CN111412330A - Hoisting piece and hanging bracket at pipeline connecting position - Google Patents

Hoisting piece and hanging bracket at pipeline connecting position Download PDF

Info

Publication number
CN111412330A
CN111412330A CN202010292547.9A CN202010292547A CN111412330A CN 111412330 A CN111412330 A CN 111412330A CN 202010292547 A CN202010292547 A CN 202010292547A CN 111412330 A CN111412330 A CN 111412330A
Authority
CN
China
Prior art keywords
cross beam
supporting plate
strip
hanger
straight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010292547.9A
Other languages
Chinese (zh)
Other versions
CN111412330B (en
Inventor
王鑫
胡骏
于欣
李桐
张杨
王毅
常艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huayun Engineering Design Co ltd
BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD
Original Assignee
Beijing Huayun Engineering Design Co ltd
BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Huayun Engineering Design Co ltd, BEIJING MECHANICAL AND ELECTRICAL ENGINEERING GROUP CO LTD filed Critical Beijing Huayun Engineering Design Co ltd
Priority to CN202010292547.9A priority Critical patent/CN111412330B/en
Publication of CN111412330A publication Critical patent/CN111412330A/en
Application granted granted Critical
Publication of CN111412330B publication Critical patent/CN111412330B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/12—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing
    • F16L3/133—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing comprising a member substantially surrounding the pipe, cable or protective tubing and hanging from a pendant
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

本发明公开了一种管道连接部位处的吊装件和吊架,其中吊装件,包括上横梁、下横梁、两根斜撑板和两根直撑板,其特征在于:上横梁和下横梁平行设置,上横梁的长度大于下横梁的长度;两根斜撑板的长度相同,对称设置在上横梁和下横梁两侧,并分别与上横梁和下横梁的端部相连接;两根直撑板分别与上横梁和下横梁垂直连接,其中第一直撑板的第一端与上横梁连接,第一直撑板的第二端与下横梁的第一端连接,第二直撑板的第一端与上横梁连接,第二直撑板的第二端与下横梁的第二端连接;上横梁开有安装孔,下横梁也开有安装孔;上横梁在安装孔两侧各开有一个条型槽,第一斜撑板和第二斜撑板上各开有一个条型槽。

Figure 202010292547

The invention discloses a hoisting member and a hanger at a pipe connection position, wherein the hoisting member comprises an upper beam, a lower beam, two diagonal braces and two straight braces, and is characterized in that the upper beam and the lower beam are parallel set, the length of the upper beam is greater than the length of the lower beam; the two diagonal braces have the same length, are symmetrically arranged on both sides of the upper beam and the lower beam, and are respectively connected with the ends of the upper beam and the lower beam; two straight braces The plates are respectively connected vertically with the upper beam and the lower beam, wherein the first end of the first straight support plate is connected with the upper beam, the second end of the first straight support plate is connected with the first end of the lower beam, and the second end of the straight support plate is connected with the first end of the lower beam. The first end is connected with the upper beam, and the second end of the second straight support plate is connected with the second end of the lower beam; the upper beam is provided with installation holes, and the lower beam is also provided with installation holes; the upper beam is opened on both sides of the installation hole There is a strip groove, and the first diagonal brace plate and the second diagonal brace plate are respectively provided with a strip type groove.

Figure 202010292547

Description

一种管道连接部位处的吊装件和吊架A hoisting piece and hanger at a pipe connection part

技术领域technical field

本发明涉及机电设备安装领域,尤其涉及一种管道连接部位处的吊装件和吊架。The invention relates to the field of electromechanical equipment installation, in particular to a hoisting piece and a hanger at a pipe connection part.

背景技术Background technique

管道安装施工过程中,管道与管道连接位置处一般应在管道接头两侧设置吊架,防止管道接头处受力,但使用传统吊架不仅需要增加大量型钢材料,增加吊点生根数量,影响建筑结构强度,而且还占用很多使用空间,十分影响美观,长期以来,很多实际项目在施工时,只考虑满足规范中对吊架的间距要求,而忽略吊架安装位置对管道系统运行使用维修的影响,很多管道吊架设置位置不合理,造成许多管道接头处都需要承载管道重量,长期如此,不仅缩短了管道接头的使用寿命,还增加了管道系统运行的安全风险。另外,对于异型管道连接,通常需要现场制作吊架,更加增加了成本,且安装难度较大。In the process of pipeline installation and construction, hangers should generally be set on both sides of the pipe joint at the connection position between the pipeline and the pipeline to prevent the pipe joint from being stressed. However, the use of traditional hangers not only requires a large amount of steel material, but also increases the number of hanging points rooting, which affects the building. Structural strength, but also takes up a lot of use space, which greatly affects the appearance. For a long time, many practical projects only consider meeting the requirements for the spacing of the hangers in the specification, and ignore the influence of the installation position of the hangers on the operation and maintenance of the pipeline system. , Many pipe hangers are installed in unreasonable positions, causing many pipe joints to carry the weight of the pipe. This long-term situation not only shortens the service life of the pipe joint, but also increases the safety risk of the pipeline system. In addition, for the connection of special-shaped pipes, hangers usually need to be fabricated on site, which further increases the cost and is difficult to install.

为此,本发明提供一种管道连接部位处的吊装件和吊架,能够很好的解决上述问题。To this end, the present invention provides a hoisting member and a hanger at the pipe connection portion, which can well solve the above problems.

发明内容SUMMARY OF THE INVENTION

为实现本发明之目的,采用以下技术方案予以实现:For realizing the purpose of the present invention, adopt following technical scheme to realize:

一种梯形吊装件,包括上横梁、下横梁、两根斜撑板和两根直撑板,其中:上横梁和下横梁平行设置,上横梁的长度大于下横梁的长度;两根斜撑板的长度相同,对称设置在上横梁和下横梁两侧,并分别与上横梁和下横梁的端部相连接;两根直撑板分别与上横梁和下横梁垂直连接,其中第一直撑板的第一端与上横梁连接,第一直撑板的第二端与下横梁的第一端连接,第二直撑板的第一端与上横梁连接,第二直撑板的第二端与下横梁的第二端连接;上横梁开有安装孔,下横梁也开有安装孔;上横梁在安装孔两侧各开有一个条型槽,第一斜撑板和第二斜撑板上各开有一个条型槽。A trapezoidal hoisting piece comprises an upper beam, a lower beam, two diagonal braces and two straight braces, wherein: the upper beam and the lower beam are arranged in parallel, and the length of the upper beam is greater than the length of the lower beam; They are of the same length, symmetrically arranged on both sides of the upper beam and the lower beam, and connected with the ends of the upper beam and the lower beam respectively; two straight support plates are respectively connected vertically with the upper beam and the lower beam, among which the first straight support plate The first end of the first straight support plate is connected with the upper beam, the second end of the first straight support plate is connected with the first end of the lower cross beam, the first end of the second straight support plate is connected with the upper cross beam, and the second end of the second straight support plate is connected with the upper cross beam. It is connected with the second end of the lower beam; the upper beam is provided with installation holes, and the lower beam is also provided with installation holes; the upper beam is provided with a strip groove on both sides of the installation hole, and the first diagonal bracing plate and the second diagonal bracing plate There is a strip groove on each.

所述的梯形吊装件,其中:第一斜撑板的第一端与上横梁的第一端连接,第一斜撑板的第二端与下横梁的第一端连接,第二斜撑板的第一端与上横梁的第二端连接,第二斜撑板的第二端与下横梁的第二端连接。The trapezoidal hoisting piece, wherein: the first end of the first diagonal bracing plate is connected to the first end of the upper beam, the second end of the first diagonal bracing plate is connected to the first end of the lower beam, and the second diagonal bracing plate is connected to the first end of the lower beam. The first end is connected with the second end of the upper beam, and the second end of the second diagonal brace is connected with the second end of the lower beam.

所述的梯形吊装件,其中:上横梁上的安装孔开设在上横梁中部,下横梁上的安装孔与上横梁上的安装孔对齐。In the trapezoidal hoisting piece, the installation holes on the upper beam are opened in the middle of the upper beam, and the installation holes on the lower beam are aligned with the installation holes on the upper beam.

所述的梯形吊装件,其中:梯形吊装件由碳钢制成。The trapezoidal hoisting piece, wherein: the trapezoidal hoisting piece is made of carbon steel.

一种吊架,包括如上之一所述的梯形吊装件、吊杆和抱箍,其中:带螺纹的上吊杆的下部从上横梁的安装孔插入后再插入下横梁的安装孔,且上吊杆在上横梁和/或下横梁两侧或一侧被螺母锁死;两根带螺纹的下吊杆分别从上横梁的两个条型槽插入后再分别插入第一斜撑板和第二斜撑板上的条型槽,且下吊杆在上横梁两侧被螺母锁死;下吊杆的下部与承托件连接。A hanger, comprising the trapezoidal hoisting piece, the hanger rod and the hoop as described in one of the above, wherein: the lower part of the threaded upper hanger rod is inserted from the installation hole of the upper beam and then inserted into the installation hole of the lower beam, and the upper hanger rod is inserted into the installation hole of the lower beam. Both sides or one side of the upper beam and/or the lower beam are locked by nuts; the two threaded lower suspension rods are respectively inserted from the two strip grooves of the upper beam and then inserted into the first diagonal bracing plate and the second diagonal bracing respectively. The strip groove on the support plate, and the lower boom is locked by nuts on both sides of the upper beam; the lower part of the lower boom is connected with the supporting part.

所述的吊架,其中:所述承托件是抱箍,下吊杆的下部设有安装孔,抱箍的两个夹片上也各设有一个安装孔,抱箍的两个夹片夹住下吊杆的下部且夹片的安装孔与下吊杆下部的安装孔对齐,螺栓插入三个安装孔后被螺母锁死。The hanger, wherein: the supporting member is a hoop, the lower part of the lower boom is provided with a mounting hole, the two clips of the hoop are also provided with an installation hole, and the two clips of the hoop are clamped. Hold the lower part of the lower boom and the mounting holes of the clip are aligned with the mounting holes of the lower part of the lower boom. After the bolts are inserted into the three mounting holes, they are locked by nuts.

所述的吊架,其中:管道接头两端的管体分别插在一个抱箍中,且被抱箍承托。The hanger, wherein: the pipe bodies at both ends of the pipe joint are respectively inserted into a hoop and supported by the hoop.

所述的吊架,其中:所述吊架由碳钢材料制成。The hanger, wherein: the hanger is made of carbon steel material.

所述的吊架,其中:上吊杆的上部安装在建筑物上。The hanger, wherein: the upper part of the upper boom is installed on the building.

一种三角形吊装件,包括上横梁、下横梁、斜撑板和直撑板,其中:上横梁和下横梁平行设置,上横梁的长度大于下横梁的长度;斜撑板的第一端连接上横梁的第一端,斜撑板的第二端连接下横梁的第一端,斜撑板与上横梁之间的夹角为锐角,斜撑板与下横梁之间的夹角为钝角;直撑板两端分别与上横梁和下横梁垂直连接,上横梁在直撑板的一侧设有条型槽,斜撑板横梁上设有条型槽;上横梁设有安装孔,下横梁设有与上横梁的安装孔相对的安装孔。A triangular hoisting piece comprises an upper beam, a lower beam, an oblique brace and a straight brace, wherein: the upper beam and the lower beam are arranged in parallel, the length of the upper beam is greater than the length of the lower beam; the first end of the oblique brace is connected to the upper The first end of the beam and the second end of the diagonal bracing plate are connected to the first end of the lower beam, the angle between the diagonal bracing plate and the upper beam is an acute angle, and the angle between the diagonal bracing plate and the lower beam is an obtuse angle; The two ends of the support plate are respectively connected vertically with the upper beam and the lower beam. The upper beam is provided with a strip groove on one side of the straight support plate, and the diagonal support plate beam is provided with a strip groove; the upper beam is provided with installation holes, and the lower beam is provided with a strip groove. There are mounting holes opposite to the mounting holes of the upper beam.

所述的三角形吊装件,其中:直撑板的第一端在靠近上横梁的第二端的位置与上横梁连接,直撑板的第二端与下横梁的第一端连接;上横梁上从靠近上横梁第一端的位置向远离该第一端的方向开设有一个条型槽,斜撑板上开设有一个条型槽。Said triangular hoisting piece, wherein: the first end of the straight support plate is connected with the upper beam at a position close to the second end of the upper beam, and the second end of the straight support plate is connected with the first end of the lower beam; A strip-shaped groove is provided at a position close to the first end of the upper beam and is provided in a direction away from the first end, and a strip-shaped groove is provided on the diagonal bracing plate.

所述的三角形吊装件,其中:上横梁在第二端附近开有安装孔,下横梁在第二端附近开有安装孔,上横梁的安装孔和条型槽分别设在直撑板两侧;上横梁的安装孔与下横梁的安装孔正对。Said triangular hoisting piece, wherein: the upper beam is provided with mounting holes near the second end, the lower beam is provided with mounting holes near the second end, and the mounting holes and strip grooves of the upper beam are respectively arranged on both sides of the straight support plate ; The mounting holes of the upper beam are directly opposite to the mounting holes of the lower beam.

所述的三角形吊装件,其中:所述三角形吊装件由碳钢材料制成。The triangular hoisting piece, wherein: the triangular hoisting piece is made of carbon steel material.

一种吊架,包括多个如上之一所述的三角形吊装件,多个吊杆和多个抱箍,其中:多个吊装件的上横梁互相重叠且上横梁上的安装孔互相对齐,多个吊装件的下横梁互相重叠且下横梁上的安装孔互相对齐,带螺纹的上吊杆的下部从上横梁的安装孔插入后再插入下横梁的安装孔,且上吊杆在上横梁两侧和下横梁两侧被螺母锁死;每个吊装件设置一个带螺纹的下吊杆,所述下吊杆从上横梁的条型槽插入后再插入斜撑板上的条型槽,且下吊杆在上横梁两侧被螺母锁死;下吊杆的下部与承托件连接。A hanger includes a plurality of triangular hoisting parts as described in one of the above, a plurality of hanging rods and a plurality of hoops, wherein: the upper beams of the plurality of hoisting parts are overlapped with each other and the mounting holes on the upper beams are aligned with each other. The lower beams of the hoisting parts overlap each other and the mounting holes on the lower beams are aligned with each other. Both sides of the lower beam are locked by nuts; each hoisting piece is provided with a threaded lower suspension rod, the lower suspension rod is inserted from the strip groove of the upper beam and then inserted into the strip groove on the diagonal bracing plate, and the lower suspension rod is suspended. The rod is locked by nuts on both sides of the upper beam; the lower part of the lower hanging rod is connected with the supporting part.

所述的吊架,其中:所述承托件是抱箍,下吊杆的下部设有安装孔,抱箍的两个夹片上也各设有一个安装孔,抱箍的两个夹片夹住下吊杆的下部且夹片的安装孔与下吊杆下部的安装孔对齐,螺栓插入三个安装孔后被螺母锁死。The hanger, wherein: the supporting member is a hoop, the lower part of the lower boom is provided with a mounting hole, the two clips of the hoop are also provided with an installation hole, and the two clips of the hoop are clamped. Hold the lower part of the lower boom and the mounting holes of the clip are aligned with the mounting holes of the lower part of the lower boom. After the bolts are inserted into the three mounting holes, they are locked by nuts.

所述的吊架,其中:三通连接的三个管体分别插在一个抱箍中,且被抱箍承托。The hanger, wherein: the three pipe bodies connected by the tee are respectively inserted into a hoop and supported by the hoop.

所述的吊架,其中:多个三角形吊装件之间具有夹角。The hanger, wherein: a plurality of triangular hanging pieces have an included angle.

所述的吊架,其中:所述吊架由碳钢材料制成。The hanger, wherein: the hanger is made of carbon steel material.

所述的吊架,其中:上吊杆上部固定在建筑物上。The hanger, wherein: the upper part of the upper hanger is fixed on the building.

一种吊架,包括如上之一所述的多个梯形吊装件、至少一个如上之一所述的三角形吊装件、吊杆和承托件,其特征在于:所述三角形吊装件的上横梁与一个上部梯形吊装件的上横梁互相重叠且多个上横梁上的安装孔互相对齐,三角形吊装件的下横梁与上部梯形吊装件的下横梁互相重叠且多个下横梁上的安装孔互相对齐;带螺纹的上吊杆的下部从多个上横梁的安装孔插入后再插入多个下横梁的安装孔后被螺母锁死;上部梯形吊装件设有两个带螺纹的下吊杆,所述两根带螺纹的下吊杆分别从上横梁的两个条型槽插入后再分别插入第一斜撑板和第二斜撑板上的条型槽后被螺母锁死;每个三角形吊装件设有一个带螺纹的下吊杆,所述下吊杆从三角形吊装件的上横梁的条型槽插入后再插入斜撑板上的条型槽,且下吊杆被螺母锁死;上部梯形吊装件和三角形吊装件的下吊杆分别与下部梯形吊装件连接;下部梯形吊装件与承托件连接。A hanger, comprising a plurality of trapezoidal hoisting pieces as described in one of the above, at least one triangular hoisting piece as described in one of the above, a hanger rod and a supporting piece, characterized in that: the upper beam of the triangular hoisting piece is connected to the The upper beams of an upper trapezoidal hoisting member overlap each other and the mounting holes on the plurality of upper beams are aligned with each other, the lower beam of the triangular hoisting member and the lower beam of the upper trapezoidal hoisting member overlap each other, and the mounting holes on the plurality of lower beams are aligned with each other; The lower part of the threaded upper boom is inserted from the mounting holes of the upper beams and then inserted into the mounting holes of the lower beams and then locked by the nuts; the upper trapezoidal lifting piece is provided with two threaded lower booms, the two A threaded lower hanger rod is inserted from the two strip-shaped grooves of the upper beam, and then inserted into the strip-shaped grooves on the first diagonal bracing plate and the second diagonal bracing plate respectively, and then locked by nuts; There is a threaded lower boom, the lower boom is inserted from the strip groove of the upper beam of the triangular hoisting piece and then inserted into the strip groove on the diagonal brace, and the lower boom is locked by the nut; the upper trapezoidal hoisting The lower hanging rod of the hoisting piece and the triangular hoisting piece are respectively connected with the lower trapezoidal hoisting piece; the lower trapezoidal hoisting piece is connected with the supporting piece.

所述的吊架,其中:上部梯形吊装件的两个下吊杆的下部分别插入一个下部梯形吊装件的上横梁的安装孔后再插入下横梁的安装孔,且下吊杆被螺母锁死;两个下部梯形吊装件都设有两个带螺纹的下吊杆,两根带螺纹的下吊杆分别从下部梯形吊装件上横梁的两个条型槽插入后再分别插入第一斜撑板和第二斜撑板上的条型槽,且下吊杆被螺母锁死;三角形吊装件的下吊杆的下部插入一个下部梯形吊装件的上横梁的安装孔后再插入下横梁的安装孔,且下吊杆被螺母锁死;每个下部梯形吊装件都设有两个带螺纹的下吊杆,两根带螺纹的下吊杆分别从下部梯形吊装件上横梁的两个条型槽插入后再分别插入第一斜撑板和第二斜撑板上的条型槽,且下吊杆被螺母锁死;下吊杆的下部与承托件连接。The hanger, wherein: the lower parts of the two lower hangers of the upper trapezoidal hoisting member are respectively inserted into the installation holes of the upper beam of a lower trapezoid hoisting member and then inserted into the installation holes of the lower beam, and the lower hangers are locked by nuts. ;Two lower trapezoidal hoisting pieces are provided with two threaded lower suspending rods, and the two threaded lower suspending rods are respectively inserted from the two strip grooves of the upper beam of the lower trapezoidal hoisting piece and then inserted into the first diagonal brace respectively The strip grooves on the plate and the second diagonal brace plate, and the lower boom is locked by the nut; the lower part of the lower boom of the triangular hoisting piece is inserted into the installation hole of the upper beam of a lower trapezoidal hoisting piece, and then inserted into the installation of the lower beam hole, and the lower boom is locked by the nut; each lower trapezoidal hoisting piece is provided with two threaded lower booms, and the two threaded lower booms are respectively connected from the lower trapezoidal hoisting piece. After the grooves are inserted, the strip-shaped grooves on the first diagonal bracing plate and the second diagonal bracing plate are respectively inserted, and the lower hanging rod is locked by the nut; the lower part of the lower hanging rod is connected with the supporting part.

所述的吊架,其中:所述承托件为托架,每个下部梯形吊装件的两个下吊杆下部均插入一个托架的安装孔后被螺母锁死,且托架分别承托一根管道。The hanger, wherein: the support member is a bracket, and the lower parts of the two lower hangers of each lower trapezoidal hanging member are inserted into a mounting hole of a bracket and locked by a nut, and the brackets respectively support a pipe.

所述的吊架,其中:所述承托件为抱箍,下部梯形吊装件的下吊杆的下部设有安装孔,抱箍的两个夹片上也各设有一个安装孔,抱箍的两个夹片夹住下吊杆的下部且夹片的安装孔与下吊杆下部的安装孔对齐,螺栓插入三个安装孔后被螺母锁死。The hanger, wherein: the supporting member is a hoop, the lower part of the lower hanging rod of the lower trapezoidal hoisting member is provided with an installation hole, and the two clips of the hoop are also provided with an installation hole, and the The two clips clamp the lower part of the lower boom, the mounting holes of the clips are aligned with the mounting holes of the lower part of the lower boom, and the bolts are inserted into the three mounting holes and locked by nuts.

所述的吊架,其中:抱箍承托管道。The hanger, wherein: the hoop supports the pipe.

所述的吊架,其中:三角形吊装件与上部梯形吊装件之间具有夹角。The hanger, wherein: there is an included angle between the triangular hoisting piece and the upper trapezoidal hoisting piece.

所述的吊架,其中:所述吊架由碳钢材料制成。The hanger, wherein: the hanger is made of carbon steel material.

所述的吊架,其中:上部梯形吊装件的上吊杆上部安装在建筑物上。The hanger, wherein: the upper part of the upper hanger of the upper trapezoidal hanger is installed on the building.

附图说明Description of drawings

图1为本发明实施方式1的管道连接部位处的吊装件结构示意图;FIG. 1 is a schematic structural diagram of a hoisting member at a pipe connection part according to Embodiment 1 of the present invention;

图2为本发明实施方式1的吊架结构示意图;2 is a schematic diagram of the structure of the hanger according to Embodiment 1 of the present invention;

图3为本发明实施方式2的管道连接部位处的吊装件结构示意图;FIG. 3 is a schematic structural diagram of a hoisting member at a pipe connection part according to Embodiment 2 of the present invention;

图4为本发明实施方式2的吊架结构示意图;4 is a schematic diagram of a hanger structure according to Embodiment 2 of the present invention;

图5为本发明实施方式3的吊架结构示意图。FIG. 5 is a schematic structural diagram of a hanger according to Embodiment 3 of the present invention.

具体实施方式Detailed ways

下面结合附图对本发明的具体实施方式进行详细说明。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

如图1所示,吊装件整体为等腰梯形结构,包括上横梁1、下横梁9、两根斜撑板10、11和两根直撑板12、13,其中上横梁1和下横梁9平行设置,上横梁1的长度大于下横梁9的长度;两根斜撑板10和11的长度相同,对称设置在上横梁1和下横梁9两侧,并分别与上横梁1和下横梁9的端部相连接,即第一斜撑板10的第一端与上横梁1的第一端连接,第一斜撑板10的第二端与下横梁9的第一端连接,第二斜撑板11的第一端与上横梁1的第二端连接,第二斜撑板11的第二端与下横梁9的第二端连接;两根直撑板12和13分别与上横梁1和下横梁9垂直连接,其中第一直撑板12的第一端与上横梁1连接,第一直撑板12的第二端与下横梁9的第一端连接,第一直撑板13的第一端与上横梁1连接,第二直撑板13的第二端与下横梁9的第二端连接;上横梁1中部开有安装孔6,下横梁9开有与之相对齐的安装孔;上横梁1在安装孔6两侧各开有一个条型槽7,第一斜撑板10和第二斜撑板11上各开有一个条型槽8。所述吊装件由碳钢材料制成。As shown in Figure 1, the hoisting member is an isosceles trapezoid structure as a whole, including an upper beam 1, a lower beam 9, two diagonal braces 10, 11 and two straight braces 12, 13, wherein the upper beam 1 and the lower beam 9 Arranged in parallel, the length of the upper beam 1 is greater than the length of the lower beam 9; the lengths of the two diagonal braces 10 and 11 are the same, and are symmetrically arranged on both sides of the upper beam 1 and the lower beam 9, and respectively with the upper beam 1 and the lower beam 9 The ends of the first diagonal bracing plate 10 are connected with the first end of the upper cross beam 1, the second end of the first diagonal bracing plate 10 is connected with the first end of the lower cross beam 9, and the second diagonal bracing plate 10 is connected with the first end of the lower cross beam 9. The first end of the support plate 11 is connected with the second end of the upper beam 1, the second end of the second diagonal support plate 11 is connected with the second end of the lower beam 9; the two straight support plates 12 and 13 are respectively connected with the upper beam 1. It is vertically connected with the lower cross beam 9, wherein the first end of the first straight support plate 12 is connected with the upper cross beam 1, the second end of the first straight support plate 12 is connected with the first end of the lower cross beam 9, and the first straight support plate 13 is connected with the first end of the lower cross beam 9. The first end of the upper beam 1 is connected to the upper beam 1, and the second end of the second straight support plate 13 is connected to the second end of the lower beam 9; Mounting holes; the upper beam 1 is provided with a strip-shaped groove 7 on both sides of the installation hole 6 , and a strip-shaped groove 8 is opened on each of the first diagonal bracing plate 10 and the second diagonal bracing plate 11 . The hoisting piece is made of carbon steel material.

如图2所示,吊架包括吊装件1,吊杆(2,3)和抱箍16。带螺纹的上吊杆3的下部从上横梁1的安装孔6插入后再插入下横梁9的安装孔,且上吊杆3在上横梁1和/或下横梁9两侧或一侧被螺母4和垫片5锁死,上吊杆3上部安装在建筑物如房顶上;两根带螺纹的下吊杆2分别从上横梁1的两个条型槽7插入后再分别插入第一斜撑板10和第二斜撑板11上的条型槽8,且下吊杆2在上横梁1两侧被两个螺母4和垫片5锁死;下吊杆2的下部设有安装孔,抱箍7的两个夹片上也各设有一个安装孔,抱箍7的两个夹片夹住下吊杆2的下部且夹片的安装孔与下吊杆2下部的安装孔对齐,将螺栓17插入三个安装孔后用螺母4和垫片5锁死;管道接头15两端的管体14分别插在一个抱箍7中,且被抱箍7承托。所述吊架由碳钢材料制成。As shown in FIG. 2 , the hanger includes a hanger 1 , a hanger rod ( 2 , 3 ) and a hoop 16 . The lower part of the threaded upper boom 3 is inserted from the mounting hole 6 of the upper beam 1 and then inserted into the mounting hole of the lower beam 9, and the upper boom 3 is on both sides or one side of the upper beam 1 and/or the lower beam 9 by the nuts 4 and 9. The gasket 5 is locked, and the upper part of the upper boom 3 is installed on a building such as a roof; the two threaded lower booms 2 are respectively inserted from the two strip grooves 7 of the upper beam 1 and then inserted into the first diagonal braces respectively 10 and the strip groove 8 on the second diagonal bracing plate 11, and the lower boom 2 is locked by two nuts 4 and washers 5 on both sides of the upper beam 1; The two clips of the hoop 7 are also provided with a mounting hole, the two clips of the hoop 7 clamp the lower part of the lower boom 2 and the mounting holes of the clips are aligned with the mounting holes of the lower part of the lower boom 2, and the bolts 17 is inserted into the three mounting holes and locked with nuts 4 and washers 5 ; the pipe bodies 14 at both ends of the pipe joint 15 are respectively inserted into a hoop 7 and supported by the hoop 7 . The hanger is made of carbon steel material.

通过上述方式,即可方便的实现在管道连接处进行管道吊装。Through the above method, the pipe hoisting at the pipe connection can be conveniently realized.

以上对本发明实施方式1的技术方案进行的描述,在实际操作中,还需要面对多根管道连接的问题,为此,本发明提出了实施方式2,以解决对多根管道设置吊架的技术问题。下面结合附图3,4对实施方式2的技术方案进行详细说明:In the above description of the technical solution of Embodiment 1 of the present invention, in actual operation, it is necessary to face the problem of connecting multiple pipes. Therefore, Embodiment 2 is proposed in the present invention to solve the problem of installing hangers on multiple pipes. technical problem. Below in conjunction with accompanying drawing 3, 4, the technical scheme of embodiment 2 is described in detail:

如图3所示,吊装件10整体为近似三角形,包括上横梁20、下横梁21、斜撑板22和直撑板23,其中上横梁20和下横梁22平行设置,上横梁20的长度大于下横梁21的长度;斜撑板22的第一端连接上横梁20的第一端,斜撑板22的第二端连接下横梁21的第一端,斜撑板22与上横梁20之间的夹角为锐角,斜撑板22与下横梁21之间的夹角为钝角;直撑板23两端分别与上横梁20和下横梁21垂直连接,且直撑板23的第一端在靠近上横梁20的第二端的位置与上横梁20连接,直撑板23的第二端与下横梁21的第一端连接;上横梁20上从靠近上横梁20第一端的位置向远离该第一端的方向开设有一个条型槽24,斜撑板22上开设有一个条型槽;上横梁20第二端附近开有安装孔,下横梁21第二端附近开有安装孔,上横梁20的安装孔和条型槽24分别设在直撑板23两侧;上横梁20的安装孔与下横梁21的安装孔正对。所述吊装件10由碳钢材料制成。As shown in FIG. 3 , the hoisting member 10 is approximately triangular as a whole, including an upper beam 20 , a lower beam 21 , a diagonal brace 22 and a straight brace 23 , wherein the upper beam 20 and the lower beam 22 are arranged in parallel, and the length of the upper beam 20 is greater than The length of the lower beam 21; the first end of the diagonal bracing plate 22 is connected to the first end of the upper beam 20, the second end of the diagonal bracing plate 22 is connected to the first end of the lower beam 21, between the diagonal bracing plate 22 and the upper beam 20 The included angle is an acute angle, and the included angle between the diagonal brace plate 22 and the lower beam 21 is an obtuse angle; the two ends of the straight brace plate 23 are respectively connected vertically with the upper beam 20 and the lower beam 21, and the first end of the straight brace plate 23 is at The position close to the second end of the upper beam 20 is connected with the upper beam 20, and the second end of the straight support plate 23 is connected with the first end of the lower beam 21; A strip groove 24 is opened in the direction of the first end, and a strip groove is opened on the diagonal brace plate 22; a mounting hole is opened near the second end of the upper beam 20, and a mounting hole is opened near the second end of the lower beam 21. The installation holes of the beam 20 and the strip grooves 24 are respectively arranged on both sides of the straight support plate 23 ; the installation holes of the upper beam 20 are directly opposite to the installation holes of the lower beam 21 . The hoisting member 10 is made of carbon steel material.

如图4所示,吊架包括三个吊装件10,吊杆(2,3)和抱箍7。其中三个吊装件10的上横梁20互相重叠且上横梁20上的安装孔互相对齐,三个吊装件10的下横梁21互相重叠且横梁21上的安装孔互相对齐,带螺纹的上吊杆3的下部从上横梁20的安装孔插入后再插入下横梁21的安装孔,且上吊杆3在上横梁20两侧和下横梁21两侧被两个螺母4和垫片5锁死,上吊杆3上部安装在建筑物如房顶上;每个吊装件10设置一个带螺纹的下吊杆2,所述下吊杆2从上横梁20的条型槽24插入后再插入斜撑板22上的条型槽,且下吊杆2在上横梁20两侧被两个螺母4和垫片5锁死;下吊杆2的下部设有安装孔,抱箍7的两个夹片上也各设有一个安装孔,抱箍7的两个夹片夹住下吊杆2的下部且夹片的安装孔与下吊杆2下部的安装孔对齐,将螺栓插入三个安装孔后用螺母锁死;三通25连接的三个管体11分别插在一个抱箍7中,且被抱箍7承托。所述吊架由碳钢材料制成。As shown in FIG. 4 , the hanger includes three hoisting parts 10 , hanger rods ( 2 , 3 ) and a hoop 7 . The upper beams 20 of the three hoisting members 10 are overlapped with each other and the mounting holes on the upper beams 20 are aligned with each other, the lower beams 21 of the three hoisting members 10 are overlapped with each other and the mounting holes on the beams 21 are aligned with each other, and the threaded upper suspension rod 3 The lower part is inserted from the installation hole of the upper beam 20 and then inserted into the installation hole of the lower beam 21, and the upper boom 3 is locked by two nuts 4 and washers 5 on both sides of the upper beam 20 and the lower beam 21. 3. The upper part is installed on a building such as a roof; each hoisting member 10 is provided with a threaded lower suspension rod 2, and the lower suspension rod 2 is inserted from the strip groove 24 of the upper beam 20 and then inserted into the diagonal brace 22 and the lower boom 2 is locked by two nuts 4 and washers 5 on both sides of the upper beam 20; the lower part of the lower boom 2 is provided with mounting holes, and the two clips of the hoop 7 are also provided with There is an installation hole, the two clips of the hoop 7 clamp the lower part of the lower boom 2 and the installation holes of the clips are aligned with the installation holes of the lower part of the lower boom 2, insert the bolts into the three installation holes and lock them with nuts. ; The three pipes 11 connected by the tee 25 are respectively inserted into a hoop 7 and are supported by the hoop 7. The hanger is made of carbon steel material.

在安装过程中,三个吊装件10之间的夹角可以调整,以适应三通25连接的三个管体之间的夹角,下吊杆2可以在上横梁和下横梁设置的条型槽中移动,以方便的在三通合适的位置用抱箍7承托三通25连接的管体。During the installation process, the angle between the three hoisting parts 10 can be adjusted to suit the angle between the three pipe bodies connected by the tee 25, and the lower suspender 2 can be set on the upper beam and the lower beam. Move in the groove, so as to conveniently support the pipe body connected by the tee 25 with the hoop 7 at the appropriate position of the tee.

通过实施方式2,在为三通等管件连接的管道提供吊架时,只需要在建筑物上设置一个生根点即可固定上吊杆,且通过预制的吊装件能够方便的组合成多种形式,为三通等连接的管道件提供便利的吊装措施,避免了管道的安全风险。Through Embodiment 2, when a hanger is provided for a pipe connected by pipe fittings such as a tee, it is only necessary to set a rooting point on the building to fix the hanger rod, and the prefabricated hanger can be conveniently combined into various forms. Provide convenient hoisting measures for connected pipes such as tee, avoiding the safety risks of pipes.

在管道安装时,还有一类更为复杂的管道需要提供吊架装置,需要将实施方式1、2的吊装件组合起来使用,为此提出了实施方式3,如图5所示:吊架包括多个梯形吊装件15、至少一个三角形吊装件10、吊杆(2,3)和托架16。其中至少一个三角形吊装件10的上横梁20与一个上部梯形吊装件的上横梁1互相重叠且多个上横梁上的安装孔互相对齐,三角形吊装件10的下横梁21与上部梯形吊装件的下横梁9互相重叠且多个下横梁上的安装孔互相对齐;带螺纹的上吊杆3的下部从多个上横梁的安装孔插入后再插入多个下横梁的安装孔,且上吊杆3在多个上横梁和/或多个下横梁两侧或一侧被螺母4和垫片5锁死,上吊杆3上部安装在建筑物如房顶上;上部梯形吊装件设有两个带螺纹的下吊杆2,两根带螺纹的下吊杆2分别从上横梁1的两个条型槽7插入后再分别插入第一斜撑板10和第二斜撑板11上的条型槽8,且下吊杆2在上横梁1两侧被两个螺母4和垫片5锁死;每个三角形吊装件10设置一个带螺纹的下吊杆2,所述下吊杆2从三角形吊装件10的上横梁20的条型槽24插入后再插入斜撑板22上的条型槽,且下吊杆2在上横梁20两侧被两个螺母4和垫片5锁死。When the pipeline is installed, there is another type of more complicated pipeline that needs to be provided with a hanger device, and the hangers of Embodiments 1 and 2 need to be used in combination. For this reason, Embodiment 3 is proposed, as shown in Figure 5: the hanger includes A plurality of trapezoidal lifts 15 , at least one triangular lift 10 , booms ( 2 , 3 ) and brackets 16 . The upper beam 20 of at least one triangular hoisting member 10 and the upper beam 1 of one upper trapezoidal hoisting member overlap each other and the mounting holes on the plurality of upper beams are aligned with each other, and the lower beam 21 of the triangular hoisting member 10 and the lower The beams 9 are overlapped with each other and the mounting holes on the multiple lower beams are aligned with each other; the lower part of the threaded upper boom 3 is inserted from the mounting holes of the multiple upper beams and then inserted into the mounting holes of the multiple lower beams, and the upper boom 3 is in multiple positions. Two upper beams and/or multiple lower beams are locked by nuts 4 and washers 5 on both sides or on one side, and the upper part of the upper hanging rod 3 is installed on a building such as a roof; the upper trapezoidal hanging piece is provided with two threaded lower Hanger rod 2, two threaded lower hanger rods 2 are respectively inserted from the two strip-shaped grooves 7 of the upper beam 1 and then inserted into the strip-shaped grooves 8 on the first diagonal bracing plate 10 and the second diagonal bracing plate 11 respectively, And the lower boom 2 is locked by two nuts 4 and washers 5 on both sides of the upper beam 1; The strip-shaped groove 24 of the upper beam 20 is inserted into the strip-shaped groove on the diagonal bracing plate 22, and the lower suspension rod 2 is locked by two nuts 4 and washers 5 on both sides of the upper beam 20.

上部梯形吊装件的两个下吊杆2的下部分别插入一个下部梯形吊装件的上横梁1的安装孔6后再插入下横梁9的安装孔,且下吊杆2在上横梁1两侧和下横梁9两侧被两个螺母4和垫片5锁死;两个下部梯形吊装件都设有两个带螺纹的下吊杆2,两根带螺纹的下吊杆2分别从下部梯形吊装件上横梁1的两个条型槽7插入后再分别插入第一斜撑板10和第二斜撑板11上的条型槽8,且下吊杆2在上横梁1两侧被两个螺母4和垫片5锁死;三角形吊装件的下吊杆2的下部插入一个下部梯形吊装件的上横梁1的安装孔6后再插入下横梁9的安装孔,且下吊杆2在上横梁1两侧和下横梁9两侧被两个螺母4和垫片5锁死;每个下部梯形吊装件设有两个带螺纹的下吊杆2,两根带螺纹的下吊杆2分别从下部梯形吊装件上横梁1的两个条型槽7插入后再分别插入第一斜撑板10和第二斜撑板11上的条型槽8,且下吊杆2在上横梁1两侧被两个螺母4和垫片5锁死。The lower parts of the two lower suspension rods 2 of the upper trapezoidal hoisting piece are respectively inserted into the mounting holes 6 of the upper beam 1 of a lower trapezoidal hoisting piece, and then inserted into the installation holes of the lower beam 9, and the lower suspension rods 2 are on both sides of the upper beam 1. Both sides of the lower beam 9 are locked by two nuts 4 and washers 5; the two lower trapezoidal hoisting parts are provided with two threaded lower suspenders 2, and the two threaded lower suspenders 2 are respectively hoisted from the lower trapezoid The two strip-shaped grooves 7 of the upper beam 1 are inserted and then inserted into the strip-shaped grooves 8 on the first diagonal bracing plate 10 and the second diagonal bracing plate 11 respectively, and the lower suspension rod 2 is surrounded by two on both sides of the upper beam 1. The nut 4 and the gasket 5 are locked; the lower part of the lower boom 2 of the triangular hoisting piece is inserted into the mounting hole 6 of the upper beam 1 of a lower trapezoidal hoisting piece and then inserted into the mounting hole of the lower beam 9, and the lower boom 2 is on the upper Both sides of the beam 1 and both sides of the lower beam 9 are locked by two nuts 4 and washers 5; Insert from the two strip-shaped grooves 7 of the upper beam 1 of the lower trapezoidal hoisting member, and then insert into the strip-shaped grooves 8 on the first diagonal bracing plate 10 and the second diagonal bracing plate 11 respectively, and the lower hanging rod 2 is on the upper beam 1. The sides are locked by two nuts 4 and washers 5.

三个下部梯形吊装件下部设有三个托架16,每个下部梯形吊装件的两个下吊杆2下部均插入其中一个托架16的安装孔后被螺母4和垫片5锁死,且托架分别承托一根连接的管道11,例如图5所示的三通管道或者四通等管件连接的管道;当然三个下部梯形吊装件的下吊杆2亦可如图2、4所示与抱箍相连以承托管道,具体的连接方式已经在前述关于附图2、4的文字说明中有所记载,不再重复说明。The lower parts of the three lower trapezoidal hoisting pieces are provided with three brackets 16, and the lower parts of the two lower suspenders 2 of each lower trapezoidal hoisting piece are inserted into the mounting holes of one of the brackets 16 and locked by nuts 4 and washers 5, and The brackets respectively support a connected pipeline 11, such as the three-way pipeline shown in Figure 5 or the pipeline connected by pipe fittings such as four-way; It is shown that it is connected with the hoop to support the pipe, and the specific connection method has been recorded in the above text description about Figures 2 and 4, and the description will not be repeated.

在上述复杂管道吊架安装过程中,三角形吊装件10与上部梯形吊装件之间的角度可调,例如可以是90度,60度等,以适应不同的管件连接的管道以对其进行吊架安装。During the installation of the above-mentioned complex pipe hanger, the angle between the triangular hanger 10 and the upper trapezoid hanger can be adjusted, for example, it can be 90 degrees, 60 degrees, etc., so as to adapt to the pipes connected by different pipe fittings to hang them. Install.

通过发明,在为各种管道提供吊架时,只需要提供少量的生根点,例如只需要在建筑物上设置一个生根点即可固定上吊杆,且通过预制的吊装件能够方便的组合成多种形式,为三通等异型管道件提供便利的吊装措施,避免了管道的安全风险。Through the invention, when providing hangers for various pipes, it is only necessary to provide a small number of rooting points. For example, only one rooting point needs to be set on the building to fix the hanging rod, and the prefabricated lifting parts can be easily combined into multiple It provides convenient hoisting measures for special-shaped pipe fittings such as tee, and avoids the safety risk of the pipeline.

Claims (5)

1. The utility model provides a trapezoidal hoist and mount piece, includes entablature, bottom end rail, two inclined supporting plates and two straight faggings, its characterized in that: the upper cross beam and the lower cross beam are arranged in parallel, and the length of the upper cross beam is greater than that of the lower cross beam; the two inclined supporting plates have the same length, are symmetrically arranged at two sides of the upper cross beam and the lower cross beam and are respectively connected with the end parts of the upper cross beam and the lower cross beam; the two straight supporting plates are respectively and vertically connected with the upper cross beam and the lower cross beam, wherein the first end of the first straight supporting plate is connected with the upper cross beam, the second end of the first straight supporting plate is connected with the first end of the lower cross beam, the first end of the second straight supporting plate is connected with the upper cross beam, and the second end of the second straight supporting plate is connected with the second end of the lower cross beam; the upper beam is provided with a mounting hole, and the lower beam is also provided with a mounting hole; the upper beam is provided with a strip groove at two sides of the mounting hole respectively, and the first inclined supporting plate and the second inclined supporting plate are provided with a strip groove respectively.
2. A hanger comprising a trapezoidal sling, a boom and a hoop as defined in claim 1, wherein: the lower part of the upper suspender with the screw thread is inserted into the mounting hole of the lower beam after being inserted into the mounting hole of the upper beam, and the upper suspender is locked by nuts at two sides or one side of the upper beam and/or the lower beam; two threaded lower suspension rods are respectively inserted into the strip-shaped grooves on the first inclined supporting plate and the second inclined supporting plate after being respectively inserted into the two strip-shaped grooves of the upper cross beam, and the lower suspension rods are locked at two sides of the upper cross beam by nuts; the lower part of the lower suspender is connected with the supporting piece.
3. The utility model provides a triangle-shaped hoist and mount piece, includes entablature, bottom end rail, oblique fagging and straight fagging, its characterized in that: the upper cross beam and the lower cross beam are arranged in parallel, and the length of the upper cross beam is greater than that of the lower cross beam; the first end of the inclined supporting plate is connected with the first end of the upper cross beam, the second end of the inclined supporting plate is connected with the first end of the lower cross beam, the included angle between the inclined supporting plate and the upper cross beam is an acute angle, and the included angle between the inclined supporting plate and the lower cross beam is an obtuse angle; two ends of the straight supporting plate are respectively and vertically connected with the upper cross beam and the lower cross beam, the upper cross beam is provided with a strip-shaped groove at one side of the straight supporting plate, and the cross beam of the inclined supporting plate is provided with a strip-shaped groove; the upper cross beam is provided with a mounting hole, and the lower cross beam is provided with a mounting hole opposite to the mounting hole of the upper cross beam.
4. A hanger comprising a plurality of triangular sling members as defined in claim 3, a plurality of hanger rods and a plurality of anchor ears, wherein: the upper crossbeams of the hoisting pieces are mutually overlapped, the mounting holes in the upper crossbeams are mutually aligned, the lower crossbeams of the hoisting pieces are mutually overlapped, the mounting holes in the lower crossbeams are mutually aligned, the lower parts of the threaded upper suspenders are inserted into the mounting holes of the lower crossbeams after being inserted into the mounting holes of the upper crossbeams, and the upper suspenders are locked at two sides of the upper crossbeams and two sides of the lower crossbeams by nuts; each hoisting piece is provided with a lower suspension rod with threads, the lower suspension rod is inserted into the strip-shaped groove on the inclined supporting plate after being inserted into the strip-shaped groove of the upper cross beam, and the lower suspension rod is locked at two sides of the upper cross beam by nuts; the lower part of the lower suspender is connected with the supporting piece.
5. A hanger comprising a plurality of trapezoidal shaped hoists as defined in claim 1, at least one triangular-shaped hoist as defined in claim 3, a boom and a support.
CN202010292547.9A 2020-04-15 2020-04-15 Hoisting piece and hanging bracket at pipeline connecting position Active CN111412330B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010292547.9A CN111412330B (en) 2020-04-15 2020-04-15 Hoisting piece and hanging bracket at pipeline connecting position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010292547.9A CN111412330B (en) 2020-04-15 2020-04-15 Hoisting piece and hanging bracket at pipeline connecting position

Publications (2)

Publication Number Publication Date
CN111412330A true CN111412330A (en) 2020-07-14
CN111412330B CN111412330B (en) 2022-01-28

Family

ID=71490074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010292547.9A Active CN111412330B (en) 2020-04-15 2020-04-15 Hoisting piece and hanging bracket at pipeline connecting position

Country Status (1)

Country Link
CN (1) CN111412330B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1073409A (en) * 1964-11-18 1967-06-28 Mueller Franz Pipe suspension means
DE3026221A1 (en) * 1980-07-10 1982-02-04 Hilti AG, 9494 Schaan Pipe hanger with positive locking action - has free ends of looped strip shaped to lock between gripping piece and bracket
DE19716165A1 (en) * 1997-04-18 1998-10-22 Ewe Wilhelm Gmbh & Co Kg Mounting for water or gas meter
EP1607665A1 (en) * 2004-06-16 2005-12-21 WOPF Befestigungselemente GmbH System for suspending pipes, conduits or the like at a sealing
CN103508360A (en) * 2012-06-29 2014-01-15 成都长迪传感技术有限公司 Mobile hanging bracket used for installing sensor forming mould
CN203474243U (en) * 2013-08-14 2014-03-12 成都高原汽车工业有限公司 Lifting appliance of automobile body rear floor framework
CN203516998U (en) * 2013-07-25 2014-04-02 常州市武进武南管道设备有限公司 Pipe clamp type suspender suspension frame
CN204510576U (en) * 2015-03-25 2015-07-29 北京城建安装集团有限公司 A kind of without the embedded suspension bracket of furred ceiling
CN205678265U (en) * 2016-03-29 2016-11-09 江苏信泰机械有限公司 A kind of lever balance suspension and support
CN206770795U (en) * 2017-05-24 2017-12-19 范云翔 A kind of heavy load horizontal pipe pull bar suspension bracket
CN108662291A (en) * 2018-05-28 2018-10-16 倍德力能源装备(江苏)有限公司 A kind of high-performance cross arm type constant supporting spring hanger and its processing technology
CN108895206A (en) * 2018-08-07 2018-11-27 江苏宇恒电气有限公司 A kind of high temperature insulating suspension and support for heat distribution pipeline and equipment
CN208951434U (en) * 2018-09-28 2019-06-07 镇江安华电气有限公司 A kind of adjustable support width hangs bracket
CN208951431U (en) * 2018-09-28 2019-06-07 镇江安华电气有限公司 It is a kind of can multi-faceted transfer sliding suspension and support
CN209067952U (en) * 2018-11-21 2019-07-05 常州信息职业技术学院 A kind of gantry support

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1073409A (en) * 1964-11-18 1967-06-28 Mueller Franz Pipe suspension means
DE3026221A1 (en) * 1980-07-10 1982-02-04 Hilti AG, 9494 Schaan Pipe hanger with positive locking action - has free ends of looped strip shaped to lock between gripping piece and bracket
DE19716165A1 (en) * 1997-04-18 1998-10-22 Ewe Wilhelm Gmbh & Co Kg Mounting for water or gas meter
EP1607665A1 (en) * 2004-06-16 2005-12-21 WOPF Befestigungselemente GmbH System for suspending pipes, conduits or the like at a sealing
CN103508360A (en) * 2012-06-29 2014-01-15 成都长迪传感技术有限公司 Mobile hanging bracket used for installing sensor forming mould
CN203516998U (en) * 2013-07-25 2014-04-02 常州市武进武南管道设备有限公司 Pipe clamp type suspender suspension frame
CN203474243U (en) * 2013-08-14 2014-03-12 成都高原汽车工业有限公司 Lifting appliance of automobile body rear floor framework
CN204510576U (en) * 2015-03-25 2015-07-29 北京城建安装集团有限公司 A kind of without the embedded suspension bracket of furred ceiling
CN205678265U (en) * 2016-03-29 2016-11-09 江苏信泰机械有限公司 A kind of lever balance suspension and support
CN206770795U (en) * 2017-05-24 2017-12-19 范云翔 A kind of heavy load horizontal pipe pull bar suspension bracket
CN108662291A (en) * 2018-05-28 2018-10-16 倍德力能源装备(江苏)有限公司 A kind of high-performance cross arm type constant supporting spring hanger and its processing technology
CN108895206A (en) * 2018-08-07 2018-11-27 江苏宇恒电气有限公司 A kind of high temperature insulating suspension and support for heat distribution pipeline and equipment
CN208951434U (en) * 2018-09-28 2019-06-07 镇江安华电气有限公司 A kind of adjustable support width hangs bracket
CN208951431U (en) * 2018-09-28 2019-06-07 镇江安华电气有限公司 It is a kind of can multi-faceted transfer sliding suspension and support
CN209067952U (en) * 2018-11-21 2019-07-05 常州信息职业技术学院 A kind of gantry support

Also Published As

Publication number Publication date
CN111412330B (en) 2022-01-28

Similar Documents

Publication Publication Date Title
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN110512766B (en) A prefabricated structure system of steel plate concrete shear wall and its construction method
CN113529571B (en) A positioning device for the cable saddle of the diamond-shaped wire-splitting pipe of a cable-stayed bridge with a short tower
CN206720558U (en) A kind of adjustable steel-reinforcement cage hanger
CN111720626A (en) Adjustable hanger
CN207316231U (en) A kind of adjustable combination hanger
CN107416685B (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN211256707U (en) Self-anchored construction hanging basket suspension mechanism based on existing structure
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN108483212A (en) Cladding glass installation self-control electric hoist hanger system and its hanging method
CN212297950U (en) A new type of hoisting piece and hanger
CN111412330B (en) Hoisting piece and hanging bracket at pipeline connecting position
CN209469874U (en) A kind of I-beam pipe installation bracket
CN218818653U (en) A hanging type integrated pipe gallery finished support and hanger
CN206889844U (en) A kind of bearing part structure of derrick type suspension and support
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN115405757A (en) Support and hanger frame for mounting light steel purline lower hanging equipment and mounting construction method
CN213927421U (en) A hanging basket fixing device for curtain wall construction
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN211083117U (en) Pipeline antidetonation props up hoist and mount and puts
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN115448144A (en) Assembled in-row pipeline hoisting device and hoisting method
CN209127931U (en) A tower crane jib reinforced frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20250811

Granted publication date: 20220128

PP01 Preservation of patent right