CN110685598A - A drill pipe device for petroleum geological exploration - Google Patents
A drill pipe device for petroleum geological exploration Download PDFInfo
- Publication number
- CN110685598A CN110685598A CN201911131309.3A CN201911131309A CN110685598A CN 110685598 A CN110685598 A CN 110685598A CN 201911131309 A CN201911131309 A CN 201911131309A CN 110685598 A CN110685598 A CN 110685598A
- Authority
- CN
- China
- Prior art keywords
- rod
- motor
- drill pipe
- cylinder
- hydraulic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/22—Rods or pipes with helical structure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/022—Control of the drilling operation; Hydraulic or pneumatic means for activation or operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/30—Assessment of water resources
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种石油地质勘探钻杆装置,包括支架和侧架,所述支架上安装有两个转轴,两个所述转轴之间通过传送链相连接,所述传送链上固定安装有若干个均匀分布的接头,每个所述接头侧壁上均固定连接有一个侧箱,每个所述侧箱顶部均固定安装有一个固定盘,其中一个所述转轴下方安装有一个驱动电机,所述驱动电机的传动轴与转轴相连接。可以解决现有的篮球存放装置虽然具备存放篮球或是对篮球进行清洁的功能,但是还存在清洁效果不佳,清洁不彻底,在清洁过程中较为浪费水资源的问题,同时不具备在存放过程中对篮球是否需要充气进行检测,并且也不具备对需要充气的篮球进行自动充气功能的问题。
The invention discloses a drill pipe device for petroleum geological exploration, comprising a bracket and a side frame, two rotating shafts are installed on the bracket, the two rotating shafts are connected by a transmission chain, and a transmission chain is fixedly installed on the transmission chain A number of evenly distributed joints, a side box is fixedly connected to the side wall of each joint, a fixed plate is fixedly installed on the top of each side box, and a drive motor is installed under one of the rotating shafts, The transmission shaft of the driving motor is connected with the rotating shaft. It can solve the problem that although the existing basketball storage device has the function of storing or cleaning the basketball, it still has the problem of poor cleaning effect, incomplete cleaning, and waste of water resources during the cleaning process, and it does not have the ability to clean the basketball during the storage process. It can detect whether the basketball needs to be inflated, and it does not have the problem of automatically inflating the basketball that needs to be inflated.
Description
技术领域technical field
本发明涉及地质勘探用钻杆领域,具体涉及一种石油地质勘探钻杆装置。The invention relates to the field of drill pipes for geological exploration, in particular to a drill pipe device for petroleum geological exploration.
背景技术Background technique
石油地质勘探需要使用到钻杆装置进行钻孔,在钻完孔之后进行不同深度位置的地质勘探,但是,现有的石油地质勘探钻杆装置在使用时仍存在一定缺陷,首先钻杆容易受到土壤内部硬土块、石块的影响,而现有的此类装置仅仅只依靠钻杆旋转来实现破土、碎石钻孔,从而极其容易受到阻碍而无法下降,并且现有的此类装置在使用过程中往往采用钻杆钻完后进行不同深度土样采集的方式,此种方式容易出现因钻杆取出土崩塌掉落而导致采样结果不准确的情况,并且此种方式也较为费时费力。Petroleum geological exploration needs to use the drill pipe device for drilling, and after drilling the hole, geological exploration at different depths is carried out. However, the existing drill pipe device for petroleum geological exploration still has certain defects in use. The influence of hard clods and stones inside the soil, and the existing such devices only rely on the rotation of the drill pipe to achieve ground breaking and gravel drilling, which is extremely easy to be hindered and cannot be lowered. In the process of use, the method of collecting soil samples at different depths after drilling by the drill pipe is often used. This method is prone to inaccurate sampling results due to the collapse of the soil taken out by the drill pipe, and this method is also time-consuming and labor-intensive.
公开号为:CN205689138U的专利公开了一种石油地质勘探钻杆装置,与本申请文相比,无法解决本申请提出的:现有的石油地质勘探钻杆装置在使用时钻杆容易受到土壤内部硬土块、石块的影响,受到阻碍而无法下降,并且现有的此类装置在使用过程中往往采用钻杆钻完后进行不同深度土样采集的方式,此种方式容易出现因钻杆取出土崩塌掉落而导致采样结果不准确的情况,并且此种方式也较为费时费力的问题。Publication number: CN205689138U patent discloses a drill pipe device for petroleum geological exploration. Compared with this application, it cannot solve the problem proposed by the application: when the existing drill pipe device for petroleum geological exploration is in use, the drill pipe is easily affected by the interior of the soil. Influenced by hard clods and stones, they are hindered and cannot be lowered, and the existing such devices often use the method of collecting soil samples at different depths after drilling with a drill pipe. Inaccurate sampling results are caused by soil collapse and falling, and this method is also time-consuming and labor-intensive.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种石油地质勘探钻杆装置,可以解决现有的石油地质勘探钻杆装置在使用时钻杆容易受到土壤内部硬土块、石块的影响,受到阻碍而无法下降,并且现有的此类装置在使用过程中往往采用钻杆钻完后进行不同深度土样采集的方式,此种方式容易出现因钻杆取出土崩塌掉落而导致采样结果不准确的情况,并且此种方式也较为费时费力的问题。The object of the present invention is to provide a drill pipe device for petroleum geological exploration, which can solve the problem that when the existing drill pipe device for petroleum geological exploration is in use, the drill pipe is easily affected by hard clods and stones in the soil, and cannot be lowered due to obstacles, In addition, the existing devices of this type often use the method of collecting soil samples at different depths after the drill pipe is drilled. This method is prone to inaccurate sampling results due to the collapse and falling of the soil taken out by the drill pipe. This method is also more time-consuming and labor-intensive.
本发明的目的可以通过以下技术方案实现:The object of the present invention can be realized through the following technical solutions:
一种石油地质勘探钻杆装置,包括车架和钻孔机构,所述车架一端顶部焊接有连接架,所述连接架通过螺杆活动连接钻孔机构,所述连接架一侧设置有固定在车架上的撑架,所述撑架下方设置有位于车架内部的第一气缸,所述第一气缸顶部连接有一根倾斜设置的第一气动杆,所述第一气动杆一端与钻孔机构侧壁相连接,所述撑架一侧固定安装有位于车架顶部的第一电源;A drill pipe device for petroleum geological exploration includes a frame and a drilling mechanism, a connecting frame is welded on the top of one end of the frame, the connecting frame is movably connected to the drilling mechanism through a screw rod, and one side of the connecting frame is provided with a A support frame on the frame, a first cylinder located inside the frame is arranged below the support frame, and a first pneumatic rod that is inclined at the top is connected to the top of the first cylinder, and one end of the first pneumatic rod is connected to the drilled hole. The side walls of the mechanism are connected, and a first power supply located on the top of the frame is fixedly installed on one side of the bracket;
所述钻孔机构包括滑架、端套和钻杆,所述滑架远离车架的侧壁上设置有两个滑槽,两个所述滑槽上均安装有一块滑板,两个所述滑板之间固定安装有端套,且所述端套不与滑架相接触,所述端套侧壁上固定安装有第二电源,所述端套上方设置有一个第二气缸,所述第二气缸与滑架之间固定连接,且所述第二气缸底部连接有一根第二气动杆,所述第二气动杆底端连接有一个第三气缸,所述第三气缸底端连接有一根第三气动杆,所述第三气动杆底端连接有由于一个位于所述端套内部的内置电机,所述内置电机与第三气缸之间还连接有若干根均匀分布的弹簧,所述内置电机两侧外壁上均安装有一排均匀分布的侧滑轮,所述侧滑轮抵在端套内侧壁上,所述内置电机底端连接有一根钻杆;The drilling mechanism includes a sliding frame, an end sleeve and a drill rod. Two sliding grooves are provided on the side wall of the sliding frame away from the vehicle frame, and a sliding plate is installed on the two sliding grooves. An end sleeve is fixedly installed between the slide plates, and the end sleeve is not in contact with the carriage, a second power source is fixedly installed on the side wall of the end sleeve, a second air cylinder is arranged above the end sleeve, and the first power supply is installed on the side wall of the end sleeve. The second cylinder and the carriage are fixedly connected, and the bottom of the second cylinder is connected with a second pneumatic rod, the bottom end of the second pneumatic rod is connected with a third cylinder, and the bottom end of the third cylinder is connected with a second pneumatic rod The third pneumatic rod, the bottom end of the third pneumatic rod is connected with a built-in motor located inside the end sleeve, and a number of evenly distributed springs are also connected between the built-in motor and the third cylinder. A row of evenly distributed side pulleys are installed on the outer walls of both sides of the motor, the side pulleys abut on the inner side wall of the end sleeve, and a drill pipe is connected to the bottom end of the built-in motor;
所述钻杆由三部分组成,位于其上的中部电机、位于其内部的内转杆、若干个位于其外壁螺纹间隙上的穿孔,所述中部电机穿接并固定在钻杆上,所述内转杆顶端与中部电机相连接,所述内转杆上固定安装有若干个均匀分布且数量与穿孔数量相同的小型液压缸,每个所述小型液压缸一侧外壁上均连接有一根中空液压管,且每个所述小型液压缸另一侧外壁上均连接有一根液压杆,每根所述液压杆的同一端均设置有一个封头。The drill pipe is composed of three parts, the middle motor located on it, the inner rotating rod located inside, and a number of perforations located on the thread gap of the outer wall. The middle motor is penetrated and fixed on the drill pipe. The top end of the inner rotating rod is connected with the motor in the middle, and several small hydraulic cylinders that are evenly distributed and the number is the same as the number of perforations are fixedly installed on the inner rotating rod. A hydraulic pipe is provided, and a hydraulic rod is connected to the outer wall of the other side of each of the small hydraulic cylinders, and the same end of each hydraulic rod is provided with a head.
优选的,所述第一电源通过导线与第一气缸之间电连接,所述第二电源通过若干根导线分别与第二气缸、第三气缸、中部电机、内置电机、小型液压缸之间电连接。Preferably, the first power source is electrically connected to the first cylinder through wires, and the second power source is electrically connected to the second cylinder, the third cylinder, the middle motor, the built-in motor, and the small hydraulic cylinder through several wires, respectively. connect.
优选的,所述钻孔机构通过第一气动杆与连接架之间转动连接。Preferably, the drilling mechanism is rotatably connected between the first pneumatic rod and the connecting frame.
优选的,所述端套连带着钻杆通过第二气动杆、滑板与滑架之间滑动连接,且端套的滑动方向与滑槽方向相同。Preferably, the end sleeve and the drill rod are slidably connected between the second pneumatic rod, the sliding plate and the carriage, and the sliding direction of the end sleeve is the same as that of the chute.
优选的,所述钻杆、内置电机与第三气缸之间通过第三气动杆、若干根弹簧活动连接。Preferably, the drill rod, the built-in motor and the third cylinder are movably connected by a third pneumatic rod and several springs.
优选的,所述液压杆、中空液压管均通过内转杆与钻杆内壁之间转动连接。Preferably, the hydraulic rod and the hollow hydraulic pipe are connected by rotation between the inner rotating rod and the inner wall of the drill rod.
优选的,所述封头的直径大小与穿孔直径大小相适配,且液压杆在初始时通过封头封闭穿孔。Preferably, the diameter of the sealing head is adapted to the diameter of the perforation, and the hydraulic rod initially closes the perforation through the sealing head.
优选的,该种石油地质勘探钻杆装置的使用方法具体步骤为:Preferably, the specific steps of the use method of this kind of petroleum geological exploration drill pipe device are:
步骤一:将钻孔机构移动至需要进行地质勘探的位置,启动第一气缸,利用第一气缸驱动第一气动杆伸长,第一气动杆在伸长的过程中顶着钻孔机构绕着连接架旋转,直至钻孔机构竖直,随后,启动钻孔机构,启动内置电机、第二气缸,利用内置电机驱动钻杆转动,利用第二气缸驱动第二气动杆伸长,实现边下降边钻孔;Step 1: Move the drilling mechanism to the position where geological exploration is required, activate the first cylinder, and use the first cylinder to drive the first pneumatic rod to extend. The connecting frame rotates until the drilling mechanism is vertical. Then, start the drilling mechanism, start the built-in motor and the second cylinder, use the built-in motor to drive the drill rod to rotate, and use the second cylinder to drive the second pneumatic rod to extend, so as to realize the side down drilling;
步骤二:钻杆在钻孔过程中在遇到坚硬土层、石块时,通过第三气缸驱动第三气动杆伸缩再配合弹簧的牵引回拉,内置电机在端套内部上下活动,并且内置电机在上下活动的过程中在弹簧的作用下带动钻杆做冲击运动,从而破开坚硬土层、石块,当钻杆到达所需深度并且完成钻孔后,关闭内置电机、第二气缸、第三气缸,此时钻杆逐渐停止转动;Step 2: When the drill rod encounters hard soil layers and stones during the drilling process, the third pneumatic rod is driven to expand and contract through the third cylinder, and then cooperate with the traction and pull back of the spring. The built-in motor moves up and down inside the end sleeve, and the built-in In the process of moving up and down, the motor drives the drill pipe to make an impact motion under the action of the spring, thereby breaking the hard soil layer and stones. When the drill pipe reaches the required depth and completes the drilling, the built-in motor, the second air cylinder, The third cylinder, the drill pipe gradually stops rotating at this time;
步骤三:当钻杆完全停止转动时,启动中部电机,利用中部电机驱动内转杆旋转180°,此时,将液压杆与中空液压管的位置对调,中空液压管转动到穿孔的位置,启动所有的小型液压缸,利用小型液压缸驱动所有的中空液压管伸长,液压杆不伸缩,从而将中空液压管从穿孔顶出,中空液压管在从穿孔顶出的过程中顶入土层并且将需要采样的土壤卡入其内部,在取样完成后将中空液压管、内转杆、液压杆均复位,最终完成勘探后,利用第二气缸将钻杆从土层内部取出,完成地质勘测以及采样。Step 3: When the drill pipe stops rotating completely, start the middle motor, and use the middle motor to drive the inner rotating rod to rotate 180°. At this time, the positions of the hydraulic rod and the hollow hydraulic pipe are reversed, and the hollow hydraulic pipe is rotated to the perforation position. Start All small hydraulic cylinders are used to drive all hollow hydraulic pipes to extend, and the hydraulic rods do not expand and contract, so as to push the hollow hydraulic pipe out of the perforation. The hollow hydraulic pipe pushes into the soil layer and pushes the The soil to be sampled is stuck into its interior. After the sampling is completed, the hollow hydraulic pipe, the inner rotating rod and the hydraulic rod are all reset. After the exploration is finally completed, the second cylinder is used to take out the drill pipe from the soil layer to complete the geological survey and sampling. .
本发明的有益效果为:由于撑架的存在并且撑架配合第一气动杆,使得钻孔机构在调整位置的过程中能够直接从撑架顶部位置及开始,并且在将钻孔机构收回时能够利用撑架支撑,更加方便快捷;The beneficial effects of the present invention are: due to the existence of the bracket and the bracket cooperates with the first pneumatic rod, the drilling mechanism can directly start from the top position of the bracket in the process of adjusting the position, and can be retracted when the drilling mechanism is retracted. It is more convenient and quicker to use the bracket to support;
由于第三气缸、第三气动杆、弹簧的存在,使得钻杆在钻孔过程中在遇到坚硬土层、石块时,能够通过第三气缸驱动第三气动杆伸缩再配合弹簧的辅助作用,使得内置电机在端套内部上下活动,并且内置电机在上下活动的过程中在弹簧的辅助下带动钻杆做冲击运动,从而使得钻杆具有劈裂机破土、碎石的功能,有效防止钻杆在运作过程中受到坚硬土层、石块的阻碍而无法前进的情况发生;Due to the existence of the third cylinder, the third pneumatic rod and the spring, when the drill rod encounters hard soil layers and stones during the drilling process, the third cylinder can drive the third pneumatic rod to expand and contract and cooperate with the auxiliary function of the spring. , make the built-in motor move up and down inside the end sleeve, and the built-in motor drives the drill pipe to do impact movement with the assistance of the spring during the up and down movement, so that the drill pipe has the functions of splitting machine to break ground and crush stones, effectively preventing drilling The pole is blocked by hard soil layers and stones during operation and cannot move forward;
由于中部电机的存在,并且中部电机穿接并固定在钻杆上,内转杆顶端与中部电机相连接,内转杆上固定安装有若干个均匀分布且数量与穿孔数量相同的小型液压缸,每个小型液压缸一侧外壁上均连接有一根中空液压管,且每个小型液压缸另一侧外壁上均连接有一根液压杆,每根液压杆的同一端均设置有一个封头,并且封头的直径大小与穿孔直径大小相适配,且液压杆在初始时通过封头封闭穿孔,从而使得钻杆在转动过程中能够避免土壤从穿孔进入钻杆内部,当钻杆完全停止转动时,启动中部电机,利用中部电机驱动内转杆旋转180°,此时,将液压杆与中空液压管的位置对调,中空液压管转动到穿孔的位置,启动所有的小型液压缸,利用小型液压缸驱动所有的中空液压管伸长,液压杆不伸缩,从而将中空液压管从穿孔顶出,由于中空液压管内部中空,从而能够在从穿孔顶出的过程中顶入土层并且将需要采样的土壤卡入其内部,在取样完成后将中空液压管、内转杆、液压杆均复位,实现一次性完成多层采样的功能,并且不会出现采样过程中土层崩塌而影响采样结果准确性的情况,更加方便快捷。Due to the existence of the middle motor, and the middle motor is penetrated and fixed on the drill pipe, the top of the inner rotating rod is connected with the middle motor, and several small hydraulic cylinders that are evenly distributed and the number is the same as the number of perforations are fixedly installed on the inner rotating rod. A hollow hydraulic pipe is connected to the outer wall of one side of each small hydraulic cylinder, and a hydraulic rod is connected to the outer wall of the other side of each small hydraulic cylinder, and the same end of each hydraulic rod is provided with a head, and The diameter of the head is adapted to the diameter of the perforation, and the hydraulic rod closes the perforation through the head at the beginning, so that the drill pipe can prevent soil from entering the drill pipe from the perforation during the rotation process. When the drill pipe stops rotating completely , start the middle motor, and use the middle motor to drive the inner rotating rod to rotate 180°. At this time, the positions of the hydraulic rod and the hollow hydraulic pipe are reversed, the hollow hydraulic pipe is rotated to the perforated position, and all the small hydraulic cylinders are activated. Drive all the hollow hydraulic pipes to extend, and the hydraulic rod does not expand and contract, so that the hollow hydraulic pipe is ejected from the perforation. Since the hollow hydraulic pipe is hollow inside, it can push into the soil layer and the soil that needs to be sampled during the process of being ejected from the perforation. After the sampling is completed, the hollow hydraulic pipe, the inner rotating rod and the hydraulic rod are all reset to realize the function of completing the multi-layer sampling at one time, and the soil layer will not collapse during the sampling process and affect the accuracy of the sampling results. situation, more convenient.
附图说明Description of drawings
为了便于本领域技术人员理解,下面结合附图对本发明作进一步的说明。In order to facilitate the understanding of those skilled in the art, the present invention will be further described below with reference to the accompanying drawings.
图1为本发明整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present invention;
图2为本发明侧视图;Fig. 2 is the side view of the present invention;
图3为本发明侧视图;Figure 3 is a side view of the present invention;
图4为本发明主视图;Fig. 4 is the front view of the present invention;
图5为本发明钻孔机构结构示意图;5 is a schematic structural diagram of the drilling mechanism of the present invention;
图6为本发明钻孔机构主视图;Fig. 6 is the front view of the drilling mechanism of the present invention;
图7为本发明钻杆内部结构示意图;7 is a schematic diagram of the internal structure of the drill pipe of the present invention;
图8为本发明内转杆结构示意图;FIG. 8 is a schematic diagram of the structure of the inner rotating rod of the present invention;
图中:1、车架;2、第一气缸;3、撑架;4、连接架;5、第一气动杆;6、钻孔机构;7、第一电源;8、滑架;9、滑板;10、第二气缸;11、第三气缸;12、端套;13、第二电源;14、中部电机;15、钻杆;16、滑槽;17、穿孔;18、第二气动杆;19、第三气动杆;20、弹簧;21、内置电机;22、侧滑轮;23、内转杆;24、小型液压缸;25、液压杆;26、封头;27、中空液压管。In the figure: 1, the frame; 2, the first cylinder; 3, the support frame; 4, the connecting frame; 5, the first pneumatic rod; 6, the drilling mechanism; 7, the first power supply; 8, the carriage; 9, Slide plate; 10, the second cylinder; 11, the third cylinder; 12, the end sleeve; 13, the second power supply; 14, the middle motor; 15, the drill pipe; 16, the chute; 17, the perforation; 18, the second pneumatic rod ; 19, the third pneumatic rod; 20, spring; 21, built-in motor; 22, side pulley; 23, inner rotation rod; 24, small hydraulic cylinder; 25, hydraulic rod; 26, head;
具体实施方式Detailed ways
下面将结合实施例对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-8所示,一种石油地质勘探钻杆装置,包括车架1和钻孔机构6,车架1一端顶部焊接有连接架4,连接架4通过螺杆活动连接钻孔机构6,连接架4一侧设置有固定在车架1上的撑架3,撑架3下方设置有位于车架1内部的第一气缸2,第一气缸2顶部连接有一根倾斜设置的第一气动杆5,第一气动杆5一端与钻孔机构6侧壁相连接,撑架3一侧固定安装有位于车架1顶部的第一电源7;1-8, a drill pipe device for petroleum geological exploration includes a
钻孔机构6包括滑架8、端套12和钻杆15,滑架8远离车架1的侧壁上设置有两个滑槽16,两个滑槽16上均安装有一块滑板9,两个滑板9之间固定安装有端套12,且端套12不与滑架8相接触,端套12侧壁上固定安装有第二电源13,端套12上方设置有一个第二气缸10,第二气缸10与滑架8之间固定连接,且第二气缸10底部连接有一根第二气动杆18,第二气动杆18底端连接有一个第三气缸11,第三气缸11底端连接有一根第三气动杆19,第三气动杆19底端连接有由于一个位于端套12内部的内置电机21,内置电机21与第三气缸11之间还连接有若干根均匀分布的弹簧20,内置电机21两侧外壁上均安装有一排均匀分布的侧滑轮22,侧滑轮22抵在端套12内侧壁上,内置电机21底端连接有一根钻杆15;The
钻杆15由三部分组成,位于其上的中部电机14、位于其内部的内转杆23、若干个位于其外壁螺纹间隙上的穿孔17,中部电机14穿接并固定在钻杆15上,内转杆23顶端与中部电机14相连接,内转杆23上固定安装有若干个均匀分布且数量与穿孔17数量相同的小型液压缸24,每个小型液压缸24一侧外壁上均连接有一根中空液压管27,且每个小型液压缸24另一侧外壁上均连接有一根液压杆25,每根液压杆25的同一端均设置有一个封头26。The
第一电源7通过导线与第一气缸2之间电连接,第二电源13通过若干根导线分别与第二气缸10、第三气缸11、中部电机14、内置电机21、小型液压缸24之间电连接。The
钻孔机构6通过第一气动杆5与连接架4之间转动连接。The
端套12连带着钻杆15通过第二气动杆18、滑板9与滑架8之间滑动连接,且端套12的滑动方向与滑槽16方向相同。The
钻杆15、内置电机21与第三气缸11之间通过第三气动杆19、若干根弹簧20活动连接。The
液压杆25、中空液压管27均通过内转杆23与钻杆15内壁之间转动连接。Both the
封头26的直径大小与穿孔17直径大小相适配,且液压杆25在初始时通过封头26封闭穿孔17。The diameter of the
该种石油地质勘探钻杆装置的使用方法具体步骤为:The specific steps of the use method of the drill pipe device for petroleum geological exploration are as follows:
步骤一:将钻孔机构6移动至需要进行地质勘探的位置,启动第一气缸2,利用第一气缸2驱动第一气动杆5伸长,第一气动杆5在伸长的过程中顶着钻孔机构6绕着连接架4旋转,直至钻孔机构6竖直,随后,启动钻孔机构6,启动内置电机21、第二气缸10,利用内置电机21驱动钻杆15转动,利用第二气缸10驱动第二气动杆18伸长,实现边下降边钻孔;Step 1: Move the
步骤二:钻杆15在钻孔过程中在遇到坚硬土层、石块时,通过第三气缸11驱动第三气动杆19伸缩再配合弹簧20的牵引回拉,内置电机21在端套12内部上下活动,并且内置电机21在上下活动的过程中在弹簧20的作用下带动钻杆15做冲击运动,从而破开坚硬土层、石块,当钻杆15到达所需深度并且完成钻孔后,关闭内置电机21、第二气缸10、第三气缸11,此时钻杆15逐渐停止转动;Step 2: When the
步骤三:当钻杆15完全停止转动时,启动中部电机14,利用中部电机14驱动内转杆23旋转180°,此时,将液压杆25与中空液压管27的位置对调,中空液压管27转动到穿孔17的位置,启动所有的小型液压缸24,利用小型液压缸24驱动所有的中空液压管27伸长,液压杆25不伸缩,从而将中空液压管27从穿孔17顶出,中空液压管27在从穿孔17顶出的过程中顶入土层并且将需要采样的土壤卡入其内部,在取样完成后将中空液压管27、内转杆23、液压杆25均复位,最终完成勘探后,利用第二气缸10将钻杆15从土层内部取出,完成地质勘测以及采样。Step 3: When the
由于撑架3的存在并且撑架3配合第一气动杆5,使得钻孔机构6在调整位置的过程中能够直接从撑架3顶部位置及开始,并且在将钻孔机构6收回时能够利用撑架3支撑,更加方便快捷;Due to the existence of the
由于第三气缸11、第三气动杆19、弹簧20的存在,使得钻杆15在钻孔过程中在遇到坚硬土层、石块时,能够通过第三气缸11驱动第三气动杆19伸缩再配合弹簧20的辅助作用,使得内置电机21在端套12内部上下活动,并且内置电机21在上下活动的过程中在弹簧20的辅助下带动钻杆15做冲击运动,从而使得钻杆15具有劈裂机破土、碎石的功能,有效防止钻杆15在运作过程中受到坚硬土层、石块的阻碍而无法前进的情况发生;Due to the existence of the
由于中部电机14的存在,并且中部电机14穿接并固定在钻杆15上,内转杆23顶端与中部电机14相连接,内转杆23上固定安装有若干个均匀分布且数量与穿孔17数量相同的小型液压缸24,每个小型液压缸24一侧外壁上均连接有一根中空液压管27,且每个小型液压缸24另一侧外壁上均连接有一根液压杆25,每根液压杆25的同一端均设置有一个封头26,并且封头26的直径大小与穿孔17直径大小相适配,且液压杆25在初始时通过封头26封闭穿孔17,从而使得钻杆15在转动过程中能够避免土壤从穿孔17进入钻杆15内部,当钻杆15完全停止转动时,启动中部电机14,利用中部电机14驱动内转杆23旋转180°,此时,将液压杆25与中空液压管27的位置对调,中空液压管27转动到穿孔17的位置,启动所有的小型液压缸24,利用小型液压缸24驱动所有的中空液压管27伸长,液压杆25不伸缩,从而将中空液压管27从穿孔17顶出,由于中空液压管27内部中空,从而能够在从穿孔17顶出的过程中顶入土层并且将需要采样的土壤卡入其内部,在取样完成后将中空液压管27、内转杆23、液压杆25均复位,实现一次性完成多层采样的功能,并且不会出现采样过程中土层崩塌而影响采样结果准确性的情况,更加方便快捷。Due to the existence of the
本发明在使用时,首先移动车架1的位置,将钻孔机构6移动至需要进行地质勘探的位置,启动第一气缸2,利用第一气缸2驱动第一气动杆5伸长,第一气动杆5在伸长的过程中顶着钻孔机构6绕着连接架4旋转,直至钻孔机构6竖直,由于撑架3的存在并且撑架3配合第一气动杆5,使得钻孔机构6在调整位置的过程中能够直接从撑架3顶部位置及开始,并且在将钻孔机构6收回时能够利用撑架3支撑,更加方便快捷,随后,启动钻孔机构6,启动内置电机21、第二气缸10,利用内置电机21驱动钻杆15转动,实现钻孔,利用第二气缸10驱动第二气动杆18伸长,实现边下降边钻孔,由于第三气缸11、第三气动杆19、弹簧20的存在,使得钻杆15在钻孔过程中在遇到坚硬土层、石块时,能够通过第三气缸11驱动第三气动杆19伸缩再配合弹簧20的辅助作用,使得内置电机21在端套12内部上下活动,并且内置电机21在上下活动的过程中在弹簧20的辅助下带动钻杆15做冲击运动,从而使得钻杆15具有劈裂机破土、碎石的功能,有效防止钻杆15在运作过程中受到坚硬土层、石块的阻碍而无法前进的情况发生,当钻杆15到达所需深度并且完成钻孔后,关闭内置电机21、第二气缸10、第三气缸11,此时钻杆15逐渐停止转动,由于中部电机14的存在,由于中部电机14穿接并固定在钻杆15上,内转杆23顶端与中部电机14相连接,内转杆23上固定安装有若干个均匀分布且数量与穿孔17数量相同的小型液压缸24,每个小型液压缸24一侧外壁上均连接有一根中空液压管27,且每个小型液压缸24另一侧外壁上均连接有一根液压杆25,每根液压杆25的同一端均设置有一个封头26,并且封头26的直径大小与穿孔17直径大小相适配,且液压杆25在初始时通过封头26封闭穿孔17,从而使得钻杆15在转动过程中能够避免土壤从穿孔17进入钻杆15内部,当钻杆15完全停止转动时,启动中部电机14,利用中部电机14驱动内转杆23旋转180°,此时,将液压杆25与中空液压管27的位置对调,中空液压管27转动到穿孔17的位置,启动所有的小型液压缸24,利用小型液压缸24驱动所有的中空液压管27伸长,液压杆25不伸缩,从而将中空液压管27从穿孔17顶出,由于中空液压管27内部中空,从而能够在从穿孔17顶出的过程中顶入土层并且将需要采样的土壤卡入其内部,在取样完成后将中空液压管27、内转杆23、液压杆25均复位,实现一次性完成多层采样的功能,并且不会出现采样过程中土层崩塌而影响采样结果准确性的情况,更加方便快捷,最终完成勘探后,利用第二气缸10将钻杆15从土层内部取出,完成地质勘测以及采样。When the present invention is in use, first move the position of the
以上公开的本发明优选实施例只是用于帮助阐述本发明。优选实施例并没有详尽叙述所有的细节,也不限制该发明仅为的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本发明的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本发明。本发明仅受权利要求书及其全部范围和等效物的限制。The above-disclosed preferred embodiments of the present invention are provided only to help illustrate the present invention. The preferred embodiments do not describe all the details and do not limit the invention to specific embodiments only. Obviously, many modifications and variations are possible in light of the content of this specification. The present specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can well understand and utilize the present invention. The present invention is to be limited only by the claims and their full scope and equivalents.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911131309.3A CN110685598B (en) | 2019-11-19 | 2019-11-19 | A drilling rod device for petroleum geological exploration |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911131309.3A CN110685598B (en) | 2019-11-19 | 2019-11-19 | A drilling rod device for petroleum geological exploration |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110685598A true CN110685598A (en) | 2020-01-14 |
| CN110685598B CN110685598B (en) | 2024-10-01 |
Family
ID=69117005
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911131309.3A Active CN110685598B (en) | 2019-11-19 | 2019-11-19 | A drilling rod device for petroleum geological exploration |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110685598B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112049585A (en) * | 2020-09-14 | 2020-12-08 | 黄如兰 | Drilling rod transfer frame for well drilling |
| CN112482992A (en) * | 2020-11-27 | 2021-03-12 | 安庆市磐石岩土有限公司 | Surveying equipment and surveying method based on geological surveying |
| CN112681278A (en) * | 2021-01-26 | 2021-04-20 | 杭州环岩工程技术有限公司 | Highway engineering geological survey ground detection device |
| CN114809953A (en) * | 2022-04-02 | 2022-07-29 | 中国矿业大学 | Diamond drill bit clamping device for geological exploration |
| CN115199208A (en) * | 2022-09-13 | 2022-10-18 | 陕西清腾畅建筑工程有限公司 | Road side slope drilling equipment |
| CN118223782A (en) * | 2024-05-24 | 2024-06-21 | 四川省第十地质大队 | Omnibearing geological detection drilling equipment |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU899193A1 (en) * | 1980-05-26 | 1982-01-23 | Предприятие П/Я Р-6375 | Apparatus for forming grip zone on tubes before drawing |
| US5515932A (en) * | 1993-09-24 | 1996-05-14 | Venture Probe, Inc. | Apparatus and method for environmental surveying for contaminants in alluvial materials and bedrock formations |
| CN106053129A (en) * | 2016-06-01 | 2016-10-26 | 中国地质大学(北京) | Full-automatic coal sample preparing and sampling machine |
| KR101770959B1 (en) * | 2016-06-27 | 2017-08-24 | (주)데스코 | casing insert equipment of drilling machine |
| CN211038503U (en) * | 2019-11-19 | 2020-07-17 | 中国石油大学胜利学院 | A drill pipe device for petroleum geological exploration |
-
2019
- 2019-11-19 CN CN201911131309.3A patent/CN110685598B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU899193A1 (en) * | 1980-05-26 | 1982-01-23 | Предприятие П/Я Р-6375 | Apparatus for forming grip zone on tubes before drawing |
| US5515932A (en) * | 1993-09-24 | 1996-05-14 | Venture Probe, Inc. | Apparatus and method for environmental surveying for contaminants in alluvial materials and bedrock formations |
| CN106053129A (en) * | 2016-06-01 | 2016-10-26 | 中国地质大学(北京) | Full-automatic coal sample preparing and sampling machine |
| KR101770959B1 (en) * | 2016-06-27 | 2017-08-24 | (주)데스코 | casing insert equipment of drilling machine |
| CN211038503U (en) * | 2019-11-19 | 2020-07-17 | 中国石油大学胜利学院 | A drill pipe device for petroleum geological exploration |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112049585A (en) * | 2020-09-14 | 2020-12-08 | 黄如兰 | Drilling rod transfer frame for well drilling |
| CN112482992A (en) * | 2020-11-27 | 2021-03-12 | 安庆市磐石岩土有限公司 | Surveying equipment and surveying method based on geological surveying |
| CN112482992B (en) * | 2020-11-27 | 2022-10-14 | 安庆市磐石岩土有限公司 | Surveying equipment and surveying method based on geological surveying |
| CN112681278A (en) * | 2021-01-26 | 2021-04-20 | 杭州环岩工程技术有限公司 | Highway engineering geological survey ground detection device |
| CN114809953A (en) * | 2022-04-02 | 2022-07-29 | 中国矿业大学 | Diamond drill bit clamping device for geological exploration |
| CN115199208A (en) * | 2022-09-13 | 2022-10-18 | 陕西清腾畅建筑工程有限公司 | Road side slope drilling equipment |
| CN118223782A (en) * | 2024-05-24 | 2024-06-21 | 四川省第十地质大队 | Omnibearing geological detection drilling equipment |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110685598B (en) | 2024-10-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110685598B (en) | A drilling rod device for petroleum geological exploration | |
| CN113404030B (en) | Soil sampling device for highway engineering road and application method thereof | |
| CN113567185B (en) | Geological rock soil investigation intensity test sampling device | |
| CN211038503U (en) | A drill pipe device for petroleum geological exploration | |
| CN211230260U (en) | A screw pile driver | |
| NO20111404A1 (en) | Smooth-line conveyed rudder cutter system | |
| CN116358923A (en) | A geological survey drilling sampling device | |
| CN211081839U (en) | Engineering geology reconnaissance sampling device | |
| CN211500550U (en) | Rotary drilling rig convenient for cleaning drill bit | |
| CN116291419B (en) | Drilling device for geological exploration and method of using the same | |
| CN116335534A (en) | A drilling device for hydraulic ring geological exploration | |
| CN117905456A (en) | Drilling device for geological exploration and construction method | |
| CN108547613B (en) | A device for measuring three-dimensional geostress in deep rock masses | |
| CN119043784A (en) | Novel sampling method for drilling coal-bed gas well | |
| CN119466587A (en) | A hole expansion device for geological exploration | |
| CN117927136B (en) | Advanced detection device and method for coal mine roadway and tunnel drilling radar while drilling | |
| WO2019119901A1 (en) | Synchronous anchor and drilling and anchoring method for hollow helical anchor bolt | |
| CN212513715U (en) | A riverbed information collection and detection device that can be automatically fixed | |
| CN211081961U (en) | Coal seam gas drainage drilling hole collapse coal cleaning device | |
| CN117365276A (en) | An integrated drilling device for drilling and supporting coal mine gas drainage holes | |
| CN116223770A (en) | Water and soil conservation detection device convenient to store and detection method | |
| CN215979188U (en) | Drilling device for geological exploration | |
| CN108871849A (en) | A kind of soil collecting device with storage and detection function | |
| CN116718418B (en) | Drilling sampling device for multi-layer formations | |
| CN219622637U (en) | Drilling machine for building detection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20240523 Address after: No. 228, Nanyi Road, Development Zone, Dongying City, Shandong Province, 257091 Applicant after: Dongying HaoChen Petroleum Technology Development Co.,Ltd. Country or region after: China Address before: China University of Petroleum Shengli College, No. 271 Beier Road, Dongying District, Dongying City, Shandong Province, 257061 Applicant before: Shengli College China University of Petroleum Country or region before: China |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20260623 Address after: 717100 Shaanxi Province, Yanchuan County, Zhongxing Building, Unit 5, Room 501 Patentee after: Yanchang Zhiyuan Industry and Trade Co.,Ltd. Country or region after: China Address before: No. 228, Nanyi Road, Development Zone, Dongying City, Shandong Province, 257091 Patentee before: Dongying HaoChen Petroleum Technology Development Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |