CN110700548A - Assembled multi-section track hanger device and operation method thereof - Google Patents
Assembled multi-section track hanger device and operation method thereof Download PDFInfo
- Publication number
- CN110700548A CN110700548A CN201911022102.2A CN201911022102A CN110700548A CN 110700548 A CN110700548 A CN 110700548A CN 201911022102 A CN201911022102 A CN 201911022102A CN 110700548 A CN110700548 A CN 110700548A
- Authority
- CN
- China
- Prior art keywords
- sliding rod
- hanging bracket
- movable sliding
- track
- silo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims abstract description 14
- 239000002023 wood Substances 0.000 claims description 2
- 239000000463 material Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention discloses an assembled multi-section track hanger device and an operation method thereof, wherein the assembled multi-section track hanger device is arranged outside an arc-shaped connected silo, and the assembled multi-section track hanger device comprises the following components in percentage by weight: the inner and outer double tracks are in a multi-section splicing structure and are spliced according to the shape of the arc connected silo; the upper structure platform is fixed at the top of the silo, and the spliced arc-shaped double rails are fixedly arranged below the upper structure platform through vertical fixing anchor rods; the movable sliding rod is arranged between the inner and outer double rails through rotating shaft wheels at two ends of the movable sliding rod, and the movable sliding rod can move along the inner and outer double rails; one end of the steel cable is wound on the movable sliding rod, the other end of the steel cable is connected with a wire rewinding device, and the wire rewinding device is fixedly arranged inside the prefabricated structure hanging bracket; the operation box is arranged in the prefabricated structure hanging bracket, and the vertical lifting and the horizontal movement of the prefabricated structure hanging bracket are controlled through the operation box. Compared with the traditional hanging bracket, the hanging bracket is convenient and quick to operate, and the construction efficiency is greatly improved.
Description
Technical Field
The invention relates to the technical field of construction of silo hangers, in particular to an assembled multi-section track hanger device and an operation method thereof.
Background
In the construction process of the silo, the conditions of secondary repair and the like of silo wall cracks, ash explosion, slab staggering, mold sticking and the like often occur, and the condition of spray finishing on the silo wall is also often met. Traditional gallows is fixed in a certain position in superstructure platform below, rises along with superstructure platform and removes, appears bulkhead quality problem just unable processing to the later stage, needs to set up movable gallows through ground aerial ladder lift truck or upper portion and solves. The measures are time-consuming and labor-consuming, the single treatment range is very limited, and the construction requirements can be met only by moving for multiple times.
Disclosure of Invention
The invention aims to solve the technical problem of providing an assembled multi-section track hanger device and an operation method thereof aiming at the defects in the prior art.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the invention provides an assembled multi-section track hanger device, which is arranged outside an arc-shaped connected silo and comprises: the device comprises an upper structure platform, a vertical fixed anchor rod, an inner rail, an outer rail, a movable sliding rod, a rotating shaft wheel, a steel cable, a prefabricated structure hanger, an operation box and a wire rewinding device; wherein:
the inner and outer double tracks are in a multi-section splicing structure and are spliced according to the shape of the arc connected silo; the upper structure platform is fixed at the top of the silo, and the spliced arc-shaped double rails are fixedly arranged below the upper structure platform through vertical fixing anchor rods; the movable sliding rod is arranged between the inner and outer double rails through rotating shaft wheels at two ends of the movable sliding rod, and the movable sliding rod can move along the inner and outer double rails; one end of the steel cable is wound on the movable sliding rod, the other end of the steel cable is connected with a wire rewinding device, and the wire rewinding device is fixedly arranged inside the prefabricated structure hanging bracket; the operation box is arranged in the prefabricated structure hanging bracket, and the vertical lifting and the horizontal movement of the prefabricated structure hanging bracket are controlled through the operation box.
Further, the inner and outer double rails of the multi-section type splicing structure of the invention comprise: the device comprises an arc-shaped rail, a linear rail, a bent rail and a connecting member; the arc-shaped rail, the linear rail and the bent rail are connected in an assembling mode through connecting members.
Furthermore, the movable sliding rod is provided with a lead hole, and a steel cable penetrates through the lead hole.
Furthermore, a hydraulic controller is arranged on the movable sliding rod, and the horizontal position of the steel cable is adjusted through the hydraulic controller, so that the horizontal distance between the prefabricated structure hanging bracket and the silo wall is adjusted.
Furthermore, a signal processor is arranged in the movable sliding rod; and the signal processor is connected with the operation box, so that the prefabricated structure hanging bracket is controlled to move.
The invention provides an operation method of an assembled multi-section track hanger device, which comprises the following steps:
the method comprises the following steps: after the upper structure platform is installed, the vertical fixing anchor rod is continuously fixed on the upper structure platform through a fixing bolt, the lower end of the fixing anchor rod is connected with the inner and outer double rails through the fixing bolt, the upper platform plate is laid by adopting a wood template, and a steel template is adopted at the position where a hanging bracket is partially hung;
step two: the movable sliding rod is embedded and installed on the inner and outer double rails through the rotating shaft wheels at the two ends, and the steel cable is threaded into a wire winder on a hanger below through a wire leading hole;
step three: lay control box and steel hawser spooler in advance on the prefabricated construction gallows, send wireless signal through the control box operation and come the remote control movable slide bar: the rotating shaft wheels at two ends of the remote control movable slide bar drive the movable slide bar to do circular movement along the inner and outer double tracks; remotely controlling a hydraulic controller inside the sliding rod to increase and decrease hydraulic pressure, so that the steel cable moves on the movable sliding rod in a radial direction, and the horizontal distance from the hanger to the silo wall is adjusted; a rotating shaft in a wire winder arranged on the hanging bracket is remotely controlled to pull the steel cable so as to adjust the vertical movement of the hanging bracket;
step four: the integral construction of the silo wall is carried out by a track arranged around the silo and a movable hanger.
The invention has the following beneficial effects: the assembled multi-section track hanger device and the operation method thereof adopt the double-track design to enhance the stability of the hanger, ensure the safe construction, have strong adjustability of the assembled track, and are suitable for a plurality of buildings such as single-bin, multi-bin and special-shaped bins. Adopt multi-direction adjustable movable slide bar, can adjust according to on-the-spot actual conditions, strong adaptability compares the partial construction area of traditional gallows, and movable slide bar makes the gallows can all-round cover whole silo body, has greatly increased the operation scope, has saved the later stage and has repaired the required material manual work of decoration.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic diagram of a spliced track structure according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1, the assembly type multi-section track hanger device according to the embodiment of the present invention is disposed outside an arc-shaped connected silo, and is characterized in that the device includes: the device comprises an upper structure platform 1, a vertical fixed anchor rod 2, an inner and outer double track 3, a movable slide rod 4, a rotating shaft wheel 5, a steel cable 8, a prefabricated structure hanger 9, an operation box 10 and a wire-rewinding device 11; wherein:
the inner and outer double tracks 3 are in a multi-section splicing structure and are spliced according to the shape of an arc-shaped connected silo; the upper structure platform 1 is fixed at the top of the silo, and the spliced arc-shaped double rails 3 are fixedly arranged below the upper structure platform 1 through vertical fixing anchor rods 2; the movable slide bar 4 is arranged between the inner and outer double rails 3 through the rotating shaft wheels 5 at the two ends of the movable slide bar 4, and the movable slide bar 4 can move along the inner and outer double rails 3; one end of a steel cable 8 is wound on the movable slide bar 4, the other end of the steel cable is connected with a wire rewinding device 11, and the wire rewinding device 11 is fixedly arranged inside the prefabricated structure hanging bracket 9; the operation box 10 is arranged inside the prefabricated structure hanger 9, and the vertical lifting and the horizontal movement of the prefabricated structure hanger 9 are controlled through the operation box 10.
As shown in fig. 2, the inner and outer double rails 3 of the multi-section type splicing structure include: the device comprises an arc track A, a linear track B, a bent track C and a connecting member D; the arc-shaped track A, the linear track B and the bent track C are connected in an assembling mode through connecting members D.
The movable sliding rod 4 is provided with a lead hole 6, and a steel cable 8 passes through the lead hole 6. The movable sliding rod 4 is provided with a hydraulic controller 7, and the horizontal position of a steel cable 8 is adjusted through the hydraulic controller 7, so that the horizontal distance between a prefabricated structure hanger 9 and the silo wall is adjusted. A signal processor 12 is arranged inside the movable sliding rod 4; the signal processor 12 is connected to the operation box 10, and controls the prefabricated structure hanger 9 to move.
The operation method of the assembled multi-section track hanger device provided by the embodiment of the invention comprises the following steps:
the method comprises the following steps: after superstructure platform installation is accomplished, pass through fixing bolt with the vertical fixation stock and fix in succession on superstructure platform, the inside and outside double track way of anchor rod lower extreme with fixing bolt connection, the upper portion platform board adopts the plank sheathing to lay, can alleviate the platform dead weight, and the part is hung and is established gallows department and adopt the steel form in order to increase strength.
Step two: the movable sliding rods are arranged in tandem and embedded on the inner and outer double rails through shaft wheels at two sides, and the steel cable is threaded into a wire winder on a hanger below through a wire leading hole.
Step three: lay control box and steel hawser spooler in advance on the gallows, send wireless signal through the control box operation and come the remote control slide bar: the rotating shaft wheels at two ends of the remote control slide bar drive the movable slide bar to do circular movement along the inner and outer double tracks; remotely controlling a hydraulic controller inside the slide bar to increase and decrease hydraulic pressure so that the steel cable moves on the movable slide bar in a radial direction; thereby adjusting the horizontal distance from the hanger to the silo wall; the rotating shaft in the wire-rewinding device arranged on the hanging bracket is remotely controlled to pull the steel cable, so as to adjust the vertical movement of the hanging bracket.
Step four: the integral construction of the silo wall is carried out by a track arranged around the silo and a movable hanger.
The invention has the following advantages:
1. this device rail mounted activity gallows has saved the material of traditional gallows integral erection greatly, save material and manual work, adopts the stability of double track way formula design reinforcing gallows, guarantees safe construction. The split mounting type track has strong adjustability and is suitable for a plurality of buildings such as single-cabin, multi-cabin and special-shaped cabin.
2. This device adopts multi-direction adjustable movable slide bar, can adjust according to on-the-spot actual conditions, and strong adaptability compares the partial construction area of traditional gallows, and movable slide bar makes the gallows can all-round cover whole silo body, has greatly increased the operation scope, has saved the later stage and has repaired the required material manual work of decorating.
3. This device passes through wireless remote control unit, is applied to engineering reality with high-tech innovation technique, has saved a plurality of equipment pipelines of traditional device, avoids the pipeline complicacy crisscross, also can not appear the damaged ageing problem of pipeline.
4. This device is different from traditional operating equipment and lays in upper portion platform, with installing control box and spooler on the gallows, can guarantee the stability of gallows, reduces the gust influence that aerial operation received. The steel cables of the single hanging bracket are controlled in series, so that the operability is improved, and the fault probability of the whole system breakdown caused by single fault is reduced.
5. This device pin-connected panel multistage track divides into arc track A, sharp shape track B and angle-adjustable's the shape track C of buckling, adopts connecting elements D to come fixed connection between the track. The tracks in various shapes are matched for use, can be applied to silo construction of different diameters, and is high in mobility.
It will be understood that modifications and variations can be made by persons skilled in the art in light of the above teachings and all such modifications and variations are intended to be included within the scope of the invention as defined in the appended claims.
Claims (6)
1. The utility model provides a pin-connected panel multistage track gallows device, sets up in the arc disjunctor silo outside, and its characterized in that, the device includes: the device comprises an upper structure platform (1), a vertical fixed anchor rod (2), an inner rail and an outer rail (3), a movable sliding rod (4), a rotating shaft wheel (5), a steel cable (8), a prefabricated structure hanger (9), an operation box (10) and a wire rewinding device (11); wherein:
the inner and outer double tracks (3) are in a multi-section splicing structure and are spliced according to the shape of the arc connected silo; the upper structure platform (1) is fixed at the top of the silo, and the spliced arc-shaped double rails (3) are fixedly arranged below the upper structure platform (1) through vertical fixing anchor rods (2); the movable sliding rod (4) is arranged between the inner and outer double rails (3) through rotating shaft wheels (5) at two ends of the movable sliding rod, and the movable sliding rod (4) can move along the inner and outer double rails (3); one end of a steel cable (8) is wound on the movable sliding rod (4), the other end of the steel cable is connected with a wire rewinding device (11), and the wire rewinding device (11) is fixedly arranged inside the prefabricated structure hanging bracket (9); the operation box (10) is arranged inside the prefabricated structure hanging bracket (9), and the vertical lifting and the horizontal movement of the prefabricated structure hanging bracket (9) are controlled through the operation box (10).
2. The sectional multi-segment rail hanger device according to claim 1, wherein the inner and outer double rails (3) of the multi-segment splicing structure comprise: an arc-shaped track (A), a linear track (B), a bent track (C) and a connecting member (D); the arc-shaped track (A), the linear track (B) and the bent track (C) are connected in an assembling mode through the connecting component (D).
3. The assembly type multi-segment rail hanger device according to claim 1, wherein the movable sliding rod (4) is provided with a wire guiding hole (6), and the steel cable (8) passes through the wire guiding hole (6).
4. The assembly type multi-section track hanging bracket device according to claim 1, wherein the movable sliding rod (4) is provided with a hydraulic controller (7), and the horizontal position of the steel cable (8) is adjusted through the hydraulic controller (7), so that the horizontal distance between the prefabricated structure hanging bracket (9) and the silo wall is adjusted.
5. The assembly type multi-section track hanging bracket device according to claim 1, characterized in that a signal processor (12) is arranged inside the movable sliding rod (4); the signal processor (12) is connected with the operation box (10) so as to control the prefabricated structure hanger (9) to move.
6. An operation method of an assembled multi-section track hanger device is characterized by comprising the following steps:
the method comprises the following steps: after the upper structure platform is installed, the vertical fixing anchor rod is continuously fixed on the upper structure platform through a fixing bolt, the lower end of the fixing anchor rod is connected with the inner and outer double rails through the fixing bolt, the upper platform plate is laid by adopting a wood template, and a steel template is adopted at the position where a hanging bracket is partially hung;
step two: the movable sliding rod is embedded and installed on the inner and outer double rails through the rotating shaft wheels at the two ends, and the steel cable is threaded into a wire winder on a hanger below through a wire leading hole;
step three: lay control box and steel hawser spooler in advance on the prefabricated construction gallows, send wireless signal through the control box operation and come the remote control movable slide bar: the rotating shaft wheels at two ends of the remote control movable slide bar drive the movable slide bar to do circular movement along the inner and outer double tracks; remotely controlling a hydraulic controller inside the sliding rod to increase and decrease hydraulic pressure, so that the steel cable moves on the movable sliding rod in a radial direction, and the horizontal distance from the hanger to the silo wall is adjusted; a rotating shaft in a wire winder arranged on the hanging bracket is remotely controlled to pull the steel cable so as to adjust the vertical movement of the hanging bracket;
step four: the integral construction of the silo wall is carried out by a track arranged around the silo and a movable hanger.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911022102.2A CN110700548A (en) | 2019-10-25 | 2019-10-25 | Assembled multi-section track hanger device and operation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911022102.2A CN110700548A (en) | 2019-10-25 | 2019-10-25 | Assembled multi-section track hanger device and operation method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110700548A true CN110700548A (en) | 2020-01-17 |
Family
ID=69202247
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911022102.2A Pending CN110700548A (en) | 2019-10-25 | 2019-10-25 | Assembled multi-section track hanger device and operation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110700548A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111706249A (en) * | 2020-06-08 | 2020-09-25 | 深圳市华星光电半导体显示技术有限公司 | Maintenance ladder |
| CN111893888A (en) * | 2020-07-15 | 2020-11-06 | 刘世松 | Movable hanging basket for bridge construction |
| CN113958111A (en) * | 2021-10-28 | 2022-01-21 | 余炳月 | Building outer wall surface moving function platform |
| CN114109014A (en) * | 2021-12-24 | 2022-03-01 | 中建八局南方建设有限公司 | A kind of super high and small diameter cylindrical curtain wall annular hanging basket and construction method thereof |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1995029309A1 (en) * | 1994-04-20 | 1995-11-02 | Warner Tollo Ab | A device in scaffolds |
| JPH08158630A (en) * | 1994-12-01 | 1996-06-18 | Toyo Kooken Kk | Rail support device for gondola running |
| JPH09125686A (en) * | 1995-10-31 | 1997-05-13 | Fujita Corp | Movable ladder |
| KR20080099685A (en) * | 2007-05-10 | 2008-11-13 | 김지욱 | Construction device and method |
| CN103477005A (en) * | 2011-03-04 | 2013-12-25 | 因内奥托雷斯有限公司 | Method for accessing the outer surface of wind turbine towers and device for use with this method |
| CN104261269A (en) * | 2014-09-12 | 2015-01-07 | 北京建工集团有限责任公司 | Special hoisting mechanism for annular dual-rail sliding track |
| CN105971270A (en) * | 2016-05-24 | 2016-09-28 | 中交第航务工程局有限公司 | Sliding formwork of vertical grain storage silo |
| CN206800973U (en) * | 2017-05-28 | 2017-12-26 | 江苏省苏中建设集团股份有限公司 | A kind of packaged type building hanging basket |
| CN209211859U (en) * | 2018-09-10 | 2019-08-06 | 中国核工业二三建设有限公司 | A kind of nuclear power basin installation auxiliary device |
-
2019
- 2019-10-25 CN CN201911022102.2A patent/CN110700548A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1995029309A1 (en) * | 1994-04-20 | 1995-11-02 | Warner Tollo Ab | A device in scaffolds |
| JPH08158630A (en) * | 1994-12-01 | 1996-06-18 | Toyo Kooken Kk | Rail support device for gondola running |
| JPH09125686A (en) * | 1995-10-31 | 1997-05-13 | Fujita Corp | Movable ladder |
| KR20080099685A (en) * | 2007-05-10 | 2008-11-13 | 김지욱 | Construction device and method |
| CN103477005A (en) * | 2011-03-04 | 2013-12-25 | 因内奥托雷斯有限公司 | Method for accessing the outer surface of wind turbine towers and device for use with this method |
| CN104261269A (en) * | 2014-09-12 | 2015-01-07 | 北京建工集团有限责任公司 | Special hoisting mechanism for annular dual-rail sliding track |
| CN105971270A (en) * | 2016-05-24 | 2016-09-28 | 中交第航务工程局有限公司 | Sliding formwork of vertical grain storage silo |
| CN206800973U (en) * | 2017-05-28 | 2017-12-26 | 江苏省苏中建设集团股份有限公司 | A kind of packaged type building hanging basket |
| CN209211859U (en) * | 2018-09-10 | 2019-08-06 | 中国核工业二三建设有限公司 | A kind of nuclear power basin installation auxiliary device |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111706249A (en) * | 2020-06-08 | 2020-09-25 | 深圳市华星光电半导体显示技术有限公司 | Maintenance ladder |
| CN111893888A (en) * | 2020-07-15 | 2020-11-06 | 刘世松 | Movable hanging basket for bridge construction |
| CN113958111A (en) * | 2021-10-28 | 2022-01-21 | 余炳月 | Building outer wall surface moving function platform |
| CN114109014A (en) * | 2021-12-24 | 2022-03-01 | 中建八局南方建设有限公司 | A kind of super high and small diameter cylindrical curtain wall annular hanging basket and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110700548A (en) | Assembled multi-section track hanger device and operation method thereof | |
| CN112030767B (en) | A steel tower unilateral climbing lifting formwork and its application in an inclined single-column steel cable tower | |
| CN204096951U (en) | Building hoist suspension rod and building hoist | |
| KR100928870B1 (en) | Retractable prop | |
| US8317244B1 (en) | Apparatus and method for positioning an object in a building | |
| CN110668318B (en) | Assembled indoor GIS (gas insulated switchgear) transportation and installation equipment and use method thereof | |
| CN105347206B (en) | The intelligent assistance platform of GIS dismounting | |
| CN105366567A (en) | Intelligent assisting platform for dismounting and mounting of GIS (Gas Insulated Substation) | |
| CN206580492U (en) | Movable lifting and positioning device for pipeline of pipe gallery | |
| CN110510527A (en) | Installation system of high slope variable cross-section slope precast block and construction method thereof | |
| CN106121253B (en) | Installation component adjustable auxiliary installation device and method | |
| CN113914214B (en) | Remote control adjustable steel box girder cantilever construction channel and construction method thereof | |
| CN221894501U (en) | Tubular pile and pole demolding and carrying vacuum chuck lifting appliance | |
| CN112377672A (en) | Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof | |
| CN220723384U (en) | Supporting and adjusting mechanism for tower crane wall-attached supporting platform | |
| CN112681144A (en) | Self-climbing type installation method of steel cable tower | |
| CN217578091U (en) | Gantry crane | |
| CN206736726U (en) | The device of the prefabricated arch ring of nose girder auxiliary erection | |
| JP6779740B2 (en) | Elevated structure inspection method | |
| KR102338934B1 (en) | Facility for approaching containment dome liner plate | |
| CN205017474U (en) | Automatic temperature pattern monitored control system that tours of over -and -under type | |
| CN209434738U (en) | Tangent tower electrified conduction wire riser | |
| CN106836003B (en) | Device for erecting prefabricated arch ring by aid of guide beam | |
| CN207724211U (en) | Deformable small space GIS/HGIS tank bodies dismount assistance platform | |
| US20250326607A1 (en) | Unlocking device and unlocking method of elevator landing door, and elevator system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200117 |
|
| RJ01 | Rejection of invention patent application after publication |