CN110952530B - Gravel pile for soft soil foundation - Google Patents

Gravel pile for soft soil foundation Download PDF

Info

Publication number
CN110952530B
CN110952530B CN201911307890.XA CN201911307890A CN110952530B CN 110952530 B CN110952530 B CN 110952530B CN 201911307890 A CN201911307890 A CN 201911307890A CN 110952530 B CN110952530 B CN 110952530B
Authority
CN
China
Prior art keywords
gravel
soft soil
layer
pile
soil foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911307890.XA
Other languages
Chinese (zh)
Other versions
CN110952530A (en
Inventor
檀兴华
张华武
李建喜
李浩然
邱伟超
方琢玉
史小魏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communications Road and Bridge North China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201911307890.XA priority Critical patent/CN110952530B/en
Publication of CN110952530A publication Critical patent/CN110952530A/en
Application granted granted Critical
Publication of CN110952530B publication Critical patent/CN110952530B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明申请公开了一种用于软土地基的碎石桩,包括碎石层,构成碎石桩的本体;泥浆层,围合所述碎石层,连接所述碎石层与外部基础;导液管,至少设置在所述碎石层中,连接所述碎石层和外部基础;所述导液管对所述泥浆层和所述碎石层中的水分起到汇集的作用,并通过自身结构及液体自重将汇集的水分输出到外部基础中。本发明申请解决了由于软土地基中水分不易被导流、软土地基固化慢,造成的施工效率低施工质量受影响的技术问题。

The present invention discloses a gravel pile for soft soil foundation, comprising a gravel layer constituting the main body of the gravel pile; a mud layer enclosing the gravel layer and connecting the gravel layer with an external foundation; a liquid guide tube at least arranged in the gravel layer and connecting the gravel layer with an external foundation; the liquid guide tube collects the water in the mud layer and the gravel layer, and outputs the collected water to the external foundation through its own structure and liquid deadweight. The present invention solves the technical problem that the construction efficiency is low and the construction quality is affected because the water in the soft soil foundation is not easy to be diverted and the soft soil foundation solidifies slowly.

Description

用于软土地基的碎石桩Stone piles for soft soil

技术领域Technical Field

本发明申请涉及道路桥梁的软土地基工程领域,具体而言,涉及一种用于软土地基的碎石桩。The present invention relates to the field of soft soil foundation engineering for roads and bridges, and in particular, to a crushed stone pile for soft soil foundation.

背景技术Background Art

随着道路扩建施工项目的日趋增多,软土地基上的桥梁及道路的扩建也成为了一项研究的课题。软土地基由于其自身结构的液化及不稳定性决定了软土地基上的扩建工程更倾向于地基加固及软土地基的固化。软土地基上的新旧路基的搭接与软土地基自身的固化程度有很大的关系,如何在较短的时间内实现软土地基的固化,决定了施工的效率和质量。With the increasing number of road expansion projects, the expansion of bridges and roads on soft soil foundations has also become a research topic. Due to the liquefaction and instability of the soft soil foundation structure, the expansion project on the soft soil foundation is more inclined to foundation reinforcement and solidification of the soft soil foundation. The overlap of the new and old roadbeds on the soft soil foundation has a lot to do with the degree of solidification of the soft soil foundation itself. How to achieve the solidification of the soft soil foundation in a shorter time determines the efficiency and quality of the construction.

发明内容Summary of the invention

本发明申请的主要目的在于提供一种用于软土地基的碎石桩,以解决由于软土地基中水分不易被导流、软土地基固化慢,造成的施工效率低施工质量受影响的技术问题。The main purpose of the present invention is to provide a gravel pile for soft soil foundation to solve the technical problem that the construction efficiency is low and the construction quality is affected due to the difficulty in diverting moisture in the soft soil foundation and the slow solidification of the soft soil foundation.

为了实现上述目的,提供了一种用于软土地基的碎石桩。In order to achieve the above object, a gravel pile for soft soil foundation is provided.

根据本发明申请的用于软土地基的碎石桩包括:The crushed stone pile for soft soil foundation according to the present invention comprises:

碎石层,构成碎石桩的本体;The gravel layer constitutes the main body of the gravel pile;

泥浆层,围合所述碎石层,连接所述碎石层与外部基础;A mud layer enclosing the gravel layer and connecting the gravel layer with an external foundation;

导液管,至少设置在所述碎石层中,连接所述碎石层和外部基础;a fluid conduit, at least arranged in the gravel layer, connecting the gravel layer and an external foundation;

所述导液管对所述泥浆层和所述碎石层中的水分起到汇集的作用,并通过自身结构及液体自重将汇集的水分输出到外部基础中。The liquid conduit collects the moisture in the mud layer and the gravel layer, and outputs the collected moisture to the external foundation through its own structure and the dead weight of the liquid.

进一步的,所述导液管为钢管。Furthermore, the catheter is a steel tube.

进一步的,所述钢管上设有结构孔洞。Furthermore, the steel pipe is provided with structural holes.

进一步的,所述导液管与所述碎石层之间设有土工布。Furthermore, a geotextile is provided between the liquid guiding pipe and the gravel layer.

进一步的,所述土工布环绕在所述导液管上。Furthermore, the geotextile surrounds the liquid guiding tube.

进一步的,所述导液管由多个套设构件组成。Furthermore, the liquid guiding tube is composed of a plurality of sleeve components.

进一步的,所述套设构件包括设置在所述碎石桩底端的第一套设构件和设置在第一套设构件上的第二套设构件。Furthermore, the sleeve component includes a first sleeve component arranged at the bottom end of the gravel pile and a second sleeve component arranged on the first sleeve component.

进一步的,所述第一套设构件包括用于固定所述第一套设构件在所述碎石层中的固定端口,以及用于连接所述第二套设构件的卡固端口。Furthermore, the first sleeve component includes a fixing port for fixing the first sleeve component in the gravel layer, and a fixing port for connecting the second sleeve component.

进一步的,所述第二套设构件一端设有卡固端口,另一端的端口尺寸与所述卡固端口相匹配。Furthermore, a fixing port is provided at one end of the second sleeve component, and a port size at the other end matches the fixing port.

进一步的,所述导液管至少设置在碎石桩的底部和/或中部。Furthermore, the liquid guide tube is at least arranged at the bottom and/or the middle of the gravel pile.

在本发明申请实施例中,采用对碎石桩的结构进行改进的方式,通过在碎石桩中加入导液管,达到了通过碎石桩的内部结构及外部结构共同对软土地基中的水分导出到底部土层的目的,从而实现了软土基础快速固化的技术效果,进而解决了由于软土地基中水分不易被导流、软土地基固化慢,造成的施工效率低施工质量受影响的技术问题。In the embodiment of the present invention, the structure of the gravel pile is improved by adding a liquid guide tube to the gravel pile, so as to achieve the purpose of draining the moisture in the soft soil foundation to the bottom soil layer through the internal and external structures of the gravel pile, thereby achieving the technical effect of rapid solidification of the soft soil foundation, and further solving the technical problem of low construction efficiency and affected construction quality due to the fact that the moisture in the soft soil foundation is not easy to be drained and the soft soil foundation solidifies slowly.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

构成本发明申请的一部分的附图用来提供对本发明申请的进一步理解,使得本发明申请的其它特征、目的和优点变得更明显。本发明申请的示意性实施例附图及其说明用于解释本发明申请,并不构成对本发明申请的不当限定。在附图中:The drawings constituting a part of the present invention are used to provide a further understanding of the present invention, so that other features, purposes and advantages of the present invention become more obvious. The drawings and descriptions of the schematic embodiments of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

图1是根据本发明申请实施例的用于软土地基的碎石桩的结构示意图。FIG. 1 is a schematic structural diagram of a gravel pile for a soft soil foundation according to an embodiment of the present invention.

附图标记Reference numerals

1:碎石层;2:泥浆层;3:导液管;301:第一套设构件;302:第二套设构件;4:土工布;5:固定端口;6:卡固端口。1: gravel layer; 2: mud layer; 3: liquid guide tube; 301: first set of components; 302: second set of components; 4: geotextile; 5: fixed port; 6: fixed port.

具体实施方式DETAILED DESCRIPTION

为了使本技术领域的人员更好地理解本发明申请方案,下面将结合本发明申请实施例中的附图,对本发明申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明申请一部分的实施例,而不是全部的实施例。基于本发明申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本发明申请保护的范围。In order to enable those skilled in the art to better understand the present invention, the technical solutions in the embodiments of the present invention will be described clearly and completely in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

需要说明的是,本发明申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本发明申请的实施例。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

在本发明申请中,术语“上”、“下”、“左”、“右”、“前”、“后”、“顶”、“底”、“内”、“外”、“中”、“竖直”、“水平”、“横向”、“纵向”等指示的方位或位置关系为基于附图所示的方位或位置关系。这些术语主要是为了更好地描述本发明申请及其实施例,并非用于限定所指示的装置、元件或组成部分必须具有特定方位,或以特定方位进行构造和操作。In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

并且,上述部分术语除了可以用于表示方位或位置关系以外,还可能用于表示其他含义,例如术语“上”在某些情况下也可能用于表示某种依附关系或连接关系。对于本领域普通技术人员而言,可以根据具体情况理解这些术语在本发明申请中的具体含义。In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in the present application can be understood according to the specific circumstances.

此外,术语“安装”、“设置”、“设有”、“连接”、“相连”、“套接”应做广义理解。例如,可以是固定连接,可拆卸连接,或整体式构造;可以是机械连接,或电连接;可以是直接相连,或者是通过中间媒介间接相连,又或者是两个装置、元件或组成部分之间内部的连通。对于本领域普通技术人员而言,可以根据具体情况理解上述术语在本发明申请中的具体含义。In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to specific circumstances.

需要说明的是,在不冲突的情况下,本发明申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明申请。It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present invention can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

在施工过程中,采用桩基进行软土地基的加固可有效的对软土地基的液化程度进行稳定,同时可通过桩基作为液体的导向柱,将地基中的水分导入软土地基下的地层或地下河中,有利于加快软土地基的固化。如何更好的利用桩基对软土地基进行固化,同时维护后期软土地基的固化程度,成为了一个新的研究方向。During the construction process, the use of pile foundations to reinforce soft soil foundations can effectively stabilize the liquefaction degree of soft soil foundations. At the same time, the pile foundations can be used as guide columns for liquids to guide the moisture in the foundation into the strata or underground rivers under the soft soil foundation, which is conducive to accelerating the solidification of the soft soil foundation. How to better use pile foundations to solidify soft soil foundations and maintain the solidification degree of soft soil foundations in the later stage has become a new research direction.

如图1所示,本发明申请涉及一种用于软土地基的碎石桩,包括碎石层1、泥浆层2和导液管3,所述碎石层1构成碎石桩的本体,所述泥浆层2围合所述碎石桩1,连接所述碎石层1与外部基础;所述导液管3至少设置在所述碎石层1中,连接所述碎石层1和外部基础。所述导液管3对所述泥浆层2和所述碎石层1中的水分起到汇集的作用,并通过自身结构及液体自重将汇集的水分输出到外部基础中。在本发明申请优选的实施例中,用于制作碎石桩的泥浆对所述碎石层1中的碎石缝隙,以及碎石层1与导液管3之间的缝隙进行密实加固,同时,所述泥浆包裹所述碎石层1的外部,形成环绕所述碎石层1的泥浆层2。As shown in FIG1 , the present invention relates to a gravel pile for soft soil foundation, comprising a gravel layer 1, a mud layer 2 and a liquid conduit 3. The gravel layer 1 constitutes the main body of the gravel pile, the mud layer 2 surrounds the gravel pile 1 and connects the gravel layer 1 with an external foundation; the liquid conduit 3 is at least arranged in the gravel layer 1 and connects the gravel layer 1 with an external foundation. The liquid conduit 3 collects the moisture in the mud layer 2 and the gravel layer 1, and outputs the collected moisture to the external foundation through its own structure and the dead weight of the liquid. In a preferred embodiment of the present invention, the mud used to make the gravel pile compacts and reinforces the gravel gaps in the gravel layer 1 and the gaps between the gravel layer 1 and the liquid conduit 3. At the same time, the mud wraps the outside of the gravel layer 1 to form a mud layer 2 surrounding the gravel layer 1.

在本发明申请优选的实施例中,所述导液管3为钢管,进一步优选的所述钢管上设有可供空气流通方便水分汇集的结构孔洞。在本发明申请进一步优选的实施例中,所述导液管3与所述碎石层1之间设有土工布4,所述土工布4环绕在所述导液管3上,降低导液管3与碎石层1直接接触,对所述导液管3进行保护,同时,为导液管3整体结构预留一定的空气可流动空间。在本发明申请优选的实施例中,包括加固网,所述加固网设置在所述碎石层1的外围,对碎石桩的整体结构起到加固的作用,同时在碎石桩的成型和浇铸过程中,圈定作业的范围,方便震动和压实。In a preferred embodiment of the present invention, the liquid guide tube 3 is a steel tube, and further preferably, the steel tube is provided with structural holes for air circulation and water collection. In a further preferred embodiment of the present invention, a geotextile 4 is provided between the liquid guide tube 3 and the gravel layer 1, and the geotextile 4 surrounds the liquid guide tube 3 to reduce the direct contact between the liquid guide tube 3 and the gravel layer 1, protect the liquid guide tube 3, and reserve a certain amount of air flow space for the overall structure of the liquid guide tube 3. In a preferred embodiment of the present invention, a reinforcement net is included, and the reinforcement net is arranged on the periphery of the gravel layer 1 to reinforce the overall structure of the gravel pile. At the same time, during the molding and casting process of the gravel pile, the scope of operation is demarcated to facilitate vibration and compaction.

在本发明申请优选的实施例中,所述导液管3由多个套设构件构成,所述套设构件至少包括设置在所述碎石桩底端的第一套设构件301和设置在所述第一套设构件301上的第二套设构件302;所述第一套设构件301包括用于固定所述第一套设构件301在所述碎石层(1)中的固定端口(5),以及用于连接所述第二套设构件302的卡固端口6,所述第二套设构件302一端设有卡固端口6,另一端的端口尺寸与所述卡固端口6的尺寸大小相匹配。在本发明申请优选的实施例中,所述第一套设构件301的固定端口5与碎石桩的下端口平齐,所述固定端口5的结构形式与所述碎石桩的结构形式相吻合,如当所述碎石桩的下端口为锥形时,所述第一套社构件301的固定端口5同样为锥形形。所述第二套设构件302的卡固端口6,以及所述第一套设构件301的卡固端口6的设置,方便所述第一套设构件301和/或多个第二套设构件302之间套接。所述第一套设构件301和第二天蛇构件302的单独设置,使所述导液管3的整体结构为阶段式的,可根据现场的施工情况及具体的施工方案进行适时的调整。In a preferred embodiment of the present invention, the catheter 3 is composed of a plurality of sleeve components, the sleeve components at least comprising a first sleeve component 301 arranged at the bottom end of the gravel pile and a second sleeve component 302 arranged on the first sleeve component 301; the first sleeve component 301 comprises a fixing port (5) for fixing the first sleeve component 301 in the gravel layer (1), and a clamping port 6 for connecting the second sleeve component 302, the second sleeve component 302 is provided with a clamping port 6 at one end, and the port size at the other end matches the size of the clamping port 6. In a preferred embodiment of the present invention, the fixing port 5 of the first sleeve component 301 is flush with the lower port of the gravel pile, and the structural form of the fixing port 5 is consistent with the structural form of the gravel pile, for example, when the lower port of the gravel pile is conical, the fixing port 5 of the first sleeve component 301 is also conical. The arrangement of the fastening port 6 of the second sleeve member 302 and the fastening port 6 of the first sleeve member 301 facilitates the sleeve connection between the first sleeve member 301 and/or multiple second sleeve members 302. The separate arrangement of the first sleeve member 301 and the second sleeve member 302 makes the overall structure of the catheter 3 phased, which can be adjusted in time according to the construction conditions on site and the specific construction plan.

在本发明申请进一步优选的实施例中,所述导液管3至少设置在碎石桩的底部和/或中部。由于所述软土地基的水分汇集向下集中在碎石桩的中下部,因此,所述导液管优选的设置在所述碎石桩的中下部。In a further preferred embodiment of the present invention, the liquid guide pipe 3 is at least arranged at the bottom and/or the middle of the gravel pile. Since the moisture in the soft soil foundation is concentrated downward in the middle and lower part of the gravel pile, the liquid guide pipe is preferably arranged in the middle and lower part of the gravel pile.

在本发明申请实施例中,采用对碎石桩的结构进行改进的方式,通过在碎石桩中加入导液管,达到了通过碎石桩的内部结构及外部结构共同对软土地基中的水分导出到底部土层的目的,从而实现了软土基础快速固化的技术效果,进而解决了由于软土地基中水分不易被导流、软土地基固化慢,造成的施工效率低施工质量受影响的技术问题。In the embodiment of the present invention, the structure of the gravel pile is improved by adding a liquid guide tube to the gravel pile, so as to achieve the purpose of draining the moisture in the soft soil foundation to the bottom soil layer through the internal and external structures of the gravel pile, thereby achieving the technical effect of rapid solidification of the soft soil foundation, and further solving the technical problem of low construction efficiency and affected construction quality due to the fact that the moisture in the soft soil foundation is not easy to be drained and the soft soil foundation solidifies slowly.

以上所述仅为本发明申请的优选实施例而已,并不用于限制本发明申请,对于本领域的技术人员来说,本发明申请可以有各种更改和变化。凡在本发明申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明申请的保护范围之内。The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims (5)

1.一种用于软土地基的碎石桩,其特征在于,包括:1. A gravel pile for soft soil foundation, characterized by comprising: 碎石层(1),构成碎石桩的本体;A gravel layer (1), constituting the main body of the gravel pile; 泥浆层(2),围合所述碎石层(1),连接所述碎石层(1)与外部基础;A mud layer (2) enclosing the gravel layer (1) and connecting the gravel layer (1) with an external foundation; 导液管(3),至少设置在所述碎石层(1)中,连接所述碎石层(1)和外部基础;A fluid conduit (3) is at least arranged in the gravel layer (1) and connects the gravel layer (1) and an external foundation; 所述导液管(3)对所述泥浆层(2)和所述碎石层(1)中的水分起到汇集的作用,并通过自身结构及液体自重将汇集的水分输出到外部基础中;The liquid guide pipe (3) collects the water in the mud layer (2) and the gravel layer (1), and outputs the collected water to the external foundation through its own structure and the deadweight of the liquid; 所述导液管(3)由多个套设构件组成;The liquid guiding tube (3) is composed of a plurality of sleeve components; 所述套设构件包括设置在所述碎石桩底端的第一套设构件(301)和设置在第一套设构件(301)上的第二套设构件(302);The sleeve component comprises a first sleeve component (301) arranged at the bottom end of the gravel pile and a second sleeve component (302) arranged on the first sleeve component (301); 所述第一套设构件(301)包括用于固定所述第一套设构件(301)在所述碎石层(1)中的固定端口(5),以及用于连接所述第二套设构件(302)的卡固端口(6);The first sleeve component (301) comprises a fixing port (5) for fixing the first sleeve component (301) in the gravel layer (1), and a fixing port (6) for connecting the second sleeve component (302); 所述第二套设构件(302)一端设有卡固端口(6),另一端的端口尺寸与所述卡固端口(6)相匹配;One end of the second sleeve component (302) is provided with a fixing port (6), and the port size of the other end matches the fixing port (6); 所述导液管(3)为钢管。The liquid guiding tube (3) is a steel tube. 2.根据权利要求1所述的用于软土地基的碎石桩,其特征在于,所述钢管上设有结构孔洞。2. The gravel pile for soft soil foundation according to claim 1, characterized in that structural holes are provided on the steel pipe. 3.根据权利要求1所述的用于软土地基的碎石桩,其特征在于,所述导液管(3)与所述碎石层(1)之间设有土工布(4)。3. The gravel pile for soft soil foundation according to claim 1, characterized in that a geotextile (4) is provided between the liquid guide tube (3) and the gravel layer (1). 4.根据权利要求3所述的用于软土地基的碎石桩,其特征在于,所述土工布(4)环绕在所述导液管(3)上。4. The gravel pile for soft soil foundation according to claim 3, characterized in that the geotextile (4) surrounds the liquid guide tube (3). 5.根据权利要求1所述的用于软土地基的碎石桩,其特征在于,所述导液管(3)至少设置在碎石桩的底部和/或中部。5. The gravel pile for soft soil foundation according to claim 1, characterized in that the liquid guide tube (3) is at least arranged at the bottom and/or the middle of the gravel pile.
CN201911307890.XA 2019-12-17 2019-12-17 Gravel pile for soft soil foundation Active CN110952530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911307890.XA CN110952530B (en) 2019-12-17 2019-12-17 Gravel pile for soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911307890.XA CN110952530B (en) 2019-12-17 2019-12-17 Gravel pile for soft soil foundation

Publications (2)

Publication Number Publication Date
CN110952530A CN110952530A (en) 2020-04-03
CN110952530B true CN110952530B (en) 2024-11-01

Family

ID=69982534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911307890.XA Active CN110952530B (en) 2019-12-17 2019-12-17 Gravel pile for soft soil foundation

Country Status (1)

Country Link
CN (1) CN110952530B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733795A (en) * 2020-06-28 2020-10-02 中冶地集团西北岩土工程有限公司 Collapsible loess area foundation treatment method
CN111997037A (en) * 2020-08-14 2020-11-27 丁思华 Drainage consolidation method for implementing soft soil foundation by utilizing natural gravitational potential energy

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277800A (en) * 2018-01-12 2018-07-13 李溯 A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile and its construction method
CN207846409U (en) * 2018-01-12 2018-09-11 李溯 A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile
CN108978625A (en) * 2018-08-21 2018-12-11 中铁第五勘察设计院集团有限公司 A kind of sand pile joint High vacuum compacting method construction of soft soil treatment engineering method
CN211922593U (en) * 2019-12-17 2020-11-13 中交路桥建设有限公司 Gravel pile for soft soil foundation

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736738B (en) * 2009-12-14 2011-04-13 温州大学 Production method of pressure resistance and pull-out resistance grouted gravel pile
CN203066056U (en) * 2013-01-29 2013-07-17 方泰建设集团有限公司 Post-grouting gravel pile with sand wall wing plates, and special immersed pipe for post-grouting gravel pile
CN103061328B (en) * 2013-01-29 2015-01-14 方泰建设集团有限公司 Post-grouting gravel pile with sand wall wing plates and construction method
CN103233468A (en) * 2013-04-18 2013-08-07 河南博特工程防护有限公司 Polymer gravel pile grouting method
CN108035344A (en) * 2017-12-20 2018-05-15 河海大学 A kind of permeable rigid pile of high polymer rubble and its construction technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277800A (en) * 2018-01-12 2018-07-13 李溯 A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile and its construction method
CN207846409U (en) * 2018-01-12 2018-09-11 李溯 A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile
CN108978625A (en) * 2018-08-21 2018-12-11 中铁第五勘察设计院集团有限公司 A kind of sand pile joint High vacuum compacting method construction of soft soil treatment engineering method
CN211922593U (en) * 2019-12-17 2020-11-13 中交路桥建设有限公司 Gravel pile for soft soil foundation

Also Published As

Publication number Publication date
CN110952530A (en) 2020-04-03

Similar Documents

Publication Publication Date Title
CN1714227A (en) Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
CN106988343A (en) A kind of town road pipeline protection structure and its construction method
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN110952530B (en) Gravel pile for soft soil foundation
CN110847207B (en) Structure and construction method for newly-built bridge by crossing existing bridge piles through subway tunnel
CN101255691B (en) Construction method for complete casing tube thin wall filling pile and movable internal mold
CN103953366B (en) Construction method of backfilling the original lining cavity at the top of the middle partition wall when the single-cavity tunnel is changed to multiple arches
CN110080254A (en) Draining friction pile-water guide culvert structure and construction method for oblique slope reinforcement
CN201358456Y (en) Plastic sleeve concrete pile
CN108978643A (en) Supporting pile construction method, reinforcement cage structure and supporting pile structure
CN112982481B (en) Structure construction method for crossing subway intersection node on pipe gallery
CN103122642A (en) Construction method of vertical post support change
CN103061332B (en) Integrally-arranged and externally-wrapped double-layered water discharging body and middle concrete combined pile and construction method
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN110513045A (en) A Novel Composite Sand Control Drainage and Decompression Well Squeeze Soil Hole Forming Device and Method
CN104060616B (en) A kind of construction formwork of retaining engineering and construction method
CN207033489U (en) Water rich strata tunnel bottom discharge structure
CN203960878U (en) A kind of construction formwork of retaining engineering
CN211922593U (en) Gravel pile for soft soil foundation
CN107217608B (en) Blind water seepage ditch at the edge of urban road and its construction method
CN202108039U (en) Cylindrical compound concrete macadam placepile
CN212640251U (en) A mobile vacuum preloading device
CN207672415U (en) A kind of embankment wall of stable structure
CN207079609U (en) A kind of new foundation ditch backfill structure
CN102061695A (en) Treatment method of drainage pipe pile composite foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant