CN111335182B - Portable single-track bridge erection machine and method for installing steel columns and steel beams during bridge erection - Google Patents
Portable single-track bridge erection machine and method for installing steel columns and steel beams during bridge erection Download PDFInfo
- Publication number
- CN111335182B CN111335182B CN202010305819.4A CN202010305819A CN111335182B CN 111335182 B CN111335182 B CN 111335182B CN 202010305819 A CN202010305819 A CN 202010305819A CN 111335182 B CN111335182 B CN 111335182B
- Authority
- CN
- China
- Prior art keywords
- seat
- steel
- base frame
- suspension
- slewing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 88
- 239000010959 steel Substances 0.000 title claims abstract description 88
- 238000000034 method Methods 0.000 title claims abstract description 18
- 239000000725 suspension Substances 0.000 claims abstract description 44
- 238000009434 installation Methods 0.000 claims description 17
- 230000005484 gravity Effects 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a portable single-rail bridge girder erection machine and a method for installing steel columns and steel beams in the process of bridging, wherein the bridge girder erection machine comprises a base frame, a suspension, a slewing mechanism, a hoisting assembly and a steering seat; the steering seat comprises a seat main body, a driving mechanism and a guiding mechanism, wherein the driving mechanism is arranged in the seat main body, the guiding mechanism is arranged below the seat main body, the steering seat is arranged on an erected steel beam through the driving mechanism, and the guiding mechanism is clamped at two sides of the steel beam and can slide along the length direction of the steel beam; the base frame is arranged on the seat main body through supporting legs, the slewing mechanism is arranged on the erected steel column bent cap through supporting legs, and the height of the supporting legs is adjustable; the suspension is hinged with the base frame through a slewing mechanism, and the hoisting assembly is arranged below the base frame and the suspension. The included angle between the base frame and the suspension bracket is adjusted through the slewing mechanism, the angle between the base frame and the erected steel beam is adjusted through the steering seat, and the gradient is adjusted through the supporting legs, so that the requirement on the curve radius in a plane can be reduced, and the working condition of small flat curve radius can be met.
Description
Technical Field
The invention belongs to the technical field of hoisting equipment and construction thereof, and particularly relates to a portable single-rail bridge girder erection machine and a steel column and steel girder installation method in a bridge girder erection process.
Background
The bridge girder erection machine is equipment for placing prefabricated girder segments on prefabricated piers. Bridge girder erection machines belong to the category of cranes because the main function is to lift up the girder segments, then transport them to the location and then drop them down.
Bridge girder erection machines are, however, quite different from cranes in general. The requirements are severe and there is a running on the beam, or longitudinal movement. The bridge girder erection machine is divided into a plurality of types of bridge girder erection machines, such as highway bridge erection, conventional railway bridge erection, passenger-dedicated railway bridge erection and the like. At present, the conventional straddle type monorail bridge girder erection machine can utilize the constructed pier stud to hoist the precast beam.
However, the bridge girder erection machine is heavy in equipment and low in construction speed; the installation of the pier stud cannot be completed; it cannot be applied to the case where the flat curve radius is small.
Disclosure of Invention
The invention aims to provide a portable single-track bridge girder erection machine suitable for working conditions of small flat curve radius and a steel column and steel girder installation method in a bridge girder erection process aiming at the defects of the prior art.
The invention provides a portable single-rail bridge girder erection machine, which comprises a base frame, a suspension, a slewing mechanism, a hoisting assembly and a steering seat; the steering seat comprises a seat main body, a driving mechanism and a guiding mechanism, wherein the driving mechanism is arranged in the seat main body, the guiding mechanism is arranged below the seat main body, the steering seat is arranged on an erected steel beam through the driving mechanism, and the guiding mechanism is clamped at two sides of the steel beam and can slide along the length direction of the steel beam; the base frame is arranged on the seat main body through supporting legs, the slewing mechanism is arranged on the erected steel column bent cap through supporting legs, and the height of the supporting legs is adjustable; the suspension is hinged with the base frame through a slewing mechanism, and the hoisting assembly is arranged below the base frame and the suspension.
In a specific embodiment, the seat main body is an I-shaped seat and comprises a pair of side plates and a pair of webs welded between the two side plates, wherein the webs are fixedly connected with a top plate, the top plate is connected with a steering cross beam in a flange manner, and a row of mounting holes are formed in the outer area of the webs below the side plates; the base frame is arranged on the steering cross beam through the supporting legs.
Preferably, the driving mechanism comprises a variable-frequency gear motor and a pulley, wherein the pulley comprises a wheel shaft and a pair of wheel bodies connected outside the wheel shaft; the pulley is arranged between a pair of webs, the variable frequency speed motor is arranged outside the webs, the output shaft extends into the webs and is connected with the wheel shaft, and the other end of the wheel shaft is connected with the webs through the shaft sleeve.
In order to use different beam widths, the guide mechanism comprises a guide seat and guide wheels, wherein a pair of guide wheels are arranged up and down and connected to the inner sides of the guide seats; the top ends of the guide seats are detachably connected under a row of mounting holes of the side plate, so that the distance between the two guide seats at the same end is adjustable, and a connecting shaft is arranged between the two guide seats at the same side; the bottom of the guide seat is provided with an automatic locking device so as to prevent the steering seat from being separated from the steel beam.
In one embodiment, the base frame and the suspension are trusses, each truss comprising a plurality of sections detachably connected; the rear end of the base frame and the front end of the suspension are both provided with supporting connecting frames.
In order to improve connection reliability, the support connecting frame is a rectangular frame with one end open, a notch is formed in a cross beam with an open end so as to be assembled with the slewing mechanism, a supporting leg mounting seat is arranged outside the slewing mechanism, and the other end of the support connecting frame is detachably connected with the truss.
As a matching scheme for improving the connection reliability, the slewing mechanism comprises a slewing supporting component and a slewing joint; the rotary support assembly comprises an upper support, a lower support and a connecting upright post; the rotary joint comprises a vertical seat and rotary supports which are respectively arranged at the upper end and the lower end of the vertical seat; the pair of rotary joints are assembled with the rotary support assembly through the inner ends of the rotary supports respectively, and the outer ends of the rotary supports are clamped into the notch for fixedly connecting.
In one embodiment, the lifting assembly comprises a crane beam and lifting equipment, wherein the crane beam is fixed under the base frame and the suspension frame, and the lifting equipment is arranged under the crane beam.
In order to facilitate the realization of visualization, an infrared camera is arranged at the front end of the suspension.
The invention also provides a method for installing the steel column and the steel beam in the bridging process, which uses the bridging machine as a tool and comprises the following steps:
firstly, installing two-span steel beams at a project installation starting point position, and placing the assembled portable single-rail bridge girder erection machine on the erected steel beams;
Step two, adjusting the center line of the middle support leg to coincide with the center line of the steel column bent cap through a steering seat, and then anchoring the flange at the bottom of the support leg on the bent cap;
step three, slowly rotating and adjusting the position of the suspension through a slewing mechanism to enable the axis of the suspension to coincide with the center point of the steel column to be installed next span;
Step four, hoisting the steel column: transporting the next span of steel columns to be installed to the position below the base frame, lifting the steel columns by using a lifting assembly, and lifting the steel columns to the position below the suspension for installation;
Step five, hoisting the steel beam: after the steel column is installed in place, conveying a next span of steel beam to be installed to the lower part of the base frame, lifting the steel column by using a lifting assembly, and lifting the steel column to the lower part of the suspension for installation;
step six, forward moving the bridge girder erection machine: after the steel beam is installed in place, the suspension is rotated back to keep the whole bridge girder erection machine in a straight line, the anchoring flanges of the middle supporting legs are loosened, the heights of the supporting legs are adjusted, the bridge girder erection machine is lowered to move forwards through the steering seat after the center of gravity of the bridge girder erection machine is lowered, and the bridge girder erection machine is driven to move forwards to the next span in place;
and step seven, after the bridge girder erection machine moves forwards to be in place, adjusting the heights of the supporting legs, repeating the step two to the step six, and circularly erecting.
In the use process, the included angle between the base frame and the suspension bracket can be adjusted through the slewing mechanism, the angle between the base frame and the steel beam which is erected can be adjusted through the steering seat, and the gradient can be adjusted through the supporting legs, so that the invention can be suitable for the working condition with a certain longitudinal curve gradient, can reduce the requirement on the curve radius in a plane, and is suitable for the working condition with a small flat curve radius.
Drawings
Fig. 1 is a schematic view showing a use state of a preferred embodiment of the present invention.
Fig. 2 is an enlarged view showing the assembly of the steering seat and the steel beam in the preferred embodiment.
Fig. 3 is an enlarged perspective view showing the assembly of the steering seat and the steel beam in the preferred embodiment.
Fig. 4 is an enlarged perspective view of the seat body in the present preferred embodiment. (steering beams not shown)
Fig. 5 is an enlarged perspective view of the support link in the preferred embodiment.
Fig. 6 is an enlarged perspective view of the swing mechanism in the preferred embodiment.
Number of drawings:
1-a base frame;
2-suspension;
3-slewing mechanism, 31-slewing supporting component, 32-slewing joint;
4, a hoisting assembly, 41, a crane beam and 42, hoisting equipment;
5-a steering seat, wherein the steering seat is provided with a steering seat,
51-Seat body, 511-side plate, 512-web plate, 513-top plate, 514-steering beam,
52-A driving mechanism, 521-a variable-frequency gear motor, 522-a pulley,
53-Guiding mechanism, 531-guiding seat, 532-guiding wheel, 533-connecting axle;
6-a movable operating platform;
7-supporting legs;
8, supporting a connecting frame and 81-notch;
a, a steel beam; b, a capping beam; c-steel column.
Detailed Description
As shown in fig. 1, the portable single-rail bridge girder erection machine provided by the embodiment comprises a base frame 1, a suspension frame 2, a slewing mechanism 3, a hoisting assembly 4, a steering seat 5 and a movable operation platform 6, wherein the base frame is installed on a steel beam a erected through the steering seat 5, the slewing mechanism 3 is installed on a steel column cap beam B erected through a supporting leg 7, the suspension frame is hinged with the base frame 1 through the slewing mechanism 3, the hoisting assembly 4 is arranged under the base frame and the suspension frame, and the movable operation platform 6 is arranged under the front end of the suspension frame and can move back and forth so as to complete steel beam installation operation.
As shown in fig. 2 and 3, the steering seat 5 includes a seat main body 51, a driving mechanism 52, and a guide mechanism 53. As shown in fig. 4, the seat main body 51 is an i-shaped seat, and comprises a pair of side plates 511 and a pair of webs 512 welded between the side plates, wherein the webs are fixedly connected with a top plate 513, the top plate is connected with a steering cross beam 514 in a flange manner, the side plates 511 are groove-shaped plates, a row of mounting holes are formed in the outer area of the webs at the bottoms of the side plates 511 for mounting the guide mechanism 53, and a pair of through holes are formed in the webs for mounting the driving mechanism 52. The driving mechanism 52 is arranged in pairs and is respectively arranged on a pair of webs, the driving mechanism comprises a variable-frequency gear motor 521 and a pulley 522, and the pulley comprises a wheel shaft and a pair of wheel bodies connected outside the wheel shaft; the pulley is arranged between a pair of webs, the variable frequency speed motor is arranged outside the webs, the output shaft extends into the webs and is connected with the wheel shaft, and the other end of the wheel shaft is connected with the webs through the shaft sleeve. The guide mechanism 53 comprises a guide seat 531 and a guide wheel 532, and a pair of guide wheels are arranged up and down and connected to the inner sides of the guide seat; a row of through holes are formed in the top plate of the guide seat, the guide seat is arranged below the side plate and fastened through bolts penetrating through the through holes and the mounting holes and matched with corresponding nuts, the distance between the two guide seats at the same end is adjustable by adjusting different hole positions, and a connecting shaft 533 is arranged between the two guide seats at the same side so as to improve synchronism. The bottom end of the guide seat 531 is provided with an automatic locking device 533, so that the whole overturning of the bridge girder erection machine caused by the fact that the steering seat is separated from the erected girder under the unexpected condition can be prevented. The pair of steering seats 5 are arranged on the steel beam A and used for installing the base frame 1, the steering seats are arranged on the top surface of the steel beam through pulleys, the guide wheels are arranged on two sides of the steel beam to be clamped, the variable-frequency gear motor drives the pulleys to walk on the steel beam in the working process so as to drive the base frame 1 to move, arbitrary-speed walking and braking can be realized, and the guide wheels are used for clamping wires to improve the stability and reliability of walking.
As shown in fig. 1, the base frame 1 and the suspension 2 are trusses which comprise a plurality of sections which are detachably connected; the rear end of the base frame and the front end of the suspension are both provided with a supporting connecting frame 8. As shown in fig. 5, the support connecting frame 8 is a rectangular frame with one end open, a notch 81 is formed on a beam at the open end to be assembled with the slewing mechanism, a supporting leg mounting seat is arranged outside, and the other end is detachably connected with the truss. One end of the base frame is arranged on the steering cross beam through a pair of supporting legs, the other end of the base frame is connected with the supporting connecting frame, and the supporting connecting frame is assembled with the steering cross beam of the other steering seat through the supporting legs. The base frame 1 and the suspension 2 are assembled with the swing mechanism 3 through a support connection frame 8.
As shown in fig. 6, the swing mechanism 3 includes a swing support assembly 31 and a swing joint 32; the rotary support assembly comprises an upper support, a lower support and a connecting upright post; the rotary joint comprises a vertical seat and rotary supports which are respectively arranged at the upper end and the lower end of the vertical seat; the inner ends of the rotary supports are sleeved on the rotary support assembly respectively for assembly, and the outer ends of the rotary supports are clamped into the notch and fixedly connected with the support connecting frame 8. The slewing mechanism 3 is beneficial to bearing the hoisting load and the unbalanced load of the bridge girder erection machine on the steel column bent cap B through a pair of supporting legs 7 arranged below the connecting upright posts; the landing leg is a hydraulic cylinder.
In the actual use process, according to the working condition, an integrated hydraulic station can be additionally arranged in the truss structure to control the lifting of the supporting legs, a gasoline engine generator is arranged in the truss structure to meet the power requirement of the bridge girder erection machine, and a 36V control system is adopted for hoisting, lifting and walking of the bridge girder erection machine. And an infrared camera and a sighting device are arranged at the front end of the truss, and the alignment condition of the bridge girder erection machine and the center of the foundation structure of the steel column to be installed can be observed through connecting a video display. Meanwhile, the display can observe the surrounding situation of the hoisting structure, and the safety during installation operation is ensured.
The hoisting assembly 4 comprises a crane beam 41 and hoisting equipment 42, wherein the crane beam is welded under the base frame and the suspension, and the four hoisting equipment are arranged under the crane beam for hoisting steel beams and steel columns.
When the bridge girder erection machine is used for constructing steel girders and steel columns, the concrete method comprises the following steps:
1. Firstly, erecting an initial two-span steel beam A, a steel column C and a cover beam B, and assembling by a bridge girder erection machine; and installing two-span steel beams at the project installation starting point position by using equipment such as an automobile crane, and integrally assembling the bridge girder erection machine and placing the bridge girder erection machine on the steel beams.
2. Secondly, anchoring the supporting legs; the center line of the supporting leg is overlapped with the center line of the steel column bent cap through bogie movement adjustment, the supporting leg extends out of the hydraulic cylinder, and the flange at the bottom of the supporting leg is anchored on the bent cap.
3. And then the position of the suspension is adjusted, and the position of the suspension is adjusted by slowly rotating the rotary structure, so that the axis of the suspension coincides with the center point of the steel column to be installed next span.
4. And then hoisting the steel column: and conveying the next steel column to be installed from the installation starting point to the tail part of the frame of the bridge girder erection machine through the girder transporting trolley, lifting the steel column by using the lifting assembly, and lifting the steel column to the position below the suspension for steel column installation.
5. Hoisting the steel beam: after the steel column is installed in place, the girder is transported to the position below the base frame from the installation starting point by the girder transporting trolley, and is lifted by the lifting assembly, and is lifted to the suspension frame for girder installation.
6. And then advancing the bridge girder erection machine: after the steel beam is installed in place, the suspension is rotated to return, so that the whole bridge girder erection machine is kept in a straight line, the anchoring flanges of the middle supporting legs are loosened, the heights of all the supporting legs are adjusted, the gravity center of the bridge girder erection machine structure is lowered, the steering frame is controlled to walk forwards, and the bridge girder erection machine is driven to move forwards to the next span in place.
Finally, after the bridge girder erection machine moves forward to be in place, the heights of the supporting legs are adjusted, and the operation of 2-6 is repeated, so that the cyclic erection can be performed.
In the use process, the included angle between the base frame and the suspension bracket can be adjusted through the slewing mechanism, the angle between the base frame and the steel beam which is erected can be adjusted through the steering seat, and the gradient can be adjusted through the supporting legs, so that the invention can be suitable for the working condition with a certain longitudinal curve gradient, can reduce the requirement on the curve radius in a plane, and is suitable for the working condition with a small flat curve radius.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010305819.4A CN111335182B (en) | 2020-04-17 | 2020-04-17 | Portable single-track bridge erection machine and method for installing steel columns and steel beams during bridge erection |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010305819.4A CN111335182B (en) | 2020-04-17 | 2020-04-17 | Portable single-track bridge erection machine and method for installing steel columns and steel beams during bridge erection |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111335182A CN111335182A (en) | 2020-06-26 |
| CN111335182B true CN111335182B (en) | 2024-11-15 |
Family
ID=71180923
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010305819.4A Active CN111335182B (en) | 2020-04-17 | 2020-04-17 | Portable single-track bridge erection machine and method for installing steel columns and steel beams during bridge erection |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111335182B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114164766B (en) * | 2021-12-24 | 2024-10-25 | 中交第一航务工程局有限公司 | Method for erecting front outriggers of bridge erecting machine |
| CN114991014B (en) * | 2022-06-08 | 2024-07-09 | 贵州铁马科技有限公司 | Straddle type single-rail overhead track bridge girder erection machine |
| CN114892541B (en) * | 2022-06-16 | 2024-08-16 | 湖南科技大学 | Walking and hoisting integrated straddle type monorail bridge girder erection machine |
| CN114892542B (en) * | 2022-06-16 | 2024-03-22 | 湖南科技大学 | Supporting method and device for straddle type monorail bridge girder erection machine |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN212247887U (en) * | 2020-04-17 | 2020-12-29 | 湖南柏宇建设工程咨询有限公司 | Portable single-rail bridge girder erection machine |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101024938A (en) * | 2007-03-09 | 2007-08-29 | 中铁十七局集团有限公司 | Assembling type bridge-errecting machine |
| CN102102317B (en) * | 2009-12-22 | 2012-03-07 | 中铁科工集团有限公司 | Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam |
| CN103147398B (en) * | 2013-02-04 | 2015-07-29 | 秦皇岛天业通联重工股份有限公司 | A kind of Bridge Erector realizes the method shifting between bridge or pass through tunnel |
| CN204185778U (en) * | 2014-10-22 | 2015-03-04 | 中铁十一局集团第六工程有限公司 | The assembled Bridge Erector of a kind of light-duty little curved segments |
| CN106480828A (en) * | 2016-12-16 | 2017-03-08 | 四川公路桥梁建设集团有限公司 | Small-radius curve T-shaped beam bridge erecting machine and rotary installation construction method |
| CN107354875A (en) * | 2017-09-06 | 2017-11-17 | 中国建筑第五工程局有限公司 | A kind of straddle-type monorail Bridge Erector |
| CN109898399A (en) * | 2019-04-19 | 2019-06-18 | 中建钢构有限公司 | A kind of assembled Landscape Bridge and its assembling method |
-
2020
- 2020-04-17 CN CN202010305819.4A patent/CN111335182B/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN212247887U (en) * | 2020-04-17 | 2020-12-29 | 湖南柏宇建设工程咨询有限公司 | Portable single-rail bridge girder erection machine |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111335182A (en) | 2020-06-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109208478B (en) | Integrated rapid construction method for prefabricated bridge | |
| WO2022142193A1 (en) | Construction method for large-span thin-wall concrete sound barrier pouring trolley | |
| WO2024148715A1 (en) | Method for erecting continuous steel truss bridge | |
| JP4962252B2 (en) | Bridge erection method and erection device | |
| CN111335182A (en) | Portable single-rail bridge girder erection machine and steel column and steel girder installation method in bridge erecting process | |
| CN114045751A (en) | Pile-beam integrated construction method for pipe pile foundation construction and cap beam-beam plate assembly | |
| CN110723677B (en) | Precast Beam Assisted Lifting Trolley | |
| CN212247887U (en) | Portable single-rail bridge girder erection machine | |
| CN115182265B (en) | Integrated bridge girder erection machine used under working condition of dry spliced segment bent cap and construction method | |
| CN114541277A (en) | Fully-assembled bridging system, beam erecting and hole passing method | |
| CN111088756A (en) | Segmental assembling bridge girder erection machine | |
| CN114476962B (en) | A steel-concrete composite beam erection system based on bridge crane | |
| CN115807387A (en) | Small-radius curve large-gradient narrow-width ramp bridge girder erection machine and construction method | |
| CN219061666U (en) | Rotatory platform truck of assembling of single-ring three-piece type tunnel lining | |
| CN110747757B (en) | Whole Kong Lianghuan frame equipment | |
| CN114481834B (en) | Pile-beam erection integrated machine and erection method | |
| CN116254769A (en) | Bridge girder erection machine suitable for continuous steel box girder ramp erection and erection construction method | |
| CN119332613A (en) | Installation method of cross-line curved steel box girder | |
| CN110172923B (en) | An environmentally friendly downward self-propelled steel trestle structure | |
| CN116043698B (en) | Construction method of side prefabricated field frame beam | |
| CN117513166A (en) | Steel box girder jacking device and system, jacking construction method | |
| CN202730648U (en) | Rotary lifting maintenance platform | |
| CN217499962U (en) | Multifunctional bridge girder erection machine | |
| CN216379190U (en) | Walking type self-balancing cross-over bridge girder erection machine | |
| JP2025065742A (en) | How to erect a main girder between two existing main girders |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |