CN111379564A - Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine - Google Patents
Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine Download PDFInfo
- Publication number
- CN111379564A CN111379564A CN202010244276.XA CN202010244276A CN111379564A CN 111379564 A CN111379564 A CN 111379564A CN 202010244276 A CN202010244276 A CN 202010244276A CN 111379564 A CN111379564 A CN 111379564A
- Authority
- CN
- China
- Prior art keywords
- anchoring
- protecting
- body part
- arm
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Earth Drilling (AREA)
Abstract
Description
技术领域technical field
本发明涉及煤矿开采技术领域,具体涉及一种煤矿用智能全液压钻装锚护三臂一体机。The invention relates to the technical field of coal mining, in particular to an intelligent full-hydraulic drilling, mounting, anchoring and protecting three-arm integrated machine for coal mines.
背景技术Background technique
随着国民经济的快速发展,煤矿掘进机逐渐成为煤矿巷道开采的主要设备,但在岩石硬度较高的岩巷中,普遍用钻爆法进行开拓。With the rapid development of the national economy, coal mine roadheaders have gradually become the main equipment for mining roadways in coal mines, but in rock roadways with high rock hardness, the drilling and blasting method is generally used for development.
目前,岩巷钻爆法施工方式及存在以下问题:At present, the construction method of rock roadway drilling and blasting method and the following problems exist:
1、人工钻孔+扒装机收料+皮带运输机出矸:人工钻孔后响炮,扒装机带动皮带运输机行驶至巷道迎头,进行收料作业,缺点如下:1. Manual drilling + loader receiving + belt conveyor discharge: After manual drilling, the gun will sound, and the loader will drive the belt conveyor to the head of the roadway for material collection. The disadvantages are as follows:
(1)人工钻孔时间长,劳动强度大,排渣水造成工作环境恶化,且危险性高;(1) Manual drilling takes a long time, and the labor intensity is high. The slag discharge water causes the working environment to deteriorate, and the risk is high;
(2)需要反复搬运钻孔;(2) It is necessary to carry the drilling repeatedly;
(3)需要人工打锚杆,劳动强度大,劳动效率低。(3) It is necessary to manually hit the bolt, which is labor-intensive and labor-efficient.
2、液压台车+扒装机+皮带运输机出矸:采用液压台车进行钻孔,响炮后,扒装机带动皮带运输机,组成连续运输系统进行出矸。缺点如下:2. Hydraulic trolley + loader + belt conveyor for gangue discharge: hydraulic trolley is used for drilling. After the gun is fired, the loader drives the belt conveyor to form a continuous transport system for gangue discharge. The disadvantages are as follows:
(1)液压台车与扒装机需要在巷道内反复调运、错车,工人需要反复拖拽电缆、水管、气管,劳动强度大;(1) Hydraulic trolleys and pick-up machines need to be repeatedly transported and misplaced in the roadway, and workers need to repeatedly drag cables, water pipes, and air pipes, which is labor-intensive;
(2)响炮作业时,需要做好两台设备的防护工作,防护工作量较大;(2) When the cannon is operating, it is necessary to do a good job in the protection of the two equipments, and the protection workload is large;
(3)需要人工打锚杆,劳动强度大,劳动效率低;(3) It is necessary to manually hit the anchor rod, which is labor-intensive and labor-inefficient;
国内还没有一台设备可以同时完成钻、装、锚、运等工作的设备。There is no equipment in China that can complete drilling, loading, anchoring, and transportation at the same time.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种煤矿用智能全液压钻装锚护三臂一体机,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide an intelligent full hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mines, so as to solve the problems raised in the above background technology.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种煤矿用智能全液压钻装锚护三臂一体机,包括本体部,所述本体部上连接有锚护平台,在所述本体部下侧连接有行走部,锚护平台上左右对称设置有左钻臂和右钻臂,所述左钻臂和右钻臂均连接有滑台组件,所述滑台组件安装在本体部上;所述本体部上还连接有扒斗装置;所述锚护平台包括工作平台,所述工作平台连接有俯仰机构,所述俯仰机构上连接有双推进锚杆机;所述工作平台上还连接有摆动机构,所述摆动机构连接有平动主臂,平台主臂连接有滑台小车。An intelligent full-hydraulic drilling, assembling, anchoring and protecting three-arm integrated machine for coal mines, comprising a main body part, an anchoring protection platform is connected to the main body part, a walking part is connected to the lower side of the main body part, and left and right symmetrically arranged on the anchoring protection platform the left drill arm and the right drill arm, the left drill arm and the right drill arm are both connected with a sliding table assembly, and the sliding table assembly is installed on the main body part; the main body part is also connected with a bucket device; the anchor The protection platform includes a working platform, the working platform is connected with a pitching mechanism, and the pitching mechanism is connected with a double-propulsion bolter; the working platform is also connected with a swing mechanism, and the swing mechanism is connected with a translation main arm, The main arm of the platform is connected with a sliding table trolley.
作为本发明进一步的方案是:所述本体部靠近扒斗装置一侧设置有铲板,铲板连接有第一运输机。As a further solution of the present invention, a shovel plate is provided on the side of the main body part close to the chopping bucket device, and the shovel plate is connected with the first conveyor.
作为本发明再进一步的方案是:所述本体部尾部连接有第二运输机。As a further solution of the present invention, a second conveyor is connected to the tail of the main body.
作为本发明再进一步的方案是:所述第二运输机与本体部可拆卸连接。As a further solution of the present invention, the second conveyor is detachably connected to the main body.
作为本发明再进一步的方案是:所述本体部上设置有液压系统和电气系统。As a further solution of the present invention, the body part is provided with a hydraulic system and an electrical system.
作为本发明再进一步的方案是:所述双推进锚杆机包括补偿油缸、前定位器、第一推进机构、中扶钎器、第二推进机构、旋转座和动力机构,所述中扶钎器上连接有前定位器,前定位器与补偿油缸相连,补偿油缸连接有旋转座;所述中扶钎器上连接有第一推进机构和第二推进机构。As a further solution of the present invention, the double-propulsion bolter includes a compensation oil cylinder, a front positioner, a first propulsion mechanism, a middle-supporting drill, a second propulsion mechanism, a rotating seat and a power mechanism, and the middle-supporting drill A front locator is connected to the device, the front locator is connected with a compensation oil cylinder, and the compensation oil cylinder is connected with a rotating seat; the middle support drill is connected with a first propulsion mechanism and a second propulsion mechanism.
作为本发明再进一步的方案是:所述第二推进机构连接有动力机构。As a further solution of the present invention, the second propulsion mechanism is connected with a power mechanism.
本发明的有益效果是:The beneficial effects of the present invention are:
1、整机功能完善,可以实现钻、装、锚、护功能,双钻臂钻孔效率高;1. The function of the whole machine is perfect, which can realize the functions of drilling, installation, anchoring and protection, and the double drilling arm has high drilling efficiency;
2、锚护平台上有工作平台,方便工人操作锚杆机;2. There is a working platform on the anchoring platform, which is convenient for workers to operate the bolting machine;
3、锚杆机具有双推进结构,可以实现两种孔深一次钻进。3. The bolter has a double-propulsion structure, which can achieve two hole depths at one time.
附图说明Description of drawings
图1为本发明优选实施例双推进锚杆机的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the double-propulsion bolter according to the preferred embodiment of the present invention;
图2为本发明优先实施例一种煤矿用智能全液压钻装锚护三臂一体机的立体结构示意图;FIG. 2 is a schematic three-dimensional structure diagram of an intelligent full-hydraulic drilling, mounting, anchoring and protecting three-arm integrated machine for coal mines according to a preferred embodiment of the present invention;
图3为本发明优先实施例锚护平台的立体结构示意图。FIG. 3 is a schematic three-dimensional structure diagram of an anchoring platform according to a preferred embodiment of the present invention.
图中:1扒斗装置、2铲板、3行走部、4滑台组件、5左钻臂、 6右钻臂、7锚护平台、8本体部、9液压系统、10第一运输机、11 电气系统、12第二运输机、7-1双推进锚杆机、7-2工作平台、7-3 平动主臂、7-4滑台小车、7-5俯仰机构、7-6摆动机构、补偿油缸 7-1-1、前定位器7-1-2、第一推进机构7-1-3、中扶钎器7-1-4、第二推进机构7-1-5、旋转座7-1-6、动力机构7-1-7。In the picture: 1. Bucket device, 2. Shovel plate, 3. Walking section, 4. Slide table assembly, 5. Left drill arm, 6 Right drill arm, 7. Anchor protection platform, 8. Main body, 9. Hydraulic system, 10. First conveyor, 11. Electrical system, 12 second transport aircraft, 7-1 double propulsion bolter, 7-2 working platform, 7-3 translation main arm, 7-4 sliding table trolley, 7-5 pitching mechanism, 7-6 swing mechanism, Compensation cylinder 7-1-1, front positioner 7-1-2, first propulsion mechanism 7-1-3, middle support drill 7-1-4, second propulsion mechanism 7-1-5, rotating seat 7 -1-6, power mechanism 7-1-7.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
实施例1:Example 1:
请参阅图1,一种煤矿用智能全液压钻装锚护三臂一体机,包括本体部8,所述本体部8上连接有锚护平台7,在所述本体部8下侧连接有行走部3,锚护平台7上左右对称设置有左钻臂5和右钻臂6,所述左钻臂5和右钻臂6均连接有滑台组件4,所述滑台组件安装在本体部8上;所述本体部8上还连接有扒斗装置1,在本实施例工作时,扒斗装置1用于对爆破后的碎渣进行收料,而另一方面也可以实现支护功能,防止出现坍塌的风险;行走部3可以实现整个装置的行走,滑台组件4主要实现左钻臂5和右钻臂6的前后移动,便于通过左钻臂5和右钻臂6对不同布置进行钻孔作业。Please refer to FIG. 1 , an intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mines, including a
所述本体部8靠近扒斗装置1一侧设置有铲板2,铲板2连接有第一运输机10,扒斗装置1在工作时将爆破后的碎渣扒到铲板2上,随后通过与铲板2相连接的第一运输机10将碎渣向后输送,实现碎渣的第一次传输。The
所述本体部8尾部连接有第二运输机12,在输所述本体部8的尾部设置第二运输机12,在上述第一运输机10的作用下,碎渣被输送到第二运输机12上,实现再一次的物料输送。The tail of the
所述第二运输机12与本体部8可拆卸连接,第二运输机12与本体部8之间可拆卸,可根据需要来选用第二运输机12,以保证碎渣的输送效果。The
所述本体部8上设置有液压系统9和电气系统11,液压系统9主要为各执行元件提供动力,电气系统11主要控制油泵以及电机等。The
实施例2:Example 2:
请参阅图2,所述锚护平台7包括工作平台7-2,所述工作平台 7-2连接有俯仰机构7-5,所述俯仰机构7-5上连接有双推进锚杆机 7-1;Please refer to FIG. 2, the
所述工作平台7-2上还连接有摆动机构7-6,所述摆动机构7-6 连接有平动主臂7-3,平台主臂7-3连接有滑台小车7-4。The working platform 7-2 is also connected with a swing mechanism 7-6, the swing mechanism 7-6 is connected with a translation main arm 7-3, and the platform main arm 7-3 is connected with a sliding table trolley 7-4.
在本发明的一个实施例中,滑台小车7-4带动锚护平台7在本体部8上的前后移动,平动主臂7-3带动锚杆机7-1和工作平台7-2的左右摆动和前后俯仰。In an embodiment of the present invention, the sliding table trolley 7-4 drives the
实施例3:Example 3:
请参阅图3,本发明实施例中,一种双推进锚杆机,包括补偿油缸7-1-1、前定位器7-1-2、第一推进机构7-1-3、中扶钎器7-1-4、第二推进机构7-1-5、旋转座7-1-6和动力机构7-1-7,所述中扶钎器7-1-4上连接有前定位器7-1-2,前定位器7-1-2与补偿油缸7-1-1 相连,补偿油缸7-1-1连接有旋转座7-1-6;所述中扶钎器7-1-4上连接有第一推进机构7-1-3和第二推进机构7-1-5,在本发明的一个实施例中,补偿油缸7-1-1用于带动第一推进机构7-1-3的向下运动,而第二推进机构7-1-5也可以实现钻进功能;本发明具有双推进功能,一台锚杆机实现双孔钻深钻进,同时实现两种孔深一次钻进,具有广泛推广应用价值。Referring to FIG. 3, in an embodiment of the present invention, a double-propulsion bolter includes a compensation oil cylinder 7-1-1, a front positioner 7-1-2, a first propulsion mechanism 7-1-3, a middle support drill 7-1-4, the second propulsion mechanism 7-1-5, the rotating seat 7-1-6 and the power mechanism 7-1-7, the middle support drill 7-1-4 is connected with a front positioner 7-1-2, the front positioner 7-1-2 is connected with the compensation oil cylinder 7-1-1, and the compensation oil cylinder 7-1-1 is connected with a rotating seat 7-1-6; the middle support drill 7-1 -4 is connected with a first propulsion mechanism 7-1-3 and a second propulsion mechanism 7-1-5. In an embodiment of the present invention, the compensation cylinder 7-1-1 is used to drive the first propulsion mechanism 7- 1-3 moves downward, and the second propulsion mechanism 7-1-5 can also realize the drilling function; the present invention has the dual propulsion function, one bolt machine realizes double-hole drilling and deep drilling, and simultaneously realizes two kinds of holes. One-time deep drilling has the value of extensive popularization and application.
所述第二推进机构7-1-5连接有动力机构7-1-7,动力机构7-1-7 用于带动第二推进机构7-1-5的向下推进工作。The second propulsion mechanism 7-1-5 is connected with a power mechanism 7-1-7, and the power mechanism 7-1-7 is used to drive the downward propulsion of the second propulsion mechanism 7-1-5.
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, but that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments are to be regarded in all respects as illustrative and not restrictive, and the scope of the invention is to be defined by the appended claims rather than the foregoing description, which are therefore intended to fall within the scope of the claims. All changes within the meaning and scope of the equivalents of , are included in the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010244276.XA CN111379564A (en) | 2020-03-31 | 2020-03-31 | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010244276.XA CN111379564A (en) | 2020-03-31 | 2020-03-31 | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111379564A true CN111379564A (en) | 2020-07-07 |
Family
ID=71217713
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010244276.XA Pending CN111379564A (en) | 2020-03-31 | 2020-03-31 | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111379564A (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200975211Y (en) * | 2006-11-03 | 2007-11-14 | 张家口宣化华泰矿冶机械有限公司 | Telescopic thruster for digging drill carriage |
| WO2009155776A1 (en) * | 2008-06-25 | 2009-12-30 | Yan Zhendong | A dilling, loading, transporting and anchoring integration machine for laneway in coal mine |
| CN107905738A (en) * | 2017-12-22 | 2018-04-13 | 长沙科达智能装备股份有限公司 | A kind of rock drilling device realized two-stage and promoted |
| CN108049877A (en) * | 2018-01-11 | 2018-05-18 | 中煤第三建设(集团)有限责任公司 | All-hydraulic intelligence bores dress anchor all-in-one machine |
| CN212359774U (en) * | 2020-03-31 | 2021-01-15 | 中煤第三建设(集团)有限责任公司 | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine |
-
2020
- 2020-03-31 CN CN202010244276.XA patent/CN111379564A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200975211Y (en) * | 2006-11-03 | 2007-11-14 | 张家口宣化华泰矿冶机械有限公司 | Telescopic thruster for digging drill carriage |
| WO2009155776A1 (en) * | 2008-06-25 | 2009-12-30 | Yan Zhendong | A dilling, loading, transporting and anchoring integration machine for laneway in coal mine |
| CN107905738A (en) * | 2017-12-22 | 2018-04-13 | 长沙科达智能装备股份有限公司 | A kind of rock drilling device realized two-stage and promoted |
| CN108049877A (en) * | 2018-01-11 | 2018-05-18 | 中煤第三建设(集团)有限责任公司 | All-hydraulic intelligence bores dress anchor all-in-one machine |
| CN212359774U (en) * | 2020-03-31 | 2021-01-15 | 中煤第三建设(集团)有限责任公司 | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201236704Y (en) | Coal drift drill shipping and anchoring integrated machine | |
| CN107060795B (en) | A kind of underground mine TBM assembly construction methods | |
| CN107130656B (en) | Integrated backhoe loader for underground drilling, anchoring and rock breaking | |
| CN104564056A (en) | Integrated tunneling and exploring machine | |
| CN108150165A (en) | A kind of cantilevered longitudinal axis anchor driving machine including hydraulic control loader mechanism | |
| CN103388346B (en) | All-in-one is loaded in mining excavation | |
| CN108049877B (en) | Fully hydraulic intelligent drilling, installation and anchoring machine | |
| CN207892529U (en) | A kind of multifunctional integrated airborne drilling apparatus | |
| CN109751078A (en) | A kind of coal working face end trigonum device for filling and method | |
| CN111379564A (en) | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine | |
| CN204371334U (en) | All-in-one is visited in pick | |
| CN215565940U (en) | Mining rock roadway heading machine | |
| CN203393758U (en) | Mining excavating and loading integrated machine | |
| CN111305863A (en) | Intelligent full-hydraulic drilling, anchoring and protecting four-arm integrated machine for coal mine | |
| CN212359774U (en) | Intelligent full-hydraulic drilling, anchoring and protecting three-arm integrated machine for coal mine | |
| CN107326952B (en) | A pipe mining robot | |
| CN212359775U (en) | Intelligent full-hydraulic drilling, anchoring and protecting four-arm integrated machine for coal mine | |
| CN113719293A (en) | Mining rock roadway heading machine | |
| CN103982195A (en) | Full-face tunnel boring machine | |
| CN203668994U (en) | Ditcher | |
| CN113622931B (en) | Rectangular shield body for excavating square tunnel and its driving method | |
| CN204436399U (en) | The milling of a kind of Support System in Soft Rock Tunnels hydraulic pressure ground digs standby | |
| Frangakis | A review of lashing methods used in shaft sinking | |
| CN223398678U (en) | Tunneling cantilever and crushing type tunneling machine | |
| CN201241718Y (en) | Clamshell excavator type mucking anchorage machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200707 |
|