CN111074748A - Cross beam assembly for being connected with main cable - Google Patents

Cross beam assembly for being connected with main cable Download PDF

Info

Publication number
CN111074748A
CN111074748A CN201911295865.4A CN201911295865A CN111074748A CN 111074748 A CN111074748 A CN 111074748A CN 201911295865 A CN201911295865 A CN 201911295865A CN 111074748 A CN111074748 A CN 111074748A
Authority
CN
China
Prior art keywords
main
cross
main cable
sides
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911295865.4A
Other languages
Chinese (zh)
Inventor
张立乾
李玉良
徐学文
李兵
吴星
陈红
闫晶
孟良
贾佳
周靖凯
田海娇
孔慧
沈兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
63921 Troops of PLA
Original Assignee
63921 Troops of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 63921 Troops of PLA filed Critical 63921 Troops of PLA
Priority to CN201911295865.4A priority Critical patent/CN111074748A/en
Publication of CN111074748A publication Critical patent/CN111074748A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a beam assembly for connecting with a main cable, which comprises an end fixing device and a beam; the cross beams are arranged at intervals along the length direction of the main cables, and meanwhile, two ends of each cross beam are fixedly connected with the main cables on two sides through end fixing devices respectively. The invention can fixedly connect the cross beam and the main cable together to realize quick erection.

Description

Cross beam assembly for being connected with main cable
Technical Field
The invention relates to the technical field of suspension bridges, in particular to a cross beam assembly for being connected with a main cable.
Background
A suspension bridge refers to a bridge with cables suspended by pylons and anchored to both banks (or ends of the bridge) as the main load bearing members of the superstructure. The cable tower is composed of a suspension cable, a cable tower, an anchorage, a suspender, a bridge deck system and the like. The main bearing member of the suspension bridge is a suspension cable which mainly bears tension and is generally made of steel (steel wires, steel cables and the like) with high tensile strength. The traditional cableway bridge cable adopts a close-spaced arrangement mode, the erection process is complex, but when emergency situations such as emergency rescue, wartime and the like are met, a bridge needs to be quickly assumed. Therefore, it is necessary to design a lightweight bridge which is convenient for rapid erection.
The cable support bridge that erects fast that applies for on the same day adopts two main push-towing ropes that set up in the bridge floor avris as main load-bearing member, needs to adopt a crossbeam system that can realize being connected with the main push-towing rope.
Disclosure of Invention
In view of this, the present invention provides a beam assembly for connecting with a main cable, which can fixedly connect a beam and a main cable together to achieve rapid erection.
The technical scheme adopted by the invention is as follows:
a cross-beam assembly for connection with a main cable, the cross-beam assembly comprising an end fixture and a cross-beam;
the cross beams are arranged at intervals along the length direction of the main cables, and meanwhile, two ends of each cross beam are fixedly connected with the main cables on two sides through end fixing devices respectively.
Furthermore, the end fixing device comprises an inverted U-shaped component and two groups of clamping assemblies;
the clamping assembly comprises two clamping blocks and a fastener, and the clamping surfaces of the clamping blocks are arc surfaces; the two clamping blocks are respectively arranged on two sides of the main cable and fixedly connected through a fastening piece;
the inside main push-towing rope that is used for holding of type of falling U part opening, type of falling U part is fixed at the crossbeam tip to hang the dress on the main push-towing rope, two sets of centre gripping subassemblies are located type of falling U part both sides, are used for injecing type of falling U part along main push-towing rope length direction's displacement.
Furthermore, the closed end of the inverted U-shaped component is provided with extending arms extending to two sides along the length direction of the main cable, and the total length of the extending arms at the two sides is equal to the spacing distance of the cross beams; the extending arms of the adjacent inverted U-shaped parts are locked by fasteners.
Furthermore, the crossbeam is the aluminum alloy case roof beam to set up the stiffening rib board at a certain distance apart.
Has the advantages that:
1. the invention aims at a bridge which adopts two main cables arranged at the side of a bridge deck as a main bearing member, can reliably connect the main cables with a cross beam, and has quick erection capacity.
2. The end fixing device not only can realize reliable connection with the main cable, but also can realize locking and positioning functions; secondly, the total length of the arms at two sides of the inverted U-shaped component is equal to the spacing distance of the cross beam, and the cross beam can play the role of a caliper when being installed in place; moreover, the extending arms of the adjacent inverted U-shaped components are locked through fasteners, and the abutting and fastening of the adjacent cross beams can be realized.
3. The cross beam is an aluminum alloy box beam, and the stiffening rib plates are arranged, so that the self weight is further reduced, and necessary structural rigidity and strength can be provided.
Drawings
FIG. 1 is a three-dimensional schematic view of a main cable and a cross beam;
FIG. 2 is a longitudinal schematic view of the present invention after connection to a main cable;
FIG. 3 is a schematic plan view of the present invention after connection to a main cable;
FIG. 4 is a cross-sectional schematic view of a beam of the present invention;
FIG. 5 is a schematic cross-sectional side view of the end fixture of the present invention;
FIG. 6 is a schematic view of the longitudinal arrangement of the end fixture of the present invention;
FIG. 7 is a front view of the inverted U-shaped member of the present invention;
FIG. 8 is a front view of the clamping block of the present invention;
wherein, 1-main cable, 2-beam, 3-end fixing device, 4-inverted U-shaped component, 5-clamping block, 6-fastener, 17-extending arm and 18-bolt component.
Detailed Description
The invention is described in detail below by way of example with reference to the accompanying drawings.
The present embodiment provides a cross beam assembly for connection with a main cable, connected with a main cable 1, comprising a cross beam 2 and an end fixing device 3. The longitudinal direction of the main cable 1 is used as the longitudinal direction.
Based on the strong tension capability of the main cable 1, as shown in fig. 1 and 2, the main cable 1 is used as a main load-bearing member. The two main cables 1 are parallel to each other and fixedly connected with external anchor seats positioned on two sides of a river bank through cable saddle anchors, and the anchor seats provide anchoring resistance for the main cables through prestressed anchor cables planted on rock strata, so that the main cables 1 have certain initial tension. The cross beams 2 are arranged at intervals along the length direction of the main cables 1, and meanwhile, two ends of each cross beam 2 are fixedly connected with the main cables 1 on two sides through end fixing devices 3 respectively; and then the bridge deck bearing plate is arranged on the cross beam 2 to form the bridge deck.
As shown in figure 4, the cross beam 2 adopts 6061AL high-strength alloy aluminum and has a thin-wall box-shaped section. And a stiffening rib plate is arranged between the top plate and the bottom plate of the box girder, and the spacing between the stiffening rib plates is 400 mm.
As shown in fig. 3 and 5, the end fixing device 3 includes an inverted U-shaped member 4 and two sets of clamping assemblies; as shown in fig. 7, the opening of the inverted U-shaped member 4 is used for accommodating the main cable 1, the closed end is provided with extending arms 17 extending to both sides, the extending direction is along the length direction of the main cable 1, and the total length of the extending arms 17 at both sides is equal to the spacing distance of the cross beam 2, so that when the cross beam 2 is installed in place, the function of a caliper can be exerted; the clamping assembly comprises two clamping blocks 5 and a bolt assembly 18, the clamping surfaces of the clamping blocks 5 are arc-shaped surfaces and are matched with the appearance of the main cable 1, as shown in fig. 8, the two clamping blocks 5 are respectively arranged on two sides of the main cable 1, and the bolt assembly 18 penetrates through the two clamping blocks 5 to lock the main cable 1. The inverted U-shaped component 4 is fixed at the end part of the cross beam 2 and is hung on the main cable 1, and the two groups of clamping components are positioned at two sides of the inverted U-shaped component 4 and are used for limiting the longitudinal relative displacement of the inverted U-shaped component 4, namely the cross beam 2 and the main cable 1; the extending arms 17 of the adjacent inverted U-shaped components 4 are connected together through the fastener 6, as shown in fig. 6, the fastener 6 includes an ear plate and two bolts, and two ends of the ear plate are fixedly connected with the two adjacent extending arms 17 through the bolts to lock the adjacent inverted U-shaped components 4.
In summary, the above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. A cross-beam assembly for connection to a main cable, the cross-beam assembly comprising end fixing means and a cross-beam;
the cross beams are arranged at intervals along the length direction of the main cables, and meanwhile, two ends of each cross beam are fixedly connected with the main cables on two sides through end fixing devices respectively.
2. A cross-beam assembly for connection to a main cable according to claim 1, wherein the end fixing means comprises an inverted U-shaped member and two sets of clamping assemblies;
the clamping assembly comprises two clamping blocks and a fastener, and the clamping surfaces of the clamping blocks are arc surfaces; the two clamping blocks are respectively arranged on two sides of the main cable and fixedly connected through a fastening piece;
the inside main push-towing rope that is used for holding of type of falling U part opening, type of falling U part is fixed at the crossbeam tip to hang the dress on the main push-towing rope, two sets of centre gripping subassemblies are located type of falling U part both sides, are used for injecing type of falling U part along main push-towing rope length direction's displacement.
3. The crossmember assembly according to claim 2, wherein the closed end of the inverted U-shaped member has arms extending to both sides along the length of the main cable, and the total length of the arms is equal to the distance between the crossmembers; the extending arms of the adjacent inverted U-shaped parts are locked by fasteners.
4. A beam assembly for connection to a main cable according to claim 1 wherein the beam is an aluminium alloy box beam and stiffening ribs are provided at spaced intervals.
CN201911295865.4A 2019-12-16 2019-12-16 Cross beam assembly for being connected with main cable Pending CN111074748A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911295865.4A CN111074748A (en) 2019-12-16 2019-12-16 Cross beam assembly for being connected with main cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911295865.4A CN111074748A (en) 2019-12-16 2019-12-16 Cross beam assembly for being connected with main cable

Publications (1)

Publication Number Publication Date
CN111074748A true CN111074748A (en) 2020-04-28

Family

ID=70315012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911295865.4A Pending CN111074748A (en) 2019-12-16 2019-12-16 Cross beam assembly for being connected with main cable

Country Status (1)

Country Link
CN (1) CN111074748A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565002A (en) * 2021-06-30 2021-10-29 中国船舶重工集团应急预警与救援装备股份有限公司 Fastening and adjusting device for main cable of cross-tensioned steel rope

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5374945U (en) * 1976-11-26 1978-06-22
CN2880899Y (en) * 2006-03-31 2007-03-21 中山市公路钢结构制造有限公司 U-shaped steel bridge deck of a prefabricated steel bridge
JP2011214221A (en) * 2010-03-31 2011-10-27 Nippon Steel Engineering Co Ltd Stiffening girder of suspension bridge, and method for constructing the same
CN202989775U (en) * 2012-12-18 2013-06-12 中国水电顾问集团贵阳勘测设计研究院 A bridge deck structure for a flatwise tensile rope bridge
CN105040592A (en) * 2015-06-12 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Horizontal pull rope bridge and erection method thereof
CN105178167A (en) * 2015-06-12 2015-12-23 中国电建集团贵阳勘测设计研究院有限公司 Double-layer steel cable bridge and erection method thereof
CN205062645U (en) * 2015-10-10 2016-03-02 中国电建集团贵阳勘测设计研究院有限公司 A passage structure for terrestrial vertebrates on both sides of the reservoir
CN106835944A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Double-deck main rope cable way bridge
CN106835953A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Cable way bridge gooseneck
CN207714142U (en) * 2017-12-31 2018-08-10 中交通力建设股份有限公司 A kind of existing cord clip antisliding apparatus of flexible suspension bridge
KR101920038B1 (en) * 2018-03-26 2019-02-08 선풍종합건설 주식회사 Pedestrian bridge and construction method thereof
CN208649872U (en) * 2018-06-27 2019-03-26 中国人民解放军63983部队 A kind of cableway foot bridge of air cushion bridge deck structure
CN109914222A (en) * 2017-12-13 2019-06-21 杭州跟策科技有限公司 Anti-static type cable bridge

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5374945U (en) * 1976-11-26 1978-06-22
CN2880899Y (en) * 2006-03-31 2007-03-21 中山市公路钢结构制造有限公司 U-shaped steel bridge deck of a prefabricated steel bridge
JP2011214221A (en) * 2010-03-31 2011-10-27 Nippon Steel Engineering Co Ltd Stiffening girder of suspension bridge, and method for constructing the same
CN202989775U (en) * 2012-12-18 2013-06-12 中国水电顾问集团贵阳勘测设计研究院 A bridge deck structure for a flatwise tensile rope bridge
CN105040592A (en) * 2015-06-12 2015-11-11 中国电建集团贵阳勘测设计研究院有限公司 Horizontal pull rope bridge and erection method thereof
CN105178167A (en) * 2015-06-12 2015-12-23 中国电建集团贵阳勘测设计研究院有限公司 Double-layer steel cable bridge and erection method thereof
CN205062645U (en) * 2015-10-10 2016-03-02 中国电建集团贵阳勘测设计研究院有限公司 A passage structure for terrestrial vertebrates on both sides of the reservoir
CN106835944A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Double-deck main rope cable way bridge
CN106835953A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Cable way bridge gooseneck
CN109914222A (en) * 2017-12-13 2019-06-21 杭州跟策科技有限公司 Anti-static type cable bridge
CN207714142U (en) * 2017-12-31 2018-08-10 中交通力建设股份有限公司 A kind of existing cord clip antisliding apparatus of flexible suspension bridge
KR101920038B1 (en) * 2018-03-26 2019-02-08 선풍종합건설 주식회사 Pedestrian bridge and construction method thereof
CN208649872U (en) * 2018-06-27 2019-03-26 中国人民解放军63983部队 A kind of cableway foot bridge of air cushion bridge deck structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565002A (en) * 2021-06-30 2021-10-29 中国船舶重工集团应急预警与救援装备股份有限公司 Fastening and adjusting device for main cable of cross-tensioned steel rope

Similar Documents

Publication Publication Date Title
CN101793010B (en) Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
US4498816A (en) Mine roof support system
CN113371598A (en) Single track hangs heavy rail linkage and track system
CN111074748A (en) Cross beam assembly for being connected with main cable
CN211689930U (en) Suspension bridge support system that erects fast
CN114541283B (en) Structure and method for solving continuous downwarping problem of large-span PC girder bridge
US20020179368A1 (en) Post-tensioned fall protection system
CN110878516A (en) Through tied arch bridge for increasing transverse rigidity of main beam
CN215364548U (en) Single track hangs heavy rail linkage and track system
CN202508790U (en) Novel tower type crane attachment framework device
CN212103624U (en) Assembled prefabricated assembled reverse sling and arch combined pedestrian bridge
CN110939060A (en) Bridge floor bearing plate of beam lattice system
CN211689905U (en) Bridge floor bearing plate of beam lattice system
CN208869942U (en) A kind of long-span continuous rigid-framed bridge external prestressing load system
CN101210417B (en) Two-way Simply Supported Non-torsion Tower Top Tension Anchorage Method of Buckle and Anchor Cable System
CN218581226U (en) Portable tying and hanging component of H-beam safety belt
CN216864803U (en) Beam falling prevention device with crossbeam connected with box girder bottom plate
CN111074747A (en) Cable support bridge that erects fast
CN211571358U (en) Through tied arch bridge for increasing transverse rigidity of main beam
CN210597604U (en) Solid steel frame structure
CN219045089U (en) Super-long-distance large-span pedestrian steel cable bridge
CN210767926U (en) Safety protection platform
CN210002675U (en) anti-seismic comprehensive hanging frame for ceiling
JP7194532B2 (en) Steel member reinforcement structure and steel member reinforcement method
CN113479792B (en) Steel tube bundle structure reinforced tower crane attachment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200428

WD01 Invention patent application deemed withdrawn after publication