CN111593889B - Large-volume concrete cooling device and using method - Google Patents

Large-volume concrete cooling device and using method Download PDF

Info

Publication number
CN111593889B
CN111593889B CN202010475669.1A CN202010475669A CN111593889B CN 111593889 B CN111593889 B CN 111593889B CN 202010475669 A CN202010475669 A CN 202010475669A CN 111593889 B CN111593889 B CN 111593889B
Authority
CN
China
Prior art keywords
pipe
cooling liquid
concrete
double
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010475669.1A
Other languages
Chinese (zh)
Other versions
CN111593889A (en
Inventor
刘龙
徐雯涛
郭欣
左可魏
毕迎迎
王修养
姜文豪
王颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anyang Institute of Technology
Original Assignee
Anyang Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anyang Institute of Technology filed Critical Anyang Institute of Technology
Priority to CN202010475669.1A priority Critical patent/CN111593889B/en
Publication of CN111593889A publication Critical patent/CN111593889A/en
Application granted granted Critical
Publication of CN111593889B publication Critical patent/CN111593889B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/02Selection of the hardening environment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application discloses a bulky concrete cooling device, including cooling system, a coolant liquid reserve tank, No. two coolant liquid reserve tanks that the multilayer set up along upper and lower direction parallel arrangement, the cooling system structure of each layer is the same, cooling system include pipe-line system, pipe-line system includes double-deck combination pipe, the middle festival section parallel arrangement of a plurality of double-deck combination pipe side by side to adopt double-deck rubber hose festival head to connect between the tip of two adjacent double-deck combination pipes, the inside and outside pipe expert of pipe-line system one end connect inlet, the liquid outlet of a coolant liquid reserve tank respectively, the inside and outside pipe of the pipe-line system other end connect liquid outlet, the inlet of No. two coolant liquid reserve tanks respectively, a plurality of stress-temperature sensor evenly distributed on the outer pipe wall of double-deck combination pipe and on the surface of concrete, detect the outer pipe wall and the surface difference in temperature, the flow and the flow speed of the cooling liquid in the inner pipe and the outer pipe of the double-layer combined pipe are adjusted, and the cooling efficiency and the cooling effect of the concrete are improved.

Description

Large-volume concrete cooling device and using method
Technical Field
The invention belongs to the technical field of engineering construction, and particularly relates to a large-volume concrete cooling device and a using method thereof.
Background
With the increasing demand of some building projects in China on large-volume concrete, the quality requirement of the large-volume concrete is particularly outstanding. After the large-volume concrete is poured, a large amount of hydration heat can be generated in the process of setting and hardening, if the heat can not be released in time, the temperature of a concrete core area is too high, the temperature difference between the inside and the outside is large, large stress is generated, concrete cracking is caused, the safe use of the structure is influenced, even the occurrence of engineering accidents is caused, great loss is brought to the life and property of people, and therefore the control of the temperature of the concrete during construction is necessary for the large-volume concrete construction. At present, the technology of embedding a condenser pipe in concrete is commonly adopted in engineering, and water is introduced to realize cooling of large-volume concrete, but from the perspective of a large amount of implementation engineering, the cooling effect is not good, the efficiency is low, and the temperature and the flow rate of cooling liquid cannot be accurately controlled.
In view of the above, the present invention provides a cooling device and a method for mass concrete, which are improved to effectively solve the problem of the temperature difference between the inside and the outside when the mass concrete is solidified and hardened.
Disclosure of Invention
In order to solve the above technical problems, an object of the present invention is to provide a circulating cooling apparatus and a method of using the same, in which cooling liquid with different flow directions circulates in a pipeline system to cool concrete, a stress-temperature sensor is used to monitor the temperature and stress condition of the concrete in a core region in real time, and a cooling liquid control system is used to control the flow rate and flow velocity of the cooling liquid.
The technical scheme adopted by the invention is as follows: a large-volume concrete cooling device comprises a plurality of layers of cooling systems, a first cooling liquid storage box 10 and a second cooling liquid storage box 11 which are arranged in parallel in the vertical direction, wherein the cooling systems of all layers are identical in structure, each cooling system comprises a pipeline system, a cooling liquid regulation and control system and a data monitoring and control system, the pipeline system comprises a double-layer combined pipe 1 and a double-layer rubber hose joint 9, the double-layer combined pipe 1 comprises a middle section, the middle section comprises an inner pipe 7 and an outer pipe 6, the cooling liquid regulation and control system comprises a cooling liquid flow control device 5 and a common pipeline 13, the pipeline system is formed by arranging the double-layer combined pipes 1 in parallel, the end parts of two adjacent double-layer combined pipes 1 are connected through the double-layer rubber hose joint 9, the inner pipe 7 at one end of the pipeline system is connected with a liquid inlet of the first cooling liquid storage box 10 through the common pipeline, the outer pipe 6 at the end is connected with a liquid outlet of a first cooling liquid storage tank 10 through a common pipeline 13, a cooling liquid flow control device 5 is installed on the section of common pipeline, a hydraulic pump is arranged in the cooling liquid flow control device 5, the inner pipe 7 at the other end of the pipeline system is connected with a liquid outlet of a second cooling liquid storage tank 11 through a common pipeline, the section of common pipeline is provided with the cooling liquid flow control device 5, and the outer pipe 6 at the end is connected with a liquid inlet of the second cooling liquid storage tank 11 through a common pipeline 13; the data monitoring and controlling system comprises a stress-temperature sensor 2 and a data processor 12; the stress-temperature sensors 2 are uniformly distributed on the wall of the outer pipe 6 of the double-layer combined pipe 1, meanwhile, the stress-temperature sensors 2 are uniformly distributed on the outer surface of concrete and are in contact with the concrete, the stress-temperature sensors 2 and the cooling liquid flow control device 5 are connected with the data processor 12, one end of a pipeline system of each cooling system is connected with the first cooling liquid storage box 10, and the other end of the pipeline system is connected with the second cooling liquid storage box 11.
The distance between two adjacent double-layer combined pipes 1 is 0.65-0.8 m, the distance between the double-layer combined pipes 1 of the adjacent upper-layer or lower-layer cooling systems is 0.65-0.8 m, and the combined pipeline at the edge of the outer layer of the concrete is 0.65-0.8 m away from the edge of the concrete.
A first supporting member 8 is arranged between the inner pipe 7 and the outer pipe 6 at equal intervals along the length direction; the double-layer rubber hose joint 9 comprises an inner-layer rubber hose 92 and an outer-layer rubber hose 91, a second supporting member is arranged between the inner-layer rubber hose 92 and the outer-layer rubber hose 91 along the length direction at the equal interval distance, two ends of the outer-layer rubber hose 91 are fixedly connected with the end parts of two adjacent outer pipes 6 respectively, and the inner-layer rubber hose 92 is fixedly connected with the end parts of two adjacent inner pipes 7 respectively.
The cooling liquid is inhibitory propylene glycol.
The structure that the inner pipe 7 at one end of the pipeline system is connected with the liquid inlet of the first cooling liquid storage tank 10 through a common pipeline is as follows: the double-layer combined pipe 1 further comprises end sections, the middle sections at the two ends of the pipeline system are respectively connected with one end section through a double-layer rubber hose joint 9, the end sections have the same structure as the middle sections, and an inner pipe 7 of the double-layer combined pipe 1 penetrates out of the pipe wall of the outer pipe 6 at one side port; an end section inner pipe 7 at one end of the pipeline system penetrates through an outer pipe 6 and is connected with a liquid inlet of a first cooling liquid storage tank 10 through a common pipeline, and the outer pipe 6 of the end section is connected with a liquid outlet of the first cooling liquid storage tank 10 through a common pipeline 13;
the structure that the inner pipe 7 at the other end of the pipeline system is connected with the liquid outlet of the second cooling liquid storage tank 11 through a common pipeline is as follows: the inner pipe 7 at the other end of the pipeline system penetrates through the outer pipe 6 and then is connected with a liquid outlet of the second cooling liquid storage box 11 through a common pipeline, and the outer pipe 6 at the end section is connected with a liquid inlet of the second cooling liquid storage box 11 through a common pipeline 13.
The using method of the large-volume concrete cooling device comprises the following steps:
the method comprises the following steps: before concrete is poured, the length of the double-layer combined pipes 1 and the length of the double-layer rubber hose joints 9 in the pipeline system are designed by field exploration and combination of a design drawing, the distance between every two adjacent double-layer combined pipes 1 is 0.65-0.8 m, the distance between every two adjacent double-layer combined pipes 1 on the upper layer or the lower layer is 0.65-0.8 m, the combined pipeline on the outer edge of the concrete is 0.65-0.8 m away from the edge of the concrete, and the pipeline system installation in each layer of cooling system in the multi-layer cooling system is completed;
step two: an inner pipe 7 at one end of the pipeline system is connected with a liquid inlet of a first cooling liquid storage tank 10 through a common pipeline 13, an outer pipe 6 at the end is connected with a liquid outlet of the first cooling liquid storage tank 10 through a common pipeline 13, a cooling liquid flow control device 5 is installed on the common pipeline, the inner pipe 7 at the other end of the pipeline system is connected with a liquid outlet of a second cooling liquid storage tank 11 through a common pipeline, a cooling liquid flow control device 5 is installed on the common pipeline, and the outer pipe 6 at the end is connected with a liquid inlet of the second cooling liquid storage tank 11 through a common pipeline 13; the cooling liquid flow control device 5 is connected with the data processor 12;
step three: uniformly distributing a plurality of stress-temperature sensors 2 on the wall of an outer pipe 6 of the double-layer combined pipe 1, and pouring concrete; the data processor 12 controls the hydraulic pumps of the cooling liquid flow control device 5 at one end of the pipeline system and the other end of the pipeline system to be opened, so that the cooling liquid flows in the outer pipe 6 and the inner pipe 7;
step four: a plurality of stress-temperature sensors 2 are uniformly distributed on the outer surface of the concrete and are contacted with the concrete, and the stress-temperature sensors 2 on the pipe wall of the outer pipe 6 of the double-layer combined pipe 1 and the stress-temperature sensors 2 on the outer surface of the concrete are connected with a data processor 12;
step five: after the inhibitive propylene glycol flows in the pipeline system for a set time, the stress-temperature sensor 2 can timely transmit the monitored stress and temperature data of the concrete outside the double-layer combined pipe 1 to the data processor 12, then the data processor 12 calculates and processes the collected data, and sends a command to the cooling liquid flowing device 5 to adjust the rotating speed of the hydraulic pump so as to control the flow speed and the flow rate of the inhibitive propylene glycol;
meanwhile, the data processor 12 compares the temperature of the concrete at the outer pipe 6 detected by the stress-temperature sensor with the temperature of the outer surface of the concrete, when the temperature difference between the temperature of the concrete at the outer pipe 6 and the temperature of the outer surface of the concrete is less than 25 degrees, only the cooling liquid flow control device 5 connected with the outer pipe 6 is started, and when the temperature difference between the temperature of the concrete at the outer pipe 6 and the temperature of the outer surface of the concrete is more than or equal to 25 degrees, hydraulic pumps of the cooling liquid flow control devices 5 at one end of the pipeline system and the other end of the pipeline system are started simultaneously;
step six: when the temperature difference between the stress-temperature sensor 2 on the pipe wall of the outer pipe 6 of the double-layer combined pipe 1 and the temperature difference between the stress-temperature sensor 2 on the outer surface of the concrete and the environment temperature do not exceed 5 ℃ and last for 2 hours, the concrete is cooled and solidified, the hydraulic pumps of the cooling liquid flow control devices 5 at one end of the pipeline system and the other end of the pipeline system are reversely rotated, and the inhibitory propylene glycol is controlled to flow back to the first cooling liquid storage box 10 from the inner pipe 7 and flow back to the second cooling liquid storage box 11 from the outer pipe 6 for storage and recycling; the common pipeline 13, the cooling liquid flow control device 5 at one end of the pipeline system and the other end of the pipeline system and the data processor 12 are disassembled, the pipeline system is kept in concrete, and then the fine aggregate concrete with the proper grain diameter is poured into the pipeline system so as to fill the pipeline and ensure the structural strength of the concrete.
After the inhibitory propylene glycol flows back to the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11, the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11 cool the inhibitory propylene glycol, the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11 are provided with a temperature detector and a condensing device, the temperature detector and the condensing device are used for detecting the temperature of the inhibitory propylene glycol flowing back into the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11, the temperature is compared with the outdoor temperature, when the temperature of the cooling liquid exceeds the outdoor temperature by more than 10 ℃, the condensing device is started to cool the cooling liquid, otherwise, the condensing device is not started, and natural cooling is performed through the environment.
Compared with the prior art, the invention has the beneficial effects that:
1. adopt double-deck combination pipe, the temperature rose after the hydration heat that the concrete release was absorbed to the outer tube coolant liquid, the outer tube coolant liquid realizes the cooling of outer tube coolant liquid through inner pipe wall with partly heat conduction to the inner tube coolant liquid opposite with outer tube flow direction simultaneously to guarantee the heat absorption capacity of outer tube coolant liquid, improved the cooling efficiency of pipeline, improved traditional single-layer pipe, the cooling effect of coolant liquid one-way flow. And the double-layer combined pipe is matched with the cooling liquid storage box to finish the backflow of the cooling liquid, so that the cyclic utilization is realized.
2. The arrangement form of the combined pipe in the concrete can be better matched by adopting the double-layer rubber hose joint, so that the large-volume concrete is better cooled, and the efficiency is improved.
3. The stress-temperature sensor can be used for visually and accurately monitoring the stress and temperature states in the concrete, and the flow speed and flow of cooling liquid in a pipeline system can be accurately controlled by matching with the cooling liquid flow control device, so that the reasonable control on the cooling effect is realized, the concrete cooling efficiency is improved, and the better cooling effect is achieved.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
FIG. 1 is an overall assembly view of a single-layer cooling system;
FIG. 2 is a stress-temperature sensor profile;
FIG. 3 is an assembled view of a double-layer combination pipe and a double-layer rubber hose joint;
FIG. 4 is an assembled view of a double-layered combination tube and a coolant flow control device;
FIG. 5 is a view of a double-layer composite pipe construction;
FIG. 6 is a structural view at the end of a double-layer composite pipe;
FIG. 7 is a sectional view of a double-layer rubber hose joint;
reference is made to the accompanying drawings in which: 1. a double-layer combined pipe; 2. a stress-temperature sensor; 5 a coolant flow control device; 6. an outer tube; 7. an inner tube; 8. a first support member; 9. a double-layer rubber hose joint; 10. a first coolant reservoir; 11. a second cooling liquid storage tank; 12. a data processor; 13. a common pipeline.
Detailed description of the preferred embodiments
In order to make the objects, technical solutions and feasibility of the present invention more clear and detailed, the present invention is described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific examples described below are only for illustrating the present invention and are not to be construed as limiting the present invention.
Referring to fig. 1 to 7, a mass concrete cooling device comprises a plurality of layers of cooling systems arranged along the vertical direction, a first cooling liquid storage tank 10 and a second cooling liquid storage tank 11, wherein each cooling system comprises a pipeline system, a cooling liquid regulation and control system and a data monitoring and control system, and each pipeline system comprises a double-layer combined pipe 1 and a double-layer rubber hose joint 9; the double-layer combined pipe 1 comprises end sections and a middle section; the middle section comprises an inner pipe 7, an outer pipe 6 and a first support member 8; the inner diameter of the inner pipe 7 is 30mm, and the pipe wall thickness is 3 mm; the inner diameter of the outer pipe 6 is 60mm, and the pipe wall thickness is 5 mm; the first support member is 8 mm in diameter; the inner pipe 7 is coaxially nested in the outer pipe 6 through a first supporting member 8 to form a double-layer pipeline; four supporting members I8 are uniformly arranged on the same cross section of the inner pipe 7 and the outer pipe 6 along the circumferential direction of the inner pipe 7, the inner side ends of the supporting members I8 are fixed on the outer wall of the inner pipe 7, the outer side ends of the supporting members I8 are fixed on the inner wall of the outer pipe 6, and the four supporting members I8 are arranged along the length direction of the double-layer combined pipe 1 at intervals of 0.5 meter.
The middle sections at the two ends of the pipeline system are respectively connected with an end section through a double-layer rubber hose joint 9, the end sections have the same structure as the middle sections, and the difference is that: the inner pipe 7 of the double-layer combined pipe 1 penetrates out of the pipe wall of the outer pipe 6 at the port of one side; after the end section inner tube 7 of pipe-line system one end wear out outer tube 6, be connected through the inlet of a common pipeline and coolant liquid reserve tank 10, the outer tube 6 of this end section is connected through the liquid outlet of a common pipeline 13 and coolant liquid reserve tank 10, and installs a coolant liquid control device 5 on this section common pipeline 13, is provided with the hydraulic pump in the coolant liquid control device 5, the inner tube 7 of the pipe-line system other end wear out and be connected through the liquid outlet of a common pipeline and No. two coolant liquid reserve tanks 11 behind outer tube 6, and install a coolant liquid control device 5 on this section common pipeline, the outer tube 6 of this end section is connected through the inlet of a common pipeline 13 and No. two coolant liquid reserve tanks 11.
The arrangement scheme of the pipeline system is as follows: the distance between the outer layer combined pipeline and the edge of the concrete is 0.65-0.8 m; the cooling liquid adopts inhibitory propylene glycol, the inhibitory propylene glycol is specially treated industrial heat transfer fluid, and the cooling liquid is characterized by low solidification temperature, high heat transfer efficiency and excellent corrosion protection performance, and can be widely used as high-temperature and low-temperature heat transfer fluid; the temperature of the inhibited propylene glycol in the outer pipe 6 in the double-layer combined pipe 1 is increased after the hydration heat released by concrete is absorbed, and on the other hand, a part of heat is conducted to the inhibited propylene glycol in the inner pipe 7 opposite to the flowing direction of the outer pipe 6 through the pipe wall of the inner pipe 7, so that the temperature of the inhibited propylene glycol in the outer pipe 6 is reduced, and the heat absorption capacity of the inhibited propylene glycol in the outer pipe 6 is ensured; the double-layer rubber hose joint 9 comprises an inner-layer rubber hose 92, an outer-layer rubber hose 91 and a second supporting member, the inner diameter of the inner-layer rubber hose 92 is 30mm, the pipe wall is 3mm, the inner diameter of the outer-layer rubber hose 9 is 60mm, the pipe wall is 5mm, the diameter of the first supporting member is 8 mm, the inner-layer rubber hose 92 and the outer-layer rubber hose 91 are uniformly provided with the second supporting member along the circumferential direction of the inner-layer rubber hose 92 on the same cross section, the inner side ends of the second supporting members are fixed on the outer wall of the inner-layer rubber hose 92, the outer side ends of the second supporting members are fixed on the inner wall of the outer-layer rubber hose 91, and the second supporting members are arranged at intervals of 0.3 m along the length direction of the double-layer rubber hose joint 9.
The inner diameters of the inner and outer layer rubber hoses 92 and 91 are respectively larger than the inner diameters of the inner pipe 6 and the outer pipe 6 of the double-layer combined pipe 1;
the pipeline system is characterized in that a plurality of double-layer combined pipes 1 are arranged in parallel side by side, and the end parts of two adjacent double-layer combined pipes 1 are connected by adopting double-layer rubber hose joints 9, namely, an outer-layer rubber hose 91 is fixedly connected with an outer pipe 6 in an embedded manner, and an inner-layer rubber hose 92 is fixedly connected with an inner pipe 7 in an embedded manner; the pipeline system is pre-embedded in a concrete structure in a multi-layer arrangement mode; the cooling liquid regulation and control system comprises a cooling liquid flow control device 5 and a common pipeline 13; the two cooling liquid flow control devices 5 are arranged, one is arranged at the inlet of an outer pipe 6 of the double-layer combined pipe 1, and the other is arranged at the inlet of an inner pipe 7 of the double-layer combined pipe 1 and used for controlling the flow and the flow speed of the inhibitory propylene glycol in a pipeline system; the coolant flow control device 5 can adjust the flow rate according to the total length of the pipeline system, and can control the flow rate of the coolant to be: 1.2-1.5 m/s of outer pipe and 1.5-2.0 m/s of inner pipe; the inlet of the outer pipe 6 refers to the head end of the pipeline system, and the inlet of the inner pipe 7 refers to the tail end of the pipeline system; the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11 are used for recovering and storing inhibitory propylene glycol, and the cooling liquid flow control device 5 and the pipeline system are respectively connected through a common pipeline 13; the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11 are provided with a temperature detector and a condensing device, and are used for detecting the temperature of the inhibitory propylene glycol flowing back into the first cooling liquid storage tank 10 and the second cooling liquid storage tank 11, comparing the detected temperature with the outdoor temperature, starting the condensing device to cool the cooling liquid when the temperature of the cooling liquid exceeds the outdoor temperature by more than 10 ℃, otherwise, not starting the condensing device, and realizing energy conservation and environmental protection through natural cooling of the environment; the data monitoring and controlling system comprises a stress-temperature sensor 2 and a data processor 12; the stress-temperature sensors 2 are uniformly distributed on the wall of the outer pipe 6 of the double-layer combined pipe 1, the stress-temperature sensors 2 are distributed on the outer surface of the concrete and are in contact with the concrete, the stress-temperature sensors 2 are connected with the data processor 12 and are used for monitoring the stress and temperature change of the concrete and transmitting data to the data processor 12, and the data processor 12 is simultaneously connected with the cooling liquid flow control device 5 and is arranged on the cooling liquid flow control device 5; the data processor 12 compares the temperature of the concrete at the outer pipe 6 detected by the received stress-temperature sensor with the temperature of the outer surface of the concrete, when the temperature difference of the concrete at the outer pipe 6 is less than 25 degrees compared with the temperature difference of the concrete at the outer surface, only the cooling liquid flow control device 5 connected with the outer pipe 6 is started, and when the temperature difference of the concrete at the outer pipe 6 is more than or equal to 25 degrees compared with the temperature difference of the concrete at the outer surface, the cooling liquid flow control device 5 connected with the outer pipe 6 and the inner pipe 7 is simultaneously started, so that energy conservation and environmental protection are realized while the condensation effect is met.
The use method of the large-volume concrete cooling device comprises the following steps:
the method comprises the following steps: before concrete is poured, the length of the double-layer combined pipes 1 and the length of the double-layer rubber hose joints 9 in the pipeline system are designed by field exploration and combination of a design drawing, the distance between every two adjacent double-layer combined pipes 1 is 0.65-0.8 m, the distance between every two adjacent double-layer combined pipes 1 on the upper layer or the lower layer is 0.65-0.8 m, the combined pipeline on the outer edge of the concrete is 0.65-0.8 m away from the edge of the concrete, and the pipeline system installation in each layer of cooling system in the multi-layer cooling system is completed;
step two: an inner pipe 7 at one end of the pipeline system is connected with a liquid inlet of a first cooling liquid storage tank 10 through a common pipeline 13, an outer pipe 6 at the end is connected with a liquid outlet of the first cooling liquid storage tank 10 through a common pipeline 13, a cooling liquid flow control device 5 is installed on the common pipeline, the inner pipe 7 at the other end of the pipeline system is connected with a liquid outlet of a second cooling liquid storage tank 11 through a common pipeline, a cooling liquid flow control device 5 is installed on the common pipeline, and the outer pipe 6 at the end is connected with a liquid inlet of the second cooling liquid storage tank 11 through a common pipeline 13; the cooling liquid flow control device 5 is connected with the data processor 12;
step three: uniformly distributing a plurality of stress-temperature sensors 2 on the wall of an outer pipe 6 of the double-layer combined pipe 1, and pouring concrete; the data processor 12 controls the hydraulic pumps of the cooling liquid flow control device 5 at one end of the pipeline system and the other end of the pipeline system to be opened, so that the cooling liquid flows in the outer pipe 6 and the inner pipe 7;
step four: a plurality of stress-temperature sensors 2 are uniformly distributed on the outer surface of the concrete and are contacted with the concrete, and the stress-temperature sensors 2 on the pipe wall of the outer pipe 6 of the double-layer combined pipe 1 and the stress-temperature sensors 2 on the outer surface of the concrete are connected with a data processor 12;
step five: after the inhibitive propylene glycol flows in the pipeline system for a set time, the stress-temperature sensor 2 can timely transmit the monitored stress and temperature data of the concrete outside the double-layer combined pipe 1 to the data processor 12, then the data processor 12 calculates and processes the collected data, and sends a command to the cooling liquid flowing device 5 to adjust the rotating speed of the hydraulic pump so as to control the flow speed and the flow rate of the inhibitive propylene glycol;
meanwhile, the data processor 12 compares the temperature of the concrete at the outer pipe 6 detected by the stress-temperature sensor with the temperature of the outer surface of the concrete, when the temperature difference between the temperature of the concrete at the outer pipe 6 and the temperature of the outer surface of the concrete is less than 25 degrees, only the cooling liquid flow control device 5 connected with the outer pipe 6 is started, and when the temperature difference between the temperature of the concrete at the outer pipe 6 and the temperature of the outer surface of the concrete is more than or equal to 25 degrees, hydraulic pumps of the cooling liquid flow control devices 5 at one end of the pipeline system and the other end of the pipeline system are started simultaneously;
step six: when the temperature difference between the stress-temperature sensor 2 on the pipe wall of the outer pipe 6 of the double-layer combined pipe 1 and the temperature difference between the stress-temperature sensor 2 on the outer surface of the concrete and the environment temperature do not exceed 5 ℃ and last for 2 hours, the concrete is cooled and solidified, the hydraulic pumps of the cooling liquid flow control devices 5 at one end of the pipeline system and the other end of the pipeline system are reversely rotated, and the inhibitory propylene glycol is controlled to flow back to the first cooling liquid storage box 10 from the inner pipe 7 and flow back to the second cooling liquid storage box 11 from the outer pipe 6 for storage and recycling; the common pipeline 13, the cooling liquid flow control device 5 at one end of the pipeline system and the other end of the pipeline system and the data processor 12 are disassembled, the pipeline system is kept in concrete, and then the fine aggregate concrete with the proper grain diameter is poured into the pipeline system so as to fill the pipeline and ensure the structural strength of the concrete.

Claims (2)

1. The use method of the large-volume concrete cooling device is characterized in that: the large-volume concrete cooling device comprises a plurality of layers of cooling systems, a first cooling liquid storage box (10) and a second cooling liquid storage box (11) which are arranged in parallel in the vertical direction, the cooling systems of all layers have the same structure, each cooling system comprises a pipeline system, a cooling liquid regulation and control system and a data monitoring and control system, the pipeline system comprises double-layer combined pipes (1) and double-layer rubber hose joints (9), each double-layer combined pipe (1) comprises a middle section, each middle section comprises an inner pipe (7) and an outer pipe (6), each cooling liquid regulation and control system comprises a cooling liquid flow control device (5) and a common pipeline (13), each pipeline system comprises a plurality of double-layer combined pipes (1) which are arranged in parallel side by side, and the end parts of two adjacent double-layer combined pipes (1) are connected by adopting the double-layer rubber hose joints (9), the cooling system is characterized in that an inner pipe (7) at one end of the pipeline system is connected with a liquid inlet of a first cooling liquid storage tank (10) through a common pipeline, an outer pipe (6) at the end is connected with a liquid outlet of the first cooling liquid storage tank (10) through a common pipeline (13), a cooling liquid flow control device (5) is installed on the section of common pipeline, a hydraulic pump is arranged in the cooling liquid flow control device (5), the inner pipe (7) at the other end of the pipeline system is connected with a liquid outlet of a second cooling liquid storage tank (11) through a common pipeline, a cooling liquid flow control device (5) is installed on the section of common pipeline, and the outer pipe (6) at the end is connected with a liquid inlet of the second cooling liquid storage tank (11) through a common pipeline (13); the data monitoring and controlling system comprises a stress-temperature sensor (2) and a data processor (12); the stress-temperature sensors (2) are uniformly distributed on the pipe wall of the outer pipe (6) of the double-layer combined pipe (1), meanwhile, the stress-temperature sensors (2) are uniformly distributed on the outer surface of concrete and are in contact with the concrete, and the stress-temperature sensors (2) and the cooling liquid flow control device (5) are connected with the data processor (12);
the distance between two adjacent double-layer combined pipes (1) is 0.65-0.8 m, the distance between the double-layer combined pipes (1) of the adjacent upper-layer or lower-layer cooling system is 0.65-0.8 m, and the combined pipeline at the edge of the outer layer of the concrete is 0.65-0.8 m away from the edge of the concrete;
a first supporting member (8) is arranged between the inner pipe (7) and the outer pipe (6) at equal intervals along the length direction; the double-layer rubber hose joint (9) comprises an inner-layer rubber hose (92) and an outer-layer rubber hose (91), a second supporting member is arranged between the inner-layer rubber hose (92) and the outer-layer rubber hose (91) at equal intervals along the length direction, two ends of the outer-layer rubber hose (91) are fixedly connected with the end parts of two adjacent outer pipes (6), and the inner-layer rubber hose (92) is fixedly connected with the end parts of two adjacent inner pipes (7);
the cooling liquid is inhibitory propylene glycol;
the structure that inner tube (7) of pipe-line system one end be connected through the inlet of a common pipeline and a coolant liquid storage tank (10) does: the double-layer combined pipe (1) further comprises end sections, the middle sections at the two ends of the pipeline system are respectively connected with one end section through a double-layer rubber hose joint (9), the end sections have the same structure as the middle sections, and an inner pipe (7) of the double-layer combined pipe (1) penetrates out of the pipe wall of the outer pipe (6) at one side port; an end section inner pipe (7) at one end of the pipeline system penetrates through the outer pipe (6) and is connected with a liquid inlet of a first cooling liquid storage tank (10) through a common pipeline, and the end section outer pipe (6) is connected with a liquid outlet of the first cooling liquid storage tank (10) through a common pipeline (13);
the structure that an inner pipe (7) at the other end of the pipeline system is connected with a liquid outlet of a second cooling liquid storage tank (11) through a common pipeline is as follows: an inner pipe (7) at the other end of the pipeline system penetrates through the outer pipe (6) and then is connected with a liquid outlet of a second cooling liquid storage tank (11) through a common pipeline, and the outer pipe (6) at the end section is connected with a liquid inlet of the second cooling liquid storage tank (11) through a common pipeline (13);
the using method of the large-volume concrete cooling device comprises the following steps:
the method comprises the following steps: before concrete is poured, the length of a double-layer combined pipe (1) and the length of a double-layer rubber hose joint (9) in a pipeline system are designed by field exploration and combination of a design drawing, the distance between two adjacent double-layer combined pipes (1) is 0.65-0.8 m, the distance between two adjacent upper-layer or lower-layer double-layer combined pipes (1) is 0.65-0.8 m, and the combined pipeline at the edge of the outer layer of the concrete is 0.65-0.8 m away from the edge of the concrete, so that the pipeline system installation in each layer of cooling system in a multi-layer cooling system is completed;
step two: an inner pipe (7) at one end of the pipeline system is connected with a liquid inlet of a first cooling liquid storage tank (10) through a common pipeline (13), an outer pipe (6) at the end is connected with a liquid outlet of the first cooling liquid storage tank (10) through a common pipeline (13), a cooling liquid flow control device (5) is installed on the common pipeline, the inner pipe (7) at the other end of the pipeline system is connected with a liquid outlet of a second cooling liquid storage tank (11) through a common pipeline, a cooling liquid flow control device (5) is installed on the common pipeline, and the outer pipe (6) at the end is connected with a liquid inlet of the second cooling liquid storage tank (11) through a common pipeline (13); the cooling liquid flow control device (5) is connected with the data processor (12);
step three: uniformly distributing a plurality of stress-temperature sensors (2) on the wall of an outer pipe (6) of the double-layer combined pipe (1), and pouring concrete; the data processor (12) controls the hydraulic pumps of the cooling liquid flow control device (5) at one end of the pipeline system and the other end of the pipeline system to be started, so that cooling liquid flows in the outer pipe (6) and the inner pipe (7);
step four: uniformly distributing a plurality of stress-temperature sensors (2) on the outer surface of the concrete, contacting the concrete, and connecting the stress-temperature sensors (2) on the pipe wall of the outer pipe (6) of the double-layer combined pipe (1) and the stress-temperature sensors (2) on the outer surface of the concrete with a data processor (12);
step five: after the inhibitive propylene glycol flows in a pipeline system for a set time, the stress-temperature sensor (2) can timely transmit the monitored stress and temperature data of the concrete outside the double-layer combined pipe (1) to the data processor (12), then the data processor (12) calculates and processes the collected data, and sends a command to the cooling liquid flowing device (5) to adjust the rotating speed of the hydraulic pump so as to control the flow speed and the flow rate of the inhibitive propylene glycol;
meanwhile, the data processor (12) compares the temperature of the concrete at the outer pipe (6) detected by the stress-temperature sensor with the temperature of the outer surface of the concrete, when the temperature of the concrete at the outer pipe (6) is less than the temperature difference at the outer surface of the concrete by 25 degrees, only the cooling liquid flow control device (5) connected with the outer pipe (6) is started, and when the temperature of the concrete at the outer pipe (6) is greater than or equal to 25 degrees than the temperature difference at the outer surface of the concrete, the hydraulic pumps of the cooling liquid flow control devices (5) at one end of the pipeline system and the other end of the pipeline system are started simultaneously;
step six: when the temperature difference between the stress-temperature sensor (2) on the pipe wall of the outer pipe (6) of the double-layer combined pipe (1) and the stress-temperature sensor (2) on the outer surface of the concrete and the ambient temperature does not exceed 5 ℃ and lasts for 2 hours, the concrete is cooled and solidified, the hydraulic pumps of the cooling liquid flow control devices (5) at one end of the pipeline system and the other end of the pipeline system are reversely rotated, the inhibitory propylene glycol is controlled to flow back to the first cooling liquid storage tank (10) from the inner pipe (7), and flow back to the second cooling liquid storage tank (11) from the outer pipe (6) for storage and recycling; the cooling liquid flow control device (5) and the data processor (12) at one end of the common pipeline (13), one end of the pipeline system and the other end of the pipeline system are disassembled, the pipeline system is kept in the concrete, and then the fine aggregate concrete with the proper particle size is poured into the pipeline system so as to fill the pipeline and ensure the structural strength of the concrete.
2. The method of using a mass concrete cooling device according to claim 1, wherein: after the inhibitory propylene glycol flows back to the first cooling liquid storage box (10) and the second cooling liquid storage box (11), the first cooling liquid storage box (10) and the second cooling liquid storage box (11) cool the inhibitory propylene glycol, the first cooling liquid storage box (10) and the second cooling liquid storage box (11) are provided with a temperature detector and a condensing device for detecting the temperature of the inhibitory propylene glycol flowing back into the first cooling liquid storage box (10) and the second cooling liquid storage box (11), the temperature of the inhibitory propylene glycol is compared with the outdoor temperature, when the temperature of the cooling liquid exceeds the outdoor temperature by more than 10 degrees, the condensing device is started to cool the cooling liquid, otherwise, the condensing device is not started, and natural cooling is realized through the environment.
CN202010475669.1A 2020-05-29 2020-05-29 Large-volume concrete cooling device and using method Active CN111593889B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010475669.1A CN111593889B (en) 2020-05-29 2020-05-29 Large-volume concrete cooling device and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010475669.1A CN111593889B (en) 2020-05-29 2020-05-29 Large-volume concrete cooling device and using method

Publications (2)

Publication Number Publication Date
CN111593889A CN111593889A (en) 2020-08-28
CN111593889B true CN111593889B (en) 2021-11-12

Family

ID=72189670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010475669.1A Active CN111593889B (en) 2020-05-29 2020-05-29 Large-volume concrete cooling device and using method

Country Status (1)

Country Link
CN (1) CN111593889B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113513181B (en) * 2021-04-19 2023-03-14 中交第三公路工程局有限公司 Intelligent temperature control device and method for mass concrete

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4108544B2 (en) * 2003-06-05 2008-06-25 三井住友建設株式会社 Mass concrete pipe cooling method
CN102758534B (en) * 2012-07-30 2014-06-04 中建商品混凝土有限公司 Method for cooling mass concrete
CN204059978U (en) * 2014-08-13 2014-12-31 上海建工集团股份有限公司 The temperature-controlled cooling system of large volume concrete structural
CN109235441B (en) * 2018-09-29 2020-06-30 黄河水利职业技术学院 Automatic circulating liquid temperature control process for mass concrete construction

Also Published As

Publication number Publication date
CN111593889A (en) 2020-08-28

Similar Documents

Publication Publication Date Title
CN105526459B (en) Connect and equip for large-scale smart city industrial building frost-cracking-preventing intelligent pipeline
CN111593889B (en) Large-volume concrete cooling device and using method
CN101634475A (en) Conducting type inter-piping fluid thermal energy transfer device
CN205878998U (en) Tubular heat exchanger online cleaning device
CN103398011B (en) Waste heat
CN102928193A (en) System for simulating low-temperature environment and monitoring radial temperature of hot oil pipeline
CN101915511B (en) Heat pump large-diameter heat exchange device and system thereof for sewage or earth surface water source
CN2818786Y (en) Local colling device for coal mine
CN206409885U (en) A kind of liquid nitrogen hot water vaporization system
CN106767031A (en) A kind of duct type heat exchanger
CN216689047U (en) Bridge cushion cap large-volume concrete pouring temperature control system
CN100453771C (en) Mining partial cold-supply device
CN105507603A (en) Heating apparatus enabling convenience for winter concrete construction
CN210174159U (en) Shearing type screw extruder and cooling system thereof
CN201884860U (en) Air surface heat tracing type freeze-proof device
CN206645807U (en) A kind of exhaust gas purifying liquid filling apparatus being used under low temperature environment
CN212431458U (en) Chilled water circulation system
CN204648717U (en) Anti-freeze solar water supply installation
CN208805078U (en) A kind of double-tube heat exchanger with refrigerant compensator
CN209054235U (en) A kind of oil-gas pipeline is got angry even head butter wall cooling system
CN112414194B (en) Equipment module, system and method for treating underground space thermal pollution
CN207260977U (en) Sand remover for geothermal drilling
CN217896155U (en) Large-volume concrete cooling device
CN206208721U (en) A kind of flue gas low-temperature corrosion detection system
CN206504107U (en) A kind of safety durable type groundwater supply pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200828

Assignee: Henan Changming Engineering Consulting Co.,Ltd.

Assignor: ANYANG INSTITUTE OF TECHNOLOGY

Contract record no.: X2024980005272

Denomination of invention: A cooling device for large volume concrete and its usage method

Granted publication date: 20211112

License type: Common License

Record date: 20240506