CN111313417B - Configuration method of intelligent civil building power supply and distribution system - Google Patents

Configuration method of intelligent civil building power supply and distribution system Download PDF

Info

Publication number
CN111313417B
CN111313417B CN202010245847.1A CN202010245847A CN111313417B CN 111313417 B CN111313417 B CN 111313417B CN 202010245847 A CN202010245847 A CN 202010245847A CN 111313417 B CN111313417 B CN 111313417B
Authority
CN
China
Prior art keywords
power supply
intelligent
distribution system
civil building
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010245847.1A
Other languages
Chinese (zh)
Other versions
CN111313417A (en
Inventor
孙长征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Renda Electric Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010245847.1A priority Critical patent/CN111313417B/en
Publication of CN111313417A publication Critical patent/CN111313417A/en
Application granted granted Critical
Publication of CN111313417B publication Critical patent/CN111313417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00—Circuit arrangements for AC mains or AC distribution networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides a configuration method of an intelligent civil building power supply and distribution system, which comprises the steps of classifying areas, calculating electric loads, configuring different electrical equipment for different categories, monitoring power distribution, alarming in time and adjusting distribution. The invention can realize the configuration of the power distribution system, integrates various functions, supervises and monitors in real time, and has high safety and reliability, and the power supply and distribution system is intelligent.

Description

Configuration method of intelligent civil building power supply and distribution system
Technical Field
The invention relates to the field of electric power, in particular to a configuration method of an intelligent civil building power supply and distribution system.
Background
With the development of economy and science and technology, higher requirements are set on the power electrical system of the civil building, richer functions are required, higher safety and reliability are also required, and with the development of intelligent products, the civil building is required to be more intelligent, the system integration level is higher, and the control is easier. The current intelligent civil building electric power system either cannot achieve so many functions, or is configured with too many components, long lines and complicated configuration, and cannot ensure safety and reliability.
In view of this, how to better configure a civil building power and electrical system with abundant functions, high reliability and high safety becomes a problem to be solved at present.
When the abnormity happens, the abnormity condition can be accurately judged, the problem can be found in time, and a solution is provided.
Disclosure of Invention
The invention aims to solve the problem that an intelligent civil building power electrical system in the prior art cannot have multiple functions, safety and reliability. The invention provides a configuration method of an intelligent civil building power supply and distribution system, which can realize integration of multiple functions, real-time supervision and monitoring, intellectualization of the power supply and distribution system and high safety and reliability by classifying areas, calculating electric loads, configuring different electrical equipment for different categories, monitoring power distribution and giving an alarm and adjusting distribution in time. When the abnormity happens, the abnormity condition can be accurately judged, the problem can be found in time, and a solution is provided.
In order to solve the technical problem, the invention provides a configuration method of an intelligent civil building power supply and distribution system, which comprises the following steps:
and S1, classifying the civil buildings to be configured according to different areas by the main control center according to the power supply subareas, wherein the types of all the areas comprise A type, B type, C type and D type. Optionally, the main control center can store and transmit various information of the intelligent civil building power supply and distribution system, and perform differentiation acquisition, data integration and analysis on information of different areas.
S2, calculating the electric loads of different types as QA,QB,QC,QDAnd setting respective power supply voltage levels, selecting a power supply mode and arranging an intelligent ammeter box.
S3, the execution center sets a lighting system for the A-type area, including an indoor lighting lamp, a public area lighting lamp, an evacuation lighting lamp and an evacuation channel indicating marker lamp; the execution center sets an electric socket power supply system for the B-type area; the execution center sets an intelligent ammeter box for the C-type area; and the execution center sets an emergency power supply device for the D-type area.
Optionally, the execution center configures different power devices according to types of the different areas to ensure integrity of the intelligent civil building, and the execution center configures different types and numbers of power devices according to different types of power loads.
Optionally, the emergency power supply device adopts an asynchronous motor, and the load factor is more than 0.7 during operation.
Optionally, the lamp for the lighting system uses a lamp with reactive compensation, and the power factor is 0.9.
S4, the execution center sets up the transmission line and the lightning protection and grounding device in the intelligent civil building power supply and distribution system;
optionally, the transmission line adopts a cable of a communication structure, so that inductive reactance of the line and loss of reactive power are reduced.
And S5, the alarm safety center sets an alarm system, a security system and a fire-fighting system in the intelligent civil building power supply system. The alarm system is set according to different types of power loads, and the security system and the fire protection system are matched with all devices in the intelligent civil building power supply and distribution system.
And S6, the power distribution monitoring center supervises the running condition of the intelligent civil building power supply and distribution system, supervises the power consumption condition of different areas, sets the standard and the rule of the normal state and the abnormal state according to the characteristics of the different areas, and displays an alarm when the abnormal state is met.
And S7, the power distribution monitoring center transmits the detected situation of the intelligent civil building power supply and distribution system to a remote control center in real time, and executes an instruction according to the setting of the reference parameter, and the remote control center evaluates the operation of the intelligent civil building power supply and distribution system and properly adjusts and distributes.
Optionally, in step S2, the different types of electric loads QA,QB,QC,QDSatisfies the following formula (1),
Figure BDA0002433956370000031
wherein cos gamma is a power triangle, PpjIs the average active load of the circuit, in kW, beta is the active load factor, SjxThe unit kW is the reactive load of the circuit, alpha is the reactive load coefficient, Ie is the rated current of the circuit, unit A, delta are the compensation capacity.
Optionally, in step S2, the setting of the smart meter box is to ensure the security and confidentiality of the system, and the account ID is set according to the type a, the type B, the type C and the type D of the regionA,IDB,IDCAnd IDDRegistering, and after the registration is successful, the main control center provides a private key d for the intelligent ammeter boxijAnd public key DijAnd then respectively sending the public key and the private key to each intelligent electric meter through a security channel, and obtaining the user IDA,IDB,IDCAnd IDDAnd judging whether the private key is effective or not, and if so, continuously monitoring the intelligent power utilization use condition.
Optionally, said α is 0.8-0.83 and said β is 0.75-0.85.
Optionally, the emergency power supply device in step S3 is configured to start when the power supply device fails temporarily and cannot operate, and the emergency power supply device is controlled by the emergency power supply center to calculate which areas the emergency power supply device supplies electric energy according to the time of the failure, and to calculate the number of the electric devices in the areas.
Optionally, the lighting system in the step S3 adopts F10-F15 for lighting, and the power of the equipment is 120 kW; F5-F5, the power of the equipment is 150kW, F1-F4, and the power of the equipment is 230 kW.
Optionally, the fire fighting system in step S5 includes a fire elevator, a fire fighting power device, a civil air defense fire fighting device, a fire pump room power, and a fire monitoring room.
Alternatively, in step S7, the power consumption in different areas, including the operation of the electrical equipment in each area, and whether the power consumption exceeds the rated value, are monitored.
Through the method, the configuration method of the intelligent civil building power supply and distribution system, disclosed by the invention, has the advantages that various functions are integrated, the real-time supervision and monitoring are realized, the power supply and distribution system is intelligent, and the safety and reliability are high by classifying the areas, calculating the electric load, configuring different electrical equipment for different categories, monitoring the power distribution and giving an alarm and adjusting the distribution in time. When the abnormity happens, the abnormity condition can be accurately judged, the problem can be found in time, and a solution is provided. .
Drawings
In order to make the technical problems solved by the present invention, the technical means adopted and the technical effects obtained more clear, the following will describe in detail the embodiments of the present invention with reference to the accompanying drawings. It should be noted, however, that the drawings described below are only illustrations of exemplary embodiments of the invention, from which other embodiments can be derived by those skilled in the art without inventive step.
Fig. 1 is a flow chart illustrating a configuration method of an intelligent civil building power supply and distribution system according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which exemplary embodiments of the invention may be embodied in many specific forms, and should not be construed as limited to the embodiments set forth herein. Rather, these exemplary embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the concept of the invention to those skilled in the art.
The structures, properties, effects or other characteristics described in a certain embodiment may be combined in any suitable manner in one or more other embodiments, while still complying with the technical idea of the invention.
In describing particular embodiments, specific details of structures, properties, effects, or other features are set forth in order to provide a thorough understanding of the embodiments by one skilled in the art. However, it is not excluded that a person skilled in the art may implement the invention in a specific case without the above-described structures, performances, effects or other features.
The flow chart in the drawings is only an exemplary flow demonstration, and does not represent that all the contents, operations and steps in the flow chart are necessarily included in the scheme of the invention, nor does it represent that the execution is necessarily performed in the order shown in the drawings. For example, some operations/steps in the flowcharts may be divided, some operations/steps may be combined or partially combined, and the like, and the execution order shown in the flowcharts may be changed according to actual situations without departing from the gist of the present invention.
The block diagrams in the figures generally represent functional entities and do not necessarily correspond to physically separate entities. I.e. these functional entities may be implemented in the form of software, or in one or more hardware modules or integrated circuits, or in different networks and/or processor means and/or microcontroller means.
The same reference numerals denote the same or similar elements, components, or parts throughout the drawings, and thus, a repetitive description thereof may be omitted hereinafter. It will be further understood that, although the terms first, second, third, etc. may be used herein to describe various elements, components, or sections, these elements, components, or sections should not be limited by these terms. That is, these phrases are used only to distinguish one from another. For example, a first device may also be referred to as a second device without departing from the spirit of the present invention. Furthermore, the term "and/or", "and/or" is intended to include all combinations of any one or more of the listed items.
Fig. 1 is a flowchart illustrating a county scale high-risk pollution plot rapid screening method according to an embodiment of the present invention.
In order to solve the technical problems, the invention provides the following technical scheme:
a configuration method of an intelligent civil building power supply and distribution system comprises the following steps:
s1: and the main control center classifies civil buildings to be configured according to different areas according to the power supply subareas, wherein the types of all the areas comprise A type, B type, C type and D type. Optionally, the classification may be divided according to different electricity consumption, or according to different functions of electricity consumption, or according to different users.
The main control center can store and transmit various information of the intelligent civil building power supply and distribution system, and perform differentiation acquisition, data integration and analysis on the information of different areas;
s2: calculating different types of electrical loads as QA,QB,QC,QDAnd setting respective power supply voltage levels, selecting a power supply mode and arranging an intelligent ammeter box. According to the use needs, the electrical loads can be different, and the fine division is favorable for limiting different electrical loads, so that the safety and the reliability are improved.
In step S2, the different types of electrical loads QA,QB,QC,QDSatisfies the following formula (1),
Figure BDA0002433956370000051
wherein cos gamma is a power triangle, PpjIs the average active load of the circuit, in kW, beta is the active load factor, SjxIs the reactive load of the circuit, the unit kW, alpha is noneThe work load coefficient, Ie, is the rated current of the circuit, unit, and a, δ are the compensation capacity. Preferably, α is 0.8 to 0.83 and β is 0.75 to 0.85. The method is obtained through experiments and a large amount of practices, and when the alpha and the beta meet the values at the same time, the power utilization planning of different types of areas of the civil building power supply and distribution system is optimized. Through the integrated calculation of the formula (1), the electric loads of different areas of the system can be effectively limited, and the safety and the reliability of a complex electrical system are ensured. As various inductors, capacitor elements and other power electronic equipment widely exist in the civil building power distribution system, in addition to active power, certain reactive power can be consumed in the working process, some electrical components are sensitive, and in order to ensure normal work, certain compensation capacity is set, and adverse effects of a power transmission system are reduced.
Optionally, in step S2, the setting of the smart meter box is to ensure the security and confidentiality of the system, and the account ID is set according to the type a, the type B, the type C and the type D of the regionA,IDB,IDCAnd IDDRegistering, and after the registration is successful, the main control center provides a private key d for the intelligent ammeter boxijAnd public key DijAnd then respectively sending the public key and the private key to each intelligent electric meter through a security channel, and obtaining the user IDA,IDB,IDCAnd IDDAnd judging whether the private key is effective or not, and if so, continuously monitoring the intelligent power utilization use condition. Therefore, the monitoring and attacking of the external users without permission to the system are ensured, and the safety is ensured. And the setting is concise, and the use is convenient.
S3, the execution center sets up electric facilities for the heterogeneous regions. Setting a lighting system for the class A area, wherein the lighting system comprises an indoor lighting lamp, a public area lighting lamp, an evacuation lighting lamp and an evacuation channel indicator light; the execution center sets an electric socket power supply system for the B-type area; the execution center sets an intelligent ammeter box for the C-type area; and the execution center sets an emergency power supply device for the D-type area.
Optionally, the execution center configures different power devices according to types of the different areas to ensure integrity of the intelligent civil building, and the execution center configures different types and numbers of power devices according to different types of power loads.
Optionally, the emergency power supply device adopts an asynchronous motor, and the load rate is more than 0.7 during operation;
optionally, the lamp for the lighting system uses a lamp with reactive compensation, and the power factor is 0.9.
And step S3, where the emergency power supply device is used to start when the power supply device fails temporarily and cannot operate, and the emergency power supply device is controlled by the emergency power supply center to calculate which areas are supplied with electric energy by the emergency power supply device and calculate the number of electric devices in the areas according to the time of the failure.
In the step S3, the lighting system adopts F10-F15 for lighting, and the power of the equipment is 120 kW; F5-F5, the power of the equipment is 150kW, F1-F4, and the power of the equipment is 230 kW. The lighting device of the configured lighting system is safe and reliable in power distribution system, saves electricity and optimizes configuration.
And S4, the execution center sets a power transmission line and a lightning protection and grounding device in the intelligent civil building power supply and distribution system, wherein the power transmission line adopts a cable with a communication structure, and the inductive reactance of the line and the loss of reactive power are reduced.
And S5, the alarm safety center sets an alarm system, a security system and a fire-fighting system in the intelligent civil building power supply system. The alarm system is set according to different types of power loads, and the security system and the fire protection system are matched with all devices in the intelligent civil building power supply and distribution system. The alarm system may use alarm detectors including window magnets, door magnets, etc. When receiving the alarm signal, the safety center can automatically cut off the power supply of the area.
The fire fighting system in the step S5 comprises a fire elevator, a fire fighting power device, a civil air defense fire fighting device, a fire pump room power device and a fire fighting monitoring room.
And S6, the power distribution monitoring center supervises the running condition of the intelligent civil building power supply and distribution system, supervises the power consumption condition of different areas, sets the standard and the rule of the normal state and the abnormal state according to the characteristics of the different areas, and displays an alarm when the abnormal state is met. The distribution monitoring center can display the power operation condition of the whole system, including each electrical device, circuit arrangement and components. When an abnormal condition is met, the abnormal condition is displayed and marked at which part of the system. And an abnormal condition library is also arranged in the power distribution monitoring center, so that abnormal conditions are cleared up and updated and expanded in a period of time. And comparing the marked abnormal conditions with an abnormal condition library, and automatically and intelligently searching a solution.
And S7, the power distribution monitoring center transmits the detected situation of the intelligent civil building power supply and distribution system to a remote control center in real time, and executes an instruction according to the setting of the reference parameter, and the remote control center evaluates the operation of the intelligent civil building power supply and distribution system and properly adjusts and distributes.
In step S7, the power consumption of different areas, including the operation of the electrical equipment in each area, and whether the power consumption exceeds the rated value, are monitored.
Compared with the prior art, the invention has the beneficial effects that: the configuration method of the intelligent civil building power supply and distribution system can realize integration of multiple functions, real-time supervision and monitoring, intelligentization of the power supply and distribution system, high safety and reliability and reduction of reject ratio by classifying areas, calculating electric loads, configuring different electrical equipment in different categories, monitoring power distribution and timely alarming and adjusting distribution. When the abnormity occurs, the abnormity condition can be accurately judged, the abnormity condition can be compared with the abnormity condition library, the problem can be found in time, and a solution is provided.
While the foregoing embodiments have described the objects, aspects and advantages of the present invention in further detail, it should be understood that the present invention is not inherently related to any particular computer, virtual machine or electronic device, and various general-purpose machines may be used to implement the present invention. The invention is not to be considered as limited to the specific embodiments thereof, but is to be understood as being modified in all respects, all changes and equivalents that come within the spirit and scope of the invention.

Claims (7)

1. A method of configuring an intelligent civil building power supply and distribution system, the method comprising the steps of:
s1, classifying the civil buildings to be configured according to different areas by the main control center according to the power supply subareas, wherein the types of the areas comprise A type, B type, C type and D type;
the main control center can store and transmit various information of the intelligent civil building power supply and distribution system, and perform differentiation acquisition, data integration and analysis on information of different areas;
s2, calculating the electric loads of different types as QA,QB,QC,QDSetting respective power supply voltage levels, selecting a power supply mode and setting an intelligent ammeter box;
s3, the execution center sets a lighting system for the A-type area, including an indoor lighting lamp, a public area lighting lamp, an evacuation lighting lamp and an evacuation channel indicating marker lamp; the execution center sets an electric socket power supply system for the B-type area; the execution center sets an intelligent ammeter box for the C-type area; the execution center sets an emergency power supply device for the D-type area;
the execution center configures different power devices according to the types of the different areas so as to ensure the integrity of the intelligent civil building, and configures different types and quantities of power devices according to different types of electric loads;
wherein, the emergency power supply device adopts an asynchronous motor, and the load factor is more than 0.7 during operation;
the lamp for the lighting system uses a lamp with reactive compensation, and the power factor is 0.9;
s4, the execution center sets up the transmission line and the lightning protection and grounding device in the intelligent civil building power supply and distribution system;
the power transmission line adopts a cable with a communication structure, so that the inductive reactance of the line and the loss of reactive power are reduced;
s5, the alarm safety center sets an alarm system, a security system and a fire fighting system in the intelligent civil building power supply system,
the alarm system is set according to different types of electric loads, and the security system and the fire protection system are matched with all devices in the intelligent civil building power supply and distribution system;
s6, the power distribution monitoring center supervises the running condition of the intelligent civil building power supply and distribution system, supervises the power consumption condition of different areas, sets the standard and rule of normal state and abnormal state according to the characteristics of different areas, and displays alarm when the abnormal state occurs;
s7, the power distribution monitoring center transmits the detected situation of the intelligent civil building power supply and distribution system to a remote control center in real time, and executes instructions according to the setting of reference parameters, and the remote control center evaluates the operation of the intelligent civil building power supply and distribution system and properly adjusts and distributes;
in the step S2, the different types of electric loads QA,QB,QC,QDSatisfies the following formula (1),
Figure FDA0003010641140000021
wherein cos gamma is a power triangle, PpjIs the average active load of the circuit, in kW, beta is the active load factor, SjxThe unit kW is the reactive load of the circuit, alpha is the reactive load coefficient, Ie is the rated current of the circuit, unit A, delta are the compensation capacity.
2. The method for configuring an intelligent civil building power supply and distribution system according to claim 1, characterized in that:
in the step S2, the setting of the smart meter box is to ensure the security and confidentiality of the system, and the account ID is set according to the type a, the type B, the type C and the type D of the areaA,IDB,IDCAnd IDDRegistering, and after the registration is successful, the main control center provides a private key d for the intelligent ammeter boxijAnd public key DijAnd then respectively sending the public key and the private key to each intelligent electric meter through a security channel, and obtaining the user IDA,IDB,IDCAnd IDDAnd judging whether the private key is effective or not, and if so, continuously monitoring the intelligent power utilization use condition.
3. The method for configuring an intelligent civil building power supply and distribution system according to claim 2, characterized in that:
the alpha is 0.8-0.83, and the beta is 0.75-0.85.
4. The method for configuring an intelligent civil building power supply and distribution system according to claim 1, characterized in that:
the emergency power supply device in step S3 is configured to start when the power supply device fails temporarily and cannot operate, and the emergency power supply device is controlled by the emergency power supply center, and calculates which areas the emergency power supply device supplies electric energy and the number of electric devices in the areas according to the time of the failure.
5. The method for configuring an intelligent civil building power supply and distribution system according to claim 1, characterized in that:
in the step S3, the lighting system adopts F10-F15 for lighting, and the power of the equipment is 120 kW; F5-F5, the power of the equipment is 150kW, F1-F4, and the power of the equipment is 230 kW.
6. The method for configuring an intelligent civil building power supply and distribution system according to claim 1, characterized in that:
the fire fighting system in the step S5 comprises a fire elevator, a fire fighting power device, a civil air defense fire fighting device, a fire pump room power device and a fire fighting monitoring room.
7. The method for configuring an intelligent civil building power supply and distribution system according to claim 1, characterized in that:
in step S7, the power consumption of different areas, including the operation of the electrical equipment in each area, and whether the power consumption exceeds the rated value, are monitored.
CN202010245847.1A 2020-03-31 2020-03-31 Configuration method of intelligent civil building power supply and distribution system Active CN111313417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010245847.1A CN111313417B (en) 2020-03-31 2020-03-31 Configuration method of intelligent civil building power supply and distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010245847.1A CN111313417B (en) 2020-03-31 2020-03-31 Configuration method of intelligent civil building power supply and distribution system

Publications (2)

Publication Number Publication Date
CN111313417A CN111313417A (en) 2020-06-19
CN111313417B true CN111313417B (en) 2021-07-06

Family

ID=71147455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010245847.1A Active CN111313417B (en) 2020-03-31 2020-03-31 Configuration method of intelligent civil building power supply and distribution system

Country Status (1)

Country Link
CN (1) CN111313417B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101795398A (en) * 2010-02-05 2010-08-04 北京建筑工程学院 Integrated monitoring system with safety monitoring center for multi-layer underground transportation junction
JP2012506231A (en) * 2008-10-14 2012-03-08 イ,ワンカン Fire-fighting automatic conversion power outage and fire-fighting combined generator
CN104319665A (en) * 2014-10-15 2015-01-28 王波 Installation method for power and electric system of civil building
CN204576190U (en) * 2015-05-18 2015-08-19 青岛阳浦智能科技有限公司 Medical building integrated power supply and supervisory system
CN105119384A (en) * 2015-09-28 2015-12-02 国家电网公司 High risk and important client remote monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012506231A (en) * 2008-10-14 2012-03-08 イ,ワンカン Fire-fighting automatic conversion power outage and fire-fighting combined generator
CN101795398A (en) * 2010-02-05 2010-08-04 北京建筑工程学院 Integrated monitoring system with safety monitoring center for multi-layer underground transportation junction
CN104319665A (en) * 2014-10-15 2015-01-28 王波 Installation method for power and electric system of civil building
CN204576190U (en) * 2015-05-18 2015-08-19 青岛阳浦智能科技有限公司 Medical building integrated power supply and supervisory system
CN105119384A (en) * 2015-09-28 2015-12-02 国家电网公司 High risk and important client remote monitoring system

Also Published As

Publication number Publication date
CN111313417A (en) 2020-06-19

Similar Documents

Publication Publication Date Title
US12212181B2 (en) Microgrid power system
CN102158129B (en) Solar photovoltaic system and fault detection method thereof
US10263436B2 (en) Electrical energy storage unit and control system and applications thereof
CN211720301U (en) Intelligent charging cabinet
CN111769559A (en) A power emergency automatic management system
CN108767952A (en) A kind of off-board charging system to interconnect
CN108011386A (en) Battery energy storage system
CN106597963A (en) Electric power alarming control system
CN109167430B (en) A kind of distributed DC power
CN106124835B (en) A method for comparing power distribution voltage with predetermined voltage
CN106569461A (en) Distributed power control device
CN106602707A (en) Remote electric power monitoring system
CN202513620U (en) Modular lithium battery uninterrupted power supply (UPS)
CN111313417A (en) Configuration method of intelligent civil building power supply and distribution system
CN112489350B (en) Dynamic-optimization bank electricity safety alarm grading method
CN109888723A (en) One kind having earth leakage protective intelligent electric meter control system and control method
CN106602713A (en) Centralized-distributed power alarm control system
CN105262156A (en) An embedded self-protection intelligent lead-acid battery
CN106571684A (en) Distributed power control system
CN106602715A (en) Power alarm monitoring method
CN106597998A (en) Collecting-distributing type power alarm monitoring method
CN213152106U (en) Intelligent Internet of things monitoring device for maintenance of elevator according to needs
CN213754103U (en) A power distribution terminal device with integrated communication
CN204290470U (en) A kind of prefabricated uninterruptible power system
CN216312989U (en) Novel UPS bypass pressure regulating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230822

Address after: Room 102, Building B22, Liandong Jinyu Industrial Center, No. 308, Section 2, Maqiaohe Road, Wangcheng Economic and Technological Development Zone, Changsha City, Hunan Province, 410000

Patentee after: Changsha Renda Electric Co.,Ltd.

Address before: Zhangqiu harmony square, 1688 Shuangshan street, Zhangqiu District, Jinan City, Shandong Province, 250202

Patentee before: Sun Changzheng

TR01 Transfer of patent right