CN110847193A - Foundation pit support beam dismantling method - Google Patents

Foundation pit support beam dismantling method Download PDF

Info

Publication number
CN110847193A
CN110847193A CN201911165962.1A CN201911165962A CN110847193A CN 110847193 A CN110847193 A CN 110847193A CN 201911165962 A CN201911165962 A CN 201911165962A CN 110847193 A CN110847193 A CN 110847193A
Authority
CN
China
Prior art keywords
pile
foundation pit
steel plate
support
support beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911165962.1A
Other languages
Chinese (zh)
Inventor
冯宗耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201911165962.1A priority Critical patent/CN110847193A/en
Publication of CN110847193A publication Critical patent/CN110847193A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a foundation pit supporting beam dismantling method, which comprises the following steps: 1. installing a support-replacing pile; 2. installing a pile cap; 3. steel bars are implanted into the waist beam, the through hole is formed in the waist beam, and a second steel plate is welded on the waist beam; 4. the first steel plate and the second steel plate are welded and integrated through threaded steel pipes. The construction method solves the problem of stability of the whole supporting structure after the supporting beam is removed through the threaded steel pipe, is rapid and simple, has relatively low cost and is convenient to implement.

Description

Foundation pit support beam dismantling method
Technical Field
The invention relates to the field of foundation pit supporting structure construction, in particular to a foundation pit supporting beam dismantling method.
Background
With the increase of urban construction speed, land resources in central areas of cities are remarkably tense, and the problems that the urban central areas need to be dismantled are more and more involved in the urban construction process. The capital pressure of the construction side is large. The project construction side often adopts a scheme of staged construction, but the construction unit also has higher requirements on the image progress. The deep foundation pit structure of stage construction is related to, appropriate support replacement measures are adopted, the inner support structure of the support structure is reasonably dismantled in advance to obtain more operation surfaces, the construction period can be shortened, and the cost is saved.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a foundation pit supporting beam dismantling method.
In order to achieve the purpose, the invention adopts the technical scheme that: the provided foundation pit supporting beam dismantling method comprises the following steps:
a. installing a support-changing pile along the outer side line of the basement at one side of the support beam which is not constructed and needs to be dismantled;
b. fixedly placing a pile cap on the support-changing pile, and embedding a first steel plate on the pile cap;
c. a waist beam is arranged above the pile cap, and a steel bar is implanted into the waist beam, a through hole is formed in the waist beam, and a second steel plate is welded on the waist beam;
d. the first steel plate and the second steel plate are welded and integrated through threaded steel pipes. Preferably, the step c of installing a support mechanism further comprises: one end of the inclined steel pipe, which is close to the vertical square stock, is provided with big scurf.
Preferably, the pile replacement in the step a is a cast-in-place pile.
Preferably, the pile cap in the step b is trapezoidal.
Preferably, the number of the implanted steel bars in the step c is 3-5.
Preferably, the diameter of the threaded steel pipe is phi 50-100 mm.
Compared with the prior art, the invention has the following advantages and beneficial effects:
1. the problem of stability of the whole supporting structure after the supporting beam is removed is solved through the threaded steel pipe 6;
2. the method is rapid, simple, relatively low in cost and convenient to implement.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
FIG. 1 is a schematic view of a method for removing a supporting beam of a foundation pit;
FIG. 2 is a schematic view of a support beam structure in a method for removing a support beam of a foundation pit;
fig. 3 is a schematic view of pile cap installation in a foundation pit support beam dismantling method.
The method comprises the following steps of 1, pile replacement, 2, a pile cap, 3, a first steel plate, 4, a second steel plate, 5, a threaded steel pipe, 6, a waist beam, 7 and a support beam.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-3, a method for removing a foundation pit supporting beam is characterized by comprising the following steps:
a. installing a support-changing pile 1 along the outer side line of the basement at one side of the support beam 7 which is not constructed and needs to be dismantled;
b. a pile cap 2 is fixedly placed on the support-changing pile 1, and a first steel plate 3 is pre-buried on the pile cap 2;
c. a waist beam 6 is arranged above the pile cap 2, and a second steel plate 4 is welded on the waist beam 6 after steel bars are implanted and through holes are formed in the waist beam;
d. the first steel plate 3 and the second steel plate 4 are welded and integrated through a threaded steel pipe 5.
Wherein: in the step a, the support-replacing pile 1 is a cast-in-place pile; the pile cap 2 in the step b is in a trapezoid shape; the number of the implanted steel bars in the step c is 3; the diameter of the threaded steel pipe 5 is phi 50 mm.
The implementation mode of the invention is as follows:
installing a support-changing pile 1 along the outer side line of the basement on one side of the basement structure which is not constructed; after the construction of the support pile 1 is completed, a pile cap 2 is installed on the support pile 1, and a first steel plate 3 is pre-buried on the pile cap. And a second steel plate 4 is arranged on the wale 6 corresponding to the pile cap 2. After the linear distance between the first plate 3 and the second plate 4 is determined, the threaded steel pipe 6 is blanked, and two ends of the threaded steel pipe 6 are welded on the first plate 3 and the second plate 4 respectively. The force received by the wale 6 is transmitted to the pile cap 2 through the support beam 7 and finally transmitted to the support-replacing pile 1, and the stability of the whole supporting structure is still ensured under the condition that the supporting beam is removed in advance.
The construction method solves the problem of stability of the whole supporting structure after the supporting beam is removed through the threaded steel pipe, and is rapid, simple, relatively low in cost and convenient to implement.
It is to be understood that the invention is not limited to the specific embodiments described above, but is intended to cover various insubstantial modifications of the inventive process concepts and solutions, or its application to other applications without modification.

Claims (5)

1. A foundation pit supporting beam dismantling method is characterized by comprising the following steps:
a. installing a support-changing pile (1) along the outer side line of the basement at one side of the support beam (7) which is not constructed and needs to be dismantled;
b. a pile cap (2) is fixedly placed on the support-changing pile (1), and a first steel plate (3) is embedded in the pile cap (2);
c. a waist beam (6) is arranged above the pile cap (2), and a second steel plate (4) is welded on the waist beam (6) through steel bars and through holes implanted;
d. the first steel plate (3) and the second steel plate (4) are welded and integrated through a threaded steel pipe (5).
2. A foundation pit support beam demolition method according to claim 1, characterized in that the bracing-change pile (1) in step a is a cast-in-place pile.
3. A foundation pit support beam demolition method as claimed in claim 1, wherein the pile cap (2) in step b is trapezoid-shaped.
4. The method for dismantling the supporting beam of the foundation pit as claimed in claim 1, wherein the number of the implanted steel bars in the step c is 3-5.
5. A foundation pit support beam dismantling method as claimed in any one of claims 1 to 4, wherein the diameter of the threaded steel pipe (5) is 50mm to 100 mm.
CN201911165962.1A 2019-11-25 2019-11-25 Foundation pit support beam dismantling method Pending CN110847193A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911165962.1A CN110847193A (en) 2019-11-25 2019-11-25 Foundation pit support beam dismantling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911165962.1A CN110847193A (en) 2019-11-25 2019-11-25 Foundation pit support beam dismantling method

Publications (1)

Publication Number Publication Date
CN110847193A true CN110847193A (en) 2020-02-28

Family

ID=69604381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911165962.1A Pending CN110847193A (en) 2019-11-25 2019-11-25 Foundation pit support beam dismantling method

Country Status (1)

Country Link
CN (1) CN110847193A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101044977B1 (en) * 2010-12-16 2011-06-29 삼정건설 주식회사 Locking mechanism of construction brace
CN205024690U (en) * 2015-08-11 2016-02-10 中建二局第三建筑工程有限公司 Additional strengthening is propped in tearing open of supporting in deep basal pit
CN209179021U (en) * 2018-12-03 2019-07-30 中国建筑一局(集团)有限公司 A foundation pit row pile support system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101044977B1 (en) * 2010-12-16 2011-06-29 삼정건설 주식회사 Locking mechanism of construction brace
CN205024690U (en) * 2015-08-11 2016-02-10 中建二局第三建筑工程有限公司 Additional strengthening is propped in tearing open of supporting in deep basal pit
CN209179021U (en) * 2018-12-03 2019-07-30 中国建筑一局(集团)有限公司 A foundation pit row pile support system

Similar Documents

Publication Publication Date Title
CN107558478A (en) Foundation ditch and construction method of the support of Fei Shou roads with dynamic stress regulatory function
CN114319417A (en) Barrel-shaped assembled wind power tower barrel foundation and construction method thereof
CN110847193A (en) Foundation pit support beam dismantling method
CN220688211U (en) Roller for threading pipe
CN213926289U (en) Steel supporting structure for underground diaphragm wall support of foundation pit
CN212896368U (en) Connecting device for deep foundation pit steel support through underground engineering and capable of being disassembled later
CN210917394U (en) Foundation pit support pile
CN108915768B (en) Fixing force transmission support system for thermodynamic pipeline in thermodynamic shield tunnel
CN111622235A (en) Prestressed supporting rod for foundation pit enclosure
CN212358330U (en) Large-diameter steel pipe pile and miniature pile combined supporting structure
CN217151380U (en) Joist pulls out post construction equipment
CN216475166U (en) Supporting foundation for pile pulling in limited space and pile pulling machine
CN213709492U (en) Novel concrete pipe pile structure
CN210597281U (en) Bridge pile foundation in-situ binding reinforcement cage deviation control die carrier
KR20130117285A (en) Driven piles with circular plate around
CN205230603U (en) Lantern ring support
CN219080317U (en) Reinforcing cage fetal membrane frame
CN207244623U (en) A kind of stand column pile switching device for DTR equipment
CN223620903U (en) A support device for underground continuous wall in deep foundation pit
CN223607896U (en) Steel sheet pile working well opening water stop structure
CN222456082U (en) Pile stabilizing platform adjusting device
CN217733981U (en) Novel support in steel sheet pile
CN217781937U (en) Anchoring structure for pit flushing repair
CN115574186B (en) A repair method for an arc-shaped inverted siphon with an inner liner.
CN204059359U (en) A kind of pile foundation concrete perfusion conduit jig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200228