CN110886223A - Construction method for concreting steel-concrete combined tower and concrete box girder - Google Patents

Construction method for concreting steel-concrete combined tower and concrete box girder Download PDF

Info

Publication number
CN110886223A
CN110886223A CN201911078376.3A CN201911078376A CN110886223A CN 110886223 A CN110886223 A CN 110886223A CN 201911078376 A CN201911078376 A CN 201911078376A CN 110886223 A CN110886223 A CN 110886223A
Authority
CN
China
Prior art keywords
tower
steel
box girder
concrete
force transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911078376.3A
Other languages
Chinese (zh)
Inventor
刘涛
支燕武
辛建忠
张伟康
宋顺心
田山坡
郑永红
何静科
董继安
龚纬
侯春辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN201911078376.3A priority Critical patent/CN110886223A/en
Publication of CN110886223A publication Critical patent/CN110886223A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a steel-concrete combined tower and concrete box girder consolidation construction method, wherein the consolidation range of the combined tower and the box girder extends to the range inside the combined tower 2-4m below a bottom plate of the box girder and extends to the range inside the combined tower at a set height above a top plate of the box girder, and the consolidation construction method comprises the following steps: firstly), arranging the force transmission steel tower wall outside the cable tower in place, and arranging a plurality of uniformly distributed prestressed steel bars inside the force transmission steel tower wall outside the cable tower; binding No. 0 steel bars of the box girder, and welding the top plate steel bars of the No. 0 block on a box girder top plate longitudinal bar anchoring steel plate on the wall of the force transmission steel tower outside the cable tower; secondly), erecting a template, and pouring No. 0 concrete block outside the wall of the force transmission steel tower outside the cable tower; thirdly), removing the template, and pouring micro-expansion concrete into the wall of the force transmission steel tower wrapped outside the cable tower; fourthly) after the micro-expansion concrete reaches the design strength, tensioning the prestressed steel bar and anchoring the upper end of the prestressed steel bar. The invention can ensure the stress safety of the consolidation point and is convenient for construction.

Description

Construction method for concreting steel-concrete combined tower and concrete box girder
Technical Field
The invention relates to a bridge construction method, in particular to a construction method for concreting a steel-concrete combined tower and a concrete box girder.
Background
The cable tower is the most important load-bearing member of a full-bridge structure of a cable-stayed bridge. The main beam part constant load and live load are transmitted to the main tower through the stay cable and then borne by the foundation at the lower part of the tower beam, the cable tower bears huge axial force and bending moment, and the safety performance of the bridge tower has a decisive role in the safety of the whole structure.
Research on development of novel bridge tower structures has never been stopped on the basis of traditional steel bridge towers and concrete bridge towers, wherein steel-concrete combined structure cable towers are receiving more and more attention with excellent performances. Firstly, the steel-concrete composite structure can complementarily utilize the respective advantages of steel and concrete in bending and compression, and the core concrete is in a three-dimensional compression state by virtue of the hoop restraining effect of the steel tower wall on the core concrete, so that the core concrete has higher compression strength and compression deformation capacity. By means of the supporting effect of the filled concrete, the geometric stability of the steel tower wall can be enhanced, the instability mode of the hollow steel tower wall is changed, and the bearing capacity of the hollow steel tower wall is improved. And secondly, the steel tower wall concrete structure has obvious advantages in the construction aspect, the steel tower wall has higher rigidity and strength, can be used as a stiff framework for construction and a side pressure resistant template, and can improve the construction progress, so that the construction period is shortened.
When the combined tower is fixedly connected with the concrete box girder, how to ensure the stress safety of the fixed joint and facilitate construction is a main problem which needs to be solved urgently when the structural form is adopted.
Disclosure of Invention
The invention provides a construction method for concreting a steel-concrete combined tower and a concrete box girder, which aims to solve the technical problems in the prior art, can ensure that the concreting point of the steel-concrete combined tower and the concrete box girder is stressed safely and is convenient to construct.
The technical scheme adopted by the invention for solving the technical problems in the prior art is as follows: a construction method for concreting a steel-concrete combined tower and a concrete box girder is characterized in that the concreting range of the combined tower and the box girder extends downwards to the inner range of the combined tower 2-4m below a bottom plate of the box girder and extends upwards to the inner range of the combined tower at a set height above a top plate of the box girder, and the concreting construction method adopts the following steps: firstly), arranging a force transmission steel tower wall outside a cable tower in place, fixedly connecting shear nails perpendicular to the cable tower and the box girder on the inner side and the outer side of the force transmission steel tower wall outside the cable tower at the junction of the cable tower and the box girder, fixedly connecting vertical plate ribs on the inner side of the force transmission steel tower wall outside the cable tower, penetrating a box girder top plate longitudinal rib anchoring steel plate on the force transmission steel tower wall outside the cable tower, arranging an upper annular pressure-bearing steel plate on the inner side and the top of the consolidation range of the force transmission steel tower wall outside the cable tower, arranging a lower annular pressure-bearing steel plate on the bottom of the force transmission steel tower wall outside the cable tower, arranging a lower annular pressure-bearing steel plate on the box girder bottom plate with a gap between the two, arranging a plurality of vent holes and a plurality of steel bar jacks uniformly distributed along the circumferential direction on the upper annular pressure-bearing steel plate, and arranging a plurality of steel bar jacks uniformly distributed along the circumferential direction, the steel bar jacks on the upper annular pressure-bearing steel plate and the steel bar jacks on the lower annular pressure-bearing steel plate are opposite up and down in a one-to-one correspondence manner, and a vertically arranged prestressed steel bar penetrates through the vertically opposite steel bar jacks of the upper annular pressure-bearing steel plate and the lower annular pressure-bearing steel plate; binding No. 0 steel bars of the box girder, and welding the top plate steel bars of the No. 0 block on a box girder top plate longitudinal bar anchoring steel plate on the wall of the force transmission steel tower outside the cable tower; secondly) erecting a template between the lower annular pressure-bearing steel plate and the box girder bottom plate, and pouring No. 0 concrete outside the force transmission steel tower wall outside the cable tower; thirdly), after the No. 0 concrete in the second step reaches the form removal strength, removing the form; pouring micro-expansion concrete into the wall of the force transmission steel tower externally coated on the cable tower through the inner hole on the upper annular pressure-bearing steel plate to the height of the upper annular pressure-bearing steel plate; fourthly) after the micro-expansion concrete reaches the design strength, tensioning the prestressed steel bar and anchoring the upper end of the prestressed steel bar on the upper annular pressure-bearing steel plate.
And the lower end anchoring points of the two circumferentially adjacent prestressed steel bars are staggered up and down.
The lower end of the shorter prestressed steel bar is anchored at the bottom of the No. 0 block.
The interval between the lower annular pressure-bearing steel plate and the box girder bottom plate is 30-60 cm.
And the consolidation range of the combined tower and the box girder extends to the internal range of the combined tower 1m above the top plate of the box girder.
The prestressed steel bar is a PC steel bar, a finish rolling twisted steel or a common steel.
The invention has the advantages and positive effects that: the steel-concrete combined tower and the No. 0 block of the concrete box girder are reliably combined by adopting the prestressed steel bar, the pre-pressure of the steel bar can effectively ensure that the concrete of the bridge tower only bears the pressure effect, and the safety of the bridge tower is improved; the combined tower is provided with an outer-wrapped force transmission steel tower wall, concrete is filled in the combined tower, and shear nails are arranged on two sides of the outer-wrapped force transmission steel tower wall, so that the combination of box girder concrete and the outer-wrapped force transmission steel tower wall can be enhanced; meanwhile, the arrangement of the shear nails enables force transmission to be more uniform; the bottom of the outer-wrapped force transmission steel tower wall is provided with an annular pressure-bearing steel plate, so that the integrity of the beam body and the bridge tower can be enhanced; the lower end anchoring points of the prestressed steel bars are staggered up and down, so that the concentrated stress of the same section can be avoided, and the anchoring points of the tensioning ends are arranged on the bearing plate in the combined tower, so that the construction is convenient. In conclusion, the invention can meet the actual stress requirement of the anchoring position of the tower foot of the steel-concrete combined bridge tower and improve the safety of the steel-concrete combined bridge tower.
Drawings
FIG. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a cross-sectional view taken along line B-B of FIG. 1;
fig. 3 is a sectional view taken along line a-a of fig. 1.
In the figure: 1. the cable tower is wrapped by a force transmission steel tower wall, 2 shear nails, 3 vertical plate ribs, 4 anchoring steel plates, 5 roof steel bars, 6 lower annular pressure-bearing steel plates, 7 upper annular pressure-bearing steel plates, 8 inner holes, 9 vent holes, 10 steel bar insertion holes, 11 prestressed steel bars, 12 micro-expansion concrete.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings:
referring to fig. 1 to 3, a steel-concrete combined tower and concrete box girder consolidation construction method, in which a consolidation range of the combined tower and the box girder is extended to an internal range of the combined tower 2 to 4m below a bottom plate of the box girder and is extended to an internal range of the combined tower at a set height above a top plate of the box girder, includes the following steps:
firstly), arranging a force transmission steel tower wall 1 outside a cable tower in place, fixedly connecting shear nails 2 perpendicular to the cable tower and a box girder on the inner side and the outer side of the force transmission steel tower wall 1 outside the cable tower, fixedly connecting vertical plate ribs 3 on the inner side of the force transmission steel tower wall 1 outside the cable tower, penetrating a box girder top plate steel bar anchoring steel plate 4 on the force transmission steel tower wall 1 outside the cable tower, arranging an upper annular pressure-bearing steel plate 7 on the inner side and the top of the consolidation range of the force transmission steel tower wall 1 outside the cable tower, arranging a lower annular pressure-bearing steel plate 6 on the bottom of the force transmission steel tower wall 1 outside the cable tower, arranging a gap between the lower annular pressure-bearing steel plate 6 and the box girder bottom plate, arranging a plurality of vent holes 9 and a plurality of steel bar jacks 10 uniformly distributed along the circumferential direction on the upper annular pressure-bearing steel plate 7, arranging a plurality of steel bar jacks 10 uniformly distributed along the circumferential direction on the lower annular pressure-bearing steel plate 6, the steel bar jacks 10 on the upper annular pressure-bearing steel plate 7 are opposite to the steel bar jacks 10 on the lower annular pressure-bearing steel plate 6 one by one, and vertically arranged prestressed steel bars 11 are respectively arranged in the vertically opposite steel bar jacks 10 of the upper annular pressure-bearing steel plate 7 and the lower annular pressure-bearing steel plate 6 in a penetrating manner.
And binding the No. 0 steel bars of the box girder, and welding the top plate steel bars 5 of the No. 0 steel bars on the box girder top plate steel bar anchoring steel plate 4 on the force transmission steel tower wall 1 wrapped outside the cable tower.
Secondly) a template is erected between the lower annular pressure-bearing steel plate 6 and the box girder bottom plate, and No. 0 concrete outside the force transmission steel tower wall is poured outside the cable tower.
Thirdly), after the No. 0 concrete in the second step reaches the form removal strength, removing the form; and pouring micro-expansion concrete 12 into the force transmission steel tower wall 1 outside the cable tower through the inner hole 8 of the upper annular pressure-bearing steel plate 7 to the height of the upper annular pressure-bearing steel plate 7.
Fourthly) after the micro-expansion concrete 12 reaches the design strength, tensioning the prestressed steel bar 11 and anchoring the upper end of the prestressed steel bar on the upper annular pressure-bearing steel plate 7, so that the consolidation construction of the combined tower and the box girder is completed, and concrete in the upper steel tower wall of the upper annular pressure-bearing steel plate 7 can be continuously poured.
In order to avoid concentrated stress on the same section, the anchoring points at the lower ends of the two circumferentially adjacent prestressed steel bars 11 are arranged in a vertically staggered manner. Further, in order to enhance the reliability of consolidation, the lower end of the prestressed steel bar 11 is anchored at the bottom of the No. 0 block. The prestressed steel bar 11 may be a PC steel bar, a finish-rolled twisted steel bar, or a general steel material.
In the embodiment, the interval between the lower annular pressure-bearing steel plate 6 and the box girder bottom plate is 30-60 cm. The consolidation range of the combined tower and the box girder extends to the internal range of the combined tower 1m above the top plate of the box girder, and correspondingly, the upper annular pressure-bearing steel plate 7 is arranged 1m above the top plate of the box girder.
Although the preferred embodiments of the present invention have been described above with reference to the accompanying drawings, the present invention is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and those skilled in the art can make many modifications without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims (6)

1. A construction method for concreting a steel-concrete combined tower and a concrete box girder is characterized in that the concreting range of the combined tower and the box girder extends downwards to the inner range of the combined tower 2-4m below a bottom plate of the box girder and extends upwards to the inner range of the combined tower at a set height above a top plate of the box girder,
the consolidation construction method comprises the following steps:
firstly), arranging a force transmission steel tower wall outside a cable tower in place, fixedly connecting shear nails perpendicular to the cable tower and the box girder on the inner side and the outer side of the force transmission steel tower wall outside the cable tower at the junction of the cable tower and the box girder, fixedly connecting vertical plate ribs on the inner side of the force transmission steel tower wall outside the cable tower, penetrating a box girder top plate longitudinal rib anchoring steel plate on the force transmission steel tower wall outside the cable tower, arranging an upper annular pressure-bearing steel plate on the inner side and the top of the consolidation range of the force transmission steel tower wall outside the cable tower, arranging a lower annular pressure-bearing steel plate on the bottom of the force transmission steel tower wall outside the cable tower, arranging a lower annular pressure-bearing steel plate on the box girder bottom plate with a gap between the two, arranging a plurality of vent holes and a plurality of steel bar jacks uniformly distributed along the circumferential direction on the upper annular pressure-bearing steel plate, and arranging a plurality of steel bar jacks uniformly distributed along the circumferential direction, the steel bar jacks on the upper annular pressure-bearing steel plate and the steel bar jacks on the lower annular pressure-bearing steel plate are opposite up and down in a one-to-one correspondence manner, and a vertically arranged prestressed steel bar penetrates through the vertically opposite steel bar jacks of the upper annular pressure-bearing steel plate and the lower annular pressure-bearing steel plate;
binding No. 0 steel bars of the box girder, and welding the top plate steel bars of the No. 0 block on a box girder top plate longitudinal bar anchoring steel plate on the wall of the force transmission steel tower outside the cable tower;
secondly) erecting a template between the lower annular pressure-bearing steel plate and the box girder bottom plate, and pouring No. 0 concrete outside the force transmission steel tower wall outside the cable tower;
thirdly), after the No. 0 concrete in the second step reaches the form removal strength, removing the form; pouring micro-expansion concrete into the wall of the force transmission steel tower externally coated on the cable tower through the inner hole on the upper annular pressure-bearing steel plate to the height of the upper annular pressure-bearing steel plate;
fourthly) after the micro-expansion concrete reaches the design strength, tensioning the prestressed steel bar and anchoring the upper end of the prestressed steel bar on the upper annular pressure-bearing steel plate.
2. The steel-concrete combined tower and concrete box girder consolidation construction method according to claim 1, wherein the lower end anchoring points of two circumferentially adjacent prestressed steel bars are staggered up and down.
3. The steel-concrete combination tower and concrete box girder consolidation construction method according to claim 2, wherein the lower ends of the shorter prestressed steel bars are anchored at the bottom of the No. 0 block.
4. The steel-concrete combined tower and concrete box girder consolidation construction method according to claim 1, wherein the interval between the lower annular pressure-bearing steel plate and the box girder bottom plate is 30-60 cm.
5. The steel-concrete combination tower and concrete box girder consolidation construction method according to claim 1, wherein the consolidation range of the combination tower and the box girder extends up to the internal range of the combination tower at 1m above the top plate of the box girder.
6. The steel-concrete combined tower and concrete box girder consolidation construction method according to claim 1, wherein the prestressed steel bar is a PC steel bar, a finish rolled twisted steel bar or a general steel.
CN201911078376.3A 2019-11-06 2019-11-06 Construction method for concreting steel-concrete combined tower and concrete box girder Pending CN110886223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911078376.3A CN110886223A (en) 2019-11-06 2019-11-06 Construction method for concreting steel-concrete combined tower and concrete box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911078376.3A CN110886223A (en) 2019-11-06 2019-11-06 Construction method for concreting steel-concrete combined tower and concrete box girder

Publications (1)

Publication Number Publication Date
CN110886223A true CN110886223A (en) 2020-03-17

Family

ID=69746986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911078376.3A Pending CN110886223A (en) 2019-11-06 2019-11-06 Construction method for concreting steel-concrete combined tower and concrete box girder

Country Status (1)

Country Link
CN (1) CN110886223A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177857A (en) * 2020-09-03 2021-01-05 重庆大学 A prestressed hollow interlayer concrete-filled steel tubular lattice type hybrid tower and its production and installation method
CN115341468A (en) * 2022-08-05 2022-11-15 中铁大桥勘测设计院集团有限公司 Combined bridge tower steel-concrete combined section structure, bridge and construction method
CN116516810A (en) * 2023-02-28 2023-08-01 中铁宝桥(扬州)有限公司 Steel shell mechanism of transition section of reinforced concrete combined tower and manufacturing method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04213605A (en) * 1990-12-12 1992-08-04 Taisei Corp Construction of diagonal member of stay panel bridge
JPH06185012A (en) * 1992-12-15 1994-07-05 Oriental Kensetsu Kk Bogie for adjusting cable tension
JP2003155707A (en) * 2001-11-22 2003-05-30 Sumitomo Constr Co Ltd Reinforcement structure for cable anchoring part of cable stayed bridge
CN101446076A (en) * 2008-12-29 2009-06-03 中铁八局集团第一工程有限公司 Cast-in-place support for long cantilever No. 0 block of cable-stayed bridge with tower beam consolidation and putting up method
CN101831867A (en) * 2010-05-11 2010-09-15 天津市市政工程设计研究院 Steel-concrete combination section structure of steel main tower or steel main arch
CN201648968U (en) * 2010-05-11 2010-11-24 天津市市政工程设计研究院 Construction of a new steel-concrete combined section of a steel main tower or steel main arch
KR20110002343A (en) * 2009-07-01 2011-01-07 주식회사 포스코건설 Cable-Stayed Bridge Column with Composite Bonding Structure and Its Construction Method
CN102182142A (en) * 2011-03-29 2011-09-14 中铁大桥勘测设计院有限公司 Box girder opening structure at main tower of concrete box girder cable-stayed bridge
CN102839601A (en) * 2012-09-11 2012-12-26 天津市市政工程设计研究院 Consolidated structure of steel piers and caps of portal-type rigid frame overpass and its construction method
CN203729193U (en) * 2014-01-26 2014-07-23 长安大学 Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN104313994A (en) * 2014-10-15 2015-01-28 广东省冶金建筑设计研究院 Hybrid girder and extradossed cable-stayed bridge without back-cables
CN105908638B (en) * 2016-05-13 2018-02-23 铁道第三勘察设计院集团有限公司 It is a kind of to turn rigid frame bridge steel box-girder and the construction method of concrete pier consolidation

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04213605A (en) * 1990-12-12 1992-08-04 Taisei Corp Construction of diagonal member of stay panel bridge
JPH06185012A (en) * 1992-12-15 1994-07-05 Oriental Kensetsu Kk Bogie for adjusting cable tension
JP2003155707A (en) * 2001-11-22 2003-05-30 Sumitomo Constr Co Ltd Reinforcement structure for cable anchoring part of cable stayed bridge
CN101446076A (en) * 2008-12-29 2009-06-03 中铁八局集团第一工程有限公司 Cast-in-place support for long cantilever No. 0 block of cable-stayed bridge with tower beam consolidation and putting up method
KR20110002343A (en) * 2009-07-01 2011-01-07 주식회사 포스코건설 Cable-Stayed Bridge Column with Composite Bonding Structure and Its Construction Method
CN101831867A (en) * 2010-05-11 2010-09-15 天津市市政工程设计研究院 Steel-concrete combination section structure of steel main tower or steel main arch
CN201648968U (en) * 2010-05-11 2010-11-24 天津市市政工程设计研究院 Construction of a new steel-concrete combined section of a steel main tower or steel main arch
CN102182142A (en) * 2011-03-29 2011-09-14 中铁大桥勘测设计院有限公司 Box girder opening structure at main tower of concrete box girder cable-stayed bridge
CN102839601A (en) * 2012-09-11 2012-12-26 天津市市政工程设计研究院 Consolidated structure of steel piers and caps of portal-type rigid frame overpass and its construction method
CN203729193U (en) * 2014-01-26 2014-07-23 长安大学 Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN104313994A (en) * 2014-10-15 2015-01-28 广东省冶金建筑设计研究院 Hybrid girder and extradossed cable-stayed bridge without back-cables
CN105908638B (en) * 2016-05-13 2018-02-23 铁道第三勘察设计院集团有限公司 It is a kind of to turn rigid frame bridge steel box-girder and the construction method of concrete pier consolidation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177857A (en) * 2020-09-03 2021-01-05 重庆大学 A prestressed hollow interlayer concrete-filled steel tubular lattice type hybrid tower and its production and installation method
CN115341468A (en) * 2022-08-05 2022-11-15 中铁大桥勘测设计院集团有限公司 Combined bridge tower steel-concrete combined section structure, bridge and construction method
CN116516810A (en) * 2023-02-28 2023-08-01 中铁宝桥(扬州)有限公司 Steel shell mechanism of transition section of reinforced concrete combined tower and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN112900618A (en) Prefabricated frame, beam column joint and construction method
CN112412707B (en) A circular cross-section concrete support structure for assembled wind turbines
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN105625787B (en) The silo structure and its construction method of prestressed steel structure and Combined concrete
CN107794837A (en) Suitable for the prefabricated assembled bridge pier and its construction method of middle meizoseismal area
CN211228066U (en) A connection structure of prefabricated steel pier and foundation
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
CN105179183A (en) Prestressed concrete wind power tower system and construction method thereof
CN112922235A (en) Fabricated concrete prefabricated column and construction method thereof
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN205369295U (en) Basis precast prestressed beam slab formula wind power generation column foot plinth
CN205636516U (en) Convertible template system of hollow concrete leaning tower
CN111877129B (en) Arch ring construction method of continuous arch bridge
CN102041785B (en) Pier steel-concrete composite structure column beam
CN216194672U (en) A hybrid reinforced prefabricated pile
CN110924426A (en) An expanded bottom cup-mouth connection structure and connection method between a reinforced concrete column and a foundation
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN205669259U (en) Post-tensioned prestressing precast frame
CN220035172U (en) Structure for improving transverse bridge directional wind resistance of double-amplitude high-pier large-span continuous rigid frame bridge
CN220538386U (en) Prefabricated pile column type pier device
CN218436634U (en) Large-span double-column type bracket system
CN203603149U (en) Multipurpose pre-stress preformed pile with changeable strength
CN218596898U (en) Nondestructive control's multicolumn assembled mound structure system
CN208039023U (en) A kind of assembled bridge pier structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200317