CN111424495B - Integrated curb double-filtering drainage device and construction method - Google Patents

Integrated curb double-filtering drainage device and construction method Download PDF

Info

Publication number
CN111424495B
CN111424495B CN202010316581.5A CN202010316581A CN111424495B CN 111424495 B CN111424495 B CN 111424495B CN 202010316581 A CN202010316581 A CN 202010316581A CN 111424495 B CN111424495 B CN 111424495B
Authority
CN
China
Prior art keywords
filtering
integrated curb
layer
integrated
curb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010316581.5A
Other languages
Chinese (zh)
Other versions
CN111424495A (en
Inventor
刘彦琦
李艺
王瑞瑶
陈雯
夏彬彬
何干皓
熊茂森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN202010316581.5A priority Critical patent/CN111424495B/en
Publication of CN111424495A publication Critical patent/CN111424495A/en
Application granted granted Critical
Publication of CN111424495B publication Critical patent/CN111424495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/223Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • E03F5/0404Gullies for use in roads or pavements with a permanent or temporary filtering device; Filtering devices specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/046Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps adapted to be used with kerbs
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Revetment (AREA)

Abstract

The invention discloses an integrated curb double-filtering drainage device, which enables an integrated curb to have the function of a water intercepting ditch, simultaneously carries out double filtration on water flow by arranging a lead wire gabion wall and a first reverse filtering layer, wherein the lead wire gabion wall filters large-particle soil and impurities in the water flow relatively, the first reverse filtering layer filters sand and impurities in the water flow, can reduce water and soil loss of a turf side slope, effectively filters impurities in the water flow, simultaneously discharges unsmooth water flow, and simultaneously improves water flow drainage efficiency by adopting a plurality of drainage pipes.

Description

Integrated curb double-filtering drainage device and construction method
Technical Field
The invention belongs to the technical field of river course embankment drainage, and particularly relates to an integrated curb double-filtering drainage device and a construction method.
Background
Under the design trend of ecological river channels, more and more river banks adopt compound side slopes, hydrophilic platforms are arranged above a normal water level, soft side slopes such as ecological turf slope protection are adopted for slopes above the platforms, and hard side slopes such as hard concrete, slurry masonry stones and the like are adopted for slopes below the platforms. The grass slope protection is generally slower in gradient, and the water supply is slower, but the problems of water flow scouring, water and soil loss, unsmooth drainage and the like exist.
The existing design is mainly provided with intercepting ditches transversely and longitudinally along the catwalk for centralized drainage, if the intercepting ditches are not designed, the catwalk is directly opposite to the incoming water, so that the catwalk is polluted by water and soil loss and muddy water, the landscape effect is affected, and the operation cost is increased. If set up special intercepting ditch, the double-walled face of its intercepting ditch all adopts concrete placement, does not filter the rivers that collect, and present intercepting ditch is in the same place all rivers collection, drains through setting up a drain pipe, can cause the rivers drainage not smooth like this, exists the impurity in the rivers simultaneously, blocks up the drain pipe easily, forms ponding, increases sanitation personnel's work load, produces serious influence to river course view.
Disclosure of Invention
The invention aims to provide an integrated curb double-filtering drainage device and a construction method, which enable the integrated curb to have the function of a water intercepting ditch, simultaneously, the lead wire gabion wall and the first reverse filtering layer are arranged to perform double-filtering on water flow, the lead wire gabion wall is used for filtering large-particle soil and sundries in the water flow relatively, the first reverse filtering layer is used for filtering sand and impurities in the water flow, and the problems that the current water flow washes the turf slope, causes water and soil loss of the turf slope, causes impurities in the water flow and simultaneously causes unsmooth drainage of the water flow, and the water flow landscape is poor, the water and soil cleaning workload is large and the water and soil cleaning cost is high are solved by adopting the arrangement of a plurality of drainage pipes.
In order to achieve the above purpose, the technical scheme adopted by the invention comprises the following steps:
An integrated curb double-filtering drainage device comprises a lead wire gabion wall vertically arranged at the slope toe of a turf slope, an integrated curb between the lead wire gabion wall and a road surface, a drainage pipe in the integrated curb and a first reverse filtering layer covered on the drainage pipe;
The vertical height of the lead wire gabion wall is higher than that of the turf slope, and the lead wire gabion wall and the turf slope form a first filtering cavity;
the integrated kerb comprises an inclined member and a vertical member, wherein one end of the inclined member is connected with the bottom of the gabion wall 1, the other end of the inclined member is connected with the bottom of the vertical member, and one end of the inclined member connected with the bottom of the gabion wall 1 is higher than one end of the inclined member connected with the bottom of the vertical member;
the top of the vertical member is flush with the road surface, and the inclined member, the vertical member, and the first filter layer form a second filter cavity.
In the water intercepting ditch adopted in the prior art, concrete pouring is adopted on the double wall surfaces of the water intercepting ditch, the collected water flow is not filtered, and sundries in the water flow are easy to cause the situation of blocking the water intercepting ditch; according to the scheme, the lead wire gabion wall is arranged at the toe of the turf slope, when water flows through the turf slope, large-particle soil and sundries in the turf are filtered by the lead wire gabion wall, smooth collection of the water flow into the integrated curb can be ensured, a large amount of large-particle soil and sundries cannot exist in the curb, the workload of sanitation workers is large, and the working efficiency of the sanitation workers is influenced; meanwhile, the water and soil loss condition of the turf side slope is reduced.
And in this scheme, adopt the vertical height that sets up the plumb line gabion wall to be higher than the vertical height of turf side slope, can effectually avoid under the big circumstances of turf side slope discharge, the rivers directly diffuse and pass the plumb line gabion wall, cause the rivers of taking debris directly to get into integration curb.
Secondly in this scheme, still set up first reverse filtering layer in integration curb, this first reverse filtering layer carries out secondary filtering to the rivers that sink into integration curb, filters finer sand and impurity in the rivers, when guaranteeing that rivers sink into the drain pipe, can not cause the drain pipe to block up, has also guaranteed that this rivers that sink into in the river can not cause the pollution to the river.
Finally, the inclined direction of the inclined component of the integrated curb is set, so that when the flow rate of water flowing into the integrated curb is low, the water can smoothly flow into the first reverse filtering layer, and the smoothness rate of the water is ensured; the ponding in the integrated curb can not be generated, and serious influence is generated on the river landscape.
Further, the first reverse filtering layer comprises non-woven geotextile and crushed stone; the diameter of the crushed stone is less than or equal to 5cm; the first reverse filtering layer formed by combining the non-woven geotextile and the broken stone can filter fine sand and impurities, so that the clarity of water flow is ensured.
Further, the lead wire gabion wall comprises gabions mechanically woven by lead wires and stones filled in the gabions and not consistent in shape and size; the stone with inconsistent shape and size is adopted, so that the contact area of the stone in the gabion can be increased, the contact area of water flow and the stone is increased, the flow area of water flow is reduced, and better filtered water flow is ensured.
Further, the drain pipe is arranged at the bottom of the vertical component, and is obliquely arranged; the drain pipe is arranged at the bottom of the vertical component, the first reverse filtering layer covers the drain pipe, the drain pipe is well wrapped, and meanwhile, the bottom surface of the first reverse filtering layer is closely contacted with the top surface of the inclined component, and no gap exists; the water flow rate of the integrated curb is ensured to be smaller, and the integrated curb can be converged into a river through the first reverse filtering layer and the drain pipe.
Further, the inclination direction of the drain pipe is the same as the inclination direction of the turf slope 4.
Further, the drain pipe adopts a PVC pipeline with phi 5 or phi 10;
further, the number of the drain pipes is not less than 1, and the drain pipes are arranged at intervals along the river direction.
In the prior art, a drain pipe is arranged in a water interception ditch, so that when the water flow is large, water flows spread to the road surface to form accumulated water on the road surface; therefore, the adoption of the plurality of water drainage pipes in the scheme can carry out better drainage on the water flow collected into the integrated curb, the problems that the water drainage formed by only arranging one water drainage pipe in the existing water interception ditch is not smooth and can lead the water flow to the road surface and form water accumulation on the road surface are solved.
Further, the interval distance of the drain pipes is 100cm.
Further, the integrated curb adopts precast concrete; the construction cost can be reduced by adopting precast concrete, and the manufacturing is simple.
The second object of the present invention is to provide a construction method of an integrated kerbstone double-filtering drainage device, which is characterized by comprising the following steps:
S1: digging a second filtering cavity and a drain pipe, reserving a pavement with the same width as that of the lead wire gabion wall at the toe of the turf slope, and digging a second filtering cavity matched with the integrated curb at one end of the pavement away from the toe of the turf slope; digging a drain pipe channel on the side wall of the second filtering cavity, which is attached to the pavement;
S2: pouring the integrated curb, and supporting the inclined member, the vertical member and the drain pipe shape penetrating through the bottom of the vertical member of the integrated curb by using a template;
When the concrete is poured, each layer of concrete is filled, a vibrator is required to be used for vibrating and tamping, and the steps are repeated until the height of the concrete filled by the vertical component is basically consistent with that of the pavement;
S3: paving a first layer of cement mortar, and uniformly paving a layer of cement mortar at the bottom of the second filtering cavity;
S4: installing an integrated curb, installing the poured integrated curb into a second filtering cavity of the excavation, enabling a drain hole of a vertical component penetrating through the integrated curb to correspond to a drain pipe channel of the excavation, reserving a gap between the integrated curb and the second filtering cavity, and paving a second inverse filter layer on the gap; the second reverse filtering layer and the first reverse filtering layer are made of the same material; then rolling the integrated curb, so that the bottom of the integrated curb is tightly combined with the first layer of cement mortar, and the top of the vertical component of the integrated curb is flush with the pavement;
S5: installing a lead wire gabion wall, wherein the lead wire gabion wall is arranged on a pavement reserved at the toe of the turf slope; the lead wire gabion wall is fixed on the two side walls by using anchor rods; one end of the right side wall anchor rod is fixedly connected with the right side of the lead wire gabion wall, and the other end of the right side wall anchor rod is fixedly connected with an inclined member of the integrated curb; one end of the left side wall anchor rod is fixedly connected with the left side of the gabion wall, and the other end of the left side wall anchor rod is fixedly arranged on the slope surface of the turf side slope;
s6: filling a second layer of cement mortar, after finishing the maintenance work of the first layer of cement mortar through the reserved gap, moving the second back filtering layer to a position where the first back filtering layer is not arranged, filling the reserved gap between the integrated curb and the second filtering cavity with the second layer of cement mortar, and flushing the top of the second layer of cement mortar with the bottom of the gabion wall.
The existing pouring mode adopts cast-in-place concrete generally, which can cause the problems of slag inclusion, honeycomb, holes or insufficient strength of the concrete, and the cast-in-place concrete has complex construction and strict requirements on construction weather; the scheme adopts the precast concrete, so that the problems can be effectively avoided, meanwhile, the construction of the precast concrete is very simple, and the workload of construction workers can be reduced.
Secondly, reserving a gap when installing the integrated curb, and paving a second reverse filtering layer on the gap; when the water flow passes through the gabion wall to filter large-particle soil and impurities in the water flow and then reaches the second reverse filtering layer, the second reverse filtering layer filters sand and impurities in the water flow and then reaches the first layer of cement mortar paved along the gaps, so that maintenance work of the first layer of cement mortar is completed, and the quality of the cement mortar is improved; after the first layer of cement mortar curing work is finished, the second filter layer is moved to a place where the first filter layer is not arranged, so that the material consumption of the filter layer is saved, and the resource waste is prevented.
Meanwhile, the bottom of the integrated curb is tightly combined with the first layer of cement mortar by rolling the integrated curb, so that bubbles in the cement mortar are avoided, and the stability and the service life of the cement mortar are influenced.
After the maintenance work of the first layer of cement mortar is finished, the reserved gaps are filled, so that in the subsequent use process, water flow cannot flow into the maintained first layer of cement mortar through the gaps, innumerable micro-pores are formed in the maintained first layer of cement mortar, the strength of the mortar is reduced, shrinkage can occur during evaporation, the cracks are easily generated, and the durability of the integrated curb is greatly reduced.
Finally, by arranging the anchor rods on the two side walls of the lead wire gabion wall, and arranging one end of the right side wall anchor rod on the inclined component of the integrated curb, the right side wall anchor rod can support and stabilize the lead wire gabion wall, and can block impurities in water flow entering the second filtering cavity, so that the impurities accumulated on the first filtering layer after being filtered by the first filtering layer can be reduced, and the flow rate of the water flow is more effectively improved; one end of the left side wall anchor rod is fixedly connected with the slope surface of the turf slope, downward pressure can be generated in the process of falling under the rain when the rain falls onto the slope surface of the turf slope, so that the left side wall anchor rod can generate better tension to the gabion wall, and the stability of the gabion wall is better ensured.
Compared with the prior art, the invention has the following advantages and beneficial effects:
1. The integrated curb double-filtering drainage device and the construction method thereof well realize quick drainage and prevent the pavement of the pavement from being polluted according to the characteristics of slower slope of the turf slope and slower water supply.
2. Meanwhile, the invention adopts double filtration combination of the lead wire gabion wall and the first reverse filtration layer, so that large-particle soil and sundries in water flow can be effectively filtered, water and soil loss of turf side slopes is prevented, the large-particle soil and sundries in the water flow are prevented from blocking a drain pipe, the drainage efficiency is improved, and accumulated water on the road surface is avoided.
Drawings
The accompanying drawings, which are included to provide a further understanding of embodiments of the application and are incorporated in and constitute a part of this specification, illustrate embodiments of the application and together with the description serve to explain the principles of the application. In the drawings:
fig. 1 is a schematic structural view of an integrated kerb double-filtration drainage device.
Reference numerals and corresponding part names:
1-a gabion wall; 101-stone blocks; 2-an integrated curb; 201-a tilting member; 202-vertical members; 3-road surface; 4-turf slope; 5-a first reverse filtration layer; 6-a drain pipe.
Detailed Description
For the purpose of making apparent the objects, technical solutions and advantages of the present invention, the present invention will be further described in detail with reference to the following examples and the accompanying drawings, wherein the exemplary embodiments of the present invention and the descriptions thereof are for illustrating the present invention only and are not to be construed as limiting the present invention.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. However, it will be apparent to one of ordinary skill in the art that: no such specific details are necessary to practice the invention. In other instances, well-known structures, materials, or methods have not been described in detail in order to avoid obscuring the present invention.
Throughout the specification, references to "one embodiment," "an embodiment," "one example," or "an example" mean: a particular feature, structure, or characteristic described in connection with the embodiment or example is included within at least one embodiment of the invention. Thus, the appearances of the phrases "in one embodiment," "in an example," or "in an example" in various places throughout this specification are not necessarily all referring to the same embodiment or example. Furthermore, the particular features, structures, or characteristics may be combined in any suitable combination and/or sub-combination in one or more embodiments or examples. Moreover, those of ordinary skill in the art will appreciate that the illustrations provided herein are for illustrative purposes and that the illustrations are not necessarily drawn to scale. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
[ Example ]
As shown in fig. 1, an integrated curb double-filtering drainage device comprises a lead wire gabion wall 1 vertically arranged at the toe of a turf slope 4, an integrated curb 2 positioned between the lead wire gabion wall 1 and a road surface 3, a drainage pipe 6 positioned in the integrated curb 2 and a first inverse filter layer 5 covered on the drainage pipe 6;
The vertical height of the gabion wall 1 is higher than that of the turf slope 4, and the gabion wall 1 and the turf slope 4 form a first filtering cavity;
the integrated kerb 2 comprises an inclined member 201 and a vertical member 202, wherein one end of the inclined member 201 is connected with the bottom of the gabion wall 1, the other end of the inclined member is connected with the bottom of the vertical member 202, and one end of the inclined member 201 connected with the bottom of the gabion wall 1 is higher than one end of the inclined member 201 connected with the bottom of the vertical member 202;
The top of the vertical member 202 is flush with the road surface 3, and the inclined member 201, the vertical member 202 and the first counter filter layer 5 form a second filter cavity.
Further, the first reverse filtering layer 5 comprises non-woven geotextile and crushed stone; the diameter of the broken stone is less than or equal to 5cm.
Further, the gabion wall 1 comprises gabions mechanically woven by lead wires and stones 101 with non-uniform shapes and sizes filled in the gabions.
Further, the drain pipe 6 is disposed at the bottom of the vertical member 202, and the drain pipe 6 is disposed in an inclined manner.
Further, the inclination direction of the drain pipe 6 is the same as the inclination direction of the turf slope 4.
Further, the drain pipe 6 adopts a PVC pipeline with phi 5 or phi 10;
Further, the number of the drain pipes 6 is not less than 1, and the drain pipes are arranged at intervals along the river direction.
Further, the interval distance of the drain pipes 6 is 100cm.
Further, the integrated curb 2 is made of precast concrete.
The invention also provides a construction method of the integrated curb double-filtering drainage device, which comprises the following steps:
S1: the second filtering cavity and the drain pipe 6 are excavated, a pavement with the same width as the lead wire gabion wall 1 is reserved at the toe of the turf slope 4, and the second filtering cavity matched with the integrated curb 2 is excavated at one end of the pavement away from the toe of the turf slope 4; digging a drain pipe 6 channel on the side wall of the second filtering cavity, which is attached to the pavement;
s2: pouring the integrated curb 2, and supporting the inclined member 201, the vertical member 202 and the drain pipe 6 penetrating through the bottom of the vertical member 202 of the integrated curb 2 by using a template;
When concrete is poured, each layer of concrete is filled, a vibrator is required to be used for vibrating and tamping, and the steps are repeated until the height of the concrete filled by the vertical member 202 is basically consistent with that of a road surface;
S3: paving a first layer of cement mortar, and uniformly paving a layer of cement mortar at the bottom of the second filtering cavity;
s4: installing the integrated curb 2, installing the poured integrated curb 2 into a second filter cavity of the excavation, enabling a drain hole of a vertical member 202 penetrating through the integrated curb 2 to correspond to a drain pipe 6 channel of the excavation, reserving a gap between the integrated curb 2 and the second filter cavity, and paving a second inverse filter layer on the gap; the second reverse filtering layer and the first reverse filtering layer 5 are the same in material; then rolling the integrated curb 2 to enable the bottom of the integrated curb 2 to be tightly combined with the first layer of cement mortar, and enabling the top of the vertical member 202 of the integrated curb 2 to be flush with the road surface;
S5: installing a gabion wall 1, and installing the gabion wall 1 on a pavement reserved at the toe of the turf slope 4; the double side walls of the gabion wall 1 are fixed by anchor rods; one end of the right side wall anchor rod is fixedly connected with the right side of the gabion wall 1, and the other end of the right side wall anchor rod is fixedly connected with the inclined member 201 of the integrated curb 2; one end of the left side wall anchor rod is fixedly connected with the left side of the gabion wall 1, and the other end of the left side wall anchor rod is fixedly arranged on the slope surface of the turf slope 4;
S6: filling a second layer of cement mortar, after finishing the maintenance work of the first layer of cement mortar through the reserved gap, moving the second back filtering layer to a position where the first back filtering layer 5 is not arranged, filling the reserved gap between the integrated curb 2 and the second filtering cavity with the second layer of cement mortar, and flushing the top of the second layer of cement mortar with the bottom of the lead wire gabion wall.
Curb stone: the kerb is a marker that is provided between a road surface and another structure, and is often required between a separator of a road and the road surface, and between a sidewalk and the road surface.
The working principle of the embodiment is as follows: the water flow flows from the turf side slope 4 to the lead wire gabion wall 1, the lead wire gabion wall 1 filters large granular soil and sundries existing in the water flow firstly, the filtered water flow enters the integrated curb 2, the water flow is collected to the bottom of the vertical member 202 according to the drainage mode of the integrated curb 2 with gradient, the drain pipe 6 is arranged at the bottom of the vertical member, sand in the water flow is filtered in the first reverse filtering layer 5 covered on the drain pipe 6, and finally the filtered water flow is collected into a river through the drain pipe 6.
The foregoing description of the embodiments has been provided for the purpose of illustrating the general principles of the invention, and is not meant to limit the scope of the invention, but to limit the invention to the particular embodiments, and any modifications, equivalents, improvements, etc. that fall within the spirit and principles of the invention are intended to be included within the scope of the invention.

Claims (8)

1. The construction method of the integrated curb double-filtering drainage device is characterized by comprising the following steps of:
S1: the second filtering cavity and the drain pipe (6) are excavated, a pavement with the same width as that of the lead wire gabion wall (1) is reserved at the toe of the turf slope (4), and a second filtering cavity matched with the integrated curb (2) is excavated at one end of the pavement away from the toe of the turf slope (4); digging a drain pipe (6) channel on the side wall of the second filtering cavity, which is attached to the pavement;
S2: pouring the integrated curb (2), and supporting the inclined member (201) and the vertical member (202) and the shape of the drain pipe (6) penetrating through the bottom of the vertical member (202) of the integrated curb (2) by using a template;
when the concrete is poured, each layer of concrete is filled, a vibrator is required to be used for vibrating and tamping, and the steps are repeated until the height of the concrete filled by the vertical component (202) is basically consistent with that of the road surface;
S3: paving a first layer of cement mortar, and uniformly paving a layer of cement mortar at the bottom of the second filtering cavity;
S4: installing an integrated curb (2), installing the poured integrated curb (2) into a second filter cavity of the excavation, enabling a drainage hole of a vertical component (202) penetrating through the integrated curb (2) to correspond to a channel of an excavated drain pipe (6), reserving a gap between the integrated curb (2) and the second filter cavity, and paving a second inverse filter layer on the gap; the second reverse filtering layer and the first reverse filtering layer (5) are the same in material; then rolling the integrated curb (2) to enable the bottom of the integrated curb (2) to be tightly combined with the bottom of the second filtering cavity, and enabling the top of the vertical member (202) of the integrated curb (2) to be flush with the road surface;
S5: installing a gabion wall (1), and installing the gabion wall (1) on a pavement reserved at the toe of the turf slope (4); anchor rods are used for fixing the double side walls of the gabion wall (1); one end of the right side wall anchor rod is fixedly connected with the right side of the lead wire gabion wall (1), and the other end of the right side wall anchor rod is fixedly connected with an inclined component (201) of the integrated curb (2); one end of the left side wall anchor rod is fixedly connected with the left side of the gabion wall (1), and the other end of the left side wall anchor rod is fixedly arranged on the slope surface of the turf side slope (4);
S6: filling a second layer of cement mortar, after finishing the maintenance work of the first layer of cement mortar through the reserved gap, moving the second back filtering layer to a position where the first back filtering layer (5) is not arranged, filling the reserved gap between the integrated curb (2) and the second filtering cavity with the second layer of cement mortar, and flushing the top of the second layer of cement mortar with the bottom of the gabion wall.
2. The construction method of the integrated curb double-filtering drainage device according to claim 1, wherein the construction method comprises the following steps of: the double-filtering drainage device comprises a lead wire gabion wall (1) vertically arranged at the toe of a turf slope (4), an integrated curb stone (2) arranged between the lead wire gabion wall (1) and a road surface (3), a drainage pipe (6) arranged in the integrated curb stone (2) and a first inverse filter layer (5) covered on the drainage pipe (6);
The vertical height of the lead wire gabion wall (1) is higher than that of the turf slope (4), and the lead wire gabion wall (1) and the turf slope (4) form a first filtering cavity;
The integrated kerb (2) comprises an inclined member (201) and a vertical member (202), one end of the inclined member (201) is connected with the bottom of the gabion wall (1), the other end of the inclined member is connected with the bottom of the vertical member (202), and one end of the inclined member (201) connected with the bottom of the gabion wall (1) is higher than one end of the inclined member (201) connected with the bottom of the vertical member (202);
The top of the vertical member (202) is flush with the road surface (3), and the inclined member (201), the vertical member (202) and the first filter layer (5) form a second filter cavity;
the first reverse filtering layer (5) comprises non-woven geotextile and crushed stone; the diameter of the crushed stone is less than or equal to 5cm;
the gabion wall (1) comprises gabions mechanically woven by lead wires and stones (101) filled in the gabions and having different shapes and sizes.
3. The construction method of the integrated curb double-filtering drainage device according to claim 2, wherein the construction method comprises the following steps of: the drain pipe (6) is arranged at the bottom of the vertical component (202), and the drain pipe (6) is obliquely arranged.
4. A construction method of an integrated kerb double-filtering drainage device according to claim 3, characterized in that: the inclination direction of the drain pipe (6) is the same as the inclination direction of the turf slope (4).
5. The construction method of the integrated curb double-filtering drainage device according to claim 2, wherein the construction method comprises the following steps of: the drain pipe (6) adoptsOr (b)Is a PVC pipe of (C).
6. The construction method of the integrated curb double-filtering drainage device according to claim 2, wherein the construction method comprises the following steps of: the number of the drain pipes (6) is not less than 1, and the drain pipes are arranged at intervals along the river direction.
7. The construction method of the integrated curb double-filtering drainage device according to claim 6, wherein the construction method comprises the following steps: the interval distance of the drain pipes (6) is 100cm.
8. The construction method of the integrated curb double-filtering drainage device according to claim 2, wherein the construction method comprises the following steps of: the integrated curb (2) is made of precast concrete.
CN202010316581.5A 2020-04-21 2020-04-21 Integrated curb double-filtering drainage device and construction method Active CN111424495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010316581.5A CN111424495B (en) 2020-04-21 2020-04-21 Integrated curb double-filtering drainage device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010316581.5A CN111424495B (en) 2020-04-21 2020-04-21 Integrated curb double-filtering drainage device and construction method

Publications (2)

Publication Number Publication Date
CN111424495A CN111424495A (en) 2020-07-17
CN111424495B true CN111424495B (en) 2024-10-22

Family

ID=71558246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010316581.5A Active CN111424495B (en) 2020-04-21 2020-04-21 Integrated curb double-filtering drainage device and construction method

Country Status (1)

Country Link
CN (1) CN111424495B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851412A (en) * 2020-08-25 2020-10-30 中国市政工程西北设计研究院有限公司 Ecological slope protection structure and method combining sand well slope drainage and trellis drip irrigation system
CN117481066A (en) * 2023-11-28 2024-02-02 广西壮族自治区水产科学研究院 Crayfish temporary raising equipment and temporary raising method
CN117758845B (en) * 2024-02-21 2026-03-17 中水北方勘测设计研究有限责任公司 A structure and construction method for a sinkhole in a spoil heap

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208183467U (en) * 2017-03-16 2018-12-04 江苏建筑职业技术学院 A kind of novel water permeable kerbstone
CN212335694U (en) * 2020-04-21 2021-01-12 中国电建集团成都勘测设计研究院有限公司 Integrated kerbstone double-filtration drainage device

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201553962U (en) * 2009-11-09 2010-08-18 昆明市政工程设计科学研究院有限公司 Reinforced concrete or natural stone U-shaped filter trough curb
US9598850B2 (en) * 2013-03-14 2017-03-21 Forterra Pipe & Precast, Llc Precast stormwater inlet filter and trap
KR101515104B1 (en) * 2014-04-16 2015-04-28 주식회사 지구코퍼레이션 Precast gutter and drainage structures having top-shaped water channel
CN104358203B (en) * 2014-11-14 2016-08-24 铁道第三勘察设计院集团有限公司 The reinforced concrete floor formula gabion side's of abandoning lateral drainage groove structure
US10385520B2 (en) * 2014-12-19 2019-08-20 Ten Cate Thiolon B.V. Sports field construction
CN204919765U (en) * 2015-07-31 2015-12-30 国网山东省电力公司东营供电公司 Transformer substation uses curb drainage system
KR101662758B1 (en) * 2015-10-29 2016-10-05 (주)아록이엔지 Retention and management system of rainwater for prevention of road flood, ground stability by maintenance of ground water level and reuse of rain water
CN205255237U (en) * 2015-12-17 2016-05-25 湖南三一快而居住宅工业有限公司 Curing kilns in advance of precast concrete member and system is protected in precuring thereof
CN205474681U (en) * 2016-03-04 2016-08-17 广州市合信方园工业设备有限公司 Formula curb is held in cabin
CN208088277U (en) * 2018-03-30 2018-11-13 长沙理工大学 A kind of roadcut soil slope multi-functional lobby water-bound
CN209798478U (en) * 2019-04-26 2019-12-17 四川华沛建筑工程有限责任公司 Take drainage channel's prefabricated curb structure of easy clearance
KR102097580B1 (en) * 2019-07-31 2020-04-06 주식회사 대영엔지니어링 A Method for the Construction of Offshore Structures Using General Concrete

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208183467U (en) * 2017-03-16 2018-12-04 江苏建筑职业技术学院 A kind of novel water permeable kerbstone
CN212335694U (en) * 2020-04-21 2021-01-12 中国电建集团成都勘测设计研究院有限公司 Integrated kerbstone double-filtration drainage device

Also Published As

Publication number Publication date
CN111424495A (en) 2020-07-17

Similar Documents

Publication Publication Date Title
CN111560812B (en) Sponge urban permeable road and construction process thereof
CN111424495B (en) Integrated curb double-filtering drainage device and construction method
CN112252115A (en) Road structure of recoverable rainwater in sponge city
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN109826065B (en) High-fill roadbed protection system and construction method thereof
CN110172884B (en) Mountain highway subgrade and construction method
CN212335694U (en) Integrated kerbstone double-filtration drainage device
CN216948347U (en) Drainage structure for landslide control
CN214460937U (en) Transportation hub rain garden structure
CN209873496U (en) Highway evaporation structure
CN209836713U (en) A hard road with a modified permeable structure
CN217781603U (en) Prevention of seepage weak soil roadbed structure
CN212316594U (en) Road surface structure device for filtering and draining water
CN217379178U (en) Combined infiltration canal structure
CN110700386A (en) Sponge city construction has rainwater well of supply groundwater function
CN213358855U (en) Can collect interception ditch of permeable material basic unit rainwater
CN211285642U (en) A hydraulic slope drainage system
CN222313683U (en) Road structure of mountain highway
CN223675076U (en) Hard road with prevent blockking up structure of mating formation that permeates water
CN216006491U (en) Road side sub-belt concave green land water seepage pavement structure
CN213358193U (en) Body-building runway ground structure
CN217438596U (en) Pavement interlayer drainage structure
CN114635487A (en) Highway evaporation plant with deodorant function
CN219604497U (en) Construction road drainage structures
CN218373114U (en) Road surface drainage structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant