CN111469862A - Rapid transfer structure of railway and urban rail transit line 2 and 4 - Google Patents

Rapid transfer structure of railway and urban rail transit line 2 and 4 Download PDF

Info

Publication number
CN111469862A
CN111469862A CN202010386670.7A CN202010386670A CN111469862A CN 111469862 A CN111469862 A CN 111469862A CN 202010386670 A CN202010386670 A CN 202010386670A CN 111469862 A CN111469862 A CN 111469862A
Authority
CN
China
Prior art keywords
platform
line
railway
rail transit
transfer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010386670.7A
Other languages
Chinese (zh)
Other versions
CN111469862B (en
Inventor
于廷润
彭庆艳
陆凯
茹梦麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN202010386670.7A priority Critical patent/CN111469862B/en
Publication of CN111469862A publication Critical patent/CN111469862A/en
Application granted granted Critical
Publication of CN111469862B publication Critical patent/CN111469862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B61—RAILWAYS
    • B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00—General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Devices For Checking Fares Or Tickets At Control Points (AREA)

Abstract

本发明公开了一种铁路与城市轨道交通二台四线快速换乘结构,该换乘结构至少包括二台、四线和双向闸机,所述二台包括第一站台和第二站台,所述第一站台和所述第二站台构成双岛式站台,所述四线包括铁路上行线、铁路下行线、轨道交通上行线和轨道交通下行线,所述轨道交通上行线和所述轨道交通下行线位于所述第一站台和所述第二站台的中间;本发明实现了铁路与城市轨道交通之间的同台快速换乘,最大程度缩减换乘距离、换乘时间,可为需要在两种交通方式间进行换乘的旅客提供极大的便利;整合了铁路及城市轨道交通两种不同的票务系统,为二者的衔接提供了新的方式,进一步为多模式交通间的整合、衔接奠定基础。

Figure 202010386670

The invention discloses a two-station and four-line rapid transfer structure for railways and urban rail transit. The transfer structure at least includes two, four-line and two-way gates, and the two platforms include a first platform and a second platform, so The first platform and the second platform form a double-island platform, and the four lines include a railway ascending line, a railway descending line, a rail transit ascending line and a rail transit descending line, the rail transit ascending line and the rail transit ascending line The down line is located in the middle of the first platform and the second platform; the present invention realizes the rapid transfer between the railway and the urban rail transit on the same platform, reduces the transfer distance and transfer time to the greatest extent, and can It provides great convenience for passengers who transfer between the two modes of transportation; it integrates two different ticketing systems of railway and urban rail transit, provides a new way for the connection between the two, and further facilitates the integration and integration of multi-modal transportation. Connection lays the foundation.

Figure 202010386670

Description

铁路与城市轨道交通二台四线快速换乘结构Rapid transfer structure of railway and urban rail transit line 2 and 4

技术领域technical field

本发明涉及铁路与城市轨道交通换乘结构技术领域,尤其涉及一种铁路与城市轨道交通二台四线快速换乘结构。The invention relates to the technical field of railway and urban rail transit transfer structures, in particular to a two-station and four-line fast transfer structure for railways and urban rail transit.

背景技术Background technique

铁路和城市轨道交通的收费系统同为闭式检票系统,车站都分为付费区和非付费区,铁路系统的售、检票手续相对繁琐,换乘便利性较差。The toll collection systems of railways and urban rail transit are both closed ticket checking systems. Stations are divided into paid areas and non-paid areas. The railway system has relatively cumbersome ticket sales and ticket checking procedures and poor transfer convenience.

铁路票务系统一般采用计算机辅助人工售票,分为验票和检票两个步骤。旅客在非付费区候车,换乘则需要重新接受售、检票服务,手续比较繁琐,候车时间也比较长。The railway ticketing system generally adopts computer-aided manual ticketing, which is divided into two steps: ticket checking and ticket checking. Passengers waiting for trains in non-paid areas need to re-accept ticket sales and ticket checking services when transferring. The procedures are cumbersome and the waiting time is relatively long.

城市轨道交通多采用自动售检票系统,旅客在站台候车,旅客换乘直接在付费区内进行,不需要再接受售、检票服务,售、检票手续较为便捷。Urban rail transit mostly adopts automatic ticketing and checking system. Passengers wait at the platform, and passengers transfer directly in the paid area. There is no need to accept ticketing and ticketing services, and the procedures for ticketing and ticketing are more convenient.

铁路与城市轨道交通换乘的主要矛盾,来自闭式检票系统的封闭性与交通便捷性之间的矛盾。当铁路只是在既有出站口检票时,客流必须离开铁路车站后才能进入另外一个系统,行走距离远。The main contradiction in the transfer between railway and urban rail transit comes from the contradiction between the closed fare collection system and the convenience of transportation. When the railway only checks tickets at the existing exit, the passenger flow must leave the railway station before entering another system, and the walking distance is long.

目前,铁路与城市轨道交通的换乘方式主要有:At present, the transfer methods between railway and urban rail transit mainly include:

(1)同站通道换乘,如图1所示,城市轨道交通车站修建既有火车站的站外,铁路客流检票出站后通过换乘通道到达轨道交通车站。这种铁路与城市轨道交通采用通道换乘方式,通常换乘距离在200m以上,换乘时间约20min;(1) Transfer at the same station passage. As shown in Figure 1, the urban rail transit station is built outside the station of the existing railway station. After the railway passenger flow checks the ticket and exits the station, it arrives at the rail transit station through the transfer passage. This kind of railway and urban rail transit adopts channel transfer mode, usually the transfer distance is more than 200m, and the transfer time is about 20min;

(2)同站立体换乘,如图2所示,新建火车站与城市轨道交通车站立体共站修建,铁路客流在出站口检票后,通过换乘厅和垂直通道实现与城市轨道交通的换乘。这种同站立体换乘方式,步行距离在100m以上,且至少乘坐两次垂直通道才能完成换乘,换乘时间约15min。(2) Three-dimensional transfer at the same station, as shown in Figure 2, the new railway station and the urban rail transit station are built in three-dimensional co-station. After the railway passenger flow checks the tickets at the exit, the transfer hall and vertical passages are used to realize the connection with the urban rail transit. transfer. This kind of three-dimensional transfer at the same station requires a walking distance of more than 100m and at least two vertical passages to complete the transfer. The transfer time is about 15 minutes.

上述换乘方式均未能实现两者间的直接换乘,不能使旅客换乘距离最短,达不到两者间真正意义上的“快速换乘”。None of the above transfer methods can achieve direct transfer between the two, and cannot make the passenger transfer distance the shortest, and cannot achieve the true "quick transfer" between the two.

本技术领域的技术人员致力于解决上述技术缺陷。Those skilled in the art are devoted to solving the above-mentioned technical defects.

发明内容SUMMARY OF THE INVENTION

有鉴于现有技术的上述缺陷,本发明的技术目的在于解决上述背景技术中提到的问题。In view of the above-mentioned defects of the prior art, the technical purpose of the present invention is to solve the problems mentioned in the above-mentioned background art.

为实现上述技术目的,本发明提供了一种铁路与城市轨道交通二台四线快速换乘结构,该换乘结构至少包括二台、四线和双向闸机;In order to achieve the above technical purpose, the present invention provides a two-station and four-lane rapid transfer structure for railway and urban rail transit, and the transfer structure at least includes two, four-lane and two-way gates;

所述二台包括第一站台和第二站台,所述第一站台和所述第二站台构成双岛式站台;The two platforms include a first platform and a second platform, and the first platform and the second platform form a double-island platform;

所述四线包括铁路上行线、铁路下行线、轨道交通上行线和轨道交通下行线;The four lines include a railway up-line, a railway down-line, a rail transit up-line and a rail-transit down-line;

所述轨道交通上行线和所述轨道交通下行线位于所述第一站台和所述第二站台的中间,所述铁路上行线和所述铁路下行线分别位于所述第一站台和所述第二站台的外侧;The rail transit ascending line and the rail transit descending line are located in the middle of the first platform and the second platform, and the railway ascending line and the railway descending line are located at the first platform and the second platform, respectively. The outside of the second platform;

在所述第一站台和所述第二站台的中间并沿着平行所述第一站台和所述第二站台的方向上设置若干组所述双向闸机。Several sets of the two-way gates are arranged in the middle of the first platform and the second platform and along a direction parallel to the first platform and the second platform.

本发明的有益效果:Beneficial effects of the present invention:

本发明由于上述结构设计,换乘距离缩短至50m以内,换乘时间缩短至3min以内,实现了铁路与城市轨道交通之间的同台快速换乘,最大程度缩减换乘距离、换乘时间,可为需要在两种交通方式间进行换乘的旅客提供极大的便利;Due to the above-mentioned structural design, the present invention shortens the transfer distance to less than 50m and the transfer time to less than 3min, realizes rapid transfer between railways and urban rail transit on the same platform, and reduces the transfer distance and transfer time to the greatest extent. It can provide great convenience for passengers who need to transfer between the two modes of transportation;

利用铁路及城市轨道交通通用的双向检票闸机,整合了铁路及城市轨道交通两种不同的票务系统,为二者的衔接提供了新的方式,进一步为多模式交通间的整合、衔接奠定基础。Using the common two-way ticket gate for railway and urban rail transit, the two different ticketing systems of railway and urban rail transit are integrated, providing a new way for the connection between the two, and further laying the foundation for the integration and connection between multi-modal transportation .

附图说明Description of drawings

图1为现有技术中通站通道换乘的结构示意图;Fig. 1 is the structural representation of the transfer through station passage in the prior art;

图2为现有技术中同站立体换乘的结构示意图;2 is a schematic structural diagram of a three-dimensional transfer at the same station in the prior art;

图3为本发明的结构示意图。FIG. 3 is a schematic structural diagram of the present invention.

图中:1第一站台、2第二站台、3铁路上行线、4铁路下行线、5轨道交通上行线、6轨道交通下行线、7双向闸机。In the picture: 1 first platform, 2 second platform, 3 railway up line, 4 railway down line, 5 rail transit up line, 6 rail transit down line, 7 two-way gates.

具体实施方式Detailed ways

以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings, so as to fully understand the purpose, characteristics and effects of the present invention.

实施例:Example:

如图3所示,一种铁路与城市轨道交通二台四线快速换乘结构,该换乘结构至少包括二台、四线和双向闸机7;As shown in FIG. 3 , a two-station and four-line rapid transfer structure between railway and urban rail transit, the transfer structure at least includes two, four-line and two-way gates 7 ;

二台包括第一站台1和第二站台2,第一站台1和第二站台2构成双岛式站台;The two platforms include the first platform 1 and the second platform 2, and the first platform 1 and the second platform 2 form a double-island platform;

四线包括铁路上行线3、铁路下行线4、轨道交通上行线5和轨道交通下行线6;The four lines include railway up-line 3, railway down-line 4, rail transit up-line 5 and rail transit down-line 6;

轨道交通上行线5和轨道交通下行线6位于第一站台1和第二站台2的中间,铁路上行线3和铁路下行线4分别位于第一站台1和第二站台2的外侧;Rail transit ascending line 5 and rail transit descending line 6 are located in the middle of the first platform 1 and the second platform 2, and the railway ascending line 3 and the railway descending line 4 are respectively located outside the first platform 1 and the second platform 2;

在第一站台1和第二站台2的中间并沿着平行第一站台1和第二站台2的方向上设置若干组双向闸机7,双向闸机7能同时实现铁路及城市轨道交通的检票出站及检票进站功能。In the middle of the first platform 1 and the second platform 2 and along the direction parallel to the first platform 1 and the second platform 2, several sets of two-way turnstiles 7 are arranged, and the two-way turnstiles 7 can realize the ticket checking of railway and urban rail transit at the same time. Exit and ticket entry functions.

具体的,第一站台1和第二站台2的站台长度应分别满足停靠一列铁路列车的长度,第一站台1的两侧分别经停铁路上行线3及轨道交通下行线6,第二站台2的两侧分别经停铁路下行线4及轨道交通上行线5。Specifically, the platform lengths of the first platform 1 and the second platform 2 should meet the length of a railway train, respectively. The two sides of the railway stop respectively on the down line 4 of the railway and the up line 5 of the rail transit.

工作原理:working principle:

通过双向闸机7对铁路车票及城市轨道交通车票的检票出(进)站功能,持有两种相应车票的旅客,可在第一站台1实现铁路上行线3方向旅客与轨道交通下行线6方向的同台换乘,可在第二站台2实现铁路下行线4方向旅客与轨道交通上行线5方向的同台换乘;Through the two-way gate 7 for railway tickets and urban rail transit tickets, passengers who hold two kinds of corresponding tickets can realize the railway up-line 3-direction passengers and the rail transit down-line 6 at the first platform 1 For the same platform transfer in the direction, the same platform transfer can be realized at the second platform 2 for passengers on the down line 4 of the railway and in the direction 5 of the upward line of the rail transit;

至于铁路上行线3方向旅客(第一站台1)与轨道交通上行线5方向(第二站台2)、铁路下行线4方向旅客(第二站台2)与轨道交通下行线6方向(第一站台1)的换乘,可以先通过双向闸机7实现同台换乘,然后再通过城市轨道交通系统到达对向站台实现快速换乘,或先通过城市轨道交通系统到达对向站台再通过双向闸机7实现同台换乘。As for the passengers on the upward railway line 3 (the first platform 1) and the upward line 5 of the rail transit (the second platform 2), the passenger on the downward railway line 4 (the second platform 2) and the downward line 6 of the rail transit (the first platform) 1), the transfer on the same platform can be realized first through the two-way gate 7, and then through the urban rail transit system to the opposite platform to achieve rapid transfer, or first through the urban rail transit system to the opposite platform and then through the two-way gate. Machine 7 realizes transfer on the same platform.

以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make many modifications and changes according to the concept of the present invention without creative efforts. Therefore, all technical solutions that can be obtained by those skilled in the art through logical analysis, reasoning or limited experiments on the basis of the prior art according to the concept of the present invention shall fall within the protection scope determined by the claims.

Claims (1)

1. The utility model provides a two quick transfer structures of four-wire of railway and urban rail transit which characterized in that: the transfer structure at least comprises two, four and two-way gate machines (7);
the second station comprises a first station (1) and a second station (2), the first station (1) and the second station (2) constituting a two-island station;
the four lines comprise a railway ascending line (3), a railway descending line (4), a rail traffic ascending line (5) and a rail traffic descending line (6);
the rail traffic up-line (5) and the rail traffic down-line (6) are located in the middle of the first platform (1) and the second platform (2), the railway up-line (3) and the railway down-line (4) are located outside the first platform (1) and the second platform (2), respectively;
-arranging several groups of said bidirectional gates in the middle of said first station (1) and said second station (2) and in a direction parallel to said first station (1) and said second station (2).
CN202010386670.7A 2020-05-09 2020-05-09 Two-platform and four-line rapid transfer structure for railway and urban rail transit Active CN111469862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010386670.7A CN111469862B (en) 2020-05-09 2020-05-09 Two-platform and four-line rapid transfer structure for railway and urban rail transit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010386670.7A CN111469862B (en) 2020-05-09 2020-05-09 Two-platform and four-line rapid transfer structure for railway and urban rail transit

Publications (2)

Publication Number Publication Date
CN111469862A true CN111469862A (en) 2020-07-31
CN111469862B CN111469862B (en) 2025-01-10

Family

ID=71762183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010386670.7A Active CN111469862B (en) 2020-05-09 2020-05-09 Two-platform and four-line rapid transfer structure for railway and urban rail transit

Country Status (1)

Country Link
CN (1) CN111469862B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11336471A (en) * 1998-05-22 1999-12-07 Toda Constr Co Ltd How to relocate aboveground railway lines to underground
CN201951455U (en) * 2010-08-26 2011-08-31 中铁二院工程集团有限责任公司 Same platform transfer station of inter-city passenger line and urban railway line
KR20150131578A (en) * 2014-05-15 2015-11-25 한국철도기술연구원 Enlarging tunnel structure for parallel constructing subsidiary main tunnel of sidetrack station for subway train, and construction method for the same
CN109519001A (en) * 2019-01-04 2019-03-26 江苏中设集团股份有限公司 City integrated Passenger Transport Hub combines safe examination system
CN212125099U (en) * 2020-05-09 2020-12-11 上海市城市建设设计研究总院(集团)有限公司 Rapid transfer structure of railway and urban rail transit line 2 and 4

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11336471A (en) * 1998-05-22 1999-12-07 Toda Constr Co Ltd How to relocate aboveground railway lines to underground
CN201951455U (en) * 2010-08-26 2011-08-31 中铁二院工程集团有限责任公司 Same platform transfer station of inter-city passenger line and urban railway line
KR20150131578A (en) * 2014-05-15 2015-11-25 한국철도기술연구원 Enlarging tunnel structure for parallel constructing subsidiary main tunnel of sidetrack station for subway train, and construction method for the same
CN109519001A (en) * 2019-01-04 2019-03-26 江苏中设集团股份有限公司 City integrated Passenger Transport Hub combines safe examination system
CN212125099U (en) * 2020-05-09 2020-12-11 上海市城市建设设计研究总院(集团)有限公司 Rapid transfer structure of railway and urban rail transit line 2 and 4

Also Published As

Publication number Publication date
CN111469862B (en) 2025-01-10

Similar Documents

Publication Publication Date Title
CN103136933B (en) Transferring coordination control method of conventional buses and subway stations
CN1102119C (en) Personal rapid transit system utilizing both course reservation and branch stop technologies
CN109519001B (en) Urban comprehensive passenger transport hub combined security inspection system
CN112441024B (en) Platform door design method based on vehicle type projection distribution and high-speed rail platform door
CN106741016A (en) Passenger transfer system and its method to set up in railway passenger station station
CN102774403A (en) Turnout-track joint control automatic allocation method of railway passenger station
CN114970993B (en) A method for adjusting conventional bus routes along rail transit lines
CN114973429A (en) Automatic ticket selling and checking system for rail train
CN103241268B (en) Subway departure time optimizing method for reducing transfer time of tunnel transfer stations
CN110700318A (en) An Intercity Railway Underground Station Integrated Development Above the Track Area
CN103806353B (en) Based on the method for designing of the speedway bus system of Expressway Service
CN107403235A (en) Rail traffic platform passenger waits position inducible system and method
CN102568193A (en) Method for designing bus system by wiring in regions
CN110148297A (en) A park-and-ride system and optimization method using shuttle bus connection
CN112722015A (en) Analysis method and analysis system for improving line transport capacity through third line and application
CN212125099U (en) Rapid transfer structure of railway and urban rail transit line 2 and 4
CN115471002A (en) A Method for Optimizing the Layout of Traffic Stations in Airport Comprehensive Transportation Hubs
CN211223399U (en) Underground one deck side formula station public area arrangement structure
CN114822261A (en) Subway passenger waiting guiding method
CN115641707A (en) A collaborative control method for multi-site pedestrian flow in urban rail transit
CN212125100U (en) Railway and Urban Rail Transit 1st and 2nd Line Rapid Transfer Structure
CN109927734A (en) A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station
CN111469862B (en) Two-platform and four-line rapid transfer structure for railway and urban rail transit
CN111469863A (en) Railway and urban rail transit one-two-line fast transfer structure
CN117952302B (en) Railway capacity calculation method and system based on train running sequence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant