CN111347819B - A construction method for large-scale landscape rockery - Google Patents

A construction method for large-scale landscape rockery Download PDF

Info

Publication number
CN111347819B
CN111347819B CN202010339309.9A CN202010339309A CN111347819B CN 111347819 B CN111347819 B CN 111347819B CN 202010339309 A CN202010339309 A CN 202010339309A CN 111347819 B CN111347819 B CN 111347819B
Authority
CN
China
Prior art keywords
rockery
positioning column
layer
construction
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010339309.9A
Other languages
Chinese (zh)
Other versions
CN111347819A (en
Inventor
潘金龙
殷树芳
楼耀威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotechnical Technology Co ltd
Original Assignee
Geotechnical Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geotechnical Technology Co ltd filed Critical Geotechnical Technology Co ltd
Priority to CN202010339309.9A priority Critical patent/CN111347819B/en
Publication of CN111347819A publication Critical patent/CN111347819A/en
Application granted granted Critical
Publication of CN111347819B publication Critical patent/CN111347819B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B44—DECORATIVE ARTS
    • B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C5/00—Processes for producing special ornamental bodies
    • B44C5/06—Natural ornaments; Imitations thereof

Landscapes

  • Revetment (AREA)

Abstract

本发明涉及一种大型景观假山施工方法,解决现代施工技术所制作的大型“塑石”假山高大且陡峭,内部结构不够稳定的问题。本施工方法包括以下步骤:a、设置定位柱,所述定位柱底部打入地下作为中心桩基础;b、环绕定位柱在地面打入若干的环周桩基础;c、在定位柱与各个环周桩基础之间拉设缆风绳;d、制作底部第一层块石,内部设置填充土和建筑垃圾压实作为内部填充物,然后浇筑混凝土;e、重复步骤d逐层向上制作块石,直到结顶;f、进行外部的装饰抹面。本发明利用桩基础的稳定性,配合缆风绳的韧性,对大型景观假山形成稳固支撑;将城市建筑垃圾用作假山内部填充料,起到了良好的经济效益和环保效益,符合建筑行业发展需求。

Figure 202010339309

The invention relates to a large-scale landscape rockery construction method, which solves the problems that the large-scale "plastic stone" rockery produced by modern construction technology is tall and steep, and the internal structure is not stable enough. The construction method includes the following steps: a. setting a positioning column, and the bottom of the positioning column is driven into the ground as a central pile foundation; b. driving a number of circumferential pile foundations on the ground around the positioning column; c. Pull cable wind ropes between the surrounding pile foundations; d. Make the first layer of block stones at the bottom, set filling soil and construction waste to be compacted as internal fillers, and then pour concrete; e. Repeat step d to make block stones layer by layer. , until the top of the knot; f, carry out external decorative plastering. The invention utilizes the stability of the pile foundation and the toughness of the cable wind rope to form a stable support for the large-scale landscape rockery; the urban construction waste is used as the internal filling material of the rockery, which has good economic and environmental benefits, and meets the development needs of the construction industry. .

Figure 202010339309

Description

Large-scale landscape rockery construction method
Technical Field
The invention belongs to the field of landscape buildings, relates to a rockery construction process, and particularly relates to a large-scale landscape rockery construction method.
Background
Rockery is a mountain constructed with materials such as soil and stone for landscaping in a garden. The conventional rockery mainly exists in garden buildings, and the main technique is a stone stacking technique, and the rockery is a modeling technique with some basic forms and operations of the mutual combination between the rockery and the rockery in the stacking process. The rockery can be divided into earth rockery, rockery and alternate rockery (earth is often called earth rockery stone wearing and stone is often called stone rockery wearing earth) according to the materials, and can be divided into mountain building (plate earth rockery), mountain piling up (pile up and synthesize mountain using mountain stone), mountain drilling (dig up natural rock and form mountain) and mountain moulding (the tradition is made of lime mortar, the modern is made of cement, brick, steel wire mesh and the like, the rockery is called plastic stone rockery in industry for short). The classical rockery is limited to stone materials, construction technical conditions and the like, and has certain limitation on the creation of landscapes, but the development of modern construction technology and artificial stone materials gradually makes it possible to create changeable and rich mountain and stone landscapes. Especially for the creation of large-scale and large-volume stone mountains, the inspiration of creation can be absorbed from the natural landform morphological characteristics and combination characteristics. The material is cement, mortar, concrete, glass fiber reinforced plastic, organic resin and GRC. However, the above method still has a major disadvantage, and the rockery formed by the method is necessarily tall and steep due to the creation of a large-scale and large-volume stone mountain, and the internal structure is not stable enough, so that a construction structure capable of playing the roles of resisting pulling and connecting the rock blocks in the large-scale stone mountain needs to be invented.
Disclosure of Invention
The invention aims to solve the problems that a large plastic stone rockery manufactured by modern construction technology is tall and steep and has an unstable internal structure, and provides a large landscape rockery construction method.
The technical scheme adopted by the invention for solving the technical problems is as follows: a construction method of a large landscape rockery is characterized by comprising the following steps: the method comprises the following steps:
step a, a positioning column is driven into the ground in the middle of a designed position of the rockery, and the bottom of the positioning column is driven into the ground to form a center pile foundation;
b, driving a plurality of surrounding pile foundations around the positioning column on the ground;
c, pulling a guy rope between the positioning column and each surrounding pile foundation, wherein the guy rope is provided with one or more layers, the inner ends of the guy ropes of different layers are connected with the positioning column at different heights, and the guy rope at the uppermost layer is connected with the top end of the positioning column and each surrounding pile foundation;
d, manufacturing a first layer of block stone at the bottom, firstly arranging a circle of surrounding type antirust geonet, arranging filling soil and construction waste in the antirust geonet to be compacted to serve as internal fillers, crosswise pulling through inhaul cables at the tops of the filling soil and the construction waste, then pouring concrete, and fully wrapping the outer side of the antirust geonet and the top surface of the internal fillers in the antirust geonet through the concrete pouring;
e, repeating the step d to upwards manufacture the block stones layer by layer until the top is formed;
and f, carrying out external decoration and plastering.
In the scheme, the internal structure of the large landscape rockery supports the large landscape rockery by utilizing the stability of the pile foundation and matching the toughness of the cable wind rope. The steel pipe reference column can wholly prevent toppling, and the connection of lower floor's piece stone is more firm in cable rope wind rope messenger to pull fixedly the steel pipe reference column. The construction scheme takes the positioning columns as the ribs, the cable wind ropes as the ribs and the anti-rust geonets as the membranes, and forms sufficient stable support for the internal support structure of the landscape rockery. Meanwhile, the scheme uses the urban construction waste as filler inside the rockery, so that the cost of the construction materials of the rockery is reduced, the cost of cleaning the construction waste is reduced, the waste discharge of construction engineering is reduced, good economic benefit and environmental protection benefit are achieved, and the development requirement of the construction industry is met.
Preferably, the positioning column in the step a is a steel pipe column.
Preferably, the foundation of the circumferential piles in the step b is a steel pipe.
Preferably, the guy cable in step c is a steel cable.
Preferably, the construction waste in the step d is bricks, tiles, stones or concrete blocks, and the filling soil is filled in gaps of the construction waste.
Preferably, the top surface of each layer of rock block in the steps d and e is poured by concrete.
Preferably, the rust-proof geonet of the first layer of rock blocks in the step d is wound on the outer side of each circumferential pile foundation.
Preferably, the anti-rust geonet of each rock block in step e is wrapped outside the cable rope.
The invention utilizes the stability of the pile foundation and the toughness of the cable wind rope to form stable support for the large landscape rockery; the invention uses the urban construction waste as the filler inside the rockery, thereby not only reducing the construction material cost of the rockery, but also reducing the construction waste clearing cost, reducing the waste discharge of the construction engineering, playing a good role in economic benefit and environmental protection benefit and meeting the development requirement of the construction industry.
Drawings
The invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic view of an interior supporting structure of an artificial hill with a positioning post and a guy rope according to the present invention.
Fig. 2 is a top view of the structure of fig. 1 of the present invention.
FIG. 3 is a schematic view of a first layer of stone block construction according to the present invention.
In the figure: 1. the device comprises a positioning column, 2, a central pile foundation, 3, a guy rope, 4, a surrounding pile foundation, 5, an antirust geonet, 6, a cross-over inhaul cable, 7 and internal fillers.
Detailed Description
The invention is further illustrated by the following specific examples in conjunction with the accompanying drawings.
Example (b): a large-scale landscape rockery construction method, the internal supporting structure is shown as figure 1-3, the middle part of the rockery is provided with a positioning column 1 made of steel pipe, the bottom end of the positioning column is driven into the ground to be used as a center pile foundation 2, and the depth of the center pile foundation 2 is 0.2-1 times of the height above the ground of the positioning column 1. Three surrounding pile foundations 4 which are driven into the ground are uniformly arranged on the circumference of the positioning column, and the surrounding pile foundations are also made of steel pipes. Two layers of guy cables 3 are arranged between the positioning columns 1 and the surrounding pile foundations 4, and the guy cables are made of steel cables. The inner end of the upper layer of the guy rope 3 is drawn at the top end of the positioning column 1, and the outer end is fixed on the surrounding pile foundation 4; the inner end of the lower layer of cable wind rope is drawn at the 1/2 height of the positioning column 1, and the outer end is fixed on the surrounding pile foundation 4. The rockery is piled up through the piece stone of range upon range of from the bottom up and forms, and the shaping is made in proper order to the piece stone from the bottom up, and each layer of piece stone sets up the rust-resistant geotechnological net 5 of surrounding type, and the rust-resistant geotechnological net of every layer of piece stone all wraps up in the outside of guy rope 2. The interior of the antirust geonet 5 is filled with soil and internal fillers 7 compacted by construction waste, and the top surface of the internal fillers is provided with six opposite-penetrating inhaul cables 6 with crossed centers. And a concrete layer is poured around the outer side of the antirust geonet 5 and above the internal filler 7. The building rubbish in the internal filler 7 is bricks, tiles, stones and concrete blocks, and the gaps of the building rubbish are filled with the filler soil.
The construction process of the embodiment comprises the following steps:
step a, a positioning column is driven into the ground in the middle of a designed position of the rockery, and the bottom of the positioning column is driven into the ground to form a center pile foundation;
b, driving a plurality of surrounding pile foundations around the positioning column on the ground;
c, pulling a guy rope between the positioning column and each surrounding pile foundation, wherein the guy rope is provided with one or more layers, the inner ends of the guy ropes of different layers are connected with the positioning column at different heights, and the guy rope at the uppermost layer is connected with the top end of the positioning column and each surrounding pile foundation;
d, manufacturing a first layer of block stone at the bottom, firstly arranging a circle of surrounding type antirust geonet, arranging filling soil and construction waste in the antirust geonet to be compacted to serve as internal fillers, crosswise pulling through inhaul cables at the tops of the filling soil and the construction waste, then pouring concrete, and fully wrapping the outer side of the antirust geonet and the top surface of the internal fillers in the antirust geonet through the concrete pouring;
e, repeating the step d to upwards manufacture the block stones layer by layer until the top is formed;
and f, carrying out external decoration and plastering.

Claims (6)

1.一种大型景观假山施工方法,其特征在于:包括以下步骤:1. a large-scale landscape rockery construction method is characterized in that: comprise the following steps: 步骤a、在假山设计位置中部的地面打入定位柱,所述定位柱底部打入地下、形成中心桩基础;Step a, driving a positioning column into the ground in the middle of the rockery design position, and driving the bottom of the positioning column into the ground to form a central pile foundation; 步骤b、环绕定位柱在地面打入若干的环周桩基础;Step b, driving a number of circumferential pile foundations around the positioning column on the ground; 步骤c、在定位柱与各个环周桩基础之间拉设缆风绳,缆风绳设置一层或多层,不同层的缆风绳内端连接与定位柱不同的高度,最上层缆风绳连接定位柱的顶端与各环周桩基础;Step c. Pull cable wind ropes between the positioning column and each circumferential pile foundation. One or more layers of cable wind ropes are arranged. The inner ends of the cable wind ropes of different layers are connected at different heights from the positioning column. The top of the locating column is connected with the surrounding pile foundation by ropes; 步骤d、制作底部第一层块石,先设置一圈环绕式防锈土工网,防锈土工网内部设置填充土和建筑垃圾压实作为内部填充物,并在填充土和建筑垃圾顶部交叉拉设对穿拉索,然后浇筑混凝土,混凝土浇筑充分包绕防锈土工网外侧及防锈土工网内部填充物的顶面;第一层块石的防锈土工网绕设于各环周桩基础的外侧;Step d, to make the first layer of block stones at the bottom, first set up a circle of anti-rust geonet, set filling soil and construction waste compaction inside the anti-rust geonet as internal filling, and cross the top of the filling soil and construction waste to pull Set up opposite cables, then pour concrete, and the concrete pouring fully surrounds the top surface of the outer side of the anti-rust geonet and the inner filling of the anti-rust geo-net; the outer side; 步骤e、重复步骤d逐层向上制作块石,直到结顶;每层块石的防锈土工网均包绕于缆风绳的外侧;Step e, repeat step d to make block stone layer by layer, until the top of the knot; the anti-rust geonet of each layer of block stone is wrapped around the outside of the cable wind rope; 步骤f、进行外部的装饰抹面。Step f, carry out external decorative plastering. 2.根据权利要求1所述的一种大型景观假山施工方法,其特征在于:步骤a中定位柱为钢管柱。2 . The construction method of a large-scale landscape rockery according to claim 1 , wherein the positioning column in step a is a steel pipe column. 3 . 3.根据权利要求1所述的一种大型景观假山施工方法,其特征在于:步骤b中环周桩基础为钢管。3 . The construction method of a large-scale landscape rockery according to claim 1 , wherein: in step b, the circumferential pile foundation is a steel pipe. 4 . 4.根据权利要求1所述的一种大型景观假山施工方法,其特征在于:步骤c中的缆风绳为钢索。4. The construction method of a large-scale landscape rockery according to claim 1, wherein the cable wind rope in step c is a steel cable. 5.根据权利要求1所述的一种大型景观假山施工方法,其特征在于:步骤d中建筑垃圾为砖块、瓦块、石块、混凝土块,填充土填充建筑垃圾的缝隙。5 . The construction method of a large-scale landscape rockery according to claim 1 , wherein the construction waste in step d is bricks, tiles, stones, and concrete blocks, and the filling soil fills the gaps of the construction waste. 6 . 6.根据权利要求1所述的一种大型景观假山施工方法,其特征在于:步骤d、e中每层块石的顶面均为混凝土浇筑。6. A kind of large-scale landscape rockery construction method according to claim 1, is characterized in that: in steps d, e, the top surface of each layer of block stone is concrete pouring.
CN202010339309.9A 2020-04-26 2020-04-26 A construction method for large-scale landscape rockery Active CN111347819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010339309.9A CN111347819B (en) 2020-04-26 2020-04-26 A construction method for large-scale landscape rockery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010339309.9A CN111347819B (en) 2020-04-26 2020-04-26 A construction method for large-scale landscape rockery

Publications (2)

Publication Number Publication Date
CN111347819A CN111347819A (en) 2020-06-30
CN111347819B true CN111347819B (en) 2022-02-18

Family

ID=71194987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010339309.9A Active CN111347819B (en) 2020-04-26 2020-04-26 A construction method for large-scale landscape rockery

Country Status (1)

Country Link
CN (1) CN111347819B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117002178A (en) * 2023-07-12 2023-11-07 龙德建设有限公司 Construction methods of garden simulation rockery

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2821824B2 (en) * 1991-09-12 1998-11-05 次郎 小林 Manufacturing method of artificial garden stone made of used paper such as newspapers and magazines
JP2000094897A (en) * 1998-09-22 2000-04-04 Shigeki Ashizawa Method for manufacturing artificial rock and artificial tree, and artificial rock and artificial tree planter manufactured by the method
CN102182179B (en) * 2011-03-07 2013-02-13 福建省建筑科学研究院 Floating pile reinforcing method
CN102338016A (en) * 2011-08-26 2012-02-01 曹信江 Water water-pumped water storage device
CN104099936B (en) * 2014-07-03 2017-01-04 上海市园林设计院有限公司 Artificial heap builds cascading waterfalls water scenery structure and construction method thereof on massif
CN104328815B (en) * 2014-10-31 2016-08-24 岩土科技股份有限公司 A kind of guide wall of underground continuous wall groove automatic excavator
CN204356716U (en) * 2014-12-16 2015-05-27 武汉农尚环境股份有限公司 A kind of artificial scape stone, car stop or bench utilizing building waste to make
CN105926807B (en) * 2016-06-06 2019-01-15 河北建筑工程学院 A kind of cast-in-place integral concrete frame wall filled with masonry system and its construction method
GB2551333B (en) * 2016-06-10 2020-04-08 Subsea 7 Norway As Subsea foundations
CN205970562U (en) * 2016-07-28 2017-02-22 深圳市山月园园艺有限公司 Artificial landscape water circulation system
CN206277871U (en) * 2016-12-16 2017-06-27 深圳北林地景园林生态有限公司 Fixed artificial hillock high
CN106759397A (en) * 2017-01-06 2017-05-31 苏州工业园区园林绿化工程有限公司 Ecological lattice guest method to set up
CN107182699B (en) * 2017-07-13 2020-12-22 上海园林绿化建设有限公司 Integral arbor underground support construction method
CN107554178B (en) * 2017-10-17 2020-05-22 绍兴壹佳建设有限公司 Rockery construction method
CN107972400B (en) * 2017-11-23 2020-04-07 杨朔 Method for manufacturing artificial large rockery
CN108656831B (en) * 2018-05-10 2020-04-10 杭州江润科技有限公司 Composite framework laminated stone plastic hill and construction method
CN110315901A (en) * 2019-05-15 2019-10-11 杭州市园林工程有限公司 A kind of garden rockery landscape construction method

Also Published As

Publication number Publication date
CN111347819A (en) 2020-06-30

Similar Documents

Publication Publication Date Title
CN112554198B (en) Construction method of deep foundation pit protection structure adjacent to high-rise building
CN105863650B (en) It is a kind of elder generation wall after hole tunnel construction method
CN101691751A (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN210238534U (en) Flexible reverse-wrapping backfill structure for annular inner support large-diameter corrugated pipe culvert
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN112922019A (en) Single-pile foundation for reinforcing soft soil foundation by offshore wind power vibroflotation cemented pile and construction method
CN110387877A (en) A kind of stiff composite pile construction technology
GB2609841A (en) Monopile foundation using cemented vibroflotation pile to reinforce soft soil foundation for use in offshore wind power generation, and construction method
CN104631713A (en) Roof greening construction method
CN202323960U (en) Shallow foundation pit forming construction structure capable of ensuring slope stability
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN103758132A (en) Construction technology of cantilever piling and supporting structure combined with sloping
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
CN111347819A (en) Large-scale landscape rockery construction method
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN212194890U (en) Internal supporting structure of large landscape rockery
CN108656831B (en) Composite framework laminated stone plastic hill and construction method
CN212896462U (en) Grid reinforced composite structure underground well
CN212129204U (en) Precast pier foundation of slip casting type recycled concrete
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN214573978U (en) Deep foundation pit protection structure adjacent to high-rise buildings
CN215715392U (en) Side slope supporting structure
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method for large-scale landscape rockery

Granted publication date: 20220218

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2024980026444

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20220218

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2024980026444

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method for large-scale landscape rockery

Granted publication date: 20220218

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2026980026200