CN110863773B - A pile foundation boring machine for building foundation engineering - Google Patents

A pile foundation boring machine for building foundation engineering Download PDF

Info

Publication number
CN110863773B
CN110863773B CN201911307034.4A CN201911307034A CN110863773B CN 110863773 B CN110863773 B CN 110863773B CN 201911307034 A CN201911307034 A CN 201911307034A CN 110863773 B CN110863773 B CN 110863773B
Authority
CN
China
Prior art keywords
shell
pull rod
drill bit
telescopic pull
support ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911307034.4A
Other languages
Chinese (zh)
Other versions
CN110863773A (en
Inventor
刘晓明
唐勋
刘华夏
龚石神
吴琼
熊象
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Dinggong Geotechnical Special Equipment Co ltd
Original Assignee
Hunan Dinggong Geotechnical Special Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Dinggong Geotechnical Special Equipment Co ltd filed Critical Hunan Dinggong Geotechnical Special Equipment Co ltd
Priority to CN201911307034.4A priority Critical patent/CN110863773B/en
Publication of CN110863773A publication Critical patent/CN110863773A/en
Application granted granted Critical
Publication of CN110863773B publication Critical patent/CN110863773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00—Rotary drilling
    • E21B3/02—Surface drives for rotary drilling
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00—Drill bits
    • E21B10/26—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
    • E21B10/32—Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers with expansible cutting tools
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00—Drill bits
    • E21B10/42—Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits
    • E21B10/43—Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits characterised by the arrangement of teeth or other cutting elements
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B12/00—Accessories for drilling tools
    • E21B12/04—Drill bit protectors
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00—Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003—Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

一种用于建筑基础工程的桩基挖孔机,包括钻架、动力头、液压垂直升架、卷扬机、伸缩拉杆和钻头机构,钻架包括上支架圈、下支架圈和斜支杆,动力头、液压垂直升架和卷扬机均设于下支架圈上,两液压垂直升架用于支撑和抬高钻头机构,以便于更换钻头机构,动力头设于两液压垂直升架之间,用于驱动伸缩拉杆转动,上支架圈通过斜支杆与液压垂直升架的顶端连接,卷扬机设于下支架圈的一端,通过钢丝绳绕过上支架圈与伸缩拉杆连接,伸缩拉杆与钻头机构连接。本发明简单轻便、制作成本低,能适用于各种不同打桩环境和孔径;扩孔能力强、钻孔稳定性高、能降低人力成本、避免人工挖孔桩的安全隐患、能大幅提升施工效率扩孔效率。

A pile foundation boring machine for building foundation engineering includes a drilling frame, a power head, a hydraulic vertical lifting frame, a winch, a telescopic pull rod and a drill mechanism. The drilling frame includes an upper support ring, a lower support ring and an oblique support rod. The power head, the hydraulic vertical lifting frame and the winch are all arranged on the lower support ring. The two hydraulic vertical lifting frames are used to support and raise the drill mechanism to facilitate the replacement of the drill mechanism. The power head is arranged between the two hydraulic vertical lifting frames and is used to drive the telescopic pull rod to rotate. The upper support ring is connected to the top of the hydraulic vertical lifting frame through the oblique support rod. The winch is arranged at one end of the lower support ring and is connected to the telescopic pull rod by a steel wire rope around the upper support ring. The telescopic pull rod is connected to the drill mechanism. The present invention is simple and light, has a low manufacturing cost, and can be applied to various different pile driving environments and hole diameters; has a strong hole expansion capacity, high drilling stability, can reduce labor costs, avoid safety hazards of manually excavated piles, and can greatly improve construction efficiency and hole expansion efficiency.

Description

Pile foundation hole digger for building foundation engineering
Technical Field
The invention relates to the field of building pile foundation engineering, in particular to a pile foundation hole digger for building foundation engineering.
Background
With the development of modern construction in China, high-rise and super-high-rise buildings in engineering construction are more and more, because the load transmitted from the upper part in the foundation construction of the high-rise buildings is very huge, the general foundation is hard to bear and needs to be specially treated to meet the requirements of designing the bearing capacity and settlement of the foundation, the bearing capacity of a single pile can be greatly improved by implementing reaming construction on the pile foundation, and the engineering cost is saved.
The construction of the bored pile is divided into a hole forming part and a pile forming part, wherein the hole forming part is the first link in the construction of the bored pile, a rotary excavator in the conventional bored pile uses slurry to protect walls, the construction of a pile foundation with the diameter of 0.8m-1.5m is more effective, but for the construction of a large aperture with the diameter of 1.5m or even more than 2.5m, the conventional large aperture rotary excavator is expensive and is mostly foreign equipment, on one hand, the whole machine is heavy, the construction cost of the hole is high, meanwhile, a special crane is needed to be matched for use, the cost and the operation difficulty are increased, the construction is not easy to be carried out on the places with more urban buildings, on the other hand, if a rock layer is met, a drill bit is driven to rotate, a connecting rod swings, the drill bit vibrates greatly, the pile hole is easy to deflect, the drill bit system is damaged, the construction cannot be carried out, the construction is usually carried out by adopting manual hole digging, the construction progress of the manual hole digging pile is slow, the downloaded Kong Naren force is dug, the working environment is bad, the working intensity is high, the hole digging efficiency is low, the safety is high, the water seepage is caused to the life hazards such as methane and the potential hazards to the workers are caused to the life.
Disclosure of Invention
The invention aims to solve the technical problems of overcoming the defects in the prior art and providing a pile foundation hole digger for building foundation engineering.
The invention solves the technical problems of the prior art by adopting the technical scheme that the pile foundation hole digger for the building foundation engineering comprises a drilling frame, a power head, a hydraulic vertical lifting frame, a winch, a telescopic pull rod and a drill bit mechanism, wherein the drilling frame comprises an upper bracket ring, a lower bracket ring and an inclined strut, the power head, the hydraulic vertical lifting frame and the winch are arranged on the lower bracket ring, the two hydraulic vertical lifting frames are used for supporting and lifting the drill bit mechanism so as to facilitate the replacement of the drill bit mechanism, the power head is arranged between the two hydraulic vertical lifting frames and is used for driving the telescopic pull rod to rotate, the upper bracket ring is connected with the top end of the hydraulic vertical lifting frame through the inclined strut, the winch is arranged at one end of the lower bracket ring and is connected with the telescopic pull rod through a steel wire rope, and the telescopic pull rod is connected with the drill bit mechanism.
Preferably, the drill bit mechanism is a rock shield mechanism, the rock shield mechanism comprises an upper shell, a lower shell, a bearing, a screw pump, a transmission motor, a transmission mechanism and a rock drill bit, the telescopic pull rod is connected with the top end of the upper shell, the upper shell is rotationally connected with the lower shell through the bearing, the transmission motor is arranged in the upper shell, the transmission motor drives the lower shell to rotate through the transmission mechanism, the screw pump penetrates through the bearing to be communicated with the upper shell and the lower shell, and the rock drill bit is arranged at the bottom end of the lower shell.
Preferably, the transmission mechanism comprises a support, a pinion, a transmission bearing and an internal gear, the support is arranged on the lower shell, the transmission bearing is arranged on the support, an output shaft of the transmission motor passes through the bottom end of the upper shell and is connected with the transmission bearing, the pinion is sleeved on the output shaft of the transmission motor, the internal gear is fixedly connected with the lower shell and meshed with the pinion, and the pinion drives the lower shell to rotate through the internal gear.
Preferably, the screw pump comprises a drainage motor, a pump pipe, a slurry outlet, a suction cavity, a leakage-proof cover and a water inlet pipe, wherein the drainage motor is arranged at the top end of the pump pipe, the pump pipe is communicated with the slurry outlet, the slurry outlet penetrates through the upper shell to discharge slurry outwards, the pump pipe penetrates through a bearing to be communicated with the suction cavity in the lower shell, the leakage-proof cover is arranged in the upper shell and forms a leakage-proof cavity with the upper shell, the bearing is arranged in the leakage-proof cavity, the water inlet pipe is sleeved on the pump pipe, the water inlet pipe penetrates through the bearing to be communicated with the upper shell and the lower shell, a water inlet is arranged on the water inlet pipe, the bottom end of the water inlet is connected with the upper end of the water inlet pipe, the top end of the water inlet penetrates through the upper shell, and clear water flows through the water inlet pipe to reach the lower shell.
Preferably, the rock drill bit includes a first drill bit and a second drill bit, the first drill bit is disposed at the center of the bottom end of the lower housing, and the second drill bit is disposed at the outer periphery of the lower housing.
Preferably, the bottom surface of lower casing is the toper structure of central authorities outwards evagination, and the bottom surface of lower casing is equipped with the slag hole, be equipped with the blade disc on the bottom surface of lower casing, be equipped with a plurality of hobbing cutter mechanisms on the blade disc, hobbing cutter mechanism includes single-blade hobbing cutter, arbor and end cover, a plurality of single-blade hobbing cutter cover are located on the arbor, the both sides of single-blade hobbing cutter are located to the end cover.
Optionally, the drill bit mechanism is reamer bit mechanism, reamer bit mechanism includes the drill bit body, goes up connecting seat, reamer arm and alloy drill bit, the drill bit body includes casing, spacing seat, chassis and slag hole, the casing forms accommodation space with the chassis, the top of casing is located to spacing seat, slag hole locates on the chassis, flexible pull rod passes spacing seat and locates the top of last connecting seat in the accommodation space and be connected, the reamer arm includes reamer arm and lower reamer arm, upward reamer arm is articulated with lower reamer arm each other, upward reamer arm's top is articulated with last connecting seat, lower reamer arm's bottom is articulated with the casing, be equipped with a plurality of scrapers on the lower reamer arm, alloy drill bit locates the central authorities of chassis, the cover is equipped with the spring on the flexible pull rod, the spring is located between spacing seat and the last connecting seat.
Preferably, the bottom of casing is equipped with down connecting seat, hasp and unblanking pull rod, unblanking pull rod control hasp switch, be equipped with the buckle on the chassis, down the connecting seat is articulated with the one end on chassis, buckle and hasp adaptation, be equipped with the blade disc on the chassis, be equipped with a plurality of scrapers on the blade disc, alloy drill bit locates the central authorities of blade disc.
Preferably, an inductor is arranged in the shell, and the inductor is electrically connected with the power head and used for inducing the soil height loaded in the accommodating space.
Preferably, the bottom of the lower support ring is provided with four hydraulic support legs for supporting and fixing the position of the lower support ring, the hydraulic support legs can be adjusted in height so that the lower support ring is horizontally arranged, and the lower support ring is provided with a plurality of draw hooks for drawing the drill carriage to move.
Compared with the prior art, the invention has the beneficial effects that:
Paving sleepers or steel pipes at the bottom of a drilling frame, pulling the drilling frame to move a position to be piled through a drag hook, constructing by adopting a reaming bit mechanism when piling is performed under geological conditions of a non-bedrock bearing stratum, unreeling a winch, pressing down a telescopic pull rod to enable a reaming arm to prop up, driving the telescopic pull rod by a power head to drive a bit body to rotate, rotatably digging a cutter disc at the bottom, reaming the hole wall of the reaming arm, enabling slag to enter a bit body from a slag hole, enabling the cutter disc to seal the slag hole when an inductor senses that slag in the bit body reaches a preset height, enabling the cutter disc to stop rotatably digging the bit body, winding the winch, lifting the telescopic pull rod upwards, shrinking the reaming arm, driving the bit body to be lifted to the ground by the telescopic pull rod, opening a lock catch by pressing down the unlocking pull rod, opening a chassis to discharge slag, and closing the chassis to enter the next rotary digging; when the rock layer is encountered in construction, the drill bit is replaced by a rock shield mechanism, and when the rock layer is used, the telescopic pull rod is connected with the upper shell through the reinforcing rib, so that the swing of the connecting rod is avoided, the winch is unreeled, the telescopic pull rod downwards presses the shield drill bit to enter the region needing to be drilled, clean water is introduced into the water inlet, three transmission motors synchronously drive three pinions to rotate, the three pinions are meshed with the internal gear disk, the lower shell is synchronously driven to rotate, the single-blade hob wets and grinds the rock, mud generated in the drilling process enters the lower shell through a slag hole, and the drain motor discharges the mud from a mud outlet through a pump pipe through a suction cavity, so that the vibration of the drill bit caused by the swing of the connecting rod can be effectively avoided, the pile hole is ensured to be vertical, the rock layer shield mechanism is simple and portable, the rock layer shield mechanism is low in manufacturing cost, can be suitable for various different piling environments and pore diameters, has strong reaming capability, high drilling stability, labor cost can be reduced, potential safety hazards of manual hole digging piles can be avoided, the construction efficiency and the reaming efficiency can be greatly improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate the invention and together with the description serve to explain the invention.
FIG. 1 is a schematic diagram of an embodiment of the present invention;
FIG. 2 is a schematic structural view of a rock shield mechanism;
FIG. 3 is a schematic diagram of the transmission mechanism shown in FIG. 2;
FIG. 4 is a top view of the rock shield mechanism shown in FIG. 2;
FIG. 5 is a schematic view of the lower housing shown in FIG. 2;
FIG. 6 is a schematic view of the hob mechanism shown in FIG. 5;
FIG. 7 is a schematic view of the reamer bit mechanism;
FIG. 8 is a schematic view of the reamer arm of FIG. 7 in a retracted configuration;
Fig. 9 is a bottom view of the reamer bit mechanism of fig. 7.
Reference numerals illustrate: 1-drilling frame, 11-upper support ring, 12-lower support ring, 121-drag hook, 122-hydraulic supporting leg, 13-inclined strut, 2-power head, 3-hydraulic vertical lifting frame, 4-winch, 5-telescopic pull rod, 51-spring, 6-drill bit mechanism, 611-upper shell, 612-lower shell, 6121-slag hole, 6122-cutter head, 61221-hob mechanism, 612211-single-blade hob, 612212-cutter shaft, 612213-end cover, 614-bearing, 615-screw pump, 6151-drainage motor, 6152-pump pipe, 6153-slurry outlet, 6154-suction cavity, 6155-leak-proof cover, 6156-water inlet pipe, 61561-water inlet, 616-drive motor, 617-drive mechanism, 6171-bracket, 6172-pinion, 6173-drive bearing, 6174-internal gear, 618-rock bit, 6181-first bit, 6182-second bit, 621-bit body, 6211-housing, 62111-lower connection seat, 62112-latch, 62113-unlocking pull rod, inductor 62114,6212-limit seat, 6213-chassis, 62131-latch, 62132-cutterhead, 62133-doctor blade, 6214-slag tap, 623-upper connection seat, 624-reamer arm, 6241-upper reamer arm, 6242-lower reamer arm, 625-alloy bit, 52-fixing mechanism, 521-locating pin.
Detailed Description
The technical scheme provided by the invention is further described below with reference to the accompanying drawings and the embodiments.
Referring to fig. 1-9, a pile foundation hole digger for building foundation engineering comprises a drilling frame 1, a power head 2, a hydraulic vertical lifting frame 3, a winch 4, a telescopic pull rod 5 and a drill bit mechanism 6, wherein the drilling frame 1 comprises an upper bracket ring 11, a lower bracket ring 12 and a bevel support rod 13, the power head 2, the hydraulic vertical lifting frame 3 and the winch 4 are all arranged on the lower bracket ring 12, the two hydraulic vertical lifting frames 3 are used for supporting and lifting the drill bit mechanism 6 so as to facilitate replacement of the drill bit mechanism 6, the power head 2 is arranged between the two hydraulic vertical lifting frames 3 and used for driving the telescopic pull rod 5 to rotate, the upper bracket ring 11 is connected with the top end of the hydraulic vertical lifting frame 3 through the bevel support rod 13, the winch 4 is arranged at one end of the lower bracket ring 12 and is connected with the telescopic pull rod 5 through a steel wire rope, and the telescopic pull rod 5 is connected with the drill bit mechanism 6.
The drill mechanism 6 is a rock shield mechanism, the rock shield mechanism comprises an upper shell 611, a lower shell 612, a bearing 614, a screw pump 615, a transmission motor 616, a transmission mechanism 617 and a rock drill bit 618, the telescopic pull rod 5 is connected with the top end of the upper shell 611, the upper shell 611 is rotationally connected with the lower shell 612 through the bearing 614, the transmission motor 616 is arranged in the upper shell 611, the transmission motor 616 drives the lower shell 612 to rotate through the transmission mechanism 617, the screw pump 615 penetrates through the bearing 614 to be communicated with the upper shell 611 and the lower shell 612, and the rock drill bit 618 is arranged at the bottom end of the lower shell 612.
The transmission mechanism 617 comprises a support 6171, a pinion 6172, a transmission bearing 6173 and an internal gear disk 6174, the support 6171 is arranged on the lower shell 612, the transmission bearing 6173 is arranged on the support 6171, an output shaft of the transmission motor 616 penetrates through the bottom end of the upper shell 611 and is connected with the transmission bearing 6173, the pinion 6172 is sleeved on the output shaft of the transmission motor 616, the internal gear disk 6174 is fixedly connected with the lower shell 612 and meshed with the pinion 6172, the pinion 6172 drives the lower shell 612 to rotate through the internal gear disk 6174, and the three pinions 6172 are meshed with the internal gear disk 6174, so that stability of a drill bit in the drilling process is guaranteed, and drilling deflection caused by vibration of the drill bit is avoided. Damaging the drill bit.
The screw pump 615 includes drainage motor 6151, pump line 6152, mud outlet 6153, inhale the chamber 6154, leak protection liquid cover 6155 and inlet tube 6156, drainage motor 6151 locates the top of pump line 6152, pump line 6152 communicates with mud outlet 6153, mud outlet 6153 passes last casing 611 and outwards discharges mud, pump line 6152 passes bearing 614 and locates the suction chamber 6154 in the lower casing 612 and communicate, leak protection liquid cover 6155 locates in the upper casing 611, forms leak protection liquid chamber with upper casing 611, bearing 614 locates in the leak protection liquid chamber, can effectively prevent that mud from spilling over, gets into upper casing 611 and influences drive motor 616 normal work, the inlet tube 6156 cover is located on the pump line 6152, inlet tube 6156 passes bearing 614 intercommunication upper casing 611 and lower casing 612, be equipped with water inlet 61561 on the inlet tube 6156, the bottom of water inlet 61561 is connected with the upper end of inlet tube 6156, the top of water inlet 61561 passes upper casing 611, and the inlet tube 61561 passes through water inlet 6156 and flows through down through the inlet tube 6156 and reachs the casing 6156.
The rock drill 618 includes a first drill 6181 and a second drill 6182, the first drill 6181 is provided at the center of the bottom end of the lower housing 612, and the second drill 6182 is provided at the outer peripheral edge of the lower housing 612.
The bottom surface of lower casing 612 is the toper structure of central outside evagination, and the bottom surface of lower casing 612 is equipped with slag hole 6121, be equipped with blade disc 6122 on the bottom surface of lower casing 612, be equipped with a plurality of hobbing cutter mechanism 61221 on the blade disc 6122, hobbing cutter mechanism 61221 includes single-edge hobbing cutter 612211, arbor 612212 and end cover 612213, a plurality of single-edge hobbing cutter 612211 cover are located on arbor 612212, the both sides of single-edge hobbing cutter 612211 are located to end cover 612213.
The top of the upper shell 611 is provided with a reinforcing rib, and the reinforcing rib is connected with the telescopic pull rod 3 to avoid the swinging of the connecting rod.
The drill bit mechanism 6 is a reaming bit mechanism, the reaming bit mechanism comprises a drill bit body 621, an upper connecting seat 623 and a reaming arm 624, an alloy drill bit 625 and a fixing mechanism 52, the drill bit body 621 comprises a shell 6211, a limiting seat 6212, a chassis 6213 and a slag hole 6214, the shell 6211 and the chassis 6213 form an accommodating space, the limiting seat 6212 is arranged at the top end of the shell 6211, the slag hole 6214 is arranged on the chassis 6213, a telescopic pull rod 5 passes through the limiting seat 6212 and is connected with the top end of the upper connecting seat 623 arranged in the accommodating space, the reaming arm 624 comprises an upper reaming arm 6241 and a lower reaming arm 6242, the upper reaming arm 6241 and the lower reaming arm 6242 are hinged with each other, the bottom end of the lower reaming arm 6242 is hinged with the shell 6211, a plurality of scraping blades 62133 are arranged on the lower reaming arm 6242, the alloy drill bit 625 is arranged in the center of the chassis 6213, the fixing mechanism 52 is arranged at the top end of the shell 6211, the telescopic pull rod 5 passes through the limiting seat 6212 and is connected with the top end of the upper reaming arm 623, the upper reaming arm 624 is provided with the upper reaming arm 521 and the lower reaming arm 6242, the upper reaming arm 521 is positioned by the upper reaming arm 521 and the lower reaming arm 5, the upper reaming arm is positioned by the upper reaming arm 521 is positioned by the upper reaming pin 5 and the upper reaming pin is correspondingly, and the lower reaming pin is positioned by the upper reaming pin 5 and the upper reaming pin is positioned by the upper and the lower reaming pin is positioned and the lower is positioned by the upper and the lower reaming rod 521 is positioned and the lower is located and the lower is.
The bottom of casing 6211 is equipped with lower connecting seat 62111, hasp 62112 and unblanking pull rod 62113, unblanking pull rod 62113 control hasp 62112 switch, be equipped with buckle 62131 on the chassis 6213, lower connecting seat 62111 is articulated with the one end of chassis 6213, buckle 62131 and hasp 62112 adaptation, be equipped with blade disc 62132 on the chassis 6213, be equipped with a plurality of scrapers 62133 on the blade disc 62132, alloy drill bit 625 locates the center of blade disc 62132.
The shell 6211 is internally provided with an inductor 62114, the inductor 62114 is electrically connected with the power head 2 and is used for sensing the soil height loaded in the accommodating space, the inductor 62114 is connected with an external driving motor, the telescopic pull rod 5 drives the drill bit body 621 to rotate and expand the hole, slag enters the drill bit body 621 from the slag hole 6214, when the inductor 62114 senses that the slag in the drill bit body 621 reaches the preset height, the telescopic pull rod 5 rotates to enable the cutter disc 62132 to seal the slag hole 6214, the drill bit body 621 stops rotary digging, the telescopic pull rod 5 is lifted upwards, the expanding arm 624 contracts, the telescopic pull rod 5 drives the drill bit body 621 to be lifted to the ground, the unlocking pull rod 62113 is pressed down to enable the lock catch 62112 to be opened, the chassis 6213 is opened to discharge the slag, and the chassis 6213 is closed to enter the next rotary digging.
The bottom of the lower bracket ring 12 is provided with four hydraulic supporting legs 122 for supporting and fixing the position of the lower bracket ring 12, the hydraulic supporting legs 122 can adjust the height of the lower bracket ring 12 so that the lower bracket ring 12 is horizontally arranged, six draw hooks 121 are arranged on the lower bracket ring 12 and distributed on four sides of the lower bracket ring 12 for drawing the movement of the drilling frame 1, the number of the draw hooks 121 can be increased or decreased according to the requirement, when the drilling frame 1 needs to move, sleepers or steel pipes are paved at the bottom of the drilling frame 1, the hydraulic supporting legs 122 shrink until the bottom ends of the hydraulic supporting legs 122 are flush with the bottom surface of the lower bracket ring 12, and the hydraulic supporting legs 122 can prevent the sleeper or the steel pipe from being blocked by the hydraulic supporting legs 122 from rolling when the drilling frame 1 is drawn to move.
In this embodiment, two reamer arms 624 are distributed in the radial direction of the drill bit body 621, and the number of reamer arms 624 can be increased to three, four or more according to the reaming requirement, and the reamer arms 624 are uniformly distributed on the drill bit body 621.
The working principle of the invention is as follows:
Sleeper or steel pipe is laid at the bottom of the drill frame 1, the hydraulic support legs 122 are contracted, the drill frame 1 is pulled by the drag hook 121 to move the position to be piled, the hydraulic support legs 122 are opened, the position of the drill frame 1 is fixed, the height of the hydraulic support legs 122 is adjusted to enable the drill frame 1 to be horizontally arranged, when piling is carried out under geological conditions of a non-bedrock bearing stratum, a reaming bit mechanism is adopted for construction, a locating pin 6261 penetrates through a through hole on the shell 6211 and the telescopic pull rod 5 to enable the reaming arm 624 to be in a contracted state, a cutterhead 62132 on the reaming bit carries out bottom rotary excavation, when the rotary excavation height is not less than 1m, the reaming bit mechanism is lifted, slag in the drill bit body 621 is discharged, the locating pin 6261 is pulled out, the winch 4 is unreeled, the telescopic pull rod 5 is pressed downwards to enable the reaming arm 624 to be spread, the power head 2 drives the telescopic pull rod 5 to drive the bit body 621 to rotate, the cutter head 62132 performs bottom rotary excavation, the reaming arms 624 perform hole wall reaming, slag enters the bit body 621 from the slag hole 6214, when the inductor 62114 senses that slag in the bit body 621 reaches a preset height, the telescopic pull rod 5 rotates to enable the cutter head 62132 to seal the slag hole 6214, the bit body 621 stops rotary excavation, the winch 4 winds up, the telescopic pull rod 5 lifts upwards, the reaming arms 624 shrink, the telescopic pull rod 5 drives the bit body 621 to lift to the ground, the unlocking pull rod 62113 is pressed to enable the lock catch 62112 to be opened, the chassis 6213 is opened to discharge slag, the chassis 6213 is closed to enter the next rotary excavation, the prefabricated semicircular concrete ring is spliced and placed into a pile foundation hole, and the concrete ring is rotationally excavated along with the reaming arms 4 to remove residual soil.
When the rock layer is encountered in construction, the drill bit is replaced by the rock shield mechanism, when the rock layer is used, the telescopic pull rod 5 is connected with the upper shell through the reinforcing ribs 6111, the swing of the connecting rod is avoided, the winch 4 is unreeled, the telescopic pull rod 5 downwards presses the shield drill bit to enter a region needing to be drilled, clear water is introduced into the water inlet 61561, the three transmission motors 616 synchronously drive the three pinion 6172 to rotate, the three pinion 6172 is meshed with the inner gear disk 6174, the lower shell 612 is synchronously driven to rotate, the single-blade hob 612211 carries out wet grinding on the rock, mud generated in the drilling process enters the lower shell 612 through the slag hole 6121, the drainage motor 6151 discharges the mud from the mud outlet 6153 through the suction cavity 6154, the vibration of the drill bit caused by the swing of the connecting rod can be effectively avoided, and the pile hole is ensured to be vertical.
The pile foundation hole digger provided by the invention is low in cost, flexible, strong, simple and portable, can be suitable for construction of building pile foundation engineering with large and small apertures under various special construction environment conditions, can solve large-aperture hole digger construction under various soil conditions, greatly improves hole digging efficiency and quality, and avoids potential safety hazards.
The above embodiments are only for illustrating the technical solution of the present invention, but not for limiting the same, and although the present invention has been described in detail with reference to the above embodiments, it should be understood by those skilled in the art that modifications may be made to the technical solution described in the above embodiments or equivalents may be substituted for part of the technical features thereof, and the modifications or substitutions do not depart from the spirit and scope of the technical solution of the embodiments of the present invention in essence.

Claims (8)

1. The pile foundation hole digger for the building foundation engineering is characterized by comprising a drilling frame (1), a power head (2), a hydraulic vertical lifting frame (3), a winch (4), a telescopic pull rod (5) and a drill bit mechanism (6), wherein the drilling frame (1) comprises an upper support ring (11), a lower support ring (12) and a diagonal support rod (13), the power head (2), the hydraulic vertical lifting frame (3) and the winch (4) are arranged on the lower support ring (12), the two hydraulic vertical lifting frames (3) are used for supporting and lifting the drill bit mechanism (6) so as to facilitate replacement of the drill bit mechanism (6), the power head (2) is arranged between the two hydraulic vertical lifting frames (3) and used for driving the telescopic pull rod (5) to rotate, the upper support ring (11) is connected with the top end of the hydraulic vertical lifting frame (3) through the diagonal support rod (13), the winch (4) is arranged at one end of the lower support ring (12) and is connected with the telescopic pull rod (5) through a wire rope by bypassing the upper support ring (11), and the telescopic pull rod (5) is connected with the drill bit mechanism (6).
The rock shield mechanism comprises an upper shell (611), a lower shell (612), a bearing (614), a screw pump (615), a transmission motor (616), a transmission mechanism (617) and a rock drill bit (618), wherein the telescopic pull rod (5) is connected with the top end of the upper shell (611), the upper shell (611) is rotationally connected with the lower shell (612) through the bearing (614), the transmission motor (616) is arranged in the upper shell (611), the transmission motor (616) drives the lower shell (612) to rotate through the transmission mechanism (617), the screw pump (615) penetrates through the bearing (614) to be communicated with the upper shell (611) and the lower shell (612), the rock drill bit (618) is arranged at the bottom end of the lower shell (612), and a reinforcing rib is arranged at the top end of the upper shell (611) and is connected with the telescopic pull rod (5);
The screw pump (615) comprises a drainage motor (6151), a pump pipe (6152), a slurry outlet (6153), a suction cavity (6154), a leakage-proof cover (6155) and a water inlet pipe (6156), wherein the drainage motor (6151) is arranged at the top end of the pump pipe (6152), the pump pipe (6152) is communicated with the slurry outlet (6153), the slurry outlet (6153) is communicated with the slurry outlet (6153) through an upper shell (611) to discharge slurry outwards, the pump pipe (6152) is communicated with the suction cavity (6154) arranged in a lower shell (612) through a bearing (614), the leakage-proof cover (6155) is arranged in the upper shell (611) to form a leakage-proof cavity with the upper shell (611), the bearing (614) is arranged in the leakage-proof cavity, the water inlet pipe (6156) is sleeved on the pump pipe (6152), the water inlet pipe (6156) is communicated with the upper shell (611) and the lower shell (612) through the bearing (614), a water inlet (61561) is arranged on the water inlet pipe (6156), the bottom end of the water inlet (61561) is connected with the upper shell (6156) through the upper shell (6156), and the water inlet (561) is connected with the water inlet pipe (6156).
2. The pile foundation hole digger for building foundation engineering according to claim 1, wherein the transmission mechanism (617) comprises a support (6171), a pinion (6172), a transmission bearing (6173) and an internal gear (6174), the support (6171) is arranged on the lower shell (612), the transmission bearing (6173) is arranged on the support (6171), an output shaft of the transmission motor (616) penetrates through the bottom end of the upper shell (611) and is connected with the transmission bearing (6173), the pinion (6172) is sleeved on the output shaft of the transmission motor (616), the internal gear (6174) is fixedly connected with the lower shell (612) and meshed with the pinion (6172), and the pinion (6172) drives the lower shell (612) to rotate through the internal gear (6174).
3. The pile foundation boring machine for building foundation works according to claim 2, wherein said rock drill bit (618) comprises a first drill bit (6181) and a second drill bit (6182), said first drill bit (6181) is provided at a bottom center of the lower housing (612), and said second drill bit (6182) is provided at an outer periphery of the lower housing (612).
4. The pile foundation hole digger for building foundation engineering of claim 3, wherein the bottom surface of the lower shell (612) is of a conical structure with a center protruding outwards, a slag outlet hole (6121) is formed in the bottom surface of the lower shell (612), a cutter disc (6122) is arranged on the bottom surface of the lower shell (612), a plurality of cutter mechanisms (61221) are arranged on the cutter disc (6122), each cutter mechanism (61221) comprises a single-blade cutter (612211), a cutter shaft (612212) and an end cover (612213), the number of single-blade cutters (612211) is multiple, the plurality of single-blade cutters (612211) are sleeved on the cutter shaft (612212), and the end covers (612213) are arranged on two sides of the single-blade cutters (612211).
5. The pile foundation boring machine for building foundation works according to claim 1, wherein the bit mechanism (6) is a boring bit mechanism, the boring bit mechanism comprises a bit body (621), an upper connecting seat (623), a boring arm (624) and an alloy bit (625), the bit body (621) comprises a shell (6211), a limiting seat (6212), a chassis (6213) and a slag hole (6214), the shell (6211) and the chassis (6213) form an accommodating space, the limiting seat (6212) is arranged at the top end of the shell (6211), the slag hole (6214) is arranged on the chassis (6213), the telescopic pull rod (5) passes through the limiting seat (6212) and is connected with the top end of the upper connecting seat (623) arranged in the accommodating space, the boring arm (624) comprises an upper boring arm (6241) and a lower arm (6242), the top end of the upper boring arm (6241) is hinged with the lower boring arm (6242), the top end of the upper boring arm (6241) is hinged with the upper connecting seat (6213), the bottom end of the lower boring arm (6242) is hinged with the upper boring arm (6242), the telescopic pull rod (5) is provided with a plurality of telescopic pull rods (6242) and the lower boring rod (6242) is arranged at the bottom end of the upper boring arm (6242), the spring (51) is arranged between the limit seat (6212) and the upper connecting seat (623).
6. The pile foundation hole digger for building foundation engineering of claim 5, wherein a lower connecting seat (62111), a lock catch (62112) and an unlocking pull rod (62113) are arranged at the bottom end of the shell (6211), the unlocking pull rod (62113) controls the lock catch (62112) to be opened and closed, a lock catch (62131) is arranged on the chassis (6213), the lower connecting seat (62111) is hinged with one end of the chassis (6213), the lock catch (62131) is matched with the lock catch (62112), a cutter disc (62132) is arranged on the chassis (6213), a plurality of scrapers (62133) are arranged on the cutter disc (62132), and the alloy drill bit (625) is arranged in the center of the cutter disc (62132).
7. The pile foundation boring machine for building foundation works of claim 6, wherein an inductor (62114) is arranged in the shell (6211), and the inductor (62114) is electrically connected with the power head (2) and used for inducing the height of soil loaded in the accommodating space.
8. The pile foundation hole digger for building foundation works according to claim 1, wherein the bottom of the lower bracket ring (12) is provided with a plurality of hydraulic supporting legs (122) for supporting and fixing the position of the lower bracket ring (12), the hydraulic supporting legs (122) can be adjusted in height so that the lower bracket ring (12) is horizontally arranged, and the lower bracket ring (12) is provided with a plurality of draw hooks (121) for drawing the drill carriage (1) to move.
CN201911307034.4A 2019-12-18 2019-12-18 A pile foundation boring machine for building foundation engineering Active CN110863773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911307034.4A CN110863773B (en) 2019-12-18 2019-12-18 A pile foundation boring machine for building foundation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911307034.4A CN110863773B (en) 2019-12-18 2019-12-18 A pile foundation boring machine for building foundation engineering

Publications (2)

Publication Number Publication Date
CN110863773A CN110863773A (en) 2020-03-06
CN110863773B true CN110863773B (en) 2025-03-28

Family

ID=69659047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911307034.4A Active CN110863773B (en) 2019-12-18 2019-12-18 A pile foundation boring machine for building foundation engineering

Country Status (1)

Country Link
CN (1) CN110863773B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980581B (en) * 2020-09-08 2024-12-31 重庆涂渝工贸有限公司 Multifunctional fully automatic drilling rig
CN112542798B (en) * 2020-10-26 2022-08-05 国网河北省电力有限公司邢台供电分公司 Ground wire operation device for high-voltage transmission line
CN112779940A (en) * 2020-12-31 2021-05-11 北京易成市政工程有限责任公司 Mountain digging device and construction method using same
CN113323053B (en) * 2021-05-26 2023-11-28 广东信稳能控技术研究有限公司 Pile pressing and digging machine for rotary pipe
CN115559661B (en) * 2022-11-11 2023-10-13 广东九和建工有限公司 Pile foundation hole digger for constructional engineering

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202450526U (en) * 2012-02-28 2012-09-26 侯隆飙 Shield excavation type pile driver dynamic drill
CN102900360A (en) * 2011-07-28 2013-01-30 华北电网有限公司 Combined type digging and drilling machine
CN203925292U (en) * 2014-03-18 2014-11-05 天津市八方工程机械设备有限公司 A kind of revolving dug reaming bit
CN204082012U (en) * 2014-09-12 2015-01-07 四川四海达通工程机械有限公司 A kind of anchoring-bolt broaching drill bit
CN207728305U (en) * 2017-12-29 2018-08-14 广州华磊建筑基础工程有限公司 Foundation pile one-shaper
CN211874374U (en) * 2019-12-18 2020-11-06 湖南鼎功岩土特种设备有限公司 Pile foundation hole digging machine for building foundation engineering

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2340811Y (en) * 1998-06-30 1999-09-29 吴贞豪 Telescopic sleeve pile driver
KR20050000461A (en) * 2003-06-24 2005-01-05 주식회사 나온테크 Cutter-linked tunnel excavator having agitating device
CN102409979B (en) * 2011-09-22 2013-08-14 张永忠 Stone-crushing drill bit
JP2013129984A (en) * 2011-12-21 2013-07-04 Mitsubishi Heavy Industries Mechatronics Systems Ltd Tunnel excavator and method of cutting obstacle with the tunnel excavator
CN107882510A (en) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 A kind of boring drill bit device of reducing and construction method
CN109281619A (en) * 2017-07-20 2019-01-29 天津天阀门有限公司 A kind of well novel adjustable bottom expanding drill
CN107476764A (en) * 2017-10-11 2017-12-15 上海长凯岩土工程有限公司 A kind of Drilling by circulation rig cylinder bores
CN110017103A (en) * 2018-01-09 2019-07-16 苏延波 It is a kind of to improve the drilling bit of pile engine for opening rock rate
CN108868800A (en) * 2018-08-25 2018-11-23 许慧 One kind preventing incrusted shield machine at excavation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900360A (en) * 2011-07-28 2013-01-30 华北电网有限公司 Combined type digging and drilling machine
CN202450526U (en) * 2012-02-28 2012-09-26 侯隆飙 Shield excavation type pile driver dynamic drill
CN203925292U (en) * 2014-03-18 2014-11-05 天津市八方工程机械设备有限公司 A kind of revolving dug reaming bit
CN204082012U (en) * 2014-09-12 2015-01-07 四川四海达通工程机械有限公司 A kind of anchoring-bolt broaching drill bit
CN207728305U (en) * 2017-12-29 2018-08-14 广州华磊建筑基础工程有限公司 Foundation pile one-shaper
CN211874374U (en) * 2019-12-18 2020-11-06 湖南鼎功岩土特种设备有限公司 Pile foundation hole digging machine for building foundation engineering

Also Published As

Publication number Publication date
CN110863773A (en) 2020-03-06

Similar Documents

Publication Publication Date Title
CN110863773A (en) A pile foundation excavator for building foundation engineering
CN109653682B (en) Drill bit with adjustable drill diameter and hole digging machine
CN207093008U (en) Drill
JP2014237939A (en) Center drilling excavator
CN102425372A (en) Vibration Drilling Drilling Rig
CN111945728A (en) A planting pile construction equipment
CN105133581A (en) Three-in-one construction method for uplift pile, lattice column and precipitation well in supporting structure
JPS6347878B2 (en)
CN211874374U (en) Pile foundation hole digging machine for building foundation engineering
US5026214A (en) Apparatus for placing cementitious materials in earth excavations
CN113530476B (en) A drill rod lifting and lowering device for down-the-hole hammer drilling process of rotary drilling rig
CN115247419A (en) Full-length steel casing concrete cast-in-place pile construction equipment and method without slurry discharge
CN222809997U (en) A kind of wrapped pile drilling and pouring integrated machine
CN116927654B (en) Hole forming construction method and auxiliary device for dry operation of pile foundation of main tower in complex geology
JP6945329B2 (en) Underground obstacle removal method
JP2000008763A (en) Deep corner excavator and deep corner excavation method
JP3022435B2 (en) Drilling rig
JP3544029B2 (en) Shaft excavator
JPH0657762A (en) Construction of deep foundation
JP3025632B2 (en) Hard rock drilling rig
KR100479514B1 (en) Apparatus for and a method of boring the ground
CN115711085B (en) A noise reduction structure for a rotary drilling rig used in construction
JPS5845529B2 (en) Steel pipe installation equipment
JP2633154B2 (en) Vertical hole drilling method
KR20110105245A (en) Grab core barrel with water spray function and excavator with same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Xiaoming

Inventor after: Tang Xun

Inventor after: Liu Huaxia

Inventor after: Gong Shishen

Inventor after: Wu Qiong

Inventor after: Xiong Xiang

Inventor before: Tang Xun

Inventor before: Liu Huaxia

Inventor before: Liu Xiaoming

Inventor before: Gong Shishen

Inventor before: Wu Qiong

Inventor before: Xiong Xiang

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant