Prefabricated hollow superposed shear wall based on flat die production and steel bar lapping
Technical Field
The invention belongs to the technical field of buildings, relates to a prefabricated shear wall, and particularly relates to a prefabricated hollow superposed shear wall based on flat die production and steel bar lapping.
Background
Under the influence of basic national conditions of more people and less land, user demand guidance of a residential market and high seismic fortification demand, the fabricated residential building mainly adopts a fabricated integral shear wall structure system in China at the present stage. The existing assembled integral shear wall structure can be divided into a fully-prefabricated shear wall structure and a superposed shear wall structure according to the adopted prefabricated wall form.
The fully-prefabricated shear wall is completely prefabricated along the wall thickness direction, and the vertical steel bars are usually connected by special steel bar joints, such as sleeve grouting joints, grout anchor lap joints and the like. The vertical steel bars of the superposed shear wall are usually connected in an indirect lap joint mode through the steel bars, a special steel bar connecting joint is not used, the requirements on machining and mounting precision are low, and the connecting cost of the prefabricated wall can be effectively reduced. However, the existing technical system of the superimposed shear wall structure generally has the defects of complex production equipment, high technical threshold, imperfect field matching construction process and the like, and part of the system is difficult to realize the integrated construction of prefabricated external wall structure, heat preservation and decoration, thereby restricting the popularization and application of the system to a certain extent.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a prefabricated hollow superposed shear wall based on flat die production and steel bar lapping, which has the advantages of low installation precision requirement and convenient connection of the existing superposed shear wall, simultaneously adopts a shaping pipeline to form an internal vertical hole by one-step pouring, does not need special pore-forming equipment, can adopt a fixed die table production line and a flat die flow production line which are commonly used in the existing prefabricated part factory to carry out flat die production, avoids the investment of newly-added fixed equipment, has few prefabricated production links and high production efficiency, and can realize the integrated construction of prefabricated external wall structure, heat preservation and decoration.
In order to achieve the purpose, the invention adopts the technical scheme that:
a prefabricated hollow superposed shear wall based on flat die production and steel bar lapping comprises a prefabricated concrete wall body containing a vertical hole, connecting steel bars distributed in the vertical hole and on-site post-cast concrete in the vertical hole. Structurally, the prefabricated hollow superposed shear wall comprises an edge component part and a wall body part, wherein stressed reinforcing steel bars such as edge component vertical reinforcing steel bars, vertically distributed reinforcing steel bars, horizontally distributed reinforcing steel bars and the like are uniformly distributed in the prefabricated wall; when the prefabricated wall is manufactured, the shaped pipelines are fixed to a prefabricated wall reinforcement cage, and vertical holes which are vertically communicated along the height direction of the prefabricated wall are formed in the prefabricated wall by utilizing the shaped pipelines when concrete is poured; after the prefabricated wall is installed on a construction site, the vertical reinforcing steel bars of the edge components of the prefabricated wall at the lower layer stretch into the vertical holes of the edge components of the prefabricated wall at the upper layer, the vertical additional connecting reinforcing steel bars are arranged in the vertical holes of the wall body, the post-cast concrete in the vertical holes is poured, the vertical reinforcing steel bars of the edge components of the prefabricated wall at the lower layer stretch into the vertical reinforcing steel bars of the edge components of the prefabricated wall at the upper layer and the vertical reinforcing steel bars of the edge components of the prefabricated wall at the upper layer, the additional connecting of the vertical additional connecting reinforcing steel bars and the vertical additional connecting steel bars in the prefabricated wall are connected in a. Adopt the design pipeline to form vertical hole, can avoid using special pore-forming equipment, can adopt the flat mould production of fixed die platform production line, flat mould flow process line that prefabricated component factory commonly used at present, prefabricated wall production efficiency is high.
In the invention, the cross section shapes and sizes of the upper part and the lower part of the shaped pipeline, which is used for forming the vertical hole, of the edge component are different; the size of the cross section of the lower part of the shaped pipeline is larger than that of the cross section of the upper part of the shaped pipeline, the lower part of the shaped pipeline can meet the condition that vertical steel bars of edge components of a lower prefabricated wall in a shear wall structure stretch into the vertical steel bars to be lapped with vertical steel bars of edge components in an upper prefabricated wall in a certain length range, and the upper part of the shaped pipeline can meet the condition that concrete is poured downwards from the upper part of a vertical duct in a construction; the height from the section change position of the shaping pipeline to the bottom surface of the prefabricated wall is not less than the lap joint length of the vertical steel bars of the edge members.
According to the invention, the vertical steel bars of the edge components are bent in the height range from the position above the section change position of the vertical hole of the edge component to the position below the bottom surface of the connecting beam, so that the vertical steel bars of the edge components extending out of the top of the lower prefabricated wall can extend into the vertical hole of the edge component of the upper prefabricated wall; the vertical steel bars of the edge components are uniformly distributed outside the shaping pipeline in the prefabricated wall so as to facilitate the installation of the shaping pipeline; the distance between the vertical steel bars of the edge component and the wall of the shaping pipeline of the edge component is not smaller than 5mm, so that the installation of the shaping pipeline and the efficient installation of the prefabricated wall board on a construction site are ensured; in the vertical reinforcing bar overlap joint region of edge component, the centre-to-centre spacing of the vertical reinforcing bar of lapped edge component should not be greater than 50mm, guarantees the reinforcing bar overlap joint and passes power effect.
According to the prefabricated wall, the vertical steel bars of the edge members extend out of the top surface of the prefabricated wall for a long length, so that the vertical steel bars of the edge members can be controlled within a short range in the production stage of the prefabricated wall when the transportation requirements cannot be met, and the vertical steel bars of the edge members are lengthened by adopting steel bar threaded joints; the steel bar threaded joint is arranged in a horizontal post-cast strip at the top of the prefabricated wall so as not to influence the installation of the upper prefabricated wall.
According to the invention, the shaped pipelines for forming the vertical holes at the wall body position can adopt the same cross section shape and size from top to bottom, and one shaped pipeline is arranged at the center position of every two rows of vertically distributed reinforcing steel bars to form the vertical holes.
According to the invention, the vertically distributed steel bars of the prefabricated wall do not extend out of the top surface and the bottom surface of the prefabricated wall, one or two vertically distributed steel bar additional connecting steel bars are distributed at the elevation of the vertical hole floor at each wall body position, and are in lap joint with four adjacent vertically distributed steel bars in the prefabricated wall; the length of the additional connecting steel bars meets the steel bar overlapping requirement, the additional connecting steel bars are discontinuously arranged in the vertical holes along the height direction, and the total area is not less than the total area of four vertically distributed steel bars in overlapping connection with the additional connecting steel bars; within the lapping range of the vertically distributed reinforcing steel bars, the lacing bars of the two layers of reinforcing steel bar net sheets of the prefabricated wall are encrypted, and a lacing bar is arranged at the crossing position of each vertically distributed reinforcing steel bar and each horizontally distributed reinforcing steel bar; when two vertically distributed reinforcing steel bars are adopted to attach the connecting reinforcing steel bars, transverse reinforcing steel bars can be welded at the upper end part and the lower end part of the two vertically distributed reinforcing steel bars to form ladder ribs, so that the additional connecting reinforcing steel bars can be conveniently fixed on site, and the force transmission performance is improved.
According to the invention, the vertical steel bars and the vertically distributed steel bars of the prefabricated wall inner edge component are bent inwards at the upper part of the wall body so as to penetrate through the inner sides of the connecting beam longitudinal bars, so that the connecting beam longitudinal bars are ensured to be linearly arranged without bending treatment; the bending angle of the vertical steel bars and the vertical distributed steel bars of the edge member is not more than 1:6, and the length of the bending section is not too long so as to facilitate the arrangement of the stirrups of the edge member; the tie bars are arranged one by one at the crossing positions of the longitudinal bars at the bottom of the connecting beam and the vertical bars in the anchoring range of the wall bodies at the two sides, so that the anchoring performance of the longitudinal bars at the bottom of the connecting beam in the wall bodies at the two sides is improved.
According to the invention, when the lower wall of the window and the wall bodies at two sides are integrally prefabricated and the requirement of horizontal joint shearing checking calculation is met by laying shearing-resistant steel bars, the shearing-resistant steel bars are pre-embedded in the connecting beam of the lower prefabricated wall, and a set pipeline is distributed in the lower wall of the upper prefabricated wall to form vertical holes; after the prefabricated wall is installed on site, shear-resistant steel bars pre-embedded in the lower connecting beam extend into vertical holes of the lower wall of the upper prefabricated wall window, and concrete is poured into the vertical holes of the lower wall of the upper prefabricated wall to realize connection; when the length of extending the shear steel bar from the top surface of the coupling beam is long and the transportation requirement cannot be met, the length of extending the shear steel bar can be controlled within a short range in the production stage of the prefabricated wall, and the shear steel bar is lengthened by adopting a steel bar threaded joint.
Edge member pore-forming is with design pipeline, wall position pore-forming is with design pipeline, window wall position pore-forming is with design pipeline all to metal material, and pipeline cross sectional shape can adopt circular, rectangle or other cross sectional form as required, and the pipeline should not be less than 70mm along wall thickness, wall length direction's size to guarantee the pouring quality of vertical downthehole post-cast concrete.
According to the prefabricated hollow superposed shear wall based on flat die production and steel bar lapping, when the prefabricated wall is installed on site, the horizontal joint at the bottom of the prefabricated wall is arranged at the elevation of the floor, and in order to ensure the compactness of post-cast concrete at the horizontal joint, the distance between the bottom surface of the prefabricated wall and the top surface of the floor is not smaller than 50 mm; the internal thread sleeve is pre-buried at the bottom of the prefabricated wall, the bolt is screwed into the internal thread sleeve in a construction site, and the bolt is adopted to control the height of the horizontal joint and adjust the levelness of the prefabricated wall.
The bottom of the prefabricated hollow superposed shear wall body and the position of the lower wall of the window is provided with a horizontal inner groove to ensure that post-cast concrete is poured compactly, and the horizontal groove can be formed by template molding or occupation of a special occupation block; the height of the horizontal inner groove is not lower than 80mm, the cross section is a trapezoidal cross section with a narrow upper part and a wide lower part, and the width of the upper bottom of the trapezoidal cross section is not lower than 80 mm.
The edge member vertical hole and vertical steel bar connecting structure can be used for prefabricating the positions of linear, L-shaped and T-shaped edge members, and adjusting and shaping pipeline arrangement according to the range of the edge members and the arrangement of vertical steel bars when the edge member vertical hole and vertical steel bar connecting structure is used for L-shaped and T-shaped edge members.
When the side face of the prefabricated hollow superposed shear wall needs to extend out of the horizontally distributed reinforcing steel bars to be connected with the adjacent prefabricated hollow superposed shear wall or the cast-in-place shear wall, the structure of the horizontally distributed reinforcing steel bars and the structure of the vertical joint are extended out of the design specifications of prefabricated concrete building technical standards, prefabricated concrete structure technical regulations and the like.
The prefabricated hollow superposed shear wall is a structural wall and can be used for building external walls or internal walls, and further, the prefabricated hollow superposed shear wall, the heat-insulating layer and the external leaf wall boards can be integrally prefabricated in a factory to form the prefabricated sandwich heat-insulating hollow superposed shear wall, so that the heat-insulating, decorating and structural integration of the prefabricated external wall is realized; the prefabricated hollow superposed shear wall and the outer leaf wall plate are tied by adopting a heat-insulating tie piece.
The invention relates to a prefabricated hollow superposed shear wall based on flat die production and steel bar lapping, which comprises the following steps: binding a steel reinforcement framework of the shear wall, laying a shaped pipeline in the steel reinforcement framework, installing a prefabricated wall side die and a horizontal inner groove die, positioning the shaped pipeline, pouring concrete to form an inner vertical hole, and curing, forming and demolding. Furthermore, the prefabricated sandwich heat-insulation hollow superposed shear wall can be produced by adopting a forward beating method or a backward beating method, and the construction procedures of the outer leaf wall plate, the heat-insulation layer and the heat-insulation tie piece are added.
The invention relates to a prefabricated hollow superposed shear wall based on flat die production and steel bar lapping, which comprises the following steps of: installing the prefabricated hollow superposed shear wall, adjusting the verticality and levelness of the prefabricated wall, laying vertical distribution steel bar additional connecting steel bars and edge member vertical steel bar extension steel bars, erecting a horizontal seam template, pouring post-cast concrete in a vertical hole to realize prefabricated wall connection, and maintaining and removing the template.
Compared with the prior art, the invention has the beneficial effects that:
(1) the vertical steel bars and the vertical distributed steel bars of the edge component of the prefabricated wall are connected in a lap joint mode, the requirements on machining and mounting accuracy are low, the connecting cost of the prefabricated wall can be effectively reduced, and the mounting efficiency is improved.
(2) The invention adopts the shaping pipeline to form the internal vertical hole by one-step pouring, does not need special hole forming equipment, can adopt the existing production lines such as the fixed die table production line, the flat die flow production line and the like which have large quantities and wide ranges of the current domestic prefabricated part factories to produce, and avoids the investment of newly added fixed equipment; the prefabricated hollow superposed shear wall is formed in one step, the number of prefabricated production links is small, and the production efficiency is high.
(3) According to the invention, the outer leaf wall plate and the heat-insulating layer can be additionally arranged on the basis of the prefabricated hollow superposed shear wall to form the prefabricated sandwich heat-insulating hollow superposed shear wall, so that the integrated construction of the prefabricated outer wall structure, heat insulation and decoration is realized, the defect that the integrated construction of the structure, the heat insulation and the decoration is difficult to realize by other superposed shear wall systems is avoided, and the complex vertical surfaces such as bay windows and the like can be realized.
(4) The vertical distributed reinforcing steel bars of the prefabricated hollow superposed shear wall do not extend out of the prefabricated wall, and only the vertical reinforcing steel bars of the edge components extend out of the top surface of the prefabricated wall, so that the standardization and universalization of a mold can be realized, and the cost of the prefabricated wall is further reduced.
(5) The vertical hole is formed by using the shaping pipeline, but the cost of the shaping pipeline is low, meanwhile, special hole forming equipment is avoided, the prefabricated wall can be cast and formed at one time, and the comprehensive cost of the prefabricated wall can be effectively controlled.
(6) The prefabricated hollow superposed shear wall has light dead weight, the vertical steel bars are connected in a lap joint mode, the field installation efficiency is high, the vertical steel bars of the upper and lower prefabricated walls are connected while post-cast concrete is poured into the vertical holes, the joint quality is controllable, the construction procedures are few, and the incremental cost of the grouting joint of the sleeve of the traditional prefabricated wall can be avoided.
(7) According to the invention, the prefabricated wall and the horizontal post-cast strip are connected into a whole by post-casting concrete in the vertical hole, the structural integrity is good, the design can be carried out by adopting a structural design method of a cast-in-place shear wall, and the popularization is convenient.
Drawings
Fig. 1 is a three-dimensional schematic view of a prefabricated hollow superposed shear wall linear edge member based on flat die production and steel bar lapping, when a single large-size shaped pipeline is adopted to form a single vertical hole, the three-dimensional schematic view simultaneously shows vertically distributed steel bar additional connecting steel bars.
Fig. 2 is a front view of the prefabricated hollow composite shear wall of fig. 1.
Fig. 3 is a schematic cross-sectional view of 1-1, 2-2 and 3-3 of fig. 2.
FIG. 4 is a schematic cross-sectional view of A-A, B-B, C-C and D-D of FIG. 2.
Fig. 5 is a three-dimensional schematic view of a large sized shaped pipe used in the location of the edge member of fig. 1.
Fig. 6 is a three-dimensional schematic view of a shaped pipeline used for connecting the vertically distributed reinforcing steel bars at the wall position in fig. 1.
Fig. 7 is a top cross-sectional view of the in-line prefabricated edge component of fig. 1.
FIG. 8 is a top cross-sectional view of an L-shaped prefabricated edge component utilizing a large sized shaped conduit as shown in FIG. 5.
FIG. 9 is a top cross-sectional view of a T-shaped prefabricated edge component utilizing a large sized shaped conduit as shown in FIG. 5.
Fig. 10 is a structural schematic diagram of vertical steel bar lap joints and horizontal joints of edge members of upper and lower prefabricated walls in the prefabricated hollow superimposed shear wall structure according to the invention.
Fig. 11 is a schematic structural view of the lap joint of the vertically distributed reinforcing steel bars of the upper and lower prefabricated walls in the prefabricated hollow superposed shear wall structure of the invention and four adjacent vertically distributed reinforcing steel bars by using a single additional connecting reinforcing steel bar.
Fig. 12 is a schematic structural view of the upper and lower layers of vertical distribution steel bars of the prefabricated wall in the prefabricated hollow superimposed shear wall structure of the invention, which are connected with four adjacent vertical distribution steel bars in a lap joint manner by using two additional connecting steel bars.
Fig. 13 is a schematic structural view of arrangement of shear steel bars at the position of the lower window wall in the prefabricated hollow composite shear wall structure.
Fig. 14 is a three-dimensional schematic view of a prefabricated hollow superposed shear wall linear edge member based on flat die production and steel bar lapping, when two small-sized shaped pipelines are adopted to form two vertical holes, and vertically distributed steel bar additional connecting steel bars are schematically shown in the figure.
Fig. 15 is a front view of the prefabricated hollow composite shear wall of fig. 14.
Fig. 16 is a schematic cross-sectional view of fig. 14 taken at 1-1, 2-2 and 3-3.
Fig. 17 is a three-dimensional schematic view of two small sized shaped ducts used in the location of the edge member of fig. 14.
Fig. 18 is a top cross-sectional view of the in-line prefabricated edge component of fig. 14.
Fig. 19 is a top cross-sectional view of an edge member with a higher reinforcement ratio and an in-line prefabricated edge member with 8 edge member vertical reinforcements.
Fig. 20 is a top cross-sectional view of an L-shaped prefabricated edge component utilizing the small sized modular duct of fig. 17.
FIG. 21 is a top cross-sectional view of a T-shaped prefabricated structural edge member utilizing the small size modular duct of FIG. 17.
FIG. 22 is a top cross-sectional view of a T-shaped preformed constraining edge member utilizing the small size shaped conduit of FIG. 17.
Fig. 23 is a three-dimensional schematic view of an improved thermal insulation, decoration and structural integration of the prefabricated hollow superposed shear wall shown in fig. 1, namely, a prefabricated sandwich thermal insulation hollow superposed shear wall.
In the figure: 1-an edge member region; 2-wall area; 3-window lower wall area; 4-a beam-connecting area; 5-a door opening; 6-window opening; 11-shaping pipeline for forming holes on the edge member; 111-shaping pipe lower pipe for forming hole by edge member; 112-forming the upper pipeline of the shaping pipeline for forming the hole by the edge member; 113-forming a pouring hole on the lower pipeline of the shaping pipeline for forming the hole by the edge member; 12-edge member vertical rebars; 121-edge member vertical rebar extension rebar; 122-threaded joint for lengthening vertical steel bars of edge members; 13-edge member stirrup; 14-edge member lacing; 21-forming a shaping pipeline for wall hole forming; 22-a horizontal inner groove at the bottom of the wall body; 23-vertically distributing reinforcing steel bars; 24-vertically distributed reinforcing steel bars are additionally connected with reinforcing steel bars; 241-vertical distribution reinforcing steel bars are additionally provided with transverse reinforcing steel bars of connecting reinforcing steel bars; 25-vertically distributing tie bars in a steel bar lap joint area; 26-leveling the prefabricated wall by using a pre-embedded internal thread sleeve; 31-a shaping pipeline for forming holes on the lower wall of the window; 32-a horizontal inner groove at the bottom of the lower wall of the window; 33-shear steel bars are jointed at the position of the lower wall of the window; 331-screw joint for lengthening shear steel bar at the position of the window lower wall; 41-connecting the bottom longitudinal bars of the beam; 42-stretching a longitudinal bar anchoring area at the bottom of the connecting beam; 43-beam-connecting stirrups; 44-connecting the top longitudinal bars of the beam; 71-horizontal seaming of the bottom of the prefabricated wall; 72-horizontal post-cast strip at the top of the prefabricated wall; 73-prefabricating a floor slab; 81-prefabricating a hollow superposed shear wall; 82-an insulating layer; 83-outer leaf wallboard.
Detailed Description
The embodiments of the present invention will be described in detail below with reference to the drawings and examples.
Referring to fig. 1-23, a prefabricated hollow superposed shear wall based on flat die production and steel bar lapping is provided, an edge member vertical steel bar 12 and a shaping pipeline 11 for edge member hole forming are arranged in an edge member region 1 of a shear wall structure, a wall body region 2 is provided with a wall body vertical distribution steel bar 23 and a shaping pipeline 21 for wall body hole forming, the edge member vertical steel bar 12 and the wall body vertical distribution steel bar 23 are uniformly distributed outside the shaping pipeline 11 for edge member hole forming and the shaping pipeline 21 for wall body hole forming in the prefabricated wall, and the prefabricated hollow superposed shear wall is characterized in that the edge member vertical steel bar 12 and the wall body vertical distribution steel bar 23 of the prefabricated wall on the upper and lower layers are connected in a lapping manner; the vertical steel bars 12 of the edge component of the lower prefabricated wall contract upwards and extend out of the top surface, and the extended extension steel bars 121 are in one-to-one lap joint connection with the vertical steel bars 12 of the edge component outside the lower pipeline 111 in the upper prefabricated wall in the lower pipeline 111 of the shaping pipeline 11 for forming the hole of the edge component of the upper prefabricated wall; the wall body vertical distribution reinforcing steel bars 23 do not extend out of the top surface or the bottom surface of the prefabricated wall, one or two vertical additional connecting reinforcing steel bars 24 are arranged near the floor elevation in the shaping pipeline 21 for forming the wall body hole, and the vertical additional connecting reinforcing steel bars 24 are in lap joint with four adjacent wall body vertical distribution reinforcing steel bars 23 outside the shaping pipeline 21 for forming the wall body hole.
According to the invention, edge member vertical holes and wall body vertical holes are respectively formed by adopting an edge member hole-forming shaping pipeline 11 and a wall body hole-forming shaping pipeline 21 in a prefabricated wall production stage, each vertical hole is arranged along the height direction of the prefabricated wall in a through-height mode, after the arrangement of each shaping pipeline, each vertical reinforcing steel bar and each reinforcing steel bar cage is completed, concrete is poured in the vertical holes, and the lap joint of the edge member vertical reinforcing steel bars 12 and the vertical distribution reinforcing steel bars 23 is completed; the prefabricated wall is formed by one-step pouring through a fixed mould platform production line or a flat mould flow production line.
According to the invention, the central positions of every two rows of wall body vertical distribution reinforcing steel bars 23 are provided with the wall body pore-forming shaping pipelines 21, the wall body pore-forming shaping pipelines 21 adopt the same cross-sectional shape and size from top to bottom, when two additional connecting reinforcing steel bars 24 are adopted, the transverse reinforcing steel bars 241 are welded at the upper end parts and the lower end parts of the two additional connecting reinforcing steel bars 24 to form ladder reinforcing steel bars, so that the field fixation of the additional connecting reinforcing steel bars 24 is facilitated, and the force transmission performance is improved; the shaping pipeline 11 for forming the holes by the edge components consists of a lower pipeline 111 and an upper pipeline 112, the two pipelines are assembled and molded after being manufactured respectively, the section of the lower pipeline 111 is larger than that of the upper pipeline 112, so that the extension steel bars 121 of the lower prefabricated wall can extend into the lower pipeline 111 of the upper prefabricated wall and are in one-to-one lap joint with the vertical steel bars 12 of the edge components outside the lower pipeline 111 of the upper prefabricated wall.
According to the invention, the prefabricated edge component is L-shaped, T-shaped or in-line-shaped, for the in-line-shaped edge component, when the area of the calculated reinforcement of the vertical steel bar of the in-line-shaped edge component is smaller than a certain value, a large-size vertical hole of the edge component is formed by a single large-size forming pipeline 11 for forming the hole of the edge component, when the area of the calculated reinforcement of the vertical steel bar of the in-line-shaped edge component is larger than a certain value, two small-size vertical holes of the edge component are formed by two small-size forming pipelines 11 for forming the hole of the edge component, the lap joint connection of the elongated steel bar 121 and the vertical steel bar 12 of the edge component is realized inside and outside the vertical hole, and 8 vertical steel bars 12 of the edge component are arranged in the; the large and small size edge member apertures are formed in the same manner as the upper conduit 112 of the shaped conduit 11.
In the invention, the vertical steel bars 12 of the edge members are lapped in the height range of the lower pipeline 111, and the length of the lower pipeline 111 is not less than the lapping length of the vertical steel bars 12 of the edge members; the lower pipeline 111 of the shaping pipeline 11 for forming the large-size edge member hole adopts a rectangular cross section, the rectangular cross section is fully or basically fully distributed on the cross section of the whole linear edge member, the rectangular pipe is bent along the middle position of the length direction of the edge member to form a protrusion, the vertical steel bars 12 of the edge member in the middle are avoided, the stiffening effect is formed at the same time, the rigidity of the lower pipeline 111 is improved, the pouring hole 113 is arranged along the lower pipeline 111, the pouring quality of concrete below the lower pipeline 111 during flat die production is ensured, and the minimum size of the pouring hole 113 is not less than 70 mm; the lower pipelines 111 of the small-sized shaping pipeline 11 for pore-forming of the edge components are rectangular in cross section, four corners are bent to form cut corners to avoid the vertical reinforcements 12 of the edge components, and gaps between the two lower pipelines 111 on the linear edge components are convenient for pouring concrete below and laying the tie bars.
In the invention, the edge member vertical steel bars 12 and the wall body vertical distribution steel bars 23 in the prefabricated wall are bent inwards at the upper part of the wall body to penetrate through the inner sides of the connecting beam bottom longitudinal bars 41, so that the connecting beam bottom longitudinal bars 41 are ensured to be linearly arranged without bending treatment; the bending angles of the edge member vertical steel bars 12 and the wall body vertical distribution steel bars 23 are not more than 1:6, the distance between the edge member vertical steel bars 12 and the wall of the shaping pipeline 11 for edge member hole forming is not less than 5mm, and the installation of the shaping pipeline 11 for edge member hole forming and the efficient installation of the prefabricated wall board on a construction site are ensured; the overlap joint region of the vertical steel bar 12 of the edge component, the center distance between the vertical steel bar 12 of the overlapped edge component and the extension steel bar 121 of the overlapped edge component is not more than 50mm, the force transferring effect of the steel bar overlap joint is ensured, and the prefabricated wall steel reinforcement cage is relatively independent from each shaping pipeline so as to facilitate the installation of each shaping pipeline.
In the prefabricated wall, a lower window wall 3 and two side walls are integrally prefabricated, if shear-resistant steel bars 33 need to be distributed in the structural design so as to meet the requirement of horizontal joint shear-resistant checking calculation, the shear-resistant steel bars 33 are pre-embedded in a connecting beam 4 of the lower prefabricated wall, and shaping pipelines 31 for forming holes of the lower window wall are distributed in the lower window wall 3 of the upper prefabricated wall to form vertical holes; the shaping pipeline 31 for forming the hole of the window lower wall penetrates through the whole window lower wall 3 from top to bottom, the shaping pipeline 11 for forming the hole of the edge component, the shaping pipeline 21 for forming the hole of the wall body and the shaping pipeline 31 for forming the hole of the window lower wall are all made of metal materials, the shaping pipeline is made by rolling and folding thin-wall steel plates with patterns or protrusions on the surfaces, the cross section is circular or rectangular, and if the shaping pipeline is a circular cross section, a metal corrugated pipe is adopted; the size of each shaping pipeline along the thickness direction and the length direction of the wall body is not less than 70mm so as to ensure the pouring quality of post-cast concrete in the vertical hole.
In the invention, in the production stage of the prefabricated wall, the vertical steel bars 12 and the shear steel bars 33 of the edge members directly extend out of the top surface of the prefabricated wall by the length required by the design and are controlled within the range meeting the transportation requirement, and the threaded joint 122 for lengthening the vertical steel bars of the edge members and the threaded joint 331 for lengthening the shear steel bars of joints at the positions of the lower walls of windows are connected with the lengthened steel bars in the construction site for lengthening so as to meet the corresponding requirement on the design length; the screwed joint 122 for lengthening the vertical steel bars of the edge components is arranged in the range of the horizontal post-cast strip 72 at the top of the prefabricated wall so as not to influence the installation of the upper-layer prefabricated wall; when the prefabricated wall is installed on site, the horizontal joint 71 at the bottom of the prefabricated wall is arranged at the elevation of the floor, and in order to ensure the compactness of post-cast concrete at the horizontal joint 71 at the bottom of the prefabricated wall, the distance between the bottom of the prefabricated wall and the top of the floor slab is not less than 50 mm; at least two internal thread sleeves 26 are pre-buried at the bottom of the prefabricated wall, bolts are screwed into the internal thread sleeves 26 in a construction site, the height of a horizontal joint 71 at the bottom of the prefabricated wall is controlled by the bolts, and the levelness of the prefabricated wall is adjusted.
In the invention, in order to ensure the compactness of the post-cast concrete of the horizontal joint between the shaping pipeline 21 for wall body hole forming and the shaping pipeline 31 for window lower wall hole forming, a first horizontal inner groove 22 is arranged at the bottom of the wall body, a second horizontal inner groove 32 is arranged at the bottom of the window lower wall area 3, and the first horizontal inner groove 22 and the second horizontal inner groove 32 are formed by template forming or occupation of a special occupation block; the height of the first horizontal inner groove 22 and the height of the second horizontal inner groove 32 are not less than 80mm, the cross section is a trapezoid cross section with a narrow upper part and a wide lower part, and the width of the upper bottom of the trapezoid cross section is not less than 80 mm.
According to the invention, the prefabricated hollow superposed shear wall 81, the heat-insulating layer 82 and the outer leaf wall plate 83 are integrally prefabricated in a factory to form the prefabricated sandwich heat-insulating hollow superposed shear wall, so that the integration of heat insulation, decoration and structure of the prefabricated outer wall is realized; the prefabricated hollow superposed shear wall 81 and the outer leaf wall plate 83 are pulled and connected by adopting a heat-insulating pull-connecting piece; the prefabricated sandwich heat-insulation hollow superposed shear wall 81 is produced by adopting a forward beating method or a backward beating method, and the construction procedures of the outer leaf wall plate 83, the heat-insulation layer 82 and the heat-insulation tie piece are added.
The following are two preferred embodiments of the present invention.
Example one
As shown in fig. 1 to 7, in the present embodiment, the prefabricated hollow superposed shear wall includes an edge member region 1, a wall body region 2, a window lower wall region 3, a beam connecting region 4, a door opening 5 and a window opening 6. It should be noted that the edge member region 1 and the wall body region 2 can be independently used for the prefabricated hollow superposed shear wall based on flat-die production and steel bar lapping. The concrete embodiment is to more fully illustrate the scheme of the invention, and the scheme comprises a window lower wall area 3, a connecting beam area 4, a door opening 5 and a window opening 6, but does not represent that the prefabricated hollow superposed shear wall based on flat die production and steel bar lapping must be used for the prefabricated shear wall comprising the window lower wall area 3, the connecting beam area 4, the door opening 5 and the window opening 6.
The advantages and the disadvantages of the existing prefabricated shear wall technical system are comprehensively considered, the prefabricated edge member vertical reinforcing steel bars 12 and the wall body vertical distribution reinforcing steel bars 23 of the prefabricated hollow superposed shear wall are connected in a lap joint mode, and the prefabricated hollow superposed shear wall technical system is a superposed shear wall technical system. The existing superposed shear wall technical system adopts secondary forming or special hole forming equipment to form an internal hollow part so as to realize the lap joint of vertical steel bars, and has the defects of complex production process of the prefabricated wall, large investment of fixed assets of the special hole forming equipment and large technical difficulty. The prefabricated hollow superposed shear wall based on flat die production and steel bar lapping adopts a shaped pipeline to form an internal vertical hole so as to realize the lapping connection of the vertical steel bars 12 of the prefabricated edge component and the vertical distributed steel bars 23 of the wall body, the prefabricated wall can be formed at one time without using special hole forming equipment, and the prefabricated hollow superposed shear wall can be produced on a fixed die table production line and a flat die flow production line which are commonly used in the prior prefabricated component factory.
In this embodiment, a straight edge member is used, and a large-sized shaped pipe 11 for forming a hole is used in the edge member region 1 to form a vertical hole, and the shaped pipe 11 for forming a hole is composed of two parts, i.e., a lower pipe 111 and an upper pipe 112. The cross section of the lower pipeline 111 is large in size and is basically distributed on the section of the whole linear edge member, the overlapping connection between the extension steel bars 121 of the vertical steel bars 12 of the prefabricated edge member of the lower layer and the vertical steel bars 12 of the edge member of the prefabricated wall of the upper layer is realized within the range of the lower pipeline 111, and the length of the lower pipeline 111 is not less than the overlapping length of the vertical steel bars 12 of the edge member; the cross section of the lower pipeline 111 can be a rectangular cross section, the rectangular pipe is bent to form a protrusion along the middle position of the length direction of the edge member, the vertical steel bars 12 of the edge member in the middle are avoided, meanwhile, a stiffening effect is formed on the lower pipeline 111, the rigidity of the pipeline is improved, and the deformation of the lower pipeline 111 when concrete is poured in the production stage of the prefabricated wall is controlled; arranging a pouring hole 113 along the lower pipeline 111 so as to ensure the pouring quality of concrete at the lower part of the pipeline 111 during flat die production, wherein the pouring hole 113 can adopt a circular or rectangular section, and the minimum size is not smaller than 70 mm; the lower pipe 111 can be made of a thin-walled steel plate with patterns or protrusions on the surface by rolling, and a rough surface is formed on the joint surface of concrete and the pipe wall, so that the force transfer performance is ensured.
The upper pipeline 112 is used for pouring concrete downwards from the upper part of the vertical hole in a construction site, the concrete pouring requirement needs to be met, the upper pipeline can be made of metal corrugated pipes or thin-wall steel plates in a rolling and folding mode, and the cross section of the upper pipeline 112 in the embodiment is circular, and can also be made of rectangular or other cross sections. The sizes of the lower pipeline 111 and the upper pipeline 112 along the thickness and the length direction of the edge member are not smaller than 70mm, and the pouring hole 113 is arranged on one side of the lower pipeline 111 deviating from the upper pipeline 112, so that post-cast concrete in the vertical hole can be conveniently vibrated, and the pouring quality is ensured. The lower duct 111 and the upper duct 112 are separately manufactured and finally assembled as a whole.
The vertical steel bars 12 of the edge member are bent in the height range from the top of the lower pipeline 111 to the bottom surface of the connecting beam, and are bent from the positions of the vertical steel bars 12 to the positions of the elongated steel bars 121 from the edge member, so as to ensure that the elongated steel bars 121 extending out of the top of the prefabricated wall can extend into the lower pipeline 111 of the edge member of the upper prefabricated wall and are in lap joint with the vertical steel bars 12 of the edge member of the upper prefabricated wall; the vertical steel bars 12 of the edge component are uniformly distributed outside the shaping pipeline 11 in the prefabricated wall, so that the prefabricated wall steel bar cage and the shaping pipeline 11 are relatively independent, and the shaping pipeline 11 is convenient to install; the distance between the vertical steel bars 12 of the edge component and the wall of the shaped pipeline 11 is not smaller than 5mm, so that the installation of the shaped pipeline 11 and the efficient installation of the prefabricated wall board on the construction site are ensured; the vertical reinforcing bar overlap joint of edge component is regional, and the centre-to-centre spacing of lapped edge component vertical reinforcing bar 12 and extension reinforcing bar 121 should not be greater than 50mm, guarantees the reinforcing bar overlap joint and passes power effect.
The vertical steel bars 12 of the edge members can directly extend out of the top surface of the prefabricated wall by the length meeting the steel bar overlapping requirement, when the vertical steel bars 12 of the edge members extend out of the top surface of the prefabricated wall by a long length and cannot meet the transportation requirement, the extending length of the vertical steel bars 12 of the edge members can be controlled within a short range in the production stage of the prefabricated wall, and the steel bar threaded joints 122 are connected with the extension steel bars 121 for extension in a construction site; as shown in fig. 10, the reinforcing bar screw 122 should be arranged within the horizontal post-cast strip 72 at the top of the prefabricated wall so as not to interfere with the installation of the upper prefabricated wall.
The vertical hole of the wall body position adopts the shaping pipeline 21 for wall body hole forming to form a hole, the shaping pipeline 21 for wall body hole forming can adopt the same section shape and size from top to bottom, in the embodiment, the section of the shaping pipeline 21 for wall body hole forming is circular, or can adopt the section of a rectangle or other forms, the size along the thickness and length direction of the prefabricated wall is not less than 70mm, and the vertical hole can be made by rolling and folding a metal corrugated pipe or a thin-wall steel plate with a bulge on the surface; and a shaping pipeline 21 for forming a wall hole is arranged at the central position of every two rows of vertically distributed reinforcing steel bars to form a vertical hole.
The vertical distribution reinforcing steel bars 23 of the prefabricated wall do not extend out of the top surface and the bottom surface of the prefabricated wall, as shown in fig. 11, an additional connecting reinforcing steel bar 24 is arranged near the elevation of the vertical hole floor of the shaping pipeline 21 for forming the hole in the wall body, and is in lap joint with four adjacent vertical distribution reinforcing steel bars 23 in the prefabricated wall; in the lapping range of the vertically distributed reinforcing steel bars, the lacing bars 25 of the two layers of reinforcing steel bar meshes of the lacing prefabricated wall are encrypted, and the crossing position of each vertically distributed reinforcing steel bar 23 and each horizontally distributed reinforcing steel bar is provided with one lacing bar 25. In addition, as shown in fig. 12, two additional connecting steel bars 24 are arranged near the floor elevation of the vertical hole of the shaped pipeline 21 for wall hole forming, and are connected with four adjacent vertical distribution steel bars 23 in the prefabricated wall in an overlapping manner; the transverse reinforcing bars 241 can be welded at the upper end and the lower end of the two additional connecting reinforcing bars 24 to form ladder reinforcing bars, so that the additional connecting reinforcing bars 24 can be conveniently fixed on site, and the force transmission performance is improved. No matter one or two additional connecting steel bars 24 are adopted, the total area of the additional connecting steel bars 24 in the vertical hole of the single shaping pipeline 21 for wall hole forming is not less than the total area of the four vertical distribution steel bars 23 in lap joint with the additional connecting steel bars.
As shown in fig. 4, the vertical steel bars 12 and the vertical distributed steel bars 23 of the inner edge member of the prefabricated wall are bent at the upper part of the wall body to penetrate through the inner sides of the longitudinal bars 41 at the bottom of the coupling beam, so that the longitudinal bars 41 at the bottom of the coupling beam are ensured to be linearly arranged without bending. The bending angles of the vertical reinforcing steel bars 12 and the vertical distribution reinforcing steel bars 23 of the edge member are not more than 1:6, and the length of a bending section is controlled so as to facilitate the arrangement of stirrups of the edge member. The tie bars 42 are arranged one by one at the crossing positions of the connecting beam bottom longitudinal bars 41 and the vertical steel bars within the anchoring range of the wall bodies on the two sides, so that the anchoring performance of the connecting beam bottom longitudinal bars 41 in the wall bodies on the two sides is improved.
The lower window wall area 3 in the assembled shear wall structure is mostly prefabricated with the wall bodies on two sides integrally, if shear-resistant steel bars 33 need to be laid in the structural design so as to meet the requirements of horizontal joint shear-resistant checking calculation, the shear-resistant steel bars 33 are pre-embedded in the connecting beam 4 of the lower prefabricated wall, and the shaping pipeline 31 for forming the hole of the lower window wall is laid in the lower window wall area 3 of the upper prefabricated wall so as to form a vertical hole. The shaping pipeline 31 for forming the hole in the window lower wall penetrates through the whole window lower wall from top to bottom, the section of the shaping pipeline 31 for forming the hole in the window lower wall in the embodiment is circular, the section can also be rectangular or other sections, the dimension along the thickness and length direction of the prefabricated wall is not smaller than 70mm, and the shaping pipeline can be made of metal corrugated pipes or thin-walled steel plates with bulges on the surfaces in a rolling mode.
As shown in fig. 13, after the prefabricated wall is installed on site, the shear steel bars 33 embedded in the lower coupling beam extend into the shaping pipeline 31 for forming the hole in the lower window wall of the upper prefabricated wall, and the vertical hole in the lower window wall is poured with post-cast concrete to realize connection. Similar to the edge member vertical bars 12, the length of the shear bars 33 protruding from the top surface of the coupling beam 4 can be controlled within a short range, and the shear bars are connected to the extension bars at the construction site using the bar screw 331 for extension.
As shown in fig. 10 to 13, when the prefabricated wall is installed on site, the horizontal joint 71 at the bottom of the prefabricated wall should be arranged at the elevation of the floor, and in order to ensure the compactness of post-cast concrete at the horizontal joint 71, the distance between the bottom of the prefabricated wall and the top of the floor is not smaller than 50 mm. At least two internal thread sleeves 26 are pre-buried at the bottom of the prefabricated wall, bolts are screwed into the internal thread sleeves 26 in a construction site, and the bolts are used for controlling the height of the horizontal joint 71 and adjusting the levelness of the prefabricated wall.
Especially, wall body is design pipeline 21 for the pore-forming, window wall pore-forming is with design pipeline 31 interval great, for the closely knit nature of guaranteeing above-mentioned position horizontal joint post-cast concrete, sets up horizontal inner groovy one 22 and horizontal inner groovy two 32 in wall body and window wall bottom, and horizontal inner groovy one 22 and horizontal inner groovy two 32 can adopt the template shaping or special occupation of space piece occupy the place and form. The heights of the first horizontal inner groove 22 and the second horizontal inner groove 32 are not lower than 80mm, the cross section is a trapezoidal cross section with a narrow upper part and a wide lower part, and the width of the upper bottom of the trapezoidal cross section is not lower than 80 mm.
When the side surface of the prefabricated hollow superposed shear wall needs to extend out of the horizontally distributed reinforcing steel bars to be connected with the adjacent prefabricated hollow superposed shear wall or the cast-in-place shear wall, the structure of the horizontally distributed reinforcing steel bars and the structure of the vertical joint are extended out of the design specifications of prefabricated concrete building technical standards, prefabricated concrete structure technical regulations and the like.
Further, as shown in fig. 8 and 9, when the prefabricated wall includes L-shaped and T-shaped edge members, the L-shaped and T-shaped prefabricated edge members may also be positioned to form vertical holes by using large-sized shaped pipes 11, so as to realize lap-joint connection of vertical reinforcements of the L-shaped and T-shaped prefabricated edge members of the upper and lower layers, and the arrangement of the shaped pipes 11 is adjusted according to the range of the edge members and the arrangement of the vertical reinforcements.
The prefabrication production process of the prefabricated hollow superposed shear wall in the preferred embodiment comprises the following steps of: binding a steel reinforcement framework of the shear wall, laying a shaped pipeline in the steel reinforcement framework, installing a prefabricated wall side die and a horizontal inner groove die, positioning the shaped pipeline, pouring concrete to form an inner vertical hole, and curing, forming and demolding. The field construction process comprises the following steps: installing the prefabricated hollow superposed shear wall, adjusting the verticality and levelness of the prefabricated wall, laying the vertically distributed steel bar additional connecting steel bars 24 or the edge member vertical steel bar extension steel bars 121, erecting a horizontal seam template, pouring concrete in the vertical holes to realize the connection of the prefabricated wall, and maintaining and removing the template.
Example two
Fig. 14 to 18 show a second embodiment of the present invention, which is different from the first embodiment in that two small-sized shaped pipes 11 for forming holes of edge members are used to form two vertical holes at the edge members to achieve lap joint of vertical steel bars of upper and lower layers of edge members, and this is advantageous in that during flat-mold production, the gap between the two small-sized shaped pipes 11 for forming holes of edge members further helps to ensure the pouring quality of lower concrete and facilitates the arrangement of the lacing wires 14 of edge members. The single small-sized edge member hole-forming shaped pipe 11 is also composed of two parts, a lower pipe 111 and an upper pipe 112. The length of the lower pipeline 111 is not less than the lap joint length of the vertical steel bars of the edge members, the cross section is a rectangular section, and four corners are bent to form cutting angles to avoid the vertical steel bars 12 of the edge members; the lower pipe 111 can be made of a thin-walled steel plate with patterns or protrusions on the surface by rolling, and a rough surface is formed on the joint surface of concrete and the pipe wall, so that the force transfer performance is ensured.
The upper pipe 112 is used for pouring concrete from the upper part of the vertical hole downwards in a construction site, the concrete pouring requirement is required to be met, the upper pipe can be made of a metal corrugated pipe or a thin-wall steel plate through rolling and folding, and the section of the upper pipe 112 in the second preferred embodiment is circular, and can also be rectangular or other sections. The sizes of the lower pipeline 111 and the upper pipeline 112 along the thickness and the length direction of the edge member are not smaller than 70mm, so that the post-cast concrete in the vertical hole can be vibrated conveniently, and the pouring quality can be ensured. The lower duct 111 and the upper duct 112 are separately manufactured and finally assembled as a whole.
Particularly, when the vertical steel bar reinforcement ratio of the edge member is large, the vertical steel bars 12 of the edge member are configured with six vertical steel bars 12, so that the diameter of the vertical steel bars 12 of the edge member is large, the force is not favorably transmitted by lapping, and the lapping length is long. At this time, referring to fig. 19, eight vertical bars 12 may be disposed in the edge member to reduce the diameter of the vertical bars of the edge member, thereby reducing the overlapping length and the amount of bars.
Further, as shown in fig. 20 to 22, the small-sized shaped duct 11 for forming holes in edge members can be used for L-shaped and T-shaped prefabricated edge members, and the arrangement of the small-sized shaped duct 11 for forming holes in edge members can be adjusted according to the ranges of the L-shaped prefabricated edge members, the T-shaped prefabricated edge members and the T-shaped prefabricated constraint edge members and the arrangement of the vertical reinforcing steel bars.
The prefabricated hollow superposed shear wall in the first embodiment or the second embodiment of the invention is a structural wall, and can be used for an external wall or an internal wall of a building, and further, as shown in fig. 23, the prefabricated hollow superposed shear wall 81, the heat insulation layer 82 and the external leaf wall plate 83 can be integrally prefabricated in a factory to form the prefabricated sandwich heat insulation hollow superposed shear wall, so that the heat insulation, decoration and structural integration of the prefabricated external wall is realized. The prefabricated hollow superposed shear wall and the outer leaf wall plate are tied by adopting a heat-insulating tie piece. At the moment, the prefabricated sandwich heat-insulation hollow superposed shear wall can be produced by adopting a forward beating method or a backward beating method, and the construction procedures of the outer leaf wall plate, the heat-insulation layer and the heat-insulation tie piece are added.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes and substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.