CN111364483A - Construction method for backfilling dry dock wall - Google Patents

Construction method for backfilling dry dock wall Download PDF

Info

Publication number
CN111364483A
CN111364483A CN202010198947.3A CN202010198947A CN111364483A CN 111364483 A CN111364483 A CN 111364483A CN 202010198947 A CN202010198947 A CN 202010198947A CN 111364483 A CN111364483 A CN 111364483A
Authority
CN
China
Prior art keywords
area
backfilled
layer
backfilling
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010198947.3A
Other languages
Chinese (zh)
Inventor
陶云
胡威海
苗艳遂
刘德胜
王尔明
王斌
郭杰
钟明乾
马疆
肖广明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Branch Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
Shanghai Branch Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Branch Cccc Third Harbor Engineering Co ltd, CCCC Third Harbor Engineering Co Ltd filed Critical Shanghai Branch Cccc Third Harbor Engineering Co ltd
Priority to CN202010198947.3A priority Critical patent/CN111364483A/en
Publication of CN111364483A publication Critical patent/CN111364483A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00—Excavations; Bordering of excavations; Making embankments
    • E02D17/18—Making embankments, e.g. dikes, dams
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00—Dry-docking of vessels or flying-boats
    • B63C1/08—Graving docks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明提供了一种干船坞坞墙后回填的施工方法,包括以下步骤:步骤一、从基坑底向路面方向回填第一层,其中,先回填坞墙后方的第一区域,待第一区域回填完成后再回填第一层的其他区域;步骤二、从第一层的顶面向路面方向回填第二层,其中,先回填坞墙后方的第二区域,待第二区域回填完成后再回填第二层的其他区域。本发明由于采用块石和土方分层回填,在隔舱内部可以保护坞墙,而且比传统设计更有利于坞墙上部的排水。

Figure 202010198947

The invention provides a construction method for backfilling behind a dry dock wall, comprising the following steps: Step 1: Backfilling the first layer from the bottom of the foundation pit to the road surface, wherein the first area behind the dock wall is backfilled first, and then the first layer is backfilled. After the area is backfilled, the other areas of the first layer are backfilled; step 2, the second layer is backfilled from the top of the first layer to the road surface. The second area behind the dock wall is backfilled first, and the second area is backfilled after the completion of the backfill. Backfill other areas of the second layer. The invention can protect the docking wall inside the compartment due to the layered backfilling of block stones and earthwork, and is more beneficial to the drainage of the upper part of the docking wall than the traditional design.

Figure 202010198947

Description

一种干船坞坞墙后回填的施工方法A construction method for backfilling behind a dry dock wall

技术领域technical field

本发明涉及土方回填领域,尤其涉及一种干船坞坞墙后回填的施工方法。The invention relates to the field of earthwork backfilling, in particular to a construction method for backfilling of dry dock walls.

背景技术Background technique

目前在干船坞基坑中的回填施工技术中一般材料采用的都是土,在施工工艺上一般也是分成两次或者几次进行回填。工序上面一般是先用推土机或者挖机整平,再用小型振动平碾进行压实,再静压再振压,直到设计要求的土方密实度。这样整体回填黏土虽然整体密实度足够,但是在排水方面并没有办法做到及时排水,并且密实的黏土也不利于排水。At present, soil is generally used in the construction technology of backfilling in drydock foundation pits, and the construction process is generally divided into two or several times for backfilling. The process is generally first leveled with bulldozers or excavators, then compacted with a small vibrating flat roller, and then statically pressed and then vibrated until the earthwork compactness required by the design. In this way, although the overall density of the overall backfill clay is sufficient, there is no way to achieve timely drainage in terms of drainage, and the dense clay is not conducive to drainage.

有鉴于此,有必要提供一种干船坞坞墙后回填的施工方法,以解决上述问题。In view of this, it is necessary to provide a construction method for backfilling behind a dry dock wall to solve the above problems.

发明内容SUMMARY OF THE INVENTION

本发明提供了一种干船坞坞墙后回填的施工方法,本发明在施工工序和材料上面都有所改进。在隔舱内采用利于排水的块石、碎石、土工布等进行分布分层回填。在隔舱外面采用0-300mm多石土和基坑挖出的土进行回填。内部隔舱内采用的材料有足够大的孔隙率,在排水方面具有优势。而后面回填的0-300mm多石土和基坑土压实过后也有足够的密实度保证基坑上面的路面所需要的承载力。The invention provides a construction method for backfilling behind a dry dock wall, and the invention has improvements in construction procedures and materials. In the compartment, use block stone, crushed stone, geotextile, etc. that are conducive to drainage for distributed and layered backfilling. Use 0-300mm rocky soil and soil excavated from the foundation pit for backfilling outside the compartment. The materials used in the internal compartments are sufficiently porous to provide advantages in terms of drainage. The backfill 0-300mm rocky soil and foundation pit soil after compaction also have enough compactness to ensure the bearing capacity of the pavement above the foundation pit.

为解决上述技术问题,本发明采用如下技术方案:In order to solve the above-mentioned technical problems, the present invention adopts the following technical solutions:

一种干船坞坞墙后回填的施工方法,包括以下步骤:A construction method for backfilling behind a dry dock wall, comprising the following steps:

步骤一、从基坑底向路面方向回填第一层,其中,先回填坞墙后方的第一区域,待第一区域回填完成后再回填第一层的其他区域;Step 1: Backfill the first layer from the bottom of the foundation pit to the road surface, wherein the first area behind the dock wall is backfilled first, and then the other areas of the first layer are backfilled after the first area is backfilled;

步骤二、从第一层的顶面向路面方向回填第二层,其中,先回填坞墙后方的第二区域,待第二区域回填完成后再回填第二层的其他区域。Step 2: Backfill the second layer from the top of the first layer to the road surface, wherein the second area behind the dock wall is backfilled first, and then other areas of the second layer are backfilled after the second area is backfilled.

作为本发明的进一步改进,所述第一层的回填高度为坑底至-6.0m,所述第二层的回填高度为-6.0m至路面底标高。As a further improvement of the present invention, the backfill height of the first layer is from the bottom of the pit to -6.0m, and the backfill height of the second layer is from -6.0m to the elevation of the road bottom.

作为本发明的进一步改进,所述步骤一中第一区域的宽度小于坞墙下方底板的宽度。As a further improvement of the present invention, in the step 1, the width of the first region is smaller than the width of the bottom plate under the docking wall.

作为本发明的进一步改进,所述步骤二中第二区域的宽度小于第一区域的最大宽度。As a further improvement of the present invention, in the second step, the width of the second region is smaller than the maximum width of the first region.

作为本发明的进一步改进,所述第一区域从基坑底向路面方向的宽度逐渐减小,第一区域在宽度方向上贴近坞墙的面为平面;As a further improvement of the present invention, the width of the first area gradually decreases from the bottom of the foundation pit to the road surface, and the surface of the first area close to the dock wall in the width direction is a plane;

所述第二区域从第一区域表面向路面方向的宽度逐渐减小,第二区域在宽度方向上贴近坞墙的面为平面;The width of the second area gradually decreases from the surface of the first area to the direction of the road surface, and the surface of the second area close to the dock wall in the width direction is a plane;

第二区域的一部分底面与第一区域的上表面接触,第二区域的另一部分底面与第一层的其他区域上表面接触。A part of the bottom surface of the second region is in contact with the upper surface of the first region, and another part of the bottom surface of the second region is in contact with the upper surface of other regions of the first layer.

作为本发明的进一步改进,所述步骤一的第一区域为块石回填,所述步骤一的其他区域为土方回填;As a further improvement of the present invention, the first area of the step 1 is backfilled with boulders, and the other areas of the step 1 are backfilled with earthwork;

所述步骤二的第二区域为块石回填,所述步骤二的第二区域为土方回填。The second area of the step 2 is backfilling with boulders, and the second area of the step 2 is backfilling with earthwork.

作为本发明的进一步改进,所述步骤一的第一区域分层回填,所述步骤一的其他区域分层回填;As a further improvement of the present invention, the first area in the step 1 is backfilled in layers, and the other areas in the step 1 are backfilled in layers;

所述步骤二的第二区域分层回填,所述步骤二的其他区域分层回填。The second area in the second step is backfilled in layers, and the other areas in the second step are backfilled in layers.

作为本发明的进一步改进,块石回填的原材料包括块石棱体、块石、碎石、土工布和黄沙。As a further improvement of the present invention, the raw materials for the backfilling of the boulders include prismatic boulders, boulders, crushed stones, geotextiles and yellow sand.

作为本发明的进一步改进,块石回填时首先用1-10kg块石做成棱体,逐层堆高,形成1:1的坡度;As a further improvement of the present invention, when backfilling the block stones, first use 1-10kg block stones to make prisms, which are piled up layer by layer to form a 1:1 gradient;

接着在后面回填50-100kg的大块石,利用20-40mm碎石找平,最后铺上土工布。Then backfill 50-100kg of large stones at the back, level it with 20-40mm gravel, and finally lay geotextiles.

作为本发明的进一步改进,土方回填采用分层碾压回填,分层厚度不大于60cm。As a further improvement of the present invention, the earthwork backfill is backfilled by layered rolling, and the layered thickness is not greater than 60cm.

作为本发明的进一步改进,土方回填时首先使用0-300mm多石土回填完毕之后采用光轮压路机碾压,直到达到设计压实度要求;As a further improvement of the present invention, when backfilling earthwork, first use 0-300mm multi-rocky soil for backfilling, and then use a smooth roller to roll it until it reaches the design compaction degree requirement;

接着回填基坑土,回填完毕之后同样采用光轮压路机碾压,直到达到压实度要求。Then backfill the foundation pit soil. After the backfill is completed, it is also rolled by a smooth roller until the compaction degree requirements are met.

本发明的有益效果是:The beneficial effects of the present invention are:

1、本发明由于采用块石和土方分层回填,在隔舱内部可以保护坞墙,具体的,在坞墙后侧直接接触区域采用1-10kg的块石回填做成三角形的梯形棱体,防止棱体后侧的50-100kg的大块石在回填过程中直接触碰坞墙而碰损坞墙,坞墙和坞墙之间的空间,称之为隔舱。此外,传统设计坞墙墙后回填黄土,没有透水性能,坞墙上部及后侧也不排水,而是在船坞周围采取止水措施(止水帷幕钢板桩),降低船坞水位,减少坞墙水位差。本发明的坞墙隔舱内部回填主体采用50-100kg大块石回填,大块石的透水性较多石土和黄土等材料更加良好,过水速度更快,能有效降低坞墙墙后水位,减少坞墙两侧水位差,防止坞墙位移。因此,本发明比传统设计更有利于坞墙上部的排水。1. The present invention can protect the dock wall inside the compartment due to the layered backfilling of block stones and earthwork. Specifically, 1-10kg of block stones are used for backfilling in the direct contact area behind the dock wall to make a triangular trapezoidal prism to prevent The 50-100kg large stone on the rear side of the prism directly touches the dock wall and damages the dock wall during the backfilling process. The space between the dock wall and the dock wall is called the compartment. In addition, the traditional design of the dock wall is backfilled with loess, which has no water permeability, and the upper and rear sides of the dock wall are not drained. Instead, water-stopping measures (water-stop curtain steel sheet piles) are taken around the dock to reduce the water level of the dock and the water level of the dock wall. Difference. The main body of the backfill in the compartment of the dock wall of the present invention is backfilled with 50-100kg large stones, the water permeability of the large stones is more, and the materials such as stone soil and loess are better, the water passing speed is faster, and the water level behind the dock wall can be effectively reduced. , reduce the water level difference on both sides of the dock wall and prevent the dock wall from shifting. Therefore, the present invention facilitates drainage of the upper part of the docking wall more than conventional designs.

2、本发明在墙后回填完成1-10kg块石、50-100kg块石和过滤层(20-40mm碎石、土工布、黄沙)后,继续在隔舱后方的土方回填中加入0-300mm多石土,多石土后侧再回填基坑开挖的黄土,本发明采用多石土回填,分层回填压实后的地基承载力达到34mpa以上,比传统黄土的分层回填压实承载力(10mpa)更大,使之整个隔舱外部土方回填区域的承载力较之传统设计有较大提高,满足坞墙装焊平台结构承载力的要求。2. After backfilling 1-10kg block stone, 50-100kg block stone and filter layer (20-40mm gravel, geotextile, yellow sand) behind the wall, the present invention continues to add 0-300mm to the earthwork backfill behind the compartment Rocky soil, backfill the loess excavated from the foundation pit on the back side of the rocky soil, the present invention adopts rocky soil backfill, and the bearing capacity of the foundation after layered backfilling and compaction reaches more than 34mpa, which is higher than the traditional layered backfilling and compaction bearing capacity of traditional loess. Compared with the traditional design, the bearing capacity of the earthwork backfill area outside the entire compartment is greatly improved, and it meets the requirements of the bearing capacity of the dock wall-mounted welding platform.

附图说明Description of drawings

图1是干船坞坞墙后回填施工方法的流程图。Figure 1 is a flow chart of a backfill construction method behind a dry dock wall.

具体实施方式Detailed ways

本发明提供了一种干船坞坞墙后回填的施工方法,包括以下步骤:步骤一、从基坑底向路面方向回填第一层,其中,先回填坞墙后方的第一区域,待第一区域回填完成后再回填第一层的其他区域;步骤二、从第一层的顶面向路面方向回填第二层,其中,先回填坞墙后方的第二区域,待第二区域回填完成后再回填第二层的其他区域。The invention provides a construction method for backfilling behind a dry dock wall, comprising the following steps: Step 1: Backfilling a first layer from the bottom of the foundation pit to the road surface, wherein the first area behind the dock wall is backfilled first, and then the first layer is backfilled. After the area backfill is completed, backfill other areas of the first layer; step 2, backfill the second layer from the top of the first layer to the road surface, wherein the second area behind the dock wall is backfilled first, and then the second area is backfilled after the completion of the backfill. Backfill other areas of the second layer.

本发明在施工工序和材料上面都有所改进,具体地,在隔舱内采用利于排水的块石、碎石、土工布等进行分布分层回填。在隔舱外面采用0-300mm多石土和基坑挖出的土进行回填。内部隔舱内采用的材料有足够大的孔隙率,在排水方面具有优势。而后面回填的0-300mm多石土和基坑土压实过后也有足够的密实度保证基坑上面的路面所需要的承载力。The present invention has improved construction procedures and materials, and specifically, distributed and layered backfilling is carried out in the compartment by using block stones, crushed stones, geotextiles, etc., which are favorable for drainage. Use 0-300mm rocky soil and soil excavated from the foundation pit for backfilling outside the compartment. The materials used in the internal compartments are sufficiently porous to provide advantages in terms of drainage. The backfill 0-300mm rocky soil and foundation pit soil after compaction also have enough compactness to ensure the bearing capacity of the pavement above the foundation pit.

实施方式一:Embodiment 1:

如图1所示,本实施方式提供了一种干船坞坞墙后回填的施工方法,包括以下步骤:步骤一、从基坑底向路面方向回填第一层,其中,先回填坞墙后方的第一区域,待第一区域回填完成后再回填第一层的其他区域;步骤二、从第一层的顶面向路面方向回填第二层,其中,先回填坞墙后方的第二区域,待第二区域回填完成后再回填第二层的其他区域。As shown in FIG. 1 , the present embodiment provides a construction method for backfilling the dry dock wall, including the following steps: Step 1: Backfill the first layer from the bottom of the foundation pit to the road surface, wherein the backfill is firstly behind the dock wall. In the first area, after the backfilling of the first area is completed, the other areas of the first layer will be backfilled; in step 2, the second layer will be backfilled from the top of the first layer to the direction of the road surface. After the backfilling of the second area is completed, other areas of the second layer are backfilled.

本实施方式在施工工序和材料上面都有所改进,具体地,在隔舱内采用利于排水的块石、碎石、土工布等进行分布分层回填。在隔舱外面采用0-300mm多石土和基坑挖出的土进行回填。内部隔舱内采用的材料有足够大的孔隙率,在排水方面具有优势。而后面回填的0-300mm多石土和基坑土压实过后也有足够的密实度保证基坑上面的路面所需要的承载力。This embodiment has improvements in construction procedures and materials. Specifically, block stones, crushed stones, geotextiles, etc., which are favorable for drainage, are used for distributed and layered backfilling in the compartment. Use 0-300mm rocky soil and soil excavated from the foundation pit for backfilling outside the compartment. The materials used in the internal compartments are sufficiently porous to provide advantages in terms of drainage. The backfill 0-300mm rocky soil and foundation pit soil after compaction also have enough compactness to ensure the bearing capacity of the pavement above the foundation pit.

实施方式二:Embodiment 2:

如图1所示,本实施方式提供了一种干船坞坞墙后回填的施工方法,包括以下步骤:步骤一、从基坑底向路面方向回填第一层,其中,先回填坞墙后方的第一区域,待第一区域回填完成后再回填第一层的其他区域;步骤二、从第一层的顶面向路面方向回填第二层,其中,先回填坞墙后方的第二区域,待第二区域回填完成后再回填第二层的其他区域。As shown in FIG. 1 , the present embodiment provides a construction method for backfilling the dry dock wall, including the following steps: Step 1: Backfill the first layer from the bottom of the foundation pit to the road surface, wherein the backfill is firstly behind the dock wall. In the first area, after the backfilling of the first area is completed, the other areas of the first layer will be backfilled; in step 2, the second layer will be backfilled from the top of the first layer to the direction of the road surface. After the backfilling of the second area is completed, other areas of the second layer are backfilled.

具体地,第一层的回填高度为坑底至-6.0m,第二层的回填高度为-6.0m至路面底标高。步骤一中第一区域的宽度小于坞墙下方底板的宽度。步骤二中第二区域的宽度小于第一区域的最大宽度。Specifically, the backfill height of the first layer is from the bottom of the pit to -6.0m, and the backfill height of the second layer is -6.0m to the elevation of the road bottom. In step 1, the width of the first area is smaller than the width of the bottom plate under the docking wall. In step 2, the width of the second area is smaller than the maximum width of the first area.

具体地,第一区域从基坑底向路面方向的宽度逐渐减小,第一区域在宽度方向上贴近坞墙的面为平面;第二区域从第一区域表面向路面方向的宽度逐渐减小,第二区域在宽度方向上贴近坞墙的面为平面;第二区域的一部分底面与第一区域的上表面接触,第二区域的另一部分底面与第一层的其他区域上表面接触。Specifically, the width of the first area from the bottom of the foundation pit to the road surface gradually decreases, and the surface of the first area close to the dock wall in the width direction is a plane; the width of the second area from the surface of the first area to the road surface gradually decreases The surface of the second area close to the dock wall in the width direction is a plane; a part of the bottom surface of the second area is in contact with the upper surface of the first area, and another part of the bottom surface of the second area is in contact with the upper surface of other areas of the first layer.

具体地,步骤一的第一区域为块石回填,步骤一的其他区域为土方回填;步骤二的第二区域为块石回填,步骤二的第二区域为土方回填。步骤一的第一区域分层回填,步骤一的其他区域分层回填;步骤二的第二区域分层回填,步骤二的其他区域分层回填。块石回填的原材料包括块石棱体、块石、碎石、土工布和黄沙。块石回填时首先用1-10kg块石做成棱体,逐层堆高,形成1:1的坡度;接着在后面回填50-100kg的大块石,利用20-40mm碎石找平,最后铺上土工布。Specifically, the first area of step 1 is backfilled with boulders, and other areas of step 1 are backfilled with earthwork; the second area of step 2 is backfilled with boulders, and the second area of step 2 is backfilled with earthwork. The first area in step 1 is backfilled in layers, and other areas in step 1 are backfilled in layers; the second area in step 2 is backfilled in layers, and other areas in step 2 are backfilled in layers. The raw materials for block rock backfill include block rock prism, block rock, crushed stone, geotextile and yellow sand. When backfilling boulders, first use 1-10kg boulders to make prisms, pile them up layer by layer to form a 1:1 slope; then backfill 50-100kg large boulders behind them, level them with 20-40mm gravel, and finally pave On the geotextile.

具体地,土方回填采用分层碾压回填,分层厚度不大于60cm。土方回填时首先使用0-300mm多石土回填完毕之后采用光轮压路机碾压,直到达到设计压实度要求;接着回填基坑土,回填完毕之后同样采用光轮压路机碾压,直到达到压实度要求。Specifically, the earthwork backfill is backfilled by layered rolling, and the layered thickness is not more than 60cm. When backfilling the earthwork, firstly use 0-300mm rocky soil to backfill and then roll it with a smooth roller until it reaches the design compaction requirement; then backfill the foundation pit soil, and after the backfill is finished, it is also rolled by a smooth roller until the compaction is achieved. degree requirements.

本实施方式在施工工序和材料上面都有所改进,具体地,在隔舱内采用利于排水的块石、碎石、土工布等进行分布分层回填。在隔舱外面采用0-300mm多石土和基坑挖出的土进行回填。内部隔舱内采用的材料有足够大的孔隙率,在排水方面具有优势。而后面回填的0-300mm多石土和基坑土压实过后也有足够的密实度保证基坑上面的路面所需要的承载力。This embodiment has improvements in construction procedures and materials. Specifically, block stones, crushed stones, geotextiles, etc., which are favorable for drainage, are used for distributed and layered backfilling in the compartment. Use 0-300mm rocky soil and soil excavated from the foundation pit for backfilling outside the compartment. The materials used in the internal compartments are sufficiently porous to provide advantages in terms of drainage. The backfill 0-300mm rocky soil and foundation pit soil after compaction also have enough compactness to ensure the bearing capacity of the pavement above the foundation pit.

实施方式三:Embodiment three:

目前在干船坞基坑中的回填施工技术中一般材料采用的都是土,在施工工艺上一般也是分成两次或者几次进行回填。工序上面一般是先用推土机或者挖机整平,再用小型振动平碾进行压实,再静压再振压,直到设计要求的土方密实度。这样整体回填黏土虽然整体密实度足够,但是在排水方面并没有办法做到及时排水,并且密实的黏土也不利于排水。At present, soil is generally used in the construction technology of backfilling in drydock foundation pits, and the construction process is generally divided into two or several times for backfilling. The process is generally first leveled with bulldozers or excavators, then compacted with a small vibrating flat roller, and then statically pressed and then vibrated until the earthwork compactness required by the design. In this way, although the overall density of the overall backfill clay is sufficient, there is no way to achieve timely drainage in terms of drainage, and the dense clay is not conducive to drainage.

在实施方式一和实施方式二公开方案的基础上,本实施方式公开了以下内容:On the basis of the solutions disclosed in Embodiment 1 and Embodiment 2, this embodiment discloses the following contents:

本实施方式首先在工序和材料上面有所改进。在隔舱内采用利于排水的块石、碎石、土工布等进行分布分层回填。在隔舱外面采用0-300mm多石土和基坑挖出的土进行回填。内部隔舱内采用的材料有足够大的孔隙率,在排水方面具有优势。而后面回填的0-300mm多石土和基坑土压实过后也有足够的密实度保证基坑上面的路面所需要的承载力。This embodiment is firstly improved in terms of process and materials. In the compartment, use block stone, crushed stone, geotextile, etc. that are conducive to drainage for distributed and layered backfilling. Use 0-300mm rocky soil and soil excavated from the foundation pit for backfilling outside the compartment. The materials used in the internal compartments are sufficiently porous to provide advantages in terms of drainage. The backfilled 0-300mm rocky soil and foundation pit soil have enough compaction to ensure the bearing capacity of the road surface above the foundation pit after compaction.

本实施方式可消除坞墙墙后排水不畅的问题,可消除对软土夹层不重视的问题,可消除回填土不密实的问题,可消除填方成弹簧土的问题。This embodiment can eliminate the problem of poor drainage behind the dock wall, the problem of not paying attention to the soft soil interlayer, the problem that the backfill is not compact, and the problem that the fill becomes spring soil.

本实施方式的土方回填主要包括扶壁坞墙肋板间回填,墙后回填等。回填包括块石回填和土方回填。The earthwork backfilling in this embodiment mainly includes backfilling between the ribs of the buttress dock wall, backfilling behind the wall, and the like. Backfill includes rock backfill and earthwork backfill.

隔舱内部主要回填1-10kg块石棱体、50-100kg块石、20-40mm碎石、土工布、黄沙。每层高度为1m。工序是首先用1-10kg块石做成棱体,逐层堆高,形成1:1的坡度。接着在后面回填50-100kg的大块石,利用20-40mm碎石找平,最后铺上土工布。这是第二层石料。在两层石料后回填黄沙。整个块石回填完成。The interior of the compartment is mainly backfilled with 1-10kg block stone prism, 50-100kg block stone, 20-40mm crushed stone, geotextile, yellow sand. The height of each floor is 1m. The process is to first use 1-10kg blocks to make prisms, and pile them up layer by layer to form a 1:1 gradient. Then backfill 50-100kg of large stones at the back, level it with 20-40mm gravel, and finally lay geotextiles. This is the second layer of stone. Backfill with yellow sand after two layers of stone. The entire block is backfilled.

隔舱外部是土方回填,主要采用分层碾压回填,分层厚度不大于60cm。首先回填0-300mm多石土,回填完毕采用光轮压路机碾压,直到达到设计压实度要求。然后回填基坑土,回填完毕同样采用光轮压路机碾压,直到达到压实度要求。部分临边结构采用小型压实机碾压施工。The exterior of the compartment is backfilled with earthwork, mainly using layered rolling backfill, and the layer thickness is not more than 60cm. First, backfill 0-300mm of rocky soil. After the backfill is completed, use a smooth roller to roll it until it reaches the design compaction requirement. Then backfill the foundation pit soil, and after the backfill is completed, it is also rolled by a smooth roller until the compaction degree requirements are met. Part of the edge structure is rolled by a small compactor.

本实施方式由于采用块石和土方分层回填,在隔舱内部可以保护坞墙,而且比传统设计更有利于坞墙上部的排水。在后方的土方回填中加入0-300mm多石土,使之整个隔舱外部土方回填区域的承载力较之传统设计提高很多,满足墙后装焊平台结构承载力的要求。Due to the layered backfill of block stones and earthwork in this embodiment, the docking wall can be protected inside the compartment, and the drainage of the upper part of the docking wall is more favorable than the traditional design. Adding 0-300mm of rocky soil to the rear earthwork backfill, the bearing capacity of the earthwork backfill area outside the entire compartment is much higher than that of the traditional design, meeting the requirements of the structural bearing capacity of the welding platform behind the wall.

Claims (10)

1.一种干船坞坞墙后回填的施工方法,其特征在于,包括以下步骤:1. a construction method for backfilling behind a dry dock wall, is characterized in that, comprises the following steps: 步骤一、从基坑底向路面方向回填第一层,其中,先回填坞墙后方的第一区域,待第一区域回填完成后再回填第一层的其他区域;Step 1: Backfill the first layer from the bottom of the foundation pit to the road surface, wherein the first area behind the dock wall is backfilled first, and then the other areas of the first layer are backfilled after the first area is backfilled; 步骤二、从第一层的顶面向路面方向回填第二层,其中,先回填坞墙后方的第二区域,待第二区域回填完成后再回填第二层的其他区域。Step 2: Backfill the second layer from the top of the first layer to the road surface, wherein the second area behind the dock wall is backfilled first, and then other areas of the second layer are backfilled after the second area is backfilled. 2.根据权利要求1所述的施工方法,其特征在于,所述第一层的回填高度为坑底至-6.0m,所述第二层的回填高度为-6.0m至路面底标高。2 . The construction method according to claim 1 , wherein the backfill height of the first layer is from the pit bottom to -6.0m, and the backfill height of the second layer is -6.0m to the road bottom elevation. 3 . 3.根据权利要求1所述的施工方法,其特征在于,所述步骤一中第一区域的宽度小于坞墙下方底板的宽度。3 . The construction method according to claim 1 , wherein in the step 1, the width of the first region is smaller than the width of the bottom plate under the dock wall. 4 . 4.根据权利要求1所述的施工方法,其特征在于,所述步骤二中第二区域的宽度小于第一区域的最大宽度。4 . The construction method according to claim 1 , wherein in the second step, the width of the second area is smaller than the maximum width of the first area. 5 . 5.根据权利要求1-4任一项所述的施工方法,其特征在于,所述第一区域从基坑底向路面方向的宽度逐渐减小,第一区域在宽度方向上贴近坞墙的面为平面;5. The construction method according to any one of claims 1-4, wherein the width of the first area gradually decreases from the bottom of the foundation pit to the road surface, and the first area is close to the width of the dock wall in the width direction. face is flat; 所述第二区域从第一区域表面向路面方向的宽度逐渐减小,第二区域在宽度方向上贴近坞墙的面为平面;The width of the second area gradually decreases from the surface of the first area to the direction of the road surface, and the surface of the second area close to the dock wall in the width direction is a plane; 第二区域的一部分底面与第一区域的上表面接触,第二区域的另一部分底面与第一层的其他区域上表面接触。A part of the bottom surface of the second region is in contact with the upper surface of the first region, and another part of the bottom surface of the second region is in contact with the upper surface of other regions of the first layer. 6.根据权利要求1所述的施工方法,其特征在于,所述步骤一的第一区域为块石回填,所述步骤一的其他区域为土方回填;6. The construction method according to claim 1, characterized in that, the first area of the step 1 is backfilling with boulders, and the other areas of the step 1 are backfilling with earthwork; 所述步骤二的第二区域为块石回填,所述步骤二的第二区域为土方回填。The second area of the step 2 is backfilling with boulders, and the second area of the step 2 is backfilling with earthwork. 7.根据权利要求1或6所述的施工方法,其特征在于,所述步骤一的第一区域分层回填,所述步骤一的其他区域分层回填;7. The construction method according to claim 1 or 6, wherein the first area of the step 1 is backfilled in layers, and the other areas of the step 1 are backfilled in layers; 所述步骤二的第二区域分层回填,所述步骤二的其他区域分层回填。The second area in the second step is backfilled in layers, and the other areas in the second step are backfilled in layers. 8.根据权利要求6所述的施工方法,其特征在于,块石回填的原材料包括块石棱体、块石、碎石、土工布和黄沙。8 . The construction method according to claim 6 , wherein the raw materials for the backfilling of the boulders include prismatic boulders, boulders, crushed stones, geotextiles and yellow sand. 9 . 9.根据权利要求8所述的施工方法,其特征在于,块石回填时首先用1-10kg块石做成棱体,逐层堆高,形成1:1的坡度;9. construction method according to claim 8, it is characterised in that, first use 1-10kg block rock to make prism when block rock backfill, pile up layer by layer, form the slope of 1:1; 接着在后面回填50-100kg的大块石,利用20-40mm碎石找平,最后铺上土工布。Then backfill 50-100kg of large stones at the back, level it with 20-40mm gravel, and finally lay geotextiles. 10.根据权利要求6所述的施工方法,其特征在于,土方回填采用分层碾压回填,分层厚度不大于60cm。10 . The construction method according to claim 6 , wherein the earthwork backfill is backfilled by layered rolling, and the layered thickness is not greater than 60 cm. 11 .
CN202010198947.3A 2020-03-20 2020-03-20 Construction method for backfilling dry dock wall Pending CN111364483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010198947.3A CN111364483A (en) 2020-03-20 2020-03-20 Construction method for backfilling dry dock wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010198947.3A CN111364483A (en) 2020-03-20 2020-03-20 Construction method for backfilling dry dock wall

Publications (1)

Publication Number Publication Date
CN111364483A true CN111364483A (en) 2020-07-03

Family

ID=71206837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010198947.3A Pending CN111364483A (en) 2020-03-20 2020-03-20 Construction method for backfilling dry dock wall

Country Status (1)

Country Link
CN (1) CN111364483A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960692A (en) * 2022-06-14 2022-08-30 鞍山三冶建筑工程有限公司 Backfill method for reducing influence of water on basement exterior wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02232417A (en) * 1989-03-03 1990-09-14 Taisei Corp Embankment foundation reinforcement method
CN204097823U (en) * 2014-08-28 2015-01-14 德州市公路工程总公司 One is partly filled out and is partly dug ecological road structure
CN205875176U (en) * 2016-04-25 2017-01-11 杭州江润科技有限公司 Ventilation embankment step grouts slabstone and completely spreads slope protection structure
CN110241779A (en) * 2019-06-25 2019-09-17 中亿丰建设集团股份有限公司 A kind of ecological block barricade and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02232417A (en) * 1989-03-03 1990-09-14 Taisei Corp Embankment foundation reinforcement method
CN204097823U (en) * 2014-08-28 2015-01-14 德州市公路工程总公司 One is partly filled out and is partly dug ecological road structure
CN205875176U (en) * 2016-04-25 2017-01-11 杭州江润科技有限公司 Ventilation embankment step grouts slabstone and completely spreads slope protection structure
CN110241779A (en) * 2019-06-25 2019-09-17 中亿丰建设集团股份有限公司 A kind of ecological block barricade and its construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
(日本)港湾、机场手册编辑委员会编: "《港湾设计、施工手册》", 30 June 1983, 人民交通出版社 *
全国勘测设计注册工程师港口与航道工程专业管理委员会编: "《注册土木工程师(港口与航道工程)职业资格考试复习辅导材料上册》", 31 July 2003, 人民交通出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960692A (en) * 2022-06-14 2022-08-30 鞍山三冶建筑工程有限公司 Backfill method for reducing influence of water on basement exterior wall
CN114960692B (en) * 2022-06-14 2024-04-26 鞍山三冶建筑工程有限公司 A backfill method to reduce the impact of water on basement exterior walls

Similar Documents

Publication Publication Date Title
CN105178125B (en) A kind of lake region High-filled emkankment is blown sand embankments construction method and embankment structure
CN109056786A (en) Face upward inclined road shoulder wall water drainage behind the wall system and construction method
CN101713291A (en) Filling-reclaiming method for building land in coal mining subsidence areas
CN111535105B (en) Waterproof isolation protection structure and construction method for municipal road subgrade in coastal plain areas
CN102383413A (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN104131530B (en) Levee revetment structure under rapid and soft foundation severe environment
CN113585303A (en) Seepage-proofing stable cofferdam structure and construction method thereof
CN219261104U (en) Composite drainage isolation structure behind wall
CN210238543U (en) Inclined slope surface layered backfill dynamic compaction leveling structure
CN213038379U (en) Open cut tunnel foundation pit backfilling structure
CN217782100U (en) Full-section cofferdam access way structure of river-crossing underground tunnel
CN106192880A (en) The box harbour of L-type and method of construction thereof
CN115928520A (en) A combined construction method of riprap, silt, silt, and dynamic compaction for subgrades in soft ground
CN106149624A (en) A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof
CN109797730A (en) Ground heddle combined pressure reality dam filling construction is made in a kind of Gullied Rolling Loess Region embankment
CN110029626A (en) A kind of bank revetment foundation consolidation process technology in soft formation side slope
CN205875176U (en) Ventilation embankment step grouts slabstone and completely spreads slope protection structure
CN210315653U (en) A cover trench for laying underground buried pipes
CN111197300B (en) Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN205062597U (en) Road bed embankment structure of blowing sand is filled out to lake region height
CN221895800U (en) Ecological protection structure of flexible retaining wall for coastal sand excavation side slope
CN220953536U (en) Long and short pile composite foundation treatment structure of lower horizontal pipe gallery structure
CN115710887B (en) Method for reinforcing asphalt core wall dam body located on deep coverage layer
CN215888297U (en) Firm cofferdam structure of prevention of seepage
CN216194920U (en) Large immersed tube tunnel backfill structure with seismic isolation performance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200703

RJ01 Rejection of invention patent application after publication