CN111413205A - A dual medium pressure test system and method - Google Patents

A dual medium pressure test system and method Download PDF

Info

Publication number
CN111413205A
CN111413205A CN202010115947.2A CN202010115947A CN111413205A CN 111413205 A CN111413205 A CN 111413205A CN 202010115947 A CN202010115947 A CN 202010115947A CN 111413205 A CN111413205 A CN 111413205A
Authority
CN
China
Prior art keywords
pressure
branch
electric valve
preset
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010115947.2A
Other languages
Chinese (zh)
Other versions
CN111413205B (en
Inventor
李勇
张小平
姜圣杰
张宏伟
杨军
郑国真
张士强
周小义
任荣波
解浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LandSpace Technology Co Ltd
Original Assignee
Lanjian Spaceflight Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanjian Spaceflight Technology Co ltd filed Critical Lanjian Spaceflight Technology Co ltd
Priority to CN202010115947.2A priority Critical patent/CN111413205B/en
Publication of CN111413205A publication Critical patent/CN111413205A/en
Application granted granted Critical
Publication of CN111413205B publication Critical patent/CN111413205B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本发明提供一种双介质压力试验系统和方法,气体从气体存储器流出后先经过第一支路,后分为第二支路和第三支路,第二支路通往被试工件,第三支路通往高压储水器;液体从高压储水器流出经过第四支路,第二支路和第四支路合并成第五支路到达被试工件;第二电动阀在第二支路上,第三电动阀在第三支路上,第四电动阀在第四支路上,第一压力检测单元设置在第五支路的管道外侧;气压控制模块,被设置为比较第一压力检测单元检测的气压与预设的第一预设压力,控制第二电动阀通断;液压控制模块,被设置为比较第一压力检测单元检测的液压与预设的第二预设压力,控制第三电动阀和第四电动阀通断。该系统高集成度,减少拆装时间和人力成本。

Figure 202010115947

The invention provides a dual-medium pressure test system and method. After the gas flows out of the gas storage, it first passes through a first branch, and then is divided into a second branch and a third branch. The second branch leads to the workpiece to be tested, and the third branch The three branches lead to the high-pressure water storage tank; the liquid flows out from the high-pressure water storage tank through the fourth branch, and the second branch and the fourth branch are combined into a fifth branch to reach the tested workpiece; the second electric valve is in the second branch. On the branch road, the third electric valve is on the third branch road, the fourth electrical valve is on the fourth branch road, and the first pressure detection unit is arranged outside the pipeline of the fifth branch road; the air pressure control module is set to compare the first pressure detection unit The air pressure detected by the unit and the preset first preset pressure control the on-off of the second electric valve; the hydraulic control module is set to compare the hydraulic pressure detected by the first pressure detection unit with the preset second preset pressure, and control the second electric valve. The three electric valve and the fourth electric valve are on and off. The system is highly integrated, reducing disassembly time and labor costs.

Figure 202010115947

Description

一种双介质压力试验系统和方法A dual medium pressure test system and method

技术领域technical field

本发明涉及工件的承压能力试验控制的领域,具体涉及一种双介质压力试验系统和方法。The invention relates to the field of test control of the pressure bearing capacity of a workpiece, in particular to a dual-medium pressure test system and method.

背景技术Background technique

为检验特殊工件或设备的承压能力是否满足设计需求,需要对该工件或设备进行液压和气压两方面的试验。In order to check whether the pressure bearing capacity of a special workpiece or equipment meets the design requirements, it is necessary to carry out both hydraulic and pneumatic tests on the workpiece or equipment.

目前液压试验的普遍做法是以水为介质,使用气动增压泵进行手动增压操作;气压试验常用高压氮气或空气经减压输出至目标压力后进行增压操作。At present, the common practice of hydraulic test is to use water as the medium and use a pneumatic booster pump to perform manual booster operation; for air pressure test, high-pressure nitrogen or air is usually decompressed and output to the target pressure for booster operation.

由于气动增压泵需手动操作,水压试验期间存在超压风险;上述两套系统独立运行且功能单一,为执行液压和气压双介质压力试验,同一工件需频繁拆卸接口,影响工作效率的同时增加接口损坏风险。Since the pneumatic booster pump needs to be manually operated, there is a risk of overpressure during the hydraulic test; the above two systems operate independently and have a single function. In order to perform the hydraulic and pneumatic dual-medium pressure test, the same workpiece needs to be disassembled frequently, which affects the work efficiency at the same time. Increased risk of interface damage.

鉴于此,亟需设计一种避免频繁拆卸接口,并且能增加工作效率的双介质压力试验系统和方法。In view of this, it is urgent to design a dual-medium pressure test system and method that avoids frequent disassembly of the interface and can increase work efficiency.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于克服现有技术的不足,提供一种双介质压力试验系统和方法。The purpose of the present invention is to overcome the deficiencies of the prior art and provide a dual-medium pressure test system and method.

本发明提供一种双介质压力试验系统,包括:气体存储器、高压储水器、第一压力检测单元、控制单元、第二电动阀、第三电动阀和第四电动阀;气体从所述气体存储器流出后先经过第一支路,后分为第二支路和第三支路,所述第二支路通往被试工件,所述第三支路通往所述高压储水器;液体从进水管流入所述高压储水器,出水管流出经过第四支路,所述第二支路和所述第四支路合并成第五支路到达所述被试工件;所述第二电动阀设置在所述第二支路上,所述第三电动阀设置在所述第三支路上,所述第四电动阀设置在所述第四支路上,所述第一压力检测单元设置在所述第五支路的管道外侧;所述控制单元包括:气压控制模块,被设置为比较所述第一压力检测单元检测的气压与预设的第一预设压力,在所述气压小于所述第一预设压力时,打开所述第二电动阀,且在所述气压达到所述第一预设压力时,关闭所述第二电动阀;液压控制模块,被设置为比较所述第一压力检测单元检测的液压与预设的第二预设压力,且在所述液压小于所述第二预设压力时,打开所述第三电动阀和所述第四电动阀,在所述液压达到所述第二预设压力时,关闭所述第四电动阀。The invention provides a dual-medium pressure test system, comprising: a gas storage, a high-pressure water storage, a first pressure detection unit, a control unit, a second electric valve, a third electric valve and a fourth electric valve; After the storage flows out, it first passes through the first branch, and then is divided into a second branch and a third branch, the second branch leads to the workpiece to be tested, and the third branch leads to the high-pressure water storage tank; The liquid flows into the high-pressure water storage tank from the water inlet pipe, and the water outlet pipe flows out through the fourth branch, and the second branch and the fourth branch are combined into a fifth branch to reach the tested workpiece; the first branch Two electric valves are arranged on the second branch, the third electric valve is arranged on the third branch, the fourth electric valve is arranged on the fourth branch, and the first pressure detection unit is arranged Outside the pipeline of the fifth branch; the control unit includes: an air pressure control module configured to compare the air pressure detected by the first pressure detection unit with a preset first preset pressure, when the air pressure is less than When the first preset pressure is used, the second electric valve is opened, and when the air pressure reaches the first preset pressure, the second electric valve is closed; the hydraulic control module is configured to compare the The hydraulic pressure detected by the first pressure detection unit is the same as the preset second preset pressure, and when the hydraulic pressure is less than the second preset pressure, the third electric valve and the fourth electric valve are opened, and the third electric valve and the fourth electric valve are opened. When the hydraulic pressure reaches the second preset pressure, the fourth electric valve is closed.

根据本发明的一个方面,双介质压力试验系统还包括:第五电动阀,设置在所述被试工件的出口管道上;所述控制单元还包括:气压保压模块,被设置为所述被试工件在达到第一预设压力值下保压设定的时间后,开启所述第五电动阀进行泄压,直至所述第一压力检测单元的所述气压为零,完成气压试验过程;液压保压模块,被设置为所述被试工件在达到第二预设压力值下保压设定的时间后,开启所述第五电动阀进行泄压,直至所述第一压力检测单元的所述液压为零,完成水压试验过程。According to an aspect of the present invention, the dual-medium pressure test system further includes: a fifth electric valve disposed on the outlet pipe of the tested workpiece; the control unit further includes: an air pressure maintaining module, configured to After the test workpiece reaches the set time of pressure holding under the first preset pressure value, the fifth electric valve is opened to release the pressure until the air pressure of the first pressure detection unit is zero, and the air pressure test process is completed; The hydraulic pressure maintaining module is set to open the fifth electric valve to release the pressure after the tested workpiece reaches the second preset pressure value for the set time, until the pressure of the first pressure detection unit is reached. The hydraulic pressure is zero, and the hydraulic test process is completed.

根据本发明的一个方面,双介质压力试验系统还包括:外接气源、气体增压泵、第二压力检测单元和第一电动阀,所述第二压力检测单元设置在所述第一支路的管道外侧,所述第一电动阀设置在所述外接气源和所述气体增压泵之间,且所述第一电动阀的出口用于与所述气体增压泵的介质气入口连通;所述控制单元还包括:充气模块,设置所述气体存储器的第三预设压力值,采集所述第二压力检测单元的第三压力值,若第三压力值低于第三预设压力值,则开启所述第一电动阀;若第三压力值达到第三预设压力值,则关闭所述第一电动阀。According to an aspect of the present invention, the dual-medium pressure test system further includes: an external air source, a gas booster pump, a second pressure detection unit and a first electric valve, the second pressure detection unit is disposed in the first branch On the outside of the pipeline, the first electric valve is arranged between the external air source and the gas booster pump, and the outlet of the first electric valve is used to communicate with the medium gas inlet of the gas booster pump ; the control unit further comprises: an inflation module, which sets the third preset pressure value of the gas storage, and collects the third pressure value of the second pressure detection unit, if the third pressure value is lower than the third preset pressure If the third pressure value reaches the third preset pressure value, the first electric valve is closed.

根据本发明的一个方面,双介质压力试验系统还包括:液位检测单元,设置在所述高压储水器存储液体部分的外侧;所述控制单元还包括:充水模块,设置所述高压储水器的预设液位值,采集所述液位检测单元的实时液位值,若实时液位值低于预设液位值,则开启所述高压储水器的进水管;若实时液位值达到预设液位值,则关闭所述高压储水器的进水管,完成所述高压储水器的充水过程。According to an aspect of the present invention, the dual-medium pressure test system further includes: a liquid level detection unit disposed outside the liquid storage portion of the high-pressure water storage unit; the control unit further includes: a water-filling module, disposed in the high-pressure water storage unit The preset liquid level value of the water tank is collected, and the real-time liquid level value of the liquid level detection unit is collected. If the real-time liquid level value is lower than the preset liquid level value, the water inlet pipe of the high-pressure water storage tank is opened; When the level value reaches the preset liquid level value, the water inlet pipe of the high-pressure water storage device is closed to complete the water filling process of the high-pressure water storage device.

根据本发明的一个方面,所述控制单元还包括:报警模块,设置所述高压储水器的低位阈值和高位阈值,采集所述液位检测单元的实时液位值,若实时液位值达到低位阈值或者高位阈值时,则发出警报信号。According to one aspect of the present invention, the control unit further includes: an alarm module, which sets the low-level threshold and the high-level threshold of the high-pressure water storage device, and collects the real-time liquid level value of the liquid level detection unit. If the real-time liquid level value reaches When the low threshold or high threshold is reached, an alarm signal is issued.

根据本发明的一个方面,双介质压力试验系统还包括:第三压力检测单元,设置在所述高压储水器存储气体部分的外侧;所述控制单元还包括:测压模块,设置所述高压储水器的第四预设压力值,采集所述第三压力检测单元的第四压力值,若第四压力值低于第四预设压力值,则开启所述第三电动阀;若第四压力值达到第四预设压力值,则关闭所述第三电动阀。According to an aspect of the present invention, the dual-medium pressure test system further includes: a third pressure detection unit, disposed outside the gas storage part of the high-pressure water storage unit; the control unit further includes: a pressure-measuring module, configured to set the high-pressure The fourth preset pressure value of the water storage device, collect the fourth pressure value of the third pressure detection unit, if the fourth pressure value is lower than the fourth preset pressure value, open the third electric valve; When the fourth pressure value reaches the fourth preset pressure value, the third electric valve is closed.

另一方面,本发明提供一种双介质压力试验方法,双介质压力试验装置包括气体存储器、高压储水器、第一压力检测单元、控制单元、第二电动阀、第三电动阀和第四电动阀,所述控制方法包括:气体从所述气体存储器流出后先经过第一支路,后分为第二支路和第三支路,所述第二支路通往被试工件,所述第三支路通往所述高压储水器;液体从进水管流入所述高压储水器,出水管流出经过第四支路,所述第二支路和所述第四支路合并成第五支路到达所述被试工件;设置所述第二电动阀在所述第二支路上,设置所述第三电动阀在所述第三支路上,设置所述第四电动阀在所述第四支路上,设置所述第一压力检测单元在所述第五支路的管道外侧;比较所述第一压力检测单元检测的气压与预设的第一预设压力,在所述气压小于所述第一预设压力时,打开所述第二电动阀,且在所述气压达到所述第一预设压力时,关闭所述第二电动阀;比较所述第一压力检测单元检测的液压与预设的第二预设压力,且在所述液压小于所述第二预设压力时,打开所述第三电动阀和所述第四电动阀,在所述液压达到所述第二预设压力时,关闭所述第四电动阀。In another aspect, the present invention provides a dual-medium pressure test method, the dual-medium pressure test device includes a gas storage, a high-pressure water storage, a first pressure detection unit, a control unit, a second electric valve, a third electric valve and a fourth electric valve An electric valve, the control method includes: after the gas flows out of the gas storage, it first passes through a first branch, and then is divided into a second branch and a third branch, and the second branch leads to the workpiece to be tested, so The third branch leads to the high-pressure water storage tank; the liquid flows into the high-pressure water storage tank from the water inlet pipe, and the water outlet pipe flows out through the fourth branch circuit, and the second branch circuit and the fourth branch circuit are combined into a The fifth branch reaches the tested workpiece; the second electric valve is set on the second branch, the third electric valve is set on the third branch, and the fourth electric valve is set on the On the fourth branch, set the first pressure detection unit outside the pipeline of the fifth branch; compare the air pressure detected by the first pressure detection unit with a preset first preset pressure, and the air pressure When the pressure is lower than the first preset pressure, open the second electric valve, and when the air pressure reaches the first preset pressure, close the second electric valve; compare the detection of the first pressure detection unit The hydraulic pressure is equal to the preset second preset pressure, and when the hydraulic pressure is less than the second preset pressure, the third electric valve and the fourth electric valve are opened, and when the hydraulic pressure reaches the second preset pressure, the third electric valve and the fourth electric valve are opened. When the second preset pressure is reached, the fourth electric valve is closed.

根据本发明的一个方面,所述双介质压力试验装置包括第五电动阀,设置在所述被试工件的出口管道上,所述控制方法还包括:设置所述被试工件在第一预设压力值下保压设定的时间,开启所述第五电动阀进行泄压,直至所述第一压力检测单元的所述气压为零,完成气压试验过程;设置所述被试工件在第二预设压力值下保压设定的时间,开启所述第五电动阀进行泄压,直至所述第一压力检测单元的所述液压为零,完成水压试验过程。According to an aspect of the present invention, the dual-medium pressure test device includes a fifth electric valve, which is arranged on the outlet pipe of the workpiece to be tested, and the control method further includes: setting the workpiece to be tested at a first preset When the pressure is maintained at the set time under the pressure value, the fifth electric valve is opened to release the pressure until the air pressure of the first pressure detection unit is zero, and the air pressure test process is completed; set the workpiece to be tested in the second For the time set for maintaining the pressure under the preset pressure value, the fifth electric valve is opened to release the pressure until the hydraulic pressure of the first pressure detection unit is zero, and the hydraulic test process is completed.

根据本发明的一个方面,所述双介质压力试验装置包括外接气源、气体增压泵、第二压力检测单元和第一电动阀,所述控制方法还包括:设置所述第二压力检测单元在所述第一支路的管道外侧,设置所述第一电动阀在所述外接气源和所述气体增压泵之间,且所述第一电动阀的出口用于与所述气体增压泵的介质气入口连通;设置所述气体存储器的第三预设压力值,采集所述第二压力检测单元的第三压力值,若第三压力值低于第三预设压力值,则开启所述第一电动阀;若第三压力值达到第三预设压力值,则关闭所述第一电动阀。According to an aspect of the present invention, the dual-medium pressure test device includes an external air source, a gas booster pump, a second pressure detection unit and a first electric valve, and the control method further includes: setting the second pressure detection unit On the outside of the pipeline of the first branch, the first electric valve is arranged between the external gas source and the gas booster pump, and the outlet of the first electric valve is used to communicate with the gas booster. The medium gas inlet of the pressure pump is connected; the third preset pressure value of the gas storage is set, and the third pressure value of the second pressure detection unit is collected. If the third pressure value is lower than the third preset pressure value, the The first electric valve is opened; if the third pressure value reaches a third preset pressure value, the first electric valve is closed.

根据本发明的一个方面,所述双介质压力试验装置包括液位检测单元,设置在所述高压储水器存储液体部分的外侧,其特征在于,所述控制方法还包括:设置所述高压储水器的预设液位值,采集所述液位检测单元的实时液位值,若实时液位值低于预设液位值,则开启所述高压储水器的进水管;若实时液位值达到预设液位值,则关闭所述高压储水器的进水管,完成所述高压储水器的充水过程。According to an aspect of the present invention, the dual-medium pressure test device includes a liquid level detection unit, which is arranged outside the liquid storage part of the high-pressure water storage tank, and characterized in that, the control method further includes: setting the high-pressure storage tank The preset liquid level value of the water tank is collected, and the real-time liquid level value of the liquid level detection unit is collected. If the real-time liquid level value is lower than the preset liquid level value, the water inlet pipe of the high-pressure water storage tank is opened; When the level value reaches the preset liquid level value, the water inlet pipe of the high-pressure water storage device is closed to complete the water filling process of the high-pressure water storage device.

根据本发明的一个发明,双介质压力试验方法还包括:设置所述高压储水器的低位阈值和高位阈值,采集所述液位检测单元的实时液位值,若实时液位值达到低位阈值或者高位阈值时,则发出警报信号。According to an invention of the present invention, the dual-medium pressure test method further includes: setting a low-level threshold value and a high-level threshold value of the high-pressure water reservoir, and collecting the real-time liquid level value of the liquid level detection unit, if the real-time liquid level value reaches the low-level threshold value Or when the threshold is high, an alarm signal is issued.

根据本发明的一个发明,所述双介质压力试验装置包括第三压力检测单元,设置在所述高压储水器存储气体部分的外侧,所述控制方法还包括:设置所述高压储水器的第四预设压力值,采集所述第三压力检测单元的第四压力值,若第四压力值低于第四预设压力值,则开启所述第三电动阀;若第四压力值达到第四预设压力值,则关闭所述第三电动阀。According to an invention of the present invention, the dual-medium pressure test device includes a third pressure detection unit disposed outside the gas storage portion of the high-pressure water storage device, and the control method further includes: setting a pressure detection unit of the high-pressure water storage device a fourth preset pressure value, collect the fourth pressure value of the third pressure detection unit, if the fourth pressure value is lower than the fourth preset pressure value, open the third electric valve; if the fourth pressure value reaches the fourth preset pressure value, the third electric valve is closed.

本发明提供的双介质压力试验装置控制系统中的控制单元包含气压控制模块和液压控制模块,在被试工件500做气压试验时,通过第一压力检测单元601实时检测第五支路管道内的气压,控制第二电动阀702的通断;在被试工件500做液压试验时,通过第一压力检测单元601实时检测第五支路管道内的液压,控制第三电动阀703和第四电动阀704的通断。通过该双介质压力试验装置控制系统能实现液体和气体作为打压介质的自由切换,提高了系统的集成度,减少了拆装时间和人力成本,提高了工作效率。The control unit in the control system of the dual-medium pressure test device provided by the present invention includes an air pressure control module and a hydraulic pressure control module. When the workpiece 500 to be tested is subjected to the air pressure test, the first pressure detection unit 601 detects the pressure in the fifth branch pipeline in real time. air pressure to control the on-off of the second electric valve 702; when the tested workpiece 500 is subjected to the hydraulic test, the first pressure detection unit 601 detects the hydraulic pressure in the fifth branch pipeline in real time, and controls the third electric valve 703 and the fourth electric valve On-off of valve 704. The control system of the dual-medium pressure test device can realize the free switching of liquid and gas as the pressing medium, improve the integration of the system, reduce the disassembly time and labor cost, and improve the work efficiency.

应了解的是,上述一般描述及以下具体实施方式仅为示例性及阐释性的,其并不能限制本发明所欲主张的范围。It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not intended to limit the scope of the invention as claimed.

附图说明Description of drawings

下面的附图是本发明的说明书的一部分,其绘示了本发明的示例实施例,所附附图与说明书的描述一起用来说明发明的原理。The accompanying drawings, which are part of the specification of the invention, illustrate exemplary embodiments of the invention and, together with the description of the specification, serve to explain the principles of the invention.

图1是本发明一个实施例的双介质压力试验系统的示意图;1 is a schematic diagram of a dual-medium pressure test system according to an embodiment of the present invention;

图2是本发明一个实施例的双介质压力试验系统的示意图;2 is a schematic diagram of a dual-medium pressure test system according to an embodiment of the present invention;

图3是本发明一个实施例的双介质压力试验统中控制单元的示意图。3 is a schematic diagram of a control unit in a dual-medium pressure test system according to an embodiment of the present invention.

附图标记说明:Description of reference numbers:

100-外接气源,200-气体增压泵,300-气体存储器,400-高压储水器,500-被试工件,601-第一压力检测单元,602-第二压力检测单元,603-第三压力检测单元,604-液位检测单元,701-第一电动阀,702-第二电动阀,703-第三电动阀,704-第四电动阀,705-第五电动阀。100-External air source, 200-Gas booster pump, 300-Gas storage, 400-High-pressure water reservoir, 500-Tested workpiece, 601-First pressure detection unit, 602-Second pressure detection unit, 603-No. Three pressure detection units, 604 - liquid level detection unit, 701 - first electric valve, 702 - second electric valve, 703 - third electric valve, 704 - fourth electric valve, 705 - fifth electric valve.

具体实施方式Detailed ways

下面将详细描述本发明的各个方面的特征和示例性实施例,为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及具体实施例,对本发明进行进一步详细描述。应理解,此处所描述的具体实施例仅被配置为解释本发明,用于示例性的说明本发明的原理,并不被配置为限定本发明。另外,附图中的机构件不一定是按照比例绘制的。例如,可能对于其他结构件或区域而放大了附图中的一些结构件或区域的尺寸,以帮助对本发明实施例的理解。The features and exemplary embodiments of various aspects of the present invention will be described in detail below. In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only configured to explain the present invention, are used to exemplify the principles of the present invention, and are not configured to limit the present invention. Additionally, the machine components in the figures are not necessarily drawn to scale. For example, the dimensions of some of the structural elements or regions in the figures may be exaggerated for other structural elements or regions to facilitate an understanding of embodiments of the present invention.

下述描述中出现的方位词均为图中示出的方向,并不是对本发明实施例的具体结构进行限定。在本发明的描述中,需要说明的是,除非另有说明,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可视具体情况理解上述术语在本发明中的具体含义。Orientation words appearing in the following description are all directions shown in the drawings, and do not limit the specific structure of the embodiments of the present invention. In the description of the present invention, it should be noted that, unless otherwise specified, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integrated ground connection; either directly or indirectly through an intermediary. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific conditions.

此外术语“包括”、“包含”“具有”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素结构件或组件不仅包括那些要素,而且还包括没有明确列出或固有的属于结构件、组件上的其他机构件。在没有更多限制的情况下,由语句“包括……”限定的要素,并不排除在包括要素的物品或者设备中还存在另外的相同要素。Furthermore, the terms "comprising," "comprising," "having," or any other variation thereof are intended to encompass a non-exclusive inclusion, whereby a structure or component that includes a list of elements includes not only those elements, but also includes not explicitly listed or inherent belong to structural parts, other mechanical parts on components. Without further limitation, an element defined by the phrase "comprising" does not preclude the presence of additional identical elements in the article or device comprising the element.

诸如“下面”、“下方”、“在…下”、“低”、“上方”、“在…上”、“高”等的空间关系术语用于使描述方便,以解释一个元件相对于第二元件的定位,表示除了与图中示出的那些取向不同的取向以外,这些术语旨在涵盖器件的不同取向。另外,例如“一个元件在另一个元件上/下”可以表示两个元件直接接触,也可以表示两个元件之间还具有其他元件。此外,诸如“第一”、“第二”等的术语也用于描述各个元件、区、部分等,并且不应被当作限制。类似的术语在描述通篇中表示类似的元件。Spatial relational terms such as "below," "below," "below," "lower," "above," "above," "higher," etc. are used to facilitate description to explain an element relative to a The orientation of the two elements means that these terms are intended to encompass different orientations of the device in addition to orientations other than those shown in the figures. In addition, for example, "one element is on/under the other" can mean that two elements are in direct contact with each other, or that there are other elements between the two elements. Furthermore, terms such as "first", "second", and the like, are also used to describe various elements, regions, sections, etc. and should not be regarded as limiting. Similar terms refer to similar elements throughout the description.

对于本领域技术人员来说,本发明可以在不需要这些具体细节中的一些细节的情况下实施。下面对实施例的描述仅仅是为了通过示出本发明的示例来提供对本发明更好的理解。It will be apparent to those skilled in the art that the present invention may be practiced without some of these specific details. The following description of the embodiments is only intended to provide a better understanding of the present invention by illustrating examples of the invention.

图1是本发明一个实施例的双介质压力试验装置的示意图,图2是本发明一个实施例的双介质压力试验系统的示意图,图3是本发明一个实施例的双介质压力试验系统中控制单元的示意图。FIG. 1 is a schematic diagram of a dual-medium pressure test device according to an embodiment of the present invention, FIG. 2 is a schematic diagram of a dual-medium pressure test system according to an embodiment of the present invention, and FIG. 3 is a control diagram of the dual-medium pressure test system according to an embodiment of the present invention. Schematic diagram of the unit.

如图1所示,一种双介质压力试验装置包括:气体增压泵200、气体存储器300和高压储水器400;外接气源100通过气体增压泵200进行气体增压后传输到气体存储器300;气体从气体存储器300流出后先经过第一支路,后分为第二支路和第三支路,第二支路通往被试工件500,第三支路通往高压储水器400;液体从进水管流入高压储水器400,出水管流出经过第四支路,第二支路和第四支路合并成第五支路到达被试工件500。As shown in FIG. 1, a dual-medium pressure test device includes: a gas booster pump 200, a gas storage 300 and a high-pressure water storage 400; an external gas source 100 pressurizes the gas through the gas booster pump 200 and transmits the gas to the gas storage 300; after the gas flows out of the gas storage 300, it first passes through the first branch, and then is divided into a second branch and a third branch. The second branch leads to the tested workpiece 500, and the third branch leads to the high-pressure water storage device. 400 ; the liquid flows from the water inlet pipe into the high-pressure water storage device 400 , the water outlet pipe flows out through the fourth branch, and the second branch and the fourth branch are combined into a fifth branch to reach the tested workpiece 500 .

具体的,气体增压泵200采用气动往复式泵,外接气源100、气体增压泵200、气体存储器300、高压储水器400之间的管路均采用不锈钢管连接,增加双介质压力试验装置的耐用性,其中高压储水器400与被试工件500之间以及高压储水器400的进水管和被试工件500的出水管的管路采用软管,方便液体的流动。外接气源100通过气体增压泵200进行气体增压后传输到气体存储器300,气体存储器300作为双介质打压的唯一压力源。外接气源100采用外接氦气瓶、外接氮气瓶或者外接压缩空气等任一种气源,高压储水器400中液体可采用纯水或超纯水。Specifically, the gas booster pump 200 adopts a pneumatic reciprocating pump, and the pipelines between the external gas source 100, the gas booster pump 200, the gas storage 300, and the high-pressure water storage 400 are all connected by stainless steel pipes, and a dual-medium pressure test is added. For the durability of the device, hoses are used for the pipelines between the high pressure water reservoir 400 and the tested workpiece 500 and the water inlet pipe of the high pressure water reservoir 400 and the water outlet pipe of the tested workpiece 500 to facilitate the flow of liquid. The external gas source 100 is pressurized by the gas booster pump 200 and then transferred to the gas storage 300, and the gas storage 300 is used as the only pressure source for dual-medium pressing. The external gas source 100 adopts any gas source such as an external helium cylinder, an external nitrogen cylinder or an external compressed air, and the liquid in the high-pressure water storage device 400 can be pure water or ultrapure water.

本发明中,气体从气体存储器300流出后先经过第一支路,后分为第二支路和第三支路,第二支路通往被试工件500,第三支路通往高压储水器400。液体从进水管流入高压储水器400,通过气体存储器300加压到高压储水器400,使得高压储水器400的出水管流出液体经过第四支路,第二支路和第四支路合并成第五支路到达被试工件500。做气压试验时气体存储器300的气体从第二支路直接到被试工件,做水压试验时气体存储器300的气体对高压储水器400的液体施压,液体从第四支路到被试工件。该一体化的双介质压力试验装置解决了双介质压力试验的前提下,同一工件能够减少频繁拆卸接口,很好的规避了设备损坏的风险,以高压气体作为压力源降低了压力控制滞后的风险。In the present invention, after the gas flows out of the gas storage 300, it first passes through the first branch, and then is divided into a second branch and a third branch. The second branch leads to the workpiece 500 to be tested, and the third branch leads to the high-pressure storage Water dispenser 400. The liquid flows into the high-pressure water accumulator 400 from the water inlet pipe, and is pressurized to the high-pressure water accumulator 400 through the gas accumulator 300, so that the liquid flowing out of the water outlet pipe of the high-pressure water accumulator 400 passes through the fourth branch, the second branch and the fourth branch Merge into the fifth branch to reach the tested workpiece 500 . During the air pressure test, the gas in the gas storage 300 goes directly from the second branch to the workpiece to be tested. During the hydraulic test, the gas in the gas storage 300 exerts pressure on the liquid in the high-pressure water storage 400, and the liquid flows from the fourth branch to the tested workpiece. artifact. The integrated dual-medium pressure test device solves the premise of dual-medium pressure test, the same workpiece can reduce frequent disassembly of the interface, and avoid the risk of equipment damage, and use high-pressure gas as the pressure source to reduce the risk of pressure control lag .

其中,高压储水器400分为两部分,第一部分位于高压储水器400的上部用于存储气体,第二部分位于高压储水器400的下部用于存储液体。高压储水器400预留空间给空气的第一部分直接和气体存储器300连接,当进行水压试验时气体存储器300施压到第一部分的气体,从而将高压储水器400的液体加压输送到被试工件500。The high-pressure water storage device 400 is divided into two parts, the first part is located at the upper part of the high-pressure water storage device 400 for storing gas, and the second part is located at the lower part of the high-pressure water storage device 400 and is used for storing liquid. The high-pressure water accumulator 400 reserves space for the first part of the air to be directly connected to the gas accumulator 300. When the water pressure test is performed, the gas accumulator 300 pressurizes the gas in the first part, so that the liquid of the high-pressure water accumulator 400 is pressurized and transported to the gas accumulator 300. 500 workpieces to be tested.

如图2和图3所示,本发明提供一种双介质压力试验系统,其可以包括上述双介质压力试验装置,其中双介质压力试验装置包括:气体存储器300、高压储水器400、第一压力检测单元601、控制单元、第二电动阀702、第三电动阀703和第四电动阀704;第二电动阀702设置在第二支路上,第三电动阀703设置在第三支路上,第四电动阀704设置在第四支路上,第一压力检测单元601设置在第五支路的管道外侧;控制单元包括:气压控制模块,被设置为比较第一压力检测单元601检测的气压与预设的第一预设压力,在气压小于第一预设压力时,打开第二电动阀702,且在气压达到第一预设压力时,关闭第二电动阀702;液压控制模块,被设置为比较第一压力检测单元601检测的液压与预设的第二预设压力,且在液压小于第二预设压力时,打开第三电动阀703和第四电动阀704,在液压达到第二预设压力时,关闭第四电动阀704。As shown in FIG. 2 and FIG. 3 , the present invention provides a dual-medium pressure test system, which may include the above-mentioned dual-medium pressure test device, wherein the dual-medium pressure test device includes: a gas storage 300, a high-pressure water storage 400, a first The pressure detection unit 601, the control unit, the second electric valve 702, the third electric valve 703 and the fourth electric valve 704; the second electric valve 702 is arranged on the second branch, the third electric valve 703 is arranged on the third branch, The fourth electric valve 704 is arranged on the fourth branch, and the first pressure detection unit 601 is arranged on the outside of the pipeline of the fifth branch; the control unit includes: an air pressure control module, which is configured to compare the air pressure detected by the first pressure detection unit 601 with the air pressure detected by the first pressure detection unit 601. The preset first preset pressure, when the air pressure is less than the first preset pressure, open the second electric valve 702, and when the air pressure reaches the first preset pressure, close the second electric valve 702; the hydraulic control module is set In order to compare the hydraulic pressure detected by the first pressure detection unit 601 with the preset second preset pressure, and when the hydraulic pressure is less than the second preset pressure, the third electric valve 703 and the fourth electric valve 704 are opened, and when the hydraulic pressure reaches the second preset pressure, the third electric valve 703 and the fourth electric valve 704 are opened. When the pressure is preset, the fourth electric valve 704 is closed.

具体的,由于双介质压力试验系统中的控制单元包含气压控制模块和液压控制模块,在被试工件500做气压试验时,通过第一压力检测单元601实时检测第五支路管道内的气压,控制第二电动阀702的通断;在被试工件500做液压试验时,通过第一压力检测单元601实时检测第五支路管道内的液压,控制第三电动阀703和第四电动阀704的通断。通过该双介质压力试验系统能实现液体和气体作为打压介质的自由切换,提高了系统的集成度,减少了拆装时间和人力成本,提高了工作效率。同时,由于设置压力检测单元和电动阀配合控制单元的自动控制,能够减少因人为因素造成的失误。Specifically, since the control unit in the dual-medium pressure test system includes an air pressure control module and a hydraulic control module, when the workpiece 500 is tested for air pressure, the air pressure in the fifth branch pipeline is detected in real time by the first pressure detection unit 601, Control the on-off of the second electric valve 702; when the tested workpiece 500 is subjected to the hydraulic test, the first pressure detection unit 601 detects the hydraulic pressure in the fifth branch pipeline in real time, and controls the third electric valve 703 and the fourth electric valve 704 on and off. Through the dual-medium pressure test system, the free switching of liquid and gas as the pressing medium can be realized, the integration of the system is improved, the disassembly time and labor cost are reduced, and the work efficiency is improved. At the same time, since the pressure detection unit and the electric valve are arranged to cooperate with the automatic control of the control unit, errors caused by human factors can be reduced.

由此可知,双介质压力试验系统可以通过配备控制单元(可以是计算机或逻辑控制器等)自动地实现被试验的工件的气压和液压测试,从而极大的提高了被试工件气压、液压测试的集成性与方便性。It can be seen that the dual-medium pressure test system can automatically realize the pneumatic and hydraulic tests of the tested workpiece by equipping a control unit (which can be a computer or a logic controller, etc.), thereby greatly improving the pneumatic and hydraulic testing of the tested workpiece. integration and convenience.

根据本发明的一个方面,双介质压力试验系统还包括:第五电动阀705,设置在被试工件500的出口管道上;控制单元还包括:气压保压模块,被设置为被试工件500在第一预设压力值下保压设定的时间,开启第五电动阀705进行泄压,直至第一压力检测单元601的气压为零,完成气压试验过程;液压保压模块,被设置为被试工件500在第二预设压力值下保压设定的时间,开启第五电动阀705进行泄压,直至第一压力检测单元601的液压为零,完成水压试验过程。According to one aspect of the present invention, the dual-medium pressure test system further includes: a fifth electric valve 705 arranged on the outlet pipe of the tested workpiece 500; the control unit further includes: an air pressure maintaining module, which is arranged so that the tested workpiece 500 is located at the outlet pipe of the tested workpiece 500; For the time set for the pressure holding under the first preset pressure value, the fifth electric valve 705 is opened to release the pressure until the air pressure of the first pressure detection unit 601 is zero, and the air pressure test process is completed; the hydraulic pressure holding module is set to be When the test workpiece 500 maintains the pressure at the second preset pressure value for the set time, the fifth electric valve 705 is opened to release the pressure until the hydraulic pressure of the first pressure detection unit 601 is zero, and the hydraulic test process is completed.

本发明中,控制单元还包括针对气压控制模块对应的气压保压模块,针对液压控制模块对应的液压保压模块,被试工件500需要在第一预设压力值和第二预设压力值下保压一定的时间,根据被试工件500的测试要求来设定。保压一定的时间后,控制单元开启第五电动阀705对被试工件500进行泄压,直至第一压力检测单元601的气压或液压为零,则气压试验或液压试验过程结束。该双介质压力试验装置控制系统的运行成本低,工作状态能够及时监控并控制其稳定,维护起来比较方便。其中保压和泄压过程全程通过该控制系统操作,能够保证人身安全。In the present invention, the control unit further includes an air pressure maintaining module corresponding to the air pressure control module, and for the hydraulic pressure maintaining module corresponding to the hydraulic control module, the workpiece 500 to be tested needs to be under the first preset pressure value and the second preset pressure value The pressure holding time is set according to the test requirements of the workpiece 500 to be tested. After maintaining the pressure for a certain period of time, the control unit opens the fifth electric valve 705 to release the pressure of the workpiece 500 under test, until the air pressure or hydraulic pressure of the first pressure detection unit 601 is zero, then the air pressure test or hydraulic pressure test process ends. The operation cost of the control system of the dual-medium pressure test device is low, the working state can be monitored and controlled in time to be stable, and the maintenance is convenient. The whole process of pressure maintenance and pressure relief is operated by the control system, which can ensure personal safety.

根据本发明的一个方面,双介质压力试验系统还包括:第二压力检测单元602和第一电动阀701,第二压力检测单元602设置在第一支路的管道外侧,第一电动阀701设置在外接气源100和气体增压泵200之间,且第一电动阀701的出口用于与气体增压泵200的介质气入口连通;控制单元还包括:充气模块,设置气体存储器300的第三预设压力值,采集第二压力检测单元602的第三压力值,若第三压力值低于第三预设压力值,则开启第一电动阀701;若第三压力值达到第三预设压力值,则关闭第一电动阀701。According to an aspect of the present invention, the dual-medium pressure test system further includes: a second pressure detection unit 602 and a first electric valve 701, the second pressure detection unit 602 is arranged outside the pipeline of the first branch, and the first electric valve 701 is arranged Between the external gas source 100 and the gas booster pump 200, and the outlet of the first electric valve 701 is used to communicate with the medium gas inlet of the gas booster pump 200; Three preset pressure values, collect the third pressure value of the second pressure detection unit 602, if the third pressure value is lower than the third preset pressure value, open the first electric valve 701; if the third pressure value reaches the third preset pressure value When the pressure value is set, the first electric valve 701 is closed.

其中,控制单元中的充气模块能够根据第二压力检测单元602的第三压力值与第三预设压力值进行比较,通过比较结果控制第一电动阀701的通断,从而完成气体存储器300的充气过程。该充气模块能够自动完成气体存储器300的充气过程,使得气体存储器300可以始终存储保持在第三压力值下的气体,保证双介质压力试验装置的气压或水压试验的正常进行。Wherein, the inflation module in the control unit can compare the third pressure value of the second pressure detection unit 602 with the third preset pressure value, and control the on-off of the first electric valve 701 according to the comparison result, thereby completing the gas storage 300 inflation process. The gas filling module can automatically complete the gas filling process of the gas storage 300, so that the gas storage 300 can always store the gas kept at the third pressure value, and ensure the normal performance of the air pressure or water pressure test of the dual medium pressure test device.

根据本发明的一个方面,双介质压力试验系统还包括:液位检测单元604,设置在高压储水器400存储液体部分的外侧;控制单元还包括:充水模块,设置高压储水器400的预设液位值,采集液位检测单元604的实时液位值,若实时液位值低于预设液位值,则开启高压储水器400的进水管;若实时液位值达到预设液位值,则关闭高压储水器400的进水管,完成高压储水器400的充水过程。According to an aspect of the present invention, the dual-medium pressure test system further includes: a liquid level detection unit 604 disposed outside the liquid storage portion of the high-pressure water accumulator 400 ; the control unit further includes: a water filling module, provided with a Preset the liquid level value, collect the real-time liquid level value of the liquid level detection unit 604, if the real-time liquid level value is lower than the preset liquid level value, open the water inlet pipe of the high-pressure water accumulator 400; if the real-time liquid level value reaches the preset liquid level value If the liquid level value is reached, the water inlet pipe of the high-pressure water storage device 400 is closed to complete the water filling process of the high-pressure water storage device 400 .

其中,控制单元中的充水模块能够根据液位检测单元604的实时液位值与预设液位值进行比较,通过比较结果控制高压储水器400的进水管的通断,从而完成高压储水器400的充水过程。该充水模块能够自动完成高压储水器400的充水过程,使得高压储水器400可以始终存储预设液位下的液体,保证双介质压力试验装置的水压试验的正常进行。The water filling module in the control unit can compare the real-time liquid level value of the liquid level detection unit 604 with the preset liquid level value, and control the on-off of the water inlet pipe of the high-pressure water accumulator 400 according to the comparison result, thereby completing the high-pressure storage The water filling process of the water device 400 . The water filling module can automatically complete the water filling process of the high pressure water accumulator 400 , so that the high pressure water accumulator 400 can always store the liquid at the preset liquid level, so as to ensure the normal performance of the water pressure test of the dual medium pressure test device.

根据本发明的一个方面,控制单元还包括:报警模块,设置高压储水器400的低位阈值和高位阈值,采集液位检测单元604的实时液位值,若实时液位值达到低位阈值或者高位阈值时,则发出警报信号。报警模块设置在高压储水器400中为了防止液体过多溢出或者过少不能进行液压试验,当实时液位值达到低位阈值或者高位阈值时,则发出警报信号,方便工作人员及时查看高压储水器400的液位情况。According to one aspect of the present invention, the control unit further includes: an alarm module, which sets the low-level threshold and the high-level threshold of the high-pressure water accumulator 400, collects the real-time liquid level value of the liquid-level detection unit 604, and if the real-time liquid level value reaches the low-level threshold or the high-level threshold When the threshold is reached, an alarm signal is issued. The alarm module is set in the high-pressure water storage tank 400 to prevent the hydraulic test from being too much or too little. When the real-time liquid level value reaches the low-level threshold or the high-level threshold, an alarm signal will be issued to facilitate the staff to check the high-pressure water storage in time. The liquid level of the device 400.

根据本发明的一个方面,双介质压力试验系统还包括:第三压力检测单元603,设置在高压储水器400存储气体部分的外侧;控制单元还包括:测压模块,设置高压储水器400的第四预设压力值,采集第三压力检测单元603的第四压力值,若第四压力值低于第四预设压力值,则开启第三电动阀703;若第四压力值达到第四预设压力值,则关闭第三电动阀703。具体的,第三压力检测单元603和测压模块的设置为了使液压试验过程更顺畅,需要保证高压储水器400存储气体部分的气压在第四预设压力值下,通过控制第三电动阀703保证其气压的稳定。According to an aspect of the present invention, the dual-medium pressure test system further includes: a third pressure detection unit 603 disposed outside the gas storage part of the high-pressure water storage device 400; the fourth preset pressure value, collect the fourth pressure value of the third pressure detection unit 603, if the fourth pressure value is lower than the fourth preset pressure value, open the third electric valve 703; When the preset pressure value is four, the third electric valve 703 is closed. Specifically, in order to make the hydraulic test process smoother for the setting of the third pressure detection unit 603 and the pressure measurement module, it is necessary to ensure that the air pressure of the gas stored in the high-pressure water accumulator 400 is under the fourth preset pressure value, by controlling the third electric valve 703 ensures the stability of its air pressure.

如图2所示,根据本发明的一方面,双介质压力试验装置还包括:第一手动阀,连接于外接气源100和气体增压泵200之间,且第一手动阀的出口连接气体增压泵200的驱动气入口;第二手动阀,连接于气体增压泵200和气体存储器300之间;第三手动阀和第一减压阀801,设置在第一支路上;第四手动阀,设置在第一分部的外侧;第五手动阀,设置在高压储水器400的入水口。设置上述各个手动阀方便人工调节气体传输和液体传输,保证双介质压力试验过程双介质的流通人工可调。As shown in FIG. 2 , according to an aspect of the present invention, the dual-medium pressure test device further includes: a first manual valve connected between the external gas source 100 and the gas booster pump 200 , and the outlet of the first manual valve is connected to the gas The driving gas inlet of the booster pump 200; the second manual valve, connected between the gas booster pump 200 and the gas storage 300; the third manual valve and the first pressure reducing valve 801, arranged on the first branch; the fourth The manual valve is arranged on the outer side of the first subsection; the fifth manual valve is arranged at the water inlet of the high-pressure water storage device 400 . The above manual valves are arranged to facilitate manual adjustment of gas transmission and liquid transmission, and to ensure that the circulation of dual media can be manually adjusted during the dual-medium pressure test.

根据本发明的一方面,双介质压力试验装置还包括:第一安全阀,设置在气体增压泵200和气体存储器300之间,且用于与气体存储器300连通;第二安全阀,设置在第二支路上;第三安全阀,设置在高压储水器400的存储气体的第一部分外侧。第一安全阀、第二安全阀和第三安全阀能够保护气体增压泵200和气体存储器300之间的管道、第二支路的管道以及高压储水器100设备的正常工作,当管道或者设备内的压力超过安全阀设定的压力值时,自动开启泄压,保证整个双介质压力试验过程的安全,防止意外发生,减少损失。According to an aspect of the present invention, the dual-medium pressure test device further includes: a first safety valve, arranged between the gas booster pump 200 and the gas storage 300, and used to communicate with the gas storage 300; a second safety valve, arranged at The second branch; the third safety valve, which is arranged outside the first part of the stored gas of the high-pressure water storage device 400 . The first safety valve, the second safety valve and the third safety valve can protect the pipeline between the gas booster pump 200 and the gas storage 300, the pipeline of the second branch and the normal operation of the high-pressure water storage 100 equipment. When the pressure in the equipment exceeds the pressure value set by the safety valve, the pressure relief is automatically opened to ensure the safety of the entire dual-medium pressure test process, prevent accidents and reduce losses.

综上,双介质压力试验装置控制系统能实现液体和气体作为打压介质的自由切换,提高了系统的集成度,减少了拆装时间和人力成本,提高了工作效率。同时,由于设置压力检测单元和电动阀配合控制单元的自动控制,能够减少因人为因素造成的失误。其中,充气过程、充水过程、气压试验过程、气压保压过程、液压试验过程和液压保压过程都能实现自动化控制,保证了人身安全。To sum up, the control system of the dual-medium pressure test device can realize the free switching of liquid and gas as the pressing medium, which improves the integration of the system, reduces the disassembly time and labor cost, and improves the work efficiency. At the same time, since the pressure detection unit and the electric valve are arranged to cooperate with the automatic control of the control unit, errors caused by human factors can be reduced. Among them, the inflation process, the water filling process, the air pressure test process, the air pressure holding process, the hydraulic test process and the hydraulic pressure holding process can be automatically controlled to ensure personal safety.

另一方面,本发明提供一种双介质压力试验方法,双介质压力试验装置包括气体存储器300、高压储水器400、第一压力检测单元601、控制单元、第二电动阀702、第三电动阀703和第四电动阀704。控制方法包括:气体从气体存储器300流出后先经过第一支路,后分为第二支路和第三支路,第二支路通往被试工件500,第三支路通往高压储水器400;液体从进水管流入高压储水器400,出水管流出经过第四支路,第二支路和第四支路合并成第五支路到达被试工件500;设置第二电动阀702在第二支路上,设置第三电动阀703在第三支路上,设置第四电动阀704在第四支路上,设置第一压力检测单元601在第五支路的管道外侧;比较第一压力检测单元601检测的气压与预设的第一预设压力,在气压小于第一预设压力时,打开第二电动阀702,且在气压达到第一预设压力时,关闭第二电动阀702;比较第一压力检测单元601检测的液压与预设的第二预设压力,且在液压小于第二预设压力时,打开第三电动阀703和第四电动阀704,在液压达到第二预设压力时,关闭第四电动阀704。On the other hand, the present invention provides a dual-medium pressure test method, the dual-medium pressure test device includes a gas storage 300, a high-pressure water storage 400, a first pressure detection unit 601, a control unit, a second electric valve 702, a third electric valve valve 703 and fourth electric valve 704 . The control method includes: after the gas flows out of the gas storage 300, it first passes through a first branch, and then is divided into a second branch and a third branch, the second branch leads to the tested workpiece 500, and the third branch leads to the high-pressure storage. Water device 400; the liquid flows into the high-pressure water storage device 400 from the water inlet pipe, the water outlet pipe flows out through the fourth branch, the second branch and the fourth branch are combined into a fifth branch to reach the tested workpiece 500; a second electric valve is provided 702 on the second branch, set the third electric valve 703 on the third branch, set the fourth electrical valve 704 on the fourth branch, set the first pressure detection unit 601 on the outside of the pipeline of the fifth branch; compare the first The air pressure detected by the pressure detection unit 601 and the preset first preset pressure, when the air pressure is less than the first preset pressure, open the second electric valve 702, and when the air pressure reaches the first preset pressure, close the second electric valve 702: Compare the hydraulic pressure detected by the first pressure detection unit 601 with a preset second preset pressure, and when the hydraulic pressure is less than the second preset pressure, open the third electric valve 703 and the fourth electric valve 704, and when the hydraulic pressure reaches the first When the second preset pressure is reached, the fourth electric valve 704 is closed.

根据本发明的一个方面,双介质压力试验装置包括第五电动阀705,设置在被试工件500的出口管道上。控制方法还包括:设置被试工件500在第一预设压力值下保压设定的时间,开启第五电动阀705进行泄压,直至第一压力检测单元601的气压为零,完成气压试验过程;设置被试工件500在第二预设压力值下保压设定的时间,开启第五电动阀705进行泄压,直至第一压力检测单元601的液压为零,完成水压试验过程。According to one aspect of the present invention, the dual-medium pressure test device includes a fifth electric valve 705 disposed on the outlet pipe of the workpiece 500 to be tested. The control method further includes: setting the time for the test workpiece 500 to maintain the pressure at the first preset pressure value, opening the fifth electric valve 705 to release the pressure, until the air pressure of the first pressure detection unit 601 is zero, and completing the air pressure test Process: set the time for the tested workpiece 500 to maintain pressure at the second preset pressure value, open the fifth electric valve 705 to release pressure, until the hydraulic pressure of the first pressure detection unit 601 is zero, and complete the hydraulic test process.

根据本发明的一个方面,双介质压力试验装置包括外接气源100、气体增压泵200、第二压力检测单元602和第一电动阀701。控制方法还包括:设置第二压力检测单元602在第一支路的管道外侧,设置第一电动阀701在外接气源100和气体增压泵200之间,且第一电动阀701的出口用于与气体增压泵200的介质气入口连通;设置气体存储器300的第三预设压力值,采集第二压力检测单元602的第三压力值,若第三压力值低于第三预设压力值,则开启第一电动阀701;若第三压力值达到第三预设压力值,则关闭第一电动阀701。According to one aspect of the present invention, the dual-medium pressure test device includes an external gas source 100 , a gas booster pump 200 , a second pressure detection unit 602 and a first electric valve 701 . The control method further includes: arranging the second pressure detection unit 602 on the outside of the pipeline of the first branch, arranging the first electric valve 701 between the external air source 100 and the gas booster pump 200, and the outlet of the first electric valve 701 is used for Connect with the medium gas inlet of the gas booster pump 200; set the third preset pressure value of the gas storage 300, and collect the third pressure value of the second pressure detection unit 602, if the third pressure value is lower than the third preset pressure If the third pressure value reaches the third preset pressure value, the first electric valve 701 is closed.

根据本发明的一个方面,双介质压力试验装置包括液位检测单元604,设置在高压储水器400存储液体部分的外侧。控制方法还包括:设置高压储水器400的预设液位值,采集液位检测单元604的实时液位值,若实时液位值低于预设液位值,则开启高压储水器400的进水管;若实时液位值达到预设液位值,则关闭高压储水器400的进水管,完成高压储水器400的充水过程。According to an aspect of the present invention, the dual-medium pressure test device includes a liquid level detection unit 604 disposed outside the liquid storage portion of the high-pressure water reservoir 400 . The control method further includes: setting a preset liquid level value of the high-pressure water accumulator 400, collecting the real-time liquid level value of the liquid level detection unit 604, and turning on the high-pressure water accumulator 400 if the real-time liquid level value is lower than the preset liquid level value If the real-time liquid level value reaches the preset liquid level value, the water inlet pipe of the high-pressure water storage device 400 is closed to complete the water filling process of the high-pressure water storage device 400 .

根据本发明的一个发明,双介质压力试验装置控制方法还包括:设置高压储水器400的低位阈值和高位阈值,采集液位检测单元604的实时液位值,若实时液位值达到低位阈值或者高位阈值时,则发出警报信号。According to an invention of the present invention, the control method for the dual-medium pressure test device further includes: setting a low-level threshold and a high-level threshold of the high-pressure water storage device 400, and collecting the real-time liquid level value of the liquid level detection unit 604, if the real-time liquid level value reaches the low-level threshold value Or when the threshold is high, an alarm signal is issued.

根据本发明的一个发明,双介质压力试验装置包括第三压力检测单元603,设置在高压储水器400存储气体部分的外侧。控制方法还包括:设置高压储水器400的第四预设压力值,采集第三压力检测单元603的第四压力值,若第四压力值低于第四预设压力值,则开启第三电动阀703;若第四压力值达到第四预设压力值,则关闭第三电动阀703。According to an invention of the present invention, the dual-medium pressure test device includes a third pressure detection unit 603 , which is disposed outside the gas storage portion of the high-pressure water accumulator 400 . The control method further includes: setting a fourth preset pressure value of the high-pressure water storage device 400, collecting a fourth pressure value of the third pressure detection unit 603, and turning on the third pressure value if the fourth pressure value is lower than the fourth preset pressure value Electric valve 703; if the fourth pressure value reaches the fourth preset pressure value, close the third electric valve 703.

需要说明的是,本发明实施例的双介质压力试验方法的具体实现方式于本发明实施例的双介质压力试验系统的具体实现方式类似,具体请参见控制系统部分的描述,为了减少冗余,不做赘述。It should be noted that the specific implementation of the dual-medium pressure test method of the embodiment of the present invention is similar to the specific implementation of the dual-medium pressure test system of the embodiment of the present invention. For details, please refer to the description of the control system. In order to reduce redundancy, I won't go into details.

以上仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention. within.

Claims (12)

1. A dual media pressure test system, comprising:
a gas storage (300), a high pressure water reservoir (400), a first pressure detection unit (601), a control unit, a second electric valve (702), a third electric valve (703) and a fourth electric valve (704);
the gas flows out of the gas storage (300), then passes through the first branch and then is divided into a second branch and a third branch, the second branch leads to a workpiece (500) to be tested, and the third branch leads to the high-pressure water storage device (400);
liquid flows into the high-pressure water storage device (400) from a water inlet pipe, and flows out from a water outlet pipe to pass through a fourth branch, and the second branch and the fourth branch are combined into a fifth branch to reach the tested workpiece (500);
the second electrically operated valve (702) is arranged on the second branch, the third electrically operated valve (703) is arranged on the third branch, the fourth electrically operated valve (704) is arranged on the fourth branch, and the first pressure detection unit (601) is arranged outside the pipeline of the fifth branch;
the control unit includes:
an air pressure control module configured to compare an air pressure detected by the first pressure detection unit (601) with a preset first preset pressure, open the second electrically operated valve (702) when the air pressure is smaller than the first preset pressure, and close the second electrically operated valve (702) when the air pressure reaches the first preset pressure;
a hydraulic control module configured to compare the hydraulic pressure detected by the first pressure detection unit (601) with a preset second preset pressure, open the third electric valve (703) and the fourth electric valve (704) when the hydraulic pressure is less than the second preset pressure, and close the fourth electric valve (704) when the hydraulic pressure reaches the second preset pressure.
2. The dual media pressure test system of claim 1, further comprising:
a fifth electric valve (705) arranged on an outlet pipeline of the tested workpiece (500);
the control unit further includes:
the air pressure maintaining module is set to open the fifth electric valve (705) for pressure relief after the tested workpiece (500) reaches a first preset pressure value for a set time, until the air pressure of the first pressure detection unit (601) is zero, and the air pressure test process is completed;
and the hydraulic pressure maintaining module is set to open the fifth electric valve (705) for pressure relief after the tested workpiece (500) reaches a second preset pressure value for pressure maintaining set time until the hydraulic pressure of the first pressure detection unit (601) is zero, so that the hydraulic pressure test process is completed.
3. The dual media pressure test system of claim 1, further comprising:
the gas booster pump comprises an external gas source (100), a gas booster pump (200), a second pressure detection unit (602) and a first electric valve (701), wherein the second pressure detection unit (602) is arranged on the outer side of a pipeline of the first branch, the first electric valve (701) is arranged between the external gas source (100) and the gas booster pump (200), and the outlet of the first electric valve (701) is used for being communicated with a medium gas inlet of the gas booster pump (200);
the control unit further includes:
the inflation module is used for setting a third preset pressure value of the gas storage (300), acquiring a third pressure value of the second pressure detection unit (602), and if the third pressure value is lower than the third preset pressure value, opening the first electric valve (701); and if the third pressure value reaches a third preset pressure value, closing the first electric valve (701).
4. The dual media pressure test system of claim 1, further comprising:
a liquid level detection unit (604) disposed outside a liquid storage portion of the high pressure water reservoir (400);
the control unit further includes:
the water filling module is used for setting a preset liquid level value of the high-pressure water storage device (400), acquiring a real-time liquid level value of the liquid level detection unit (604), and starting a water inlet pipe of the high-pressure water storage device (400) if the real-time liquid level value is lower than the preset liquid level value; and if the real-time level value reaches the preset level value, closing the water inlet pipe of the high-pressure water storage device (400) to finish the water filling process of the high-pressure water storage device (400).
5. The dual media pressure test system of claim 4, wherein the control unit further comprises:
and the alarm module is used for setting a low-level threshold value and a high-level threshold value of the high-pressure water storage device (400), acquiring a real-time level value of the liquid level detection unit (604), and sending an alarm signal if the real-time level value reaches the low-level threshold value or the high-level threshold value.
6. The dual media pressure test system of claim 4, further comprising:
a third pressure detecting unit (603) disposed outside a gas storing portion of the high pressure reservoir (400);
the control unit further includes:
the pressure measuring module is used for setting a fourth preset pressure value of the high-pressure water storage device (400), acquiring a fourth pressure value of the third pressure detection unit (603), and if the fourth pressure value is lower than the fourth preset pressure value, opening the third electric valve (703); and if the fourth pressure value reaches a fourth preset pressure value, closing the third electric valve (703).
7. A dual medium pressure test method, wherein the dual medium pressure test device comprises a gas storage (300), a high pressure water reservoir (400), a first pressure detection unit (601), a control unit, a second electric valve (702), a third electric valve (703) and a fourth electric valve (704), characterized in that the test method comprises:
the gas flows out of the gas storage (300), then passes through the first branch and then is divided into a second branch and a third branch, the second branch leads to a workpiece (500) to be tested, and the third branch leads to the high-pressure water storage device (400);
liquid flows into the high-pressure water storage device (400) from a water inlet pipe, and flows out from a water outlet pipe to pass through a fourth branch, and the second branch and the fourth branch are combined into a fifth branch to reach the tested workpiece (500);
-providing the second electrically operated valve (702) in the second branch, -providing the third electrically operated valve (703) in the third branch, -providing the fourth electrically operated valve (704) in the fourth branch, -providing the first pressure detection means (601) outside the duct of the fifth branch;
comparing the air pressure detected by the first pressure detection unit (601) with a preset first preset pressure, opening the second electric valve (702) when the air pressure is smaller than the first preset pressure, and closing the second electric valve (702) when the air pressure reaches the first preset pressure;
comparing the hydraulic pressure detected by the first pressure detection unit (601) with a preset second preset pressure, opening the third electric valve (703) and the fourth electric valve (704) when the hydraulic pressure is less than the second preset pressure, and closing the fourth electric valve (704) when the hydraulic pressure reaches the second preset pressure.
8. The dual media pressure test method of claim 7, the dual media pressure test apparatus comprising a fifth electrically operated valve (705) disposed on an outlet conduit of the workpiece (500) under test, wherein the control method further comprises:
after the tested workpiece (500) is maintained for a set time under the condition that the pressure reaches a first preset pressure value, the fifth electric valve (705) is opened to release the pressure until the air pressure of the first pressure detection unit (601) is zero, and the air pressure test process is completed;
and after the tested workpiece (500) is maintained for a set time under the condition of reaching a second preset pressure value, opening the fifth electric valve (705) for pressure relief until the hydraulic pressure of the first pressure detection unit (601) is zero, and finishing the hydraulic pressure test process.
9. The dual media pressure test method of claim 7, wherein the dual media pressure test apparatus comprises an external gas source (100), a gas booster pump (200), a second pressure detection unit (602) and a first electric valve (701), and the control method further comprises:
arranging the second pressure detection unit (602) outside the pipeline of the first branch, arranging the first electric valve (701) between the external gas source (100) and the gas booster pump (200), and enabling an outlet of the first electric valve (701) to be communicated with a medium gas inlet of the gas booster pump (200);
setting a third preset pressure value of the gas storage (300), collecting the third pressure value of the second pressure detection unit (602), and if the third pressure value is lower than the third preset pressure value, opening the first electric valve (701); and if the third pressure value reaches a third preset pressure value, closing the first electric valve (701).
10. The dual medium pressure test method as set forth in claim 7, said dual medium pressure test device comprising a liquid level sensing unit (604) disposed outside a liquid storing portion of said high pressure water reservoir (400), wherein said control method further comprises:
setting a preset level value of the high-pressure water storage device (400), acquiring a real-time level value of the liquid level detection unit (604), and opening a water inlet pipe of the high-pressure water storage device (400) if the real-time level value is lower than the preset level value; and if the real-time level value reaches the preset level value, closing the water inlet pipe of the high-pressure water storage device (400) to finish the water filling process of the high-pressure water storage device (400).
11. The dual media pressure test method of claim 10, further comprising:
setting a low level threshold value and a high level threshold value of the high pressure water storage device (400), acquiring a real-time level value of the liquid level detection unit (604), and sending an alarm signal if the real-time level value reaches the low level threshold value or the high level threshold value.
12. The double medium pressure test method as claimed in claim 10, the double medium pressure test apparatus comprising a third pressure detecting unit (603) provided outside a gas storing part of the high pressure reservoir (400), wherein the control method further comprises:
setting a fourth preset pressure value of the high-pressure water reservoir (400), acquiring a fourth pressure value of the third pressure detection unit (603), and if the fourth pressure value is lower than the fourth preset pressure value, opening the third electric valve (703); and if the fourth pressure value reaches a fourth preset pressure value, closing the third electric valve (703).
CN202010115947.2A 2020-02-25 2020-02-25 Double-medium pressure test system and method Active CN111413205B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010115947.2A CN111413205B (en) 2020-02-25 2020-02-25 Double-medium pressure test system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010115947.2A CN111413205B (en) 2020-02-25 2020-02-25 Double-medium pressure test system and method

Publications (2)

Publication Number Publication Date
CN111413205A true CN111413205A (en) 2020-07-14
CN111413205B CN111413205B (en) 2021-03-02

Family

ID=71491073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010115947.2A Active CN111413205B (en) 2020-02-25 2020-02-25 Double-medium pressure test system and method

Country Status (1)

Country Link
CN (1) CN111413205B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238919A (en) * 2020-02-25 2020-06-05 蓝箭航天技术有限公司 Double-medium pressure test device
CN112557200A (en) * 2020-11-03 2021-03-26 蓝箭航天技术有限公司 Multi-station hydrostatic test control method
CN113466056A (en) * 2021-08-02 2021-10-01 华东理工大学 Pressure loading system for micro metal test piece high-temperature bulging test
CN114112714A (en) * 2021-12-08 2022-03-01 中国科学院武汉岩土力学研究所 Supercharging device for rock and concrete material high-pressure unloading cracking test

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1441240A (en) * 2002-05-27 2003-09-10 浙江海门试压泵厂 Automatic pressure measuring device and method
JP2005227254A (en) * 2004-02-13 2005-08-25 Kakiuchi:Kk Temperature compensation method for inspection data error caused by outside air temperature, which occurs during pressure-resistant expansion test of high-pressure gas container re-inspection
CN103808569A (en) * 2014-01-26 2014-05-21 合肥通用机械研究院 High-pressure fatigue test device and test method
KR20150125794A (en) * 2014-04-30 2015-11-10 두산중공업 주식회사 Automatic control apparatus and method for hydrostatic test
CN105043886A (en) * 2015-06-26 2015-11-11 中国船舶重工集团公司第七二五研究所 Double-medium testing device for performing gas pressure test and hydraulic test on natural gas pressure vessel
EP3104158A1 (en) * 2014-02-04 2016-12-14 Nakata Manufacturing Co., Ltd. Hydraulic testing method and device
CN106677969A (en) * 2017-02-23 2017-05-17 王政玉 Energy storage device
CN106959246A (en) * 2017-02-17 2017-07-18 中国石油大学(华东) A kind of anhydrous fracture simulation experimental provision of liquid nitrogen and method
CN209069746U (en) * 2018-10-08 2019-07-05 海德利森(天津)检测设备有限公司 A kind of high precision low pressure hydraulic pressure test platform
CN210090206U (en) * 2019-06-17 2020-02-18 新兴河北工程技术有限公司 Quick water injection energy storage system of hydraulic press

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1441240A (en) * 2002-05-27 2003-09-10 浙江海门试压泵厂 Automatic pressure measuring device and method
JP2005227254A (en) * 2004-02-13 2005-08-25 Kakiuchi:Kk Temperature compensation method for inspection data error caused by outside air temperature, which occurs during pressure-resistant expansion test of high-pressure gas container re-inspection
CN103808569A (en) * 2014-01-26 2014-05-21 合肥通用机械研究院 High-pressure fatigue test device and test method
EP3104158A1 (en) * 2014-02-04 2016-12-14 Nakata Manufacturing Co., Ltd. Hydraulic testing method and device
KR20150125794A (en) * 2014-04-30 2015-11-10 두산중공업 주식회사 Automatic control apparatus and method for hydrostatic test
CN105043886A (en) * 2015-06-26 2015-11-11 中国船舶重工集团公司第七二五研究所 Double-medium testing device for performing gas pressure test and hydraulic test on natural gas pressure vessel
CN106959246A (en) * 2017-02-17 2017-07-18 中国石油大学(华东) A kind of anhydrous fracture simulation experimental provision of liquid nitrogen and method
CN106677969A (en) * 2017-02-23 2017-05-17 王政玉 Energy storage device
CN209069746U (en) * 2018-10-08 2019-07-05 海德利森(天津)检测设备有限公司 A kind of high precision low pressure hydraulic pressure test platform
CN210090206U (en) * 2019-06-17 2020-02-18 新兴河北工程技术有限公司 Quick water injection energy storage system of hydraulic press

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238919A (en) * 2020-02-25 2020-06-05 蓝箭航天技术有限公司 Double-medium pressure test device
CN112557200A (en) * 2020-11-03 2021-03-26 蓝箭航天技术有限公司 Multi-station hydrostatic test control method
CN112557200B (en) * 2020-11-03 2024-01-19 蓝箭航天技术有限公司 Multi-station hydrostatic test control method
CN113466056A (en) * 2021-08-02 2021-10-01 华东理工大学 Pressure loading system for micro metal test piece high-temperature bulging test
CN114112714A (en) * 2021-12-08 2022-03-01 中国科学院武汉岩土力学研究所 Supercharging device for rock and concrete material high-pressure unloading cracking test

Also Published As

Publication number Publication date
CN111413205B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN111413205A (en) A dual medium pressure test system and method
CN105043886B (en) A kind of natural gas pressure vessel carries out double dielectric testing devices of gas and water pressure experiment
CN204514627U (en) Subsea tree ground testing system
CN110108477A (en) The intelligent bulge test platform and method of nuclear power unit main steam isolation valve solenoid valve
CN102410961A (en) Gas cylinder detection system
CN108801773B (en) Special-shaped valve pressure on-line test system and test method
CN210863143U (en) Intelligent pressure test platform for solenoid valve of main steam isolation valve of nuclear power plant
CN112798427A (en) A serpentine hydraulic automatic pressure test system
CN217926233U (en) Portable electric pressure test pump
CN207144064U (en) A kind of water system stable-pressure device for having maintenance function concurrently
CN111238919A (en) Double-medium pressure test device
CN204530859U (en) Nuclear power plant's emergency feedwater supply system flow control device
CN209432381U (en) A kind of air tightness detection system of EMU brake apparatus
CN212008140U (en) Double medium pressure test device
CN219777068U (en) Breather valve verifying device
CN117605725A (en) High pressure hydraulic cylinder test pump station
CN217786526U (en) A water pump pressure tank air bag life testing device
CN217901198U (en) Gas circuit comprehensive test bed
CN215727339U (en) Portable pressure test pump
CN115707877A (en) Automatic detection and pressurization adjusting system for energy storage device of welding machine hydraulic system
CN212410308U (en) Skid-mounted pressure testing system
CN113960466A (en) Multifunctional electromagnetic valve test bed
CN115711814B (en) Integrated pressure test system
CN211925371U (en) Ammonia tank system
CN212988787U (en) Hydraulic testing device for fuel cell automobile cylinder valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200728

Address after: No.13, Ronghua South Road, Daxing Economic and Technological Development Zone, Beijing 100176

Applicant after: Blue Arrow Space Technology Co.,Ltd.

Address before: 313000 Building 1, No.177, huangzhishan Road, Huzhou City, Zhejiang Province

Applicant before: LANJIAN SPACEFLIGHT TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant