CN111155438B - Construction equipment applied to steel tower column and construction process thereof - Google Patents

Construction equipment applied to steel tower column and construction process thereof Download PDF

Info

Publication number
CN111155438B
CN111155438B CN202010049739.7A CN202010049739A CN111155438B CN 111155438 B CN111155438 B CN 111155438B CN 202010049739 A CN202010049739 A CN 202010049739A CN 111155438 B CN111155438 B CN 111155438B
Authority
CN
China
Prior art keywords
hanging
box body
steel
moving
steel tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010049739.7A
Other languages
Chinese (zh)
Other versions
CN111155438A (en
Inventor
文定旭
薛帆
薛志武
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority to CN202010049739.7A priority Critical patent/CN111155438B/en
Publication of CN111155438A publication Critical patent/CN111155438A/en
Application granted granted Critical
Publication of CN111155438B publication Critical patent/CN111155438B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses construction equipment and a construction process applied to a steel tower column, wherein the construction equipment comprises the following steps of S1, completing the installation of the first sections of the steel tower column by adopting an automobile crane; s2, building construction equipment; and S3, mounting the residual section steel column. The invention effectively solves the problems of large occupied area, long construction time and high cost in the traditional construction process.

Description

Construction equipment applied to steel tower column and construction process thereof
Technical Field
The invention relates to the field of construction methods of steel tower columns such as power transmission towers, bridge main towers and the like. More particularly, the present invention relates to a construction equipment applied to a steel tower column and a construction process thereof.
Background
At present, with the acceleration of urban progress of various countries in the world, the demand of cities for electric power is particularly obvious, and the contradiction between the increasing of cities and the occupation area reduction of urban land of transmission lines and transmission towers is increasingly prominent. In the traditional hoisting mode of the steel tower column of the power transmission tower, the conditions of large occupied area, long construction time and low efficiency occur when the suspension type stay wire pole-holding tower is assembled, and the construction quality and the construction progress are seriously affected; when the automobile crane is used for hoisting the sections, the assembly height and the weight of the sections of the power transmission tower are limited by the maximum hoisting capacity of the crane, and the method has no obvious advantages for constructing the power transmission tower with larger height; when the helicopter is used for hoisting, although the occupied area is small and the hoisting height is not limited, the construction cost is greatly increased, and the passage of the helicopter is limited in the urban of the forest of the high building.
Disclosure of Invention
The invention aims to overcome the defects of the prior construction technology, provides a safe and reliable steel tower column construction process and equipment, and effectively solves the problems of large occupied area, long construction time and high cost in the traditional construction process.
To achieve these objects and other advantages and in accordance with the purpose of the invention, there is provided construction equipment applied to a steel tower column, comprising: the device comprises a frame body, a moving system and a lifting system;
the frame body is of a frame structure, and a bearing beam is connected above the frame body to provide a working space for the moving system; the lifting system is arranged on the bearing beam and is used for hoisting and moving the steel tower column section;
the moving system comprises a slideway and a moving device; the slide way is vertically fixed on the frame body and is of a ladder-shaped structure with a plurality of cross bars arranged at intervals; the moving device is arranged on the supporting anchor; the movable device comprises a first box body, a second box body, a movable support and a telescopic driving device, wherein the lower end of the movable support is fixed with a supporting anchor, the upper end of the movable support is fixed with the lower end of the second box body, the upper end of the second box body is fixed with the bottom surface of the driving device, and the upper end of the driving device is fixed with the second box body; the first box body and the second box body have the same structure;
The first box includes: the box comprises a box body, a hanging gripper, a connecting rod and a spring; the hanging and grabbing device is characterized in that the hanging and grabbing device is rotatably fixed in the box body through a shaft rod, the head of the hanging and grabbing device protrudes out of the side face of the box body, the head of the hanging and grabbing device is gradually convergent, the upper surface of the head of the hanging and grabbing device is composed of a horizontal plane and an inclined plane which is gradually inclined downwards, the lower surface of the head of the hanging and grabbing device is a curved surface in arc transition, the middle part of the hanging and grabbing device is fixedly connected with one end of a connecting rod, one side of the box body, far away from the head of the hanging and grabbing device, is fixedly connected with a shell with an opening above, baffles are arranged on the periphery above the shell, springs are arranged in the shell, the bottom ends of the springs are fixed with the inner bottom face of the shell, the top ends of the springs are fixedly connected with a limiting plate, the other end of the connecting rod is hinged with the limiting plate, and openings which do not limit the connecting rod to move downwards are arranged on two opposite sides of the shell; wherein the head of the hanging grab props against the cross rod of the slideway to bear the slideway.
Preferably, the frame body is formed by erecting a plurality of cross beams, vertical frame bodies and trusses.
Preferably, the lifting system comprises:
The lifting mechanism is arranged on the bearing beam;
the amplitude-variable travelling mechanism controls the lifting mechanism to move along the direction of the bearing beam;
And the lifting appliance is connected with the lifting mechanism and is used for lifting the steel tower column section.
The invention also provides a steel tower column construction process using the construction equipment, which comprises the following steps:
s1, finishing the installation of at least the first three sections of the steel tower column, and adopting construction equipment to install from the next section;
s2, building construction equipment;
s21, fixedly installing supporting anchors on at least two sections on the installed steel column section;
S23, installing at least four groups of vertically arranged slideways and at least eight groups of moving devices, carrying the moving support of the corresponding moving device through supporting anchors, and carrying the weight of the corresponding slideways through hanging grabs;
s24, erecting a frame body along the periphery of the installed steel tower column, wherein the frame body is fixedly connected with the slide way;
Step S25, connecting a bearing beam above the frame body, and installing a lifting system on the bearing beam;
S3, mounting a residual section steel tower column;
S31, hoisting and moving a steel column section to be installed by using a hoisting system, erecting a working platform on a frame body, and welding the hoisted steel column section by using the working platform;
Step S32, when the height of the installed steel tower column section is higher than the hoisting height of the hoisting system, controlling the driving device of the moving device to synchronously push the slideway to move upwards, and ensuring that the driving devices of all the moving devices on at least one section of steel tower column are not pushed; wherein, the pushing length of the driving device is set as follows: the hanging gripper of the non-pushing moving device moves relatively from the current cross rod of the pushing slideway to the cross rod below the current cross rod, so that the non-pushing moving device bears the slideway, and the driving devices of the rest moving devices retract to finish the upward movement of the frame body;
s33, removing the moving device and the supporting anchors which are positioned at the lowest part of the steel column section, and installing the moving device and the supporting anchors on the newly installed steel column section above;
and step S34, after the frame body is moved up to the lifting height of the lifting system to be higher than the height of the steel column section which is completely installed, repeating the steps S31-S33, and completing the lifting and the installation of the rest steel column sections until the installation of the steel column is completed.
Preferably, the method further comprises the step S4 of removing construction equipment applied to the steel tower column after the steel tower column is installed, and hoisting the components through a tower crane.
Preferably, the method further comprises the step S4 of controlling the frame body to move downwards after the steel tower column is installed, and specifically comprises the following steps:
s41, the shell of the second box body is unfixed with the second box body, then the shell is turned 180 degrees and then fixed with the second box body, so that the positions of the upper surface and the lower surface of the hanging head are changed, namely the curved surface of the hanging head faces upwards;
s42, controlling the driving device to retract synchronously, so that the first box body is hung and grabbed to move downwards against the slideway;
S43, turning the shell of the second box body by 180 degrees to enable the horizontal surface of the head part of the corresponding hanging gripper to face upwards; turning the shell of the first box body by 180 degrees to enable the curved surface of the head part corresponding to the hanging grip to face upwards; controlling the driving device to lift the first box body;
S44, turning the shell of the second box body by 180 degrees to enable the curved surface of the head part corresponding to the hanging grip to face upwards; the shell of the first box body is turned 180 degrees, the horizontal surface of the head corresponding to the hanging and grabbing is upwards, so that the state after the step S41 is achieved, and the frame body is moved downwards in a reciprocating mode.
Preferably, the auxiliary cross braces are connected between the steel columns as the installation height of the steel columns increases.
The application at least comprises the following beneficial effects: the construction equipment is applied to the installation construction of the steel tower column, the self structure of the steel tower column is used as a support, and the method that the construction equipment climbs on the steel tower column and performs segment installation is adopted to complete the installation construction of the tower column.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is an elevation view of the present invention applied to construction equipment for a steel tower column;
FIG. 2 is a top view of the construction equipment of the present invention applied to a steel tower;
FIG. 3 is a side view of the construction equipment of the present invention applied to a steel tower;
FIG. 4 is a schematic diagram of a mobile device according to the present invention;
FIG. 5 is a schematic structural view of the lifting mechanism and luffing travelling mechanism of the present invention;
FIG. 6 is a schematic view of step S31 of the steel column installation process of embodiment 1 of the present invention;
FIG. 7 is a schematic view of the present invention of example 1 mounted to the upper part of a steel tower;
FIG. 8 is a schematic view of the invention of example 1 mounted to the top of a steel tower;
FIG. 9 is a schematic view showing the downward movement of the frame body after the installation of the steel column in example 1 of the present invention;
FIG. 10 is a schematic diagram of the embodiment 1 of the present invention when the frame moves downward;
fig. 11 is a detailed view of the hanging grab of the present invention.
Reference numerals illustrate: the device comprises a frame body 1, a beam 11, a vertical frame body 12, a truss 13, a slideway 2, a moving device 3, a first box body 31, a second box body 32, a moving support 33, a driving device 34, a box body 311, a hanging and grabbing device 312, a connecting rod 313, a spring 314, a housing 315, a baffle 316, a limit plate 317, a horizontal plane 312a, an inclined plane 312b, a curved plane 312c, a lifting mechanism 41, a pulley block 411, a steel wire rope 412, a winch 413, a luffing running mechanism 42, a track 421, a rail clamping device 422, a 423 oil cylinder 43, a lifting appliance 5, a supporting and anchoring device 6 steel tower column segments 7 auxiliary transverse struts 8 and a bearing beam 8.
Detailed Description
The present invention is described in further detail below with reference to examples to enable those skilled in the art to practice the same by referring to the description.
In the description of the present invention, the terms "transverse", "longitudinal", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus are not to be construed as limiting the present invention.
As shown in fig. 1 to 3, the present invention provides a construction equipment applied to a steel tower column, including: the device comprises a frame body 1, a moving system and a lifting system;
the frame body 1 is erected along the periphery of the steel tower column to form a frame structure, and a bearing beam 8 is connected above the frame body 1 to provide a working space for a moving system; the lifting system is arranged on the bearing beam 8 and is used for hoisting and moving the steel tower column segment 6;
The moving system comprises a slideway 2 and a moving device 3; the slide way 2 is vertically fixed on the frame body 1, and the slide way 2 is of a ladder-shaped structure with a plurality of cross bars arranged at intervals; the moving device is arranged on a supporting anchor 5, the supporting anchor 5 is fixed with the erected steel tower column, and the supporting anchor 5 is used for supporting the moving device 3; the moving device 3 comprises a first box 31, a second box 32, a moving support 33 and a telescopic driving device 34 (the driving device 34 is an oil cylinder in the embodiment), the lower end of the moving support 33 is fixed with the supporting anchor 5, the upper end of the moving support 33 is fixed with the lower end of the second box 32, the upper end of the second box 32 is fixed with the bottom surface of the driving device 34, and the upper end of the driving device 34 is fixed with the second box 32; the first case 31 has the same structure as the second case 32.
As shown in fig. 4 and 11, the first casing 31 includes: the box body 311, the hanging grip 312, the connecting rod 313 and the spring 314; the hanging gripper 312 is rotatably fixed inside the box body 311 through a shaft rod, the head of the hanging gripper 312 protrudes out of the side surface of the box body 311, the head of the hanging gripper 312 is gradually convergent, the upper surface of the head of the hanging gripper 312 is composed of a horizontal plane 312a and a gradually downward inclined plane 312b, the lower surface of the head of the hanging gripper 312 is a curved surface 312c with arc transition, the middle part of the hanging gripper 312 is fixedly connected with one end of the connecting rod 313, one side of the box body 311, which is far away from the head of the hanging gripper 312, is fixedly provided with a shell 315 with an opening at the upper part, the periphery above the shell 315 is provided with a baffle 316, a spring 314 is arranged in the shell 315, the bottom end of the spring 314 is fixed with the inner bottom surface of the shell 315, the top end of the spring 314 is fixedly connected with a limiting plate 317, the baffle 316 limits the limiting plate 317, the other end of the connecting rod 313 is hinged with the limiting plate 317 through the shaft rod, and two opposite sides of the shell 315 are provided with openings which do not limit downward movement of the connecting rod 313; wherein the head of the catch 312 abuts the rail of the slide 2 to carry the slide 2.
In a preferred embodiment of the construction equipment applied to the steel tower column, the frame body 1 is erected by a plurality of cross beams 11, vertical frame bodies 12 and trusses 13 to form a frame structure. The cross beam 11 is connected with the truss 13 for the purpose of increasing structural rigidity, and the bearing beam 8 is located above the vertical frame body 12 to provide working space for the lifting mechanism 41.
In a preferred embodiment of the present application applied to the construction equipment of a steel tower, as shown in fig. 1 and 5, the lifting system comprises:
The lifting mechanism 41 is installed on the bearing beam 8 and is used for lifting the steel column section 6 on the ground to the height to be installed, the lifting mechanism 41 comprises a winch 413, a pulley block 411 and a steel wire rope 412, the lifting appliance 43 is lifted through the winch 413 and the steel wire rope 412, and the direction of the steel wire rope 412 is adjusted through the pulley block 411;
The luffing travelling mechanism 42 controls the lifting mechanism 41 to move along the direction of the bearing beam 8 and is used for moving the steel tower column segment 6 to the position to be installed; the luffing traveling mechanism 42 comprises a track 421 arranged on the load beam 8, two groups of rail clamping devices 422 and an oil cylinder 423, wherein a pulley connected with the lifting appliance 43 through a steel wire rope 412 is slidably arranged on the track 421, one side of the pulley is connected with one group of rail clamping devices (front rail clamping devices), the other group of rail clamping devices (rear rail clamping devices) are connected through the oil cylinder 423, and the pulley is driven to move on the track 421 through the rail clamping devices 422, specifically: when the front rail clamp clamps the rail 421, the rear rail clamp releases the rail 421, the oil cylinder 423 pushes the rear rail clamp to move, after moving in place, the rear rail clamp clamps the rail 421, the front rail clamp releases, the oil cylinder 423 withdraws, and the oil cylinder 423 drives the front rail clamp to move, so that the reciprocating motion completes the displacement of the pulley.
And a lifting appliance 43 connected with a set of pulleys of the lifting mechanism 41 through a steel wire rope 412 for lifting the steel tower column segment 6.
Example 1
A steel tower column construction process utilizing the construction equipment comprises the following steps:
S1, mounting the front three sections of the steel tower column by adopting an automobile crane, and mounting by adopting construction equipment from the next section.
S2, building construction equipment;
step S21, mounting the support anchors 5: a support anchor 5 is fixedly mounted on at least two sections on the installed steel column section 6.
Step S23, mounting a mobile system: four sets of vertically arranged slide ways 2 and twelve sets of moving devices 3 are installed, the moving support 33 corresponding to the moving devices 3 is borne by the supporting anchors 5, and the weight corresponding to the slide ways 2 is borne by the hanging grabs 312.
And step S24, erecting a frame body 1 along the periphery of the installed steel tower column, wherein the frame body 1 is fixedly connected with the slideway 2, and the load on the slideway 2 is borne by a moving device 3 arranged on a supporting anchor 5.
Step S25, connecting the bearing beam 8 above the frame body 1, and installing the lifting system on the bearing beam 8.
S3, mounting a residual section steel tower column;
Step S31, as shown in FIG. 6, hoisting and moving the steel column segment 6 to be installed by using a hoisting system, erecting a working platform on the frame body 1, welding and other operations on the hoisted steel column segment 6 by using the working platform, erecting the working platform on the cross beam 11, and performing segment welding and other operations on the steel column by using a constructor by using the working platform.
Step S32, controlling the frame body 1 to climb upwards: when the height of the installed steel tower column section 6 is higher than the hoisting height of the hoisting system, the driving device 34 of the moving device 3 is controlled to synchronously push the slideway 2 to move upwards, and the driving devices 34 of all the moving devices 3 on at least one section of steel tower column are ensured not to push; wherein, the pushing length of the driving device 34 is set as follows: the hanging gripper 312 of the non-pushing moving device 3 moves relatively from the current cross rod of the pushing slide way 2 to the cross rod below the current cross rod, so that the non-pushing moving device 3 carries the slide way 2, and the driving device 34 of the rest moving devices 3 retracts to finish the upward movement of the frame body 1.
Step S33, removing the moving device 3 and the supporting anchor 5 located at the lowest part of the steel column segment 6, and installing the same on the newly installed steel column segment 6 above.
And step S34, as shown in fig. 7 and 8, after the frame body 1 moves up to the lifting height of the lifting system to be higher than the height of the steel tower column section 6 which is completely installed, repeating the steps S31-S33 to complete the lifting and the installation of the rest steel tower column sections 6 until the installation of the steel tower column is completed. Along with the rising of the installation height of the steel tower columns, the auxiliary cross braces 7 are connected between the steel tower columns, so that the stability of the whole structure is improved, and the auxiliary cross braces 7 can be removed after the installation of the steel tower columns is completed.
In a preferred embodiment of the construction process for the steel tower column by using the construction equipment, the method further comprises the step S4 of dismantling the construction equipment applied to the steel tower column after the steel tower column is installed, and hoisting down the components through a tower crane. The construction step is suitable for bridge construction with a tower crane.
In a preferred embodiment of the steel tower column construction process using the construction equipment, the construction step is suitable for construction of a power transmission tower type, after the construction equipment cannot be hoisted down after the construction equipment is installed, only the frame body 1 can be controlled to move down to convey the construction equipment, as shown in fig. 9-10, and the construction process further comprises the steps of S4, after the steel tower column is installed, controlling the frame body 1 to move down, and specifically comprises the following steps:
s41, the shell 315 of the second box body 32 is unfixed with the second box body 32, then the shell 315 is turned 180 degrees and then is fixed with the second box body 32, so that the positions of the upper surface and the lower surface of the head of the hanging gripper 312 are changed, namely the curved surface 312c of the head of the hanging gripper 312 faces upwards;
s42, the driving device 34 is controlled to retract synchronously, so that the hanging gripper 312 of the first box 31 moves downwards against the slideway 2.
S43, turning the shell 315 of the second box 32 by 180 degrees to enable the horizontal plane 312a of the head of the corresponding hanging gripper 312 to face upwards; the shell 315 of the first box 31 is turned 180 degrees, so that the curved surface 312c of the head of the corresponding hanging gripper 312 faces upwards; the drive means 34 are controlled to lift the first box 31, while the slide 2 is stationary.
S44, the shell 315 of the second box 32 is turned 180 degrees, so that the curved surface 312c of the head of the corresponding hanging gripper 312 faces upwards; the housing 315 of the first case 31 is turned 180 ° so that the horizontal plane 312a corresponding to the head of the hanging grip 312 is upward, and the state after step S41 is reached, and thus the downward movement of the frame 1 is reciprocally realized.
The process and the equipment can be used in the construction field including but not limited to the construction of power transmission steel towers and bridge main tower steel tower columns.
Although embodiments of the present invention have been disclosed above, it is not limited to the details and embodiments shown, it is well suited to various fields of use for which the invention is suited, and further modifications may be readily made by one skilled in the art, and the invention is therefore not to be limited to the particular details and examples shown and described herein, without departing from the general concepts defined by the claims and the equivalents thereof.

Claims (7)

1. Construction equipment for steel tower column, characterized by comprising: the device comprises a frame body, a moving system and a lifting system;
the frame body is of a frame structure, and a bearing beam is connected above the frame body to provide a working space for the moving system; the lifting system is arranged on the bearing beam and is used for hoisting and moving the steel tower column section;
the moving system comprises a slideway and a moving device; the slide way is vertically fixed on the frame body and is of a ladder-shaped structure with a plurality of cross bars arranged at intervals; the moving device is arranged on the supporting anchor; the movable device comprises a first box body, a second box body, a movable support and a telescopic driving device, wherein the lower end of the movable support is fixed with a supporting anchor, the upper end of the movable support is fixed with the lower end of the second box body, the upper end of the second box body is fixed with the bottom surface of the driving device, and the upper end of the driving device is fixed with the second box body; the first box body and the second box body have the same structure;
The first box includes: the box comprises a box body, a hanging gripper, a connecting rod and a spring; the hanging and grabbing device is characterized in that the hanging and grabbing device is rotatably fixed in the box body through a shaft rod, the head of the hanging and grabbing device protrudes out of the side face of the box body, the head of the hanging and grabbing device is gradually convergent, the upper surface of the head of the hanging and grabbing device is composed of a horizontal plane and an inclined plane which is gradually inclined downwards, the lower surface of the head of the hanging and grabbing device is a curved surface in arc transition, the middle part of the hanging and grabbing device is fixedly connected with one end of a connecting rod, one side of the box body, far away from the head of the hanging and grabbing device, is fixedly connected with a shell with an opening above, baffles are arranged on the periphery above the shell, springs are arranged in the shell, the bottom ends of the springs are fixed with the inner bottom face of the shell, the top ends of the springs are fixedly connected with a limiting plate, the other end of the connecting rod is hinged with the limiting plate, and openings which do not limit the connecting rod to move downwards are arranged on two opposite sides of the shell; wherein the head of the hanging grab props against the cross rod of the slideway to bear the slideway;
The lifting system comprises an amplitude-variable travelling mechanism, and the amplitude-variable travelling mechanism controls the lifting mechanism to move along the direction of the bearing beam and is used for moving the steel tower column section to the position to be installed; the luffing traveling mechanism comprises a track arranged on the bearing beam, two groups of rail clamping devices and an oil cylinder, wherein a pulley connected with the lifting appliance through a steel wire rope is slidably arranged on the track, one side of the pulley is connected with one group of rail clamping devices, the other group of rail clamping devices are connected with the other group of rail clamping devices through the oil cylinder, and the pulley is driven to move on the track through the rail clamping devices.
2. The construction equipment for a steel tower column according to claim 1, wherein the frame body is constructed by a plurality of cross beams, vertical frame bodies and trusses.
3. Construction equipment for steel towers according to claim 1 or 2, wherein the lifting system comprises:
The lifting mechanism is arranged on the bearing beam;
the amplitude-variable travelling mechanism controls the lifting mechanism to move along the direction of the bearing beam;
And the lifting appliance is connected with the lifting mechanism and is used for lifting the steel tower column section.
4. A steel tower construction process using the construction equipment of claim 1, comprising the steps of:
s1, finishing the installation of at least the first three sections of the steel tower column, and adopting construction equipment to install from the next section;
s2, building construction equipment;
s21, fixedly installing supporting anchors on at least two sections on the installed steel column section;
S23, installing at least four groups of vertically arranged slideways and at least eight groups of moving devices, carrying the moving support of the corresponding moving device through supporting anchors, and carrying the weight of the corresponding slideways through hanging grabs;
s24, erecting a frame body along the periphery of the installed steel tower column, wherein the frame body is fixedly connected with the slide way;
Step S25, connecting a bearing beam above the frame body, and installing a lifting system on the bearing beam;
S3, mounting a residual section steel tower column;
S31, hoisting and moving a steel column section to be installed by using a hoisting system, erecting a working platform on a frame body, and welding the hoisted steel column section by using the working platform;
Step S32, when the height of the installed steel tower column section is higher than the hoisting height of the hoisting system, controlling the driving device of the moving device to synchronously push the slideway to move upwards, and ensuring that the driving devices of all the moving devices on at least one section of steel tower column are not pushed; wherein, the pushing length of the driving device is set as follows: the hanging gripper of the non-pushing moving device moves relatively from the current cross rod of the pushing slideway to the cross rod below the current cross rod, so that the non-pushing moving device bears the slideway, and the driving devices of the rest moving devices retract to finish the upward movement of the frame body;
s33, removing the moving device and the supporting anchors which are positioned at the lowest part of the steel column section, and installing the moving device and the supporting anchors on the newly installed steel column section above;
and step S34, after the frame body is moved up to the lifting height of the lifting system to be higher than the height of the steel column section which is completely installed, repeating the steps S31-S33, and completing the lifting and the installation of the rest steel column sections until the installation of the steel column is completed.
5. The steel column construction process using the construction equipment according to claim 4, further comprising the step of removing the construction equipment applied to the steel column after the steel column is installed, and hoisting the components by a tower crane.
6. The steel column construction process using construction equipment according to claim 4, further comprising the step of controlling the frame body to move down after the steel column is installed, specifically comprising the steps of:
s41, the shell of the second box body is unfixed with the second box body, then the shell is turned 180 degrees and then fixed with the second box body, so that the positions of the upper surface and the lower surface of the hanging head are changed, namely the curved surface of the hanging head faces upwards;
s42, controlling the driving device to retract synchronously, so that the first box body is hung and grabbed to move downwards against the slideway;
S43, turning the shell of the second box body by 180 degrees to enable the horizontal surface of the head part of the corresponding hanging gripper to face upwards; turning the shell of the first box body by 180 degrees to enable the curved surface of the head part corresponding to the hanging grip to face upwards; controlling the driving device to lift the first box body;
S44, turning the shell of the second box body by 180 degrees to enable the curved surface of the head part corresponding to the hanging grip to face upwards; the shell of the first box body is turned 180 degrees, the horizontal surface of the head corresponding to the hanging and grabbing is upwards, so that the state after the step S41 is achieved, and the frame body is moved downwards in a reciprocating mode.
7. The steel column construction process using the construction equipment according to claim 4, wherein the auxiliary cross braces are connected between the steel columns as the installation height of the steel columns increases.
CN202010049739.7A 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof Active CN111155438B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010049739.7A CN111155438B (en) 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010049739.7A CN111155438B (en) 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof

Publications (2)

Publication Number Publication Date
CN111155438A CN111155438A (en) 2020-05-15
CN111155438B true CN111155438B (en) 2024-07-26

Family

ID=70563653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010049739.7A Active CN111155438B (en) 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof

Country Status (1)

Country Link
CN (1) CN111155438B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023095002A1 (en) * 2021-11-23 2023-06-01 Gregory John Neighbours Apparatus for assembling wind turbines and method therefor
CN115559209B (en) * 2022-09-08 2025-08-29 中交路桥华南工程有限公司 Construction method of double tower column cable tower
CN115478731B (en) * 2022-10-12 2024-04-30 东南大学 An intelligent balancing suspension pole system capable of resisting strong winds and a method of using the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212128860U (en) * 2020-01-16 2020-12-11 中交武汉港湾工程设计研究院有限公司 Construction equipment applied to steel tower column

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2419150B (en) * 2004-10-16 2007-06-27 Anthony Michael Wood A ring shaped node joint for an offshore tower support base
CN101122115B (en) * 2007-08-03 2011-01-26 中铁一局集团有限公司 A construction method for tower crane displacement in high pier and long-span bridge construction projects
CN109296191A (en) * 2018-09-26 2019-02-01 中交武汉港湾工程设计研究院有限公司 An automatic climbing platform for steel tower construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212128860U (en) * 2020-01-16 2020-12-11 中交武汉港湾工程设计研究院有限公司 Construction equipment applied to steel tower column

Also Published As

Publication number Publication date
CN111155438A (en) 2020-05-15

Similar Documents

Publication Publication Date Title
CN110952550B (en) Suspended self-supporting pile driving method and pile driver
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN110004834B (en) Automatic climbing platform for hanging cable construction
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN111155438A (en) Construction equipment applied to steel tower column and construction process thereof
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN107476560B (en) Wind power tower construction platform and method
CN215925692U (en) Overlength multispan assembly type integrated multifunctional bridge girder erection machine
CN112681144B (en) Self-climbing installation method of steel cable tower
KR20120131896A (en) Vertical and horizontal type Hydro-crane
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN103601078B (en) Suspension type hanging device
CN115559209B (en) Construction method of double tower column cable tower
CN212128860U (en) Construction equipment applied to steel tower column
CN215828096U (en) Self-lifting hoisting equipment and sliding locking assembly
CN212895958U (en) Lower hanging movable bridge floor crane
CN210341680U (en) Door type corrugated steel web plate installation and overhanging type hanging bracket structure
CN119411487A (en) A mid-leg mechanism of an ultra-low-position bridge erecting machine and a bridge erecting machine
CN108078479A (en) A kind of full hydraulic drive telescopic boom window cleaning equipment
CN112744664B (en) Self-lifting hoisting equipment, construction method and sliding locking assembly
CN218434629U (en) Lifting frame for tower type pier construction
CN212477430U (en) Wave form steel web SCC worker method hangs basket with hoisting accessory
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method
CN211947971U (en) A standardized multifunctional work trolley for bridge anti-collision wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant