CN110847443B - Mounting structure of assembled fast-assembling steelframe - Google Patents
Mounting structure of assembled fast-assembling steelframe Download PDFInfo
- Publication number
- CN110847443B CN110847443B CN201911131768.1A CN201911131768A CN110847443B CN 110847443 B CN110847443 B CN 110847443B CN 201911131768 A CN201911131768 A CN 201911131768A CN 110847443 B CN110847443 B CN 110847443B
- Authority
- CN
- China
- Prior art keywords
- tube
- plate
- sleeve
- plug
- present
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/76—Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明提供了一种装配式快装型钢架的安装结构,其方管;底座,其包括连接板和连接管,连接板设置于连接管的底部;连接构件,包括套装管和插装管,插装管设置于套装管的顶部,方管套设于插装管上,连接管插装于套装管内;套装管的一侧设置有限位插口;限位插板,限位插板插装于限位插口中。本发明相较于现有技术具有以下优点:通过不同构件进行装配式安装,施工安全,安装效率高;受力均衡,没有明显的应力集中点,结构体系安全稳定,连接牢靠;各部件可重复利用,降低材料成本。
The present invention provides an installation structure of an assembled quick-install steel frame, which comprises a square tube; a base, which comprises a connecting plate and a connecting tube, the connecting plate being arranged at the bottom of the connecting tube; a connecting member, which comprises a sleeve tube and a plug-in tube, the plug-in tube being arranged at the top of the sleeve tube, the square tube being sleeved on the plug-in tube, the connecting tube being plugged into the sleeve tube; a limited position socket being arranged on one side of the sleeve tube; a limited position plug-in plate, the limited position plug-in plate being plugged into the limited position socket. Compared with the prior art, the present invention has the following advantages: assembled installation is performed through different components, construction is safe, and installation efficiency is high; force is balanced, there is no obvious stress concentration point, the structural system is safe and stable, and the connection is reliable; each component can be reused, reducing material costs.
Description
技术领域Technical Field
本发明涉及一种快装型钢架,具体而言,涉及一种装配式快装型钢架的安装结构。The invention relates to a quick-install steel frame, in particular to an installation structure of an assembled quick-install steel frame.
背景技术Background Art
装配式装饰是近年新兴的一种装饰施工形式。装配式装饰顾名思义,即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,并且施工现场更为整洁和美观,不会产生过多的装饰材料垃圾,是一种更为绿色环保的装饰施工形式。Prefabricated decoration is a new form of decoration construction in recent years. As the name suggests, prefabricated decoration is to produce all the parts and components needed for decoration in the factory, and then transport them to the decoration site for assembly and installation, eliminating the traditional decoration site's measurement, cutting and other operations, making the construction simpler and more convenient, greatly improving the construction efficiency of the decoration site, and making the construction site cleaner and more beautiful, without generating too much decoration material waste, which is a more green and environmentally friendly form of decoration construction.
目前,市面上针对钢架施工比较依赖焊接作业,对施工人员素质、技能要求比较高,导致施工成本逐年攀升;且现场焊接作业存在很多安全隐患;而当下比较常见的钢架干法装配式作业,连接构件比较简单,不能够形成稳定的受力结构,具体表现为:方管通过膨胀螺栓、角码以及螺钉进行连接,然而一个角码与一个膨胀螺栓连接固定于可靠的建筑面上,应力集中且荷载有限;方管与角码间的连接仅仅靠打入燕尾螺钉固定,同样具有应力集中、荷载有限的缺陷。At present, the market relies more on welding operations for steel frame construction, which has high requirements on the quality and skills of construction personnel, resulting in rising construction costs year by year; and there are many safety hazards in on-site welding operations; and the more common steel frame dry assembly operations currently have relatively simple connecting components and cannot form a stable force-bearing structure, which is specifically manifested as follows: square tubes are connected by expansion bolts, angle brackets and screws, but an angle bracket is connected and fixed to a reliable building surface with an expansion bolt, resulting in stress concentration and limited load; the connection between the square tube and the angle bracket is only fixed by driving in dovetail screws, which also has the defects of stress concentration and limited load.
发明内容Summary of the invention
鉴于此,本发明提供了一种装配式快装型钢架的安装结构,通过不同构件进行装配式安装,施工安全,安装效率高;受力均衡,没有明显的应力集中点,结构体系安全稳定,连接牢靠;各部件可重复利用,降低材料成本。In view of this, the present invention provides an installation structure of an assembled quick-install steel frame, which is assembled and installed through different components, with safe construction and high installation efficiency; the force is balanced, there is no obvious stress concentration point, the structural system is safe and stable, and the connection is reliable; each component can be reused, reducing material costs.
为此,本发明提供了一种装配式快装型钢架的安装结构,其包括:To this end, the present invention provides an installation structure of an assembled quick-install steel frame, which includes:
方管;Square tube;
底座,其包括连接板和连接管,连接板设置于连接管的底部;A base, comprising a connecting plate and a connecting pipe, wherein the connecting plate is arranged at the bottom of the connecting pipe;
连接构件,包括套装管和插装管,插装管设置于套装管的顶部,方管套设于插装管上,连接管插装于套装管内;套装管的一侧设置有限位插口;The connecting component comprises a sleeve tube and an inserting tube, wherein the inserting tube is arranged on the top of the sleeve tube, the square tube is sleeved on the inserting tube, and the connecting tube is inserted into the sleeve tube; a limited position socket is arranged on one side of the sleeve tube;
限位插板,限位插板插装于限位插口中。A limit plug plate is inserted into the limit socket.
进一步地,上述底座的侧面形状呈“T”型。Furthermore, the side surface of the base is in a "T" shape.
进一步地,上述连接板的相对两侧设置有连接孔,连接孔为腰型孔。Furthermore, connecting holes are arranged on opposite sides of the connecting plate, and the connecting holes are waist-shaped holes.
进一步地,上述限位插口呈“C”型。Furthermore, the above-mentioned limiting socket is in a "C" shape.
进一步地,上述限位插板的侧面呈“L”型。Furthermore, the side surface of the above-mentioned limiting plug plate is "L"-shaped.
进一步地,上述连接板的长度尺寸大于连接管的长度尺寸,连接板的宽度尺寸大于连接管的宽度尺寸。Furthermore, the length dimension of the above-mentioned connecting plate is greater than the length dimension of the connecting pipe, and the width dimension of the connecting plate is greater than the width dimension of the connecting pipe.
进一步地,上述套装管的外径尺寸大于插装管的外径尺寸。Furthermore, the outer diameter of the sleeve tube is larger than the outer diameter of the insertion tube.
进一步地,上述套装管的内径尺寸与连接管的外径尺寸相匹配,插装管的外径尺寸与方管的内径尺寸相匹配。Furthermore, the inner diameter of the sleeve tube matches the outer diameter of the connecting tube, and the outer diameter of the insert tube matches the inner diameter of the square tube.
进一步地,上述连接板通过连接孔和膨胀螺栓与原始建筑相连接。Furthermore, the connection plate is connected to the original building through connection holes and expansion bolts.
本发明所提供的一种装配式快装型钢架的安装结构,主要包括方管、底座、连接构件以及限位插板,方管通过底座和连接构件与原始建筑进行连接,并通过限位插板进行位置的限定;具体的,底座包括连接板和连接管,连接构件包括套装管和插装管,套装管的一侧设置有限位插口,套装管套于连接管上,插装管插于方管中,连接板和原始建筑相连接,即可实现方管的固定安装。The present invention provides an installation structure of an assembled quick-install steel frame, which mainly includes a square tube, a base, a connecting member and a limiting plug plate. The square tube is connected to the original building through the base and the connecting member, and the position is limited by the limiting plug plate. Specifically, the base includes a connecting plate and a connecting tube, the connecting member includes a sleeve tube and an insertion tube, a limiting socket is provided on one side of the sleeve tube, the sleeve tube is sleeved on the connecting tube, the insertion tube is inserted into the square tube, and the connecting plate is connected to the original building to realize the fixed installation of the square tube.
安装时,首先将底座安装于原始建筑;其次将连接构件插入方管内,插入时涂抹适量的结构胶;之后将连接好的方管和连接构件套装在底座之上;最后在连接构件的限位插口内插入限位插板。During installation, first install the base on the original building; secondly, insert the connecting component into the square tube, and apply an appropriate amount of structural adhesive during insertion; then, put the connected square tube and connecting component on the base; finally, insert the limit plug into the limit socket of the connecting component.
通过上述结构,使得本发明所提供的一种装配式快装型钢架的安装结构相较于现有技术主要具有以下优点:Through the above structure, the installation structure of the assembled quick-install steel frame provided by the present invention has the following advantages compared with the prior art:
一、整个安装过程全部在常温常态的条件下进行,纯装配式安装,安全高效;1. The entire installation process is carried out under normal temperature and normal conditions. It is a pure assembly installation, safe and efficient;
二、不会像焊接作业产生后续的工作,如焊点剔除焊渣、刷防锈漆等,减少施工工序;Second, there will be no subsequent work like welding operations, such as removing welding slag from welding points, applying anti-rust paint, etc., which reduces the construction process;
三、各构件间的连接紧密,受力均衡,没有明显的应力集中点,结构体系安全稳定;3. The connections between the components are tight, the stress is balanced, there is no obvious stress concentration point, and the structural system is safe and stable;
四、该安装结构内的所有部件均为独立可拆卸模块,能够实现多次循环利用,能够创造额外的经济效益。Fourth, all components in the installation structure are independent detachable modules, which can be recycled many times and create additional economic benefits.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本发明的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
图1为本发明实施例提供的一种装配式快装型钢架的安装结构的主视剖视图;FIG1 is a front cross-sectional view of an installation structure of an assembled quick-install steel frame provided by an embodiment of the present invention;
图2为本发明实施例提供的一种装配式快装型钢架的安装结构的侧视剖视图;FIG2 is a side cross-sectional view of an installation structure of an assembled quick-install steel frame provided by an embodiment of the present invention;
图3为本发明实施例提供的一种装配式快装型钢架的安装结构的俯视图;FIG3 is a top view of an installation structure of an assembled quick-install steel frame provided by an embodiment of the present invention;
图4为本发明实施例中底座的俯视图;FIG4 is a top view of the base in an embodiment of the present invention;
图5为本发明实施例中底座的侧视图;FIG5 is a side view of the base in an embodiment of the present invention;
图6为本发明实施例中底座的主视图;FIG6 is a front view of the base in an embodiment of the present invention;
图7为本发明实施例中连接构件的俯视图;FIG7 is a top view of a connecting member in an embodiment of the present invention;
图8为本发明实施例中连接构件的左视图;FIG8 is a left side view of a connecting member in an embodiment of the present invention;
图9为本发明实施例中连接构件的主视图;FIG9 is a front view of a connecting member according to an embodiment of the present invention;
图10为本发明实施例中连接构件的右视图;FIG10 is a right side view of the connecting member in the embodiment of the present invention;
图11为本发明实施例中限位插板的侧视图;FIG11 is a side view of a limit plug plate in an embodiment of the present invention;
图12为本发明实施例中限位插板的主视图。FIG. 12 is a front view of the limit plug plate in the embodiment of the present invention.
具体实施方式DETAILED DESCRIPTION
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
实施例一:Embodiment 1:
参见图1至图12,图中示出了本发明实施例一提供的一种装配式快装型钢架的安装结构,其包括:方管1;底座2,其包括连接板21和连接管22,连接板21设置于连接管22的底部;连接构件3,包括套装管31和插装管32,插装管32设置于套装管31的顶部,方管1套设于插装管32上,连接管22插装于套装管31内;套装管31的一侧设置有限位插口33;限位插板4,限位插板4插装于限位插口33中。具体地,底座2的侧面形状呈“T”型。Referring to Figures 1 to 12, the figures show an installation structure of an assembled quick-install steel frame provided by the first embodiment of the present invention, which includes: a square tube 1; a base 2, which includes a connecting plate 21 and a connecting tube 22, and the connecting plate 21 is arranged at the bottom of the connecting tube 22; a connecting member 3, which includes a sleeve tube 31 and an inserting tube 32, and the inserting tube 32 is arranged at the top of the sleeve tube 31, the square tube 1 is sleeved on the inserting tube 32, and the connecting tube 22 is inserted into the sleeve tube 31; a limited position socket 33 is provided on one side of the sleeve tube 31; and a limit plug 4, and the limit plug 4 is inserted into the limit plug 33. Specifically, the side shape of the base 2 is "T"-shaped.
本实施例所提供的一种装配式快装型钢架的安装结构,主要包括方管1、底座2、连接构件3以及限位插板4,方管1通过底座2和连接构件3与原始建筑6进行连接,并通过限位插板4进行位置的限定;具体的,底座2包括连接板21和连接管22,连接构件3包括套装管31和插装管32,套装管31的一侧设置有限位插口33,套装管31套于连接管22上,插装管32插于方管1中,连接板21和原始建筑6相连接,即可实现方管1的固定安装。The present embodiment provides an installation structure of an assembled quick-install steel frame, which mainly includes a square tube 1, a base 2, a connecting member 3 and a limiting plug plate 4. The square tube 1 is connected to the original building 6 through the base 2 and the connecting member 3, and the position is limited by the limiting plug plate 4; specifically, the base 2 includes a connecting plate 21 and a connecting tube 22, the connecting member 3 includes a sleeve tube 31 and an insert tube 32, a limiting socket 33 is provided on one side of the sleeve tube 31, the sleeve tube 31 is sleeved on the connecting tube 22, the insert tube 32 is inserted into the square tube 1, the connecting plate 21 is connected to the original building 6, and the fixed installation of the square tube 1 can be realized.
安装时,首先将底座2安装于原始建筑6;其次将连接构件3插入方管1内,插入时涂抹适量的结构胶;之后将连接好的方管1和连接构件3套装在底座2之上;最后在连接构件3的限位插口33内插入限位插板4。During installation, first install the base 2 on the original building 6; secondly, insert the connecting member 3 into the square tube 1, and apply a proper amount of structural adhesive during insertion; then, put the connected square tube 1 and the connecting member 3 on the base 2; finally, insert the limiting plug plate 4 into the limiting socket 33 of the connecting member 3.
通过上述结构,使得本发明所提供的一种装配式快装型钢架的安装结构相较于现有技术主要具有以下优点:Through the above structure, the installation structure of the assembled quick-install steel frame provided by the present invention has the following advantages compared with the prior art:
一、整个安装过程全部在常温常态的条件下进行,纯装配式安装,安全高效;1. The entire installation process is carried out under normal temperature and normal conditions. It is a pure assembly installation, safe and efficient;
二、不会像焊接作业产生后续的工作,如焊点剔除焊渣、刷防锈漆等,减少施工工序;Second, there will be no subsequent work like welding operations, such as removing welding slag from welding points, applying anti-rust paint, etc., which reduces the construction process;
三、各构件间的连接紧密,受力均衡,没有明显的应力集中点,结构体系安全稳定;3. The connections between the components are tight, the stress is balanced, there is no obvious stress concentration point, and the structural system is safe and stable;
四、该安装结构内的所有部件均为独立可拆卸模块,能够实现多次循环利用,能够创造额外的经济效益。Fourth, all components in the installation structure are independent detachable modules, which can be recycled many times and create additional economic benefits.
实施例二:Embodiment 2:
参见图1-4,图中示出了本发明实施例二提供的一种装配式快装型钢架的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:连接板21的相对两侧设置有连接孔211,连接孔211为腰型孔;连接板21通过连接孔211和膨胀螺栓5与原始建筑6相连接。通过上述结构的设置,能够提高底座2和原始建筑6的连接强度,提高整体钢架的稳定性。Referring to Figures 1-4, the figures show an installation structure of an assembled quick-install steel frame provided by the second embodiment of the present invention. This embodiment further provides the following improved technical solutions based on the above embodiments: connecting holes 211 are provided on opposite sides of the connecting plate 21, and the connecting holes 211 are waist-shaped holes; the connecting plate 21 is connected to the original building 6 through the connecting holes 211 and the expansion bolts 5. By setting the above structure, the connection strength between the base 2 and the original building 6 can be improved, and the stability of the overall steel frame can be improved.
实施例三:Embodiment three:
参见图7、图11,图中示出了本发明实施例三提供的一种装配式快装型钢架的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:限位插口33呈“C”型;限位插板4的侧面呈“L”型。通过上述结构的设置,能够将底座2和连接构件3进一步插紧定位,提高两者的连接力度。Referring to FIG. 7 and FIG. 11, the figures show an installation structure of an assembled quick-install steel frame provided by the third embodiment of the present invention. This embodiment further provides the following improved technical solutions based on the above embodiments: the limit socket 33 is "C" shaped; the side of the limit plug plate 4 is "L" shaped. Through the arrangement of the above structure, the base 2 and the connecting member 3 can be further inserted and positioned, thereby improving the connection strength between the two.
实施例四:Embodiment 4:
参见图1-6,图中示出了本发明实施例四提供的一种装配式快装型钢架的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:连接板21的长度尺寸大于连接管22的长度尺寸,连接板21的宽度尺寸大于连接管22的宽度尺寸;套装管31的外径尺寸大于插装管32的外径尺寸;套装管31的内径尺寸与连接管22的外径尺寸相匹配,插装管32的外径尺寸与方管1的内径尺寸相匹配。通过上述结构的设置,能够提高方管1和插装管32之间和套装管31和连接管22之间的安装效果,从而提升整体钢架的连接效果。Referring to Figures 1-6, the figure shows an installation structure of an assembled quick-install steel frame provided by the fourth embodiment of the present invention. This embodiment further makes the following technical solutions as improvements on the basis of the above embodiments: the length dimension of the connecting plate 21 is greater than the length dimension of the connecting tube 22, and the width dimension of the connecting plate 21 is greater than the width dimension of the connecting tube 22; the outer diameter dimension of the sleeve tube 31 is greater than the outer diameter dimension of the plug-in tube 32; the inner diameter dimension of the sleeve tube 31 matches the outer diameter dimension of the connecting tube 22, and the outer diameter dimension of the plug-in tube 32 matches the inner diameter dimension of the square tube 1. By setting the above structure, the installation effect between the square tube 1 and the plug-in tube 32 and between the sleeve tube 31 and the connecting tube 22 can be improved, thereby improving the connection effect of the overall steel frame.
显然,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911131768.1A CN110847443B (en) | 2019-11-18 | 2019-11-18 | Mounting structure of assembled fast-assembling steelframe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911131768.1A CN110847443B (en) | 2019-11-18 | 2019-11-18 | Mounting structure of assembled fast-assembling steelframe |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110847443A CN110847443A (en) | 2020-02-28 |
| CN110847443B true CN110847443B (en) | 2024-08-16 |
Family
ID=69602514
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911131768.1A Active CN110847443B (en) | 2019-11-18 | 2019-11-18 | Mounting structure of assembled fast-assembling steelframe |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110847443B (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN211873441U (en) * | 2019-11-18 | 2020-11-06 | 金螳螂精装科技(苏州)有限公司 | Mounting structure of assembled fast-assembling type steelframe |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5808981B2 (en) * | 2011-08-30 | 2015-11-10 | 岡部株式会社 | Steel structure exposed column base structure |
| CN110158813A (en) * | 2019-04-24 | 2019-08-23 | 苏州金螳螂建筑装饰股份有限公司 | A kind of bottom fast joint structure of assembled type steel frame partition wall |
-
2019
- 2019-11-18 CN CN201911131768.1A patent/CN110847443B/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN211873441U (en) * | 2019-11-18 | 2020-11-06 | 金螳螂精装科技(苏州)有限公司 | Mounting structure of assembled fast-assembling type steelframe |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110847443A (en) | 2020-02-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110847443B (en) | Mounting structure of assembled fast-assembling steelframe | |
| CN211873441U (en) | Mounting structure of assembled fast-assembling type steelframe | |
| CN211873325U (en) | Steel construction prefabricated formula building coupling assembling | |
| CN215670736U (en) | A new type of plug-in dry hanging stone structure | |
| CN210105122U (en) | A roof structure for assembling houses | |
| CN203856909U (en) | Coupler | |
| CN203129573U (en) | Non-dismounting connecting device for outer side back ridge steel tubes of large timber formwork | |
| CN219316118U (en) | Curtain wall mounting structure | |
| CN215888808U (en) | Assembled roof suspended structure | |
| CN202148664U (en) | Stone material dry-hang mounting structure of vertical surface | |
| CN215055557U (en) | A steel structure safety rope fixing device | |
| CN205348414U (en) | Steel structure connecting piece | |
| CN210947518U (en) | A wall decorative panel installation structure using butterfly buckle | |
| CN103925269B (en) | Profile connection set between a kind of support | |
| CN211899810U (en) | Reinforced supporting structure for constructional engineering | |
| CN209978619U (en) | An easy-to-install sword-type metal pendant | |
| CN219343684U (en) | A detachable curtain wall installation structure | |
| CN212224507U (en) | Fast-assembling system of assembled wall ceramic tile veneer | |
| CN206429041U (en) | Building construction enclosure wall | |
| CN218990785U (en) | Detachable decorative line structure | |
| CN209568650U (en) | A plug-in pendant for fixing the upper hook head by buckle | |
| CN111188487B (en) | A double oblique pin fastener for building steel pipe support | |
| CN218292291U (en) | Beam column node connecting device | |
| CN223593784U (en) | Dish knot node structure | |
| CN204370627U (en) | A kind of stone curtain wall mount fixing structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250703 Address after: 272000 West Head of Xianzhuang Village, Nanzhang Street Office, Rencheng District, Jining City, Shandong Province Patentee after: Shandong Guolong Construction Co.,Ltd. Country or region after: China Address before: Minsheng Road, Suzhou Industrial Park, 215123 Jiangsu province Loufeng No. 5 Patentee before: GOLD MANTIS FINE DECORATION TECHNOLOGY (SUZHOU) Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |