CN110905041B - A kind of water storage plant wall for sponge city - Google Patents

A kind of water storage plant wall for sponge city Download PDF

Info

Publication number
CN110905041B
CN110905041B CN201911257360.9A CN201911257360A CN110905041B CN 110905041 B CN110905041 B CN 110905041B CN 201911257360 A CN201911257360 A CN 201911257360A CN 110905041 B CN110905041 B CN 110905041B
Authority
CN
China
Prior art keywords
water
water storage
plant wall
water inlet
storage cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201911257360.9A
Other languages
Chinese (zh)
Other versions
CN110905041A (en
Inventor
梁东
刘浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shenghua Pipe Technology Co ltd
Original Assignee
Wulian Yongxin Information Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wulian Yongxin Information Consulting Co ltd filed Critical Wulian Yongxin Information Consulting Co ltd
Priority to CN201911257360.9A priority Critical patent/CN110905041B/en
Publication of CN110905041A publication Critical patent/CN110905041A/en
Application granted granted Critical
Publication of CN110905041B publication Critical patent/CN110905041B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots
    • A01G27/02Self-acting watering devices, e.g. for flower-pots having a water reservoir, the main part thereof being located wholly around or directly beside the growth substrate
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/002Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a sponge city water storage plant wall which comprises a plant wall body and a water channel, wherein the water channel is arranged on two sides of a road, one end, close to the plant wall body, of the water channel is communicated with a water inlet pipe, the bottom of the water inlet pipe is communicated with a water outlet pipe through a tee joint, the other end, connected with the water inlet pipe through the tee joint, of the water inlet pipe is communicated with a first water storage cavity arranged in the ground, the top of the first water storage cavity is provided with two current-conducting plates, a second water storage cavity is arranged in the plant wall body, and the second water storage cavity is communicated with the cavity and provided with. Has the advantages that: according to the invention, the first water storage cavities arranged on two sides of the road and the second water storage cavities in the plant walls realize the rainwater storage effect under the condition of rainwater concentration, so that the rainwater treatment elasticity of the whole city is improved, and heavy metal enrichment in the road runoff rainwater is realized by heavy metal super-accumulation plants, so that sewage formed by rainwater is subjected to middle-end and advanced treatment, and the heavy load of a sewage plant during terminal treatment is avoided.

Description

一种海绵城市用蓄水植物墙A kind of water storage plant wall for sponge city

技术领域technical field

本发明涉及海绵城市技术领域,尤其涉及一种海绵城市用蓄水植物墙。The invention relates to the technical field of sponge cities, in particular to a water storage plant wall for sponge cities.

背景技术Background technique

海绵城市,是新一代城市雨洪管理概念,是指城市能够像海绵一样,在适应环境变化和应对雨水带来的自然灾害等方面具有良好的弹性,也可称之为“水弹性城市”,植物墙是用绿色植物编植成的墙体,是利用植物的根系对生长环境的超强自适应能力,使自然界中栖息于平地上的植物永久地生长于垂直的建筑墙面,为建筑设计和建筑装饰提供一种新型的有机生态材料。Sponge city is a new generation of urban stormwater management concept. It means that the city can be like a sponge and has good flexibility in adapting to environmental changes and responding to natural disasters caused by rainwater. It can also be called a "water elastic city". The plant wall is a wall made of green plants. It uses the super adaptive ability of the root system of the plant to the growth environment, so that the plants inhabiting the flat ground in nature grow permanently on the vertical building wall, which is used for architectural design. And building decoration provides a new type of organic ecological material.

在海绵城市的概念中,对雨水的弹性处理是关键,而在南方降雨较多较频繁的城市中,对雨水天气下污水厂的工作负荷较大,严重情况下,会有未经处理的雨水直接入江的情况,造成水体污染,而在雨水经过道路径流排放入江后,更会造成大量的重金属污染,基于此本发明通过设计一种海绵城市用蓄水植物墙,使得对雨水较多的条件下对雨水收集以及处理工作,提高对雨水的弹性处理。In the concept of sponge city, the elastic treatment of rainwater is the key, and in cities with more and more frequent rainfall in the south, the work load of sewage plants in rainy weather is relatively large. In severe cases, there will be untreated rainwater. The situation of directly entering the river will cause water pollution, and after the rainwater is discharged into the river through the path, it will cause a large amount of heavy metal pollution. Under the rainwater collection and treatment work, improve the elastic treatment of rainwater.

发明内容SUMMARY OF THE INVENTION

本发明的目的是为了解决现有技术中雨水频繁的地区中污水处理负荷较大,现有技术中污水的末端处理时效果较差的问题,而设计的一种海绵城市用蓄水植物墙。The purpose of the present invention is to solve the problem that the sewage treatment load is large in the areas with frequent rainwater in the prior art, and the end treatment effect of the sewage in the prior art is poor, and a water storage plant wall for sponge city is designed.

为了实现上述目的,本发明采用了如下技术方案:一种海绵城市用蓄水植物墙,包括植物墙本体和水渠,所述水渠设置在道路两侧并且靠近植物墙本体的一端连通有进水管,所述进水管底部通过三通连通设有排水管,进水管通过三通连接的另一端连通有开设在地面内部的第一蓄水腔,所述第一蓄水腔的顶部设有两个导电板,所述植物墙本体的中部开设有第二蓄水腔,所述第二蓄水腔与空腔连通设有压力阀;In order to achieve the above object, the present invention adopts the following technical scheme: a water storage plant wall for sponge city, comprising a plant wall body and a water channel, and the water channel is arranged on both sides of the road and is connected with a water inlet pipe near one end of the plant wall body, The bottom of the water inlet pipe is connected with a drain pipe through a tee, and the other end of the water inlet pipe is connected with a first water storage cavity opened inside the ground, and the top of the first water storage cavity is provided with two conductive A second water storage cavity is opened in the middle of the plant wall body, and a pressure valve is provided in the second water storage cavity in communication with the cavity;

所述第一蓄水腔的内壁密封固定连接有隔板,所述隔板将第一蓄水腔分为两个部分,靠近所述进水管的第一蓄水腔的部分顶部贯穿设有连接管,所述连接管中设有单向阀,所述连接管与地面的连接处设有水泵;The inner wall of the first water storage cavity is sealed and fixedly connected with a partition, the partition divides the first water storage cavity into two parts, and a connection is provided through the top of the part of the first water storage cavity close to the water inlet pipe. The connecting pipe is provided with a one-way valve, and the connection between the connecting pipe and the ground is provided with a water pump;

所述第一蓄水腔远离进水管的部分中设有多块碎石并且远离隔板一侧设有排污管,所述排污管与排水管均与外界污水处理装置连接。The part of the first water storage chamber away from the water inlet pipe is provided with a plurality of crushed stones, and the side away from the partition plate is provided with a sewage pipe, and the sewage pipe and the drain pipe are both connected to the external sewage treatment device.

在上述海绵城市用蓄水植物墙中,所述植物墙本体有多块空心砖砌成,每个所述空心砖中均种植有植物,所述植物的品种选用重金属超积累植物,所述空心砖的远离第二蓄水腔一侧连接有一层固定层,所述空心砖靠近第二蓄水腔的一侧设有透水膜。In the above-mentioned water storage plant wall for sponge city, the body of the plant wall is made of a plurality of hollow bricks, and each of the hollow bricks is planted with plants, and the species of the plants are heavy metal hyperaccumulation plants. One side of the second water storage cavity is connected with a layer of fixed layer, and the side of the hollow brick close to the second water storage cavity is provided with a water permeable membrane.

在上述海绵城市用蓄水植物墙中,所述植物墙本体的顶部开设有漏斗结构的进水口,所述进水口的外侧设有环形的太阳能电池板,所述太阳能电池板与水泵电连接,所述进水口中密封连接有过滤网。In the above-mentioned water storage plant wall for sponge city, the top of the plant wall body is provided with a water inlet with a funnel structure, and the outer side of the water inlet is provided with a ring-shaped solar panel, and the solar panel is electrically connected to the water pump. A filter screen is sealed and connected to the water inlet.

与现有的技术相比,本发明的优点在于:Compared with the prior art, the advantages of the present invention are:

1、本发明中,通过设置可蓄水的第一蓄水腔和第二蓄水腔实现在雨水天气下暂时蓄水的作用,使得沿道路径流过程中的雨水被收集,提高城市整体对于雨水的处理弹性,同时减小暴雨下污水厂的处理负荷;1. In the present invention, the first water storage cavity and the second water storage cavity that can store water are provided to temporarily store water in rainy weather, so that the rainwater in the process of flowing along the road is collected, and the overall urban response to rainwater is improved. improve the treatment flexibility and reduce the treatment load of the sewage treatment plant under heavy rain;

2、在初期作用下,当雨水刚开始冲刷道路时,水中由车辆排放的污染物的含量较高,而雨水直接下落而不经过道路中的污染物含量较低,通过第一蓄水腔和第二蓄水腔对经过道路径流和不经过道路径流的雨水进行分别蓄存,提高了城市对雨水处理的弹性,以及在水循环时再处理的效率;2. Under the initial action, when the rainwater just begins to wash the road, the content of pollutants discharged by vehicles in the water is relatively high, while the content of pollutants in the rainwater falling directly without passing through the road is relatively low. The second water storage chamber stores the rainwater that passes through the road and does not pass through the road separately, which improves the city's elasticity of rainwater treatment and the efficiency of reprocessing during water circulation;

3、第一蓄水腔和第二蓄水腔通过连接管相互连通,并且设置当第一蓄水腔顶部的导电板相互连通时,水泵打开,则这种状态下第一蓄水腔中的水则通过水泵和连接管进入第二蓄水腔中,使得在植物墙中设置的多株重金属超积累植物对雨水中的重金属的吸收,从而实现对雨水的中端和提前处理,而设置压力阀开启压力为第二蓄水腔水满状态,则当压力阀开启时,第二蓄水腔中的水将直接向外排出,此时通过排污管排出的水将直接进入再回收管道或者排江管道,而提高了对道路径流雨水处理中的效率;3. The first water storage chamber and the second water storage chamber are connected to each other through the connecting pipe, and when the conductive plates on the top of the first water storage chamber are connected to each other, the water pump is turned on, and in this state, the water in the first water storage chamber is connected. The water enters the second water storage cavity through the water pump and the connecting pipe, so that the heavy metal hyperaccumulation plants set in the plant wall can absorb the heavy metals in the rainwater, so as to realize the intermediate and advanced treatment of the rainwater, and set the pressure The valve opening pressure is the second water storage chamber full of water, then when the pressure valve is opened, the water in the second storage chamber will be directly discharged to the outside, at this time, the water discharged through the sewage pipe will directly enter the recycling pipeline or drain. River pipeline, and improve the efficiency of rainwater treatment on the road flow;

4、第一蓄水腔靠近排污管一侧设置多块碎石,当水流垂直进入碎石区域时将会产生自然过滤,从而提高对雨水的处理效果,同时植物墙本体的顶部设置太阳能电池板,用于储蓄太阳能并用于压力阀水泵从而减小对能源的消耗;4. Multiple pieces of gravel are arranged on the side of the first water storage chamber near the sewage pipe. When the water flow enters the gravel area vertically, it will produce natural filtration, thereby improving the treatment effect of rainwater. At the same time, the top of the plant wall body is provided with solar panels. , used to save solar energy and used in pressure valve water pump to reduce energy consumption;

5植物墙本体中的第二蓄水腔则同时起到了对植物墙本体中的植物灌溉的储水作用、使得在正常状态下无需对植物墙进行灌溉系统的设计,而重金属超积累植物大多数具有耐干旱和耐高温的特点,因此可以完美适合对于植物墙的设计要求,起到美化环境和吸收噪音的功能。5. The second water storage cavity in the main body of the plant wall also plays the role of water storage for the irrigation of the plants in the main body of the plant wall, making it unnecessary to design the irrigation system for the plant wall under normal conditions. It has the characteristics of drought resistance and high temperature resistance, so it can be perfectly suitable for the design requirements of plant walls, which can beautify the environment and absorb noise.

附图说明Description of drawings

图1为本发明提出的一种海绵城市用蓄水植物墙的结构示意图;Fig. 1 is the structural representation of a kind of sponge city water storage plant wall proposed by the present invention;

图2为本发明提出的一种海绵城市用蓄水植物墙中的俯视图;Fig. 2 is a top view in a water storage plant wall for a sponge city proposed by the present invention;

图3为本发明提出的一种海绵城市用蓄水植物墙中A部分的放大示意图。FIG. 3 is an enlarged schematic view of part A of a water storage plant wall for a sponge city proposed by the present invention.

图中:1植物墙本体、101空心砖、102固定层、103植物、104透水膜、2水渠、3进水管、4排水管、5第一蓄水腔、6导电板、7第二蓄水腔、8水泵、9连接管、10单向阀、11隔板、12排污管、13压力阀、14进水口、15太阳能电池板、16过滤网。In the figure: 1. Plant wall body, 101. Hollow brick, 102. Fixed layer, 103. Plant, 104. Permeable membrane, 2. Water channel, 3. Water inlet pipe, 4. Drain pipe, 5. First water storage cavity, 6. Conductive plate, 7. Second water storage cavity , 8 water pumps, 9 connecting pipes, 10 one-way valves, 11 partitions, 12 sewage pipes, 13 pressure valves, 14 water inlets, 15 solar panels, 16 filters.

具体实施方式Detailed ways

以下实施例仅处于说明性目的,而不是想要限制本发明的范围。The following examples are for illustrative purposes only and are not intended to limit the scope of the invention.

实施例Example

参照图1-3,一种海绵城市用蓄水植物墙,包括植物墙本体1和水渠2,水渠2设置在道路两侧并且靠近植物墙本体1的一端连通有进水管3,进水管3底部通过三通连通设有排水管4,进水管3通过三通连接的另一端连通有开设在地面内部的第一蓄水腔5,第一蓄水腔5的顶部设有两个导电板6,植物墙本体1的中部开设有第二蓄水腔7,第二蓄水腔7与空腔连通设有压力阀13;1-3, a water storage plant wall for sponge city, including plant wall body 1 and water channel 2, the water channel 2 is arranged on both sides of the road and is connected with an inlet pipe 3 near one end of the plant wall body 1, and the bottom of the water inlet pipe 3 is connected. A drain pipe 4 is connected through the tee, and the other end of the water inlet pipe 3 is connected with a first water storage cavity 5 opened in the ground. The top of the first water storage cavity 5 is provided with two conductive plates 6, The middle of the plant wall body 1 is provided with a second water storage cavity 7, and the second water storage cavity 7 is connected with the cavity and is provided with a pressure valve 13;

第一蓄水腔5的内壁密封固定连接有隔板11,隔板11将第一蓄水腔5分为两个部分,靠近进水管3的第一蓄水腔5的部分顶部贯穿设有连接管9,连接管9中设有单向阀10,单向阀10只允许水从第一蓄水腔5流至第二蓄水腔7,连接管9与地面的连接处设有水泵8,水泵8用于将第一蓄水腔5中的水抽第二蓄水腔7中,第一蓄水腔5远离进水管3的部分中设有多块碎石并且远离隔板11一侧设有排污管12,排污管12与排水管4均与外界污水处理装置连接,其中排水管4与污水处理装置中的一次处理结构连接,排污管12与污水处理装置中的二次处理结构或者回收管道连接。The inner wall of the first water storage chamber 5 is sealed and fixedly connected with a partition 11, which divides the first water storage chamber 5 into two parts, and the top part of the first water storage chamber 5 near the water inlet pipe 3 is provided with a connection Pipe 9, a one-way valve 10 is provided in the connecting pipe 9, the one-way valve 10 only allows water to flow from the first water storage cavity 5 to the second water storage cavity 7, and the connection between the connecting pipe 9 and the ground is provided with a water pump 8, The water pump 8 is used to pump the water in the first water storage chamber 5 into the second water storage chamber 7. The part of the first water storage chamber 5 away from the water inlet pipe 3 is provided with a plurality of crushed stones and the side away from the partition plate 11 is provided. There is a sewage pipe 12, and both the sewage pipe 12 and the drain pipe 4 are connected with the external sewage treatment device, wherein the sewage pipe 4 is connected with the primary treatment structure in the sewage treatment device, and the sewage pipe 12 is connected with the secondary treatment structure in the sewage treatment device or recycling Pipe connection.

植物墙本体1有多块空心砖101砌成,每个空心砖101中通过内部设置的土壤种植有植物103,植物103的品种选用重金属超积累植物,可选用弗吉尼亚盐角草、牙买加克拉莎草、盐地鼠尾粟等,具有较好的根系吸收重金属能力,空心砖101的远离第二蓄水腔7一侧连接有一层固定层102,空心砖101靠近第二蓄水腔7的一侧设有透水膜104,透水膜104用于避免雨水直接与空心砖101中的土壤接触,在渗透的作用下污水被植物103处理,植物墙本体1的顶部开设有漏斗结构的进水口14,进水口14的外侧设有环形的太阳能电池板15,太阳能电池板15与水泵8电连接,进水口14中密封连接有过滤网16。The plant wall body 1 is made of a plurality of hollow bricks 101, and each hollow brick 101 is planted with plants 103 through the soil set inside. A layer of fixed layer 102 is connected to the side of the hollow brick 101 away from the second water storage cavity 7, and the side of the hollow brick 101 close to the second water storage cavity 7 is provided with a permeable membrane 104, the permeable membrane 104 is used to prevent the rainwater from directly contacting the soil in the hollow brick 101, and the sewage is treated by the plants 103 under the action of infiltration. The top of the plant wall body 1 is provided with a funnel-structured water inlet 14. There is a ring-shaped solar cell panel 15 , the solar cell panel 15 is electrically connected with the water pump 8 , and a filter screen 16 is sealed in the water inlet 14 .

在城市污水处理中,道路径流污染处理是城市污水处理的重要环节,其由于包含了大量车辆的尾气排放,使得自身具有的重金属污染物较高,而一般在雨水天气下,城市污水处理承担着生活污水,工业污水以及雨水,负荷较重,使得排水系统的雨天溢流污染问题已成为影响河道水质的重要因素,因此在本发明中,通过第一蓄水腔5和第二蓄水腔7对于雨水的蓄存作用,从而在一定时间内缓解了城市排水系统的负荷,起到了海绵城市的要求,同时植物墙本体1设置在道路两侧时,通过道路径流进入水渠2和第一蓄水腔5的水中含有大量的重金属污染,并且在初期效应下,污染物的含量较大,此时当第一蓄水腔5的水位漫过两个导电板6的高度时,两个导电板6在以水作为电解质的作用下连通太阳能电池板15的电路,使水泵8启动,第一蓄水腔5中的经过道路径流和初期效应的雨水将直接进入第二蓄水腔7中,通过重金属超积累对其含量中的重金属进行吸收,使得减少了雨水中的污染物含量,当水位低于导电板6高度时,水泵8处于关闭状态,在压力阀13开启前,使得进入第二蓄水腔7的雨水一直被吸收处理,而设定压力阀13的开启压力为第二蓄水腔7水满,则第二蓄水腔7中水位超过压力阀13启动压力时,使得第二蓄水腔7中储存的水直接进入第一蓄水腔5靠近排污管12一侧部分,在碎石的自然过滤下进入排污管12,而此时的排污管12直接与外界污水处理装置中的再回收管道、排江管道或者二次处理管道,而无需经过污水的一次处理,减少了污水厂对雨水的处理负荷。In urban sewage treatment, road runoff pollution treatment is an important part of urban sewage treatment. Because it contains a large number of vehicle exhaust emissions, it has high heavy metal pollutants. Generally, in rainy weather, urban sewage treatment is responsible for Domestic sewage, industrial sewage and rainwater have heavy loads, so that the problem of overflow pollution in the drainage system has become an important factor affecting the water quality of the river. Therefore, in the present invention, the first water storage cavity 5 and the second water storage cavity 7 are passed through. For the storage of rainwater, the load of the urban drainage system is relieved within a certain period of time, and the requirements of the sponge city are met. At the same time, when the plant wall body 1 is installed on both sides of the road, it flows into the canal 2 and the first water storage through the road path. The water in the cavity 5 contains a large amount of heavy metal pollution, and under the initial effect, the content of the pollutants is relatively large. At this time, when the water level of the first water storage cavity 5 overflows the height of the two conductive plates 6, the two conductive plates 6 Under the action of water as the electrolyte, the circuit of the solar panel 15 is connected to start the water pump 8, and the rainwater in the first water storage chamber 5 through the channel flow and the initial effect will directly enter the second water storage chamber 7, and the heavy metal Hyperaccumulation absorbs the heavy metals in its content, so that the pollutant content in the rainwater is reduced. When the water level is lower than the height of the conductive plate 6, the water pump 8 is in a closed state, and before the pressure valve 13 is opened, it enters the second water storage. The rainwater in the chamber 7 has been absorbed and processed, and the opening pressure of the pressure valve 13 is set to be full of water in the second water storage chamber 7. When the water level in the second water storage chamber 7 exceeds the starting pressure of the pressure valve 13, the second water storage chamber 7 is filled with water. The water stored in the cavity 7 directly enters the first water storage cavity 5 near the side of the sewage pipe 12, and enters the sewage pipe 12 under the natural filtration of the crushed stone, and the sewage pipe 12 at this time is directly connected to the external sewage treatment device. Recycling pipelines, river drainage pipelines or secondary treatment pipelines do not need to undergo primary treatment of sewage, reducing the treatment load of sewage plants on rainwater.

尽管本文较多地使用了植物墙本体1、空心砖101、固定层102、植物103、透水膜104、水渠2、进水管3、排水管4、第一蓄水腔5、导电板6、第二蓄水腔7、水泵8、连接管9、单向阀10、隔板11、排污管12、压力阀13、进水口14、太阳能电池板15、过滤网16等术语,但并不排除使用其它术语的可能性。使用这些术语仅仅是为了更方便地描述和解释本发明的本质;把它们解释成任何一种附加的限制都是与本发明精神相违背的。Although the plant wall body 1, the hollow brick 101, the fixed layer 102, the plants 103, the permeable membrane 104, the water channel 2, the water inlet pipe 3, the drain pipe 4, the first water storage cavity 5, the conductive plate 6, the second Terms such as water storage chamber 7, water pump 8, connecting pipe 9, one-way valve 10, partition plate 11, sewage pipe 12, pressure valve 13, water inlet 14, solar panel 15, filter screen 16, etc., are not excluded. Possibilities of terms. These terms are used only to more conveniently describe and explain the nature of the present invention; it is contrary to the spirit of the present invention to interpret them as any kind of additional limitation.

Claims (3)

1.一种海绵城市用蓄水植物墙,包括植物墙本体(1)和水渠(2),其特征在于,所述水渠(2)设置在道路两侧并且靠近植物墙本体(1)的一端连通有进水管(3),所述进水管(3)底部通过三通连通设有排水管(4),进水管(3)通过三通连接的另一端连通有开设在地面内部的第一蓄水腔(5),所述第一蓄水腔(5)的顶部设有两个导电板(6),所述植物墙本体(1)的中部开设有第二蓄水腔(7),所述第二蓄水腔(7)与空腔连通设有压力阀(13);1. A water storage plant wall for a sponge city, comprising a plant wall body (1) and a water channel (2), wherein the water channel (2) is arranged on both sides of the road and is close to one end of the plant wall body (1) A water inlet pipe (3) is communicated with, the bottom of the water inlet pipe (3) is connected with a drain pipe (4) through a tee, and the other end of the water inlet pipe (3) is communicated with a first storage tank opened in the ground through the other end of the tee connection. A water cavity (5), the top of the first water storage cavity (5) is provided with two conductive plates (6), and the middle of the plant wall body (1) is provided with a second water storage cavity (7), so The second water storage cavity (7) is connected with the cavity and is provided with a pressure valve (13); 所述第一蓄水腔(5)的内壁密封固定连接有隔板(11),所述隔板(11)将第一蓄水腔(5)分为两个部分,靠近所述进水管(3)的第一蓄水腔(5)的部分顶部贯穿设有连接管(9),所述连接管(9)中设有单向阀(10),所述连接管(9)与地面的连接处设有水泵(8);The inner wall of the first water storage cavity (5) is sealed and fixedly connected with a partition plate (11), and the partition plate (11) divides the first water storage cavity (5) into two parts, which are close to the water inlet pipe ( 3) Part of the top of the first water storage chamber (5) is provided with a connecting pipe (9), a one-way valve (10) is arranged in the connecting pipe (9), and the connecting pipe (9) is connected to the ground. A water pump (8) is provided at the connection; 所述第一蓄水腔(5)远离进水管(3)的部分中设有多块碎石并且远离隔板(11)一侧设有排污管(12),所述排污管(12)与排水管(4)均与外界污水处理装置连接。The part of the first water storage chamber (5) away from the water inlet pipe (3) is provided with a plurality of crushed stones, and the side away from the partition plate (11) is provided with a sewage pipe (12), the sewage pipe (12) and the sewage pipe (12). The drain pipes (4) are all connected with the external sewage treatment device. 2.根据权利要求1所述的一种海绵城市用蓄水植物墙,其特征在于,所述植物墙本体(1)有多块空心砖(101)砌成,每个所述空心砖(101)中均种植有植物(103),所述植物(103)的品种选用重金属超积累植物,所述空心砖(101)的远离第二蓄水腔(7)一侧连接有一层固定层(102),所述空心砖(101)靠近第二蓄水腔(7)的一侧设有透水膜(104)。2. A water storage plant wall for sponge city according to claim 1, characterized in that, the plant wall body (1) is made of a plurality of hollow bricks (101), and each hollow brick (101) has Plants (103) are all planted, and the varieties of the plants (103) are selected from heavy metal hyperaccumulation plants. A water-permeable membrane (104) is provided on the side of the hollow brick (101) close to the second water storage cavity (7). 3.根据权利要求1所述的一种海绵城市用蓄水植物墙,其特征在于,所述植物墙本体(1)的顶部开设有漏斗结构的进水口(14),所述进水口(14)的外侧设有环形的太阳能电池板(15),所述太阳能电池板(15)与水泵(8)电连接,所述进水口(14)中密封连接有过滤网(16)。3. The water storage plant wall for a sponge city according to claim 1, wherein the top of the plant wall body (1) is provided with a water inlet (14) of a funnel structure, and the water inlet (14) ) is provided with an annular solar cell panel (15) on the outer side, the solar cell panel (15) is electrically connected with the water pump (8), and a filter screen (16) is sealed in the water inlet (14).
CN201911257360.9A 2019-12-10 2019-12-10 A kind of water storage plant wall for sponge city Expired - Fee Related CN110905041B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911257360.9A CN110905041B (en) 2019-12-10 2019-12-10 A kind of water storage plant wall for sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911257360.9A CN110905041B (en) 2019-12-10 2019-12-10 A kind of water storage plant wall for sponge city

Publications (2)

Publication Number Publication Date
CN110905041A CN110905041A (en) 2020-03-24
CN110905041B true CN110905041B (en) 2020-12-18

Family

ID=69824251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911257360.9A Expired - Fee Related CN110905041B (en) 2019-12-10 2019-12-10 A kind of water storage plant wall for sponge city

Country Status (1)

Country Link
CN (1) CN110905041B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118140735A (en) * 2024-04-10 2024-06-07 广东省建筑装饰工程有限公司 An assembled sponge water storage real plant intelligent control system and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5133661B2 (en) * 2007-11-28 2013-01-30 株式会社プラネット Wall planting planting equipment
CN106746205A (en) * 2016-12-15 2017-05-31 安庆师范大学 A kind of Intelligent rain purifies landscape system
CN207048033U (en) * 2017-06-16 2018-02-27 深圳市奥德斯景观及建筑规划设计院有限公司 A kind of green building
CN208001626U (en) * 2018-02-24 2018-10-26 重庆市潼南区华夏大地生态工程技术有限公司 It is a kind of to irrigate ecological afforestation enclosure wall certainly
CN109041900A (en) * 2018-08-21 2018-12-21 河海大学 A kind of urban architecture vertical planting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5133661B2 (en) * 2007-11-28 2013-01-30 株式会社プラネット Wall planting planting equipment
CN106746205A (en) * 2016-12-15 2017-05-31 安庆师范大学 A kind of Intelligent rain purifies landscape system
CN207048033U (en) * 2017-06-16 2018-02-27 深圳市奥德斯景观及建筑规划设计院有限公司 A kind of green building
CN208001626U (en) * 2018-02-24 2018-10-26 重庆市潼南区华夏大地生态工程技术有限公司 It is a kind of to irrigate ecological afforestation enclosure wall certainly
CN109041900A (en) * 2018-08-21 2018-12-21 河海大学 A kind of urban architecture vertical planting system

Also Published As

Publication number Publication date
CN110905041A (en) 2020-03-24

Similar Documents

Publication Publication Date Title
CN204551684U (en) Green building rainwater ecological utilization system
CN201512826U (en) Sand filter wall split rainwater treatment system
CN105863019A (en) Sewage intercepting type environment-friendly gutter inlet device
CN105735449B (en) A kind of urban road rainwater collecting and treating system
CN103088896A (en) Ecological road shock resistance rainwater utilization system
CN105714723A (en) Urban road rainwater collection treatment and application system
CN104098223B (en) A kind of rural scattered domestic sewage processing system and method
CN106835972A (en) A kind of rain-water accumulating system of sponge-type ecology bridge
CN205204913U (en) A stealthy ecological filtering pond system that is used for initial stage rainwater to collect retrieval and utilization
CN205857342U (en) A kind of efficient rainwater ecological cyclic utilization system for green building
CN203741704U (en) Rainwater collecting and recycling system for overpass
CN203307872U (en) Rainwater collecting, purifying and recycling integrated system for residential communities
CN110905041B (en) A kind of water storage plant wall for sponge city
CN111962630A (en) A device for rainwater collection and energy wave treatment in sponge city
CN209816969U (en) A green roof rainwater collection and recycling system based on traditional sponge wisdom
CN204898855U (en) System is used multipurposely to sponge district rainwater
CN205662974U (en) Environmental rainwater branch matter collection in hillock district holds system
CN207905089U (en) A kind of tree pool inlet for stom water
CN207645999U (en) A kind of resident living area initial rainwater runoff intercepts, purification equipment
CN106836441B (en) A kind of dirty optimization system of interception type drainage pumping plant that adding porous permeable divider wall section
CN2863947Y (en) Primary stormwater interception system for controlling urban non-point source pollution
CN209011284U (en) A kind of double abandoned stream rain water separators
CN207633472U (en) Sponge urban water system for building district
CN218374256U (en) A treatment system for diversion, purification and reuse of rainwater on the pavement of residential areas
CN217870824U (en) Initial rainwater infiltration and flow dividing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201130

Address after: No.29 Yucai Road, Wulian County, Rizhao City, Shandong Province

Applicant after: WULIAN YONGXIN INFORMATION CONSULTING Co.,Ltd.

Address before: 450000 new campus of Zhengzhou University, 100 science Avenue, hi tech Zone, Henan, Zhengzhou

Applicant before: Liang Dong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210805

Address after: 262300 north of juanhe road and west of jiuxianshan Road, Chaohe Town, Wulian County, Rizhao City, Shandong Province

Patentee after: Shandong Shenghua Pipe Technology Co.,Ltd.

Address before: No.29 Yucai Road, Wulian County, Rizhao City, Shandong Province

Patentee before: WULIAN YONGXIN INFORMATION CONSULTING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201218

CF01 Termination of patent right due to non-payment of annual fee