CN110714612A - Cast-in-place floor support system for steel structure buildings - Google Patents

Cast-in-place floor support system for steel structure buildings Download PDF

Info

Publication number
CN110714612A
CN110714612A CN201911034783.4A CN201911034783A CN110714612A CN 110714612 A CN110714612 A CN 110714612A CN 201911034783 A CN201911034783 A CN 201911034783A CN 110714612 A CN110714612 A CN 110714612A
Authority
CN
China
Prior art keywords
steel
flange
square
cast
place floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911034783.4A
Other languages
Chinese (zh)
Inventor
黄亮
郭金池
刘文亮
谭熙
王金志
童涛
魏晓光
龙乐生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201911034783.4A priority Critical patent/CN110714612A/en
Publication of CN110714612A publication Critical patent/CN110714612A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种钢结构建筑现浇楼板支撑系统,包括:第一钢梁和第二钢梁,所述第一钢梁和所述第二钢梁并列设置,所述第一钢梁上设置有第一翼缘,所述第二钢梁上设置有第二翼缘;支撑机构,所述支撑机构包括有顶托和固定夹具,所述顶托设置在所述固定夹具上,所述第一翼缘和所述第二翼缘上均可拆卸地固定有所述固定夹具;主龙骨,所述主龙骨设置有两根及以上,单根的所述主龙骨的两端通过所述顶托分别与所述第一翼缘、所述第二翼缘抵持。本发明利用钢结构建筑本身存在的第一钢梁和第二钢梁,在第一钢梁的第一翼缘上可拆卸地固定有顶托,在第二钢梁的第二翼缘上也可拆卸地固定有顶托,通过顶托实现主龙骨的支撑固定。

Figure 201911034783

The invention discloses a cast-in-place floor slab support system for a steel structure building, comprising: a first steel beam and a second steel beam, the first steel beam and the second steel beam are arranged side by side, and the first steel beam is placed on the A first flange is provided, and a second flange is provided on the second steel beam; a support mechanism, the support mechanism includes a jacking and a fixing clamp, the jacking is arranged on the fixing clamp, and the The first flange and the second flange can be detachably fixed with the fixing fixture; the main keel, the main keel is provided with two or more, and the two ends of the single main keel pass through the The jacks are respectively abutted against the first flange and the second flange. The present invention utilizes the first steel beam and the second steel beam existing in the steel structure building itself, and a jack is detachably fixed on the first flange of the first steel beam, and also on the second flange of the second steel beam. A top bracket is detachably fixed, and the main keel is supported and fixed by the top bracket.

Figure 201911034783

Description

钢结构建筑现浇楼板支撑系统Cast-in-place floor support system for steel structure buildings

技术领域technical field

本发明涉及钢结构建筑领域,尤其是涉及一种钢结构建筑现浇楼板支撑系统。The invention relates to the field of steel structure buildings, in particular to a cast-in-place floor slab support system for steel structure buildings.

背景技术Background technique

楼板支撑系统是钢结构建筑施工中最重要的措施之一,通常情况下,施工现场采用脚手架或永久模板对楼板模板进行支撑,但是脚手架支撑搭设周期长、搭拆工序繁琐,往往制约钢结构建筑施工速度,而永久模板则造价高昂。为简化支模工序、提高施工速度和降低造价,有必要结合钢结构建筑的特点采用其他支模方式进行作业。The floor support system is one of the most important measures in the construction of steel structure buildings. Usually, scaffolding or permanent formwork is used to support the floor formwork on the construction site. construction speed, while permanent formwork is expensive. In order to simplify the formwork process, improve the construction speed and reduce the cost, it is necessary to adopt other formwork methods in combination with the characteristics of steel structure buildings.

发明内容SUMMARY OF THE INVENTION

本发明旨在至少解决现有技术中存在的技术问题之一。为此,本发明提出一种钢结构建筑现浇楼板支撑系统,能够对楼板模板进行快速支撑,安装和拆卸方便,周转快。The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes a cast-in-place floor slab support system for a steel structure building, which can quickly support the slab formwork, is easy to install and disassemble, and has a fast turnover.

第一方面,本发明的一个实施例提供了一种钢结构建筑现浇楼板支撑系统,包括:第一钢梁和第二钢梁,所述第一钢梁和所述第二钢梁并列设置,所述第一钢梁上设置有第一翼缘,所述第二钢梁上设置有第二翼缘;支撑机构,所述支撑机构包括有顶托和固定夹具,所述顶托设置在所述固定夹具上,所述第一翼缘和所述第二翼缘上均可拆卸地固定有所述固定夹具;主龙骨,所述主龙骨设置有两根及以上,单根的所述主龙骨的两端通过所述顶托分别与所述第一翼缘、所述第二翼缘抵持。In a first aspect, an embodiment of the present invention provides a cast-in-place floor slab support system for a steel structure building, comprising: a first steel beam and a second steel beam, the first steel beam and the second steel beam are arranged side by side , the first steel beam is provided with a first flange, and the second steel beam is provided with a second flange; a support mechanism, the support mechanism includes a jack and a fixing clamp, and the jack is arranged on the On the fixing fixture, the first flange and the second flange are detachably fixed with the fixing fixture; the main keel, the main keel is provided with two or more, and the single Both ends of the main keel are respectively abutted against the first flange and the second flange through the jacking.

本发明实施例的钢结构建筑现浇楼板支撑系统至少具有如下有益效果:利用钢结构建筑本身存在的第一钢梁和第二钢梁,在第一钢梁的第一翼缘上可拆卸地固定有顶托,在第二钢梁的第二翼缘上也可拆卸地固定有顶托,通过顶托实现主龙骨的支撑固定,由此可对楼板模板进行快速支撑,安装和拆卸方便,周转快。The cast-in-place floor slab support system of the steel structure building according to the embodiment of the present invention has at least the following beneficial effects: using the first steel beam and the second steel beam existing in the steel structure building itself, the first flange of the first steel beam can be detachably mounted on the first flange. The top support is fixed, and the top support is also detachably fixed on the second flange of the second steel beam. The support and fixation of the main keel is realized by the top support, so that the floor formwork can be quickly supported, and the installation and disassembly are convenient. Fast turnaround.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述固定夹具包括安装块和螺钉,所述安装块呈“U”形,所述安装块与所述螺钉螺纹配合,所述安装块嵌套在所述第一翼缘上,所述安装块与所述螺钉均与所述第一翼缘抵持。According to the cast-in-place floor slab support system for steel structure buildings according to other embodiments of the present invention, the fixing fixture includes a mounting block and a screw, the mounting block is in a "U" shape, and the mounting block is threadedly matched with the screw, so The mounting block is nested on the first flange, and both the mounting block and the screw abut against the first flange.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述螺钉设置在所述安装块远离所述主龙骨的一侧。According to the cast-in-place floor slab support system for a steel structure building according to other embodiments of the present invention, the screw is arranged on a side of the installation block away from the main keel.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述支撑机构还包括有圆管和卡件,所述圆管固定在所述安装块上,所述顶托上设置有螺杆,所述螺杆插入到所述圆管中,所述卡件与所述螺杆螺纹配合,所述卡件与所述圆管抵持。According to the cast-in-place floor slab support system for steel structure buildings according to other embodiments of the present invention, the support mechanism further includes a round pipe and a clamp, the round pipe is fixed on the installation block, and the jack is provided with a A screw is inserted into the circular tube, the clip is threadedly matched with the screw, and the clip is abutted against the circular tube.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述顶托上设置有U形槽,所述U形槽中放置有所述主龙骨。According to the cast-in-place floor slab support system for steel structure buildings according to other embodiments of the present invention, a U-shaped groove is provided on the top bracket, and the main keel is placed in the U-shaped groove.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述主龙骨的长度可调节。According to the cast-in-place floor slab support system of the steel structure building according to other embodiments of the present invention, the length of the main keel is adjustable.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述主龙骨包括方管和方钢,所述方钢的一端置于所述方管内,所述方钢远离所述方管的一端通过所述顶托与所述第一翼缘抵持,所述方管远离所述方钢的一端所述顶托与所述第二翼缘抵持。According to the cast-in-place floor support system for steel structure buildings according to other embodiments of the present invention, the main keel includes a square tube and a square steel, one end of the square steel is placed in the square tube, and the square steel is far away from the square tube. One end of the pipe is abutted against the first flange through the jack, and the jack at one end of the square tube away from the square steel abuts against the second flange.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述方管上设置有第一通孔,所述第一通孔沿所述方管的长度方向设置有两个及以上,所述方钢上设置有第二通孔,所述第二通孔沿所述方钢的长度方向设置有两个及以上,所述方管和所述方钢通过穿过所述第一通孔和所述第二通孔的螺栓锁紧固定。According to the cast-in-place floor support system for steel structure buildings according to other embodiments of the present invention, the square tube is provided with a first through hole, and two or more first through holes are provided along the length direction of the square tube , the square steel is provided with a second through hole, the second through hole is provided with two or more along the length direction of the square steel, the square tube and the square steel pass through the first The bolts of the through hole and the second through hole are locked and fixed.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,还包括有次龙骨,所述次龙骨设置在所述主龙骨远离所述第一翼缘的一侧,所述次龙骨与所述主龙骨交错设置。According to other embodiments of the present invention, the cast-in-place floor support system for a steel structure building further includes a secondary keel, the secondary keel is disposed on the side of the main keel away from the first flange, and the secondary keel is connected to the The main keels are staggered.

根据本发明的另一些实施例的钢结构建筑现浇楼板支撑系统,所述钢梁为工字钢或槽钢。According to other embodiments of the present invention, in the cast-in-place floor slab support system for a steel structure building, the steel beam is an I-beam or a channel steel.

附图说明Description of drawings

图1是第一实施例的钢结构建筑现浇楼板支撑系统的斜视图;Fig. 1 is the oblique view of the cast-in-place floor support system of the steel structure building of the first embodiment;

图2是图1中的钢结构建筑现浇楼板支撑系统的正视图;Fig. 2 is the front view of the cast-in-place floor slab support system of the steel structure building in Fig. 1;

图3是图1中的钢结构建筑现浇楼板支撑系统的部分支撑机构的斜视图;Fig. 3 is the oblique view of the partial support mechanism of the cast-in-place floor slab support system of the steel structure building in Fig. 1;

图4是图1中的钢结构建筑现浇楼板支撑系统的另一部分支撑机构的斜视图。FIG. 4 is an oblique view of another part of the support mechanism of the cast-in-place floor slab support system of the steel structure building in FIG. 1 .

具体实施方式Detailed ways

以下将结合实施例对本发明的构思及产生的技术效果进行清楚、完整地描述,以充分地理解本发明的目的、特征和效果。显然,所描述的实施例只是本发明的一部分实施例,而不是全部实施例,基于本发明的实施例,本领域的技术人员在不付出创造性劳动的前提下所获得的其他实施例,均属于本发明保护的范围。The concept of the present invention and the technical effects produced will be clearly and completely described below with reference to the embodiments, so as to fully understand the purpose, characteristics and effects of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, other embodiments obtained by those skilled in the art without creative efforts are all within the scope of The scope of protection of the present invention.

在本发明实施例的描述中,如果涉及到方位描述,例如“上”、“下”、“前”、“后”、“左”、“右”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the embodiments of the present invention, if the orientation description is involved, for example, the orientation or positional relationship indicated by "up", "down", "front", "rear", "left", "right", etc. is based on the accompanying drawings The orientation or positional relationship shown is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a reference to the present invention. limits.

在本发明实施例的描述中,如果某一特征被称为“设置”、“固定”、“连接”、“安装”在另一个特征,它可以直接设置、固定、连接在另一个特征上,也可以间接地设置、固定、连接、安装在另一个特征上。在本发明实施例的描述中,如果涉及到“若干”,其含义是一个以上,如果涉及到“多个”,其含义是两个以上,如果涉及到“大于”、“小于”、“超过”,均应理解为不包括本数,如果涉及到“以上”、“以下”、“以内”,均应理解为包括本数。如果涉及到“第一”、“第二”,应当理解为用于区分技术特征,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量或者隐含指明所指示的技术特征的先后关系。In the description of the embodiments of the present invention, if a feature is referred to as "set", "fixed", "connected", "installed" on another feature, it can be directly set, fixed, or connected on another feature, It can also be indirectly disposed, fixed, connected, mounted on another feature. In the description of the embodiments of the present invention, if "several" is involved, it means more than one; if it involves "plurality", it means more than two; ", should be understood as not including this number, if it involves "above", "below", "within", it should be understood as including this number. If it refers to "first" and "second", it should be understood to be used to distinguish technical features, but not to indicate or imply relative importance, or to imply indicate the number of indicated technical features or to imply indicate the indicated The sequence of technical features.

参照图1至图4,图1是第一实施例的钢结构建筑现浇楼板支撑系统的斜视图,图2是图1中的钢结构建筑现浇楼板支撑系统的正视图,图3是图1中的钢结构建筑现浇楼板支撑系统的部分支撑机构的斜视图,图4是图1中的钢结构建筑现浇楼板支撑系统的另一部分支撑机构的斜视图。本实施例的钢结构建筑现浇楼板支撑系统包括第一钢梁100、支撑机构200、主龙骨300、次龙骨400和第二钢梁500,第一钢梁100和第二钢梁500平行设置,第一钢梁100上设置有第一翼缘110,第二钢梁500上设置有第二翼缘510,主龙骨300设置有两根及以上,配合第一钢梁100和第二钢梁500,实现对楼板模板的支撑,单根的主龙骨300的两端分别设置有一个支撑机构200,最终通过第一翼缘110和第二翼缘510实现主龙骨300的支撑和固定,次龙骨400置于主龙骨300的上方,次龙骨400与主龙骨300交错设置。1 to 4, FIG. 1 is an oblique view of the cast-in-place floor support system of the steel structure building according to the first embodiment, FIG. 2 is a front view of the cast-in-place floor support system of the steel structure building in FIG. 1, and FIG. Figure 4 is an oblique view of another part of the support mechanism of the cast-in-place floor support system of the steel structure building in Figure 1 . The cast-in-place floor slab support system for a steel structure building in this embodiment includes a first steel beam 100, a support mechanism 200, a main keel 300, a secondary keel 400 and a second steel beam 500, and the first steel beam 100 and the second steel beam 500 are arranged in parallel , the first steel beam 100 is provided with a first flange 110, the second steel beam 500 is provided with a second flange 510, the main keel 300 is provided with two or more, cooperate with the first steel beam 100 and the second steel beam 500 , to realize the support for the floor formwork, the two ends of the single main keel 300 are respectively provided with a support mechanism 200, and finally the first flange 110 and the second flange 510 are used to realize the support and fixation of the main keel 300, and the secondary keel. The 400 is placed above the main keel 300, and the secondary keel 400 and the main keel 300 are staggered.

在本实施例中,第一钢梁100和第二钢梁500均为工字钢,次龙骨400为方木,工字钢在钢结构建筑应用较多,由此有利于本实施例的钢结构建筑现浇楼板支撑系统的广泛利用。In this embodiment, the first steel beam 100 and the second steel beam 500 are both I-beams, and the secondary keel 400 is square wood. I-beams are widely used in steel structure buildings, which is beneficial to the Extensive use of cast-in-place floor support systems for structural buildings.

在另外的实施例中,第一钢梁100和第二钢梁500也可使用槽钢。In other embodiments, channel steel can also be used for the first steel beam 100 and the second steel beam 500 .

支撑机构200包括有固定夹具、圆管230、顶托240和卡件250,其中,固定夹具包括螺钉210和安装块220,圆管230固定在安装块220上,固定方式可采用螺纹连接或焊接固定,顶托240包括有螺杆241和支撑部242,螺杆241和支撑部242一体设置,支撑部242上设置有U形槽,主龙骨300插入到U形槽中,由此可对主龙骨300进行支撑和限位,卡件250和螺杆241螺纹配合,螺杆241插入到圆管230的伸缩孔231中后,卡件250与圆管230抵持,通过旋转卡件250,可使顶托240从伸缩孔231中伸出,或者缩回至伸缩孔231中,由此方便调节支撑机构200的总体高度,以适应不同规格的工字钢。The support mechanism 200 includes a fixing fixture, a round tube 230, a jack 240 and a clip 250, wherein the fixing fixture includes a screw 210 and a mounting block 220, and the round tube 230 is fixed on the mounting block 220, and the fixing method can be screwed or welded. For fixing, the jack 240 includes a screw 241 and a support portion 242. The screw 241 and the support portion 242 are integrally provided. The support portion 242 is provided with a U-shaped groove, and the main keel 300 is inserted into the U-shaped groove, so that the main keel 300 To support and limit the position, the clip 250 and the screw 241 are threadedly matched. After the screw 241 is inserted into the telescopic hole 231 of the round tube 230, the clip 250 abuts against the round tube 230. By rotating the clip 250, the jack 240 can be lifted. Extending from the telescopic hole 231, or retracting into the telescopic hole 231, it is convenient to adjust the overall height of the support mechanism 200 to adapt to I-beams of different specifications.

在本实施例中,还可通过调节顶托240,使得顶托240与第一钢梁100上的与第一翼缘110相对的翼缘抵持,由此可进一步对主龙骨300进行限位。In this embodiment, the jack 240 can also be adjusted so that the jack 240 abuts against the flange on the first steel beam 100 opposite to the first flange 110 , thereby further limiting the position of the main keel 300 .

安装块220呈“U”形,由此形有一个一侧开口的卡槽221,螺钉210与安装块220螺纹配合,且螺钉210的一端能够伸入至卡槽221中,第一翼缘110嵌入到卡槽221中(以支撑机构200固定在第一钢梁100上为例),通过拧紧螺钉210,可使得第一翼缘110的一个侧面与卡槽221的内壁抵持,第一翼缘110的另一个侧面与螺钉210抵持,由此将固定夹具可拆卸地固定在第一翼缘110上。The mounting block 220 is in the shape of a "U", which has a slot 221 open on one side. The screw 210 is threadedly matched with the mounting block 220, and one end of the screw 210 can extend into the slot 221. The first flange 110 It is embedded in the card slot 221 (taking the support mechanism 200 fixed on the first steel beam 100 as an example), and by tightening the screws 210, one side surface of the first flange 110 can be abutted against the inner wall of the card slot 221, and the first flange The other side of the flange 110 abuts against the screw 210 , thereby detachably fixing the fixing fixture on the first flange 110 .

在本实施例中,螺钉210设置在安装块220的下侧,由于安装块220主要起支撑作用,卡槽221的内壁可与第一翼缘110大面积接触,由此可防止圆管230晃动,也即可防止顶托240晃动,由此可对主龙骨300提供稳定的支撑。另外,为将安装块220牢固地固定在第一翼缘110上,螺钉210设置有4个,4个螺钉210可增大安装块220和第一翼缘110之间的摩擦力,防止安装块220相对第一翼缘110运动。In this embodiment, the screw 210 is arranged on the lower side of the mounting block 220. Since the mounting block 220 mainly plays a supporting role, the inner wall of the clamping slot 221 can be in large-area contact with the first flange 110, thereby preventing the round tube 230 from shaking. , that is, the jacking bracket 240 can be prevented from shaking, thereby providing stable support to the main keel 300 . In addition, in order to firmly fix the mounting block 220 on the first flange 110, four screws 210 are provided, and the four screws 210 can increase the friction force between the mounting block 220 and the first flange 110, preventing the mounting block 220 moves relative to the first flange 110 .

为使得主龙骨300能够适应第一钢梁100和第二钢梁500之间的距离,主龙骨300的长度可调节,在本实施例中,主龙骨300包括有方管310和方钢320,方管310设置有两根,方钢320位于两根方管310之间,且方钢320的两端分别插入到两根方管310中,通过使方钢320从方管310中伸出,或者缩回至方管310中,可调节主龙骨300的长度。In order to make the main keel 300 adapt to the distance between the first steel beam 100 and the second steel beam 500, the length of the main keel 300 can be adjusted. In this embodiment, the main keel 300 includes a square tube 310 and a square steel 320. Two square pipes 310 are provided, the square steel 320 is located between the two square pipes 310, and the two ends of the square steel 320 are respectively inserted into the two square pipes 310. Or retracted into the square tube 310, the length of the main keel 300 can be adjusted.

在另外的实施例中,也可设置一根方管310和一根方钢320,同样可实现主龙骨300长度可调节的功能。In another embodiment, a square tube 310 and a square steel 320 can also be provided, and the function of adjusting the length of the main keel 300 can also be realized.

在本实施例中,为使得主龙骨300的长度确定后,方钢320不会相对方管310运动,方管310上设置有第一通孔311,第一通孔311设置有两个及以上,方钢320上设置有第二通孔321,第二通孔321设置有两个及以上,在主龙骨300的长度确定后,通过穿过对准的第一通孔311和第二通孔321的螺栓,可使得方钢320相对方管310固定,由此可提高安全性能。In this embodiment, after the length of the main keel 300 is determined, the square steel 320 will not move relative to the square tube 310, the square tube 310 is provided with a first through hole 311, and the first through hole 311 is provided with two or more , the square steel 320 is provided with a second through hole 321, and the second through hole 321 is provided with two or more. The bolts of 321 can fix the square steel 320 relative to the square tube 310, thereby improving the safety performance.

在另外的实施例中,也可设置一根方管310和一根方钢320,同样可实现主龙骨300长度可调节的功能。In another embodiment, a square tube 310 and a square steel 320 can also be provided, and the function of adjusting the length of the main keel 300 can also be realized.

上面结合附图对本发明实施例作了详细说明,但是本发明不限于上述实施例,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。此外,在不冲突的情况下,本发明的实施例及实施例中的特征可以相互组合。The embodiments of the present invention have been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned embodiments. Within the scope of knowledge possessed by those of ordinary skill in the technical field, various modifications can be made without departing from the purpose of the present invention. kind of change. Furthermore, the embodiments of the present invention and features in the embodiments may be combined with each other without conflict.

Claims (10)

1. The utility model provides a cast-in-place floor braced system of steel construction building which characterized in that includes:
the first steel beam and the second steel beam are arranged in parallel, a first flange is arranged on the first steel beam, and a second flange is arranged on the second steel beam;
the supporting mechanism comprises a jacking support and a fixing clamp, the jacking support is arranged on the fixing clamp, and the fixing clamp is detachably fixed on both the first flange and the second flange;
the main joist, the main joist is provided with two and more, single the both ends of main joist are passed through the top hold in the palm respectively with the first edge of a wing the second edge of a wing supports and holds.
2. The cast-in-place floor slab supporting system for the steel structure building as claimed in claim 1, wherein the fixing clamp includes a mounting block and a screw, the mounting block is U-shaped, the mounting block is in threaded fit with the screw, the mounting block is nested on the first flange, and both the mounting block and the screw are abutted against the first flange.
3. The system of claim 2, wherein the screw is disposed on a side of the mounting block remote from the main runner.
4. The steel structure building cast-in-place floor supporting system according to claim 2, wherein the supporting mechanism further comprises a round pipe and a clamping piece, the round pipe is fixed on the mounting block, a screw rod is arranged on the jacking, the screw rod is inserted into the round pipe, the clamping piece is in threaded fit with the screw rod, and the clamping piece abuts against the round pipe.
5. The system as claimed in claim 4, wherein the top support is provided with a U-shaped groove, and the main joist is placed in the U-shaped groove.
6. The steel structural building cast-in-place floor support system of claim 1, wherein the main runners are adjustable in length.
7. The steel structure building cast-in-place floor supporting system according to claim 6, wherein the main keel comprises a square pipe and square steel, one end of the square steel is arranged in the square pipe, one end, far away from the square pipe, of the square steel is abutted against the first flange through the jacking, and one end, far away from the square steel, of the square steel is abutted against the second flange through the jacking.
8. The system of claim 7, wherein the square pipe has two or more first through holes formed therein along a length direction of the square pipe, the square steel has two or more second through holes formed therein along a length direction of the square steel, and the square pipe and the square steel are locked and fixed by bolts passing through the first through holes and the second through holes.
9. The cast-in-place floor slab supporting system for the steel structure building as claimed in any one of claims 1 to 8, further comprising secondary runners, the secondary runners are arranged on one side of the main runners away from the first flange, and the secondary runners are staggered with the main runners.
10. The steel structure building cast-in-place floor support system according to any one of claims 1 to 8, wherein the steel beam is an I-beam or a channel.
CN201911034783.4A 2019-10-29 2019-10-29 Cast-in-place floor support system for steel structure buildings Pending CN110714612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911034783.4A CN110714612A (en) 2019-10-29 2019-10-29 Cast-in-place floor support system for steel structure buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911034783.4A CN110714612A (en) 2019-10-29 2019-10-29 Cast-in-place floor support system for steel structure buildings

Publications (1)

Publication Number Publication Date
CN110714612A true CN110714612A (en) 2020-01-21

Family

ID=69214497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911034783.4A Pending CN110714612A (en) 2019-10-29 2019-10-29 Cast-in-place floor support system for steel structure buildings

Country Status (1)

Country Link
CN (1) CN110714612A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554422A (en) * 2020-12-28 2021-03-26 浙江亚厦装饰股份有限公司 Leveling structure suitable for steel structure building and mounting method
CN113653317A (en) * 2021-09-28 2021-11-16 中建科工集团有限公司 A bottom formwork structure and floor slab pouring construction method
CN113944322A (en) * 2021-10-20 2022-01-18 龙元明筑科技有限责任公司 Connect and exempt from interim bearing structure of welding trompil on H shaped steel roof beam upper portion
CN116623938A (en) * 2023-04-25 2023-08-22 广州机施建设集团有限公司 A floor support structure and its construction method
CN117449577A (en) * 2023-12-26 2024-01-26 卫华建工集团有限公司 A steel structure cast-in-place plate bracket-less formwork fixing device and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040101625A (en) * 2003-05-26 2004-12-03 (주)나인 System and construction method of slab form
JP2005139861A (en) * 2003-11-10 2005-06-02 Sumitomo Metal Steel Products Inc Support
KR101572420B1 (en) * 2014-08-04 2015-11-26 (주)블루폼 Supporting device for deck plate panel
CN108412202A (en) * 2018-05-11 2018-08-17 上海建工四建集团有限公司 Floor plates formwork system and its construction method being set on girder steel lower flange
CN211736349U (en) * 2019-10-29 2020-10-23 中建钢构有限公司 Cast-in-place floor support system for steel structure building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040101625A (en) * 2003-05-26 2004-12-03 (주)나인 System and construction method of slab form
JP2005139861A (en) * 2003-11-10 2005-06-02 Sumitomo Metal Steel Products Inc Support
KR101572420B1 (en) * 2014-08-04 2015-11-26 (주)블루폼 Supporting device for deck plate panel
CN108412202A (en) * 2018-05-11 2018-08-17 上海建工四建集团有限公司 Floor plates formwork system and its construction method being set on girder steel lower flange
CN211736349U (en) * 2019-10-29 2020-10-23 中建钢构有限公司 Cast-in-place floor support system for steel structure building

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554422A (en) * 2020-12-28 2021-03-26 浙江亚厦装饰股份有限公司 Leveling structure suitable for steel structure building and mounting method
CN113653317A (en) * 2021-09-28 2021-11-16 中建科工集团有限公司 A bottom formwork structure and floor slab pouring construction method
CN113944322A (en) * 2021-10-20 2022-01-18 龙元明筑科技有限责任公司 Connect and exempt from interim bearing structure of welding trompil on H shaped steel roof beam upper portion
CN113944322B (en) * 2021-10-20 2023-01-10 龙元明筑科技有限责任公司 Connect and exempt from interim bearing structure of welding trompil on H shaped steel roof beam upper portion
CN116623938A (en) * 2023-04-25 2023-08-22 广州机施建设集团有限公司 A floor support structure and its construction method
CN117449577A (en) * 2023-12-26 2024-01-26 卫华建工集团有限公司 A steel structure cast-in-place plate bracket-less formwork fixing device and construction method
CN117449577B (en) * 2023-12-26 2024-03-29 卫华建工集团有限公司 A steel structure cast-in-place plate bracket-less formwork fixing device and construction method

Similar Documents

Publication Publication Date Title
CN110714612A (en) Cast-in-place floor support system for steel structure buildings
CN104594628B (en) Cast-in-place concrete contignation form bracing system and construction method
CN205369958U (en) A support frame for prefabricating wallboard installation
CN204418660U (en) Cast-in-situ concrete beam and slab structure form bracing system
CN202810209U (en) Support carrier of beam framework
CN211736349U (en) Cast-in-place floor support system for steel structure building
CN208072857U (en) A kind of building wall body insulating board dedicated hanging part structure
CN112942779A (en) Fine-adjustable cantilever formwork system device and construction method using same
CN210067488U (en) Outdoor curtain wall unwrapping wire appurtenance
CN211973855U (en) Pipe gallery embedded part
CN105113782A (en) Lead screw cross-shaped lock catch part and scaffold jacking assembly with lock catch part
CN211313306U (en) Movable scaffold for constructional engineering
KR200448068Y1 (en) Mold supporter for concrete beams
CN217028175U (en) Be applied to adjustable support of assembled of vertical tuber pipe
CN219100721U (en) Inclined template supporting device for cornice structure
CN217930126U (en) Wave form roof beam guardrail stand range unit
CN222229690U (en) Gas riser fixing bracket for high-rise buildings
CN221236319U (en) Externally hung wallboard unsupported self-adjusting high-precision equipment
CN222936265U (en) Ceiling structure without light steel keel
CN215252975U (en) Embedded foundation bolt mounting auxiliary tool
CN222295519U (en) Adjustable mounting device for protective facilities
CN219387260U (en) Assembled building construction superimposed sheet fixing device
CN223593184U (en) Adjustable support device for positioning dowel bar of concrete field road
CN222184218U (en) Adjustable edge protection
CN110939790A (en) Electromechanical pipeline support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200121

RJ01 Rejection of invention patent application after publication