CN111519914A - Curtain wall installation guide rail device fixed on roof truss beam and construction method - Google Patents

Curtain wall installation guide rail device fixed on roof truss beam and construction method Download PDF

Info

Publication number
CN111519914A
CN111519914A CN202010436693.4A CN202010436693A CN111519914A CN 111519914 A CN111519914 A CN 111519914A CN 202010436693 A CN202010436693 A CN 202010436693A CN 111519914 A CN111519914 A CN 111519914A
Authority
CN
China
Prior art keywords
steel
guide rail
horizontal
roof
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010436693.4A
Other languages
Chinese (zh)
Inventor
王敬
王四久
张卫平
李博
夏天
沈国军
李利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau South China Co Ltd
Original Assignee
China Construction Eighth Bureau South China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau South China Co Ltd filed Critical China Construction Eighth Bureau South China Co Ltd
Priority to CN202010436693.4A priority Critical patent/CN111519914A/en
Publication of CN111519914A publication Critical patent/CN111519914A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a curtain installation guide rail device who is fixed in roofing flower frame roof beam, includes at least a set of guide rail system, and every group guide rail system includes: the guide rail installation mechanism comprises two horizontal cantilever supports arranged above the roof truss beam and at least one guide rail channel steel, wherein the guide rail channel steel is arranged below the horizontal cantilever supports and is fixed with each other, and the two horizontal cantilever supports are fixedly connected through a steel square tube; each horizontal cantilever support is correspondingly provided with one fixing mechanism, each fixing mechanism comprises a steel stand column and an embedded steel plate fixed on the top surface of the roof flower stand beam, the steel stand column is arranged on the top of the roof flower stand beam, one end of each steel stand column is fixedly connected with the embedded steel plate, and the other end of each steel stand column is connected with the corresponding horizontal cantilever support; the horizontal traveling device is arranged in the guide rail channel steel and can move along the guide rail channel steel. The invention has the advantages of safe installation, improvement of the whole installation efficiency, convenient installation and space saving.

Description

Curtain wall installation guide rail device fixed on roof truss beam and construction method
Technical Field
The invention relates to the technical field of buildings, in particular to a curtain wall installation guide rail device fixed on a roof truss beam and a construction method.
Background
In some projects, roof covering upper portion often can design some flower frame roof beams and increase the whole effect of building, and conventional curtain installation adopts the roof covering to set up hoisting device, is difficult to satisfy roofing structure top curtain installation, often assists the installation with the tower crane to the life cycle of tower crane has been prolonged, and is difficult to guarantee the safety in the installation.
Disclosure of Invention
The invention aims to provide a curtain wall mounting guide rail device which can fully cover the range of a vertical mounting face of a curtain wall plate and is fixed on a roof truss beam, and the integral mounting efficiency is improved.
The invention is realized by adopting the following technical scheme:
the utility model provides a curtain installation guide rail device who is fixed in roofing flower frame roof beam, includes at least a set of guide rail system, and every group guide rail system includes:
the guide rail mounting mechanism comprises two horizontal cantilever supports arranged above the roof flower shelf beam and at least one guide rail channel steel, the guide rail channel steel is arranged below the horizontal cantilever supports and fixed with each other, and the two horizontal cantilever supports are fixedly connected through a steel square tube;
each horizontal cantilever support is correspondingly provided with one fixing mechanism, each fixing mechanism comprises a steel stand column and an embedded steel plate fixed on the top surface of the roof flower shelf beam, the steel stand column is arranged at the top of the roof flower shelf beam, one end of each steel stand column is fixedly connected with the embedded steel plate, and the other end of each steel stand column is connected with the corresponding horizontal cantilever support;
and the horizontal traveling device is arranged in the guide rail channel steel and can move along the guide rail channel steel.
Further, fixed establishment still includes the steel bracing, steel bracing one end with horizontal cantilever supports and is connected, the other end with the steel stand is connected.
Further, fixed establishment still includes supplementary fixing device, supplementary fixing device is including arranging in the steel member of hanging of horizontal cantilever support bottom, the hangers board that is fixed in the roofing structural layer, hang the steel member with the hangers board passes through wire rope and connects.
Further, the bottom that the horizontal cantilever supported is equipped with the steel sheet, and every guide rail channel-section steel corresponds and is equipped with one the steel sheet, and the guide rail channel-section steel with the steel sheet is articulated.
Further, one side that horizontal cantilever support was provided with the steel bracing is equipped with the guide rail channel-section steel, the opposite side is equipped with hang the steel member.
Preferably, the number of the guide rail channel steels is two, the guide rail channel steel on the inner side is used for hoisting the curtain wall plate, and the guide rail channel steel on the outer side is used for assisting the installation of the curtain wall plate by the operating platform.
A construction method of a curtain wall installation guide rail device fixed on a roof truss beam comprises the following steps:
s1, embedding a steel plate on the top surface of the roof flower rack beam to serve as a support of the curtain wall mounting guide rail;
s2, sequentially mounting a support steel upright post, a cantilever horizontal support channel steel, a steel inclined strut and an auxiliary fixing device;
s3, installing a horizontal steel square tube, and connecting adjacent horizontal cantilever supports into a whole to improve the stability and the stress effect;
s4, sequentially welding two steel plates on the outer side of the horizontal cantilever support;
and S5, installing a guide rail channel steel and a horizontal walking device, wherein the guide rail channel steel is hinged with the upper steel plate.
The invention has the following advantages:
1. the auxiliary installation of the tower crane is not needed, so that the service cycle of the tower crane is prolonged, and the safety in the installation process is ensured.
2. The vertical face range of the curtain wall plate installation can be fully covered, and the overall installation efficiency is improved.
3. The installation is convenient, the space is saved, the coverage is wide, the construction is flexible and efficient, and the input cost is low.
4. The curtain wall is suitable for high-rise buildings with curtain walls on the outer vertical surfaces.
Description of the drawings:
FIG. 1 is a top view of the curtain wall mounting rail assembly of the present invention secured to a roof truss beam;
FIG. 2 is a side view of the curtain wall mounting rail assembly of the present invention secured to a roof truss beam.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1-2, a curtain installation guide rail device who is fixed in roofing flower frame roof beam includes at least two sets of guide rail system, and every group guide rail system includes:
the guide rail installation mechanism comprises two horizontal cantilever supports 11 arranged above a roof truss beam 10 and two guide rail channel steel 12, wherein the guide rail channel steel 12 is arranged below the horizontal cantilever supports 11 and is fixed with each other, the two horizontal cantilever supports 11 are fixedly connected through a steel square tube 13, and the adjacent horizontal cantilever supports 11 in each section are connected into a whole through the steel square tube 13, so that the overall stability and the stress effect are improved;
each horizontal cantilever support is correspondingly provided with a fixing mechanism, each fixing mechanism comprises a steel upright post 21 and an embedded steel plate 22 fixed on the top surface of the roof flower frame beam 10, the steel upright post 21 is arranged on the top of the roof flower frame beam 10, one end of each steel upright post 21 is fixedly connected with the embedded steel plate 22, and the other end of each steel upright post 21 is connected with the corresponding horizontal cantilever support 11; fixing mechanism still includes steel bracing 23, and 23 one end of steel bracing is connected with horizontal cantilever support 11, and the other end is connected with steel stand 21 increase steel bracing 23 on the steel stand 21, wherein, one side that horizontal cantilever support 11 was provided with steel bracing 23 is equipped with two guide rail channel-section steels 12, and inboard guide rail channel-section steel is used for hoist and mount curtain plate, and outside track channel-section steel sets up the supplementary curtain plate installation of operation platform and can improve curtain plate installation effectiveness like this.
Every section of vertical adoption single bracing of fixed establishment, steel stand 21 is as main supporting mechanism promptly, and can set up according to actual conditions is nimble, can practice thrift the space like this, promotes the bulk rigidity through setting up steel bracing 23, increases stability. In order to improve the rigidity of the mechanism, a steel plate 111 is arranged at the bottom of the horizontal cantilever support 11, the steel plate 111 is welded with the horizontal cantilever support 11, one steel plate 111 is correspondingly arranged on each guide rail channel steel 12, and the guide rail channel steel 12 is hinged to the steel plate 111.
In addition, the fixing mechanism further comprises an auxiliary fixing device, the auxiliary fixing device comprises a hanging steel member 24 and a hanging lug plate 25, the hanging steel member 24 is arranged at the bottom of the horizontal cantilever support 11 and is fixed on the roof structure layer 4, the hanging steel member 24 is connected with the hanging lug plate 25 through a steel wire rope 26, and the hanging steel member 24 is arranged on the other side of the horizontal cantilever support 11.
The horizontal traveling device 3 is arranged in the guide rail channel steel 12 and can move along the guide rail channel steel 12, and the horizontal traveling device can move in the whole vertical face in the guide rail channel steel 12 and can meet the requirements of material lifting and installation.
A construction method of a curtain wall installation guide rail device fixed on a roof truss beam comprises the following steps:
s1, embedding a steel plate on the top surface of the roof flower rack beam to serve as a support of the curtain wall mounting guide rail;
s2, sequentially mounting a support steel upright post, a cantilever horizontal support channel steel, a steel inclined strut and an auxiliary fixing device;
s3, installing a horizontal steel square tube, and connecting adjacent horizontal cantilever supports into a whole;
s4, sequentially welding two steel plates on the outer side of the horizontal cantilever support;
and S5, installing a guide rail channel steel and a horizontal walking device, wherein the guide rail channel steel is hinged with the upper steel plate.
The construction method is simple, only a steel plate needs to be embedded in the top surface of the roof flower stand beam to serve as a support of the curtain wall installation guide rail, the support steel upright post, the cantilever horizontal support channel steel, the steel inclined strut and the horizontal steel square tube are sequentially installed, all sections of supports are connected into a stable whole, the rigidity and the stress effect of the supports are improved, the unloading steel wire rope is installed on the inner side of the horizontal cantilever support, and the bottom of the horizontal cantilever support is fixed on the roof structural layer. Cantilever horizontal stay outside end welded fastening twice steel sheet, installation guide rail and horizontal running gear, inboard guide rail are used for hoist and mount curtain plate, and the outside guide rail is used for installing the installation of operation platform auxiliary curtain plate, improves curtain plate installation effectiveness.
While the invention has been described in detail and with reference to the drawings and examples, it will be apparent to one skilled in the art that various changes can be made therein. Therefore, certain details of the embodiments should not be construed as limitations of the present invention, as modifications of the materials of construction, specifications of materials, specific dimensions, manner of connection, etc. are considered to be within the scope of the claims. The scope of the invention is to be considered as the scope of the invention as defined by the appended claims.

Claims (7)

1. The utility model provides a be fixed in curtain installation guide rail device of roofing flower frame roof beam, its characterized in that includes at least a set of guide rail system, and every guide rail system of group includes:
the guide rail mounting mechanism comprises two horizontal cantilever supports arranged above the roof flower shelf beam and at least one guide rail channel steel, the guide rail channel steel is arranged below the horizontal cantilever supports and fixed with each other, and the two horizontal cantilever supports are fixedly connected through a steel square tube;
each horizontal cantilever support is correspondingly provided with one fixing mechanism, each fixing mechanism comprises a steel stand column and an embedded steel plate fixed on the top surface of the roof flower shelf beam, the steel stand column is arranged at the top of the roof flower shelf beam, one end of each steel stand column is fixedly connected with the embedded steel plate, and the other end of each steel stand column is connected with the corresponding horizontal cantilever support;
and the horizontal traveling device is arranged in the guide rail channel steel and can move along the guide rail channel steel.
2. The curtain wall mounting track assembly secured to a roof truss beam of claim 1 wherein the securing mechanism further includes a steel diagonal brace, one end of the steel diagonal brace being connected to the horizontal cantilever support and the other end being connected to the steel upright.
3. The curtain wall mounting rail assembly fixed to the roof truss beam as claimed in claim 2, wherein the fixing mechanism further comprises an auxiliary fixing device, the auxiliary fixing device comprises a hanging steel member disposed at the bottom of the horizontal cantilever support and a hanging lug plate fixed to the roof structure layer, and the hanging steel member and the hanging lug plate are connected through a steel wire rope.
4. The curtain wall mounting rail assembly secured to the roof truss beam of claim 3 wherein the bottom of the horizontal cantilevered support is provided with a steel plate, one of the steel plates is provided for each rail channel, and the rail channels are hinged to the steel plates.
5. The curtain wall mounting rail assembly secured to the roof truss beam of claim 4 wherein the horizontal cantilevered support is provided with the rail channel on one side and the hanger steel member on the other side with the steel diagonal brace.
6. The curtain wall mounting rail assembly fastened to the roof truss beam of claim 1 wherein there are two rail channel sections, the inner rail channel section being used to hoist curtain wall panels and the outer rail channel section being used to assist in mounting the curtain wall panels on the operating platform.
7. A method of constructing a curtain wall mounting rail assembly of claim 6 secured to a roof truss beam, comprising the steps of:
s1, embedding a steel plate on the top surface of the roof flower rack beam to serve as a support of the curtain wall mounting guide rail;
s2, sequentially mounting a support steel upright post, a cantilever horizontal support channel steel, a steel inclined strut and an auxiliary fixing device;
s3, installing a horizontal steel square tube, and connecting adjacent horizontal cantilever supports into a whole to improve the stability and the stress effect;
s4, sequentially welding two steel plates on the outer side of the horizontal cantilever support;
and S5, installing a guide rail channel steel and a horizontal walking device, wherein the guide rail channel steel is hinged with the upper steel plate.
CN202010436693.4A 2020-05-21 2020-05-21 Curtain wall installation guide rail device fixed on roof truss beam and construction method Pending CN111519914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010436693.4A CN111519914A (en) 2020-05-21 2020-05-21 Curtain wall installation guide rail device fixed on roof truss beam and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010436693.4A CN111519914A (en) 2020-05-21 2020-05-21 Curtain wall installation guide rail device fixed on roof truss beam and construction method

Publications (1)

Publication Number Publication Date
CN111519914A true CN111519914A (en) 2020-08-11

Family

ID=71906146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010436693.4A Pending CN111519914A (en) 2020-05-21 2020-05-21 Curtain wall installation guide rail device fixed on roof truss beam and construction method

Country Status (1)

Country Link
CN (1) CN111519914A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0940371A (en) * 1995-08-04 1997-02-10 Santoku:Kk Lifting-in method and device of outer wall members of building
CN102912991A (en) * 2012-10-31 2013-02-06 中建三局第二建设工程有限责任公司 Track hosting device and track hoisting method of large curtain wall unit plate
CN205908031U (en) * 2016-08-03 2017-01-25 浙江南方装饰工程有限公司 A rail mounted lifting device for high -rise building curtain wall construction
CN207582986U (en) * 2017-12-06 2018-07-06 中建一局集团第一建筑有限公司 Go out roofing combination formula glass curtain wall hoist and mount construction system
CN110562868A (en) * 2019-08-26 2019-12-13 常州第一建筑集团有限公司 Hoisting construction method for unit type glass curtain wall of super high-rise building
CN210316599U (en) * 2019-06-10 2020-04-14 深圳市中邦(集团)建设总承包有限公司 A curtain ring rail for roofing truss beam position
CN212336763U (en) * 2020-05-21 2021-01-12 中建八局华南建设有限公司 Curtain wall installation guide rail device fixed on roof flower frame beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0940371A (en) * 1995-08-04 1997-02-10 Santoku:Kk Lifting-in method and device of outer wall members of building
CN102912991A (en) * 2012-10-31 2013-02-06 中建三局第二建设工程有限责任公司 Track hosting device and track hoisting method of large curtain wall unit plate
CN205908031U (en) * 2016-08-03 2017-01-25 浙江南方装饰工程有限公司 A rail mounted lifting device for high -rise building curtain wall construction
CN207582986U (en) * 2017-12-06 2018-07-06 中建一局集团第一建筑有限公司 Go out roofing combination formula glass curtain wall hoist and mount construction system
CN210316599U (en) * 2019-06-10 2020-04-14 深圳市中邦(集团)建设总承包有限公司 A curtain ring rail for roofing truss beam position
CN110562868A (en) * 2019-08-26 2019-12-13 常州第一建筑集团有限公司 Hoisting construction method for unit type glass curtain wall of super high-rise building
CN212336763U (en) * 2020-05-21 2021-01-12 中建八局华南建设有限公司 Curtain wall installation guide rail device fixed on roof flower frame beam

Similar Documents

Publication Publication Date Title
CN215803108U (en) Attached beam type hanging basket
CN113152664A (en) Steel structural framework and modularized additional elevator
CN109296192B (en) Lifting frame for assembled building
CN212336763U (en) Curtain wall installation guide rail device fixed on roof flower frame beam
CN115852843A (en) Construction method of cable crane main tower cable saddle of long-span railway suspension bridge
CN105625645A (en) Construction method of suspension type steel-structured lighting skylight
CN210635627U (en) Large-scale lifting machine for outer wall decoration
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN111519914A (en) Curtain wall installation guide rail device fixed on roof truss beam and construction method
CN217051458U (en) Lifting system for corridor multi-layer steel structure truss
CN215253414U (en) Steel structural framework and modularized additional elevator
CN214302804U (en) Double-layer hanging basket of riding horse type
CN215671292U (en) Prefabricated wallboard supporting system
CN214462401U (en) Double-layer protection frame with novel structure
CN212403409U (en) Lifting platform frame based on suspended dome roof system
CN211257773U (en) Door type integral lifting steel platform
CN217326383U (en) Parapet hanging basket structure
CN218668451U (en) Hanging basket for high-altitude auxiliary installation of aluminum plate
CN201485204U (en) Gas tank hanging device
CN217102809U (en) Portal frame assembly for silo wall lifting support system
CN218623252U (en) Hanging basket installation fixing system at framework
CN218088703U (en) Steel bar truss building carrier plate installation device
CN2263161Y (en) Self-lifting scaffold
CN219080936U (en) Lifting adjustable all-steel climbing frame
CN220336399U (en) Profile steel construction platform for high-altitude overhanging

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination