CN110792090B - 一种用于水库的浮式拱围堰的施工方法 - Google Patents
一种用于水库的浮式拱围堰的施工方法 Download PDFInfo
- Publication number
- CN110792090B CN110792090B CN201910996322.9A CN201910996322A CN110792090B CN 110792090 B CN110792090 B CN 110792090B CN 201910996322 A CN201910996322 A CN 201910996322A CN 110792090 B CN110792090 B CN 110792090B
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- staff
- river
- water
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Abstract
本发明公开了一种用于水库的浮式拱围堰及其施工方法,包括以下步骤:(1)将材料放置到需要围堰的地方,(2)将材料进行焊接,焊接成圆形或者半圆形,(3)员工将抽水泵放入到半圆形或者圆形的围堰内,(4)员工将水倒入到围堰内,当水填满围堰时,按水的漏点对围堰的进行修补,(5)员工选定选定好需要围堰的地方,(6)将河底的杂物清理干净,(7)员工潜入到河底,将若干固定柱插入到河底内,(8)将焊接完成的围堰拉人到河内,(9)将铁链与固定柱固定(10)员工将铁链的另一端与围堰固定,解决了围堰受到水流的影响产生偏移,同时解决了员工需要潜入河底对围堰进行补修。
Description
本发明涉及水库的浮式拱围堰及其施工方法的技术领域,特别涉及一种用于水库的浮式拱围堰的施工方法。
背景技术
传统水库的浮式拱围堰及其施工方法,在施工的过程中围堰会出现随着水流偏移的现象,同时在补修围堰的的过程中,需要员工潜入到河底对围堰进行补修。
本发明内容
本发明的目的是提供一种用于水库的浮式拱围堰的施工方法,解决了围堰受到水流的影响产生偏移,同时解决了员工需要潜入河底对围堰进行补修。
本发明的上述技术目的是通过以下技术方案得以实现的:
一种用于水库的浮式拱围堰及其施工方法,其特征在于,包括以下步骤:(1)员工选定好需要围堰的地方;(2)将材料放置到需要围堰的地方;
(3)根据围堰测量的需要,将材料进行焊接,焊接成圆形或者半圆形;
(4)当材料焊接成圆形或半圆形时,员工将抽水泵放入到半圆形或者圆形的围堰内;
(5)员工将水倒入到围堰内,当水填满围堰时,按水的漏点对围堰进行修补;
(6)对于员工选定好需要围堰的地方,将河底的杂物清理干净;
(7)当河底的杂物清理干净后,员工潜入到河底,将若干固定柱插入到河底内;
(8)当员工将固定柱插入到河底时,将焊接完成的围堰拉入到河内;
(9)当围堰拉入到河内时,员工潜入到河底将铁链与固定柱固定;
(10)当固定柱与铁链固定时,员工将铁链的另一端与围堰固定。
作为优选,对围堰修补至水无法漏出围堰。
作为优选,在选定的过程中,需要对水流的流向进行测试。
作为优选,准备材料的同时,需要将焊接所需的机器与后续将围堰拉入河里的材料准备就绪。
作为优选,员工在焊接的过程中,先用电焊,电焊完成后用交叉焊接将材料进行焊接,利用电焊将材料初步进行焊接,交叉焊防止材料之间产生分离。
作为优选,当员工修补完成漏点时,将抽水泵打开,利用抽水泵将水抽出围堰。
作为优选,固定柱插入到河底的距离为50cm~1m。
作为优选,在焊接前加工圆木或圆石放入到材料下方,当焊接完成后拉动围堰利用圆木减轻阻力将围堰拉入到河内。
作为优选,围堰拉入到河内时,员工需先将链条绑在围堰侧壁上,员工通过链条将围堰拉到需要的位置。
作为优选,员工潜入河内,将链条的另一端与固定柱固定,利用固定柱将链条与围堰进行固定。
本发明的有益效果:(1)对围堰进行固定,防止围堰受到水流的影响产生偏移。
(2)在陆地上对围堰进行修补,防止员工在河内修补时,出现意外。
(3)利用圆木或者圆石,在搬运的过程中降低围堰与地面的摩擦力。
(4)利用抽水泵,防止水进入到围堰内。
(5)利用点焊便于增加员工的工作效率。
具体实施方式
以下所述仅是本发明的优选实施方式,保护范围并不仅局限于该实施例,凡属于本发明思路下的技术方案应当属于本发明的保护范围。同时应当指出,对于本技术领域的普通技术人员而言,在不脱离本发明原理前提下的若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。
一种用于水库的浮式拱围堰的施工方法,包括以下步骤:
(1)将材料放置到需要围堰的地方。
(2)根据围堰测量的需要,将材料进行焊接,焊接成圆形或者半圆形,准备材料的同时,需要将焊接所需的机器与后续将围堰拉入河里的材料准备就绪。
(3)当材料焊接成圆形或半圆形时,员工将抽水泵放入到半圆形或者圆形的围堰内。
(4)员工将水倒入到围堰内,当水填满围堰时,按水的漏点对围堰的进行修补,对围堰修补至水无法漏出围堰,员工在焊接的过程中,先用电焊,电焊完成后用交叉焊接将材料进行焊接,利用电焊将材料初步进行焊接,交叉焊防止材料之间产生分离,当员工修补完成漏点时,将抽水泵打开,利用抽水泵将水抽出围堰。
(5)员工在选定需要围堰的地方的过程中,需要对水流的流向进行测试,防止后续围堰放入到河内时,难以定位。
(6)当员工选定好需要围堰的地方时,将河底的杂物清理干净。
(7)当河底的杂物清理干净后,员工潜入到河底,将若干固定柱插入到河底内,固定柱插入到河底的距离为60cm。
(8)当员工将固定柱插入到河底时,在焊接前将工圆木或圆石放入到材料下方,当焊接完成后拉动围堰利用圆木减轻阻力将围堰拉入到河内。
(9)当围堰拉入到河内时,员工潜入到河底将铁链与固定柱固定,围堰拉入到河内时,员工需先将链条绑在围堰侧壁上,员工通过链条将围堰拉到需要的位置员工潜入河内。
(10)当固定柱与铁链固定时,员工将铁链的另一端与围堰固定,利用固定柱将链条与围堰进行固定。
普通围堰:在对围堰进行修补时,需要先将围堰拉入到河内,导致后袖修补时,需要员工先对围堰进行隔绝,工艺繁琐,围堰在放入河内时,会出现围堰与需要的位置受到河流的流向而出现偏移。
上续围堰:在修补的过程中,工件简单明了,对围堰进行定位。
Claims (10)
1.一种用于水库的浮式拱围堰的施工方法,其特征在于,包括以下步骤:(1)员工选定好需要围堰的地方;(2)将材料放置到需要围堰的地方;
(3)根据围堰测量的需要,将材料进行焊接,焊接成圆形或者半圆形;
(4)当材料焊接成圆形或半圆形时,员工将抽水泵放入到半圆形或者圆形的围堰内;
(5)员工将水倒入到围堰内,当水填满围堰时,按水的漏点对围堰进行修补;
(6)对于员工选定好需要围堰的地方,将河底的杂物清理干净;
(7)当河底的杂物清理干净后,员工潜入到河底,将若干固定柱插入到河底内;
(8)当员工将固定柱插入到河底时,将焊接完成的围堰拉入到河内;
(9)当围堰拉入到河内时,员工潜入到河底将铁链与固定柱固定;
(10)当固定柱与铁链固定时,员工将铁链的另一端与围堰固定。
2.根据权利要求1所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,对围堰修补至水无法漏出围堰。
3.根据权利要求2所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,在选定的过程中,需要对水流的流向进行测试。
4.根据权利要求3所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,准备材料的同时,需要将焊接所需的机器与后续将围堰拉入河里的材料准备就绪。
5.根据权利要求4所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,员工在焊接的过程中,先用电焊,电焊完成后用交叉焊接将材料进行焊接,利用电焊将材料初步进行焊接,交叉焊防止材料之间产生分离。
6.根据权利要求5所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,当员工修补完成漏点时,将抽水泵打开,利用抽水泵将水抽出围堰。
7.根据权利要求6所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,固定柱插入到河底的距离为50cm~1m。
8.根据权利要求7所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,在焊接前加工圆木或圆石放入到材料下方,当焊接完成后拉动围堰利用圆木减轻阻力将围堰拉入到河内。
9.根据权利要求8所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,围堰拉入到河内时,员工需先将链条绑在围堰侧壁上,员工通过链条将围堰拉到需要的位置。
10.根据权利要求9所述的一种用于水库的浮式拱围堰的施工方法,其特征在于,员工潜入河内,将链条的另一端与固定柱固定,利用固定柱将链条与围堰进行固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910996322.9A CN110792090B (zh) | 2019-10-18 | 2019-10-18 | 一种用于水库的浮式拱围堰的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910996322.9A CN110792090B (zh) | 2019-10-18 | 2019-10-18 | 一种用于水库的浮式拱围堰的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110792090A CN110792090A (zh) | 2020-02-14 |
CN110792090B true CN110792090B (zh) | 2021-03-30 |
Family
ID=69440454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910996322.9A Active CN110792090B (zh) | 2019-10-18 | 2019-10-18 | 一种用于水库的浮式拱围堰的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110792090B (zh) |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO891613L (no) * | 1989-04-20 | 1990-10-22 | Leiv Ellingsen | Fremgangsmaate til avgrensning av paa havflaten flytende, forurensende olje eller lignende forurensninger. |
FR2679277B1 (fr) * | 1991-07-18 | 1995-09-29 | Hubert Francine | Batardeau demontable pour l'entretien des canaux d'exploitation hydraulique. |
CN2196640Y (zh) * | 1994-06-21 | 1995-05-10 | 吴长春 | 海上油船漏油防扩散围栏 |
CN201254727Y (zh) * | 2008-09-09 | 2009-06-10 | 武汉武大巨成加固实业有限公司 | 桥梁桩柱水下维修施工围堰 |
CN101653902A (zh) * | 2009-08-31 | 2010-02-24 | 招商局重工(深圳)有限公司 | 围井的制作方法 |
CN101725112B (zh) * | 2009-12-18 | 2011-12-21 | 中铁大桥局集团第三工程有限公司 | 一种桥墩的施工方法 |
CN103015442B (zh) * | 2013-01-15 | 2015-02-11 | 中铁大桥局集团有限公司 | 分体围堰施工方法 |
CN103938638A (zh) * | 2014-03-27 | 2014-07-23 | 湖南顺天建设集团有限公司 | 一种深水单壁钢围堰浮筒法的施工方法 |
-
2019
- 2019-10-18 CN CN201910996322.9A patent/CN110792090B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN110792090A (zh) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059903B (zh) | 基坑内穿底板降水井封堵施工方法 | |
CN101429768B (zh) | 预应力高强砼管桩静压施工方法 | |
CN102561404B (zh) | 一种型钢混凝土柱式接头及采用该接头的地下连续墙的施工方法 | |
CN104233960A (zh) | 用于桥梁连续梁腹板灌浆的工件及施工方法 | |
CN110792090B (zh) | 一种用于水库的浮式拱围堰的施工方法 | |
CN108442237A (zh) | 一种预制桥墩和预制承台快速拼接的构造及其施工方法 | |
DE602006021478D1 (de) | Verfahren zum bilden von überwachten betonpfeilern | |
CN105735205A (zh) | 一种混凝土面板水平施工缝错台修复方式 | |
CN202466644U (zh) | 一种型钢混凝土柱式接头 | |
CN109736416A (zh) | 新老污水管道深井点连接结构及施工方法 | |
CN206874852U (zh) | 顶升钢管混凝土用截止阀 | |
CN203346872U (zh) | 预铸基桩及复合桩结构 | |
CN109853539A (zh) | 接长护筒及其施工方法 | |
CN205823286U (zh) | 一种水中盾构机到达接收结构 | |
CN105649076A (zh) | 一种用于phc桩套装施工的外桩内孔挡土活瓣式桩尖 | |
CN108824461A (zh) | 一种拉森钢板桩围堰及其施工方法 | |
CN205501988U (zh) | 一种双筒形锁扣桩 | |
CN208201899U (zh) | 一种拼接式钢骨架集水井 | |
JP2015040403A (ja) | トンネルの漏水処理方法 | |
CN207685819U (zh) | 一种交错分节式混凝土管桩 | |
CN112962513A (zh) | 一种河道疏浚方法 | |
CN104153386A (zh) | 桩基承台周边立面垫层工具式钢模及其施工方法 | |
CN103343529A (zh) | 移动式钢管筏浮潜水上施工平台 | |
CN107470742A (zh) | 一种钢管对接焊接装置 | |
CN205776182U (zh) | 一种钢筋混凝土支护桩及其接桩结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Construction Method for Floating Arch Cofferdam Used in Reservoirs Effective date of registration: 20230902 Granted publication date: 20210330 Pledgee: Zhejiang Shangyu Rural Commercial Bank Co.,Ltd. Fenghui Sub branch Pledgor: LONGDE CONSTRUCTION Co.,Ltd. Registration number: Y2023330001917 |