CN111485912B - Gangue filling and cementing roadway retaining system and method - Google Patents

Gangue filling and cementing roadway retaining system and method Download PDF

Info

Publication number
CN111485912B
CN111485912B CN202010241754.1A CN202010241754A CN111485912B CN 111485912 B CN111485912 B CN 111485912B CN 202010241754 A CN202010241754 A CN 202010241754A CN 111485912 B CN111485912 B CN 111485912B
Authority
CN
China
Prior art keywords
filling
support
gangue
roadway
pier stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010241754.1A
Other languages
Chinese (zh)
Other versions
CN111485912A (en
Inventor
卞卡
柏夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Boxia Mining Technology Co ltd
YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD
Original Assignee
Jiangsu Boxia Mining Technology Co ltd
YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Boxia Mining Technology Co ltd, YANGZHOU ZHONGKUANG BUILDING NEW MATERIAL TECHNOLOGY CO LTD filed Critical Jiangsu Boxia Mining Technology Co ltd
Priority to CN202010241754.1A priority Critical patent/CN111485912B/en
Publication of CN111485912A publication Critical patent/CN111485912A/en
Application granted granted Critical
Publication of CN111485912B publication Critical patent/CN111485912B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Abstract

The invention provides a gangue filling cementing roadway keeping system which comprises a plurality of hydraulic supports, a gangue blocking support, a filling support device, a pier column mold, a gangue throwing device and a grouting pump station, wherein the plurality of hydraulic supports are arranged on the gangue blocking support; a preset distance is kept between a tail beam of the hydraulic support at the end of the working face and the constructed pier column; the waste rock blocking bracket is positioned in the entry retaining operation area; the filling support device comprises a filling support and a filling box body; a closed roadside supporting space is formed between the filling box body and the constructed pier stud; the pier stud mold is positioned in the roadside support space; the grouting pump station is communicated with a grouting pipe; when the pier stud mold is poured, the grouting pipe penetrates through the second grouting hole and extends into the first grouting hole; when the roadside support space is poured, the grouting pipe extends into the second grouting hole; the grouting pipe is positioned in the gob-side roadway. The invention realizes that the cementing roadway is filled following the working face, and the gangue can be digested in situ in the pit, no other materials are needed to be added, and the roadway retaining cost is low. The invention also provides a gangue filling cementing roadway retaining method.

Description

Gangue filling and cementing roadway retaining system and method
Technical Field
The invention belongs to the technical field of coal mine roadway support, and particularly relates to a gangue filling cementing roadway retaining system and a gangue filling cementing roadway retaining method.
Background
In recent years, the coal pillar-free mining process is widely applied to coal mine production activities, and the roadside filling gob-side entry retaining is a great development direction of coal pillar-free mining. The gob-side entry retaining means that a mining roadway behind a mined working face is retained along a mining edge by a certain method to be used as a mining roadway of a next working face.
In the prior art, the roadside filling is divided into high-water material roadside filling and concrete roadside filling, the roadside filling and the concrete roadside filling have the same characteristics, a roadside filling body needs to be constructed, certain material investment needs to be increased, and for mines with complex geological conditions, poor coal quality and poor mine benefits, the difficulty of application of the roadside filling technology in the mines is greatly increased due to the fact that the material investment is small. In addition, because can produce a large amount of waste rocks during the excavation of rock roadway in the pit, current environmental protection policy is more and more strict, and ground no waste rock is piled up the place, for realizing that the waste rock can not go out the well and digest in situ in the pit, need to carry out waste utilization to the waste rock promptly. Therefore, the invention provides a gob-side entry retaining method which can fully utilize mine waste rock and has lower cost, and the method becomes the problem to be solved by engineering technicians in the field.
Disclosure of Invention
The invention aims to provide a system and a method for filling a cemented roadway with gangue, which realize that the cemented roadway is filled following a working face, the gangue can be digested in situ underground, other materials are not required to be added, and the roadway keeping cost is low. In order to achieve the purpose, the invention adopts the following technical scheme:
the invention provides a gangue filling cementing roadway keeping system, which comprises:
the hydraulic supports are used for maintaining a working face top plate and erected on the working face; a preset distance is kept between the tail beam of the hydraulic support at the end of the working face and the constructed pier column;
the waste rock blocking support is used for maintaining a side roof of the mining area and is positioned in the entry retaining operation area;
the filling support device is used for supporting a top plate of a roadway retaining operation area and pouring a waste rock wall body; the filling support device comprises a filling support and a filling box body; the filling box body is positioned behind the filling bracket; the filling support is positioned between the waste rock blocking support and the gob-side roadway; one end of the filling box body is open; a second grouting hole is formed in the filling box body; the open end of the filling box body is surrounded on the outer side of the constructed pier stud; a closed roadside supporting space is formed between the filling box body and the constructed pier stud;
the pier column die is used for forming a pier column and is positioned in the roadside supporting space; the pier stud mold is positioned at one end of the filling box body and is arranged opposite to the constructed pier stud; a first grouting hole is formed in the pier stud mold;
the gangue throwing device is used for transporting gangue and filling the gangue between the pier stud and the constructed pier stud, and the gangue throwing device is positioned in the gob-side roadway;
the grouting pump station is communicated with a grouting pipe; when the pier stud mold is poured, the grouting pipe penetrates through the second grouting hole and extends into the first grouting hole; when the roadside support space is poured, the grouting pipe extends into the second grouting hole; the grouting pipe is located in the gob-side roadway.
Preferably, the device further comprises a single hydraulic column; the single hydraulic column is arranged in the gob-side roadway; the single hydraulic prop is positioned at one side of the constructed pier stud.
Preferably, a first metal net is laid on a top plate of the hydraulic support at the end of the working face; the first metal net is connected with the metal net on the working face top plate.
Preferably, the gangue dumping device comprises a gangue dumping machine and a conveyor belt conveyor; the output end of the conveyor belt conveyor is connected with the input end of the gangue throwing machine.
The invention also provides a gangue filling cementing roadway keeping method based on the gangue filling cementing roadway keeping system, which comprises the following steps of:
(1) erecting the hydraulic support and the waste rock blocking support: erecting the hydraulic support at a working face at a preset distance to maintain a working face top plate; erecting the waste rock blocking support in a roadway retaining operation area to maintain a side roof of the goaf;
(2) erecting the filling and supporting device: erecting the filling support device between the waste rock blocking support and the gob-side roadway; the filling support device is positioned in a roadway retaining operation area, and the filling support is positioned between the waste rock blocking support and the gob-side roadway; a roadside supporting space is formed between the filling box body and the constructed pier stud;
(3) pouring a pier stud: placing the pier stud mold into the roadside support space, pouring a high-water filling material into the pier stud mold through the grouting pump station and the grouting pipe, and forming a pier stud after the pier stud mold is filled;
(4) and (3) casting a gangue wall: through annotate throw the cash machine to the pier stud with build between the pier stud and fill waste rock, later pass through slip casting pump station and slip casting pipe to the pier stud with build between the pier stud and pour high water filling material in order to form the waste rock wall body, form at last and use adjacent 2 pier studs as the skeleton, use the waste rock wall body as the roadside supporter of auxiliary protection.
Preferably, the preset distance is 3.6-4 m.
Preferably, the distance between the center of the pier and the center of the constructed pier is 3 m.
Compared with the prior art, the invention has the advantages that: the method comprises the following steps of following a working face, erecting a hydraulic support, a waste rock blocking support and a filling support device at a preset distance, then pouring a pier stud mold to form a pier stud, then filling waste rock between the pier stud and a constructed pier stud, and finally pouring a filling box body to form the roadside support body. Therefore, the invention realizes that the cementing roadway is filled following the working face, the gangue can be digested in situ in the pit, other materials are not required to be added, and the roadway retaining cost is low.
Drawings
Fig. 1 is a structural diagram of a gangue-filled cemented lane keeping system according to an embodiment of the present invention;
FIG. 2 is a block diagram of the pier mold of FIG. 1;
fig. 3 is a flowchart of a gangue-filling cementing roadway-retaining method according to an embodiment of the present invention.
The method comprises the following steps of 1-waste rock blocking support, 2-filling support, 3-constructed pier stud, 4-conveyor belt, 5-waste rock throwing machine, 6-waste rock, 7-grouting pump station, 8-grouting pipe, 9-single hydraulic prop, 10-hinged top beam, 11-pier stud mold, 12-first grouting hole, 13-filling box body, 14-overflow hole, 15-hydraulic support and 16-goaf.
Detailed Description
The present invention will now be described in more detail with reference to the accompanying schematic drawings, in which preferred embodiments of the invention are shown, it being understood that one skilled in the art may modify the invention herein described while still achieving the advantageous effects of the invention. Accordingly, the following description should be construed as broadly as possible to those skilled in the art and not as limiting the invention.
As shown in fig. 1, a gangue-filled cemented roadway-retaining system includes: the device comprises a plurality of hydraulic supports 15, a waste rock blocking support 1, a filling support device, a pier stud mold 11, a grouting pump station 7 and a waste rock throwing device. The specific arrangement is as follows:
the hydraulic support 15 is used for maintaining a working face top plate and is erected at a working face; a preset distance is kept between the tail beam of the hydraulic support 15 at the end of the working face and the constructed pier stud 3; that is, the filling arrangement of the next roadside support body is prepared when the preset distance between the working face and the constructed pier stud 3 is reached along with the advance of the working face.
The waste rock blocking support 1 is used for maintaining a side roof of a goaf and is positioned in a roadway retaining operation area, namely a goaf 16.
The filling support device is used for supporting a top plate of a roadway-retaining operation area and pouring a waste rock wall body. Specifically, the filling support device comprises a filling bracket 2 and a filling box body 13; the filling box body 13 is positioned at the rear of the filling bracket 2; a telescopic element is arranged between the filling box 13 and the filling support 2, so that the filling support 2 is pushed along with the working surface, while the filling box 13 is kept still. In the present embodiment, the advancing direction of the working surface is the forward direction.
The filling support 2 is used for supporting a top plate of a roadway retaining operation area and is arranged between the waste rock blocking support 1 and a gob-side roadway; the filling support 2 is arranged close to the hydraulic support 15.
The filling box body 13 is arranged far away from the hydraulic support 15, and a second grouting hole is reserved in the filling box body 13 and used for pouring a waste rock wall body; one end of the filling box body 13 is opened; the open end of the filling box body 13 is surrounded on the outer side of the constructed pier stud 3; and a closed roadside supporting space is formed between the filling box body 13 and the constructed pier stud 3. In the present embodiment, the length of the filling case 13 is not less than 4.0 m. Further, the steel plate of the filling box 13 on the roadway side can be lifted and horizontally moved. In addition, when the condition of the top plate of the entry retaining operation area is poor, an anchor rod can be arranged for maintenance.
The pier stud mold 11 is used for forming a pier stud and is placed in the roadside supporting space; the pier stud mould 11 is positioned at one end of the filling box body 13 and is arranged opposite to the constructed pier stud 3; the pier stud mold 11 is provided with a first grouting hole 12. The pier stud mould 11 is structurally shown in figure 2: the pier column mould 11 can be made of seamless steel tubes, FRP, PVC and other materials which can ensure the forming of pier columns; the pier stud mould 11 is provided with a first grouting hole 12 and an overflow hole 14, and valves are arranged at the first grouting hole 12 and the overflow hole 14. In other embodiments other than this embodiment, the pier stud may be prefabricated.
And the gangue dumping device is used for transporting gangue 6 and filling the gangue 6 between the pier stud and the constructed pier stud 3, and the gangue dumping device is positioned in the gob-side roadway.
The grouting pump station 7 is communicated with a grouting pipe 8; when the pier stud mold 11 is poured, the grouting pipe 8 penetrates through the second grouting hole and extends into the first grouting hole 12; when the roadside support space is poured, the grouting pipe 8 extends into the second grouting hole; namely, when the pier stud mold 11 is poured, the grouting pump station 7 fills the high-water filling material into the first grouting hole 12; when a gangue wall is poured, the grouting pipe 8 is drawn out of the first grouting hole 12, the grouting pump station 7 fills high-water filling materials into the second grouting hole, and the high-water filling materials enter the roadside support space to cement gangue 6.
In the embodiment, the device further comprises a single hydraulic column; the single hydraulic column is arranged in the gob-side roadway; the hydraulic prop 9 is located on one side of the constructed pier stud 3. The method is characterized in that a retained roadway part formed by a plurality of roadside support bodies adopts single hydraulic props 9 matched with hinged top beams 10 to form reinforced supports, 2 adjacent rows of the reinforced supports are arranged in parallel, the row distance is 1200 mm multiplied by 1000mm, the length of each reinforced support is 80-120 m, and after the distance is exceeded, the reinforced supports are gradually retracted to the inner section (rear) along with the advance of a working face. Specifically, the hinged top beam 10 is arranged along the trend of the roadway, and the single hydraulic prop 9 is supported on the hinged top beam 10 to form a reinforced supporting whole.
In the embodiment, a first metal net is laid on the top plate of the hydraulic support 15 (first hydraulic support 15) at the end of the working face; the first metal net is connected with the metal net on the working face top plate. The metal net is also arranged on other 2-4 hydraulic supports 15 close to the first hydraulic support 15, so that the connection with the metal net on the working face top plate is realized.
In the embodiment, the gangue dumping device comprises a gangue dumping machine 5 and a conveyor belt conveyor 4; the output end of the conveyor belt conveyor 4 is connected with the input end of the gangue throwing machine 5. Namely, the belt conveyer 4 transports the gangue 6 to the gangue throwing machine 5. In the present embodiment, the gangue throwing machine 5 and the conveying conveyor are both in the prior art, and are not described in detail herein.
The invention also provides a gangue 6 filling cementation roadway retaining method which is suitable for the gateway gob-side roadway retaining of the track of the fully mechanized mining face, and based on the gangue filling cementation roadway retaining system, as shown in fig. 3, the gangue 6 filling cementation roadway retaining method comprises the following steps of (1) to (4):
(1) erecting a hydraulic support 15 and a waste rock blocking support 1: erecting a hydraulic support 15 at the working face at a preset distance to maintain the working face top plate; erecting a waste rock blocking support 1 in a roadway retaining operation area to maintain a side roof of a goaf; in the embodiment, the preset distance is 3.6 m-4 m, namely, the filling support 2 and the filling box body 13 are arranged to perform the work of filling the cemented roadway.
(2) Erecting a filling support device: a filling support device is erected between the waste rock blocking support 1 and the gob-side roadway; the filling support device is positioned in the entry retaining operation area, and the filling support 2 is positioned between the waste rock blocking support 1 and the gob-side entry; a roadside support space is formed between the filling box body 13 and the constructed pier stud 3.
(3) Pouring a pier stud: placing a pier column mold 11 into a roadside supporting space, pouring a high-water filling material into the pier column mold 11 through a grouting pump station 7 and a grouting pipe 8, and forming a pier column after the pier column mold 11 is filled; preferably, the distance between the center of the pier and the center of the constructed pier 3 is 3 m. Specifically, the high-water-content quick-setting mortar material is prepared into slurry at a grouting pump station 7 according to a ratio of water to cement of 1: 1-1.5: 1, then a double-liquid grouting pump is started for pumping, the slurry is conveyed through a grouting pipe 8, the mixed slurry (high-water-content filling material) is poured into the pier column mold 11 through a first grouting hole 12 of the pier column mold 11, pouring is stopped after the slurry flows out from an overflow hole 14, and valves at the overflow hole 14 and the first grouting hole 12 are closed, so that pouring of the pier column is finished. The pier stud has high initial supporting force and large supporting resistance, the working face can normally recover and move the frame, and the pier stud and the frame can work in parallel without mutual influence.
(4) And (3) casting a gangue wall: and (3) filling waste rock 6 between the pier stud and the constructed pier stud by using a waste rock filling and throwing machine 5 (a small waste rock throwing machine), and pouring the high-water filling material between the pier stud and the constructed pier stud 3 by using a grouting pump station 7 and a grouting pipe 8 in the same step (3) to form a waste rock wall. Specifically, a double-liquid grouting pump is started for pumping, the grout is conveyed through a grouting pipe 8, and the mixed grout (high-water filling material) is injected between the pier column in the step (3) and the constructed pier column 3 through a second grouting hole in a filling box body 13. Therefore, the roadside support body taking 2 adjacent pier studs as a framework and a gangue wall body as auxiliary protection is formed.
The above description is only a preferred embodiment of the present invention, and does not limit the present invention in any way. It will be understood by those skilled in the art that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (5)

1. A gangue-filling cementing roadway-retaining system is characterized by comprising:
the hydraulic supports are used for maintaining a working face top plate and erected on the working face; a preset distance is kept between the tail beam of the hydraulic support at the end of the working face and the constructed pier column;
the waste rock blocking support is used for maintaining a side roof of the mining area and is positioned in the entry retaining operation area;
the filling support device is used for supporting a top plate of a roadway retaining operation area and pouring a waste rock wall body; the filling support device comprises a filling support and a filling box body; the filling box body is positioned behind the filling bracket; a telescopic part is arranged between the filling box body and the filling bracket; the filling support is positioned between the waste rock blocking support and the gob-side roadway; one end of the filling box body is open; a second grouting hole is formed in the filling box body; the open end of the filling box body is surrounded on the outer side of the constructed pier stud; the constructed pier column is positioned inside the filling box body; before pouring the pier stud mold, a closed roadside supporting space is formed between the filling box body and the constructed pier stud;
the pier column die is used for forming a pier column and is positioned in the roadside supporting space; the pier stud mold is positioned at one end of the filling box body and is arranged opposite to the constructed pier stud; the constructed pier stud is positioned at the other end of the filling box body; a first grouting hole is formed in the pier stud mold;
the gangue throwing device is used for transporting gangue and filling the gangue between the pier stud and the constructed pier stud, and the gangue throwing device is positioned in the gob-side roadway;
the grouting pump station is communicated with a grouting pipe; when the pier stud mold is poured, the grouting pipe penetrates through the second grouting hole and extends into the first grouting hole; when the roadside support space is poured, the grouting pipe extends into the second grouting hole; the grouting pipe is positioned in the gob-side roadway;
a single hydraulic column; the single hydraulic column is arranged in the gob-side roadway; the single hydraulic column is positioned on one side of the constructed pier column; a first metal net is laid on a top plate of the hydraulic support at the end of the working face; the first metal net is connected with the metal net on the working face top plate.
2. The gangue-filling cemented lane keeping system according to claim 1, wherein the gangue dumping device comprises a gangue dumping machine and a conveyor belt conveyor; the output end of the conveyor belt conveyor is connected with the input end of the gangue throwing machine.
3. A gangue-filling cementing roadway-retaining method based on the gangue-filling cementing roadway-retaining system according to any one of claims 1 to 2, which is characterized by comprising the following steps:
(1) erecting the hydraulic support and the waste rock blocking support: erecting the hydraulic support at a working face at a preset distance to maintain a working face top plate; erecting the waste rock blocking support in a roadway retaining operation area to maintain a side roof of the goaf;
(2) erecting the filling and supporting device: erecting the filling support device between the waste rock blocking support and the gob-side roadway; the filling support device is positioned in a roadway retaining operation area, and the filling support is positioned between the waste rock blocking support and the gob-side roadway; a roadside supporting space is formed between the filling box body and the constructed pier stud;
(3) pouring a pier stud: placing the pier stud mold into the roadside support space, pouring a high-water filling material into the pier stud mold through the grouting pump station and the grouting pipe, and forming a pier stud after the pier stud mold is filled;
(4) and (3) casting a gangue wall: and filling waste rock between the pier studs and the constructed pier studs through the waste rock throwing machine, and then pouring high-water filling materials between the pier studs and the constructed pier studs through the grouting pump station and the grouting pipe to form a waste rock wall body, and finally forming a roadside support body which takes the adjacent 2 pier studs as a framework and takes the waste rock wall body as auxiliary protection.
4. The gangue-filling cementing roadway-retaining method according to claim 3, wherein the preset distance is 3.6-4 m.
5. The method for filling a cemented lane according to claim 4, wherein the distance between the center of the pier and the center of the constructed pier is 3 m.
CN202010241754.1A 2020-03-31 2020-03-31 Gangue filling and cementing roadway retaining system and method Active CN111485912B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010241754.1A CN111485912B (en) 2020-03-31 2020-03-31 Gangue filling and cementing roadway retaining system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010241754.1A CN111485912B (en) 2020-03-31 2020-03-31 Gangue filling and cementing roadway retaining system and method

Publications (2)

Publication Number Publication Date
CN111485912A CN111485912A (en) 2020-08-04
CN111485912B true CN111485912B (en) 2022-04-08

Family

ID=71794504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010241754.1A Active CN111485912B (en) 2020-03-31 2020-03-31 Gangue filling and cementing roadway retaining system and method

Country Status (1)

Country Link
CN (1) CN111485912B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796757A (en) * 2021-01-26 2021-05-14 扬州中矿建筑新材料科技有限公司 Method for high-water filling material roadside filling gob-side entry retaining
CN113339052B (en) * 2021-05-24 2022-04-29 中国矿业大学 High-water-material grout stopping wall goaf filling method
CN113958347B (en) * 2021-08-30 2023-09-01 新疆大学 Method for constructing roadside support body by FRP constraint sand-based cementing material column
CN113605970B (en) * 2021-08-30 2022-06-07 中国矿业大学 Overlying strata isolation grouting filling method for coal gangue underground emission reduction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564139A (en) * 2014-12-29 2015-04-29 新汶矿业集团有限责任公司 Dense filling system and filling method
CN104712360A (en) * 2015-01-14 2015-06-17 中国矿业大学 Adjustable high-adaptability formwork support for large mining height fully-mechanized face and gob-side entry retaining method
CN105370304A (en) * 2015-12-07 2016-03-02 平顶山天安煤业股份有限公司 High stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method
CN106907177A (en) * 2017-04-28 2017-06-30 山东科技大学 A kind of girdle gob side entry retaining roadside packing method for protecting support
CN110847912A (en) * 2019-04-16 2020-02-28 天地科技股份有限公司 Stope face support-unloading combined gob-side entry retaining roadway and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564139A (en) * 2014-12-29 2015-04-29 新汶矿业集团有限责任公司 Dense filling system and filling method
CN104712360A (en) * 2015-01-14 2015-06-17 中国矿业大学 Adjustable high-adaptability formwork support for large mining height fully-mechanized face and gob-side entry retaining method
CN105370304A (en) * 2015-12-07 2016-03-02 平顶山天安煤业股份有限公司 High stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method
CN106907177A (en) * 2017-04-28 2017-06-30 山东科技大学 A kind of girdle gob side entry retaining roadside packing method for protecting support
CN110847912A (en) * 2019-04-16 2020-02-28 天地科技股份有限公司 Stope face support-unloading combined gob-side entry retaining roadway and construction method

Also Published As

Publication number Publication date
CN111485912A (en) 2020-08-04

Similar Documents

Publication Publication Date Title
CN111485912B (en) Gangue filling and cementing roadway retaining system and method
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN102425427B (en) Method for constructing tunnel by utilizing shield empty-pushing crossing mine method
CN109209490B (en) Working face withdrawing method for gangue filling auxiliary end mining stage
CN106930777A (en) The construction method of the lining of Bored Section of Metro main track assembled two
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN109630112B (en) N00 mining method of cut top filling
CN103161498B (en) Half-edge coal seam section coal pillar roadside packing method
CN102337925B (en) Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving
CN103850708A (en) Method for performing gob-side entry retaining through concrete filling body
CN109252877A (en) Bilayer two lining in proximity tunnel combines contignation multi-step construction method
CN112627820B (en) Coal pillar-free mining method for 'three lower' coal pressing
CN109209484B (en) Auxiliary working face withdrawing method for withdrawing channel combined with paste prefabricated block
CN114776369A (en) Roadway retaining method for fully-mechanized mining filling working face of gangue solid
CN114776368A (en) System for adopt to fill and stay integration and combine and adopt waste filling working face
CN112343614B (en) U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method
CN112647947B (en) Non-coal-pillar mining method for mining area
CN112112672A (en) Gob-side entry retaining roadside support body construction method based on gangue cement-based material
CN114320365A (en) Rapid construction method of integral prefabricated reinforced concrete lining tunnel
CN217400961U (en) System for adopt to fill and stay integration and combine and adopt waste filling working face
CN111322093A (en) Deep soft rock roadway anchoring-U-shaped steel support-after-frame filling cooperative control method
CN111779534B (en) Top grouting and roof contacting filling method by upward grouting column method
CN212272289U (en) Filling replacement mining equipment for 'three lower' coal pressing area
CN116335665B (en) Mining method for constructing near-horizontal thin ore body under top-protection layer stoping water body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant