CN110685373A - Construction method of integrated exterior wall masonry system - Google Patents

Construction method of integrated exterior wall masonry system Download PDF

Info

Publication number
CN110685373A
CN110685373A CN201910868872.2A CN201910868872A CN110685373A CN 110685373 A CN110685373 A CN 110685373A CN 201910868872 A CN201910868872 A CN 201910868872A CN 110685373 A CN110685373 A CN 110685373A
Authority
CN
China
Prior art keywords
precast concrete
column
wall
construction method
concrete slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910868872.2A
Other languages
Chinese (zh)
Other versions
CN110685373B (en
Inventor
吴姗姗
蒋路
柏松
朱鑫明
陈雪英
顾洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201910868872.2A priority Critical patent/CN110685373B/en
Publication of CN110685373A publication Critical patent/CN110685373A/en
Application granted granted Critical
Publication of CN110685373B publication Critical patent/CN110685373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Finishing Walls (AREA)

Abstract

The invention relates to a construction method of an integrated exterior wall masonry system, which comprises the following construction steps: 1) prefabricating a precast concrete slab in a factory; 2) selecting a proper lifting appliance according to the form of the component and the lifting height; 3) hoisting the precast concrete slab to a construction position; 4) stopping the prefabricated concrete plate from descending when the distance from the installation position is 50cm, and checking whether the front and back surfaces of the prefabricated concrete plate are consistent with a drawing; 5) preliminarily fixing the position of the precast concrete plate according to the position of the embedded anchor bolt; 6) accurately adjusting the position of the embedded anchor bolt according to the control line, and coinciding with the position of the measurement paying-off; 7) placing the precast concrete slab in place; fixing the precast concrete plate through a fixing nut, so that the precast concrete plate is fixed on the column; 8) building the reserved tie bars of the precast concrete slabs and the outer walls of the building blocks together; 9) and a through seam is reserved between the other side of the column and the outer wall of the building block. The invention has the advantages of convenient construction, reduced thickness of column outer wrapping wallboard, reduced risk of convex beam and convex column, etc.

Description

Construction method of integrated exterior wall masonry system
[ technical field ] A method for producing a semiconductor device
The invention relates to a construction method of a building outer wall, in particular to a construction method of an integrated outer wall masonry system, and belongs to the technical field of building engineering.
[ background of the invention ]
The masonry wall body is a wall body which is built by bricks or building blocks, is one of main components of a building and plays roles of enclosure and bearing. The masonry wall has many advantages of heat preservation, heat insulation, sound insulation and the like.
The steel-concrete partial combined column is a novel combined member proposed in Europe in the eighties of the twentieth century, and the basic type of the section of the combined column is that concrete is filled between flanges of an H-shaped steel member. The combined column has the advantages of large bearing capacity and high rigidity.
When the masonry wall and the steel-concrete part combination column are combined to form a novel masonry external wall, the defects are often as follows:
1. to improve the fire performance of the column. The wallboard needs to be wrapped outside the column, the wallboard can occupy the building area, and meanwhile, the risk of convex beams and convex columns is easily generated indoors.
2. The construction difficulty is big, and the precision is poor, and the wholeness is poor, easily produces the crack.
3. The wall is built in the market, and the construction efficiency of building outside the column is low.
Therefore, in order to solve the above technical problems, it is necessary to provide an innovative construction method of an integrated exterior wall masonry system to overcome the above-mentioned drawbacks of the prior art.
[ summary of the invention ]
In order to solve the problems, the invention aims to provide a construction method of an integrated exterior wall masonry system, which is convenient to construct, and can reduce the thickness of column exterior cladding wall boards and reduce the risk of convex beams and convex columns.
In order to achieve the purpose, the invention adopts the technical scheme that: a construction method of an integrated outer wall masonry system comprises a column, a precast concrete plate and a building block outer wall; wherein, an embedded anchor bolt is fixed on the column; the precast concrete plate is provided with a through hole; the embedded anchor bolt penetrates through the through hole and is in threaded connection with a fixing nut; reserving a tie bar on the precast concrete slab; the building block outer walls are respectively built on two sides of the column, wherein the building block outer wall and the tie bar tie on one side are provided with a seam structure, and a seam structure is arranged between the building block outer wall and the column on the other side;
the method comprises the following construction steps:
1) prefabricating a precast concrete slab in a factory;
2) selecting a proper lifting appliance according to the form of the component and the lifting height;
3) the precast concrete slab is lifted off the ground, whether the precast concrete slab is horizontal or not and whether the stress condition of each lifting point is uniform or not are checked, and the precast concrete slab can be lifted to a construction position after the member reaches the horizontal state and the stress of each lifting hook is uniform;
4) stopping the prefabricated concrete plate from descending when the distance from the installation position is 50cm, and checking whether the front and back surfaces of the prefabricated concrete plate are consistent with a drawing;
5) preliminarily fixing the position of the precast concrete plate according to the position of the embedded anchor bolt;
6) accurately adjusting the position of the embedded anchor bolt according to the control line, and coinciding with the position of the measurement paying-off;
7) after the transverse joint is adjusted to be straight according to the elevation, the precast concrete slab is in place, and grout needs to be set when the precast concrete slab is in place; fixing the precast concrete plate through a fixing nut, so that the precast concrete plate is fixed on the column;
8) building the reserved tie bars of the precast concrete slabs and the outer wall of the building blocks together to form an integral outer wall;
9) and a through seam is reserved between the other side of the column and the outer wall of the building block, and the outer wall plate seam structure is adopted for processing.
The construction method of the integrated exterior wall masonry system further comprises the following steps: the manufacturing process of the precast concrete plate in the step 1) comprises the following steps:
1-1), cleaning a die table, spraying a release agent, and fixing a steel template as required;
1-2), fixing tie bars of a concrete slab on the steel formwork;
1-3), fixing a demoulding anchor bolt and a hanging anchor bolt as a demoulding hanging mould sleeve;
1-4), reserving a sleeve so as to leave a mounting through hole;
1-5), pouring common concrete to a specified thickness to form a flat plate, vibrating, and after initial setting;
1-6), covering the protective film and carrying out steam curing;
1-7), after the curing time is enough and the concrete strength is reached, removing the formwork and warehousing, and finishing the manufacture of the precast concrete slab.
The construction method of the integrated exterior wall masonry system further comprises the following steps: the post includes H shaped steel, H shaped steel is by the web to and the welding constitute at the web both ends and with the web vertically edge of a wing, pre-buried crab-bolt welds on the web.
The construction method of the integrated exterior wall masonry system further comprises the following steps: concrete is filled between flanges in the H-shaped steel.
The construction method of the integrated exterior wall masonry system further comprises the following steps: the steel bar mesh and the tie steel bar are tied.
The construction method of the integrated exterior wall masonry system further comprises the following steps: and heat-insulating rock wool is filled between the column and the precast concrete plate as well as between the column and the outer wall of the building block.
The construction method of the integrated exterior wall masonry system further comprises the following steps: and sealant is filled in the seam structure.
The construction method of the integrated exterior wall masonry system further comprises the following steps: the building block outer wall close to one side of the seam structure comprises a square steel pipe constructional column, an anchor bar is welded on the square steel pipe constructional column, and the anchor bar is connected with a reinforcing mesh.
The construction method of the integrated exterior wall masonry system of the invention also comprises the following steps: and the outer surfaces of the precast concrete slab and the outer wall of the building block are sequentially paved with a steel wire mesh, alkali-resistant glass fiber mesh cloth and outer wall painting paint.
Compared with the prior art, the invention has the following beneficial effects:
1. the precast concrete plate is integrally poured, so that the precast concrete plate has good integrity, the thickness of the column outer wrapping wall body can be reduced, the building area is increased, and the risk of the convex beam and the convex column is reduced;
2. the precast concrete plate has light weight, low hoisting difficulty in site construction and material cost saving, and is convenient to install and adjustable in three directions by adopting bolt connection;
3. the precast concrete plate is simple to operate on the basis of not increasing the cost of the die and the die table, greatly improves the manufacturing efficiency and reduces the manufacturing cost.
4. The precast concrete plate can achieve the first-level fireproof effect.
5. The integrated outer wall masonry system well makes up short plates on the masonry outer wall;
6. the integrated exterior wall masonry system has good physical performance, is prefabricated and produced by factories, and has extremely high assembly rate.
[ description of the drawings ]
Fig. 1 is an exploded perspective view of an integrated exterior wall masonry system of the present invention.
Fig. 2 is a horizontal sectional view of the integrated exterior wall masonry system of the present invention.
Fig. 3 is a vertical sectional view of the integrated exterior wall masonry system of the present invention.
[ detailed description ] embodiments
Referring to the attached drawings 1 to 3 in the specification, the invention relates to an integrated exterior wall masonry system, which comprises a column 2, a precast concrete plate 1, a building block exterior wall 3 and the like.
Wherein, an embedded anchor bolt 4 is fixed on the column 2. In the present embodiment, the column 2 includes an H-shaped steel 5, the H-shaped steel 5 is composed of a web 51 and flanges 52 welded to both ends of the web 51 and perpendicular to the web 51, and the anchor bolts 4 are welded to the web 51. Concrete 53 is filled between flanges 52 in the H-shaped steel 5 to improve the structural strength of the column 2 and improve the fireproof effect of the column 2. Of course, concrete may be left unfilled as desired.
The precast concrete plate 1 is precast in a factory and is provided with a through hole 11. The embedded anchor 4 passes through the through hole 11 and is screwed with a fixing nut 41, so that the precast concrete slab 1 is fixed on the column 2. And a tie bar 12 is reserved on the precast concrete slab 1.
The manufacturing process of the precast concrete plate 1 comprises the following steps:
1-1), cleaning a die table, spraying a release agent, and fixing a steel template as required;
1-2), fixing tie bars 12 of a concrete slab on the steel formwork;
1-3), fixing a demoulding anchor bolt and a hanging anchor bolt as a demoulding hanging mould sleeve;
1-4), reserving a sleeve so as to leave a mounting through hole 11;
1-5), pouring common concrete to a specified thickness to form a flat plate, vibrating, and after initial setting;
1-6), covering the protective film and carrying out steam curing;
1-7), after the curing time is enough and the concrete strength is reached, removing the formwork and warehousing, and finishing the manufacture of the precast concrete slab.
The precast concrete plate 1 is integrally cast, has good integrity, can reduce the thickness of a column outer wrapping wall body, increases the building area and reduces the risk of convex beams and convex columns; meanwhile, the three-way adjustable steel wire rope is light in weight, low in hoisting difficulty in site construction and material cost saving, and convenient to install and adjustable in three directions due to the fact that the steel wire rope is connected through bolts. On the basis of not increasing the cost of a mould and a mould table, the precast concrete plate 1 is simple to operate, greatly improves the manufacturing efficiency and reduces the manufacturing cost.
The building block outer walls 3 are respectively built on two sides of the column 1, wherein the building block outer wall 3 and the tie steel bar 12 on one side are tied, and a seam structure is arranged between the building block outer wall 3 and the column 1 on the other side. Specifically, a steel bar net piece 31 is laid in the building block outer wall 3; the steel mesh 31 and the tie bars 12 are tied, so that the bonding strength of the building block outer wall 3 and the precast concrete slab 1 is improved. The seam structure enables the outer wall masonry system to be telescopic, cracks are not easy to generate, and the seam structure is filled with the sealant 7.
Further, heat-insulating rock wool 6 is filled between the column 2 and the precast concrete slab 1, between the column 2 and the outer wall 3 of the building block, so that the heat-insulating performance of the outer wall masonry system is improved.
The building block outer wall 3 close to one side of the seam structure comprises a square steel pipe constructional column 8, an anchor bar 81 is welded and connected to the square steel pipe constructional column 8, and the anchor bar 81 is connected with the steel mesh 31.
And the outer surfaces of the precast concrete board 1 and the outer wall 3 of the building block are sequentially paved with a steel wire mesh 91, alkali-resistant glass fiber mesh cloth 92 and outer wall painting paint 93, so that the wall surface of the outer wall masonry system has good flatness, and can be decorated as required.
The construction method of the integrated exterior wall masonry system comprises the following construction steps:
1) prefabricating a precast concrete slab 1 in a factory;
2) selecting a proper lifting appliance according to the form of the component and the lifting height;
3) the precast concrete slab 1 is lifted off the ground, whether the precast concrete slab 1 is horizontal or not and whether the stress condition of each lifting point is uniform or not are checked, and the precast concrete slab can be lifted to a construction position after the member reaches the horizontal state and the stress of each lifting hook is uniform;
4) stopping the prefabricated concrete plate 1 from descending when the distance from the installation position is 50cm, and checking whether the front and back surfaces of the prefabricated concrete plate 1 are consistent with a drawing;
5) preliminarily fixing the position of the precast concrete plate 1 according to the position of the embedded anchor bolt 4;
6) accurately adjusting the position of the embedded anchor bolt 4 according to the control line, and coinciding with the position of the measurement paying-off;
7) after the transverse joint is adjusted to be straight according to the elevation, the precast concrete slab 1 is in place, and grout needs to be set when the slab is in place; fixing the precast concrete panel 1 by the fixing nut 41, so that the precast concrete panel 1 is fixed on the column 2;
8) the reserved tie bars 12 of the precast concrete slabs 1 and the building block outer wall 3 are built together to form an integral outer wall;
9) and a through seam is reserved between the other side of the column and the outer wall 3 of the building block, and an outer wall plate seam structure is adopted for processing.
The integrated outer wall masonry system is simple and convenient to construct, can reduce the thickness of the outer wall covering plate of the column 2, reduce the risk of the convex beam and the convex column, increase the building area and well compensate for short plates on the masonry outer wall.
The above embodiments are merely preferred embodiments of the present disclosure, which are not intended to limit the present disclosure, and any modifications, equivalents, improvements and the like, which are within the spirit and principle of the present disclosure, should be included in the scope of the present disclosure.

Claims (9)

1. A construction method of an integrated exterior wall masonry system is characterized in that: the integrated outer wall masonry system comprises a column, a precast concrete plate and a building block outer wall; wherein, an embedded anchor bolt is fixed on the column; the precast concrete plate is provided with a through hole; the embedded anchor bolt penetrates through the through hole and is in threaded connection with a fixing nut; reserving a tie bar on the precast concrete slab; the building block outer walls are respectively built on two sides of the column, wherein the building block outer wall and the tie bar tie on one side are provided with a seam structure, and a seam structure is arranged between the building block outer wall and the column on the other side;
the method comprises the following construction steps:
1) prefabricating a precast concrete slab in a factory;
2) selecting a proper lifting appliance according to the form of the component and the lifting height;
3) the precast concrete slab is lifted off the ground, whether the precast concrete slab is horizontal or not and whether the stress condition of each lifting point is uniform or not are checked, and the precast concrete slab can be lifted to a construction position after the member reaches the horizontal state and the stress of each lifting hook is uniform;
4) stopping the prefabricated concrete plate from descending when the distance from the installation position is 50cm, and checking whether the front and back surfaces of the prefabricated concrete plate are consistent with a drawing;
5) preliminarily fixing the position of the precast concrete plate according to the position of the embedded anchor bolt;
6) accurately adjusting the position of the embedded anchor bolt according to the control line, and coinciding with the position of the measurement paying-off;
7) after the transverse joint is adjusted to be straight according to the elevation, the precast concrete slab is in place, and grout needs to be set when the precast concrete slab is in place; fixing the precast concrete plate through a fixing nut, so that the precast concrete plate is fixed on the column;
8) building the reserved tie bars of the precast concrete slabs and the outer wall of the building blocks together to form an integral outer wall;
9) and a through seam is reserved between the other side of the column and the outer wall of the building block, and the outer wall plate seam structure is adopted for processing.
2. The construction method of the integrated exterior wall masonry system according to claim 1, wherein: the manufacturing process of the precast concrete plate in the step 1) comprises the following steps:
1-1), cleaning a die table, spraying a release agent, and fixing a steel template as required;
1-2), fixing tie bars of a concrete slab on the steel formwork;
1-3), fixing a demoulding anchor bolt and a hanging anchor bolt as a demoulding hanging mould sleeve;
1-4), reserving a sleeve so as to leave a mounting through hole;
1-5), pouring common concrete to a specified thickness to form a flat plate, vibrating, and after initial setting;
1-6), covering the protective film and carrying out steam curing;
1-7), after the curing time is enough and the concrete strength is reached, removing the formwork and warehousing, and finishing the manufacture of the precast concrete slab.
3. The construction method of the integrated exterior wall masonry system according to claim 1, wherein: the post includes H shaped steel, H shaped steel is by the web to and the welding constitute at the web both ends and with the web vertically edge of a wing, pre-buried crab-bolt welds on the web.
4. The construction method of the integrated exterior wall masonry system according to claim 3, wherein: concrete is filled between flanges in the H-shaped steel.
5. The construction method of the integrated exterior wall masonry system according to claim 1, wherein: the steel bar mesh and the tie steel bar are tied.
6. The construction method of the integrated exterior wall masonry system according to claim 1, wherein: and heat-insulating rock wool is filled between the column and the precast concrete plate as well as between the column and the outer wall of the building block.
7. The construction method of the integrated exterior wall masonry system according to claim 1, wherein: and sealant is filled in the seam structure.
8. The construction method of the integrated exterior wall masonry system according to claim 6, wherein: the building block outer wall close to one side of the seam structure comprises a square steel pipe constructional column, an anchor bar is welded on the square steel pipe constructional column, and the anchor bar is connected with a reinforcing mesh.
9. The construction method of the integrated exterior wall masonry system according to claim 1, wherein: and the outer surfaces of the precast concrete slab and the outer wall of the building block are sequentially paved with a steel wire mesh, alkali-resistant glass fiber mesh cloth and outer wall painting paint.
CN201910868872.2A 2019-09-16 2019-09-16 Construction method of integrated exterior wall masonry system Active CN110685373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910868872.2A CN110685373B (en) 2019-09-16 2019-09-16 Construction method of integrated exterior wall masonry system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910868872.2A CN110685373B (en) 2019-09-16 2019-09-16 Construction method of integrated exterior wall masonry system

Publications (2)

Publication Number Publication Date
CN110685373A true CN110685373A (en) 2020-01-14
CN110685373B CN110685373B (en) 2020-12-29

Family

ID=69109127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910868872.2A Active CN110685373B (en) 2019-09-16 2019-09-16 Construction method of integrated exterior wall masonry system

Country Status (1)

Country Link
CN (1) CN110685373B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592739A (en) * 2022-03-22 2022-06-07 辽宁省城乡市政工程集团有限责任公司 Semi-assembly type ultra-deep superposed water storage tank and construction process

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333825A (en) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 Construction Method of Transfer Floor of Frame-supported Steel Concrete Beam Structure of High-Rise Building
CN201367654Y (en) * 2008-12-12 2009-12-23 北京工业大学 Combined shear wall of steel tube concrete, steel plate with holes and concrete
CN102926503A (en) * 2012-03-19 2013-02-13 南京旭建新型建材股份有限公司 Fireproof beam column applying autoclaved lightweight aerated concrete ultrathin plate
CN202831399U (en) * 2012-10-30 2013-03-27 杨华龙 Bearing column structure for integrated building
CN103982041A (en) * 2014-05-07 2014-08-13 杜景云 Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
KR20140108815A (en) * 2013-02-28 2014-09-15 (주)더나은구조엔지니어링 Open channel and H-shaped composite beam and steel structure using the same
CN105064543A (en) * 2015-09-09 2015-11-18 歌山建设集团有限公司 Formwork-free constructional column and construction method
JP2015535315A (en) * 2013-01-25 2015-12-10 ジョン ウー カン H-bar, and method for installing form using this H-bar and non-metallic plate
CN105239726A (en) * 2015-09-01 2016-01-13 同济大学 Prefabricated steel-reinforced concrete combined special-shaped energy-dissipating column
CN105908864A (en) * 2016-05-25 2016-08-31 杭州江润科技有限公司 Interface crack preventing structure for filling brickwork and framework shear wall and construction method
CN106193292A (en) * 2016-07-16 2016-12-07 江南大学 A kind of steel frame assembled integral reinforced concrete shear wall structure system
KR20180005946A (en) * 2016-07-07 2018-01-17 주식회사 액트파트너 Prefabricated src structure for column and the manufacturing method thereof
CN206971462U (en) * 2017-05-31 2018-02-06 中国建筑第八工程局有限公司 Fill the connecting pole of wall
CN108118796A (en) * 2018-01-03 2018-06-05 浙江绿筑集成科技有限公司 A kind of assembled fire prevention integrated building component and its construction method
CN208363358U (en) * 2018-05-09 2019-01-11 李藏柱 The connection structure of concrete prefabricated panel and steel column
CN109594690A (en) * 2018-12-24 2019-04-09 湖北神州建材有限责任公司 A kind of assembled architecture high-performance steam-pressing aero-concrete circuit board external wall structure
CN109797908A (en) * 2019-01-31 2019-05-24 江南大学 A kind of partial precast fashioned iron-concrete combination column and its application based on side plate

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333825A (en) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 Construction Method of Transfer Floor of Frame-supported Steel Concrete Beam Structure of High-Rise Building
CN201367654Y (en) * 2008-12-12 2009-12-23 北京工业大学 Combined shear wall of steel tube concrete, steel plate with holes and concrete
CN102926503A (en) * 2012-03-19 2013-02-13 南京旭建新型建材股份有限公司 Fireproof beam column applying autoclaved lightweight aerated concrete ultrathin plate
CN202831399U (en) * 2012-10-30 2013-03-27 杨华龙 Bearing column structure for integrated building
JP2015535315A (en) * 2013-01-25 2015-12-10 ジョン ウー カン H-bar, and method for installing form using this H-bar and non-metallic plate
KR20140108815A (en) * 2013-02-28 2014-09-15 (주)더나은구조엔지니어링 Open channel and H-shaped composite beam and steel structure using the same
CN103982041A (en) * 2014-05-07 2014-08-13 杜景云 Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
CN105239726A (en) * 2015-09-01 2016-01-13 同济大学 Prefabricated steel-reinforced concrete combined special-shaped energy-dissipating column
CN105064543A (en) * 2015-09-09 2015-11-18 歌山建设集团有限公司 Formwork-free constructional column and construction method
CN105908864A (en) * 2016-05-25 2016-08-31 杭州江润科技有限公司 Interface crack preventing structure for filling brickwork and framework shear wall and construction method
KR20180005946A (en) * 2016-07-07 2018-01-17 주식회사 액트파트너 Prefabricated src structure for column and the manufacturing method thereof
CN106193292A (en) * 2016-07-16 2016-12-07 江南大学 A kind of steel frame assembled integral reinforced concrete shear wall structure system
CN206971462U (en) * 2017-05-31 2018-02-06 中国建筑第八工程局有限公司 Fill the connecting pole of wall
CN108118796A (en) * 2018-01-03 2018-06-05 浙江绿筑集成科技有限公司 A kind of assembled fire prevention integrated building component and its construction method
CN208363358U (en) * 2018-05-09 2019-01-11 李藏柱 The connection structure of concrete prefabricated panel and steel column
CN109594690A (en) * 2018-12-24 2019-04-09 湖北神州建材有限责任公司 A kind of assembled architecture high-performance steam-pressing aero-concrete circuit board external wall structure
CN109797908A (en) * 2019-01-31 2019-05-24 江南大学 A kind of partial precast fashioned iron-concrete combination column and its application based on side plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592739A (en) * 2022-03-22 2022-06-07 辽宁省城乡市政工程集团有限责任公司 Semi-assembly type ultra-deep superposed water storage tank and construction process
CN114592739B (en) * 2022-03-22 2024-04-26 辽宁省城乡市政工程集团有限责任公司 Semi-assembled ultra-deep superposed water storage tank and construction process

Also Published As

Publication number Publication date
CN110685373B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN109235702B (en) Assembled double-steel-plate combined shear wall structure with ribs and construction method thereof
CN104912257A (en) Prefabricated special-shaped light-steel composite wall board and mounting method thereof
CN204385886U (en) Villages and small towns low layer assembling damping architectural structure system
CN102140842B (en) Industrial construction method for multistory residence system with clamp die frame core wall self-bearing structure
CN108842944A (en) A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method
CN104863290A (en) Combined wall formed by single prefabricated wall sections and construction method
CN108005265A (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer and its preparation and construction method
CN207739437U (en) A kind of prefabricated steel reinforced concrete shear wall structure
CN110284587A (en) A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor
CN108005264A (en) A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method
KR20050054407A (en) Steel concrete structure using angle shapes
CN110685373B (en) Construction method of integrated exterior wall masonry system
CN105019598A (en) Reinforced lightweight plate for grooved reinforced concrete pavement
CN210888330U (en) Prefabricated building enclosure
CN110593440B (en) Construction method of prefabricated wall structure
CN211499282U (en) Integrated outer wall masonry system
CN108005266A (en) A kind of strip frame precast reinforced concrete shear wall structure and preparation and installation method
CN115247498A (en) Fixed bolster of prefabricated wallboard and contain braced system of this support
CN218374567U (en) Can fix a position ALC wallboard reinforced structure that can exempt from to plaster
CN207739439U (en) A kind of steel framework constraint precast reinforced concrete shear wall structure
CN208202224U (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer
CN110847435B (en) Peripheral retaining wall body of assembled building
CN211597570U (en) Prefabricated assembled stitch of finished product and accessory node structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200114

Assignee: Anhui Zhihong Precision Construction Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023990000037

Denomination of invention: A construction method of integrated exterior wall masonry system

Granted publication date: 20201229

License type: Common License

Record date: 20230113

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200114

Assignee: Jiangxi Huahong Jinggong Steel Structure Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034645

Denomination of invention: A Construction Method for Integrated Exterior Wall Masonry System

Granted publication date: 20201229

License type: Common License

Record date: 20230413

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200114

Assignee: Jiangsu Lvjian Jinggong Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2023980034833

Denomination of invention: A Construction Method for Integrated Exterior Wall Masonry System

Granted publication date: 20201229

License type: Common License

Record date: 20230421

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200114

Assignee: Weinan Guokong Jinggong Green Building Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980009941

Denomination of invention: A construction method for an integrated exterior wall masonry system

Granted publication date: 20201229

License type: Common License

Record date: 20240717

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200114

Assignee: Chongqing Kunda Precision Integrated Technology Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980014873

Denomination of invention: A construction method for an integrated exterior wall masonry system

Granted publication date: 20201229

License type: Common License

Record date: 20240914

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20200114

Assignee: Anhui Huiyu Construction Engineering Co.,Ltd.

Assignor: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Contract record no.: X2024980016463

Denomination of invention: A construction method for an integrated exterior wall masonry system

Granted publication date: 20201229