CN111395193A - Construction formwork and construction method for integral pouring of pier-column-tie beams - Google Patents
Construction formwork and construction method for integral pouring of pier-column-tie beams Download PDFInfo
- Publication number
- CN111395193A CN111395193A CN202010330477.1A CN202010330477A CN111395193A CN 111395193 A CN111395193 A CN 111395193A CN 202010330477 A CN202010330477 A CN 202010330477A CN 111395193 A CN111395193 A CN 111395193A
- Authority
- CN
- China
- Prior art keywords
- template
- column
- construction
- pier stud
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 91
- 238000009415 formwork Methods 0.000 title claims description 73
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 238000005266 casting Methods 0.000 claims description 9
- 238000003466 welding Methods 0.000 claims description 6
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 21
- 238000013461 design Methods 0.000 description 7
- 239000002023 wood Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000005728 strengthening Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000006185 dispersion Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 241001139947 Mida Species 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本发明申请涉及桥梁工程施工领域,具体而言,涉及一种墩柱系梁整体浇筑的施工模板及其施工方法。The application of the present invention relates to the field of bridge engineering construction, in particular, to a construction template for integrally pouring pier-column-tie beams and a construction method thereof.
背景技术Background technique
墩柱系梁是桥梁下部结构中普遍存在的设计,目的是加强墩柱之间的联系,保证墩柱的稳定性。为了避免墩柱系梁施工荷载对模板应力过大导致模板受力破坏,施工过程中采取的常规施工工艺通常包括,搭设支架将墩柱系梁施工过程中产生的应力传递至地面和在墩柱施工时预埋钢板。The pier-column tie-beam is a ubiquitous design in the substructure of bridges, and its purpose is to strengthen the connection between the piers and columns and ensure the stability of the piers. In order to avoid excessive stress on the formwork caused by the construction load of the pier-column-tie beam, the conventional construction techniques adopted in the construction process usually include erecting brackets to transfer the stress generated during the construction of the pier-column-tie beam to the ground and at the pier column. Pre-embedded steel plates during construction.
搭设支架将墩柱系梁施工过程中产生的应力传递至地面,该施工工艺对原地面承载力有较高的要求,地面需要进行压实处理;支架搭设费时费力,在工期紧张的情况下,更是不能满足进度要求;此外,在墩柱系梁设计位置较高时,支架本身的稳定性难以保证,存在一定的安全隐患。The erection of supports transfers the stress generated during the construction of the pier-column-tie beam to the ground. This construction process has high requirements on the bearing capacity of the original ground, and the ground needs to be compacted; the erection of supports is time-consuming and laborious. In addition, when the design position of the pier-column-tie beam is high, the stability of the support itself is difficult to guarantee, and there are certain safety hazards.
在墩柱施工时预埋钢板,模板拆除以后焊接牛腿桩柱作为系梁施工的受力支撑,进而进行中系梁施工,此种做法虽然避免了地面环境对系梁施工的不利影响,但不同的墩柱直径对预埋钢板的尺寸及弧度有较高得要求,钢板需要定形加工;且预埋钢板后期容易生锈,影响墩柱的外观质量;墩柱浇筑至中系梁处必须停止,待下部混凝土强度到达设计强度时方可做为中系梁施工的受力支撑,期间大量的等待时间影响施工进度。Pre-embed steel plates during the construction of the piers. After the formwork is removed, the corbel piles are welded as the force support for the tie beam construction, and then the middle tie beam construction is carried out. Although this method avoids the adverse effects of the ground environment on the tie beam construction, it Different pier column diameters have higher requirements on the size and radian of the embedded steel plate, and the steel plate needs to be shaped and processed; and the embedded steel plate is prone to rust in the later stage, which affects the appearance quality of the pier column; the pier column must be poured to the middle tie beam. , when the strength of the lower concrete reaches the design strength, it can be used as the stress support for the construction of the central tie beam, during which a large amount of waiting time affects the construction progress.
因此,需要提供一种不受地面环境限制、无需墩柱预埋件的整体式系梁浇筑新工艺。Therefore, it is necessary to provide a new pouring process for integral tie beams that is not restricted by the ground environment and does not require embedded parts for piers.
发明内容SUMMARY OF THE INVENTION
本发明申请的主要目的在于提供一种墩柱系梁整体浇筑的施工模板及其施工方法,以解决由于常规施工工艺受地面环境限制、施工过程繁琐,对工件要求高,造成的施工过程繁琐、施工周期长、施工成本高的技术问题。The main purpose of the application of the present invention is to provide a construction template for integrally pouring piers, columns and beams and a construction method thereof, so as to solve the problems caused by the restrictions of the ground environment, the cumbersome construction process, and the high requirements for workpieces due to the conventional construction technology. The technical problems of long construction period and high construction cost.
为了实现上述目的,根据本发明申请的一方面,提供了一种墩柱系梁整体浇筑的施工模板。In order to achieve the above object, according to one aspect of the present application, a construction template for integrally pouring a pier-column-tie beam is provided.
根据本发明申请的墩柱系梁整体浇筑的施工模板包括:The construction formwork for the integral pouring of the pier-column-tie-beam applied for according to the present invention includes:
牛腿柱;corbel column;
墩柱模板,包括基础钢板、模板竖肋、模板横肋和模板横箍,所述模板竖肋、所述模板横肋和所述模板横箍设置在所述基础钢板上;The pier column formwork includes a base steel plate, a formwork vertical rib, a formwork transverse rib and a formwork transverse hoop, and the formwork vertical rib, the formwork transverse rib and the formwork transverse hoop are arranged on the foundation steel plate;
所述牛腿柱设置在所述模板竖肋、模板横肋和模板横箍的交叉处。The corbel column is arranged at the intersection of the vertical rib of the formwork, the horizontal rib of the formwork and the horizontal hoops of the formwork.
进一步的,所述牛腿柱与所述墩柱模板采用角焊缝满焊形式进行连接。Further, the corbel column and the pier column formwork are connected by fillet welding.
进一步的,所述牛腿柱为采用两根I14工字钢组合成三脚架结构形式。Further, the corbel column adopts the combination of two I14 I-beams to form a tripod structure.
进一步的,所述牛腿柱上包括用于与所述墩柱模板进行连接的结构凹槽。Further, the corbel column includes a structural groove for connecting with the pier column formwork.
进一步的,包括至少两个所述牛腿柱,所述至少两个所述牛腿柱沿同一水平轴线对称设置在所述墩柱模板上。Further, at least two of the corbel columns are included, and the at least two corbel columns are symmetrically arranged on the pier column formwork along the same horizontal axis.
为了实现上述目的,根据本发明申请的另一方面,提供了一种墩柱系梁整体浇筑的施工方法。In order to achieve the above object, according to another aspect of the present application, a construction method for integrally pouring a pier column tie beam is provided.
根据本发明申请的墩柱系梁整体浇筑的施工方法包括上述任一种所述的墩柱系梁整体浇筑的施工模板,其步骤包括:The construction method for integrally pouring a pier-column-tie beam according to the present invention includes any of the above-mentioned construction templates for integrally casting a pier-column-tie beam, and the steps include:
根据墩柱系梁设计标高位置,推算出所述牛腿柱的位置,将所述牛腿柱焊接在所述墩柱模板的所述模板竖肋、所述模板横肋以及所述模板横箍的交叉处;According to the design elevation position of the pier column tie beam, the position of the corbel column is calculated, and the corbel column is welded to the template vertical rib, the template transverse rib and the template transverse hoop of the pier column template. the intersection;
在所述牛腿柱上放置横梁,所述横梁之间通过拉杆进行连接;A beam is placed on the corbel column, and the beams are connected by tie rods;
在所述横梁上面均匀搭设方木;Evenly erect square wood on the beam;
检测所述牛腿柱的标高,确认无误后安装墩柱系梁模板的底模,进行钢筋绑扎;Detect the elevation of the corbel column, and install the bottom formwork of the pier column tie beam formwork after confirming that it is correct, and carry out reinforcement binding;
浇筑混凝土,完成墩柱系梁整体浇筑的施工。Concrete is poured to complete the construction of the overall pouring of the pier-column-tie beam.
进一步的,所述牛腿柱与所述墩柱模板采用角焊缝满焊形式进行连接。Further, the corbel column and the pier column formwork are connected by fillet welding.
进一步的,所述牛腿柱为采用两根I14工字钢组合成三脚架结构形式。Further, the corbel column adopts the combination of two I14 I-beams to form a tripod structure.
进一步的,所述横梁为I45a工字钢,所述横梁上搭设的所述方木的尺寸大小为100mm×100mm,间距为25cm。Further, the beam is I45a I-beam, the size of the square wood erected on the beam is 100mm×100mm, and the spacing is 25cm.
进一步的,包括至少两个所述牛腿柱,所述至少两个所述牛腿柱沿同一水平轴线对称设置在所述墩柱模板上。Further, at least two of the corbel columns are included, and the at least two corbel columns are symmetrically arranged on the pier column formwork along the same horizontal axis.
在本发明申请实施例中,采用设计一种墩柱系梁整体浇筑的施工模板的方式,通过在墩柱模板的基础钢板,以及模板竖肋、模板横肋和模板横箍的交叉处设置牛腿柱的结构设计,达到了省略了支架的搭设、拆除以及加强地基承载力的工作的目的,从而实现了节省了资源和工期,不需要在墩身上设置预埋件,大大提高了施工效率的技术效果,进而解决了由于常规施工工艺受地面环境限制、施工过程繁琐,对工件要求高,造成的施工过程繁琐、施工周期长、施工成本高的技术问题。In the application example of the present invention, a construction formwork for integrally pouring the pier column and beam is adopted, and the cross of the base steel plate of the pier column formwork and the vertical rib of the formwork, the horizontal rib of the formwork and the horizontal hoop of the formwork is arranged. The structural design of the leg column achieves the purpose of omitting the erection and dismantling of the support and the work of strengthening the bearing capacity of the foundation, thereby saving resources and construction period, and does not need to set embedded parts on the pier, which greatly improves the construction efficiency. The technical effect further solves the technical problems of cumbersome construction process, long construction period and high construction cost caused by the fact that the conventional construction process is limited by the ground environment, the construction process is cumbersome, and the requirements for the workpiece are high.
附图说明Description of drawings
构成本发明申请的一部分的附图用来提供对本发明申请的进一步理解,使得本发明申请的其它特征、目的和优点变得更明显。本发明申请的示意性实施例附图及其说明用于解释本发明申请,并不构成对本发明申请的不当限定。在附图中:The accompanying drawings, which form a part of the present application, are included to provide a further understanding of the present application and to make other features, objects and advantages of the present application more apparent. The drawings and descriptions of the schematic embodiments of the present application are used to explain the present application, and do not constitute an improper limitation to the present application. In the attached image:
图1是根据本发明申请实施例的墩柱系梁整体浇筑的施工模板结构示意图。FIG. 1 is a schematic structural diagram of a construction template for integral pouring of a pier-column-tie beam according to an embodiment of the present invention.
图2是根据本发明申请实施例的墩柱系梁整体浇筑的施工模板具体应用的结构示意图。FIG. 2 is a schematic structural diagram of a specific application of a construction template for integrally pouring a pier-column-tie beam according to an embodiment of the present application.
附图标记reference number
1:牛腿柱;2:墩柱模板;201:基础钢板;202:模板竖肋;203:模板横肋;204:模板横箍;3:横梁;4:方木。1: corbel column; 2: pier column formwork; 201: foundation steel plate; 202: formwork vertical rib; 203: formwork transverse rib; 204: formwork horizontal hoop; 3: beam; 4: square wood.
具体实施方式Detailed ways
为了使本技术领域的人员更好地理解本发明申请方案,下面将结合本发明申请实施例中的附图,对本发明申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明申请一部分的实施例,而不是全部的实施例。基于本发明申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本发明申请保护的范围。In order to enable those skilled in the art to better understand the application solutions of the present invention, the technical solutions in the application embodiments of the present invention will be described clearly and completely below with reference to the accompanying drawings in the application embodiments of the present invention. Obviously, the described The examples are only examples of a part of the application of the present invention, but not all examples. Based on the embodiments in the application of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the application of the present invention.
需要说明的是,本发明申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本发明申请的实施例。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first", "second", etc. in the description and claims of the present application and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific sequence or sequence. . It is to be understood that the data so used may be interchanged under appropriate circumstances for the embodiments of the present application described herein. Furthermore, the terms "comprising" and "having" and any variations thereof, are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those expressly listed Rather, those steps or units may include other steps or units not expressly listed or inherent to these processes, methods, products or devices.
在本发明申请中,术语“上”、“下”、“左”、“右”、“前”、“后”、“顶”、“底”、“内”、“外”、“中”、“竖直”、“水平”、“横向”、“纵向”等指示的方位或位置关系为基于附图所示的方位或位置关系。这些术语主要是为了更好地描述本发明申请及其实施例,并非用于限定所指示的装置、元件或组成部分必须具有特定方位,或以特定方位进行构造和操作。In the present application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle" The orientations or positional relationships indicated by , "vertical", "horizontal", "horizontal", "longitudinal", etc. are based on the orientations or positional relationships shown in the drawings. These terms are primarily used to better describe the present application and its embodiments, and are not intended to limit the fact that the indicated device, element or component must have a particular orientation, or be constructed and operated in a particular orientation.
并且,上述部分术语除了可以用于表示方位或位置关系以外,还可能用于表示其他含义,例如术语“上”在某些情况下也可能用于表示某种依附关系或连接关系。对于本领域普通技术人员而言,可以根据具体情况理解这些术语在本发明申请中的具体含义。In addition, some of the above-mentioned terms may be used to express other meanings besides orientation or positional relationship. For example, the term "on" may also be used to express a certain attachment or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in the application of the present invention can be understood according to specific situations.
此外,术语“安装”、“设置”、“设有”、“连接”、“相连”、“套接”应做广义理解。例如,可以是固定连接,可拆卸连接,或整体式构造;可以是机械连接,或电连接;可以是直接相连,或者是通过中间媒介间接相连,又或者是两个装置、元件或组成部分之间内部的连通。对于本领域普通技术人员而言,可以根据具体情况理解上述术语在本发明申请中的具体含义。Furthermore, the terms "installed", "set up", "provided with", "connected", "connected", "socketed" should be construed broadly. For example, it may be a fixed connection, a detachable connection, or a unitary structure; it may be a mechanical connection, or an electrical connection; it may be directly connected, or indirectly connected through an intermediary, or between two devices, elements, or components. internal communication. For those of ordinary skill in the art, the specific meanings of the above terms in the application of the present invention can be understood according to specific situations.
需要说明的是,在不冲突的情况下,本发明申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明申请。It should be noted that the embodiments in the present application and the features of the embodiments may be combined with each other under the condition of no conflict. The application of the present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
在本领域相关的技术方案的技术上,为克服现有方案的缺点,根据具体的施工应用进行技术改进,涉及到模板的改进,往往认为牛腿柱设置与墩柱模板连接共同来进行墩柱系梁整体浇筑的施工的支持及上层建筑结构施工力的分散和承载是不可行的,本发明申请的技术方案在基于实际工程的基础上,通过多方的计算及在工程中的具体实施和应用得出的。并非本领域技术人员通过常规的结构设定或预想可以实现或或者确保可以实施的,是经过发明人进行了多次的计算和力的分析,并结合现场的施工情况和最终验证得出的,期间付出了大量的劳动,是为推动本领域相关技术的发展而做出的技术改进。In terms of the technology of the related technical solutions in this field, in order to overcome the shortcomings of the existing solutions, technical improvements are made according to specific construction applications, involving the improvement of the formwork, it is often considered that the corbel column setting and the pier column formwork connection are combined to carry out the pier column. The support of the construction of the integral pouring of the tie beam and the dispersion and bearing of the construction force of the superstructure structure are infeasible. derived. It is not that those skilled in the art can realize or ensure that it can be implemented through conventional structural settings or expectations. It is obtained after the inventor has carried out many calculations and force analysis, combined with the construction situation on site and the final verification. A lot of labor was paid during the period, and it was a technical improvement made to promote the development of related technologies in this field.
如图1所示,本发明申请涉及一种墩柱系梁整体浇筑的施工模板,该墩柱系梁整体浇筑的施工模板包括,牛腿柱1和墩柱模板2,所述墩柱模板2包括基础钢板201、模板竖肋202、模板横肋203和模板横箍204,所述模板竖肋202、模板横肋203和模板横箍204设置在所述基础钢板201上;所述牛腿柱1设置在所述模板竖肋202、所述模板横肋203和所述模板横箍204的交叉处,以增强所述墩柱系梁整体浇筑的施工模板承受荷载的强度和整体结构的稳定性。As shown in FIG. 1 , the present application relates to a construction formwork for integrally pouring pier-column-tie beams. The pier-column-tie-beam integrally casting construction formwork includes a
在本发明申请优选的实施例中,所述牛腿柱1与所述墩柱模板2采用角焊缝满焊形式进行连接,以保证所述墩柱系梁整体浇筑的施工模板满足墩柱系梁施工的承载力要求。在进一步优选的实施例中,所述牛腿柱1为采用两根I14工字钢组合成三脚架结构形式,所述牛腿柱1上包括用于与所述墩柱模板2进行连接的结构凹槽,该结构凹槽分别对应所述模板竖肋202、所述模板横肋203和所述模板横箍204设置。In a preferred embodiment of the application of the present invention, the
在本发明申请优选的实施例中,包括至少两个所述牛腿柱1,所述至少两个所述牛腿柱1沿同一水平轴线对称设置在所述墩柱模板2上;所述牛腿柱1的数量为墩柱个数的2倍。In a preferred embodiment of the present application, at least two of the
为了实现上述目的,根据本发明申请的另一方面,提供了一种墩柱系梁整体浇筑的施工方法。In order to achieve the above object, according to another aspect of the present application, a construction method for integrally pouring a pier column tie beam is provided.
根据本发明申请的墩柱系梁整体浇筑的施工方法包括上述任一种所述的墩柱系梁整体浇筑的施工模板,其步骤包括:The construction method for integrally pouring a pier-column-tie beam according to the present invention includes any of the above-mentioned construction templates for integrally casting a pier-column-tie beam, and the steps include:
根据墩柱系梁设计标高位置,减去模板厚度、上部方木以及横梁的高度,推算出所述牛腿柱1的位置,如图1所示,将所述牛腿柱1焊接在所述墩柱模板2的所述模板竖肋202、所述模板横肋203以及所述模板横箍204的交叉处,以增强结构承受荷载的强度和整体的稳定性;According to the design elevation position of the pier column tie beam, minus the thickness of the formwork, the height of the upper square wood and the beam, the position of the
如图2所示,在所述牛腿柱1上放置横梁3,该结构设置便于力的分散和传导,将施工中的上部荷载传递至牛腿柱上;所述横梁之间通过拉杆进行连接,保证其整体稳定性;As shown in Figure 2, a
在所述横梁3上面均匀搭设方木4;On the top of the
检测所述牛腿柱1的标高,确认无误后安装墩柱系梁模板的底模,进行钢筋绑扎;Detect the elevation of the
浇筑混凝土,完成墩柱系梁整体浇筑的施工。Concrete is poured to complete the construction of the overall pouring of the pier-column-tie beam.
在本发明申请优选的实施例中,所述牛腿柱1与所述墩柱模板2采用角焊缝满焊形式进行连接,以保证满足墩柱系梁施工的承载力要求;所述牛腿柱1为采用两根I14工字钢组合成三脚架结构形式;所述横梁3为I45a工字钢,所述横梁3上搭设的所述方木4的尺寸大小为100mm×100mm,间距为25cm。In a preferred embodiment of the application of the present invention, the
在本发明申请优选的实施例中,同一个墩柱上焊接至少两个所述牛腿柱,所述至少两个所述牛腿柱1沿同一水平轴线对称设置在所述墩柱模板上;在本发明申请优选的实施例中,所述牛腿柱1数量为墩柱个数的2倍。In a preferred embodiment of the present application, at least two of the corbel columns are welded on the same pier column, and the at least two of the
本发明申请中的技术方案较常规的柱系梁施工方法省略了支架的搭设、拆除以及加强地基承载力的工作,节省了资源和工期,不需要在墩身上设置预埋件,大大提高了施工效率,可经过midas Civil验算其结构受力满足规范要求大大提高了施工过程中的安全性。达到了提高施工效率、经济效益以及施工安全性的目的。Compared with the conventional column beam construction method, the technical solution in the application of the present invention omits the work of erecting, dismantling and strengthening the bearing capacity of the foundation, saves resources and construction period, does not need to set embedded parts on the pier, and greatly improves the construction The efficiency can be checked by midas Civil, and its structural force meets the requirements of the specification, which greatly improves the safety in the construction process. The purpose of improving construction efficiency, economic benefit and construction safety is achieved.
在本发明申请实施例中,采用设计一种墩柱系梁整体浇筑的施工模板的方式,通过在墩柱模板的基础钢板,以及模板竖肋、模板横肋和模板横箍的交叉处设置牛腿柱的结构设计,达到了省略了支架的搭设、拆除以及加强地基承载力的工作的目的,从而实现了节省了资源和工期,不需要在墩身上设置预埋件,大大提高了施工效率的技术效果,进而解决了由于常规施工工艺受地面环境限制、施工过程繁琐,对工件要求高,造成的施工过程繁琐、施工周期长、施工成本高的技术问题。In the application example of the present invention, a construction formwork for integrally pouring the pier column and beam is adopted, and the cross of the base steel plate of the pier column formwork and the vertical rib of the formwork, the horizontal rib of the formwork and the horizontal hoop of the formwork is arranged. The structural design of the leg column achieves the purpose of omitting the erection and dismantling of the support and the work of strengthening the bearing capacity of the foundation, thereby saving resources and construction period, and does not need to set embedded parts on the pier, which greatly improves the construction efficiency. The technical effect further solves the technical problems of cumbersome construction process, long construction period and high construction cost caused by the fact that the conventional construction process is limited by the ground environment, the construction process is cumbersome, and the requirements for the workpiece are high.
以上所述仅为本发明申请的优选实施例而已,并不用于限制本发明申请,对于本领域的技术人员来说,本发明申请可以有各种更改和变化。凡在本发明申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明申请的保护范围之内。The above descriptions are only preferred embodiments of the application of the present invention, and are not intended to limit the application of the present invention. For those skilled in the art, the application of the present invention may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included within the protection scope of the present application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010330477.1A CN111395193B (en) | 2020-04-23 | 2020-04-23 | Construction template for integral pouring of pier column tie beam and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010330477.1A CN111395193B (en) | 2020-04-23 | 2020-04-23 | Construction template for integral pouring of pier column tie beam and construction method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111395193A true CN111395193A (en) | 2020-07-10 |
| CN111395193B CN111395193B (en) | 2024-11-01 |
Family
ID=71437655
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010330477.1A Active CN111395193B (en) | 2020-04-23 | 2020-04-23 | Construction template for integral pouring of pier column tie beam and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111395193B (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103866697A (en) * | 2014-04-10 | 2014-06-18 | 中铁二局股份有限公司 | Pier and horizontal tie beam bracket support synchronization construction method |
| JP2015137468A (en) * | 2014-01-21 | 2015-07-30 | 大成建設株式会社 | Frame structure for column/beam jointing part and construction method for column/beam jointing part |
| CN205617245U (en) * | 2016-01-18 | 2016-10-05 | 中国铁建大桥工程局集团有限公司 | A unsettled built -up plate support frame for high pier capping beam |
| CN106087762A (en) * | 2016-08-09 | 2016-11-09 | 杭州江润科技有限公司 | Pier stud and straining beam Tong Bu pour formwork erecting structure and construction method thereof |
| CN106592436A (en) * | 2016-12-15 | 2017-04-26 | 王勋 | Manufacturing method of tool mold plate for city bridges |
| CN107401113A (en) * | 2017-06-21 | 2017-11-28 | 杭州江润科技有限公司 | Stiff skeleton straining beam structure and construction method built in a kind of high pier |
| CN108118612A (en) * | 2016-11-28 | 2018-06-05 | 宁波市罗司曼厨卫有限公司 | A kind of Non-strut bridge pier template |
| WO2020001156A1 (en) * | 2018-06-29 | 2020-01-02 | 比亚迪股份有限公司 | Bridge and bridge pier thereof |
| CN110700105A (en) * | 2019-10-21 | 2020-01-17 | 中交一公局第七工程有限公司 | Synchronous construction method for high pier column and tie beam and template used in same |
| CN212561185U (en) * | 2020-04-23 | 2021-02-19 | 中交路桥建设有限公司 | Pier stud tie beam integral casting's construction template |
-
2020
- 2020-04-23 CN CN202010330477.1A patent/CN111395193B/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015137468A (en) * | 2014-01-21 | 2015-07-30 | 大成建設株式会社 | Frame structure for column/beam jointing part and construction method for column/beam jointing part |
| CN103866697A (en) * | 2014-04-10 | 2014-06-18 | 中铁二局股份有限公司 | Pier and horizontal tie beam bracket support synchronization construction method |
| CN205617245U (en) * | 2016-01-18 | 2016-10-05 | 中国铁建大桥工程局集团有限公司 | A unsettled built -up plate support frame for high pier capping beam |
| CN106087762A (en) * | 2016-08-09 | 2016-11-09 | 杭州江润科技有限公司 | Pier stud and straining beam Tong Bu pour formwork erecting structure and construction method thereof |
| CN108118612A (en) * | 2016-11-28 | 2018-06-05 | 宁波市罗司曼厨卫有限公司 | A kind of Non-strut bridge pier template |
| CN106592436A (en) * | 2016-12-15 | 2017-04-26 | 王勋 | Manufacturing method of tool mold plate for city bridges |
| CN107401113A (en) * | 2017-06-21 | 2017-11-28 | 杭州江润科技有限公司 | Stiff skeleton straining beam structure and construction method built in a kind of high pier |
| WO2020001156A1 (en) * | 2018-06-29 | 2020-01-02 | 比亚迪股份有限公司 | Bridge and bridge pier thereof |
| CN110700105A (en) * | 2019-10-21 | 2020-01-17 | 中交一公局第七工程有限公司 | Synchronous construction method for high pier column and tie beam and template used in same |
| CN212561185U (en) * | 2020-04-23 | 2021-02-19 | 中交路桥建设有限公司 | Pier stud tie beam integral casting's construction template |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111395193B (en) | 2024-11-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110700105B (en) | Synchronous construction method and formwork used for high pier pier column and tie beam | |
| WO2020118563A1 (en) | Design and rapid construction methods for flush assembly of prefabricated steel beams and floor | |
| CN110206144B (en) | Construction method of steel reinforced column beam column joint | |
| CN105586833A (en) | Construction method for integrally forming large cast-in-place thin-wall high pier through stiff skeleton reinforcement cage | |
| CN111411724A (en) | Steel beam-concrete composite floor slab combined assembly system | |
| CN107869195A (en) | A kind of shaped steel steel column and column cap sizing punching block construction method | |
| CN108396630A (en) | The big box-beam structure of precast concrete with the connection of wet seam direction across bridge | |
| CN110924538B (en) | Concrete column node zone steel bushing and concrete column beam node connection structure | |
| CN205874944U (en) | Double T type wave form steel web profiled steel sheet combination beam | |
| CN205636474U (en) | Assembled bracket structure | |
| CN111042575A (en) | Steel structure upright post reinforcing structure and method for basement roof temporary road | |
| CN113802726A (en) | Edge member of superimposed integral prefabricated shear wall and installation method | |
| CN104963295A (en) | Support frame for non-ground internal-force balanced cast-in-place beam and construction method thereof | |
| CN210152251U (en) | A device using prefabricated laminated floor slabs as cast-in-place beam side form supports | |
| CN111851754B (en) | A steel structure foundation embedded bolt structure and construction method thereof | |
| CN205617664U (en) | Prefabricated pier stud locating rack for steel reinforcement cage | |
| CN204850445U (en) | Pour device with floor joint construction post | |
| CN212561185U (en) | Pier stud tie beam integral casting's construction template | |
| CN203603264U (en) | Externally-wrapped pillar base | |
| CN111395193B (en) | Construction template for integral pouring of pier column tie beam and construction method thereof | |
| CN115976898B (en) | Construction system and construction method of pile-slab connection structure for soilless roadbed | |
| CN111561071A (en) | A kind of prefabricated shear wall connecting device and installation method | |
| CN216892017U (en) | Tie beam integral casting template in template connecting piece and lower stand | |
| CN217268036U (en) | Assembled beam column node | |
| CN106087693B (en) | A kind of double-T shaped Wavelike steel webplate-profiled sheet combination beam and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |