CN111590729A - A series mould table device and production process for three-dimensional production of precast concrete slabs - Google Patents

A series mould table device and production process for three-dimensional production of precast concrete slabs Download PDF

Info

Publication number
CN111590729A
CN111590729A CN202010459449.XA CN202010459449A CN111590729A CN 111590729 A CN111590729 A CN 111590729A CN 202010459449 A CN202010459449 A CN 202010459449A CN 111590729 A CN111590729 A CN 111590729A
Authority
CN
China
Prior art keywords
mold table
mold
precast concrete
hanger
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010459449.XA
Other languages
Chinese (zh)
Other versions
CN111590729B (en
Inventor
郑永春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Neiqiu County Keji New Building Materials Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010459449.XA priority Critical patent/CN111590729B/en
Publication of CN111590729A publication Critical patent/CN111590729A/en
Application granted granted Critical
Publication of CN111590729B publication Critical patent/CN111590729B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00—Moulds; Cores; Mandrels
    • B28B7/22—Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00—Moulds; Cores; Mandrels
    • B28B7/26—Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

本发明属于装配式建筑工程技术领域,特别涉及一种立体生产预制混凝土板的串联模台装置及生产工艺。该装置包括模台吊具和多组模台组件;模台组件包括模台及多个支撑柱,多个支撑柱沿周向设置于模台的边缘处;多组模台组件可叠置进行预制混凝土板的立体生产,支撑柱用于支撑上层的模台组件;模台吊具用于模台组件的吊装、平移及码垛。本发明能实现一种低投入、高产出、见效快、易推广、能耗低的预制混凝土构件生产方式,如钢筋混凝土叠合楼板、墙板的预制,对我国装配式建筑的推广应用必将产生巨大的影响,同时实现经济效益及社会效益双丰收。

Figure 202010459449

The invention belongs to the technical field of prefabricated construction engineering, and particularly relates to a series mold table device and a production process for three-dimensionally producing precast concrete slabs. The device includes a mold table hanger and multiple groups of mold table assemblies; the mold table assembly includes a mold table and a plurality of support columns, and the plurality of support columns are arranged at the edge of the mold table along the circumferential direction; The three-dimensional production of precast concrete slabs, the support column is used to support the upper formwork assembly; the formwork spreader is used for the hoisting, translation and stacking of the formwork assembly. The invention can realize a production method of precast concrete components with low input, high output, quick effect, easy promotion and low energy consumption, such as the prefabrication of reinforced concrete laminated floor and wall panels, which is necessary for the promotion and application of prefabricated buildings in my country. It will have a huge impact and achieve both economic and social benefits.

Figure 202010459449

Description

一种立体生产预制混凝土板的串联模台装置及生产工艺A series mould table device and production process for three-dimensional production of precast concrete slabs

技术领域technical field

本发明属于装配式建筑工程技术领域,特别涉及一种立体生产预制混凝土板的串联模台装置及生产工艺。The invention belongs to the technical field of prefabricated construction engineering, and particularly relates to a series mold table device and a production process for three-dimensionally producing precast concrete slabs.

背景技术Background technique

大力发展装配式建筑已是我国建筑产业升级的基本方向。混凝土预制构件,特别是楼板及墙板等用量越来越大,传统的生产工艺及方式不但投入大、效率低、能耗,而且产能越来越满足不了市场需求。Vigorously developing prefabricated buildings is the basic direction of my country's construction industry upgrading. The consumption of prefabricated concrete components, especially floor slabs and wall panels, is increasing. The traditional production processes and methods not only have large investment, low efficiency, and energy consumption, but their production capacity is increasingly unable to meet market demand.

模台是混凝土预制构件的生产平台,由模台主梁、模台次梁及模台面板组成。模台主梁是整个模台的主受力构件,负责保证整个模台的平整、稳定,并把整个模台的荷载传递给地面基础。模台次梁保证模台面板平整稳定,并把模台面板上的所有荷载传递给模台主梁。模台面板是制作混凝土预制构件的操作面,一般为钢板等坚硬、平滑材料制成,以保证混凝土预制构件表面光滑平整。The formwork table is the production platform of concrete prefabricated components. The main beam of the mold table is the main force-bearing member of the entire mold table, which is responsible for ensuring the smoothness and stability of the entire mold table, and transfers the load of the entire mold table to the ground foundation. The sub-beam of the mould table ensures that the mould table panel is flat and stable, and transmits all the loads on the mould table panel to the main beam of the mould table. The formwork panel is the operating surface for making concrete prefabricated components, and is generally made of hard and smooth materials such as steel plates to ensure that the surface of the concrete prefabricated components is smooth and flat.

现有模台形式有:固定模台和流水线模台。The existing mold table forms are: fixed mold table and assembly line mold table.

固定模台直接在地面铺设,即模台主梁接触地面,并保持不动。固定模台采用平铺生产:将模台平铺于厂房车间内,并固定不动。基本工艺:组模浇筑完毕,就地养护,成品一块一块原位吊装。其缺陷是:模台主梁直接与地面基础接触,如果地面不平,极易造成主梁扭曲,影响构件精度;模台不能叠放:主梁层层相压会变形,且与地面接触更易扭曲变形;占地面积大,基本投资大,生产效率低下,人员需求大;单层平面养护,能耗高,平铺生产,物料及成品转运困难;人员、物料、装备混杂,安全隐患大,厂房空间未有任何利用。The fixed mold table is laid directly on the ground, that is, the main beam of the mold table touches the ground and remains stationary. The fixed mold table is produced by tiling: the mold table is laid flat in the workshop and fixed. Basic process: After the mold is poured, it is maintained on site, and the finished product is hoisted in-situ piece by piece. The defect is: the main beam of the formwork table is directly in contact with the ground foundation. If the ground is not flat, it is easy to cause the main beam to be twisted and affect the accuracy of the components; the formwork table cannot be stacked: the main beam will be deformed by layer-by-layer pressure, and it is more likely to be distorted in contact with the ground. Deformation; large floor space, large capital investment, low production efficiency, and large demand for personnel; single-layer plane maintenance, high energy consumption, flat lay production, difficult transfer of materials and finished products; mixed personnel, materials, and equipment, great potential safety hazards, and workshops The space is not used in any way.

流水线模台的模台主梁置于轨道上,并通过动滑轮在轨道上运行。平模流水线生产:将模台置于轨道上,生产工位人员不动,模台在轨道上移动,通过及其复杂的机械装置提升到集中点养护。其缺陷是:模台不能叠放,集中养护时是通过托架结构将模台托起,即上下模台不接触,否则会变形。厂房及基础设施要求高,投资大,工期长,生产设备投入高,安装期长,电控设备复杂,操作人员要求高,生产区域占地面积大;构件养护严重不合理:不同时期生产的产品在同一养护区内养护,不但能耗大,产品质量也不易保证;模台只能平面移动,且只能在规定的路线移动,未能合理利用空间,生产效率低下;单线流水作业,一旦任意环节出问题,整个生产线就会形成卡堵,物料组织,成品运输线路过长,效率低下,浪费严重,不能交叉作业。The main beam of the die table of the assembly line is placed on the track and runs on the track through the movable pulley. Flat die assembly line production: place the die table on the track, the production station personnel do not move, the die table moves on the track, and is lifted to a centralized point for maintenance through its complicated mechanical device. The disadvantage is: the mold table cannot be stacked, and the mold table is held up by the bracket structure during centralized maintenance, that is, the upper and lower mold tables are not in contact, otherwise it will be deformed. High requirements for workshops and infrastructure, large investment, long construction period, high investment in production equipment, long installation period, complex electronic control equipment, high requirements for operators, and large production area; serious unreasonable maintenance of components: products produced in different periods Maintenance in the same maintenance area not only consumes a lot of energy, but also cannot guarantee the quality of the product; the mold table can only move in a plane, and it can only move in the specified route, the space cannot be used reasonably, and the production efficiency is low; single-line assembly operation, once arbitrary If there is a problem in the link, the entire production line will be blocked, the material will be organized, the finished product transportation line will be too long, the efficiency will be low, and the waste will be serious.

发明内容SUMMARY OF THE INVENTION

针对上述问题,本发明的目的在于提供一种立体生产预制混凝土板的串联模台装置及生产工艺,以克服现有模台形式及生产工艺的不足。In view of the above problems, the purpose of the present invention is to provide a series mold table device and production process for the three-dimensional production of precast concrete slabs, so as to overcome the deficiencies of the existing mold table form and production technology.

为了实现上述目的,本发明采用以下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:

一种立体生产预制混凝土板的串联模台装置,包括:模台吊具和多组模台组件;A series mold table device for three-dimensional production of precast concrete slabs, comprising: mold table hangers and multiple groups of mold table components;

模台组件包括模台及多个支撑柱,多个支撑柱沿周向设置于模台的边缘处;The mold table assembly includes a mold table and a plurality of support columns, and the plurality of support columns are arranged at the edge of the mold table along the circumferential direction;

多组模台组件可叠置进行预制混凝土板的立体生产,支撑柱用于支撑上层的模台组件;Multiple sets of formwork assemblies can be stacked for three-dimensional production of precast concrete slabs, and support columns are used to support formwork assemblies on the upper layer;

模台吊具用于模台组件的吊装、平移及码垛。The mold table spreader is used for lifting, translation and stacking of mold table components.

所述支撑柱的上端凸出于所述模台的上表面,并且凸出部分的高度大于预制混凝土板的厚度;The upper end of the support column protrudes from the upper surface of the formwork table, and the height of the protruding part is greater than the thickness of the precast concrete slab;

多个所述支撑柱的上端面位于同一水平面上。The upper end surfaces of the plurality of support columns are located on the same horizontal plane.

所述模台为矩形结构,并且四角设有对位角板,所述对位角板用于与所述模台吊具进行对位。The mold table has a rectangular structure, and four corners are provided with aligning angle plates, which are used to align with the mold table hanger.

所述对位角板的上端面与所述支撑柱的上端面位于同一高度。The upper end surface of the aligning angle plate and the upper end surface of the supporting column are located at the same height.

所述模台吊具包括吊索、框架及可伸缩卡具,其中框架的内侧至少设有一组相对设置的可伸缩卡具,所述吊索连接在所述框架上,用于与外部吊装设备连接。The mold table spreader includes a sling, a frame and a retractable clamp, wherein at least one set of oppositely arranged retractable clamps are arranged on the inner side of the frame, and the sling is connected to the frame for connecting with external hoisting equipment connect.

所述框架为矩形结构,并且四角设有引导机构,所述引导机构用于与所述模台四角上的对位角板配合,将所述框架引导至所述模台的外侧。The frame has a rectangular structure, and four corners are provided with guide mechanisms, which are used for cooperating with the alignment angle plates on the four corners of the mold table to guide the frame to the outside of the mold table.

所述引导机构包括固定板、伸缩杆及导流板,其中固定板与所述框架连接;所述导流板铰接在所述固定板的下端,并且向外侧倾斜;所述伸缩杆设置于所述固定板上,并且伸缩端与所述导流板连接。The guiding mechanism includes a fixed plate, a telescopic rod and a deflector, wherein the fixed plate is connected with the frame; the deflector is hinged on the lower end of the fixed plate and is inclined to the outside; the telescopic rod is arranged on the the fixed plate, and the telescopic end is connected with the deflector.

一种立体生产预制混凝土板的方法,包括如上任意之一所述的立体生产预制混凝土板的串联模台装置,所述方法包括以下几个步骤:A method for three-dimensionally producing precast concrete slabs, comprising the tandem mold table device for three-dimensionally producing precast concrete slabs as described in any one of the above, the method comprising the following steps:

1)模台布置:平铺式布置;1) Mold table layout: tile layout;

2)混凝土浇筑:在布置好的模台上支模具、钢筋绑扎、预埋件固定,然后混凝土浇筑;2) Concrete pouring: support the mold on the arranged mold table, bind the steel bars, fix the embedded parts, and then pour the concrete;

3)首台模台起吊:将模台吊具对准模台下沉,使模台吊具与模台对位,并夹紧模台;3) Lifting the first die table: Align the die table hanger with the die table and sink, so that the die table hanger is aligned with the die table, and clamp the die table;

4)模台移位:模台吊具通过吊索与外部吊装设备连接,将模台起吊水平移位;4) Die table displacement: The mold table spreader is connected to the external hoisting equipment through a sling, and the mold table is lifted and shifted horizontally;

5)模台叠放:将模台叠置在另一模台的上方;5) Stacking of mold tables: stacking the mold table on top of another mold table;

6)多层叠放、移位养护:将模台叠放到设计层数后,通过模台吊具整叠移位至养护工位,进行立体养护;6) Multi-layer stacking and shifting maintenance: after the mold table is stacked on the design layer, the entire stack is shifted to the maintenance station by the mold table spreader for three-dimensional maintenance;

7)成品移位:养护至规定时间后,混凝土硬化成型,并达到拆模强度;此时通过模台吊具整叠移位至拆模工位,进行成品脱模;7) Finished product displacement: After curing to the specified time, the concrete is hardened and formed, and reaches the demoulding strength; at this time, the whole stack is shifted to the demoulding station by the mold table hanger, and the finished product is demolded;

8)依次循环。8) Cycle in turn.

在步骤3)中,模台吊具通过底部的导流板与模台上的对位角板对位,将框架导入模台的外侧,可伸缩卡具伸出并夹紧模台。In step 3), the mold table hanger is aligned with the alignment angle plate on the mold table through the guide plate at the bottom, the frame is introduced into the outer side of the mold table, and the retractable clamp extends and clamps the mold table.

在步骤5)中,模台吊具通过底部的导流板与模台上的对位角板对位,将框架导入模台的外侧,可伸缩卡具缩回释放模台。In step 5), the mold table hanger is aligned with the alignment angle plate on the mold table through the bottom guide plate, the frame is introduced into the outer side of the mold table, and the retractable clamp retracts to release the mold table.

本发明的优点及有益效果是:The advantages and beneficial effects of the present invention are:

1.本发明的串联模台装置及生产工艺充分发挥了传统固定模台及流水线工艺的各自优点(固定台:操作面多;流水线:效率高),同时摒弃了两种工艺的不足(固定台:不灵活、产能低;流水线:投资大、能耗高)。1. The serial mold table device and production process of the present invention give full play to the respective advantages of the traditional fixed mold table and the assembly line process (fixed table: many operating surfaces; assembly line: high efficiency), while abandoning the deficiencies of the two processes (fixed table : inflexible, low production capacity; assembly line: large investment, high energy consumption).

2.本发明的模台制作方便,由于主梁变成多点支撑,其截面可以大幅减小,原有模台改造容易,造价降低。2. The mold table of the present invention is convenient to manufacture, since the main beam becomes multi-point support, its cross section can be greatly reduced, the original mold table is easy to transform, and the cost is reduced.

3.本发明多工艺生产可兼容:可以传统平铺生产,也可以立体生产。立体生产,厂房面积大幅度减少,充分利用空间;立体分区养护,能耗低,操作灵活;现有存量设备容易改造,社会效益、经济效益均赢;模台叠放、集中垂直及水平运输,生产效率大幅提高;可交叉作业;方便整体搬迁移动且厂区迁移无建筑垃圾;项目覆盖范围广,产能大。3. The multi-process production of the present invention is compatible: it can be produced by traditional flat laying or three-dimensional production. Three-dimensional production, the plant area is greatly reduced, and the space is fully utilized; three-dimensional partition maintenance, low energy consumption, flexible operation; easy to retrofit existing equipment, social and economic benefits; The production efficiency is greatly improved; it can be cross-operated; the overall relocation is convenient and there is no construction waste in the factory relocation; the project covers a wide range and has a large production capacity.

4.本发明生产方式灵活:可施工现场游牧式生产,也可固定厂房式生产。4. The production mode of the present invention is flexible: nomadic production at the construction site, or fixed workshop production.

附图说明Description of drawings

图1为本发明立体生产预制混凝土板的串联模台装置的结构示意图;Fig. 1 is the structural representation of the serial mould table device of three-dimensional production of precast concrete slab of the present invention;

图2为本发明中模台的结构示意图;Fig. 2 is the structural representation of the mould table in the present invention;

图3为图2的侧视图;Fig. 3 is the side view of Fig. 2;

图4为图2的俯视图;Fig. 4 is the top view of Fig. 2;

图5为本发明中模台本体的结构示意图;Fig. 5 is the structural representation of the mold table body in the present invention;

图6为图5的侧视图;Fig. 6 is the side view of Fig. 5;

图7为本发明中模台吊具的结构示意图;Fig. 7 is the structural schematic diagram of the mold table spreader in the present invention;

图8为图7的侧视图;Fig. 8 is the side view of Fig. 7;

图9为图7的俯视图;Fig. 9 is the top view of Fig. 7;

图10为本发明中引导机构的结构示意图;10 is a schematic structural diagram of a guiding mechanism in the present invention;

图11为本发明中模台吊具吊装单模台的示意图;Fig. 11 is the schematic diagram of hoisting the single mold table with the middle mold table hanger of the present invention;

图12为本发明中模台吊具吊装串联模台的示意图。FIG. 12 is a schematic diagram of hoisting a series die set by a die set hanger according to the present invention.

图中:1为模台本体,101为模台主梁,102为模台次梁,103为模台面板,2为支撑柱,3为对位角板,4为模台吊具,401为吊索,402为框架,403为可伸缩卡具,404为引导机构,4041为固定板,4042为伸缩杆,4043为导流板。In the figure: 1 is the main body of the mold table, 101 is the main beam of the mold table, 102 is the sub-beam of the mold table, 103 is the mold table panel, 2 is the support column, 3 is the counter angle plate, 4 is the mold table hanger, and 401 is the mold table. For the sling, 402 is a frame, 403 is a retractable clamp, 404 is a guiding mechanism, 4041 is a fixed plate, 4042 is a telescopic rod, and 4043 is a deflector.

具体实施方式Detailed ways

为了使本发明的目的、技术方案和优点更加清楚,下面结合附图和具体实施例对本发明进行详细描述。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

如图1所示,本发明提供的一种立体生产预制混凝土板的串联模台装置,包括:模台吊具4和多组模台组件,其中模台组件包括模台1及多个支撑柱2,多个支撑柱2沿周向设置于模台1的边缘处;多组模台组件可叠置进行预制混凝土板的立体生产,支撑柱2用于支撑上层的模台组件;模台吊具4用于模台组件的吊装、平移及码垛。As shown in FIG. 1 , the present invention provides a three-dimensionally producing precast concrete slab series mold table device, including: mold table hanger 4 and multiple groups of mold table components, wherein the mold table components include a mold table 1 and a plurality of support columns 2. A plurality of support columns 2 are arranged at the edge of the mold table 1 along the circumferential direction; multiple groups of mold table components can be stacked for three-dimensional production of precast concrete slabs, and the support columns 2 are used to support the upper mold table components; Tool 4 is used for hoisting, translation and stacking of die table components.

如图2-4所示,本发明的实施例中,支撑柱2固定在靠近模台1的边缘处,下端可与模台1的底面平齐或凸出于底面;模台1的上端凸出于模台1的上表面,并且凸出部分的高度大于预制混凝土板的厚度,以便支撑上层的模台组件。优选地,叠置的多组模台组件,各层中的支撑柱2一一对应,从下至上依次串联,保证可靠支撑。As shown in Figures 2-4, in the embodiment of the present invention, the support column 2 is fixed near the edge of the mold table 1, and the lower end can be flush with the bottom surface of the mold table 1 or protrude from the bottom surface; the upper end of the mold table 1 is convex Out of the upper surface of the formwork table 1, and the height of the protruding part is greater than the thickness of the precast concrete slab, so as to support the formwork table assembly on the upper layer. Preferably, the support columns 2 in each layer of the stacked modules are in one-to-one correspondence, and are connected in series from bottom to top to ensure reliable support.

进一步地,模台1边缘的多个支撑柱2的上端面位于同一水平面上,保证上层模台1的水平位置。Further, the upper end surfaces of the plurality of support columns 2 on the edge of the die table 1 are located on the same horizontal plane, so as to ensure the horizontal position of the upper die table 1 .

本发明的实施例中,模台1为矩形结构,并且四角设有对位角板3,对位角板3用于与模台吊具4进行对位。优先地,对位角板3的上端面与支撑柱2的上端面位于同一高度,保证模台吊具4与对位角板3的顺利对位,同时不妨碍支撑柱2对上层模台1的支撑。In the embodiment of the present invention, the mold table 1 has a rectangular structure, and four corners are provided with aligning corner plates 3 , which are used to align with the mold table hanger 4 . Preferably, the upper end surface of the aligning angle plate 3 and the upper end surface of the supporting column 2 are located at the same height, so as to ensure the smooth alignment of the die table hanger 4 and the aligning angle plate 3, and at the same time not hinder the supporting column 2 to the upper die table 1. support.

如图5-6所示,本发明的实施例中,模台1包括模台主梁101、模台次梁102及模台面板103,两个模台主梁101之间连接有多个相互平行的模台次梁102,从而形成模台支架,模台面板103设置于模台支架上。As shown in FIGS. 5-6 , in the embodiment of the present invention, the mold table 1 includes a mold table main beam 101 , a mold table sub-beam 102 and a mold table panel 103 , and a plurality of mutual mutual beams are connected between the two mold table main beams 101 . The parallel sub-beams 102 of the mold table form the mold table support, and the mold table panel 103 is arranged on the mold table support.

如图7-9所示,本发明的实施例中,模台吊具4包括吊索401、框架402及可伸缩卡具403,其中框架402的内侧至少设有一组相对设置的可伸缩卡具403,吊索401连接在框架402上,用于与外部吊装设备连接。As shown in FIGS. 7-9 , in the embodiment of the present invention, the mold table hanger 4 includes a sling 401 , a frame 402 and a retractable clamp 403 , wherein at least one set of oppositely arranged retractable clamps is provided on the inner side of the frame 402 403, the sling 401 is connected to the frame 402 for connecting with external hoisting equipment.

框架402为矩形结构,并且四角设有引导机构404,引导机构404用于与模台1四角上的对位角板3配合,将框架402引导至模台1的外侧。本实施例中,框架402的内侧四框上设有两组相对设置的可伸缩卡具403,通过可伸缩卡具403的伸出或缩回,实现对模台1的夹紧或释放。The frame 402 has a rectangular structure, and four corners are provided with guide mechanisms 404 . The guide mechanisms 404 are used to cooperate with the alignment corner plates 3 on the four corners of the mold table 1 to guide the frame 402 to the outside of the mold table 1 . In this embodiment, the inner four frames of the frame 402 are provided with two sets of oppositely arranged retractable clamps 403 , and the mold table 1 can be clamped or released by extending or retracting the retractable clamps 403 .

具体地,吊索401为柔性材质,具体可采用高强度钢索或缆绳,通过滑轮组同步上下移动。框架402为高刚性、高强度的中空框形结构,内框稍大于串联模台的外轮廓,内置液压及电控系统。可伸缩卡具403置于框架402的内侧,伸出时可卡于模台主梁101的外侧。本发明的实施例中,可伸缩卡具403为现有技术,在此不再赘述。Specifically, the sling 401 is made of a flexible material, specifically a high-strength steel cable or cable, and moves up and down synchronously through a pulley block. The frame 402 is a high-rigidity, high-strength hollow frame-shaped structure, the inner frame is slightly larger than the outer contour of the tandem die table, and the hydraulic and electric control systems are built-in. The retractable clamp 403 is placed on the inner side of the frame 402, and can be clamped on the outer side of the main beam 101 of the die table when extended. In the embodiment of the present invention, the retractable fixture 403 is in the prior art, and details are not described herein again.

如图10所示,本发明的实施例中,引导机构404置于框架402的内框四角,包括固定板4041、伸缩杆4042及导流板4043,其中固定板4041与框架402连接;导流板铰接在固定板4041的下端,并且向外侧倾斜;伸缩杆4042设置于固定板4041上,并且伸缩端与导流板4043连接。伸缩杆4042驱动导流板4043转动,从而调整导流板4043的倾斜角度。在非工作状态时,通过伸缩杆4042驱动导流板4043转动至水平位置且贴合在框架402的下方,方便收藏存放。As shown in FIG. 10 , in the embodiment of the present invention, the guide mechanism 404 is placed at the four corners of the inner frame of the frame 402, including a fixed plate 4041, a telescopic rod 4042 and a deflector 4043, wherein the fixed plate 4041 is connected with the frame 402; The plate is hinged on the lower end of the fixed plate 4041 and is inclined to the outside; The telescopic rod 4042 drives the deflector 4043 to rotate, thereby adjusting the inclination angle of the deflector 4043 . In the non-working state, the deflector 4043 is driven by the telescopic rod 4042 to rotate to a horizontal position and fit under the frame 402, which is convenient for storage and storage.

模台吊具4接近模台1时,四个导流板4043通过伸缩杆4042驱动张开,大致对准对位角板3后收拢,吊索401会微摆动调位,四角对齐后,可伸缩卡具403伸出,夹紧模台1,导流板4043通过伸缩杆4042驱动二次打开,模台吊具4就位。When the mold table spreader 4 is close to the mold table 1, the four deflectors 4043 are driven to open by the telescopic rod 4042, and are roughly aligned with the alignment angle plate 3 and then folded. The sling 401 will slightly swing and adjust the position. The telescopic clamp 403 stretches out to clamp the die table 1, the deflector 4043 is driven by the telescopic rod 4042 to open twice, and the die table hanger 4 is in place.

一种立体生产预制混凝土板的方法,包括如上任意实施例之一的立体生产预制混凝土板的串联模台装置,该方法包括以下几个步骤:A method for three-dimensional production of precast concrete slabs, comprising the serial mould table device for three-dimensional production of precast concrete slabs according to any one of the above embodiments, the method comprises the following steps:

1)模台布置:平铺式布置;1) Mold table layout: tile layout;

2)混凝土浇筑:在布置好的模台1上支模具、钢筋绑扎、预埋件固定,然后混凝土浇筑;2) Concrete pouring: On the arranged formwork table 1, support the mold, bind the steel bars, fix the embedded parts, and then pour the concrete;

3)首台模台起吊:将模台吊具4对准模台1下沉,使模台吊具4与模台1对位,并夹紧模台1;3) Lifting the first die table: align the die table hanger 4 with the die table 1 and sink, so that the die table hanger 4 is aligned with the die table 1, and clamp the die table 1;

具体地,模台吊具4下沉时,模台吊具4通过底部的导流板4043与模台1上的对位角板3对位,因导流板4043向外倾斜,开口较宽,能将模台1包含其内。通过四角处的导流板4043调整框架402的位置,且将框架402顺利导入模台1的外侧,两组可伸缩卡具403伸出并夹紧模台1,也可夹紧支撑柱2,如图1所示;Specifically, when the mold table hanger 4 sinks, the mold table hanger 4 is aligned with the alignment angle plate 3 on the mold table 1 through the baffle plate 4043 at the bottom. Because the baffle plate 4043 is inclined outward, the opening is wider. , the mold table 1 can be contained therein. Adjust the position of the frame 402 through the deflectors 4043 at the four corners, and smoothly guide the frame 402 to the outside of the die table 1, two sets of retractable clamps 403 extend out and clamp the die table 1, and can also clamp the support column 2, As shown in Figure 1;

4)模台移位:模台吊具4通过吊索401与外部吊装设备连接,将模台1起吊水平移位;4) Displacement of the mold table: The mold table spreader 4 is connected to the external hoisting equipment through the sling 401, and the mold table 1 is lifted and horizontally displaced;

5)模台叠放:通过模台吊具4将模台1叠置在另一模台1的上方;5) stacking of the mould table: the mould table 1 is stacked on the top of another mould table 1 by the mould table hanger 4;

具体地,模台吊具4将模台1吊装至另一模台1的上方时,模台吊具4通过底部的四个导流板4043分别与另一模台1上的四个对位角板3对位,将框架402顺利导入另一模台1的外侧,上部模台1与下部模台1完成对接就位,可伸缩卡具403缩回释放模台1,如图11所示;Specifically, when the mold table hanger 4 lifts the mold table 1 above another mold table 1, the mold table hanger 4 aligns with the four guide plates 4043 on the bottom of the other mold table 1 respectively. The angle plate 3 is aligned, and the frame 402 is smoothly introduced to the outside of the other mold table 1. The upper mold table 1 and the lower mold table 1 are docked in place, and the retractable clamp 403 retracts to release the mold table 1, as shown in Figure 11. ;

6)多层叠放、移位养护:将模台1叠放到设计层数后,通过模台吊具4整叠移位至养护工位,进行立体养护,如图12所示;6) Multi-layer stacking and shifting maintenance: After stacking the mold table 1 to the design layer, the entire stack is shifted to the maintenance station by the mold table spreader 4, and three-dimensional maintenance is performed, as shown in Figure 12;

7)成品移位:养护至规定时间后,混凝土硬化成型,并达到拆模强度;此时通过模台吊具4整叠移位至拆模工位,进行成品脱模;7) Finished product displacement: After curing for a specified time, the concrete is hardened and formed and reaches the demoulding strength; at this time, the whole stack is shifted to the demoulding station by the die table hanger 4, and the finished product is demolded;

8)依次循环。8) Cycle in turn.

本发明的实施例中,支撑柱2为高强度受力体,与模台主梁101相连,模台所有重量通过支撑柱2层层传递到地面基础。支撑柱2的底面与模台主梁101的底面平齐或凸出于主梁底面,支撑柱2的上表面支撑上一层模台支撑柱的底面,使上下模台形成串联状态,即:模台1通过支撑柱2形成叠放状态。串联模台的传力路径清晰明确:混凝土构件→模台面板→模台次梁→模台主梁→模台支撑柱→地面基础。支撑柱2也可以凸出于模台下面,使柱体顶面与模台面板平。本例支撑柱凸出于模台上面,可免于在柱体处浇筑构件或设置模具,否则影响串联模台上下对位。支撑柱顶端可以锥形设计,此时支撑柱底面则需要设计有对位孔,方便上下对位,形成类似集装箱四角对位装置。In the embodiment of the present invention, the support column 2 is a high-strength force-bearing body, which is connected to the main beam 101 of the mold table, and all the weight of the mold table is transmitted to the ground foundation through the support column 2 layer by layer. The bottom surface of the support column 2 is flush with the bottom surface of the main beam 101 of the mold table or protrudes from the bottom surface of the main beam, and the upper surface of the support column 2 supports the bottom surface of the support column of the upper layer of the mold table, so that the upper and lower mold tables form a series state, that is: The die table 1 is formed in a stacked state by the support column 2 . The force transmission path of the tandem mold table is clear and clear: concrete member → mold table panel → mold table secondary beam → mold table main beam → mold table support column → ground foundation. The support column 2 can also protrude below the die table, so that the top surface of the column body is flat with the die table panel. In this example, the support column protrudes above the mold table, which can avoid pouring components or setting molds at the column, otherwise it will affect the upper and lower alignment of the series mold table. The top of the support column can be designed with a tapered shape. At this time, the bottom surface of the support column needs to be designed with alignment holes to facilitate up and down alignment, forming a four-corner alignment device similar to a container.

本发明的实施例中,对位角板3镶嵌于模台1的四角,并与四角的支撑柱2平齐。上下模台叠放对位时,吊具的导流板4043可轻松与之接触对位,使得上下模台四周平齐一致。模台吊具4也可采用单边开口或双边开口,侧向对位。模台吊具4通过吊索401与起重设备相连接,进行工作。桁吊、桥式吊车、龙门吊、移动龙门、塔吊等起重设备均可。In the embodiment of the present invention, the aligning angle plates 3 are embedded in the four corners of the die table 1 and are flush with the supporting columns 2 at the four corners. When the upper and lower mold tables are stacked and aligned, the deflector 4043 of the spreader can be easily contacted and aligned, so that the upper and lower mold tables are flush and consistent. The mold table hanger 4 can also use a single-sided opening or a bilateral opening for lateral alignment. The die table spreader 4 is connected with the lifting equipment through the sling 401 to work. Truss cranes, bridge cranes, gantry cranes, mobile gantry cranes, tower cranes and other lifting equipment can be used.

本发明能实现一种低投入、高产出、见效快、易推广、能耗低的预制混凝土构件生产方式,如钢筋混凝土叠合楼板、墙板的预制,对我国装配式建筑的推广应用必将产生巨大的影响,同时实现经济效益及社会效益双丰收。The invention can realize a production method of precast concrete components with low input, high output, quick effect, easy promotion and low energy consumption, such as the prefabrication of reinforced concrete laminated floor and wall panels, which is necessary for the promotion and application of prefabricated buildings in my country. It will have a huge impact and achieve both economic and social benefits.

以上所述仅为本发明的实施方式,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内所作的任何修改、等同替换、改进、扩展等,均包含在本发明的保护范围内。The above descriptions are merely embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, expansion, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims (10)

1.一种立体生产预制混凝土板的串联模台装置,其特征在于,包括:模台吊具(4)和多组模台组件;1. a three-dimensional production prefabricated concrete slab series mould table device, is characterized in that, comprises: mould table hanger (4) and multiple groups of mould table assemblies; 模台组件包括模台(1)及多个支撑柱(2),多个支撑柱(2)沿周向设置于模台(1)的边缘处;The mold table assembly includes a mold table (1) and a plurality of support columns (2), and the plurality of support columns (2) are arranged at the edge of the mold table (1) along the circumferential direction; 多组模台组件可叠置进行预制混凝土板的立体生产,支撑柱(2)用于支撑上层的模台组件;Multiple groups of formwork assemblies can be stacked for three-dimensional production of precast concrete slabs, and the support column (2) is used to support the formwork assemblies on the upper layer; 模台吊具(4)用于模台组件的吊装、平移及码垛。The mold table spreader (4) is used for hoisting, translation and stacking of mold table components. 2.根据权利要求1所述的立体生产预制混凝土板的串联模台装置,其特征在于,所述支撑柱(2)的上端凸出于所述模台(1)的上表面,并且凸出部分的高度大于预制混凝土板的厚度;2. The tandem mold table device for three-dimensional production of precast concrete slabs according to claim 1, wherein the upper end of the support column (2) protrudes from the upper surface of the mold table (1), and protrudes The height of the part is greater than the thickness of the precast concrete slab; 多个所述支撑柱(2)的上端面位于同一水平面上。The upper end surfaces of the plurality of support columns (2) are located on the same horizontal plane. 3.根据权利要求1所述的立体生产预制混凝土板的串联模台装置,其特征在于,所述模台(1)为矩形结构,并且四角设有对位角板(3),所述对位角板(3)用于与所述模台吊具(4)进行对位。3. The three-dimensional production precast concrete slab tandem mould table device according to claim 1, characterized in that, the mould table (1) is a rectangular structure, and four corners are provided with counter-angle plates (3). The angle plate (3) is used for alignment with the mold table hanger (4). 4.根据权利要求3所述的立体生产预制混凝土板的串联模台装置,其特征在于,所述对位角板(3)的上端面与所述支撑柱(2)的上端面位于同一高度。4. The tandem mold table device for three-dimensional production of precast concrete slabs according to claim 3, characterized in that, the upper end surface of the counter-angle plate (3) and the upper end surface of the support column (2) are located at the same height . 5.根据权利要求3所述的立体生产预制混凝土板的串联模台装置,其特征在于,所述模台吊具(4)包括吊索(401)、框架(402)及可伸缩卡具(403),其中框架(402)的内侧至少设有一组相对设置的可伸缩卡具(403),所述吊索(401)连接在所述框架(402)上,用于与外部吊装设备连接。5. The tandem mold table device for three-dimensional production of precast concrete slabs according to claim 3, wherein the mold table spreader (4) comprises a sling (401), a frame (402) and a retractable clamp ( 403), wherein the inner side of the frame (402) is provided with at least one set of oppositely arranged retractable clamps (403), and the slings (401) are connected to the frame (402) for connection with external hoisting equipment. 6.根据权利要求5所述的立体生产预制混凝土板的串联模台装置,其特征在于,所述框架(402)为矩形结构,并且四角设有引导机构(404),所述引导机构(404)用于与所述模台(1)四角上的对位角板(3)配合,将所述框架(402)引导至所述模台(1)的外侧。6 . The tandem mold table device for three-dimensional production of precast concrete slabs according to claim 5 , wherein the frame ( 402 ) has a rectangular structure, and four corners are provided with guide mechanisms ( 404 ), and the guide mechanisms ( 404 ) ) is used to cooperate with the alignment angle plates (3) on the four corners of the die table (1) to guide the frame (402) to the outside of the die table (1). 7.根据权利要求6所述的立体生产预制混凝土板的串联模台装置,其特征在于,所述引导机构(404)包括固定板(4041)、伸缩杆(4042)及导流板(4043),其中固定板(4041)与所述框架(402)连接;所述导流板铰接在所述固定板(4041)的下端,并且向外侧倾斜;所述伸缩杆(4042)设置于所述固定板(4041)上,并且伸缩端与所述导流板(4043)连接。7 . The tandem mold table device for three-dimensional production of precast concrete slabs according to claim 6 , wherein the guiding mechanism ( 404 ) comprises a fixed plate ( 4041 ), a telescopic rod ( 4042 ) and a guide plate ( 4043 ). 8 . , wherein the fixing plate (4041) is connected with the frame (402); the deflector is hinged on the lower end of the fixing plate (4041) and inclined to the outside; the telescopic rod (4042) is arranged on the fixing plate (4042) plate (4041), and the telescopic end is connected with the deflector (4043). 8.一种立体生产预制混凝土板的方法,其特征在于,包括如权利要求1-7任一项所述的立体生产预制混凝土板的串联模台装置,所述方法包括以下几个步骤:8. a method for three-dimensional production of precast concrete slabs, characterized in that, comprising the three-dimensional production of precast concrete slabs as described in any one of claims 1-7 series formwork device, the method comprises the following steps: 1)模台布置:平铺式布置;1) Mold table layout: tile layout; 2)混凝土浇筑:在布置好的模台(1)上支模具、钢筋绑扎、预埋件固定,然后混凝土浇筑;2) Concrete pouring: Support the mold, tie the steel bars, fix the embedded parts on the arranged mold table (1), and then pour the concrete; 3)首台模台起吊:将模台吊具(4)对准模台(1)下沉,使模台吊具(4)与模台(1)对位,并夹紧模台(1);3) Lifting the first mold table: Align the mold table hanger (4) with the mold table (1) and sink it down, align the mold table hanger (4) with the mold table (1), and clamp the mold table (1). ); 4)模台移位:模台吊具(4)通过吊索(401)与外部吊装设备连接,将模台(1)起吊水平移位;4) Displacement of the mold table: The mold table spreader (4) is connected with the external hoisting equipment through the sling (401), and the mold table (1) is lifted and displaced horizontally; 5)模台叠放:将模台(1)叠置在另一模台(1)的上方;5) Stacking the mold table: stack the mold table (1) on top of another mold table (1); 6)多层叠放、移位养护:将模台(1)叠放到设计层数后,通过模台吊具(4)整叠移位至养护工位,进行立体养护;6) Multi-layer stacking and shifting maintenance: after the mold table (1) is stacked on the design layer, the entire stack is shifted to the maintenance station by the mold table spreader (4) for three-dimensional maintenance; 7)成品移位:养护至规定时间后,混凝土硬化成型,并达到拆模强度;此时通过模台吊具(4)整叠移位至拆模工位,进行成品脱模;7) Displacement of finished product: After curing to the specified time, the concrete will harden and form, and reach the strength of demoulding; at this time, the whole stack is shifted to the demoulding station by the mould platform hanger (4), and the finished product is demoulded; 8)依次循环。8) Cycle in turn. 9.根据权利要求8所述的方法,其特征在于,在步骤3)中,模台吊具(4)通过底部的导流板(4043)与模台(1)上的对位角板(3)对位,将框架(402)导入模台(1)的外侧,可伸缩卡具(403)伸出并夹紧模台(1)。9. The method according to claim 8, characterized in that, in step 3), the mold table hanger (4) passes through the guide plate (4043) at the bottom and the alignment angle plate (4043) on the mold table (1). 3) Align the position, guide the frame (402) into the outer side of the die table (1), and extend the retractable clamp (403) to clamp the die table (1). 10.根据权利要求8所述的方法,其特征在于,在步骤5)中,模台吊具(4)通过底部的导流板(4043)与模台(1)上的对位角板(3)对位,将框架(402)导入模台(1)的外侧,可伸缩卡具(403)缩回释放模台(1)。10. The method according to claim 8, characterized in that, in step 5), the mold table hanger (4) passes through the guide plate (4043) at the bottom and the alignment angle plate (4043) on the mold table (1). 3) Align the position, guide the frame (402) into the outer side of the mold table (1), and retract the retractable clamp (403) to release the mold table (1).
CN202010459449.XA 2020-05-27 2020-05-27 A series of mold platform device and production process for three-dimensional production of precast concrete panels Active CN111590729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010459449.XA CN111590729B (en) 2020-05-27 2020-05-27 A series of mold platform device and production process for three-dimensional production of precast concrete panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010459449.XA CN111590729B (en) 2020-05-27 2020-05-27 A series of mold platform device and production process for three-dimensional production of precast concrete panels

Publications (2)

Publication Number Publication Date
CN111590729A true CN111590729A (en) 2020-08-28
CN111590729B CN111590729B (en) 2025-05-30

Family

ID=72187893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010459449.XA Active CN111590729B (en) 2020-05-27 2020-05-27 A series of mold platform device and production process for three-dimensional production of precast concrete panels

Country Status (1)

Country Link
CN (1) CN111590729B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121246010A (en) * 2025-10-15 2026-01-02 中交一公局第二工程有限公司 Automatic production line for stacked prefabricated components and working method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206278696U (en) * 2016-12-22 2017-06-27 河北雪龙机械制造有限公司 Gripping-type stacking machine
CN109849162A (en) * 2019-04-10 2019-06-07 赵德云 A kind of multilayer platform mold preparing concrete prefabricated board and its process
WO2019174460A1 (en) * 2018-03-14 2019-09-19 刁宏伟 Combination mould for piled precast concrete composite floor boards, and usage method therefor
CN110253725A (en) * 2019-07-15 2019-09-20 赵德云 A flexible formwork system for three-dimensional production of laminated floor slabs with holes
CN212445702U (en) * 2020-05-27 2021-02-02 赵红玲 Series connection mould table device for three-dimensional production of precast concrete slab

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206278696U (en) * 2016-12-22 2017-06-27 河北雪龙机械制造有限公司 Gripping-type stacking machine
WO2019174460A1 (en) * 2018-03-14 2019-09-19 刁宏伟 Combination mould for piled precast concrete composite floor boards, and usage method therefor
CN109849162A (en) * 2019-04-10 2019-06-07 赵德云 A kind of multilayer platform mold preparing concrete prefabricated board and its process
CN110253725A (en) * 2019-07-15 2019-09-20 赵德云 A flexible formwork system for three-dimensional production of laminated floor slabs with holes
CN212445702U (en) * 2020-05-27 2021-02-02 赵红玲 Series connection mould table device for three-dimensional production of precast concrete slab

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121246010A (en) * 2025-10-15 2026-01-02 中交一公局第二工程有限公司 Automatic production line for stacked prefabricated components and working method thereof

Also Published As

Publication number Publication date
CN111590729B (en) 2025-05-30

Similar Documents

Publication Publication Date Title
CN205219397U (en) Ferry -boat formula precast concrete of central authorities component production line
CN110700105B (en) Synchronous construction method and formwork used for high pier pier column and tie beam
CN111409185B (en) An integrated device and production process for mobile production of precast concrete panels
CN206796168U (en) The complete erecting device of prefabricated case beam reinforcing bar is used in construction
CN108381746B (en) Construction method of prefabricated box girder with sliding pedestal
WO2023082776A1 (en) Box-type prefabricated member system and operating method
CN205112063U (en) Integral hydraulic pressure exterior sheathing of precast box girder
CN110847050A (en) Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof
CN108071124B (en) Construction method of prefabricated assembly type subway station prefabricated part
CN114856086A (en) Reinforced concrete double-limb bent frame column for heavy factory building and construction method thereof
CN108729666B (en) A combined load-bearing device for high-rise building or bridge tower construction
CN216640216U (en) Sliding die mechanism for cast-in-place simply supported beam construction
CN212445702U (en) Series connection mould table device for three-dimensional production of precast concrete slab
WO2017054723A1 (en) Concave building template set construction method
CN111590729B (en) A series of mold platform device and production process for three-dimensional production of precast concrete panels
CN109849162A (en) A kind of multilayer platform mold preparing concrete prefabricated board and its process
CN115306435A (en) Hydropower station air cushion type surge chamber construction comprehensive operation trolley and use method thereof
CN110253725A (en) A flexible formwork system for three-dimensional production of laminated floor slabs with holes
CN209868946U (en) Multilayer platform mould for preparing concrete precast slab
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
CN216075182U (en) Side slope concrete slab supporting slip form
CN109877940A (en) The production of prefabricated board, lifting and secondary pour integrated apparatus and construction method
CN215471896U (en) Prefabricated case roof beam die block length adjustment device
CN212421717U (en) Movable integrated device for producing precast concrete plates
CN210551992U (en) Flexible mould platform system for three-dimensional production of laminated floor slabs with holes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20250507

Address after: 054299 Wuguo Village South, Wuguodian Township, Neiqiu County, Xingtai City, Hebei Province

Applicant after: Neiqiu County Keji New Building Materials Co.,Ltd.

Country or region after: China

Address before: 110005 4-5-1, 266-4, Nanwu Road, Heping District, Shenyang City, Liaoning Province

Applicant before: Zhao Hongling

Country or region before: China

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant