CN110984671B - 5G communication launching tower with lever folding and expanding functions - Google Patents

5G communication launching tower with lever folding and expanding functions Download PDF

Info

Publication number
CN110984671B
CN110984671B CN201911152570.1A CN201911152570A CN110984671B CN 110984671 B CN110984671 B CN 110984671B CN 201911152570 A CN201911152570 A CN 201911152570A CN 110984671 B CN110984671 B CN 110984671B
Authority
CN
China
Prior art keywords
plate
blocks
electric welding
gear
sleeve frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911152570.1A
Other languages
Chinese (zh)
Other versions
CN110984671A (en
Inventor
雷谢明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Ruixing Steel Structure Co ltd
Original Assignee
Jiaxing Huawei New Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Huawei New Energy Co Ltd filed Critical Jiaxing Huawei New Energy Co Ltd
Priority to CN201911152570.1A priority Critical patent/CN110984671B/en
Publication of CN110984671A publication Critical patent/CN110984671A/en
Application granted granted Critical
Publication of CN110984671B publication Critical patent/CN110984671B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
    • E04H12/187Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic with hinged sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Support Of Aerials (AREA)

Abstract

The invention discloses a 5G communication launching tower with lever folding expansion, which structurally comprises a tower body, pedals, communication tower plates, a hanging device and a cluster antenna. Has the advantages that: the invention utilizes the arc buckle plate arranged on the surface of the mounting plate, saves the large circle of flanges needed by the traditional antenna increase installation, and the mounting plate provided by the invention has six installation plates which are respectively in a trapezoidal structure, can enlarge the installation quantity of the antenna and can not cause mutual overlapping influence.

Description

5G communication launching tower with lever folding and expanding functions
Technical Field
The invention relates to the field of communication equipment, in particular to a 5G communication launching tower with lever folding expansion.
Background
With the development of the technology communication technology from the 2G era to the 5G era, the energy and signal diffusion required by the transmission tower are increased, so that the number of antennas mounted on the transmission tower needs to be increased to ensure the diffusion of signals.
And when increasing required platform of antenna installation or support arm, generally need the staff to climb to the end and install, and do not have a large amount of safeguard procedures in middle part and its periphery because of its terminal bearing capacity is relatively poor, and because its mounting height is greater than 60 meters, the produced wind energy power of eminence is stronger, then the danger of personal safety easily appears, simultaneously because of tower end when installing the antenna, traditional installation is then through flange winding fixed mounting, it is located the height and is in the work degree of difficulty great when passing through flange mounting, and in the flange winding, lead to the antenna when the installation of mutual interference for not overlapping, then need carry out orderly lock installation in proper order to the flange, thereby lead to the installation of antenna quantity to reduce, be unfavorable for satisfying the current situation and institute.
Disclosure of Invention
Aiming at the defects of the prior art, the invention aims to provide a 5G communication launching tower with lever folding expansion, which aims to solve the problems that when a platform or a support arm required by antenna installation is required to be added in the prior art, workers are generally required to climb to the tail end for installation, the bearing capacity of the tail end is poorer than that of the middle part, a large number of protective measures are not provided at the periphery of the tail end, the installation height is more than 60 meters, the wind power generated at the high position is stronger, the existing danger of personal safety is easy to occur, meanwhile, when the antenna is installed at the tail end of the tower, the traditional installation is fixedly installed through flange windings, the working difficulty is higher when the antenna is installed through the flange at the high position, and when the antenna is installed through the flange windings and the flange windings, the flanges are required to be sequentially and orderly buckled for installation so as not to overlap with each other interference, is not favorable for meeting the defects of the current situation.
In order to achieve the purpose, the invention is realized by the following technical scheme:
the utility model provides a 5G communication launching tower with lever is converted into and is expanded, its structure includes the tower body, running-board, communication column plate, hangs and establishes device, antenna tied in a bundle, the running-board is equipped with a plurality of and is evenly equidistance respectively and installs in the tower body surface and be connected through the electric welding, the communication column plate is equipped with two altogether and is evenly equidistance respectively and installs in tower body upper portion, hang and establish the device and install in the tower body end and be connected through the electric welding, antenna tied in a bundle locates to hang and establishes the device upper surface and be connected through the electric welding, it includes rotating mechanism, suspension mechanism to hang and establishes the device, suspension mechanism locates rotating mechanism upper surface and is.
As a further scheme of the invention, the rotating mechanism comprises a pulling structure, a power plate and a gear, wherein the power plate is arranged on the left side of the plate moving structure and is connected with the plate moving structure in a buckling manner, the gear is arranged on the upper surface of the power plate and is connected with the power plate through electric welding, and the gear is connected with the suspension mechanism through meshing.
As a further scheme of the invention, the pulling structure comprises a sleeve frame, a limiting spring, a right-angle plate, a pushing ball and a buckling ball, wherein the limiting spring is arranged inside the sleeve frame and is connected with the sleeve frame through electric welding, the pushing ball is arranged at the right-angle position of the right-angle plate and is connected with the right-angle plate through electric welding, the pushing ball is arranged inside the sleeve frame and is connected with the sleeve frame through sleeving, and the buckling ball is arranged at the shorter end of the right-angle plate and is connected with the power plate through buckling, so that the convenient pulling of workers is facilitated.
As a further scheme of the invention, the sleeve frame is in an arc structure, the upper part of the sleeve frame is in an inclined structure, the tail end of the downward inclined side of the sleeve frame is provided with a rectangular groove, the rectangular groove and the sleeve frame are in an integrated structure and have the same diameter with the right-angle plate, and the fixing effect is favorably realized when the mounting plate falls to a required position.
As a further scheme of the invention, the outermost side of the lower surface of the power plate is uniformly and equidistantly provided with a plurality of grooves, and the grooves are connected with the buckling balls in a buckling manner, so that the point and the line are realized by the lever principle, and the labor of workers when pulling the suspension mechanism to fold and fall is saved.
As a further scheme of the invention, the suspension mechanism comprises a mounting plate, a movable shaft, a pull rod, a limiting block and a rolling gear, wherein the mounting plate is provided with six blocks which are respectively arranged on the surface of the movable shaft and connected with the movable shaft through electric welding, the pull rod is provided with six blocks which are respectively connected with the two side surfaces of the movable shaft in a U shape, the limiting block is provided with six blocks which are respectively arranged below the inner side of the pull rod, the rolling gear is provided with six blocks which are respectively arranged on the outer side of the gear in a uniform and equidistant shape, the rolling gear is connected with the gear through meshing, one end of the pull rod bypasses the limiting block and is connected with the rolling gear through winding, the platform plate or the support arm used by a worker is convenient to provide a convenient mounting plate, and the folding of the controllable type is beneficial to the personal safety of the worker, avoiding it from climbing to the end.
As a further scheme of the invention, the mounting plate is in a trapezoid shape, five groups of arc pinch plates are arranged on the surface of the mounting plate, the arc pinch plates are uniformly and equidistantly arranged on the outer surface of the mounting plate and are connected through electric welding, and the convenient installation of increasing receivers conveniently is facilitated.
Advantageous effects of the invention
Compared with the traditional 5G communication launching tower with lever folding expansion, the invention has the following beneficial effects:
the invention utilizes the arc pinch plate arranged on the surface of the mounting plate, saves the buckling connection of a large circle of flanges required by the traditional antenna during the increasing installation, and the mounting plates arranged in the invention have six installation structures which are respectively in a trapezoidal structure, can enlarge the installation quantity of the antennas and can not cause mutual overlapping influence.
The invention utilizes the hanging mechanism which is arranged to have the function of falling and folding under the rotating action of the rotating mechanism, thereby providing convenience for workers when a platform plate or a support arm used by the number of antennas needs to be increased, and avoiding the danger of personal safety easily caused by the fact that the tail end bearing capacity is poorer than the middle part and the high wind energy power is stronger when the traditional communication launching tower needs to increase the number of antennas.
Drawings
Other features, objects and advantages of the invention will become more apparent from a reading of the detailed description of non-limiting embodiments with reference to the attached drawings.
In the drawings:
fig. 1 is a schematic structural diagram of a 5G communication tower with lever folding expansion according to the present invention.
Fig. 2 is a schematic top view of the hanging device of the present invention.
Fig. 3 is a schematic view of the internal top structure of the hanging device of the present invention.
FIG. 4 is a schematic front view of the pulling structure and the power plate according to the present invention.
Fig. 5 is a schematic perspective view of the frame of the present invention.
Fig. 6 is a partial perspective view of the suspension mechanism of the present invention.
Fig. 7 is an enlarged view of a structure in fig. 2.
In the figure: the tower body-1, the foot pedal-2, the communication tower plate-3, the hanging device-4, the cluster antenna-5, the rotating mechanism-4 a, the hanging mechanism-4 b, the pulling structure-4 a1, the power plate-4 a2, the gear-4 a3, the sleeve frame-4 a11, the limit spring-4 a12, the right angle plate-4 a13, the pushing ball-4 a14, the buckling ball-4 a15, the rectangular groove-f, the groove-g, the mounting plate-4 b1, the movable shaft-4 b2, the pull rod-4 b3, the limit block-4 b4, the rolling gear-4 b5 and the arc buckle-x.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
As shown in fig. 1 to 7, the present invention provides a technical solution of a 5G communication tower with lever folding expansion:
as shown in fig. 1-2, a 5G communication launching tower with lever folding expansion structurally comprises a tower body 1, pedals 2, communication tower plates 3, hanging devices 4 and cluster antennas 5, wherein the pedals 2 are provided with a plurality of blocks which are respectively installed on the outer surface of the tower body 1 in an even and equidistant manner and connected through electric welding, the communication tower plates 3 are totally provided with two blocks which are respectively installed on the upper portion of the tower body 1 in an even and equidistant manner, the hanging devices 4 are installed at the tail end of the tower body 1 and connected through electric welding, the cluster antennas 5 are installed on the upper surface of the hanging devices 4 and connected through electric welding, each hanging device 4 comprises a rotating mechanism 4a and a hanging mechanism 4b, and the hanging mechanisms 4b are installed on the upper surface of the rotating mechanism 4a and connected through meshing.
As shown in fig. 3, the rotating mechanism 4a includes a pulling structure 4a1, a power plate 4a2, and a gear 4a3, the power plate 4a2 is disposed on the left side of the plate moving structure 4a1 and is connected by buckling, the gear 4a3 is disposed on the upper surface of the power plate 4a2 and is connected by electric welding, and the gear 4a3 is connected with the suspension mechanism 4b by meshing.
As shown in fig. 3-4, the pulling structure 4a1 includes a sleeve frame 4a11, a limiting spring 4a12, a right-angle plate 4a13, a pushing ball 4a14, and a snapping ball 4a15, wherein the limiting spring 4a12 is disposed inside the sleeve frame 4a11 and connected by electric welding, the pushing ball 4a14 is mounted at a right-angle of the right-angle plate 4a13 and connected by electric welding, the pushing ball 4a14 is disposed inside the sleeve frame 4a11 and connected by nesting, the snapping ball 4a15 is mounted at a shorter end of the right-angle plate 4a13 and connected with the power plate 4a2 by snapping, which is beneficial for facilitating the pulling of workers.
As shown in fig. 5, the sleeve frame 4a11 has an arc structure and an inclined upper portion, a rectangular groove f is formed at the end of the downward inclined side of the sleeve frame 4a11, and the rectangular groove f and the sleeve frame 4a11 are integrated and have the same diameter as the right-angle plate 4a13, so as to facilitate the fixing of the mounting plate 4b1 when the mounting plate 4b1 falls to a desired position.
As shown in fig. 4, a plurality of grooves g are uniformly and equidistantly formed in the outermost side of the lower surface of the power plate 4a2, and the grooves g are connected with the buckling balls 4a15 in a buckling manner, so that the point and the line of a lever principle are facilitated, and the labor of a worker when pulling the hanging mechanism 4b to fold and fall is saved.
As shown in fig. 3-6, the suspension mechanism 4b includes a mounting plate 4b1, a movable shaft 4b2, a pull rod 4b3, a limit block 4b4, and a winding gear 4b5, the mounting plate 4b1 has six blocks and is respectively mounted on the surface of the movable shaft 4b2 and connected by electric welding, the pull rod 4b3 has six blocks and is respectively connected to the two side surfaces of the movable shaft 4b2 in a U shape, the limit block 4b4 has six blocks and is respectively mounted below the inner side of the pull rod 4b3, the winding gear 4b5 has six blocks and is respectively mounted on the outer side of the gear 4a3 in a uniform and equidistant manner, the gear 4b5 is connected to the winding gear 4a3 by meshing, one end of the pull rod 4b3 is connected to the winding gear 4b5 by winding around the limit block 4b4, which is beneficial for the convenience of providing a convenient mounting plate or arm for the staff to use when the number of antennas needs to be increased, and the controllable folding is beneficial to protecting the personal safety of workers and avoiding climbing to the tail end.
As shown in fig. 7, mounting panel 4b1 is trapezoidal shape and the surface is equipped with five groups of arc buckle x, arc buckle x is even equidistance form and installs in mounting panel 4b1 surface and be connected through the electric welding, is favorable to realizing the convenient installation that conveniently increases the receiver.
To sum up, through the mutual cooperation of the suspension mechanism 4b and the rotating mechanism 4a that are equipped with, realize making things convenient for the staff to the safe increase of launching tower antenna quantity, avoid appearing the fall accident that the top climbing caused, simultaneously under the effect of mounting panel 4b1 and arc buckle board x, reduce the flange when its terminal antenna is connected and use, cause the phenomenon of bearing a burden and antenna installation quantity reduction.
The specific realization principle is as follows: when using, the staff is in order to satisfy the use of communication current situation, when needing to increase required platform of antenna installation or support arm, generally need the staff to climb to the end and install, and do not have a large amount of safeguard procedures in middle part and its periphery because of its terminal bearing capacity is relatively poor, and because of its mounting height is greater than 60 meters, the produced wind energy power of eminence is stronger, then the danger of personal safety easily appears, simultaneously when installing the antenna because of the tower end, traditional installation is then through flange winding fixed mounting, it is located the height and is great through the work degree of difficulty when flange mounting, and in the flange winding, lead to the antenna when installing for not overlapping mutual interference, then need carry out orderly lock installation in proper order to the flange, thereby lead to the installation of antenna quantity to reduce, be unfavorable for satisfying the current situation needs.
Therefore, by utilizing the hanging device 4, when a worker climbs to the uppermost communication tower plate 3, the longer end of the right-angle plate 4a13 is pulled to move downwards, the buckling ball 4a15 is buckled with the groove g under the action of the right-angle plate 4a13, and the worker moves backwards at the moment, so that the 4a13 is buckled at the position of the rectangular groove f along the 4a11, the lever principle is effectively utilized, the labor waste is effectively saved, meanwhile, the gear 4a3 drives the rolling gear 4b5 to rotate under the rotation action of the power plate 4a2, so that the rolling gear 4b5 is pulled by the pull rod 4b3 to pull the mounting plate 4b1 to move downwards to the outside to be folded to a required angle, the phenomenon that the worker climbs to the tail end of the mounting plate to cause the accident of the existing falling when the mounting plate 4b1 falls and is folded to a certain height is avoided, and the antenna is mounted through the arc x, the phenomenon that the load is born and the number of antennas is reduced due to the fact that the flanges are used in a winding mode when the tail end antennas are connected is effectively reduced.
The invention solves the problems that in the prior art, when a platform or a support arm required by antenna installation needs to be added, a worker is required to climb to the tail end to install the antenna, the bearing capacity of the tail end is poorer than that of the middle part, no large number of protection measures are provided at the periphery of the tail end, and the wind power generated at a high position is stronger because the installation height is more than 60 meters, so that the danger of personal safety is easy to occur, meanwhile, when the antenna is installed at the tail end of a tower, the traditional installation is fixedly installed through a flange winding, the working difficulty is higher when the antenna is installed through the flange at a high position, and the installation of the antenna is not overlapped and interfered with each other because of the flange winding, the flanges need to be sequentially and orderly buckled and installed, so that the installation of the number of the antennas is reduced, and the antenna is not beneficial to the current situation, the invention utilizes the arc buckling plates arranged on the, the invention saves the buckling connection of large circles of flanges required by the traditional antenna increase installation, and the installation plates of the invention have six installation plates which are respectively in a trapezoidal structure, can enlarge the installation quantity of the antenna and can not cause mutual superposition influence.
While there have been shown and described what are at present considered the fundamental principles and essential features of the invention and its advantages, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (1)

1. The utility model provides a 5G communication launching tower with lever is converted and is expanded, its structure includes tower body (1), running-board (2), communication column plate (3), hangs and establishes device (4), bunched antenna (5), its characterized in that: the pedal plates (2) are provided with a plurality of blocks which are uniformly and equidistantly arranged on the outer surface of the tower body (1) and are connected through electric welding, the communication tower plates (3) are provided with two blocks which are uniformly and equidistantly arranged on the upper part of the tower body (1), the hanging device (4) is arranged at the tail end of the tower body (1) and is connected through electric welding, and the cluster antenna (5) is arranged on the upper surface of the hanging device (4) and is connected through electric welding;
the hanging device (4) comprises a rotating mechanism (4 a) and a hanging mechanism (4 b), and the hanging mechanism (4 b) is arranged on the upper surface of the rotating mechanism (4 a) and is connected with the rotating mechanism (4 a) through meshing;
the rotating mechanism (4 a) comprises a wrenching structure (4 a 1), a power plate (4 a 2) and a gear (4 a 3), wherein the power plate (4 a 2) is arranged on the left side of the plate moving structure (4 a 1) and connected with the plate moving structure through buckling, the gear (4 a 3) is arranged on the upper surface of the power plate (4 a 2) and connected with the power plate through electric welding, and the gear (4 a 3) is connected with the suspension mechanism (4 b) through meshing;
the wrenching structure (4 a 1) comprises a sleeve frame (4 a 11), a limiting spring (4 a 12), a right-angle plate (4 a 13), a pushing ball (4 a 14) and a buckling ball (4 a 15), wherein the limiting spring (4 a 12) is arranged inside the sleeve frame (4 a 11) and connected through electric welding, the pushing ball (4 a 14) is arranged at the right-angle position of the right-angle plate (4 a 13) and connected through electric welding, the pushing ball (4 a 14) is arranged inside the sleeve frame (4 a 11) and connected through nesting, and the buckling ball (4 a 15) is arranged at the shorter end of the right-angle plate (4 a 13) and connected with a power plate (4 a 2) through buckling;
the sleeve frame (4 a 11) is of an arc structure, the upper part of the sleeve frame is of an inclined structure, the tail end of one side of the sleeve frame (4 a 11) which inclines downwards is provided with a rectangular groove (f), and the rectangular groove (f) and the sleeve frame (4 a 11) are of an integrated structure and have the same diameter as the right-angle plate (4 a 13);
the outermost side of the lower surface of the power plate (4 a 2) is provided with a plurality of grooves (g) in uniform and equidistant shapes, and the grooves (g) are connected with the buckling balls (4 a 15) in a buckling manner;
the hanging mechanism (4 b) comprises a mounting plate (4 b 1), a movable shaft (4 b 2), a pull rod (4 b 3), a limiting block (4 b 4) and a rolling gear (4 b 5), the mounting plate (4 b 1) is provided with six blocks, the six blocks are respectively mounted on the surface of the movable shaft (4 b 2) and connected through electric welding, the pull rod (4 b 3) is provided with six blocks, the six blocks are respectively connected with the two side surfaces of the movable shaft (4 b 2) in a U shape, the limiting block (4 b 4) is provided with six blocks and respectively mounted below the inner side of the pull rod (4 b 3), the rolling gear (4 b 5) is provided with six blocks, the six blocks are respectively mounted on the outer side of a gear (4 a 3) in a uniform and equidistant manner, the rolling gear (4 b 5) is connected with a 3) through meshing, and one end of the pull rod (4 b 3) is connected with the rolling gear (4 b 5) through winding around the limiting block (4 b 4);
mounting panel (4 b 1) are trapezoidal form and the surface is equipped with five groups arc buckle (x), arc buckle (x) are even equidistance form and install in mounting panel (4 b 1) surface and be connected through the electric welding.
CN201911152570.1A 2019-11-22 2019-11-22 5G communication launching tower with lever folding and expanding functions Active CN110984671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911152570.1A CN110984671B (en) 2019-11-22 2019-11-22 5G communication launching tower with lever folding and expanding functions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911152570.1A CN110984671B (en) 2019-11-22 2019-11-22 5G communication launching tower with lever folding and expanding functions

Publications (2)

Publication Number Publication Date
CN110984671A CN110984671A (en) 2020-04-10
CN110984671B true CN110984671B (en) 2020-12-11

Family

ID=70085691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911152570.1A Active CN110984671B (en) 2019-11-22 2019-11-22 5G communication launching tower with lever folding and expanding functions

Country Status (1)

Country Link
CN (1) CN110984671B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111769350B (en) * 2020-07-10 2021-07-06 浙江德宝通讯科技股份有限公司 Single-tube tower antenna fixing device and single-tube communication tower

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098794A (en) * 1999-09-30 2001-04-10 Kajima Corp Expansion method of operating radio tower
CN103682552A (en) * 2012-09-12 2014-03-26 启碁科技股份有限公司 Antenna mount, antenna arrangement comprising the antenna mount, and antenna mount combination
CN204112826U (en) * 2014-10-21 2015-01-21 景县电讯金属构件制造有限公司 Novel base station communication signal launching tower
CN204475952U (en) * 2015-03-06 2015-07-15 景县电讯金属构件制造有限公司 There is the quick mounting type single tube communication launching tower of dilatation function
CN204516881U (en) * 2015-01-30 2015-07-29 中国铁塔股份有限公司南京市分公司 Telescopic T-shaped arm communication tower platform
CN106285153A (en) * 2016-08-09 2017-01-04 华信咨询设计研究院有限公司 Expanded type communication tower
CN107104266A (en) * 2017-06-03 2017-08-29 马鞍山九致信息科技有限公司 A kind of solar communications base station
CN206571233U (en) * 2017-03-14 2017-10-20 辽宁邮电规划设计院有限公司 The convenient platform of communication tube tower extension type
CN206646903U (en) * 2017-04-07 2017-11-17 上海勤电信息科技有限公司 A kind of communication steel tower for facilitating installing advertisement board
CN207673106U (en) * 2017-12-21 2018-07-31 北京市光环电信股份有限公司 Guywire tower
CN207852901U (en) * 2018-03-09 2018-09-11 南京华脉科技股份有限公司 A kind of antenna for base station mounting bracket based on motorized adjustment
CN209298330U (en) * 2018-12-26 2019-08-23 吉林建筑大学城建学院 A kind of communication antenna being easily installed
CN209312985U (en) * 2019-01-30 2019-08-27 国脉科技股份有限公司 A kind of telescopic antenna device wireless suitable for 5G

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001098794A (en) * 1999-09-30 2001-04-10 Kajima Corp Expansion method of operating radio tower
CN103682552A (en) * 2012-09-12 2014-03-26 启碁科技股份有限公司 Antenna mount, antenna arrangement comprising the antenna mount, and antenna mount combination
CN204112826U (en) * 2014-10-21 2015-01-21 景县电讯金属构件制造有限公司 Novel base station communication signal launching tower
CN204516881U (en) * 2015-01-30 2015-07-29 中国铁塔股份有限公司南京市分公司 Telescopic T-shaped arm communication tower platform
CN204475952U (en) * 2015-03-06 2015-07-15 景县电讯金属构件制造有限公司 There is the quick mounting type single tube communication launching tower of dilatation function
CN106285153A (en) * 2016-08-09 2017-01-04 华信咨询设计研究院有限公司 Expanded type communication tower
CN206571233U (en) * 2017-03-14 2017-10-20 辽宁邮电规划设计院有限公司 The convenient platform of communication tube tower extension type
CN206646903U (en) * 2017-04-07 2017-11-17 上海勤电信息科技有限公司 A kind of communication steel tower for facilitating installing advertisement board
CN107104266A (en) * 2017-06-03 2017-08-29 马鞍山九致信息科技有限公司 A kind of solar communications base station
CN207673106U (en) * 2017-12-21 2018-07-31 北京市光环电信股份有限公司 Guywire tower
CN207852901U (en) * 2018-03-09 2018-09-11 南京华脉科技股份有限公司 A kind of antenna for base station mounting bracket based on motorized adjustment
CN209298330U (en) * 2018-12-26 2019-08-23 吉林建筑大学城建学院 A kind of communication antenna being easily installed
CN209312985U (en) * 2019-01-30 2019-08-27 国脉科技股份有限公司 A kind of telescopic antenna device wireless suitable for 5G

Also Published As

Publication number Publication date
CN110984671A (en) 2020-04-10

Similar Documents

Publication Publication Date Title
CN108825444B (en) Inhibit disturbing flow device, flow-disturbing equipment and the tower hanging method of building enclosure vibration
CN110984671A (en) 5G communication launching tower with lever folding and expanding functions
CN111960180A (en) Draw gear that cable manufacture used
CN108412291A (en) A kind of intelligent single-pipe tower that the anti-climbing safety coefficient based on Internet of Things is high
CN202414173U (en) Fixed mooring system for tethered balloon
CN204516881U (en) Telescopic T-shaped arm communication tower platform
CN203514920U (en) Communication stay wire tower with movable platforms
CN205244785U (en) Article traction device
CN213037282U (en) Nuclear power station steam generator overturning and hoisting device
CN203637692U (en) Vehicle-mounted insulation ladder device
CN201753237U (en) Small electrical lifting device
CN203143000U (en) Hot air balloon fixed point lifting device
CN206571184U (en) A kind of high rise elevator well construction safety device
CN203131225U (en) Adjustable movable rotary-type combined support
CN211714730U (en) Overhead transposition structure for personnel on power transmission line steel pipe tower
CN204609463U (en) Power engineering Fast Installation protection fence
CN209490400U (en) Climbing protective device for working at heights for electric power maintenance
CN206571246U (en) A kind of construction safety fence
CN112502748A (en) Tunnel waterproof cloth trolley climbing device
CN119160016B (en) Bury formula new energy automobile and fill electric pile
CN203954658U (en) A kind of six ring roller-coasters
CN220300357U (en) Auxiliary device is demolishd to tower crane pull rod
CN224030587U (en) Wind power high-altitude construction operation platform
CN223509605U (en) A high-altitude work device for tunnel maintenance
CN214728445U (en) Space expansion platform device behind car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201124

Address after: Room 1509-2, building 1, Jiaxing photovoltaic technology innovation park, 1288 Kanghe Road, Gaozhao street, Xiuzhou District, Jiaxing City, Zhejiang Province

Applicant after: Jiaxing Huawei new energy Co.,Ltd.

Address before: 351100 Licheng e-commerce building, No. 588, Xiadian Road, Gongchen street, Licheng District, Putian City, Fujian Province

Applicant before: Lei Xieming

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240315

Address after: 053500 east side of Guangchuan street, Guangchuan Town, Jing County, Hengshui City, Hebei Province

Patentee after: Hengshui Ruixing Steel Structure Co.,Ltd.

Country or region after: China

Address before: Room 1509-2, Building 1, Jiaxing Photovoltaic Science and Technology Innovation Park, No. 1288 Kanghe Road, Gaozhao Street, Xiuzhou District, Jiaxing City, Zhejiang Province, 314000

Patentee before: Jiaxing Huawei new energy Co.,Ltd.

Country or region before: China