list to a corresponding team long terminal so that the team long terminal sends the rectification list to a rectification terminal; receiving an rectification record of a rectification end, and sending the rectification record to a quality worker end; and receiving an acceptance record of the quality member end on the rectification record, wherein the acceptance record is a rectification list or an acceptance qualified record. The construction quality inspection method, the construction quality inspection system, the construction quality inspection medium and the construction quality inspection device are used for promoting a construction quality inspection plan and strengthening supervision.

Description

Construction quality inspection method, system, medium and device
Technical Field
The invention relates to the technical field of building engineering management, in particular to a construction quality inspection method, a construction quality inspection system, a construction quality inspection medium and a construction quality inspection device.
Background
In the existing building construction process, the construction quality of a construction building needs to be inspected. The conventional inspection process of the construction quality has many personnel and complicated inspection projects, and the problems of omission, unsmooth circulation, untimely treatment, insufficient supervision and the like can be caused if the inspection is carried out on line.
Therefore, the problems that the construction quality inspection supervision strength is not enough and the circulation is not smooth are expected to be solved.
Disclosure of Invention
In view of the above disadvantages of the prior art, an object of the present invention is to provide a construction quality inspection method, system, medium and apparatus, which are used to solve the problems of insufficient supervision and unsmooth circulation of construction quality inspection in the prior art.
In order to achieve the above objects and other related objects, the present invention provides a construction quality inspection method, including the steps of: generating a construction quality inspection plan of the building, and sending the construction quality inspection plan to a corresponding quality worker end; receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record; when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan; when the acceptance record is the rectification list, sending the rectification list to a corresponding team long terminal so that the team long terminal sends the rectification list to a rectification terminal; receiving an rectification record of a rectification end, and sending the rectification record to a quality worker end; and receiving an acceptance record of the quality member end on the rectification record, wherein the acceptance record is a rectification list or an acceptance qualified record.
In an embodiment of the present invention, the receiving an acceptance record of the rectification record of the quality member side, wherein the acceptance record is a rectification list or an acceptance qualified record further includes: when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan; and when the acceptance record is the correction order, sending the correction order to the corresponding team long terminal so that the team long terminal sends the correction order to the correction terminal.
In an embodiment of the present invention, when the time point from the time point when the modification order is sent to the corresponding team leader exceeds a first predetermined time period and the modification record of the modification end is not received, the modification order is repeatedly sent to the corresponding team leader.
In an embodiment of the present invention, the method further comprises receiving feedback from the correction list of the team leader.
In an embodiment of the present invention, when the time point when the modification order is sent to the corresponding team long terminal exceeds a second predetermined time period and the modification order of the team long terminal is not received and feedback is received, the modification order is repeatedly sent to the corresponding team long terminal.
In an embodiment of the invention, a one-to-one correspondence relationship is established between the construction quality inspection plan and the two-dimensional codes, so that the quality worker end, the team leader end or the reform end obtains the corresponding construction quality inspection plan based on scanning the two-dimensional codes.
In order to achieve the above object, the present invention further provides a construction quality inspection system, including: the system comprises a generation module, a first acceptance receiving module, a qualified acceptance module, a rectification recording module and a second acceptance receiving module; the generating module is used for generating a construction quality inspection plan of the building and sending the construction quality inspection plan to a corresponding quality worker end; the first acceptance receiving module is used for receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record; the acceptance check module is used for ending the circulation of the construction quality inspection plan when the acceptance record is the acceptance check record; the rectification module is used for sending the rectification list to a corresponding team long terminal when the acceptance record is the rectification list so that the team long terminal sends the rectification list to the rectification terminal; the rectification recording module is used for receiving a rectification record of a rectification end and sending the rectification record to a quality worker end; and the second acceptance receiving module is used for receiving an acceptance record of the quality member end on the rectification record, wherein the acceptance record is a rectification list or an acceptance qualified record.
To achieve the above object, the present invention also provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements any one of the above construction quality inspection methods.
In order to achieve the above object, the present invention further provides a construction quality inspection device, including: a processor and a memory; the memory is used for storing a computer program; the processor is connected with the memory and is used for executing the computer program stored in the memory so as to enable the construction quality inspection device to execute any one of the construction quality inspection methods.
Finally, the invention also provides a construction quality inspection system, which comprises the construction quality inspection device, a quality worker end, a team and team long end and a rectification end; the construction quality inspection device is used for generating a construction quality inspection plan and sending the construction quality inspection plan to a corresponding quality worker end; receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record; when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan; when the acceptance record is the rectification list, sending the rectification list to a corresponding team long terminal so that the team long terminal sends the rectification list to a rectification terminal; receiving an rectification record of a rectification end, and sending the rectification record to a quality worker end; receiving an acceptance record of the rectification record of the quality member end, wherein the acceptance record is a rectification list or an acceptance qualified record; the quality worker end is used for sending an acceptance record of the construction quality inspection plan to the construction quality inspection device; sending the acceptance record of the rectification record to the construction quality inspection device; the team long end is used for receiving the correction order sent by the construction quality inspection device; sending the rectification list to a rectification end; the rectification end is used for receiving a rectification list sent by the team long end; and sending the correction record to a construction quality inspection device.
As mentioned above, the construction quality inspection method, the construction quality inspection system, the construction quality inspection medium and the construction quality inspection device have the following beneficial effects: the method is used for promoting the construction quality inspection plan and strengthening the supervision.
Drawings
FIG. 1 is a flow chart illustrating a construction quality inspection method according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of the construction quality inspection system according to an embodiment of the present invention;
FIG. 3 is a schematic structural diagram of an inspection device for construction quality according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a construction quality inspection system according to another embodiment of the present invention.
Description of the element reference numerals
21 generating module
22 first acceptance receiving module
23 acceptance module
24 rectification module
25 rectification recording module
26 second acceptance receiving module
31 processor
32 memory
41 construction quality inspection device
42 quality member terminal
43 team long terminal
44 truing end
Detailed Description
The embodiments of the present invention are described below with reference to specific embodiments, and other advantages and effects of the present invention will be easily understood by those skilled in the art from the disclosure of the present specification. The invention is capable of other and different embodiments and of being practiced or of being carried out in various ways, and its several details are capable of modification in various respects, all without departing from the spirit and scope of the present invention. It is to be noted that the features in the following embodiments and examples may be combined with each other without conflict.
It should be noted that the drawings provided in the following embodiments are only for illustrating the basic idea of the present invention, so that the components related to the present invention are only shown in the drawings rather than drawn according to the number, shape and size of the components in actual implementation, the type, quantity and proportion of the components in actual implementation can be changed freely, and the layout of the components can be more complicated.
The construction quality inspection method, the system, the medium and the device enhance supervision, are smooth in circulation and are not easy to omit construction quality inspection plans.
As shown in fig. 1, in an embodiment, the construction quality inspection method of the present invention includes the following steps:
and step S11, generating a construction quality inspection plan, and sending the construction quality inspection plan to a corresponding quality worker side.
Specifically, the construction quality inspection plan includes: the construction quality inspection content and the corresponding quality personnel end distribution for the construction quality inspection. For example: the construction quality inspection plan for the building, such as the building No. 25 in the north area of a residential district, comprises the following steps: and (5) construction quality inspection content, and a quality worker end is appointed for each family by taking the family as a detected unit. Of course, it is also possible to assign a member end to each floor in units of floors to be inspected and assign a member end to each floor in units of floors to be inspected. And sending the construction quality inspection plan to a corresponding quality worker end, namely sending the construction quality inspection content to a specified quality worker end.
Specifically, the construction quality inspection content is as shown in the following table 1 a:
Figure BDA0002478796100000041
Figure BDA0002478796100000051
in the above table one, the designation of the designated mass member side is performed in units of users.
Another construction quality inspection content table 1 b:
Figure BDA0002478796100000052
and step S12, receiving an acceptance record of the construction quality inspection plan of the quality worker side, wherein the acceptance record is an adjustment list or an acceptance qualified record.
Specifically, after quality inspection is carried out on the building to be inspected by a quality worker, an acceptance record table is filled, the acceptance record table comprises the quality acceptance record of the first table, and when the unit to be inspected corresponding to the quality acceptance record is qualified, the acceptance record table where the quality acceptance record is located is the acceptance qualified record; and when the detected unit corresponding to the quality acceptance record is unqualified, the acceptance record table where the quality acceptance record is located is the correction list. Specifically, the rectification list further includes: the method comprises the following steps of (1) explaining field inspection items needing to be rectified and problem photos of the field inspection items needing to be rectified; and generating a label of the site inspection project needing to be rectified at a specific position of the three-dimensional model of the building according to the rectification sheet. Specifically, each field inspection item corresponds to a three-dimensional model of the building on which the construction quality inspection is performed one-to-one. For example, the three-dimensional model of the building includes: the method comprises the following steps of marking a wall body, a window, an entrance door, a main horizontal door, a secondary horizontal door and the like at the entrance door of the three-dimensional model of the building when the entrance door is unqualified in quality: the quality of the entrance door is not qualified. Such a more intuitive display requires a modification of the part.
Acceptance record table 2 a:
Figure BDA0002478796100000061
Figure BDA0002478796100000071
acceptance record table 2 b: and recording the acceptance and acceptance.
Figure BDA0002478796100000072
Figure BDA0002478796100000081
And step S13, when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan.
Specifically, when the acceptance record is an acceptance qualified record, it indicates that the construction quality inspection plan is completed in units of households, floors or buildings, and the circulation is not required, so that the circulation of the construction quality inspection plan is finished.
And step S14, when the acceptance record is the rectification list, sending the rectification list to the corresponding team long terminal so that the team long terminal sends the rectification list to the rectification terminal.
Specifically, the team leader is in communication connection with the modification leader, and the team leader is configured to dispatch a modification order to the modification leader so that the corresponding modification leader completes a modification task corresponding to the modification order. Because such an allocation facilitates the allocation of the correction sheets based on the knowledge of the team leader about the correction ends under the respective team.
Specifically, when the time point of sending the rectification list to the corresponding team long terminal exceeds a first preset time period and the rectification record of the rectification terminal is not received, the rectification list is repeatedly sent to the corresponding team long terminal. Therefore, the team leader can be reminded to monitor the rectification list in time. For example, when the time point of sending the rectification list to the corresponding team leader exceeds 12 hours and the rectification record of the rectification end is not received, the rectification list is repeatedly sent to the corresponding team leader.
Specifically, the method further comprises receiving feedback of the rectification list of the long end of the team. Therefore, whether the team long end receives the rectification list or not can be known, so that the team long end is prevented from being missed to connect the rectification list, the flow of the construction quality inspection method is improved, and the loophole is prevented from occurring.
Specifically, when the time point of sending the rectification list to the corresponding team long terminal exceeds a second preset time period and the rectification list of the team long terminal is not received and feedback is received, the rectification list is repeatedly sent to the corresponding team long terminal. And reminding the team long terminal to forward the rectification list again in time and supervising the quality supervisor terminal to rectify according to the rectification list. For example, when the time point of sending the rectification list to the corresponding group long end exceeds 2 hours and the rectification list of the group long end receives no feedback, the rectification list is repeatedly sent to the corresponding group long end.
And step S15, receiving the rectification record of the rectification end, and sending the rectification record to the quality member end.
Specifically, the rectification end obtains, based on the rectification list: the method comprises the following steps of describing a field inspection item needing to be rectified, taking a problem picture of the field inspection item needing to be rectified, and marking the field inspection item needing to be rectified at a specific position of a three-dimensional model of the building, so that corresponding rectification can be carried out. And after the rectification end completes rectification, receiving a rectification record of the rectification end. The rectification record comprises: the modified description of the field inspection item, the modified picture of the field inspection item, and the label of the modified field inspection item on the specific position of the three-dimensional model of the building. Therefore, the circulation of the rectification records of the rectification end to the quality member end is completed, and the quality member end can process the rectification records in time.
And step S16, receiving an acceptance record of the quality member end to the rectification record, wherein the acceptance record is a rectification list or an acceptance qualified record.
Specifically, the quality worker side checks and accepts the rectification record again according to the check and acceptance of the construction quality inspection plan to generate a check and acceptance record, and the check and acceptance record is a rectification list or a check and acceptance qualified record. And when the acceptance record is the acceptance qualified record, ending the circulation of the construction quality inspection plan. And when the acceptance record is the correction order, sending the correction order to the corresponding team long terminal so that the team long terminal sends the correction order to the correction terminal. I.e., re-executed as per step S14.
Specifically, it also includes when any one or more of the following occurs in a problem contained in the correction sheet: and (4) repeatedly generating the problem item contained in the rectification list in the last week, refusing rectification by the long end of the team, and generating the problem again after rectification, and sending a penalty list to the long end of the team sending the rectification list. Therefore, the problem contained in the rectification list is prevented from being processed in the processing process, or the rectification list is not timely, serious and responsible for processing the problem contained in the rectification list, so that the construction quality inspection method is smoother to execute.
Specifically, the method further comprises the steps of establishing a corresponding relation between a problem corresponding to a field inspection item of the rectification list and a problem reason, and obtaining the problem reason of the problem according to the corresponding relation, so as to obtain a person responsible for the problem, and further generate a person responsible for the punishment list. Therefore, the problem of the rectification list can be corresponding to the person in charge, and the problem corresponding to any field inspection project can be taken charge of by people.
Specifically, the method further comprises the steps of presetting some field inspection items as key field inspection items, and generating a penalty list of the key field inspection items when the problems contained in the rectification list include the key field inspection items. Therefore, important on-site inspection projects can be controlled and supervised, and important potential safety hazards are prevented.
Specifically, the construction quality inspection plan and the two-dimensional codes are in one-to-one correspondence, so that the quality worker end, the team long end or the rectification end can obtain the corresponding construction quality inspection plan based on scanning of the two-dimensional codes. For example, a two-dimensional code is generated by taking a household as a unit, and a one-to-one correspondence relationship is established between the construction quality inspection plan and the two-dimensional code, so that the quality member end, the team and group long end or the rectification end obtains the corresponding construction quality inspection plan based on scanning the two-dimensional code. The construction quality inspection plan comprises: and a quality worker end, an acceptance record and a rectification record corresponding to the construction quality inspection plan. Therefore, the progress of the construction quality inspection plan can be conveniently known in real time.
As shown in fig. 2, in an embodiment, the construction quality inspection system of the present invention includes a generating module 21, a first acceptance receiving module 22, an acceptance qualified module 23, an rectification module 24, a rectification recording module 25, and a second acceptance receiving module 26; the generating module 21 is configured to generate a construction quality inspection plan of a building, and send the construction quality inspection plan to a corresponding quality worker side; the first acceptance receiving module 22 is configured to receive an acceptance record of the construction quality inspection plan of the quality worker side, where the acceptance record is an adjustment order or an acceptance qualified record; the acceptance qualified module 23 is configured to end the circulation of the construction quality inspection plan when the acceptance record is an acceptance qualified record; the rectification module 24 is configured to send the rectification list to a corresponding team long terminal when the acceptance record is the rectification list, so that the team long terminal sends the rectification list to the rectification terminal; the rectification recording module 25 is used for receiving a rectification record of a rectification end and sending the rectification record to a quality worker end; the second acceptance receiving module 26 is configured to receive an acceptance record of the quality member for the rectification record, where the acceptance record is a rectification list or an acceptance qualified record.
It should be noted that the structures and principles of the generating module 21, the first acceptance receiving module 22, the acceptance qualified module 23, the rectification module 24, the rectification recording module 25, and the second acceptance receiving module 26 correspond to the steps in the construction quality inspection method one to one, and therefore, the description thereof is omitted here.
It should be noted that the division of the modules of the above system is only a logical division, and the actual implementation may be wholly or partially integrated into one physical entity, or may be physically separated. And these modules can be realized in the form of software called by processing element; or may be implemented entirely in hardware; and part of the modules can be realized in the form of calling software by the processing element, and part of the modules can be realized in the form of hardware. For example, the x module may be a processing element that is set up separately, or may be implemented by being integrated in a chip of the apparatus, or may be stored in a memory of the apparatus in the form of program code, and the function of the x module may be called and executed by a processing element of the apparatus. Other modules are implemented similarly. In addition, all or part of the modules can be integrated together or can be independently realized. The processing element described herein may be an integrated circuit having signal processing capabilities. In implementation, each step of the above method or each module above may be implemented by an integrated logic circuit of hardware in a processor element or an instruction in the form of software.
For example, the above modules may be one or more integrated circuits configured to implement the above methods, such as: one or more Application Specific Integrated Circuits (ASICs), or one or more microprocessors (DSPs), or one or more Field Programmable Gate Arrays (FPGAs), among others. For another example, when one of the above modules is implemented in the form of a Processing element scheduler code, the Processing element may be a general-purpose processor, such as a Central Processing Unit (CPU) or other processor capable of calling program code. For another example, these modules may be integrated together and implemented in the form of a system-on-a-chip (SOC).
In an embodiment of the present invention, the present invention further includes a computer-readable storage medium, on which a computer program is stored, and the computer program, when executed by a processor, implements any one of the above-mentioned construction quality inspection methods.
Those of ordinary skill in the art will understand that: all or part of the steps for implementing the above method embodiments may be performed by hardware associated with a computer program. The aforementioned computer program may be stored in a computer readable storage medium. When executed, the program performs steps comprising the method embodiments described above; and the aforementioned storage medium includes: various media that can store program codes, such as ROM, RAM, magnetic or optical disks.
As shown in fig. 3, in an embodiment, the construction quality inspection device of the present invention includes: a processor 31 and a memory 32; the memory 32 is for storing a computer program; the processor 31 is connected to the memory 32 and is configured to execute the computer program stored in the memory 32, so that the construction quality inspection apparatus executes any one of the construction quality inspection methods.
Specifically, the memory 32 includes: various media that can store program codes, such as ROM, RAM, magnetic disk, U-disk, memory card, or optical disk.
Preferably, the Processor 31 may be a general-purpose Processor, including a Central Processing Unit (CPU), a Network Processor (NP), and the like; the integrated Circuit may also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other Programmable logic device, discrete Gate or transistor logic device, or discrete hardware components.
As shown in fig. 4, in an embodiment, the construction quality inspection system of the present invention includes the construction quality inspection device 41, a quality worker end 42, a team long end 43, and a rectification end 44; the construction quality inspection device 41 is used for generating a construction quality inspection plan and sending the construction quality inspection plan to a corresponding quality worker end 42; receiving an acceptance record of the construction quality inspection plan of the quality member end 42, wherein the acceptance record is an adjustment list or an acceptance qualified record; when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan; when the acceptance record is the rectification list, sending the rectification list to the corresponding team long terminal 43, so that the team long terminal 43 sends the rectification list to the rectification terminal 44; receiving the rectification record of the rectification end 44, and sending the rectification record to the quality member end 42; receiving an acceptance record of the rectification record of the quality member end 42, wherein the acceptance record is a rectification list or an acceptance qualified record; the quality operator end 42 is used for sending an acceptance record of the construction quality inspection plan to the construction quality inspection device 41; sending the acceptance record of the rectification record to the construction quality inspection device 41; the team long end 43 is used for receiving the correction order sent by the construction quality inspection device 41; sending the rectification list to a rectification end 44; the rectification end 44 is used for receiving the rectification list sent by the team long end 43; the rectification record is sent to the construction quality inspection device 41. The construction quality inspection device 41 is in communication connection with the quality worker end 42, the team long end 43 and the rectification end 44, and the team long end 43 and the rectification end 44.
In summary, the construction quality inspection method, the construction quality inspection system, the construction quality inspection medium and the construction quality inspection device are used for promoting a construction quality inspection plan and strengthening supervision. Therefore, the invention effectively overcomes various defects in the prior art and has high industrial utilization value.
The foregoing embodiments are merely illustrative of the principles and utilities of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

Claims (10)

1. A construction quality inspection method is characterized by comprising the following steps:
generating a construction quality inspection plan of the building, and sending the construction quality inspection plan to a corresponding quality worker end;
receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record;
when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan;
when the acceptance record is the rectification list, sending the rectification list to a corresponding team long terminal so that the team long terminal sends the rectification list to a rectification terminal;
receiving an rectification record of a rectification end, and sending the rectification record to a quality worker end;
and receiving an acceptance record of the quality member end on the rectification record, wherein the acceptance record is a rectification list or an acceptance qualified record.
2. The construction quality inspection method according to claim 1, wherein the receiving of the acceptance record of the rectification record of the quality member side, the acceptance record being a rectification list or an acceptance qualified record further comprises:
when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan;
and when the acceptance record is the correction order, sending the correction order to the corresponding team long terminal so that the team long terminal sends the correction order to the correction terminal.
3. The construction quality inspection method according to claim 1, wherein the distance from the time point when the modification order is sent to the corresponding team long terminal exceeds a first preset time period, and when the modification record of the modification end is not received, the modification order is repeatedly sent to the corresponding team long terminal.
4. The construction quality inspection method according to claim 1, further comprising receiving feedback of the modification order at the long end of the team.
5. The construction quality inspection method according to claim 4, wherein the time when the distance from the time when the modification list is sent to the corresponding team long terminal exceeds a second preset time period, and when the modification list of the team long terminal is not received and feedback is received, the modification list is repeatedly sent to the corresponding team long terminal.
6. The construction quality inspection method according to claim 1, further comprising establishing a one-to-one correspondence relationship between the construction quality inspection plan and the two-dimensional codes, so that the quality worker side, the team leader side or the rectification side obtains the corresponding construction quality inspection plan based on scanning the two-dimensional codes.
7. The utility model provides a construction quality system of patrolling and examining, its characterized in that includes: the system comprises a generation module, a first acceptance receiving module, a qualified acceptance module, a rectification recording module and a second acceptance receiving module;
the generating module is used for generating a construction quality inspection plan of the building and sending the construction quality inspection plan to a corresponding quality worker end;
the first acceptance receiving module is used for receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record;
the acceptance check module is used for ending the circulation of the construction quality inspection plan when the acceptance record is the acceptance check record;
the rectification module is used for sending the rectification list to a corresponding team long terminal when the acceptance record is the rectification list so that the team long terminal sends the rectification list to the rectification terminal;
the rectification recording module is used for receiving a rectification record of a rectification end and sending the rectification record to a quality worker end;
and the second acceptance receiving module is used for receiving an acceptance record of the quality member end on the rectification record, wherein the acceptance record is a rectification list or an acceptance qualified record.
8. A computer-readable storage medium having a computer program stored thereon, wherein the computer program is executed by a processor to implement the construction quality inspection method according to any one of claims 1 to 6.
9. The utility model provides a construction quality inspection device which characterized in that includes: a processor and a memory;
the memory is used for storing a computer program;
the processor is connected to the memory for executing the computer program stored in the memory to cause the construction quality inspection apparatus to perform the construction quality inspection method according to any one of claims 1 to 6.
10. A construction quality inspection system comprising the construction quality inspection device according to claim 9, a quality worker terminal, a team leader terminal, and a reorganization terminal;
the construction quality inspection device is used for generating a construction quality inspection plan and sending the construction quality inspection plan to a corresponding quality worker end; receiving an acceptance record of the construction quality inspection plan of the quality worker end, wherein the acceptance record is a rectification list or an acceptance qualified record; when the acceptance record is an acceptance qualified record, ending the circulation of the construction quality inspection plan; when the acceptance record is the rectification list, sending the rectification list to a corresponding team long terminal so that the team long terminal sends the rectification list to a rectification terminal; receiving an rectification record of a rectification end, and sending the rectification record to a quality worker end; receiving an acceptance record of the rectification record of the quality member end, wherein the acceptance record is a rectification list or an acceptance qualified record;
the quality worker end is used for sending an acceptance record of the construction quality inspection plan to the construction quality inspection device; sending the acceptance record of the rectification record to the construction quality inspection device;
the team long end is used for receiving the correction order sent by the construction quality inspection device; sending the rectification list to a rectification end;
the rectification end is used for receiving a rectification list sent by the team long end; and sending the correction record to a construction quality inspection device.
CN202010372863.7A 2020-05-06 2020-05-06 Construction quality inspection method, system, medium and device Pending CN111598422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010372863.7A CN111598422A (en) 2020-05-06 2020-05-06 Construction quality inspection method, system, medium and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010372863.7A CN111598422A (en) 2020-05-06 2020-05-06 Construction quality inspection method, system, medium and device

Publications (1)

Publication Number Publication Date
CN111598422A true CN111598422A (en) 2020-08-28

Family

ID=72189592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010372863.7A Pending CN111598422A (en) 2020-05-06 2020-05-06 Construction quality inspection method, system, medium and device

Country Status (1)

Country Link
CN (1) CN111598422A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112348476A (en) * 2020-11-12 2021-02-09 中建水务环保有限公司 On-duty management method, electronic device, storage medium and system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104156845A (en) * 2014-08-22 2014-11-19 重庆软文科技有限责任公司 Environmental protection supervision inspection platform system
CN105933458A (en) * 2016-07-01 2016-09-07 江苏四五安全科技有限公司 Multilevel cloud monitoring platform
CN107133776A (en) * 2016-08-02 2017-09-05 北京尚优力达科技有限公司 A kind of mobile security supervisory systems
CN107749091A (en) * 2017-09-30 2018-03-02 石家庄学院 Power distribution patrol method and terminal device
CN107748951A (en) * 2017-09-26 2018-03-02 中国建筑第八工程局有限公司 Building engineering construction inspection of quality method and system based on BIM
CN108765234A (en) * 2018-05-07 2018-11-06 重庆睿宇测绘有限责任公司 Doubtful illegal building information management system
CN109542647A (en) * 2018-11-21 2019-03-29 泰康保险集团股份有限公司 Information transmitting administrative method and device, electronic equipment, storage medium
CN109559251A (en) * 2018-09-19 2019-04-02 中建科技有限公司深圳分公司 Construction method for inspecting, device and terminal based on Building Information Model
CN109920036A (en) * 2019-04-02 2019-06-21 中国十七冶集团有限公司 A kind of arc steel structure construction method based on BIM technology
CN110084530A (en) * 2019-05-07 2019-08-02 万翼科技有限公司 Analytical equipment and its method, the movement inspection device and storage medium of mobile inspection
CN110400075A (en) * 2019-07-24 2019-11-01 中煤地建设工程有限公司 A kind of wisdom building site quality safety management system
CN110738397A (en) * 2019-09-19 2020-01-31 深圳大尚网络技术有限公司 management method and device for construction engineering safety and electronic equipment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104156845A (en) * 2014-08-22 2014-11-19 重庆软文科技有限责任公司 Environmental protection supervision inspection platform system
CN105933458A (en) * 2016-07-01 2016-09-07 江苏四五安全科技有限公司 Multilevel cloud monitoring platform
CN107133776A (en) * 2016-08-02 2017-09-05 北京尚优力达科技有限公司 A kind of mobile security supervisory systems
CN107748951A (en) * 2017-09-26 2018-03-02 中国建筑第八工程局有限公司 Building engineering construction inspection of quality method and system based on BIM
CN107749091A (en) * 2017-09-30 2018-03-02 石家庄学院 Power distribution patrol method and terminal device
CN108765234A (en) * 2018-05-07 2018-11-06 重庆睿宇测绘有限责任公司 Doubtful illegal building information management system
CN109559251A (en) * 2018-09-19 2019-04-02 中建科技有限公司深圳分公司 Construction method for inspecting, device and terminal based on Building Information Model
CN109542647A (en) * 2018-11-21 2019-03-29 泰康保险集团股份有限公司 Information transmitting administrative method and device, electronic equipment, storage medium
CN109920036A (en) * 2019-04-02 2019-06-21 中国十七冶集团有限公司 A kind of arc steel structure construction method based on BIM technology
CN110084530A (en) * 2019-05-07 2019-08-02 万翼科技有限公司 Analytical equipment and its method, the movement inspection device and storage medium of mobile inspection
CN110400075A (en) * 2019-07-24 2019-11-01 中煤地建设工程有限公司 A kind of wisdom building site quality safety management system
CN110738397A (en) * 2019-09-19 2020-01-31 深圳大尚网络技术有限公司 management method and device for construction engineering safety and electronic equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国医学院协会等: "《医院建设工程项目管理指南》", 31 December 2019 *
张鹏飞等: "《基于BIM技术的大型建筑群体数字化协同管理》", 31 October 2019 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112348476A (en) * 2020-11-12 2021-02-09 中建水务环保有限公司 On-duty management method, electronic device, storage medium and system

Similar Documents

Publication Publication Date Title
CN104392310A (en) Networked work coordinated management system
CN109360123B (en) Multi-professional construction management method and system based on room
CN109472550B (en) Human error prevention method and device for million-kilowatt nuclear power station and terminal equipment
CN111126777A (en) Work order intelligent processing method
CN110456750B (en) Information acquisition equipment, forging die production information acquisition system and working method thereof
CN106096872A (en) A kind of factory's substandard product report processing system and method
CN113111144A (en) Room marking method and device and robot movement method
CN110930003A (en) Work order processing method and device
CN111598422A (en) Construction quality inspection method, system, medium and device
CN104835004A (en) Guest room information management method and system
CN108520329B (en) Accurate automatic allocation method and device for second-hand house clients based on broker portrait
CN115601004A (en) User work agency reminding system based on machine learning
CN103136634A (en) Region certified property intelligent task management system
CN114374604A (en) Intelligent home configuration method in offline mode, storage medium and system
CN110019625B (en) Text standard address spatialization method and device and computer readable storage medium
CN103778005A (en) Automatic task allocation method and device
CN112150048A (en) Transport control method, transport control device, electronic apparatus, and storage medium
CN105825325A (en) Project quality supervision personnel supervision capability evaluation method and device
CN107871344B (en) Anti-substitute-printing attendance checking method for intelligent monitoring management
EP4058952A1 (en) Tracking intended and actual participation in a meeting
CN104809239A (en) Instrument appointment registering method and management platform of instruments
CN111145444A (en) Spacecraft switching test tool management method, system and medium
CN109697547A (en) The management method and management system of safe mass inspection
CN115619146A (en) Building construction supervision method, system, medium and equipment based on BIM
CN115271670A (en) Management method and system based on mobile terminal and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200828