- CN110792221A CN110792221A CN201910876030.1A CN201910876030A CN110792221A CN 110792221 A CN110792221 A CN 110792221A CN 201910876030 A CN201910876030 A CN 201910876030A CN 110792221 A CN110792221 A CN 110792221A
- Authority
- CN
- China
- Prior art keywords
- laminated board
- prefabricated
- board body
- steel bars
- prefabricated laminated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/06—Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
- E04C5/065—Light-weight girders, e.g. with precast parts
- E04C5/0653—Light-weight girders, e.g. with precast parts with precast parts
- E04C5/0656—Light-weight girders, e.g. with precast parts with precast parts with lost formwork
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Building Environments (AREA)
Abstract
本发明公开了一种防漏浆的预制叠合板及其施工方法,包括方形叠合板本体,叠合板本体内设有在水平方向纵横交错的钢筋,所述钢筋沿着叠合板本体的端面向外延伸,叠合板本体顶面设有倒V字形的连接钢筋,连接钢筋的的尖部突出叠合板本体的顶面,靠近叠合板本体拼接端的钢筋向外延伸后向着叠合板本体的顶面方向弯折。该防漏浆的预制叠合板在现浇钢筋混凝土层时不易漏浆。
The invention discloses a prefabricated laminated board with anti-leakage slurry and a construction method thereof, comprising a square laminated board body, wherein the laminated board body is provided with steel bars that are crisscrossed in a horizontal direction, and the steel reinforcement bars extend outward along the end surface of the laminated board body. Extension, the top surface of the laminated board body is provided with an inverted V-shaped connecting steel bar, the tip of the connecting steel bar protrudes from the top surface of the laminated board body, and the steel bars close to the splicing end of the laminated board body extend outward and then bend toward the top surface of the laminated board body. fold. The prefabricated laminated board with anti-leakage slurry is not easy to leak slurry when the reinforced concrete layer is cast in place.
Description
技术领域:Technical field:
本发明涉及建筑领域,具体讲是一种防漏浆的预制叠合板及其施工方法。The invention relates to the field of construction, in particular to a prefabricated laminated board with anti-leakage slurry and a construction method thereof.
背景技术:Background technique:
叠合板是由预制板和现浇钢筋混凝土层叠合而成的装配整体式楼板。叠合楼板整体性好,板的上下表面平整,便于饰面层装修,适用于对整体刚度要求较高的高层建筑和大开间建筑。薄板的预应力主筋即是叠合楼板的主筋,上部混凝土现浇层仅配置负弯矩钢筋和构造钢筋。预应力薄板用作现浇混凝土层的底模,不必为现浇层支撑模板。薄板底面光滑平整,板缝经处理后,顶棚可以不再抹灰。这种叠合楼板具有现浇楼板的整体性、刚度大、抗裂性好、不增加钢筋消耗、节约模板等优点。叠合板已广泛运用于建筑施工过程中,因其安装方便的特点大大缩短了施工工期,现场上有运用的技术中有多种叠合板形式,且叠合板之间的拼接技术通常采用的形式为,叠合板一侧边凸出的钢筋插入另一块叠合板一侧的钢筋插孔中,形成钢筋连接方式。但不管哪种结构,在拼接后与现浇混凝土叠合时容易在拼接处漏浆。Laminated slab is an assembled monolithic floor slab composed of prefabricated slabs and cast-in-place reinforced concrete layers. The integrity of the superimposed floor slab is good, and the upper and lower surfaces of the slab are flat, which is convenient for the decoration of the veneer layer, and is suitable for high-rise buildings and large-bay buildings that require high overall rigidity. The prestressed main reinforcement of the thin slab is the main reinforcement of the superimposed floor slab, and the upper cast-in-place concrete layer is only equipped with negative moment reinforcement and structural reinforcement. The prestressed sheet is used as the bottom form for the cast-in-place concrete layer, and it is not necessary to support the formwork for the cast-in-place layer. The bottom surface of the thin plate is smooth and flat, and the ceiling can no longer be plastered after the seam of the plate is treated. This kind of superimposed floor has the advantages of the integrity of the cast-in-place floor, high rigidity, good crack resistance, no increase in the consumption of steel bars, and saving of formwork. Laminated boards have been widely used in the construction process, and the construction period has been greatly shortened due to its convenient installation. There are many types of laminated board in the technology used on the site, and the splicing technology between the laminated boards is usually in the form of , the reinforcing bars protruding from one side of the laminated board are inserted into the reinforcing steel jacks on one side of the other laminated board to form a reinforcing bar connection method. But no matter what kind of structure, it is easy to leak grout at the splicing when it is superimposed with the cast-in-place concrete after splicing.
发明内容:Invention content:
本发明所要解决的技术问题是,提供一种在现浇钢筋混凝土层时不易漏浆的防漏浆的预制叠合板。The technical problem to be solved by the present invention is to provide a prefabricated laminated board with anti-leakage slurry which is not easy to leak slurry during the cast-in-place reinforced concrete layer.
本发明的技术解决方案是,提供一种防漏浆的预制叠合板,包括方形叠合板本体,叠合板本体内设有在水平方向纵横交错的钢筋,所述钢筋沿着叠合板本体的端面向外延伸,叠合板本体顶面设有倒V字形的连接钢筋,连接钢筋的的尖部突出叠合板本体的顶面,靠近叠合板本体拼接端的钢筋向外延伸后向着叠合板本体的顶面方向弯折,叠合板本体拼接端底面具有向着顶面方向凹陷的避让凹槽,避让凹槽由拼接端的端面向着叠合板本体方向延伸。The technical solution of the present invention is to provide a leak-proof prefabricated laminated board, including a square laminated board body, and the laminated board body is provided with steel bars that are crisscrossed in the horizontal direction, and the steel bars are along the end face of the laminated board body. The top surface of the laminated board body is provided with an inverted V-shaped connecting steel bar, and the tip of the connecting steel bar protrudes from the top surface of the laminated board body. Bending, the bottom surface of the splicing end of the laminated board body has an avoidance groove recessed toward the top surface direction, and the avoidance groove extends from the end face of the spliced end to the direction of the laminated board body.
作为优选,避让凹槽沿着叠合板本体拼接端的长度方向设置。Preferably, the avoidance groove is arranged along the length direction of the spliced end of the laminated board body.
进一步的,避让凹槽的宽度为6-10cm,避让凹槽的深度为0.5-0.8cm。Further, the width of the avoidance groove is 6-10cm, and the depth of the avoidance groove is 0.5-0.8cm.
本发明还提供根据一种防漏浆的预制叠合板的施工方法,包括以下步骤,The present invention also provides a construction method of a prefabricated laminated board according to a leak-proof slurry, comprising the following steps:
步骤一、由下层楼板架设框架梁支架及模具;Step 1, erect the frame beam bracket and the mold from the lower floor slab;
步骤二、绑扎所述框架梁的底部钢筋及梁箍筋;
步骤三、吊装所有预制叠合板,使其端部设置在所述框架梁中线处;
步骤四、对所有所述预制叠合板定位;Step 4. Positioning all the prefabricated laminated boards;
步骤五、绑扎所述框架梁的上部钢筋;Step 5, binding the upper steel bars of the frame beam;
步骤六、浇筑所述框架梁;Step 6, pouring the frame beam;
步骤七、在相邻的两个所述预制叠合板的拼接端之间的空隙区域下方设置模板,并在拼接端的避让凹槽中固定弹性垫,弹性垫容置在相对设置的两块预制叠合板的两个避让凹槽形成的容置腔中;Step 7: Set up a template under the gap area between the splicing ends of the two adjacent prefabricated laminates, and fix elastic pads in the avoidance grooves of the splicing ends, and the elastic pads are accommodated in two oppositely arranged prefabricated laminates. in the accommodating cavity formed by the two avoidance grooves of the plywood;
步骤八、在所有所述预制叠合板上绑扎现浇混凝土层的负弯矩钢筋和构造钢筋;Step 8: Binding the negative bending moment steel bars and structural steel bars of the cast-in-place concrete layer on all the prefabricated laminated boards;
步骤九、现浇混凝土层,使所有所述预制叠合板相互连接形成整体的叠合板;Step 9, cast-in-place concrete layer, so that all the prefabricated laminated boards are connected to each other to form an integral laminated board;
步骤十、待混凝土固化后,取下模板并撕离弹性垫。Step 10. After the concrete is cured, remove the formwork and tear off the elastic pad.
进一步的,弹性垫通过压敏胶粘接于预制叠合板的避让凹槽中。Further, the elastic pad is bonded to the avoidance groove of the prefabricated laminated board through pressure-sensitive adhesive.
采用以上技术后与现有技术相比,本发明具有以下优点:将叠合板本体拼接后,在其对应的拼接处下方的避让凹槽中设置弹性防渗垫,然后通过叠合板本体下方的模板进行支撑,这样,在浇筑混凝土时就不会造成拼接处的砂浆渗漏。Compared with the prior art after the above technology is adopted, the present invention has the following advantages: after splicing the laminated board body, an elastic impermeable pad is arranged in the avoidance groove below the corresponding splicing part, and then the template under the laminated board body is passed through. Bracing so that there is no leakage of mortar at the joint when the concrete is poured.
附图说明:Description of drawings:
图1为本发明的结构示意图。FIG. 1 is a schematic structural diagram of the present invention.
图2为本发明拼接配合示意图。FIG. 2 is a schematic diagram of splicing and matching according to the present invention.
具体实施方式:Detailed ways:
下面结合附图和具体实施方式对本发明作进一步说明:The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments:
如图1、2所示,一种防漏浆的预制叠合板,包括方形叠合板本体1,叠合板本体1内设有在水平方向纵横交错的钢筋2,所述钢筋2沿着叠合板本体的端面向外延伸,叠合板本体1顶面设有倒V字形的连接钢筋3,连接钢筋3的的尖部突出叠合板本体的顶面,靠近叠合板本体拼接端的钢筋向外延伸后向着叠合板本体的顶面方向弯折,本实施例中弯折成圆弧弯钩状,叠合板本体拼接端底面具有向着顶面方向凹陷的避让凹槽4,避让凹槽4由拼接端的端面向着叠合板本体方向延伸,避让凹槽4为平面槽。当然,对应的,在叠合板本体的对应端面还开设有与钢筋插接配合的插孔。As shown in Figures 1 and 2, a prefabricated laminated board with anti-leakage slurry includes a square laminated board body 1. The laminated board body 1 is provided with
其具体施工方法如下,包括以下步骤,The specific construction method is as follows, including the following steps:
步骤一、由下层楼板架设框架梁支架及模具;Step 1, erect the frame beam bracket and the mold from the lower floor slab;
步骤二、绑扎所述框架梁的底部钢筋及梁箍筋;
步骤三、吊装所有预制叠合板,使其端部设置在所述框架梁中线处;
步骤四、对所有所述预制叠合板定位;Step 4. Positioning all the prefabricated laminated boards;
步骤五、绑扎所述框架梁的上部钢筋;Step 5, binding the upper steel bars of the frame beam;
步骤六、浇筑所述框架梁;Step 6, pouring the frame beam;
步骤七、在相邻的两个所述预制叠合板的拼接端之间的空隙区域下方设置模板,并在拼接端的避让凹槽中固定弹性垫,弹性垫容置在相对设置的两块预制叠合板的两个避让凹槽形成的容置腔中;Step 7: Set up a template under the gap area between the splicing ends of the two adjacent prefabricated laminates, and fix elastic pads in the avoidance grooves of the splicing ends, and the elastic pads are accommodated in two oppositely arranged prefabricated laminates. in the accommodating cavity formed by the two avoidance grooves of the plywood;
步骤八、在所有所述预制叠合板上绑扎现浇混凝土层的负弯矩钢筋和构造钢筋;Step 8: Binding the negative bending moment steel bars and structural steel bars of the cast-in-place concrete layer on all the prefabricated laminated boards;
步骤九、现浇混凝土层,使所有所述预制叠合板相互连接形成整体的叠合板;Step 9, cast-in-place concrete layer, so that all the prefabricated laminated boards are connected to each other to form an integral laminated board;
步骤十、待混凝土固化后,取下模板并撕离弹性垫。Step 10. After the concrete is cured, remove the formwork and tear off the elastic pad.
本发明通过在拼接端底面设置避让凹槽,得以在施工时通过在两相邻的叠合板板体的避让凹槽中设置弹性防渗垫,该弹性防渗垫可选用PVC或PP等片材,将其贴合在避让凹槽中,然后底下用支撑叠合板的模板支承,使得弹性防渗垫容置在两个叠合板的避让凹槽形成的容置空间内,这样,当进行浇筑施工时,砂浆不易从该拼接处渗漏。待混凝土固化后,拆除模板时,顺带将弹性防渗垫取下。为了更好防渗效果,弹性防渗垫与避让凹槽内壁接触的一面可涂覆压敏胶或其他易于清理的粘接剂,这样方便固定在叠合板上。In the present invention, by arranging avoidance grooves on the bottom surface of the splicing end, elastic impermeable pads can be arranged in the avoidance grooves of two adjacent laminated board bodies during construction, and the elastic impermeability pads can be selected from sheets such as PVC or PP , fit it in the avoidance groove, and then use the formwork supporting the laminated board to support it, so that the elastic impermeable pad is accommodated in the accommodation space formed by the avoidance groove of the two laminated boards. When the mortar is not easy to leak from the joint. After the concrete is cured, remove the elastic impermeable pad along with it when removing the formwork. In order to improve the anti-seepage effect, the side of the elastic anti-seepage pad in contact with the inner wall of the avoidance groove can be coated with pressure-sensitive adhesive or other easy-to-clean adhesive, so that it can be easily fixed on the laminated board.
以上仅就本发明较佳的实施例作了说明,但不能理解为是对权利要求的限制。凡是利用本发明说明书及附图内容所做的等效结构或等效流程变换,均包括在本发明的专利保护范围之内。The above only describes the preferred embodiments of the present invention, but should not be construed as limiting the claims. All equivalent structures or equivalent process transformations made by using the contents of the description and drawings of the present invention are included within the scope of patent protection of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910876030.1A CN110792221A (en) | 2019-09-17 | 2019-09-17 | A kind of prefabricated laminated board with anti-leakage slurry and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910876030.1A CN110792221A (en) | 2019-09-17 | 2019-09-17 | A kind of prefabricated laminated board with anti-leakage slurry and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110792221A true CN110792221A (en) | 2020-02-14 |
Family
ID=69427278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910876030.1A Pending CN110792221A (en) | 2019-09-17 | 2019-09-17 | A kind of prefabricated laminated board with anti-leakage slurry and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110792221A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATA190487A (en) * | 1987-07-28 | 1989-05-15 | Bucher Franz | METHOD FOR INSTALLING A CEILING SHEET POOLABLE WITH LOCAL CONCRETE |
CN202787598U (en) * | 2012-08-24 | 2013-03-13 | 叶长青 | Superimposed slab |
CN107313539A (en) * | 2017-08-04 | 2017-11-03 | 徐焱 | A kind of pre-stress hollow superimposed sheet |
CN107514083A (en) * | 2017-09-30 | 2017-12-26 | 沈阳建筑大学 | Side hangs reinforcing bar band shear key reinforced concrete slab structure and connection method |
CN109707090A (en) * | 2019-03-01 | 2019-05-03 | 中建二局第二建筑工程有限公司 | A kind of superimposed sheet reinforces pre-buried anti-faulting of slab ends structure and construction method under band plate |
CN109736499A (en) * | 2018-12-27 | 2019-05-10 | 浙江大经住工科技有限公司 | A kind of prefabricated superimposed sheet and its precasting process |
CN212001831U (en) * | 2019-09-17 | 2020-11-24 | 巨匠建设集团股份有限公司 | Prefabricated superimposed sheet of leak protection thick liquid |
-
2019
- 2019-09-17 CN CN201910876030.1A patent/CN110792221A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATA190487A (en) * | 1987-07-28 | 1989-05-15 | Bucher Franz | METHOD FOR INSTALLING A CEILING SHEET POOLABLE WITH LOCAL CONCRETE |
CN202787598U (en) * | 2012-08-24 | 2013-03-13 | 叶长青 | Superimposed slab |
CN107313539A (en) * | 2017-08-04 | 2017-11-03 | 徐焱 | A kind of pre-stress hollow superimposed sheet |
CN107514083A (en) * | 2017-09-30 | 2017-12-26 | 沈阳建筑大学 | Side hangs reinforcing bar band shear key reinforced concrete slab structure and connection method |
CN109736499A (en) * | 2018-12-27 | 2019-05-10 | 浙江大经住工科技有限公司 | A kind of prefabricated superimposed sheet and its precasting process |
CN109707090A (en) * | 2019-03-01 | 2019-05-03 | 中建二局第二建筑工程有限公司 | A kind of superimposed sheet reinforces pre-buried anti-faulting of slab ends structure and construction method under band plate |
CN212001831U (en) * | 2019-09-17 | 2020-11-24 | 巨匠建设集团股份有限公司 | Prefabricated superimposed sheet of leak protection thick liquid |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201087480Y (en) | Prestressed concrete composite beam | |
CN202559570U (en) | Thin-wall light steel composite floor slab without dismantling bottom cast | |
CN111305081B (en) | Construction technology of a prefabricated bridge deck wet joint connection structure | |
CN209066714U (en) | A kind of prestressed reinforced concrete laminated board and its stacking structure and connecting structure | |
CN107327063A (en) | A kind of prefabricated underplate concrete superimposed sheet with ribbing | |
CN111188457A (en) | Edge sealing beam structure of super high-rise steel structure building and construction method | |
CN108978967A (en) | A kind of method of the prefabricated part overlapping connection concrete floor of total cross-section | |
CN107090908B (en) | A joint connection method of vertical prefabricated components | |
CN108104284A (en) | Shear wall steel arm is embedded in the wallboard connecting structure and assembly method of floor | |
CN110512785A (en) | One-way laminated slab and formwork structure and construction method with tongue-and-groove and no rib | |
CN110499857A (en) | An installation method for vertical reinforcement and callback of precast concrete laminated slabs | |
CN211143474U (en) | Precast concrete slabs and connecting structures | |
CN110792221A (en) | A kind of prefabricated laminated board with anti-leakage slurry and construction method thereof | |
CN107165280B (en) | A kind of large span open-spandrel sandwich board stay in place form support system and construction method | |
CN202347722U (en) | Assembly type prefabricated concrete wall board provided with wood-wool cement boards | |
CN212001831U (en) | Prefabricated superimposed sheet of leak protection thick liquid | |
CN101245642A (en) | A two-way laminated concrete slab with strip-shaped block bottom slab | |
CN111379337B (en) | Secondary structure anti-seepage and anti-leakage construction method | |
CN102535851A (en) | Board integrated construction process of prefabricated floor board of masonry house | |
CN204059941U (en) | A kind of arrangement of reinforcement formula permanent formwork and concrete structure member | |
CN204356915U (en) | The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall | |
CN211229507U (en) | Circular arc angle floor that can have enough to meet need falls board and hangs mould | |
CN112982692A (en) | One-way superimposed sheet joint connecting structure and construction method | |
CN206477431U (en) | Overlap balcony | |
CN112144675A (en) | Precast concrete reversed ridge with overhanging reinforcing steel bars and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200214 |