CN110714652A - Concrete pole root positioning disc - Google Patents

Concrete pole root positioning disc Download PDF

Info

Publication number
CN110714652A
CN110714652A CN201910974384.XA CN201910974384A CN110714652A CN 110714652 A CN110714652 A CN 110714652A CN 201910974384 A CN201910974384 A CN 201910974384A CN 110714652 A CN110714652 A CN 110714652A
Authority
CN
China
Prior art keywords
guard plate
hole
plate
gear
semicircle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910974384.XA
Other languages
Chinese (zh)
Inventor
于义和
韩立华
石砺瑄
赵春增
吕鹏
戴鑫
修雨蔷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panjin Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Panjin Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panjin Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Panjin Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN201910974384.XA priority Critical patent/CN110714652A/en
Publication of CN110714652A publication Critical patent/CN110714652A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2269Mounting poles or posts to the holder in a socket

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

本发明涉及一种砼杆杆根定位盘,其结构为,第一档位护板的两端分别设有第一固定孔,第一固定销穿过第一固定孔;所述的第二档位护板的两端分别设有第二固定孔,第二固定销穿过第二固定孔;所述的第一半圆护板焊接在第一挡板护板的中部,所述的第二半圆护板焊接在第二档位护板的中部,第一半圆护板和第二半圆护板相对应形成圆形结构,所述的第一半圆护板和第二半圆护板的侧肋板上分别竖直设有第一通孔和第二通孔,所述的挡板底端设有限位柱,限位柱插入第一通孔或第二通孔内。本发明能将杆根牢牢定位,防止了杆根定位点位移、砼杆倾斜、甚至倒杆的危险事故的发生。提高了杆根定点定位埋设的准确性。

Figure 201910974384

The invention relates to a concrete rod root positioning plate. The two ends of the position guard plate are respectively provided with second fixing holes, and the second fixing pins pass through the second fixing holes; the first semicircle guard plate is welded on the middle of the first baffle guard plate, and the second semicircle guard plate is welded The guard plate is welded on the middle of the second gear guard plate, the first semicircle guard plate and the second semicircle guard plate form a corresponding circular structure, and the side ribs of the first semicircle guard plate and the second semicircle guard plate A first through hole and a second through hole are vertically arranged respectively, and a limit column is arranged at the bottom end of the baffle plate, and the limit column is inserted into the first through hole or the second through hole. The invention can firmly locate the root of the rod, and prevent the occurrence of dangerous accidents such as displacement of the positioning point of the root of the rod, inclination of the concrete rod, and even falling of the rod. The accuracy of the fixed-point positioning and embedding of the rod root is improved.

Figure 201910974384

Description

砼杆杆根定位盘Concrete rod root positioning plate

技术领域technical field

本发明涉及一种在送电、配电输电线路上杆塔组立或应急抢修维护作业使用的一种可靠有效的工具,尤其涉及一种砼杆杆根定位盘,属于电力送配电技术领域。The invention relates to a reliable and effective tool for pole and tower assembly or emergency repair and maintenance operations on power transmission and distribution lines, in particular to a concrete pole root positioning plate, which belongs to the technical field of power transmission and distribution.

背景技术Background technique

送、配电线路架设作业,电杆组立过程中,线路路径不可避免会遇到沙土地,沼泽地,湿地渠边等土质比较松软地区,在挖掘电杆基坑或电杆埋设过程中,经常遇到塌方的现象,电杆基坑作业面积往往是硬质土壤地区基坑作业面积几倍以上,挖掘土方量较大,电杆杆根在较大基坑中,定位点因塌方或外力掩埋受力不均产生位移,所以只能依靠辅助绳不断校正,位移偏大无法校正的程度下,只能重新挖掘,重新埋设,重复施工。During the erection of transmission and distribution lines, in the process of pole assembly, the line path will inevitably encounter sandy soil, swampy land, wetlands and other areas with relatively soft soil. The phenomenon of landslide is often encountered. The working area of the pole foundation pit is often several times more than that of the foundation pit in the hard soil area, and the amount of earthwork to be excavated is large. The uneven force of the burial produces displacement, so it can only be continuously corrected by the auxiliary rope. If the displacement is too large and cannot be corrected, it can only be re-excavated, re-embedded, and repeated construction.

杆基因外力破坏或者气候环境的影响下,杆基土壤流失,极易造成杆塔倾斜,甚至倒杆伤人的事故的发生。通常使用土埋打桩陈旧式施工工艺,重复作业,浪费大量的人力、物力。所以急需一种专业的工具,在保证杆塔杆基定位准确的同时,安全有效的进行杆基培土维护工作。Under the influence of the external force of the pole gene or the influence of the climate environment, the soil loss of the pole base can easily cause the pole and tower to tilt, and even the accident that the pole falls and hurts people. Usually, the old-fashioned construction technology of soil piling is used, and the repeated operations waste a lot of manpower and material resources. Therefore, there is an urgent need for a professional tool, which can safely and effectively carry out the maintenance of the pole foundation soil while ensuring the accurate positioning of the pole foundation.

发明内容SUMMARY OF THE INVENTION

本发明针对上述现有技术中存在的问题,提供了一种砼杆杆根定位盘,解决了现有技术中土质松软地区易造成杆塔倾斜的问题。Aiming at the problems existing in the above-mentioned prior art, the present invention provides a concrete pole root positioning disc, which solves the problem that the pole tower is easily inclined in the area with soft soil in the prior art.

本发明的技术方案如下:The technical scheme of the present invention is as follows:

砼杆杆根定位盘,包括第一档位护板、第二档位护板、第一半圆护板、第二半圆护板及挡板,第一档位护板和第二档位护板结构相同对称设置,所述的第一档位护板的两端分别设有第一固定孔,第一固定销穿过第一固定孔;所述的第二档位护板的两端分别设有第二固定孔,第二固定销穿过第二固定孔;所述的第一半圆护板焊接在第一挡板护板的中部,所述的第二半圆护板焊接在第二档位护板的中部,第一半圆护板和第二半圆护板相对应形成圆形结构,所述的第一半圆护板和第二半圆护板的侧肋板上分别竖直设有第一通孔和第二通孔,所述的挡板底端设有限位柱,限位柱插入第一通孔或第二通孔内。Concrete rod root positioning plate, including first gear guard, second gear guard, first semicircle guard, second semicircle guard and baffle, first gear guard and second gear guard The structure is the same and symmetrically arranged, the two ends of the first gear guard plate are respectively provided with a first fixing hole, the first fixing pin passes through the first fixing hole; the two ends of the second gear guard plate are respectively provided with There is a second fixing hole, and the second fixing pin passes through the second fixing hole; the first semicircular guard plate is welded on the middle of the first baffle guard plate, and the second semicircular guard plate is welded at the second gear In the middle of the guard plate, the first semi-circular guard plate and the second semi-circular guard plate form a corresponding circular structure, and the side ribs of the first semi-circle guard plate and the second semi-circle guard plate are respectively vertically provided with first passages. A hole and a second through hole, the bottom end of the baffle plate is provided with a limiting column, and the limiting column is inserted into the first through hole or the second through hole.

所述的第一档位护板和第二档位护板的主体为槽钢,第一档位护板和第二档位护板的两端分别设有第一手把位通孔和第二手把位通孔。The main bodies of the first gear guard plate and the second gear guard plate are channel steel, and the two ends of the first gear guard plate and the second gear guard plate are respectively provided with a first handle position through hole and a second Used handle through holes.

所述的第一半圆护板和第二半圆护板的侧壁分别设有第一连接耳和第二连接耳,第一连接耳和第二连接耳通过螺杆螺母拆卸式连接。The side walls of the first semicircular guard plate and the second semicircular guard plate are respectively provided with a first connection ear and a second connection ear, and the first connection ear and the second connection ear are detachably connected by a screw nut.

所述的挡板横截面为圆弧形。The cross section of the baffle is arc-shaped.

本发明的优点效果如下:The advantages and effects of the present invention are as follows:

能将杆根牢牢定位,防止了杆根定位点位移、砼杆倾斜、甚至倒杆的危险事故的发生。提高了杆根定点定位埋设的准确性。安装简易,操作简单,提高现场作业的工作效率,减轻了作业人员的劳动强度。The rod root can be firmly positioned, preventing the occurrence of dangerous accidents such as displacement of the positioning point of the rod root, tilting of the concrete rod, and even falling of the rod. The accuracy of the fixed-point positioning and embedding of the rod root is improved. The installation is simple and the operation is simple, which improves the work efficiency of on-site operations and reduces the labor intensity of the operators.

附图说明Description of drawings

图1为本发明的结构示意图。FIG. 1 is a schematic structural diagram of the present invention.

图中,1、第一档位护板,2、第二档位护板,3、第一半圆护板,4、第二半圆护板,5、挡板,6、第一固定孔,7、第二固定孔,8、第二固定销,9、第一通孔,10、第二通孔,11、第一手把位通孔,12、第二手把位通孔,13、第一连接耳,14、第二连接耳,15、螺杆。In the figure, 1, the first gear guard, 2, the second gear guard, 3, the first semicircle guard, 4, the second semicircle guard, 5, the baffle, 6, the first fixing hole, 7 , the second fixing hole, 8, the second fixing pin, 9, the first through hole, 10, the second through hole, 11, the first handle position through hole, 12, the second handle position through hole, 13, the first A connecting ear, 14, a second connecting ear, 15, a screw.

具体实施方式Detailed ways

实施例Example

如图所示,砼杆杆根定位盘,包括第一档位护板1、第二档位护板2、第一半圆护板3、第二半圆护板4及挡板5,第一档位护板和第二档位护板结构相同对称设置,所述的第一档位护板的两端分别设有第一固定孔6,第一固定销穿过第一固定孔;所述的第二档位护板2的两端分别设有第二固定孔7,第二固定销8穿过第二固定孔;所述的第一半圆护板3焊接在第一挡板护板1的中部,所述的第二半圆护板4焊接在第二档位护板2的中部,第一半圆护板和第二半圆护板相对应形成圆形结构,所述的第一半圆护板和第二半圆护板的侧肋板上分别竖直设有第一通孔9和第二通孔10,所述的挡板5底端设有限位柱,限位柱插入第一通孔或第二通孔内。As shown in the figure, the concrete rod root positioning plate includes a first gear guard 1, a second gear guard 2, a first semicircular guard 3, a second semicircular guard 4 and a baffle 5. The first gear The position guard plate and the second position guard plate have the same structure and are symmetrically arranged, the two ends of the first position guard plate are respectively provided with first fixing holes 6, and the first fixing pins pass through the first fixing holes; The two ends of the second gear guard plate 2 are respectively provided with second fixing holes 7 , and the second fixing pins 8 pass through the second fixing holes; In the middle, the second semicircular guard plate 4 is welded to the middle of the second gear guard plate 2, the first semicircular guard plate and the second semicircular guard plate correspond to form a circular structure, and the first A first through hole 9 and a second through hole 10 are vertically provided on the side rib of the second semicircular guard plate, respectively. The bottom end of the baffle plate 5 is provided with a limiting column, and the limiting column is inserted into the first through hole or the second through hole. two through holes.

所述的第一档位护板和第二档位护板的主体为槽钢,第一档位护板和第二档位护板的两端分别设有第一手把位通孔11和第二手把位通孔12,便于作业人员搬运第一档位护板和第二档位护板。The main bodies of the first gear guard plate and the second gear guard plate are channel steel, and the two ends of the first gear guard plate and the second gear guard plate are respectively provided with the first handle position through holes 11 and 11. The second handle position through hole 12 is convenient for the operator to carry the first gear guard plate and the second gear guard plate.

所述的第一半圆护板和第二半圆护板的侧壁分别设有第一连接耳13和第二连接耳14,第一连接耳和第二连接耳通过螺杆15、螺母拆卸式连接。The side walls of the first and second semicircular guards are respectively provided with first connecting ears 13 and second connecting ears 14 , which are detachably connected by screws 15 and nuts.

所述的挡板横截面为圆弧形。The cross section of the baffle is arc-shaped.

本发明的安装使用方法:将挖好的基坑做4点定位标,第一固定销穿过第一固定孔,第二固定销穿过第二固定孔,使第一档位护板和第二档位护板在基坑两侧牢固固定,将挡板下端的限位柱插入第一通孔或第二通孔内,待组立砼杆插入第一半圆护板和第二半圆护板构成的圆形孔中定位固定,用螺杆螺母将第一连接耳和第二连接耳紧固。The installation and use method of the present invention: the dug foundation pit is used as a 4-point positioning mark, the first fixing pin passes through the first fixing hole, and the second fixing pin passes through the second fixing hole, so that the first gear guard plate and the second The second-speed guard plate is firmly fixed on both sides of the foundation pit, insert the limiting column at the lower end of the baffle into the first through hole or the second through hole, and insert the assembled concrete rod into the first semicircular shield and the second semicircular shield The formed circular hole is positioned and fixed, and the first connecting ear and the second connecting ear are fastened with a screw nut.

效果对比:某供电公司10千伏线路检修作业,先后有65基电杆在特Effect comparison: a power supply company's 10 kV line maintenance operation, there are 65 base poles in the special

殊松软地质环境中,使用砼杆杆根定位盘一次性组立完成,杆位准确,未出现重复施工现象;防倒杆安全区域内没有作业人员进入,安全保障有力。有20基在同样的地质环境下未使用砼杆杆根定位盘,施工作业中出现了重复施工现象,个别杆根定位掩埋出现位移不准确,导致个别现场在杆塔防倒杆安全区域内有作业人员重复进入进行校正。In the special soft and soft geological environment, the concrete pole root positioning plate is used to complete the assembly at one time, the pole position is accurate, and there is no repeated construction phenomenon; no operators enter the safety area of the anti-falling pole, and the safety guarantee is strong. 20 bases did not use concrete pole root positioning discs in the same geological environment. Repeated construction occurred in the construction operation. The displacement of individual pole roots was inaccurate in the positioning and burial, resulting in some work in the safety area of the pole and tower. Personnel repeatedly entered for correction.

结论:砼杆杆根定位盘达到了设立要求,使用效果良好,安装简易,使用方便。节省人力、物力,提高了施工效率,极大的提高了安全性。Conclusion: The concrete rod root positioning disc meets the requirements of the establishment, the use effect is good, the installation is simple, and the use is convenient. Save manpower and material resources, improve construction efficiency, and greatly improve safety.

Claims (4)

1. The concrete rod root positioning disc is characterized by comprising a first gear guard plate, a second gear guard plate, a first semicircular guard plate, a second semicircular guard plate and a baffle plate, wherein the first gear guard plate and the second gear guard plate are arranged in the same and symmetrical mode, two ends of the first gear guard plate are respectively provided with a first fixing hole, and a first fixing pin penetrates through the first fixing holes; two ends of the second gear guard plate are respectively provided with a second fixing hole, and a second fixing pin passes through the second fixing holes; first semicircle backplate weld at the middle part of first baffle backplate, second semicircle backplate weld at the middle part of second gear backplate, first semicircle backplate and the corresponding circular structure that forms of second semicircle backplate, the lateral floor of first semicircle backplate and second semicircle backplate on vertically be equipped with first through-hole and second through-hole respectively, the baffle bottom be equipped with spacing post, spacing post inserts in first through-hole or the second through-hole.
2. The concrete pole root positioning plate of claim 1, wherein the main bodies of the first and second gear guard plates are channel steel, and the two ends of the first and second gear guard plates are respectively provided with a first handle through hole and a second handle through hole.
3. The concrete pole root positioning plate of claim 1, wherein the side walls of the first and second semicircular guard plates are respectively provided with a first and second connection lug, and the first and second connection lugs are detachably connected through a screw and a nut.
4. The concrete pole root positioning plate of claim 1, wherein the cross section of the baffle is circular arc.
CN201910974384.XA 2019-10-14 2019-10-14 Concrete pole root positioning disc Pending CN110714652A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910974384.XA CN110714652A (en) 2019-10-14 2019-10-14 Concrete pole root positioning disc

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910974384.XA CN110714652A (en) 2019-10-14 2019-10-14 Concrete pole root positioning disc

Publications (1)

Publication Number Publication Date
CN110714652A true CN110714652A (en) 2020-01-21

Family

ID=69211606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910974384.XA Pending CN110714652A (en) 2019-10-14 2019-10-14 Concrete pole root positioning disc

Country Status (1)

Country Link
CN (1) CN110714652A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110082706A (en) * 2010-01-12 2011-07-20 (주) 명도산업조명 Underground purchase cover of street light lantern
CN207033022U (en) * 2017-07-10 2018-02-23 江西工程学院 Electronics and Information Engineering communication tower fixed seat
CN207314961U (en) * 2017-08-07 2018-05-04 宁夏回族自治区电力设计院有限公司 A kind of electric power cable wind-resistant fixing bracket for overhead line
CN208430852U (en) * 2018-04-09 2019-01-25 中国建筑第七工程局有限公司 Flag platform
CN209099869U (en) * 2018-11-15 2019-07-12 西京学院 A kind of Electronics and Information Engineering communication tower fixing seat

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110082706A (en) * 2010-01-12 2011-07-20 (주) 명도산업조명 Underground purchase cover of street light lantern
CN207033022U (en) * 2017-07-10 2018-02-23 江西工程学院 Electronics and Information Engineering communication tower fixed seat
CN207314961U (en) * 2017-08-07 2018-05-04 宁夏回族自治区电力设计院有限公司 A kind of electric power cable wind-resistant fixing bracket for overhead line
CN208430852U (en) * 2018-04-09 2019-01-25 中国建筑第七工程局有限公司 Flag platform
CN209099869U (en) * 2018-11-15 2019-07-12 西京学院 A kind of Electronics and Information Engineering communication tower fixing seat

Similar Documents

Publication Publication Date Title
CN108301332A (en) The detachable steel trestle construction method of beret slice
CN110714652A (en) Concrete pole root positioning disc
CN207700201U (en) A kind of building municipal works slope reinforcement device
CN206034941U (en) Bored concrete pile stake hole is with protection screen panel
CN109058583B (en) Tool pipe for hand-digging type pipe jacking construction
CN106565021B (en) Pipeline construction method for ecological wetland
CN104963347A (en) Foundation pit waist beam steel pipe tape support-changing construction method
CN204530694U (en) Pier stud pile foundation steel pile casting under a kind of single pile water receiving
CN208235540U (en) A kind of interim excavation supporting structure of deep-buried pipeline active well
CN223202343U (en) Temporary simple supporting device for open cut foundation pit construction
CN114402747A (en) Portable mine restoration side slope afforestation plant-growing hole drilling equipment
CN108086086B (en) A drilling repair structure and a method for repairing asphalt pavement by using it
CN206299142U (en) Job site hole raceway groove protector
CN207646742U (en) A kind of foundation pit support device convenient for fast assembling-disassembling
CN218884940U (en) Instrument for checking and accepting length of surface subsidence monitoring point
CN222297155U (en) A pipeline installation protection device
CN219033084U (en) Combined fast-assembling type aluminum alloy flood control wall
CN211776286U (en) A mobile utility pole that can be easily disassembled and assembled in mines
CN204212510U (en) 110KV line project improvement column foot plated construction
CN221941125U (en) Heavy-duty water construction operation platform
CN209128995U (en) A kind of large-tonnage ground auger structure
CN209430200U (en) U-shaped shield detachable reaction frame without cutter head
CN223740225U (en) Novel pipeline foundation pier
TWI862442B (en) Underground obstacle lifting system
CN219196926U (en) Portable foundation pit protection guardrail for building foundation pit protection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200121