CN111293444A - Improved live-line loading and unloading wire clamp - Google Patents
Improved live-line loading and unloading wire clamp Download PDFInfo
- Publication number
- CN111293444A CN111293444A CN202010222970.1A CN202010222970A CN111293444A CN 111293444 A CN111293444 A CN 111293444A CN 202010222970 A CN202010222970 A CN 202010222970A CN 111293444 A CN111293444 A CN 111293444A
- Authority
- CN
- China
- Prior art keywords
- operating member
- main body
- clamp
- wire
- wire clip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002184 metal Substances 0.000 claims abstract description 29
- 229910052751 metal Inorganic materials 0.000 claims abstract description 29
- 230000001154 acute effect Effects 0.000 claims abstract description 11
- 239000011248 coating agent Substances 0.000 claims description 9
- 238000000576 coating method Methods 0.000 claims description 9
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 7
- 238000003780 insertion Methods 0.000 abstract description 3
- 230000037431 insertion Effects 0.000 abstract description 3
- 238000013461 design Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000005096 rolling process Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/28—Clamped connections, spring connections
- H01R4/48—Clamped connections, spring connections utilising a spring, clip, or other resilient member
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R11/00—Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
- H01R11/11—End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
- H01R11/12—End pieces terminating in an eye, hook, or fork
- H01R11/14—End pieces terminating in an eye, hook, or fork the hook being adapted for hanging on overhead or other suspended lines, e.g. hot line clamp
Landscapes
- Clamps And Clips (AREA)
Abstract
本发明涉及电力设备技术领域,具体公开一种改良型的带电装卸线夹,线夹主体,所述线夹主体的一侧设有侧倾U型槽;上操作构件,所述上操作构件与所述线夹主体的上部转动连接,其与所述线夹主体远离所述侧倾U型槽的一侧设有可供金属横杆插入的锐角空间;夹块,所述夹块位于所述侧倾U型槽中并与所述侧倾U型槽的槽底上下滑动连接;下操作构件,所述下操作构件的上端贯穿所述线夹主体的底部并与所述夹块转动连接,下端设有乚型部,所述乚型部设有可供所述金属横杆插入的正置U型槽;所述下操作构件的上端与所述线夹主体螺纹连接。本发明提供一种改良型的带电装卸线夹,具有便于装拆的优点,能有效提高电力人员的工作效率。
The invention relates to the technical field of electrical equipment, and specifically discloses an improved live loading and unloading wire clip, a wire clip main body, one side of the wire clip main body is provided with a roll U-shaped groove; an upper operating member, the upper operating member and the The upper part of the main body of the wire clip is rotatably connected, and the side of the main body of the wire clip away from the U-shaped groove of the roll is provided with an acute angle space for the insertion of a metal cross bar; a clamping block, the clamping block is located in the A lower operating member, the upper end of the lower operating member penetrates through the bottom of the main body of the wire clip and is rotatably connected with the clamping block, The lower end is provided with a cut-out portion, and the cut-out portion is provided with an upright U-shaped groove into which the metal cross bar can be inserted; the upper end of the lower operating member is threadedly connected with the main body of the wire clip. The invention provides an improved electrified loading and unloading wire clip, which has the advantages of being convenient to assemble and disassemble, and can effectively improve the work efficiency of electric personnel.
Description
技术领域technical field
本发明涉及电力设备技术领域,尤其涉及一种改良型的带电装卸线夹。The invention relates to the technical field of electrical equipment, in particular to an improved live-loading and unloading wire clip.
背景技术Background technique
挂接地线是电力人员日常工作之一,一般地挂接地线需要使用装卸线夹、接地铜线和绝缘棒。参见图1,传统的装卸线夹1一般包括设有挂孔1011和固线孔1012的线夹主体101、与所述线夹主体101滑动连接的夹块102以及与所述夹块102转动连接并与所述线夹主体101螺纹连接的转动杆103,转动杆103的底部设有操作孔1031。参见图2,一般的绝缘棒2包括多段可螺纹连接的棒体201,最上部的棒体201一般设有金属横杆202。Hanging the ground wire is one of the daily work of the electric power personnel. Generally, the ground wire needs to be installed and removed using clips, grounding copper wires and insulating rods. Referring to FIG. 1 , a conventional wire clamp 1 generally includes a
挂接地线的步骤如下:The steps to hook up the ground wire are as follows:
①将接地铜线的一端接地,另一端固定在固线孔1012中;① Ground one end of the grounding copper wire, and fix the other end in the
②将金属横杆202穿入挂孔1011中,然后通过绝缘棒2举起装卸线夹 1,并将装卸线夹1挂在需要接地的导线或者带电三角环等带电体上;② Insert the
③将金属横杆202从挂孔1011中取出,然后将金属横杆202穿入1031 中,转动金属横杆202以使夹块102向上滑动,最终夹块102与线夹主体101 夹紧带电体,将金属横杆202从操作孔1031中取出,完成接地。③ Take out the
当检修结束后,需要将装卸线夹1取下,其过程如下:When the overhaul is over, the loading and unloading clamp 1 needs to be removed. The process is as follows:
④举起绝缘棒2,将金属横杆202插入操作孔1031中;④ Lift up the
⑤反向转动绝缘棒2以使夹块102往下滑动,松开带电体;⑤ Rotate the
⑥将金属横杆202从操作孔1031中取出,然后将金属横杆202插入挂孔1011中,将装卸线夹1从带电体上取下,最后手动松开接地铜线与固线孔 1012即可。⑥ Take out the
在取下装卸线夹的过程中,需要将金属横杆依次插入操作孔和挂孔中,在实际作业过程中,装卸线夹的位置一般较高,绝缘棒又很重,电力人员在地面很难将金属横杆与操作孔或者挂孔进行对齐,尤其是在大风的天气,挂接地线往往需要花费电力人员大量的时间和精力,这极大地影响了电力人员的工作效率。In the process of removing the loading and unloading clips, it is necessary to insert the metal crossbar into the operation hole and the hanging hole in turn. In the actual operation process, the position of the loading and unloading clips is generally high, and the insulating rod is very heavy. It is difficult to align the metal crossbar with the operation hole or the hanging hole, especially in windy weather, it often takes a lot of time and energy of the electrician to hang the ground wire, which greatly affects the work efficiency of the electrician.
因此,需要对现有的装卸线夹进行改进,以使其便于装拆,从而提高电力人员的工作效率。Therefore, it is necessary to improve the existing assembling and disassembling wire clips so as to facilitate the assembling and disassembling thereof, so as to improve the work efficiency of electric power personnel.
发明内容SUMMARY OF THE INVENTION
本发明的一个目的在于,提供一种改良型的带电装卸线夹,具有便于装拆的优点,能有效提高电力人员的工作效率。One object of the present invention is to provide an improved live wire clip, which has the advantage of being easy to assemble and disassemble, and can effectively improve the work efficiency of electric personnel.
为达以上目的,本发明提供一种改良型的带电装卸线夹,包括:In order to achieve the above purpose, the present invention provides an improved live loading and unloading wire clip, comprising:
线夹主体,所述线夹主体的一侧设有侧倾U型槽;The main body of the wire clip, one side of the main body of the wire clip is provided with a tilting U-shaped groove;
上操作构件,所述上操作构件与所述线夹主体的上部转动连接,其与所述线夹主体远离所述侧倾U型槽的一侧设有可供金属横杆插入的锐角空间;an upper operating member, the upper operating member is rotatably connected with the upper part of the main body of the wire clip, and is provided with an acute-angle space for the insertion of the metal cross bar on the side of the main body of the wire clip away from the U-shaped groove of the roll;
夹块,所述夹块位于所述侧倾U型槽中并与所述侧倾U型槽的槽底上下滑动连接;a clamping block, the clamping block is located in the rolling U-shaped groove and is slidably connected with the bottom of the rolling U-shaped groove;
下操作构件,所述下操作构件的上端贯穿所述线夹主体的底部并与所述夹块转动连接,下端设有乚型部,所述乚型部设有可供所述金属横杆插入的正置U型槽;所述下操作构件的上端与所述线夹主体螺纹连接。A lower operating member, the upper end of the lower operating member penetrates through the bottom of the main body of the wire clip and is rotatably connected with the clamping block, and the lower end is provided with a cut-out portion, and the cut-out portion is provided with a metal cross bar for insertion the upright U-shaped groove; the upper end of the lower operating member is threadedly connected with the main body of the wire clip.
优选的,所述线夹主体的顶部为圆弧结构,所述圆弧结构的轴线处设有螺栓转轴,所述螺栓转轴依次贯穿所述圆弧结构和所述上操作构件,所述圆弧结构和所述上操作构件绕所述螺栓转轴转动连接。Preferably, the top of the main body of the wire clip is an arc structure, the axis of the arc structure is provided with a bolt rotating shaft, and the bolt rotating shaft passes through the arc structure and the upper operating member in sequence, and the arc The structure and the upper operating member are rotatably connected around the bolt rotation axis.
优选的,所述上操作构件的顶部设有固定螺栓,所述固定螺栓的下端可贯穿所述上操作构件并抵持所述线夹主体。Preferably, the top of the upper operating member is provided with a fixing bolt, and the lower end of the fixing bolt can penetrate through the upper operating member and abut against the main body of the wire clip.
优选的,所述下操作构件的顶部为螺杆,所述螺杆位于所述正置U型槽的槽口1/2宽度处的正上方。Preferably, the top of the lower operating member is a screw rod, and the screw rod is located just above the 1/2 width of the notch of the upright U-shaped groove.
优选的,所述螺杆与乚型部之间还设有斜杆。Preferably, an oblique rod is further provided between the screw and the profile portion.
优选的,所述上操作机构的侧面设有第一凹槽,所述第一凹槽的槽底设有第一荧光涂层。Preferably, a side surface of the upper operating mechanism is provided with a first groove, and a groove bottom of the first groove is provided with a first fluorescent coating.
优选的,所述下操作机构的侧面设有第二凹槽,所述第二凹槽的槽底设有第二荧光涂层。Preferably, the side surface of the lower operating mechanism is provided with a second groove, and the bottom of the second groove is provided with a second fluorescent coating.
优选的,所述线夹主体的下部设有一用于与接地铜线连接的接线螺栓。Preferably, the lower part of the main body of the wire clip is provided with a connecting bolt for connecting with the grounding copper wire.
本发明的有益效果在于:提供一种改良型的带电装卸线夹,当需要使夹块往下滑动时,将金属横杆插入正置U型槽中并转动绝缘棒即可,当需要从高处取下线夹主体时,只需要将金属横杆插入锐角空间中并往上提即可;本发明采用锐角空间代替原来的挂孔,采用正置U型槽代替原来的操作孔;锐角空间和正置U型槽的结构设计均十分便于插入金属横杆,可以减少金属横杆的对准时间,具有便于装拆的优点,能有效提高电力人员的工作效率。The beneficial effects of the present invention are as follows: to provide an improved electrified loading and unloading wire clamp. When the clamp block needs to slide down, the metal cross bar is inserted into the upright U-shaped groove and the insulating rod is rotated. When removing the main body of the wire clamp, it is only necessary to insert the metal cross bar into the acute angle space and lift it up; the present invention adopts the acute angle space to replace the original hanging hole, and the upright U-shaped groove replaces the original operation hole; the acute angle space The structural design of the upright U-shaped groove is very easy to insert the metal crossbar, which can reduce the alignment time of the metal crossbar, has the advantage of easy assembly and disassembly, and can effectively improve the work efficiency of electric personnel.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.
图1为背景技术提供的现有的装卸线夹的结构示意图;1 is a schematic structural diagram of an existing loading and unloading wire clip provided by the background technology;
图2为背景技术提供的现有的绝缘棒的结构示意图;2 is a schematic structural diagram of an existing insulating rod provided by the background technology;
图3为实施例提供的改良型的带电装卸线夹的结构示意图。FIG. 3 is a schematic structural diagram of an improved live wire clip provided by an embodiment.
图3中:In Figure 3:
3、线夹主体;301、侧倾U型槽;302、圆弧结构;3. Main body of wire clip; 301, U-shaped groove for roll; 302, arc structure;
4、上操作构件;401、锐角空间;4. Upper operating member; 401. Acute angle space;
5、夹块;5. Clamping block;
6、下操作构件;601、螺杆;602、斜杆;603、乚型部;6031、正置U 型槽;6. Lower operating member; 601, screw rod; 602, oblique rod; 603, S-shaped part; 6031, upright U-shaped groove;
7、固定螺栓;7. Fixing bolts;
8、转轴螺栓;8. Shaft bolts;
9、第一荧光涂层;9. The first fluorescent coating;
10、第二荧光涂层;10. The second fluorescent coating;
11、接线螺栓。11. Wiring bolts.
具体实施方式Detailed ways
为使得本发明的目的、特征、优点能够更加的明显和易懂,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,下面所描述的实施例仅仅是本发明一部分实施例,而非全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。In order to make the purposes, features and advantages of the present invention more obvious and understandable, the following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the following description The embodiments described above are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
下面结合附图并通过具体实施方式来进一步说明本发明的技术方案。The technical solutions of the present invention are further described below with reference to the accompanying drawings and through specific embodiments.
参见图3,本实施例提供一种改良型的带电装卸线夹,包括线夹主体3、上操作构件4、夹块5和下操作构件6。所述线夹主体3的一侧设有侧倾U型槽301。所述上操作构件4与所述线夹主体3的上部转动连接,其与所述线夹主体3远离所述侧倾U型槽301的一侧设有可供金属横杆插入的锐角空间401。所述夹块5位于所述侧倾U型槽301中并与所述侧倾U型槽301的槽底上下滑动连接。所述下操作构件6的上端贯穿所述线夹主体3的底部并与所述夹块5转动连接,下端设有乚型部603,所述乚型部603设有可供所述金属横杆插入的正置U型槽6031;所述下操作构件6的上端与所述线夹主体3螺纹连接。Referring to FIG. 3 , the present embodiment provides an improved electrified loading and unloading wire clamp, including a
可以理解的是,当需要使夹块5往下滑动时,将金属横杆插入正置U型槽6031中并转动绝缘棒即可,当需要从高处取下线夹主体3时,只需要将金属横杆插入锐角空间401中并往上提即可;本发明采用锐角空间401代替原来的挂孔,采用正置U型槽6031代替原来的操作孔;锐角空间401和正置U型槽6031的结构设计均十分便于插入金属横杆,可以减少金属横杆的对准时间,具有便于装拆的优点,能有效提高电力人员的工作效率。It can be understood that when the
优选的,所述线夹主体3的顶部为圆弧结构302,所述圆弧结构302的轴线处设有螺栓转轴,所述螺栓转轴依次贯穿所述圆弧结构302和所述上操作构件4,所述圆弧结构302和所述上操作构件4绕所述螺栓转轴转动连接。Preferably, the top of the
具体地,转动上操作构件4就可以调整锐角空间401的大小,方便适应不同直径的金属横杆。Specifically, the size of the acute-
本实施例中,所述上操作构件4的顶部设有固定螺栓7,所述固定螺栓7 的下端可贯穿所述上操作构件4并抵持所述线夹主体3。In this embodiment, the top of the upper operating member 4 is provided with a fixing
具体地,当将上操作构件4转动至合适的位置后,拧紧固定螺栓7,就可以实现上操作构件4与线夹主体3之间的相对固定,保证锐角空间401不变形。Specifically, after the upper operating member 4 is rotated to an appropriate position, the fixing
可选的,所述下操作构件6的顶部为螺杆601,所述螺杆601位于所述正置U型槽6031的槽口1/2宽度处的正上方。Optionally, the top of the lower operating member 6 is a
可以理解的是,当螺杆601位于所述正置U型槽6031的槽口1/2宽度处的正上方时,可以保证整个下操作构件6的旋转轴线就是螺杆601的轴线,且此时下操作机构的转动会是最平稳的。这样的结构设计可以保证转动绝缘棒时下操作构件6的转动最平稳流畅,乚型部603不发生多余的晃动。It can be understood that when the
进一步地,所述螺杆601与乚型部603之间还设有斜杆602。Further, an
具体地,通过斜杆602实现螺杆601位于所述正置U型槽6031的槽口 1/2宽度处的正上方的结构设计。Specifically, the structure design that the
本实施例中,所述上操作机构的侧面设有第一凹槽,所述第一凹槽的槽底设有第一荧光涂层9。所述下操作机构的侧面设有第二凹槽,所述第二凹槽的槽底设有第二荧光涂层10。In this embodiment, the side surface of the upper operating mechanism is provided with a first groove, and the groove bottom of the first groove is provided with a first
可以理解的是,设置荧光涂层可以提高夜间操作的便捷性。It is understandable that providing a fluorescent coating can improve the convenience of nighttime operation.
可选的,所述线夹主体3的下部设有一用于与接地铜线连接的接线螺栓。Optionally, the lower part of the
具体地,接线螺栓可以实现接地铜线与线夹主体3之间的固接。Specifically, the connection bolt can realize the fixed connection between the ground copper wire and the
本发明提供一种改良型的带电装卸线夹,增大金属横杆的瞄准范围,提高绝缘棒一次穿越命中率,且提高可视化效果,满足现场操作需求;具备结构简单和操作方便等优点,能够有效提高工作效率、节省工作时间。The invention provides an improved live loading and unloading wire clip, which increases the aiming range of the metal cross bar, improves the one-time crossing hit rate of the insulating rod, improves the visualization effect, and meets the needs of on-site operation; it has the advantages of simple structure and convenient operation, etc. Effectively improve work efficiency and save work time.
以说明和描述的目的提供上述实施例的描述。不意指穷举或者限制本公开。特定的实施例的单独元件或者特征通常不受到特定的实施例的限制,但是在适用时,即使没有具体地示出或者描述,其可以互换和用于选定的实施例。在许多方面,相同的元件或者特征也可以改变。这种变化不被认为是偏离本公开,并且所有的这种修改意指为包括在本公开的范围内。The foregoing description of the embodiments has been provided for the purposes of illustration and description. It is not intended to be exhaustive or to limit the present disclosure. Individual elements or features of a particular embodiment are generally not limited to that particular embodiment, but where applicable, can be interchanged and used in a selected embodiment, even if not specifically shown or described. The same elements or features may also vary in many respects. Such changes are not considered to be a departure from this disclosure, and all such modifications are intended to be included within the scope of this disclosure.
以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。The above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: The recorded technical solutions are modified, or some technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010222970.1A CN111293444A (en) | 2020-03-26 | 2020-03-26 | Improved live-line loading and unloading wire clamp |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010222970.1A CN111293444A (en) | 2020-03-26 | 2020-03-26 | Improved live-line loading and unloading wire clamp |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111293444A true CN111293444A (en) | 2020-06-16 |
Family
ID=71025989
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010222970.1A Pending CN111293444A (en) | 2020-03-26 | 2020-03-26 | Improved live-line loading and unloading wire clamp |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111293444A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111525297A (en) * | 2020-07-06 | 2020-08-11 | 广东电网有限责任公司东莞供电局 | Combined multifunctional grounding device |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201266688Y (en) * | 2008-08-28 | 2009-07-01 | 杭州市电力局 | Electrified lapping wire connector for power distribution electric network |
| CN208189819U (en) * | 2018-05-25 | 2018-12-04 | 广东电网有限责任公司 | A kind of earthing clamp |
| CN208256937U (en) * | 2018-06-05 | 2018-12-18 | 广西电网有限责任公司柳州供电局 | Duck tongue type spiral compression formula earthing clamp |
| CN209516057U (en) * | 2019-01-17 | 2019-10-18 | 国网浙江省电力有限公司金华供电公司 | A kind of heavy duty detergent earthing clamp |
| CN209766678U (en) * | 2019-06-12 | 2019-12-10 | 河北永安线路器材有限公司 | Live loading and unloading clamp |
| CN211404757U (en) * | 2020-03-26 | 2020-09-01 | 广东电网有限责任公司 | Improved live-line loading and unloading wire clamp |
-
2020
- 2020-03-26 CN CN202010222970.1A patent/CN111293444A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201266688Y (en) * | 2008-08-28 | 2009-07-01 | 杭州市电力局 | Electrified lapping wire connector for power distribution electric network |
| CN208189819U (en) * | 2018-05-25 | 2018-12-04 | 广东电网有限责任公司 | A kind of earthing clamp |
| CN208256937U (en) * | 2018-06-05 | 2018-12-18 | 广西电网有限责任公司柳州供电局 | Duck tongue type spiral compression formula earthing clamp |
| CN209516057U (en) * | 2019-01-17 | 2019-10-18 | 国网浙江省电力有限公司金华供电公司 | A kind of heavy duty detergent earthing clamp |
| CN209766678U (en) * | 2019-06-12 | 2019-12-10 | 河北永安线路器材有限公司 | Live loading and unloading clamp |
| CN211404757U (en) * | 2020-03-26 | 2020-09-01 | 广东电网有限责任公司 | Improved live-line loading and unloading wire clamp |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111525297A (en) * | 2020-07-06 | 2020-08-11 | 广东电网有限责任公司东莞供电局 | Combined multifunctional grounding device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204552247U (en) | A kind of portable insulator crossarm | |
| CN106451214B (en) | A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator | |
| CN202997080U (en) | Plug-in type equipment wire clamp of distribution transformer | |
| CN105514877B (en) | Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture | |
| CN111293444A (en) | Improved live-line loading and unloading wire clamp | |
| CN107979024A (en) | A kind of powered combination tool for eliminating transmission line of electricity drainage plate heating defect of ground potential method | |
| CN109616989B (en) | Branch box on post | |
| CN205565511U (en) | Change insulators cross arm fixture for operation with two steel pipe poles that return of tower | |
| CN207283116U (en) | A kind of terminal cord holder of supporting street code | |
| CN221096026U (en) | Linear type composite insulating cross arm of distribution line | |
| CN211404757U (en) | Improved live-line loading and unloading wire clamp | |
| CN206907577U (en) | Assembled strain insulator-string | |
| CN109616964B (en) | Plug-and-play adjustable cable support for transformer incoming line | |
| CN118712944A (en) | A medium-phase conductor bearing and fixing tool for non-stop operation of distribution network and operation method | |
| CN206099164U (en) | A combined tool for live replacement of UHV double-circuit tension insulators on the same tower | |
| CN205051016U (en) | General earth bar with adjustable | |
| CN204651844U (en) | For the vertical insulator sour jujube button of 10kV power overhead network | |
| CN204577640U (en) | A kind of high-voltage prepayment switch-box outlet cable jockey | |
| CN206432612U (en) | A kind of switch cabinet bus static contact earthing or grounding means | |
| CN203014291U (en) | Installation structure of 110 kV cable outdoor terminal ends | |
| CN209313381U (en) | An overhead insulated wire holder | |
| CN214201574U (en) | But quick assembly disassembly formula electric energy meter | |
| CN211744001U (en) | A vertical conductor grounding ring | |
| CN209896357U (en) | Spiral double-locking connector | |
| CN203589662U (en) | Sectional ground wire connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |
