CN111441589A - Secondary pouring concrete combined launder - Google Patents
Secondary pouring concrete combined launder Download PDFInfo
- Publication number
- CN111441589A CN111441589A CN202010252515.6A CN202010252515A CN111441589A CN 111441589 A CN111441589 A CN 111441589A CN 202010252515 A CN202010252515 A CN 202010252515A CN 111441589 A CN111441589 A CN 111441589A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- plate
- fixing ring
- concrete
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0481—Concrete chutes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种二次浇注混凝土组合式流槽,包括异形钢板流槽、插销固定环、开孔洞钢板、插销式钢板,开孔洞钢板一侧面上安装有插销固定环,开孔洞钢板上水平插入安装有异形钢板流槽,插销固定环上竖直插入安装有插销式钢板;该二次浇注混凝土组合式流槽通过异形钢板流槽浇筑混凝土,可以充分保证二次结构构造柱和剪力墙等顶部混凝土浇筑饱满,一次成型且平整,异形钢板流槽内混凝土可及时使用,减少材料浪费、节约成本、减少出现二次修补、剔凿的状况出现,具有易于操作、节约人工费、节约混凝土、绿色环保施工的特点;该组合式流槽,安装紧固,稳定性好;该组合式流槽制作工艺简单、制作成本低廉,而且还可以循环使用。
The invention discloses a secondary pouring concrete combined flow trough, which comprises a special-shaped steel plate flow trough, a bolt fixing ring, a perforated steel plate, and a bolt type steel plate. The special-shaped steel plate runner is inserted and installed, and the bolt-type steel plate is vertically inserted and installed on the bolt fixing ring; the secondary pouring concrete combined runner is poured concrete through the special-shaped steel plate runner, which can fully guarantee the secondary structure structural column and shear wall. When the top concrete is fully poured, formed and flat at one time, the concrete in the special-shaped steel plate launder can be used in time, reducing material waste, saving costs, reducing the occurrence of secondary repairs and chiseling, and has the advantages of easy operation, saving labor costs, and saving concrete. , The characteristics of green and environmental protection construction; the combined flow trough, the installation is fast and the stability is good; the combined flow trough is simple in production process, low in production cost, and can be recycled.
Description
技术领域technical field
本发明涉及建筑施工技术领域,具体涉及到一种组合式流槽工具,更具体的是一种用于二次结构构造柱、剪力墙及过梁浇筑混凝土的二次浇注混凝土组合式流槽。The invention relates to the technical field of building construction, in particular to a combined flow trough tool, and more particularly to a secondary pouring concrete combined flow trough for pouring concrete for secondary structure columns, shear walls and lintels .
背景技术Background technique
在建筑工程的施工过程中,二次结构构造柱、剪力墙及过梁等,在浇筑混凝土施工时经常会出现顶部混凝土浇筑不饱满需要二次修补,或顶部混凝土浇筑超出墙面需二次剔凿等现象发生,导致二次结构构造柱、剪力墙及过梁等顶部混凝土成型质量差、观感差、人工费浪费、混凝土浪费等问题,因此一种操作简单、施工方便且能一次成型的浇筑二次结构的工具是保证质量与进度、节约人工和材料的关键因素。In the construction process of the construction project, the secondary structure of the columns, shear walls and lintels, etc., often occurs when the top concrete is not full and needs a second repair, or the top concrete exceeds the wall and needs a second time. The occurrence of chiseling and other phenomena leads to problems such as poor molding quality, poor appearance, waste of labor, and waste of concrete on the top of secondary structural columns, shear walls, and lintels. Therefore, a simple operation, convenient construction and one-time molding The best tools for pouring secondary structures are a key factor in ensuring quality and schedule, saving labor and materials.
使用现阶段的流槽工具进行浇注,存在以下不足之处:(1)二次结构混凝土浇筑效果较为一般,存在一定的质量问题,且在浇筑构造柱、剪力墙及过梁时,往构造柱、剪力墙及过梁里灌注混凝土也不方便,给实际操作带来一定的难度;(2)现有的流槽工具安装不够紧固,稳定性不足,混凝土浇注过程易于换晃动;(3)现有的流槽工具安有的价格昂贵,有的属于一次性消耗品,不可以循环利用,浇注过程耗费成本大。Using the current trough tool for pouring has the following shortcomings: (1) The secondary structure concrete pouring effect is relatively general, and there are certain quality problems, and when pouring structural columns, shear walls and lintels, it is difficult to construct It is also inconvenient to pour concrete into the columns, shear walls and lintels, which brings certain difficulties to the actual operation; (2) the existing trough tools are not installed tightly enough, the stability is insufficient, and the concrete pouring process is easy to change and shake; ( 3) The existing launder tools are expensive, and some are disposable consumables, which cannot be recycled, and the pouring process costs a lot.
发明内容SUMMARY OF THE INVENTION
为了克服上述的技术问题,本发明的目的在于提供了二次浇注混凝土组合式流槽:(1)通过将异形钢板流槽的两侧固定板和防漏钢板插入至混凝土进料口,浇注混凝土时,将混凝土倒入至导流板中,混凝土经过导流板、阻流板导流,从防漏钢板上进入混凝土进料口中,浇注完成后,取下异形钢板流槽,使用插销式钢板,手持手托板,推动定型板上移,从下固定环内腔底部穿入,从上固定环内腔顶部穿出,将混凝土进料口封闭,解决了现有的二次结构混凝土浇筑效果较为一般,存在一定的质量问题,且在浇筑构造柱、剪力墙及过梁时,往构造柱、剪力墙及过梁里灌注混凝土也不方便,给实际操作带来一定的难度的问题;(2)通过将异形钢板流槽的两侧固定板和防漏钢板插入至混凝土进料口中,两侧固定板与防漏钢板分别与混凝土进料口内腔两侧以及底部接触,使得两侧固定板在混凝土进料口内腔的位置被限制,不可以进行上下移动,稳固板内侧与下固定环外侧贴合,由于防漏钢板与稳固板呈相互垂直状态,此时稳固板进一步防止稳固板晃动,解决了现有的流槽工具安装不够紧固,稳定性不足,混凝土浇注过程易于换晃动的问题;(3)当混凝土完全凝固后,从钉子孔眼取出钉子,拆卸下开孔洞钢板、插销式钢板,就可以进行下一次的混凝土浇注,解决了现有的流槽工具安有的价格昂贵,有的属于一次性消耗品,不可以循环利用,浇注过程耗费成本大的问题。In order to overcome the above-mentioned technical problems, the purpose of the present invention is to provide a secondary pouring concrete combined launder: (1) by inserting the fixed plates and leak-proof steel plates on both sides of the special-shaped steel launder into the concrete feed port, pouring concrete When pouring the concrete into the deflector, the concrete is guided by the deflector and the spoiler, and enters the concrete feed port from the leak-proof steel plate. , hold the hand support plate, push the setting plate to move, penetrate from the bottom of the inner cavity of the lower fixing ring, and pass through the top of the inner cavity of the upper fixing ring, and seal the concrete feeding port, which solves the existing secondary structure concrete pouring effect. More general, there are certain quality problems, and when pouring structural columns, shear walls and lintels, it is inconvenient to pour concrete into the structural columns, shear walls and lintels, which brings certain difficulties to the actual operation. (2) By inserting the fixed plates and leak-proof steel plates on both sides of the special-shaped steel plate flow trough into the concrete feed port, the two sides of the fixed plates and the leak-proof steel plates are respectively in contact with the two sides and the bottom of the inner cavity of the concrete feed port, so that the two sides are in contact with each other. The position of the fixed plate in the inner cavity of the concrete feed port is restricted, and it cannot move up and down. The inner side of the stabilizer plate is attached to the outside of the lower fixing ring. Since the leak-proof steel plate and the stabilizer plate are perpendicular to each other, the stabilizer plate further prevents the stabilizer plate. Shaking solves the problems that the existing flow trough tools are not installed tightly enough, have insufficient stability, and are easy to shake during the concrete pouring process; (3) When the concrete is completely solidified, take out the nails from the nail holes, and remove the open-hole steel plates and bolts. The next time concrete pouring can be carried out by using the type steel plate, which solves the problem that the existing launder tools are expensive, some are disposable consumables, cannot be recycled, and the pouring process costs a lot.
本发明的目的可以通过以下技术方案实现:The object of the present invention can be realized through the following technical solutions:
二次浇注混凝土组合式流槽,包括异形钢板流槽、插销固定环、开孔洞钢板、插销式钢板,所述开孔洞钢板一侧面上安装有插销固定环,所述开孔洞钢板上水平插入安装有异形钢板流槽,所述插销固定环上竖直插入安装有插销式钢板;The secondary pouring concrete combined flow trough includes a special-shaped steel plate flow trough, a bolt fixing ring, a perforated steel plate, and a bolt-type steel plate. A bolt fixing ring is installed on one side of the perforated steel plate. There is a special-shaped steel plate flow groove, and a bolt-type steel plate is vertically inserted and installed on the bolt fixing ring;
所述异形钢板流槽包括导流板、阻流板、固定板、稳固板、防漏钢板,所述导流板两侧均安装有阻流板,所述阻流板呈直角三角形,两侧所述阻流板一侧底部安装有固定板,所述导流板底端竖直安装有稳固板,所述稳固板与导流板之间呈120-150°的夹角,所述导流板底端水平安装有防漏钢板,所述防漏钢板与稳固板呈相互垂直状态;The special-shaped steel flow trough includes a baffle plate, a baffle plate, a fixed plate, a stabilizing plate, and a leak-proof steel plate, and baffle plates are installed on both sides of the baffle plate. A fixing plate is installed at the bottom of one side of the baffle plate, and a stabilizing plate is vertically installed at the bottom end of the baffle plate. A leak-proof steel plate is installed horizontally at the bottom end of the plate, and the leak-proof steel plate and the stabilizing plate are perpendicular to each other;
所述插销固定环包括上固定环、下固定环、紧固螺栓,所述上固定环中部水平贯穿安装有紧固螺栓,所述上固定环、下固定环均呈U形;The bolt fixing ring includes an upper fixing ring, a lower fixing ring and a fastening bolt, the middle part of the upper fixing ring is horizontally installed with fastening bolts, and the upper fixing ring and the lower fixing ring are both U-shaped;
所述开孔洞钢板顶部中间位置开设有混凝土进料口,所述开孔洞钢板两侧均开设有若干钉子孔眼;A concrete feed port is provided in the middle position of the top of the perforated steel plate, and several nail holes are opened on both sides of the perforated steel plate;
所述插销式钢板包括定位槽、定型板、手托板,所述手托板顶部一侧垂直安装有定型板,所述定型板一侧面中轴线顶部开设有定位槽。The bolt-type steel plate includes a positioning groove, a setting plate, and a hand support plate. A setting plate is installed vertically on one side of the top of the hand support plate, and a positioning groove is opened on the top of the central axis of one side of the setting plate.
作为本发明进一步的方案:所述异形钢板流槽、插销固定环、开孔洞钢板、插销式钢板的材质均为不锈钢。As a further solution of the present invention: the materials of the special-shaped steel plate runner, the bolt fixing ring, the perforated steel plate, and the bolt-type steel plate are all stainless steel.
作为本发明进一步的方案:两侧所述固定板与防漏钢板分别与混凝土进料口内腔两侧以及底部接触,所述稳固板内侧与下固定环外侧接触。As a further solution of the present invention, the fixing plates and the leak-proof steel plates on both sides are respectively in contact with both sides and the bottom of the inner cavity of the concrete feed port, and the inner side of the stabilization plate is in contact with the outer side of the lower fixing ring.
作为本发明进一步的方案:所述上固定环的底部与混凝土进料口顶部位于同一水平面上,所述下固定环的顶部与混凝土进料口底部位于同一水平面上,所述上固定环、下固定环的内腔宽度大于混凝土进料口的宽度。As a further solution of the present invention: the bottom of the upper fixing ring and the top of the concrete feeding port are on the same horizontal plane, the top of the lower fixing ring and the bottom of the concrete feeding port are on the same horizontal plane, the upper fixing ring, the lower The width of the inner cavity of the fixing ring is larger than the width of the concrete feeding port.
作为本发明进一步的方案:所述定型板的宽度等于上固定环、下固定环的内腔宽度,所述定位槽与紧固螺栓为配合构件。As a further solution of the present invention: the width of the shaping plate is equal to the width of the inner cavity of the upper fixing ring and the lower fixing ring, and the positioning groove and the fastening bolt are matching components.
作为本发明进一步的方案:该二次浇注混凝土组合式流槽的工作过程如下:As a further scheme of the present invention: the working process of this secondary pouring concrete combined launder is as follows:
步骤一:先将钢板在工厂进行裁板,加工成异形钢板流槽、插销固定环、开孔洞钢板、插销式钢板;Step 1: First, cut the steel plate in the factory, and process it into special-shaped steel plate runners, bolt fixing rings, perforated steel plates, and bolt-type steel plates;
步骤二:在开孔洞钢板上切割出混凝土进料口、钻钉出钉子孔眼,并将上固定环、下固定环分别焊接在混凝土进料口上下侧,将紧固螺栓旋入上固定环的螺孔中;Step 2: Cut the concrete feed port on the perforated steel plate, drill the nails to get the nail holes, and weld the upper and lower fixing rings on the upper and lower sides of the concrete feed port respectively, and screw the fastening bolts into the upper and lower fixing rings. in the screw hole;
步骤三:使用钉子通过钉子孔眼将安装好插销固定环的开孔洞钢板安装在混凝土浇注用的模板上,将异形钢板流槽的两侧固定板和防漏钢板插入至混凝土进料口,此时稳固板与下固定环侧面贴合,此时异形钢板流槽已经稳定插入安装至开孔洞钢板中;Step 3: Use nails to install the perforated steel plate with the bolt fixing ring installed on the formwork for concrete pouring through the nail holes, and insert the fixed plates on both sides of the special-shaped steel plate flow trough and the leak-proof steel plate into the concrete feed port. The stabilizing plate is attached to the side of the lower fixing ring, and the special-shaped steel plate launder has been stably inserted and installed into the perforated steel plate;
步骤四:浇注混凝土时,将混凝土倒入至导流板中,混凝土经过导流板、阻流板导流,从防漏钢板上进入混凝土进料口中,浇注开始;Step 4: When pouring concrete, pour the concrete into the deflector, the concrete is guided by the deflector and the spoiler, and enters the concrete feed port from the leak-proof steel plate, and the pouring starts;
步骤五:浇注完成后,取下异形钢板流槽,使用插销式钢板,手持手托板,推动定型板上移,从下固定环内腔底部穿入,从上固定环内腔顶部穿出,将混凝土进料口封闭,直至手托板底部与开孔洞钢板底部平齐,旋动紧固螺栓,使得紧固螺栓进入定位槽中,此时,插销式钢板已经固定于插销固定环内腔中;Step 5: After the pouring is completed, remove the special-shaped steel plate launder, use the bolt-type steel plate, hold the hand support plate, push the setting plate to move, penetrate from the bottom of the inner cavity of the lower fixing ring, and pass out from the top of the inner cavity of the upper fixing ring. Close the concrete feeding port until the bottom of the hand support plate is flush with the bottom of the steel plate with the opening hole, and then rotate the fastening bolt to make the fastening bolt enter the positioning groove. At this time, the bolt-type steel plate has been fixed in the inner cavity of the bolt fixing ring. ;
步骤六:当混凝土完全凝固后,从钉子孔眼取出钉子,拆卸下开孔洞钢板、插销式钢板,进行下一次的混凝土浇注。Step 6: When the concrete is completely solidified, take out the nails from the nail holes, remove the open-hole steel plate and the bolt-type steel plate, and proceed to the next concrete pouring.
本发明的有益效果:Beneficial effects of the present invention:
(1)本发明的二次浇注混凝土组合式流槽,通过在开孔洞钢板上切割出混凝土进料口、钻钉出钉子孔眼,并将上固定环、下固定环分别焊接在混凝土进料口上下侧,将紧固螺栓旋入上固定环的螺孔中通过使用钉子通过钉子孔眼将安装好插销固定环的开孔洞钢板安装在混凝土浇注用的模板上,将异形钢板流槽的两侧固定板和防漏钢板插入至混凝土进料口,此时稳固板与下固定环侧面贴合,此时异形钢板流槽已经稳定插入安装至开孔洞钢板中,浇注混凝土时,将混凝土倒入至导流板中,混凝土经过导流板、阻流板导流,从防漏钢板上进入混凝土进料口中,浇注完成后,取下异形钢板流槽,使用插销式钢板,手持手托板,推动定型板上移,从下固定环内腔底部穿入,从上固定环内腔顶部穿出,将混凝土进料口封闭,旋动紧固螺栓,使得紧固螺栓进入定位槽中;该二次浇注混凝土组合式流槽通过异形钢板流槽浇筑混凝土,可以充分保证二次结构构造柱和剪力墙等顶部混凝土浇筑饱满,一次成型且平整,异形钢板流槽内混凝土可及时使用,减少材料浪费、节约成本、减少出现二次修补、剔凿的状况出现,具有易于操作、节约人工费、节约混凝土、绿色环保施工的特点;(1) The secondary pouring concrete combined flow trough of the present invention, by cutting out the concrete feed port on the perforated steel plate, drilling the nails out of the nail hole, and welding the upper fixing ring and the lower fixing ring to the concrete feed port respectively On the upper and lower sides, screw the fastening bolts into the screw holes of the upper fixing ring. Use the nails to install the open-hole steel plate with the bolt fixing ring installed on the template for concrete pouring through the nail holes, and fix the two sides of the special-shaped steel plate runner. The plate and the leak-proof steel plate are inserted into the concrete feeding port. At this time, the stabilizing plate is attached to the side of the lower fixing ring. At this time, the special-shaped steel plate launder has been stably inserted into the open-hole steel plate. When pouring concrete, pour the concrete into the guide. In the flow plate, the concrete is guided by the deflector and the baffle plate, and enters the concrete feed port from the leak-proof steel plate. After the pouring is completed, remove the special-shaped steel plate flow trough, use the bolt-type steel plate, hold the hand plate, and push the setting. The plate is moved, penetrated from the bottom of the inner cavity of the lower fixed ring, and passed out from the top of the inner cavity of the upper fixed ring, closed the concrete feed port, and rotated the fastening bolts to make the fastening bolts enter the positioning groove; this secondary pouring The concrete combined launder is pouring concrete through the special-shaped steel plate launder, which can fully ensure that the top concrete such as secondary structural columns and shear walls are fully poured, formed and flat at one time, and the concrete in the special-shaped steel plate launder can be used in time, reducing material waste, It saves costs, reduces the occurrence of secondary repairs and chiseling, and has the characteristics of easy operation, saving labor costs, saving concrete, and green construction;
(2)本发明的二次浇注混凝土组合式流槽,浇注混凝土时,通过将异形钢板流槽的两侧固定板和防漏钢板插入至混凝土进料口中,两侧固定板与防漏钢板分别与混凝土进料口内腔两侧以及底部接触,使得两侧固定板在混凝土进料口内腔的位置被限制,不可以进行上下移动,使得异形钢板流槽安装的稳固,稳固板内侧与下固定环外侧贴合,由于防漏钢板与稳固板呈相互垂直状态,此时稳固板进一步防止稳固板晃动,进一步提高稳定性;该二次浇注混凝土组合式流槽,安装紧固,稳定性好;(2) The secondary pouring concrete combined launder of the present invention, when pouring concrete, by inserting the two side fixing plates and the leak-proof steel plates of the special-shaped steel plate launder into the concrete feed port, the two side fixing plates and the leak-proof steel plates are respectively Contact with both sides and bottom of the inner cavity of the concrete feed port, so that the position of the fixed plates on both sides in the cavity of the concrete feed port is restricted, and cannot be moved up and down, so that the installation of the special-shaped steel plate launder is stable, and the inner side of the plate and the lower fixing ring are stabilized. The outer side is attached, because the leak-proof steel plate and the stabilizer plate are in a mutually perpendicular state, the stabilizer plate further prevents the stabilizer plate from shaking and further improves the stability;
(3)本发明的二次浇注混凝土组合式流槽,当混凝土完全凝固后,从钉子孔眼取出钉子,拆卸下开孔洞钢板、插销式钢板,就可以进行下一次的混凝土浇注;该二次浇注混凝土组合式流槽制作工艺简单、制作成本低廉,而且还可以循环使用。(3) In the secondary pouring concrete combined launder of the present invention, when the concrete is completely solidified, the nails are taken out from the nail holes, and the perforated steel plates and the bolt-type steel plates are disassembled, and the next concrete pouring can be carried out; the second pouring The concrete combined launder has a simple manufacturing process, low manufacturing cost, and can be recycled.
附图说明Description of drawings
下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.
图1是本发明中二次浇注混凝土组合式流槽的结构示意图;Fig. 1 is the structural representation of secondary pouring concrete combined launder in the present invention;
图2是本发明中二次浇注混凝土组合式流槽的侧视图;Fig. 2 is a side view of a secondary pouring concrete combined launder of the present invention;
图3是本发明中异形钢板流槽的结构示意图;Fig. 3 is the structural representation of special-shaped steel plate launder in the present invention;
图4是本发明中插销固定环、开孔洞钢板的连接视图;Fig. 4 is the connection view of the bolt fixing ring and the perforated steel plate in the present invention;
图5是本发明中插销式钢板的结构示意图。FIG. 5 is a schematic structural diagram of a bolt-type steel plate in the present invention.
图中:100、异形钢板流槽;200、插销固定环;300、开孔洞钢板;400、插销式钢板;101、导流板;102、阻流板;103、固定板;104、稳固板;105、防漏钢板;201、上固定环;202、下固定环;203、紧固螺栓;301、混凝土进料口;302、钉子孔眼;401、定位槽;402、定型板;403、手托板。In the picture: 100, special-shaped steel plate flow groove; 200, bolt fixing ring; 300, perforated steel plate; 400, bolt type steel plate; 101, deflector plate; 102, spoiler plate; 103, fixing plate; 105, leak-proof steel plate; 201, upper fixing ring; 202, lower fixing ring; 203, fastening bolt; 301, concrete inlet; 302, nail hole; 401, positioning groove; 402, setting plate; 403, hand rest plate.
具体实施方式Detailed ways
下面将结合本发明实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
实施例1:Example 1:
请参阅图1-5所示,本实施例为二次浇注混凝土组合式流槽,包括异形钢板流槽100、插销固定环200、开孔洞钢板300、插销式钢板400,所述开孔洞钢板300一侧面上安装有插销固定环200,所述开孔洞钢板300上水平插入安装有异形钢板流槽100,所述插销固定环200上竖直插入安装有插销式钢板400;Please refer to FIGS. 1-5 , this embodiment is a secondary pouring concrete combined launder, including a special-shaped steel plate launder 100 , a
所述异形钢板流槽100包括导流板101、阻流板102、固定板103、稳固板104、防漏钢板105,所述导流板101两侧均安装有阻流板102,所述阻流板102呈直角三角形,两侧所述阻流板102一侧底部安装有固定板103,所述导流板101底端竖直安装有稳固板104,所述稳固板104与导流板101之间呈120-150°的夹角,所述导流板101底端水平安装有防漏钢板105,所述防漏钢板105与稳固板104呈相互垂直状态;The special-shaped
所述插销固定环200包括上固定环201、下固定环202、紧固螺栓203,所述上固定环201中部水平贯穿安装有紧固螺栓203,所述上固定环201、下固定环202均呈U形;The
所述开孔洞钢板300顶部中间位置开设有混凝土进料口301,所述开孔洞钢板300两侧均开设有若干钉子孔眼302;A
所述插销式钢板400包括定位槽401、定型板402、手托板403,所述手托板403顶部一侧垂直安装有定型板402,所述定型板402一侧面中轴线顶部开设有定位槽401。The bolt-
具体的,所述异形钢板流槽100、插销固定环200、开孔洞钢板300、插销式钢板400的材质均为不锈钢;两侧所述固定板103与防漏钢板105分别与混凝土进料口301内腔两侧以及底部接触,所述稳固板104内侧与下固定环202外侧接触,此时稳固板104进一步防止稳固板104晃动,进一步提高稳定性;所述上固定环201的底部与混凝土进料口301顶部位于同一水平面上,所述下固定环202的顶部与混凝土进料口301底部位于同一水平面上,所述上固定环201、下固定环202的内腔宽度大于混凝土进料口301的宽度;所述定型板402的宽度等于上固定环201、下固定环202的内腔宽度,所述定位槽401与紧固螺栓203为配合构件。Specifically, the special-shaped
请参阅图1-5所示,本实施例中的二次浇注混凝土组合式流槽的工作过程如下:Referring to Figures 1-5, the working process of the secondary pouring concrete combined launder in this embodiment is as follows:
步骤一:先将钢板在工厂进行裁板,加工成异形钢板流槽100、插销固定环200、开孔洞钢板300、插销式钢板400;Step 1: First, cut the steel plate in the factory, and process it into a special-shaped
步骤二:在开孔洞钢板300上切割出混凝土进料口301、钻钉出钉子孔眼302,并将上固定环201、下固定环202分别焊接在混凝土进料口301上下侧,将紧固螺栓203旋入上固定环201的螺孔中;Step 2: Cut out the
步骤三:使用钉子通过钉子孔眼302将安装好插销固定环200的开孔洞钢板300安装在混凝土浇注用的模板上,将异形钢板流槽100的两侧固定板103和防漏钢板105插入至混凝土进料口301,此时稳固板104与下固定环202侧面贴合,此时异形钢板流槽100已经稳定插入安装至开孔洞钢板300中;Step 3: Use nails to install the perforated
步骤四:浇注混凝土时,将混凝土倒入至导流板101中,混凝土经过导流板101、阻流板102导流,从防漏钢板105上进入混凝土进料口301中,浇注开始;Step 4: when pouring concrete, pour the concrete into the
步骤五:浇注完成后,取下异形钢板流槽100,使用插销式钢板400,手持手托板403,推动定型板402上移,从下固定环202内腔底部穿入,从上固定环201内腔顶部穿出,将混凝土进料口301封闭,直至手托板403底部与开孔洞钢板300底部平齐,旋动紧固螺栓203,使得紧固螺栓203进入定位槽401中,此时,插销式钢板400已经固定于插销固定环200内腔中;Step 5: After the pouring is completed, remove the special-shaped steel plate launder 100, use the bolt-
步骤六:当混凝土完全凝固后,从钉子孔眼302取出钉子,拆卸下开孔洞钢板300、插销式钢板400,进行下一次的混凝土浇注。Step 6: When the concrete is completely solidified, take out the nails from the nail holes 302, remove the lower-
在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, description with reference to the terms "one embodiment," "example," "specific example," etc. means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one aspect of the present invention. in one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
以上内容仅仅是对本发明所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。The above contents are only examples and descriptions of the present invention, and those skilled in the art can make various modifications or supplements to the described specific embodiments or replace them in similar ways, as long as they do not deviate from the invention or exceed the present rights The scope defined by the claims shall all belong to the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010252515.6A CN111441589A (en) | 2020-04-01 | 2020-04-01 | Secondary pouring concrete combined launder |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010252515.6A CN111441589A (en) | 2020-04-01 | 2020-04-01 | Secondary pouring concrete combined launder |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111441589A true CN111441589A (en) | 2020-07-24 |
Family
ID=71654798
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010252515.6A Pending CN111441589A (en) | 2020-04-01 | 2020-04-01 | Secondary pouring concrete combined launder |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111441589A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113802850A (en) * | 2021-09-28 | 2021-12-17 | 浙江大东吴建筑科技有限公司 | Device suitable for regional concrete placement is watered after assembled PEC component |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06272380A (en) * | 1993-03-18 | 1994-09-27 | Osaka Gas Co Ltd | Concrete placement method and placement chute in inverted lining method |
| CN102383598A (en) * | 2011-09-23 | 2012-03-21 | 中国十七冶集团有限公司 | Method for section construction of building project constructional column |
| CN204850448U (en) * | 2015-08-27 | 2015-12-09 | 中交第一公路工程局有限公司 | Qualities of concrete shaping of constructional column top are improved new tool formula dustpan template |
| CN205677249U (en) * | 2016-05-13 | 2016-11-09 | 江苏启安建设集团有限公司 | A kind of casting concrete constructional column hopper |
| CN206607875U (en) * | 2017-03-21 | 2017-11-03 | 中建三局第一建设工程有限责任公司 | A kind of constructional column dustpan mouthful |
| CN110230394A (en) * | 2019-06-24 | 2019-09-13 | 中冶建工集团有限公司 | The construction method of constructional column |
| CN212562530U (en) * | 2020-04-01 | 2021-02-19 | 中建四局第六建设有限公司 | Secondary pouring concrete combined type launder |
-
2020
- 2020-04-01 CN CN202010252515.6A patent/CN111441589A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06272380A (en) * | 1993-03-18 | 1994-09-27 | Osaka Gas Co Ltd | Concrete placement method and placement chute in inverted lining method |
| CN102383598A (en) * | 2011-09-23 | 2012-03-21 | 中国十七冶集团有限公司 | Method for section construction of building project constructional column |
| CN204850448U (en) * | 2015-08-27 | 2015-12-09 | 中交第一公路工程局有限公司 | Qualities of concrete shaping of constructional column top are improved new tool formula dustpan template |
| CN205677249U (en) * | 2016-05-13 | 2016-11-09 | 江苏启安建设集团有限公司 | A kind of casting concrete constructional column hopper |
| CN206607875U (en) * | 2017-03-21 | 2017-11-03 | 中建三局第一建设工程有限责任公司 | A kind of constructional column dustpan mouthful |
| CN110230394A (en) * | 2019-06-24 | 2019-09-13 | 中冶建工集团有限公司 | The construction method of constructional column |
| CN212562530U (en) * | 2020-04-01 | 2021-02-19 | 中建四局第六建设有限公司 | Secondary pouring concrete combined type launder |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113802850A (en) * | 2021-09-28 | 2021-12-17 | 浙江大东吴建筑科技有限公司 | Device suitable for regional concrete placement is watered after assembled PEC component |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106760503A (en) | A kind of constructional column based on standard knot combination is poured uses template | |
| CN206646826U (en) | Tool-type responde template reinforcing device | |
| CN103243730B (en) | The mould on casting concrete basis | |
| CN205677249U (en) | A kind of casting concrete constructional column hopper | |
| CN212053789U (en) | Rotary screw type movable hopper for concrete pouring of constructional column | |
| CN217680512U (en) | Tool type constructional column pouring opening device | |
| CN212562530U (en) | Secondary pouring concrete combined type launder | |
| CN211447760U (en) | Aluminum alloy wall formwork reinforcement quick assembly and disassembly structure | |
| CN210032613U (en) | Pre-buried section structure in entrance to a cave, case and pre-buried structure, reservation entrance to a cave | |
| CN220395175U (en) | A structural column pouring auxiliary device | |
| CN206279762U (en) | A kind of building form combination | |
| CN214658814U (en) | Constructional column shaping combined template structure | |
| CN204804318U (en) | Building templates that bottom mounting is firm | |
| CN210828338U (en) | Wall post template fixing tool | |
| CN210067444U (en) | Column frame structure mould | |
| CN209941967U (en) | A T-shaped wall panel connection structure | |
| CN220599216U (en) | Concrete pouring feeder | |
| CN217537345U (en) | A pouring pre-embedded connection device | |
| CN216553052U (en) | A kind of aluminum mold pre-embedded beam casing | |
| CN214658815U (en) | Movable constructional column horn mouth pouring template | |
| CN207063524U (en) | The detachable sealing beam framework fixer of architectural engineering | |
| CN209653377U (en) | The straight degree of dry concrete wall horizontal joint template adjusts bracing means | |
| CN206855691U (en) | A kind of positioning component for PC wallboard moulds | |
| CN223062023U (en) | Construction formwork reinforcing fitting | |
| CN2873941Y (en) | Positioning fastening device for building formwork |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| AD01 | Patent right deemed abandoned | ||
| AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20250905 |